Urban building solid resource supervision method and system
By generating regulatory early warning times and nodes, collecting project information, allocating service resources, and generating regulatory paths, the shortcomings in construction waste supervision have been addressed, achieving effective resource utilization and environmental protection.
Patent Information
- Application Number
- CN202411138032.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-19
AI Technical Summary
The long-term accumulation of construction waste has a serious impact on the environment and safety. The lack of an effective regulatory mechanism leads to resource waste and potential dangers.
By acquiring project process nodes and schedules, regulatory warning times and nodes are generated to monitor project progress, collect project information, confirm legality, allocate service resources according to total resources, and generate regulatory paths to ensure effective use of resources and timely and targeted supervision.
It enables full-process supervision of solid resources in construction projects, avoids resource waste, ensures proper handling, promptly identifies problems and takes measures, and improves the efficiency and accuracy of supervision.
Smart Images

Figure CN119027056A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of urban resource processing, and in particular to a method and system for supervising urban building solid resources. Background Art
[0002] Construction waste is solid waste generated during the construction, reconstruction, expansion or demolition of buildings. According to the different sources of construction waste, it can be divided into construction waste and demolition waste. Construction waste, as the name suggests, is solid waste generated in new construction, reconstruction or expansion projects, while demolition waste is construction waste generated when buildings are demolished. Construction waste has a wide range of erosion effects on our living environment. If we ignore construction waste for a long time, it will have a bad impact on urban environmental sanitation, living conditions, land quality assessment, etc. First of all, a large amount of land piled with construction waste will reduce the quality of the soil and reduce the production capacity of the soil; construction waste piled in the air will affect the air quality, and some dust particles will be suspended in the air, which is harmful to human health; during the stacking process of construction waste, long-term accumulation will cause harmful substances in construction waste to penetrate into the underground waters and pollute the water environment; if construction waste is piled in the city, it will be detrimental to the urban environment and aesthetics; the stacking of construction waste may have certain safety hazards, and some accidents may occur at any time. Therefore, it is necessary to clean up urban construction waste in a timely manner and establish a good supervision mechanism to ensure urban life. Summary of the invention
[0003] In view of the above-mentioned defects, an embodiment of the present invention discloses a method and system for supervising solid resources of urban buildings, which can effectively supervise the solid resources throughout the whole process.
[0004] The first aspect of the embodiment of the present invention discloses a method for supervising urban building solid resources, comprising:
[0005] Obtain project process nodes and project schedule, generate solid resource supervision warning time and supervision nodes, and generate project information collection time according to project process nodes;
[0006] When the solid resource supervision warning time is met, the project progress is monitored at preset time intervals to confirm whether to start the supervision process, and the supervision nodes include different supervision times and corresponding supervision projects;
[0007] In response to the supervision process start instruction, the project information of the corresponding project process node is collected when the project information collection time is met, the project information includes project personnel and project execution path, and the project information is confirmed at the first time and the legality of project execution and the total amount of solid resources are calculated according to the project information;
[0008] When the legality exceeds the set threshold, a corresponding number of service resources are allocated according to the total amount of solid resources, and a supervision path corresponding to the process node of this project is generated;
[0009] Whenever the supervision time corresponding to any supervision node is reached, the current project process node is supervised according to the supervision path.
[0010] As an optional implementation manner, in the first aspect of the embodiment of the present invention, generating a solid resource supervision warning time and a supervision node includes:
[0011] Collect the progress duration of the same project process nodes in history and generate the progress duration range of the project process nodes;
[0012] Calculate the solid resource supervision warning time according to the progress time range and the preset calculation coefficient;
[0013] Obtain the corresponding project information according to the project process node, and generate a supervision node for each execution node in the project information.
[0014] As an optional implementation manner, in a first aspect of the embodiment of the present invention, confirming the project information at the first time includes:
[0015] Obtain the corresponding minimum professional level of the project personnel according to the project process node, and generate at least one matching service path; the service path is used to indicate the execution items and execution time of the project personnel;
[0016] Compare and see whether the professional level of the project personnel exceeds the minimum professional level of project personnel.
[0017] As an optional implementation manner, in the first aspect of the embodiment of the present invention, calculating the project execution legality according to the project information includes:
[0018] Obtain the professional level and number of operations of the project personnel in the project information, and select the project personnel whose professional level meets the minimum professional level of the project personnel and whose number of operations meets the preset standards as the comparison project personnel;
[0019] Calculate and compare the proportion of project personnel in all project personnel in the project information, obtain the execution path in the project information, and calculate the matching degree between the execution path and the service path;
[0020] The legality of project execution is calculated based on the ratio and matching degree.
[0021] As an optional implementation manner, in the first aspect of the embodiment of the present invention, allocating a corresponding number of service resources according to the total amount of solid resources includes:
[0022] A relationship table between the total amount of solid resources and the number of divisions is preset, and the total amount of fixed resources is divided into a number of segments of solid resources of corresponding number of divisions according to the relationship table;
[0023] Calculate the average professional level of all project personnel, and evenly distribute the total number of project personnel according to the number of divisions, so that the number of project personnel corresponding to each section of solid resources is consistent, and the difference between the average professional levels of project personnel corresponding to each section of solid resources is less than the set threshold;
[0024] When the project process node includes a transportation node, a corresponding number of transportation tools are allocated according to the total amount of fixed resources and the single carrying capacity of the transportation tools.
[0025] As an optional implementation, in the first aspect of the embodiment of the present invention, generating a supervision path corresponding to the process node of this project includes:
[0026] Obtain one or more execution projects corresponding to the process node of this project, and obtain the execution tools and execution order corresponding to the execution projects;
[0027] Assign execution tools corresponding to execution projects and generate supervision paths based on the execution order.
[0028] As an optional implementation manner, in the first aspect of the embodiment of the present invention, it also includes:
[0029] Classify solid resources and collect project process nodes, project schedules and project information corresponding to each type of solid resources;
[0030] Generate regulatory reference information for each type of solid resource.
[0031] A second aspect of an embodiment of the present invention discloses an urban building solid resource supervision system, comprising:
[0032] Information acquisition module: used to obtain project process nodes and project schedule, generate solid resource supervision warning time and supervision nodes, and generate project information collection time according to project process nodes;
[0033] Start confirmation module: used to monitor the project progress at preset time intervals to confirm whether to start the supervision process when the solid resource supervision warning time is met. The supervision node includes different supervision times and corresponding supervision items;
[0034] Information confirmation module: used to respond to the supervision process start instruction, collect the project information of the corresponding project process node when the project information collection time is met, the project information includes project personnel, project execution path, and confirm the project information at the first time and calculate the legality of project execution and the total amount of solid resources based on the project information;
[0035] Process allocation module: when the legitimacy exceeds the set threshold, a corresponding number of service resources are allocated according to the total amount of solid resources, and a supervision path corresponding to the process node of this project is generated;
[0036] Node supervision module: used to supervise the current project process node according to the supervision path every time the supervision time corresponding to any supervision node is reached.
[0037] As an optional implementation, in the second aspect of the embodiment of the present invention, generating a solid resource supervision warning time and a supervision node includes:
[0038] Collect the progress duration of the same project process nodes in history and generate the progress duration range of the project process nodes;
[0039] Calculate the solid resource supervision warning time according to the progress time range and the preset calculation coefficient;
[0040] Obtain the corresponding project information according to the project process node, and generate a supervision node for each execution node in the project information.
[0041] As an optional implementation manner, in a second aspect of the embodiment of the present invention, confirming the project information at the first time includes:
[0042] Obtain the corresponding minimum professional level of the project personnel according to the project process node, and generate at least one matching service path; the service path is used to indicate the execution items and execution time of the project personnel;
[0043] Compare and see whether the professional level of the project personnel exceeds the minimum professional level of project personnel.
[0044] As an optional implementation manner, in a second aspect of the embodiment of the present invention, calculating the project execution legality according to the project information includes:
[0045] Obtain the professional level and number of operations of the project personnel in the project information, and select the project personnel whose professional level meets the minimum professional level of the project personnel and whose number of operations meets the preset standards as the comparison project personnel;
[0046] Calculate and compare the proportion of project personnel in all project personnel in the project information, obtain the execution path in the project information, and calculate the matching degree between the execution path and the service path;
[0047] The legality of project execution is calculated based on the ratio and matching degree.
[0048] As an optional implementation manner, in the second aspect of the embodiment of the present invention, allocating a corresponding number of service resources according to the total amount of solid resources includes:
[0049] A relationship table between the total amount of solid resources and the number of divisions is preset, and the total amount of fixed resources is divided into a number of segments of solid resources of corresponding number of divisions according to the relationship table;
[0050] Calculate the average professional level of all project personnel, and evenly distribute the total number of project personnel according to the number of divisions, so that the number of project personnel corresponding to each section of solid resources is consistent, and the difference between the average professional levels of project personnel corresponding to each section of solid resources is less than the set threshold;
[0051] When the project process node includes a transportation node, a corresponding number of transportation tools are allocated according to the total amount of fixed resources and the single carrying capacity of the transportation tools.
[0052] As an optional implementation, in the second aspect of the embodiment of the present invention, generating a supervision path corresponding to the process node of this project includes:
[0053] Obtain one or more execution projects corresponding to the process node of this project, and obtain the execution tools and execution order corresponding to the execution projects;
[0054] Assign execution tools corresponding to execution projects and generate supervision paths based on the execution order.
[0055] As an optional implementation manner, in the second aspect of the embodiment of the present invention, it also includes:
[0056] Classify solid resources and collect project process nodes, project schedules and project information corresponding to each type of solid resources;
[0057] Generate regulatory reference information for each type of solid resource.
[0058] The third aspect of an embodiment of the present invention discloses an electronic device, comprising: a memory storing executable program code; a processor coupled to the memory; the processor calls the executable program code stored in the memory to execute the urban building solid resource supervision method disclosed in the first aspect of the embodiment of the present invention.
[0059] A fourth aspect of an embodiment of the present invention discloses a computer-readable storage medium storing a computer program, wherein the computer program enables a computer to execute the urban building solid resource supervision method disclosed in the first aspect of an embodiment of the present invention.
[0060] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:
[0061] In the embodiment of the present invention, the solid resource supervision warning time and supervision node are generated by obtaining the project process node and the project schedule, and the project information collection time is generated according to the project process node. When the solid resource supervision warning time is met, the project progress is monitored at preset time intervals to confirm whether the supervision process is started, ensuring that specific supervision projects can be effectively supervised at different stages. When the project information collection time is met, the project information of the corresponding project process node is collected, and the legitimacy of the project information is confirmed, which helps to accurately grasp the processing of solid resources and ensure the reasonable processing of solid resources. If the legitimacy of the project exceeds the set threshold, the corresponding number of service resources is allocated according to the total amount of solid resources, which ensures the effective use of service resources and avoids the waste of resources. At the same time, the system will also generate the supervision path corresponding to the project process node according to the actual situation of the project, which provides clear guidance for subsequent supervision work. The embodiment ensures the timeliness and pertinence of supervision, helps to find problems in time and take corresponding measures, and realizes the full supervision of the utilization of solid resources in construction projects through refined process and time management. At the same time, by allocating service resources and generating supervision paths according to the actual situation of the project, the effective utilization of resources and the pertinence of supervision are ensured. BRIEF DESCRIPTION OF THE DRAWINGS
[0062] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0063] Figure 1 It is a flow chart of a method for supervising urban building solid resources provided by an embodiment of the present invention;
[0064] Figure 2 It is a structural schematic diagram of a solid resource monitoring device for urban buildings provided by an embodiment of the present invention;
[0065] Figure 3 It is a structural schematic diagram of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0066] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0067] It should be noted that the terms "first", "second", "third", "fourth", etc. in the specification and claims of the present invention are used to distinguish different objects rather than to describe a specific order. The terms "including" and "having" in the embodiments of the present invention and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device including a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0068] The embodiment of the present invention discloses a method, system, electronic device and storage medium for supervising solid resources of urban buildings. The solid resource supervision warning time and supervision node are generated by acquiring the project process node and the project schedule, and the project information collection time is generated according to the project process node. When the solid resource supervision warning time is met, the project progress is monitored at preset time intervals to confirm whether to start the supervision process, so as to ensure that specific supervision projects can be effectively supervised at different stages. When the project information collection time is met, the project information of the corresponding project process node is collected, and the legality of the project information is confirmed, which is helpful to accurately grasp the processing of solid resources and ensure the reasonable processing of solid resources. If the legality of the project exceeds the set threshold, the corresponding number of service resources is allocated according to the total amount of solid resources, which ensures the effective use of service resources and avoids the waste of resources. At the same time, the system will also generate the supervision path corresponding to the current project process node according to the actual situation of the project, which provides clear guidance for subsequent supervision work. The embodiment ensures the timeliness and pertinence of supervision, helps to find problems in time and take corresponding measures, and realizes the whole process supervision of the utilization of solid resources in construction projects through refined process and time management. At the same time, by allocating service resources and generating supervision paths according to the actual situation of the project, the effective use of resources and the pertinence of supervision are ensured.
[0069] Embodiment 1
[0070] See also Figure 1 , Figure 1 It is a flow chart of a method for supervising solid resources of urban buildings disclosed in an embodiment of the present invention. Among them, the execution subject of the method described in the embodiment of the present invention is an execution subject composed of software and / or hardware, and the execution subject can receive relevant information by wired or / and wireless means, and can send certain instructions. Of course, it can also have certain processing functions and storage functions. The execution subject can control multiple devices, such as a remote physical server or cloud server and related software, or it can be a local host or server and related software that performs related operations on a device placed somewhere. In some scenarios, multiple storage devices can also be controlled, and the storage devices can be placed in the same place or different places as the devices. For example Figure 1 As shown, the urban building solid resource supervision method includes the following steps:
[0071] 101. Obtain project process nodes and project schedule, generate solid resource supervision warning time and supervision nodes, and generate project information collection time based on project process nodes.
[0072] The method first generates the early warning time and supervision nodes of solid resource supervision by obtaining the project process nodes and project schedule. This allows the supervisor to preset key checkpoints according to the actual progress of the project. At the same time, according to the project process nodes, the project information collection time is also generated to ensure that the project information can be collected accurately and timely when needed.
[0073] Furthermore, the solid resource supervision warning time and supervision nodes are generated, including: collecting the progress duration of the same historical project process nodes, generating the progress duration range of the project process nodes; calculating the solid resource supervision warning time according to the progress duration range and the preset calculation coefficient; obtaining the corresponding project information according to the project process node, and generating a supervision node for each execution node in the project information.
[0074] For the ongoing project, the system first needs to collect the progress duration data of the same project process nodes in history. These data should include the actual progress of multiple similar projects so as to analyze and obtain a reasonable progress duration range. Based on the collected historical data, the system uses statistical methods (such as mean, median, standard deviation, etc.) to calculate and generate the progress duration range of the project process node. This range should be able to reflect the normal progress of most projects at this process node. Next, the system calculates the solid resource supervision warning time based on the generated progress duration range and the preset calculation coefficient. This warning time should usually be earlier than the expected completion time of the project process node to leave enough time to deal with possible progress delays or insufficient resources. The preset calculation coefficient can be set according to the actual situation of the project and the company's management strategy, such as a percentage of the progress duration range or a fixed time interval. After generating the solid resource supervision warning time, the system needs to generate a corresponding supervision node for each execution node in the project process. The generation of supervision nodes should be based on the specific content and importance of the project process node. For key execution nodes, such as the procurement, use, and storage of solid resources, more intensive supervision nodes should be set up to ensure the smooth execution of these nodes and the rational use of resources. Each supervision node should contain specific information such as supervision time, supervision content, and supervision standards, so that supervisors can clearly understand the supervision requirements and operating specifications of each node.
[0075] Collect the progress duration data of the same project process nodes in history, usually including the actual progress of multiple similar projects, so as to analyze and obtain a reasonable progress duration range. When calculating the warning time for solid resource supervision, use statistical methods (such as mean, median, standard deviation, etc.) to analyze the collected historical data and calculate the progress duration range of the project process node. For example, the average value of the historical data plus or minus a standard deviation can be used to determine a reasonable progress duration range. According to the actual situation and management strategy of the project, set an early warning coefficient. Exemplarily, the early warning coefficient can be a percentage, indicating the advance amount of the early warning time relative to the expected completion time. For example, if the early warning coefficient is set to 20%, it means that the early warning time will be 20% ahead of the expected completion time. According to the project plan and schedule, calculate the expected completion time of the current project process node, combine the expected completion time with the early warning coefficient, and calculate the solid resource supervision early warning time. Exemplarily, the specific calculation formula can be: early warning time = expected completion time - (estimated completion time * early warning coefficient), where the early warning coefficient is a decimal between 0 and 1, indicating the early warning time relative to the expected completion time. The proportion of the early warning time.
[0076] 102. When the solid resource supervision warning time is met, monitor the project progress at preset time intervals to confirm whether to start the supervision process, and the supervision node includes different supervision times and corresponding supervision projects.
[0077] When the solid resource supervision warning time is met, the system will monitor the project progress at preset time intervals. This helps to detect abnormalities or deviations in the project progress in a timely manner, so as to decide whether to start the supervision process. Supervision nodes are key points in the supervision process, and each node has a specific supervision time and corresponding supervision items. This ensures that detailed inspections can be carried out on specific supervision items at different stages of the project.
[0078] 103. In response to the supervision process start instruction, the project information of the corresponding project process node is collected when the project information collection time is met. The project information includes project personnel and project execution path, and the project information is confirmed at the first time, and the legality of the project execution and the total amount of solid resources are calculated based on the project information.
[0079] Once the supervision process is started, the system will collect project information for the corresponding project process nodes when the project information collection time is met. This information includes key data such as project personnel and project execution path. After collecting the information, the system will confirm the accuracy of this information as soon as possible, and calculate the legality of project execution and the total amount of solid resources based on the project information. This helps to ensure the compliance of the project and accurately grasp the utilization of solid resources.
[0080] The first time is a point in time, which means a point in time after a certain time interval after the project information is collected. It does not mean that the project information is confirmed immediately after the project information is collected. There is a certain time interval after the project information is collected. This duration is set according to the actual situation, such as 5 minutes, 30 minutes, 1 hour, 24 hours after the information collection is completed.
[0081] Specifically, confirming the project information at the first time includes: obtaining the corresponding minimum professional level of project personnel according to the project process node, and generating at least one matching service path; the service path is used to indicate the execution items and execution time of the project personnel; comparing whether the professional level of the project personnel exceeds the minimum professional level of the project personnel.
[0082] In this example, complete project information is collected first, including basic project information, staffing, time nodes, etc. According to the process nodes and specific requirements of the project, the minimum professional level of the project personnel required for each node is determined. According to the minimum professional level and project process nodes, corresponding service paths are planned for project personnel of different levels. The professional level of all project personnel is extracted from the project information. The set filtering conditions are used, that is, the professional level must meet the minimum professional level of the project personnel.
[0083] Furthermore, the professional level and number of jobs of the project personnel in the project information are obtained, and the project personnel whose professional level meets the minimum professional level of the project personnel and whose number of jobs meets the preset standards are screened as comparison project personnel; the proportion of the comparison project personnel in all the project personnel in the project information is calculated, and the execution path in the project information is obtained, and the matching degree of the execution path and the service path is calculated; the legality of the project execution is calculated based on the proportion and matching degree.
[0084] In order to more accurately evaluate the legality of project execution, we can further consider the professional level and number of operations of project personnel, as well as the degree of their matching with the preset standards, and combine the matching degree of the execution path to comprehensively calculate the legality of project execution. Collect the professional level and the expected or assigned number of operations of all project personnel from the project information, and the number of operations that meet the preset standards may be the upper or lower limit of the number to screen and compare project personnel. Of course, in order to improve service quality and ensure service standards, project personnel with more operations are usually selected, which means they have more project experience. Calculate the proportion of comparison project personnel in all project personnel in the project information. The proportion calculation formula is: number of comparison project personnel / total number of project personnel, and compare the calculated proportion with the comparison value. If the proportion exceeds the comparison value, it is considered that the project personnel configuration in the project information meets the requirements, and the project information is confirmed. During the application process, workload assessment methods (such as analogy method, WBS splitting method, etc.) can be used to estimate the total workload required for the project. The actual execution path is compared with the previously generated service path to calculate the matching degree between them. The matching degree can be determined by comparing the task allocation, execution order, whether the key activities are consistent, etc. The matching degree can be expressed by quantitative indicators (such as similarity percentage) or qualitative evaluation (such as high, medium, and low matching degrees). The proportion of project personnel and the matching degree between the execution path and the service path are used as two main indicators. Combined with other possible evaluation factors (such as project funding, environmental impact assessment, etc.), the legality of the project execution is calculated together. Methods such as weighted scoring method or fuzzy comprehensive evaluation method can be used to integrate these indicators and obtain a comprehensive project execution legality score or grade. According to the calculated project execution legality score or grade, the project is evaluated and feedback is given. If the score or grade is low, it means that there may be illegal or non-compliant situations in the project execution process, which requires further investigation and corresponding corrective measures.
[0085] The execution path in the embodiment includes the execution order. If transportation is involved, the execution path includes the transportation path. In the specific calculation, multiple aspects such as static partial matching, parameter partial matching, and sequential matching are considered. Different weights are set corresponding to the importance of different factors. Exemplarily, the weight of static partial matching is 0.6, the weight of parameter partial matching is 0.4, and the sequential matching is not considered. The matching degree calculation formula can be: matching degree = (static part score * 0.6 + parameter part score * 0.4) / 10. Among them, the static part includes, for example, a fixed string or a specified path that must be executed and cannot be changed. For example, at node a, job link a1 must be completed, and the job sequence of job link a1 is a11. These are all specified and cannot be changed. When comparing, the static part is used. For example, at node b, job link b1 needs to be completed. The reference sequence of job link b1 is b11, but it is not unique. There can also be b12, b13 and b14, among which b12 and b13 are closer to and preferred to b11. Then, during the matching calculation, see whether it is b14. If it is b14, it does not match. Here, the part with variability, certain changes or selection space is used as the parameter part. Or in terms of transportation path, the reference path is c, which is the most preferred path, but the c1 path is planned according to the actual situation, and this path is also used as the parameter part.
[0086] 104. When the legality exceeds the set threshold, a corresponding number of service resources are allocated according to the total amount of solid resources, and a supervision path corresponding to the process node of this project is generated.
[0087] If the legality of the project exceeds the set threshold (i.e. the project is within the compliance range), the system will allocate the corresponding number of service resources based on the total amount of solid resources. This ensures the effective use of service resources and avoids waste of resources. At the same time, the system will also generate the supervision path corresponding to the process node of this project based on the actual situation of the project. This provides clear guidance for subsequent supervision work.
[0088] Specifically, a corresponding number of service resources are allocated according to the total amount of solid resources, including: presetting a relationship table between the total amount of solid resources and the number of divisions, and dividing the total amount of fixed resources into a number of segments of solid resources of a corresponding number of divisions according to the relationship table; calculating the average professional level of all project personnel, and evenly allocating the total number of project personnel according to the number of divisions, so that the number of project personnel corresponding to each segment of solid resources is consistent, and the difference between the average professional levels of the project personnel corresponding to each segment of fixed resources is less than a set threshold; when the project process node includes a transportation node, a corresponding number of transportation tools are allocated according to the total amount of fixed resources and the single carrying capacity of the transportation tool.
[0089] In the above, according to the actual situation and needs of the project, a relationship table between the total amount of solid resources and the number of divisions is preset, for example, 0-1000 tons, the number of divisions is 1, 1001-5000 tons, the number of divisions is 2, 5001-10000, the number of divisions is 3, and so on. According to the total amount of solid resources and the preset relationship table, the total amount of solid resources is divided into several sections of solid resources with corresponding division numbers. The total number of project personnel is evenly distributed according to the number of divided solid resource sections. When allocating, it is necessary to consider that the difference between the average professional level of the project personnel corresponding to each section of solid resources is less than the set threshold, sort the project personnel according to the professional level, and allocate the project personnel to each solid resource section from high to low or from low to high in turn, ensuring that the average professional level of each section is close and the difference is less than the set threshold. According to the total amount of fixed resources and the single carrying capacity of the transportation tool, calculate the required number of transportations, and allocate the corresponding number of transportation tools according to the required number of transportations. If one transportation cannot complete the transportation of all resources, it is necessary to ensure that there are enough transportation tools for multiple transportations.
[0090] The above generation of the supervision path specifically includes obtaining one or more execution projects corresponding to the process node of this project, and obtaining the execution tools and execution order corresponding to the execution projects; assigning the execution tools corresponding to the execution projects, and generating the supervision path according to the execution order. Execution tools include transportation tools, operating tools, etc. When transportation is required, the supervision path also includes supervision of the transportation process.
[0091] 105. Whenever the supervision time corresponding to any supervision node is reached, the current project process node is supervised according to the supervision path.
[0092] Whenever the supervision time corresponding to any supervision node is reached, the system will supervise the current project process node according to the pre-generated supervision path. This ensures the timeliness and pertinence of supervision, helps to find problems in time and take corresponding measures.
[0093] The embodiment also includes: classifying solid resources, collecting project process nodes, project schedules and project information corresponding to each type of solid resources; and generating regulatory reference information for each type of solid resources.
[0094] Different solid resources are classified and the corresponding information is classified and managed for data analysis and traceability. Correspondingly, the solid resource supervision warning time, supervision path, etc. generated in the past for each type of solid resource are saved accordingly. Then, a supervision reference information is generated by combining the project information, solid resource supervision warning time, supervision path, etc. that have been executed in each type of solid resource. For example, the solid resources of category a have been supervised four times, and the project information, solid resource supervision warning time and supervision path are different each time. In combination with the four situations, common features are selected for retention. For example, project personnel a is used in the four supervisions, and project personnel a is included in the generated supervision reference information. In the four supervision processes, there are execution tools b in three times, and the supervision does not include execution tools b. Since execution tools b still appear more times, execution tools b are also included in the supervision and warning plan of this type of solid resources. For individual characteristics, that is, the four different supervision situations, select the retention with higher priority. The selection of priority can be comprehensively based on safety and economy.
[0095] Embodiment 2
[0096] See also Figure 2 , Figure 2 Schematic diagram of the structure of a city building solid resource supervision system disclosed in an embodiment of the present invention. Figure 2 As shown, the urban building solid resource supervision system may include: an information acquisition module 201, a start confirmation module 202, an information confirmation module 203, a process allocation module 204 and a node supervision module 205, wherein the information acquisition module 201 is used to obtain project process nodes and project schedules, generate solid resource supervision warning time and supervision nodes, and generate project information collection time according to project process nodes; the start confirmation module 202 is used to monitor the project progress at preset time intervals to confirm whether to start the supervision process when the solid resource supervision warning time is met, and the supervision nodes include different supervision times and corresponding supervision projects; the information confirmation module Block 203: used to respond to the supervision process start instruction, collect the project information of the corresponding project process node when the project information collection time is met, the project information includes project personnel, project execution path, and confirm the project information at the first time and calculate the project execution legality and the total amount of solid resources based on the project information; process allocation module 204: used to allocate a corresponding number of service resources according to the total amount of solid resources when the legality exceeds the set threshold, and generate the supervision path corresponding to the current project process node; node supervision module 205: used to supervise the current project process node according to the supervision path when the supervision time corresponding to any supervision node is reached.
[0097] In the information acquisition module 201, the solid resource supervision warning time and supervision node are generated, including: collecting the progress duration of the same historical project process nodes, generating the progress duration range of the project process nodes; calculating the solid resource supervision warning time according to the progress duration range and the preset calculation coefficient; obtaining the corresponding project information according to the project process node, and generating a supervision node for each execution node in the project information.
[0098] In the information confirmation module 203, the project information is confirmed at the first time, including: obtaining the corresponding minimum professional level of the project personnel according to the project process node, and generating at least one matching service path; the service path is used to indicate the execution items and execution time of the project personnel; comparing whether the professional level of the project personnel exceeds the minimum professional level of the project personnel.
[0099] Furthermore, in the information confirmation module 203, the legality of the project execution is calculated based on the project information, including: obtaining the professional level and the number of operations of the project personnel in the project information, screening the project personnel whose professional level meets the minimum professional level of the project personnel and whose number of operations meets the preset standards as comparison project personnel; calculating the proportion of the comparison project personnel in all the project personnel in the project information, and obtaining the execution path in the project information, calculating the matching degree between the execution path and the service path; and calculating the legality of the project execution based on the proportion and the matching degree.
[0100] In the process allocation module 204, a corresponding number of service resources are allocated according to the total amount of solid resources, including: a relationship table between the total amount of solid resources and the number of divisions is preset, and the total amount of fixed resources is divided into a number of segments of solid resources of a corresponding number of divisions according to the relationship table; the average professional level of all project personnel is calculated, and the total number of project personnel is evenly allocated according to the number of divisions, so that the number of project personnel corresponding to each segment of solid resources is consistent, and the difference between the average professional levels of the project personnel corresponding to each segment of fixed resources is less than a set threshold; when the project process node includes a transportation node, a corresponding number of transportation tools are allocated according to the total amount of fixed resources and the single carrying capacity of the transportation tool.
[0101] As an optional implementation manner, in the first aspect of the embodiment of the present invention,
[0102] As an optional implementation manner, in the first aspect of the embodiment of the present invention,
[0103] Embodiment 3
[0104] See also Figure 3 , Figure 3Schematic diagram of the structure of an electronic device disclosed in an embodiment of the present invention. The electronic device may be a computer, a server, etc. Of course, in certain circumstances, it may also be a smart device such as a mobile phone, a tablet computer, a monitoring terminal, and an image acquisition device with processing functions. Figure 3 As shown, the electronic device may include:
[0105] A memory 301 storing executable program codes;
[0106] a processor 302 coupled to the memory 301;
[0107] The processor 302 calls the executable program code stored in the memory 301 to execute part or all of the steps in the urban building solid resource supervision method in the first embodiment.
[0108] The embodiment of the present invention discloses a computer-readable storage medium storing a computer program, wherein the computer program enables a computer to execute part or all of the steps in the urban building solid resource supervision method in the first embodiment.
[0109] The embodiment of the present invention further discloses a computer program product, wherein when the computer program product is run on a computer, the computer is enabled to execute part or all of the steps in the urban building solid resource supervision method in the first embodiment.
[0110] An embodiment of the present invention also discloses an application publishing platform, wherein the application publishing platform is used to publish a computer program product, wherein when the computer program product runs on a computer, the computer executes part or all of the steps in the urban building solid resource supervision method in embodiment one.
[0111] In various embodiments of the present invention, it should be understood that the size of the serial numbers of the processes does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.
[0112] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, i.e., they may be located in one place or distributed over multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0113] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0114] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-accessible memory. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution, can be embodied in the form of a software product, which is stored in a memory and includes several requests for a computer device (which can be a personal computer, a server or a network device, etc., specifically a processor in a computer device) to perform some or all of the steps of the method described in each embodiment of the present invention.
[0115] In the embodiments provided by the present invention, it should be understood that "B corresponding to A" means that B is associated with A, and B can be determined according to A. However, it should also be understood that determining B according to A does not mean determining B only according to A, and B can also be determined according to A and / or other information.
[0116] A person of ordinary skill in the art can understand that some or all of the steps in the various methods of the embodiments can be completed by instructing related hardware through a program, and the program can be stored in a computer-readable storage medium, and the storage medium includes a read-only memory (ROM), a random access memory (RAM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), a one-time programmable read-only memory (OTPROM), an electronically erasable rewritable read-only memory (EEPROM), a compact disc (CD-ROM) or other optical disc storage, magnetic disk storage, magnetic tape storage, or any other computer-readable medium that can be used to carry or store data.
[0117] The above is a detailed introduction to the urban building solid resource supervision method, system, electronic device and storage medium disclosed in the embodiments of the present invention. Specific examples are used in this article to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea; at the same time, for general technical personnel in this field, according to the ideas of the present invention, there will be changes in the specific implementation methods and application scopes. In summary, the content of this specification should not be understood as a limitation on the present invention.
Claims
1. A method for supervising urban building solid resources, characterized in that: include: Obtain project process nodes and project schedule, generate solid resource supervision warning time and supervision nodes, and generate project information collection time according to project process nodes; When the solid resource supervision warning time is met, the project progress is monitored at preset time intervals to confirm whether to start the supervision process, and the supervision nodes include different supervision times and corresponding supervision projects; In response to the supervision process start instruction, the project information of the corresponding project process node is collected when the project information collection time is met, the project information includes project personnel and project execution path, and the project information is confirmed at the first time and the legality of project execution and the total amount of solid resources are calculated according to the project information; When the legality exceeds the set threshold, a corresponding number of service resources are allocated according to the total amount of solid resources, and a supervision path corresponding to the process node of this project is generated; Whenever the supervision time corresponding to any supervision node is reached, the current project process node is supervised according to the supervision path.
2. The urban building solid resource supervision method according to claim 1 is characterized in that: Generate solid resource supervision warning time and supervision nodes, including: Collect the progress duration of the same project process nodes in history and generate the progress duration range of the project process nodes; Calculate the solid resource supervision warning time according to the progress time range and the preset calculation coefficient; Obtain the corresponding project information according to the project process node, and generate a supervision node for each execution node in the project information.
3. The urban building solid resource supervision method according to claim 1 is characterized in that: Confirm project information at the first time, including: Obtain the corresponding minimum professional level of the project personnel according to the project process node, and generate at least one matching service path; the service path is used to indicate the execution items and execution time of the project personnel; Compare and see whether the professional level of the project personnel exceeds the minimum professional level of project personnel.
4. The urban building solid resource supervision method according to claim 3 is characterized in that: Calculate the legality of project execution based on project information, including: Obtain the professional level and number of operations of the project personnel in the project information, and select the project personnel whose professional level meets the minimum professional level of the project personnel and whose number of operations meets the preset standards as the comparison project personnel; Calculate and compare the proportion of project personnel in all project personnel in the project information, obtain the execution path in the project information, and calculate the matching degree between the execution path and the service path; The legality of project execution is calculated based on the ratio and matching degree.
5. The urban building solid resource supervision method according to claim 4 is characterized in that: Allocate corresponding service resources according to the total amount of solid resources, including: A relationship table between the total amount of solid resources and the number of divisions is preset, and the total amount of fixed resources is divided into a number of segments of solid resources of corresponding number of divisions according to the relationship table; Calculate the average professional level of all project personnel, and evenly distribute the total number of project personnel according to the number of divisions, so that the number of project personnel corresponding to each section of solid resources is consistent, and the difference between the average professional levels of project personnel corresponding to each section of solid resources is less than the set threshold; When the project process node includes a transportation node, a corresponding number of transportation tools are allocated according to the total amount of fixed resources and the single carrying capacity of the transportation tools.
6. The urban building solid resource supervision method according to claim 1 is characterized in that: Generate the supervision path corresponding to the process nodes of this project, including: Obtain one or more execution projects corresponding to the process node of this project, and obtain the execution tools and execution order corresponding to the execution projects; Assign execution tools corresponding to execution projects and generate supervision paths based on the execution order.
7. The urban building solid resource supervision method according to claim 1 is characterized in that: Also includes: Classify solid resources and collect project process nodes, project schedules and project information corresponding to each type of solid resources; Generate regulatory reference information for each type of solid resource.
8. An urban building solid resource supervision system, characterized in that: include: Information acquisition module: used to obtain project process nodes and project schedule, generate solid resource supervision warning time and supervision nodes, and generate project information collection time according to project process nodes; Start confirmation module: used to monitor the project progress at preset time intervals to confirm whether to start the supervision process when the solid resource supervision warning time is met. The supervision node includes different supervision times and corresponding supervision items; Information confirmation module: used to respond to the supervision process start instruction, collect the project information of the corresponding project process node when the project information collection time is met, the project information includes project personnel, project execution path, and confirm the project information at the first time and calculate the legality of project execution and the total amount of solid resources based on the project information; Process allocation module: when the legitimacy exceeds the set threshold, a corresponding number of service resources are allocated according to the total amount of solid resources, and a supervision path corresponding to the process node of this project is generated; Node supervision module: used to supervise the current project process node according to the supervision path every time the supervision time corresponding to any supervision node is reached.
9. An electronic device, characterized in that: include: A memory storing executable program code; a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute the urban building solid resource supervision method as described in any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, wherein the computer program enables a computer to execute the urban building solid resource supervision method according to any one of claims 1 to 7.
Citation Information
Patent Citations
Method for monitoring collaborative execution condition of investment plan and fund plan of power grid infrastructure project
CN114240044A
Construction project collaborative supervision system based on BIM model
CN115439099A
Safety supervision resource scheduling method based on 4D building model and multi-objective optimization
CN115758506A
Power grid infrastructure project construction management method and system
CN117010615A
Power grid infrastructure project safety management method and system
CN117010616A
Cited By
Program allocation method and system for medical project and medium
CN121579220A