Park integrated energy system decoupling clearing method based on multi-parameter planning

By constructing a unified pricing model for the integrated energy system of the park based on multi-parameter programming, and extracting segmented analytical mapping relationships, the problems of information privacy and communication pressure during market clearing are solved, and efficient and privacy-protected market clearing is achieved.

CN119027194APending Publication Date: 2024-11-26SHANGHAI UNIVERSITY OF ELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411032010.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the market clearing process of the integrated energy system in the park, the existing technology makes it difficult to protect information privacy, puts great pressure on the communication system, and has high requirements for information interaction, resulting in low market clearing efficiency and difficulty in achieving optimal resource allocation.

Method used

A unified pricing model is constructed using a multi-parameter programming approach. By segmenting and analyzing the mapping relationship, the CIES bidding cost-electric power-thermal power surface, thermal power-market heat price declaration curve, and electric power-market electricity price declaration curve are extracted under both centralized and decentralized operating frameworks. This simplifies information reporting, reduces communication requirements, and protects privacy.

Benefits of technology

It effectively protected information privacy, reduced the pressure on communication systems, improved market clearing efficiency, reduced information exchange requirements, made reasonable use of effective information, and achieved efficient market clearing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119027194A_ABST
    Figure CN119027194A_ABST
Patent Text Reader

Abstract

The invention relates to a park integrated energy system decoupling clearing method based on multi-parameter planning. The method comprises the following steps: S1, constructing a unified quotation model of multiple coupling characteristics of a park integrated energy system; s2, under a centralized operation framework, calculating a segment analysis mapping relation corresponding to a CIES bidding cost-electric power-thermal power curved surface at a t moment; s3, under a distributed operation framework, calculating a segmented analysis mapping relation corresponding to the t-moment thermal power-market thermal price declaration curve; s4, calculating a segmented analysis mapping relation corresponding to the t-moment electric power-market electricity price declaration curve under a centralized operation framework; and S5, solving the centralized optimization clearing model and the distributed optimization clearing model to obtain a centralized clearing result and a distributed clearing result. Compared with the prior art, the method has the advantages of protecting the privacy of information in the clearing process, reducing the transmission pressure of a communication system and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system dispatching and operation, and in particular to a decoupling and clearing method for a park integrated energy system based on multi-parameter planning. Background Art

[0002] The technical and economic characteristics of the park's integrated energy system are complex, showing the coupling, conversion, interaction and storage of multiple energy sources in the production, transmission and consumption links, and can achieve cross-time market arbitrage through energy storage systems and multi-energy loads. Therefore, when CIES participates in market quotations, it presents multiple coupling characteristics such as multiple energy forms, cross-time scales, and binary identities of production and consumption, thus generating a high-dimensional quotation information space. High-dimensional quotation information is usually difficult to adapt to the current market operation system and affects its operating efficiency.

[0003] The integrated energy market can be divided into centralized and decentralized types based on the subject composition and clearing mode. For the centralized market structure, the only system operator will summarize all the declared information and make unified clearing. In this mode, it is equivalent to market participants such as CIES reporting all equipment operating parameters and load demands to the market. This method can make the best decision on the production and consumption of multiple energy sources from the perspective of decision makers with global information, and maximize social welfare. However, the massive information declaration of market participants will bring high information costs, affect the market clearing efficiency, and it is difficult for market decision makers to collect all the information of massive distributed resources, and supervision is difficult, which is usually difficult to achieve in actual market operation.

[0004] For decentralized market structures, independent operators of each market aggregate the declared information of market participants and conduct decentralized clearing. The clearing order mainly includes sequential and iterative clearing. If the energy markets at all levels are cleared sequentially, CIES usually needs to allocate joint costs for energy coupling equipment, such as combined heat and power (CHP) units on the production side and calculate the marginal production cost and report it to the market. However, simply cutting the joint cost according to the ratio of electricity and heat production efficiency will lead to serious cross-subsidy between heterogeneous energy sources, reducing the overall benefits of energy coupling equipment. The prior art proposes to define the heat production cost of CHP units as the difference between the total production cost and its expected income in the electricity market to achieve cost allocation. This method can reduce cross-subsidy to a certain extent, but the cost modeling of CHP units is relatively rough, and it is difficult to accurately reflect their true marginal costs in the heat and electricity markets, and the quotation model has low accuracy. If the energy markets at all levels are iteratively cleared, existing research mainly constructs the bidding strategy as a two-level optimization problem in which market participants interact with the upper energy market. The upper layer is the optimal energy management of market participants, and the lower layer is the energy market clearing. It is iterated until energy and price converge to obtain the optimal bidding strategy. Some scholars also model the bidding strategy as a non-cooperative game model between members or unify the behaviors of other members into a response model of the energy market to form a master-slave game architecture. By interacting with the energy market until energy and price converge, the optimal bidding strategy is obtained. Although these methods can avoid cross-subsidy between energy sources and achieve optimal resource allocation, they require repeated iterations and have high requirements for information interaction between market managers and participants, making them difficult to apply to large-scale energy trading markets.

[0005] When clearing, the current method requires the declaration of a large amount of information, places high demands on information exchange between market managers and participants, is prone to leaking private information, and puts a lot of pressure on the communication system due to the need to transmit a large amount of data. Summary of the invention

[0006] The purpose of the present invention is to provide a decoupled clearing method for a campus integrated energy system based on multi-parameter planning in order to protect the privacy of information during the clearing process and reduce the transmission pressure of the communication system.

[0007] The purpose of the present invention can be achieved by the following technical solutions:

[0008] A decoupling and clearing method for a park integrated energy system based on multi-parameter planning, the method comprising the following steps:

[0009] S1. Construct a unified quotation model for the multiple coupling characteristics of the park's integrated energy system;

[0010] S2. Under the centralized operation framework, transform the model established in S1 to obtain a first model transformation form, solve the first model transformation form, and obtain a piecewise analytical mapping relationship corresponding to the CIES bidding cost-electric power-thermal power surface at time t;

[0011] S3, under the decentralized operation framework, transform the model established in S1 to obtain a second model transformation form, solve the second model transformation form, and obtain a segmented analytical mapping relationship corresponding to the thermal power-market thermal price declaration curve at time t;

[0012] S4. Under the decentralized operation framework, transform the model established in S1 to obtain a third model transformation form, solve the third model transformation form, and obtain a segmented analytical mapping relationship corresponding to the electric power-market electricity price declaration curve at time t;

[0013] S5. Based on the segmented analytical mapping relationship obtained in S2 to S4, a centralized optimization clearing model and a decentralized optimization clearing model are established under a centralized operation framework and a decentralized operation framework respectively, and the centralized optimization clearing model and the decentralized optimization clearing model are solved to obtain centralized clearing results and decentralized clearing results.

[0014] Furthermore, the specific steps of solving the transformation form of the first model and obtaining the piecewise analytical mapping relationship corresponding to the CIES bidding cost-electric power-thermal power surface at time t are:

[0015] Based on the Lagrangian function and KKT conditions, the transformation form of the first model is solved to obtain the optimal solution X corresponding to the constraint set of the nth group when the planning parameter vector θ changes in the critical region. n (θ), the optimal solution X n (θ) is the unique affine function of the planning parameter vector θ. By enumerating all active constraint sets and inactive constraint sets, the piecewise analytical mapping relationship corresponding to the CIES bidding cost-electric power-thermal power surface at time t is obtained;

[0016] The optimal solution X n (θ) is:

[0017] X n (θ)={D -1 Mθ+D -1 F} acticve =K n θ+G n

[0018] Among them, K n , G nare the sorted parameter coefficient vector and constant coefficient vector respectively; D, M and F are the coefficient matrix and constant matrix of the unified bidding model's energy storage operation constraints, the system's internal electric power and thermal power energy supply and demand balance constraints, the power limit constraints during production unit operation, and the CHP unit's thermal-electric coupling constraints.

[0019] Furthermore, the segmented analytical mapping relationship corresponding to the CIES bidding cost-electric power-thermal power surface at time t is:

[0020]

[0021] in, represents the bidding cost of the park, P t is the electric power traded with the market at time t, H t is the thermal power traded with the market at time t, k t,n,1 , k t,n,2 K n Corresponding variables The first and second column sub-elements of the row; g t,n G n Corresponding variables The child element of the row, K n , G n are the rearranged parameter coefficient vector and constant coefficient vector respectively.

[0022] Furthermore, the method for solving the second model transformation form is the same as the method for solving the first model transformation form. The optimal solution of the second model transformation form is X n (μ t )for:

[0023]

[0024] Among them, μ t Hot price in the market, are the rearranged parameter coefficient vector and constant coefficient vector respectively.

[0025] Furthermore, the segmented analytical mapping relationship corresponding to the thermal power-market thermal price declaration curve at time t is:

[0026]

[0027] in, and They are and The corresponding variable H t,n The child element of the row, H t is the thermal power traded with the market at time t, μ t Hot price in the market.

[0028] Furthermore, the method for solving the transformation form of the third model is the same as the method for solving the transformation form of the first model. The obtained segmented analytical mapping relationship corresponding to the electric power-market electricity price declaration curve at time t is:

[0029]

[0030] in, and are the parameter coefficients and constant coefficients obtained by solving, P t is the electric power traded with the market at time t.

[0031] Furthermore, the objective function of the centralized optimization clearing model is:

[0032]

[0033] in, and They are the index collections of the park's integrated energy system, electric load agents, thermal load agents, power generators, and heat suppliers; and are the clearing powers of the electricity and heat load agents at time t, respectively; and are the clearing power of the power generator and the heat supplier at time t respectively; and are the quotation functions submitted by electricity and heat load agents to the market, which are also their respective utility functions, indicating the satisfaction and price willing to pay of agents under different load amounts; and The quotation functions submitted to the market by power generators and heat suppliers are also their respective cost functions, which represent the production costs under different power supply and heat supply. and P i G are the maximum and minimum output of the generator set, respectively. and are the maximum and minimum outputs of the heating supplier’s units, represents the segmented analytical mapping relationship corresponding to the CIES bidding cost-electric power-thermal power surface of park i at time t, P i,t It is the segmented analytical mapping relationship corresponding to the electric power-market electricity price declaration curve of park i at time t under the corresponding index, and T represents the total time.

[0034] Furthermore, the objective function of the decentralized optimization clearing model is:

[0035]

[0036] Among them, μi,t (H t ) and λ i,t (P t ) are the price-volume relationship curves extracted from the heat and electricity markets of park i at time t, based on the segmented analytical mapping relationship corresponding to the thermal power-market heat price declaration curve of park i at time t and the segmented analytical mapping relationship corresponding to the electric power-market electricity price declaration curve of park i at time t, respectively. H t is the thermal power traded with the market at time t, and are the clearing powers of the electricity and heat load agents at time t, respectively; and are the clearing power of the power generator and the heat supplier at time t respectively; and are the quotation functions submitted by electricity and heat load agents to the market, which are also their respective utility functions, indicating the satisfaction and price willing to pay of agents under different load amounts; and are the quotation functions submitted to the market by power generators and heat suppliers, which are also their respective cost functions, indicating the production costs under different power supply and heat supply, and T represents the total time.

[0037] Furthermore, the constraints of the centralized optimization clearing model and the decentralized optimization clearing model are:

[0038]

[0039] in, and They are the index collections of the park's integrated energy system, electric load agents, thermal load agents, power generators, and heat suppliers; and are the clearing powers of the electricity and heat load agents at time t, respectively; and are the clearing power of the generator and the heat supplier at time t, and P i G are the maximum and minimum output of the generator set, respectively. and They are the maximum and minimum outputs of the heating supplier's units respectively.

[0040] Furthermore, the objective function of the unified quotation model of the park integrated energy system with multiple coupling characteristics is:

[0041]

[0042] Among them, f t WTis the fan output cost; f t CHP is the output cost of CHP unit; t EU is the output cost of conventional generator; f t GB is the output cost of the gas boiler; f t EES and f t HES are the operating costs of electric energy storage and thermal energy storage respectively; t is the market electricity price at time t; P t is the electric power traded with the market at time t, P t >0 means selling electricity to the market, P t <0 means purchasing electricity from the market; μ t is the hot market price at time t; H t is the thermal power traded with the market at time t, H t >0 means selling hot to the market, H t <0 means buying heat from the market; T is the total time period; C OP The total operating cost of the park.

[0043] Compared with the prior art, the present invention has the following beneficial effects:

[0044] In the present invention, for the centralized market operation framework, the existing model usually makes the optimal decision on the production and consumption of multiple energy sources from the perspective of decision makers with global information to maximize social welfare. However, the massive information declaration of market participants will bring high information costs, affect the market clearing efficiency, and it is difficult for market decision makers to collect all the information of massive distributed resources, and supervision is difficult, which is usually difficult to achieve in actual market operation. The present invention proposes to replace the operating parameters of each distributed resource within CIES by reporting the CIES bidding cost-electric power-thermal power surface, such as traditional thermal power plants reporting installed capacity, minimum technical output and climbing constraints; energy conversion units such as electricity to heat need to report production capacity and conversion efficiency; for aggregation agents such as electricity sellers and integrated energy service providers, it is necessary to report parameter information of internal distributed energy or feasible domains of multi-energy coupling. It greatly reduces information costs and communication requirements, protects CIES privacy, reduces the dimension of reported information space, reasonably utilizes effective information, and helps the market achieve efficient clearing.

[0045] In view of the decentralized market operation framework, CIES in the existing model, as a multi-energy load participant, mostly participates in the market as a price acceptor, that is, only submits the amount of energy purchased before the market is cleared. The above method is difficult to clearly describe the characteristics of CIES trading energy under the influence of different electricity prices and heat prices, and it is difficult to reflect the active purchase / sale energy willingness of CIES producers and consumers. In addition, the existing model solution mostly relies on the repeated iteration between user-side energy adjustment and market clearing, which has high requirements for information interaction and communication between the market and users, and privacy cannot be guaranteed. The present invention extracts the CIES thermal power-heat price declaration curve and the electric power-electricity price declaration curve respectively to effectively describe the changes in user purchase / sale energy under the influence of different energy prices, and enables CIES as a producer or consumer to directly participate in the market by submitting the "quantity-price" curve, so that CIES's willingness to buy / sell energy and its complementary characteristics can be fully considered in the market clearing, while avoiding iterative calculations in the clearing process, effectively protecting CIES's privacy in the transaction process, and reducing the requirements for information interaction and communication. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 is a flow chart of the present invention;

[0047] Figure 2 It is a schematic diagram of the trading operation framework of the participating regional thermal-electricity integrated energy market (centralized / decentralized structure) of the present invention;

[0048] Figure 3 The CIES bidding cost-electric power-thermal power surface of the present invention;

[0049] Figure 4 is the CIES thermal power-heat price declaration curve at time t of the present invention;

[0050] Figure 5 It is the CIES electric power-electricity price declaration curve at time t of the present invention. DETAILED DESCRIPTION

[0051] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.

[0052] Based on the multi-parameter planning theory, the present invention proposes a decoupling and clearing method for a park integrated energy system based on multi-parameter planning. The flow chart of the method is as follows: Figure 1As shown, the extraction of CIES effective quotation information under the centralized / decentralized operation framework of the regional thermal-electricity integrated energy market is realized and reported to the corresponding market, which is more in line with the real market environment and data disclosure rules. For the centralized market operation framework, after the park participates in the market through the dimension reduction quotation surface, the market clearing model is effectively simplified and the market operation efficiency is improved; for the decentralized market operation framework, after the park participates in the market through the dimension reduction quotation curve, the market clearing avoids the information iteration process, which effectively reduces the cross-subsidy between energy sources while improving the market operation efficiency. The method proposed by the present invention includes the following steps:

[0053] S1. Construct a unified quotation model for the multiple coupling characteristics of the park's integrated energy system;

[0054] S2. Under the centralized operation framework, transform the model established in S1 to obtain a first model transformation form, solve the first model transformation form, and obtain a piecewise analytical mapping relationship corresponding to the CIES bidding cost-electric power-thermal power surface at time t;

[0055] S3, under the decentralized operation framework, transform the model established in S1 to obtain a second model transformation form, solve the second model transformation form, and obtain a segmented analytical mapping relationship corresponding to the thermal power-market thermal price declaration curve at time t;

[0056] S4. Under the decentralized operation framework, transform the model established in S1 to obtain a third model transformation form, solve the third model transformation form, and obtain a segmented analytical mapping relationship corresponding to the electric power-market electricity price declaration curve at time t;

[0057] S5. Based on the segmented analytical mapping relationship obtained in S2 to S4, a centralized optimization clearing model and a decentralized optimization clearing model are established under a centralized operation framework and a decentralized operation framework respectively, and the centralized optimization clearing model and the decentralized optimization clearing model are solved to obtain centralized clearing results and decentralized clearing results.

[0058] First, in S1 of the present invention, a unified quotation model is established that takes into account the multiple coupling characteristics of the park integrated energy system. The model takes into account the multiple coupling characteristics of CIES, such as multiple energy forms, cross-time scales, and dual identities of production and consumption. Based on the predicted market clearing price, a quotation model is constructed with the goal of minimizing the total operating cost of CIES, taking into account the operating constraints of electricity, heat systems, and coupled energy equipment. Figure 2 As shown in , the production equipment includes CHP units, gas boilers, traditional power generation units and fans, etc.; the energy storage system includes power storage and heat storage equipment; and the users are multi-energy loads. The objective function is mainly composed of three parts: the operating cost of the park's production equipment, the operating cost of energy storage, and the cost of the park's participation in market transactions, as shown below:

[0059]

[0060] Among them, f t WT is the fan output cost; f t CHP is the output cost of CHP unit; t EU is the output cost of conventional generator; f t GB is the output cost of the gas boiler; f t EES and f t HES are the operating costs of electric energy storage and thermal energy storage respectively; t is the market electricity price at time t; P t is the electric power traded with the market at time t, P t >0 means selling electricity to the market, P t <0 means purchasing electricity from the market; μ t is the hot market price at time t; H t is the thermal power traded with the market at time t, H t >0 means selling hot to the market, H t <0 means buying heat from the market; T is the total time period; C OP The total operating cost of the park.

[0061] in:

[0062] f t WT =C WT P t WT (2)

[0063]

[0064] f t EU =C EU,1 P t EU +C EU,2 (P t EU ) 2 (4)

[0065]

[0066] f t EES =C EES,1 P t dis +C EES,2 P t ch (6)

[0067]

[0068] Among them, C WT , C CHP,0-5 , C EU,1-2 , C GB , C EES,1-2 and C HES,1-2 They represent the cost coefficients of fans, CHP units, conventional generator sets, gas boilers, electrical energy storage, and thermal energy storage, respectively. t WT , P t EU and P t CHP They represent the electric power produced by the wind turbine, conventional power generation unit and CHP unit at time t respectively; Respectively represent the thermal power produced by the gas boiler and CHP unit at time t; P t ch and P t dis are the charging power and discharging power at time t respectively; and are the heat storage power and heat release power at time t respectively.

[0069] Electric energy storage needs to control the non-simultaneous charging and discharging of the system by setting binary variables. This constraint is non-convex, which will cause computational burden or be unsolvable in practical applications. In multi-parameter planning theory, non-convex constraints will bring about the dimensionality disaster in computation, and it is difficult to obtain the optimal solution in a short time. Therefore, based on the parameter characteristics of the electric energy storage model, the convex model of the energy storage system is constructed using the vertex information of the feasible domain, as shown below:

[0070]

[0071] in, is the electric energy storage capacity at time t; and E ES are the upper and lower limits of the electric energy storage capacity respectively; is the upper limit of storage power; η ech is the storage efficiency; P dis is the upper limit of discharge power; η edis is the discharge efficiency; Δ is the time step, and in the present invention, Δ=1h.

[0072] Thermal energy storage mainly includes large thermal storage tanks, thermal storage tanks and thermal storage electric boilers, etc. Its dynamic mathematical model can be expressed as:

[0073]

[0074] Where: is the capacity of thermal energy storage at time t; and Q ES are the upper and lower limits of thermal energy storage capacity respectively; σ is the heat dissipation loss rate of thermal energy storage; is the upper limit of thermal storage power; η hch is the thermal storage efficiency; is the upper limit of heat release power; η hdis For heat release efficiency.

[0075] During operation, CIES mainly meets the energy balance constraints and the operation constraints of each unit. Equations (9)-(20) are energy storage operation constraints; Equations (21)-(22) are the system internal electric power and thermal power energy supply and demand balance constraints; Equations (23)-(24) are the power limit constraints when the production unit is in operation; and Equation (25) is the CHP unit thermal-electric coupling constraint.

[0076] P t WT +P t EU +P t CHP +P t dis -P t ch -P t L =P t (twenty one)

[0077]

[0078] Where: P t L and They represent the electricity and heat load demands at time t respectively; and P EU Respectively represent the upper and lower limits of the output of conventional generator sets; and P CHP , H CHP They represent the upper and lower limits of the electric and thermal output of the CHP unit respectively; and H GB Respectively represent the upper and lower limits of gas boiler output; and are the parameters of the CHP unit on the feasible boundary b.

[0079] On the basis of the unified bidding model, the present invention realizes the extraction of CIES effective bidding information under two operating frameworks of the regional thermal-electric integrated energy market through multi-parameter planning theory. Multi-parameter planning theory can analyze the optimal solution set and feasibility changes in the optimization problem when multiple parameters change, and obtain the target value and the feasible space of the solution. Therefore, in the centralized operation framework, the trading electric power and thermal power are used as planning parameters, and the optimal value of the bidding cost is used as the variable to be mapped; in the decentralized operation framework, the market energy price is used as the planning parameter, and the corresponding optimal value of the trading energy is used as the variable to be mapped, so that the unified bidding model can be constructed as a typical multi-parameter planning problem.

[0080] In S2 of the present invention, the steps of extracting the quotation surface under the centralized market structure are as follows:

[0081] Under the centralized operation framework, P t and H t As planning parameters, the bidding cost of the park To find the optimal solution, extract Quotation surface. To facilitate derivation, the equality constraints in the quotation model are transformed into complementary inequalities. In addition, since the electric energy storage system has been convexified in Section 2, the existing constraints are all independent linear constraints. The original quotation model can be expressed as follows, which is the first model transformation form:

[0082] min X T ΑX+ΒX+Jθ(26)

[0083] st DX≤Mθ+F (27)

[0084] Where: is the decision variable matrix, P CHP , H CHP , P EU , H GB , P ch , H ch , P dis , C OP are all T-dimensional row vectors. and are T-1 dimensional row vectors, not including P t and H t , θ=[H t ,P t ] T is the planning parameter vector. A, B and J are the coefficient matrices after the arrangement of equations (1)-(7); D, M and F are the coefficient matrices and constant matrix after the arrangement of equations (8)-(25).

[0085] In order to find the optimal solution of the above model, the Lagrangian function is constructed as follows:

[0086]

[0087] The first-order Karush-Kuhn-Tucker (KKT) conditions are as follows:

[0088]

[0089] Where: ζ is the vector composed of Lagrange multipliers.

[0090] When the parameter θ changes within its feasible domain, there are N sets of constraints. Suppose the optimal solution under the constraint set of the nth set is X n , where n = 1, 2, ..., N. According to the original feasibility condition, the constraint set of the nth group is shown in equations (30)-(31).

[0091] {DX n -Mθ-F} active =0 (30)

[0092] {DX n -Mθ-F} inactive <0 (31) where: {·} active is the active constraint set in the inequality constraint set, {·} inactive is an inactive constraint set in the inequality constraint set.

[0093] Therefore, the optimal solution X corresponding to the nth set of constraints is n As shown in formula (32), substitute it into formula (31) and define the critical region R n As shown in formula (33):

[0094] X n (θ)={D -1 Mθ+D -1 F} acticve =K n θ+G n (32)

[0095]

[0096] Where: K n , U n and G n 、V n are the rearranged parameter coefficient vector and constant coefficient vector respectively.

[0097] When θ is in the critical region R nWhen the internal changes, it always corresponds to a unique set of active and inactive constraint sets, and the optimal solution is a unique affine function about θ. By enumerating all active and inactive constraint sets, we can get the CIES bidding cost-electric power-thermal power surface at time t as follows: Figure 3 As shown, the segmented parsing mapping relationship is as follows:

[0098]

[0099] Where: k t,n,1 , k t,n,2 K n Corresponding variables The first and second sub-elements of the row; g t,n G n Corresponding variables The child elements of the row.

[0100] In S3 and S4 of the present invention, the quotation curve extraction under the decentralized market structure is performed, and the market heat price μ t and electricity price λ t As planning parameters, the external heat and electricity trading power of the park is taken as the optimal solution to be sought, and H is extracted. t (μ t ) and P t (λ t ) quotation curve. When clearing in sequence, the park first extracts H based on the market forecast electricity price and quotation model. t (μ t ) Report to the heat market. The original quotation model can be expressed as the following second model transformation form:

[0101]

[0102] Where: Decision variable matrix X = [P CHP ,H CHP ,P EU ,H GB ,P ch ,H ch ,P dis ,H dis ,P,H,C OP ] T , where P = [P1, P2, ..., P T ],H=[H1,H2,…,H T ]. and is the coefficient matrix after the arrangement of equations (1)-(7), and They are the coefficient matrix and constant matrix after the arrangement of equations (8)-(25) respectively.

[0103] Similarly, by optimizing the solution through KKT conditions, we can get the optimal solution X corresponding to the nth set of constraints. n and the critical region R n They are as follows:

[0104]

[0105] The thermal power-market heat price declaration curve of the park's comprehensive energy system at time t is as follows: Figure 4 As shown, the segmented parsing mapping relationship is as follows:

[0106]

[0107] Where: and They are and The corresponding variable H t,n The child elements of the row.

[0108] The park submits the heat power-heat price declaration curve to the heat market operator, and the heat market is cleared. Then the park solves the quotation model based on the cleared heat price and heat power to extract P t (λ t ) Report to the power market. The original quotation model is expressed as the following third model transformation form:

[0109]

[0110] Where: Decision variable matrix X = [P CHP ,H CHP ,P EU ,P ch ,P dis ,P,C OP ] T . They are the coefficient matrices after the arrangement of equations (1)-(7). and They are the coefficient matrix and constant matrix after the arrangement of equations (8)-(25) respectively.

[0111] The solution principle of this model is the same as that in the heat market, so it will not be repeated here. Therefore, by solving the problem, the electric power-market electricity price declaration curve of the park integrated energy system at time t can be obtained as follows: Figure 5 As shown, the segmented parsing mapping relationship is as follows:

[0112]

[0113] Where: and are the parameter coefficients and constant coefficients obtained from the solution respectively.

[0114] In S5 of the present invention, based on the decoupled quotation strategy of the park integrated energy system proposed in the present invention, market optimization clearing methods under the centralized and decentralized operation frameworks of the regional thermal-electric integrated energy market are proposed respectively.

[0115] Under the centralized market structure, the integrated energy market operator collects the quotation functions of various market participants (park integrated energy system, power generators, heat suppliers, electricity load agents, and heat load agents), conducts market clearing and settlement with the goal of maximizing social welfare, and establishes a centralized optimization clearing model:

[0116]

[0117] Where: and They are the index collections of the park's integrated energy system, electric load agents, thermal load agents, power generators, and heat suppliers; and are the clearing powers of the electricity and heat load agents at time t, respectively; and are the clearing power of the power generator and the heat supplier at time t respectively; and are the quotation functions submitted by electricity and heat load agents to the market, which are also their respective utility functions, indicating the satisfaction and price willing to pay of agents under different load amounts; and The quotation functions submitted to the market by power generators and heat suppliers are also their respective cost functions, which represent the production costs under different power supply and heat supply. and P i G are the maximum and minimum output of the generator set, respectively. and H i G They are the maximum and minimum outputs of the heating supplier's units respectively.

[0118] Under the decentralized market structure, independent operators of the heat and electricity markets each maximize the social welfare W in their respective markets. H and W E To achieve the goal of clearing, the constraints of the thermal system are shown in equations (46)-(47), and the constraints of the power system are shown in equations (44)-(45). The objective functions of the electricity and heat market optimization clearing models are shown below, respectively. A decentralized optimization clearing model is established:

[0119]

[0120] Where: μ i,t (Ht ) and λ i,t (P t ) are the price-volume relationship curves extracted by park i in the heat and electricity markets at time t. i,t >0 o'clock, is positive, indicating the heating cost function of the i-th CIES at time t; H i,t <0: is negative, indicating the heat load utility function of the ith CIES at time t. Similarly, when P i,t >0 o'clock, is positive, indicating the power supply cost function of the i-th CIES at time t; P i,t <0: is negative, indicating the electric load utility function of the ith CIES at time t.

[0121] Based on the multi-parameter planning theory, the present invention realizes the extraction of CIES effective quotation information under the centralized / decentralized operation framework of the regional thermal-electricity integrated energy market and reports it to the corresponding market, which is more in line with the real market environment and data disclosure rules. For the centralized market operation framework, after the park participates in the market through the dimension reduction quotation surface, the market clearing model is effectively simplified and the market operation efficiency is improved; for the decentralized market operation framework, after the park participates in the market through the dimension reduction quotation curve, the market clearing avoids the information iteration process, effectively reducing the cross-subsidy between energy sources while improving the market operation efficiency.

[0122] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.

Claims

1. A decoupling and clearing method for a park integrated energy system based on multi-parameter planning, characterized in that: The method comprises the following steps: S1. Construct a unified quotation model for the multiple coupling characteristics of the park's integrated energy system; S2. Under the centralized operation framework, transform the model established in S1 to obtain a first model transformation form, solve the first model transformation form, and obtain a piecewise analytical mapping relationship corresponding to the CIES bidding cost-electric power-thermal power surface at time t; S3, under the decentralized operation framework, transform the model established in S1 to obtain a second model transformation form, solve the second model transformation form, and obtain a segmented analytical mapping relationship corresponding to the thermal power-market thermal price declaration curve at time t; S4. Under the decentralized operation framework, transform the model established in S1 to obtain a third model transformation form, solve the third model transformation form, and obtain a segmented analytical mapping relationship corresponding to the electric power-market electricity price declaration curve at time t; S5. Based on the segmented analytical mapping relationship obtained in S2 to S4, a centralized optimization clearing model and a decentralized optimization clearing model are established under a centralized operation framework and a decentralized operation framework respectively, and the centralized optimization clearing model and the decentralized optimization clearing model are solved to obtain centralized clearing results and decentralized clearing results.

2. According to the method of decoupling and clearing the park integrated energy system based on multi-parameter planning according to claim 1, it is characterized in that: The specific steps of solving the transformation form of the first model to obtain the piecewise analytical mapping relationship corresponding to the CIES bidding cost-electric power-thermal power surface at time t are: Based on the Lagrangian function and KKT conditions, the transformation form of the first model is solved to obtain the optimal solution X corresponding to the constraint set of the nth group when the planning parameter vector θ changes in the critical region. n (θ), the optimal solution X n (θ) is the unique affine function of the planning parameter vector θ. By enumerating all active constraint sets and inactive constraint sets, the piecewise analytical mapping relationship corresponding to the CIES bidding cost-electric power-thermal power surface at time t is obtained; The optimal solution X n (θ) is: X n (θ)={D -1 Mθ+D -1 F} acticve =K n θ+G n Among them, K n , G n are the sorted parameter coefficient vector and constant coefficient vector respectively; D, M and F are the coefficient matrix and constant matrix of the unified bidding model's energy storage operation constraints, the system's internal electric power and thermal power energy supply and demand balance constraints, the power limit constraints during production unit operation, and the CHP unit's thermal-electric coupling constraints.

3. According to claim 2, a method for decoupling and clearing a park integrated energy system based on multi-parameter planning is characterized in that: The segmented analytical mapping relationship corresponding to the CIES bidding cost-electric power-thermal power surface at time t is: in, represents the bidding cost of the park, P t is the electric power traded with the market at time t, H t is the thermal power traded with the market at time t, k t,n,1 , k t,n,2 K n Corresponding variables The first and second sub-elements of the row; g t,n G n Corresponding variables The child element of the row, K n , G n are the rearranged parameter coefficient vector and constant coefficient vector respectively.

4. The method for decoupling and clearing a park integrated energy system based on multi-parameter planning according to claim 3 is characterized in that: The method for solving the second model transformation form is the same as the method for solving the first model transformation form. The optimal solution of the second model transformation form is X n (μ t )for: Among them, μ t Hot price in the market, are the rearranged parameter coefficient vector and constant coefficient vector respectively.

5. The method for decoupling and clearing a park integrated energy system based on multi-parameter planning according to claim 4 is characterized in that: The segmented analytical mapping relationship corresponding to the thermal power-market heat price declaration curve at time t is: in, and They are and The corresponding variable H t,n The child element of the row, H t is the thermal power traded with the market at time t, μ t Hot price in the market.

6. The method for decoupling and clearing a park integrated energy system based on multi-parameter planning according to claim 5 is characterized in that: The method for solving the transformation form of the third model is the same as the method for solving the transformation form of the first model. The segmented analytical mapping relationship corresponding to the electric power-market electricity price declaration curve at time t obtained after solving is: in, and are the parameter coefficients and constant coefficients obtained by solving, P t is the electric power traded with the market at time t.

7. The method for decoupling and clearing a park integrated energy system based on multi-parameter planning according to claim 6 is characterized in that: The objective function of the centralized optimization clearing model is: in, and They are the index collections of the park's integrated energy system, electric load agents, thermal load agents, power generators, and heat suppliers; and are the clearing powers of the electricity and heat load agents at time t, respectively; and are the clearing power of the power generator and the heat supplier at time t respectively; and are the quotation functions submitted by electricity and heat load agents to the market, which are also their respective utility functions, indicating the satisfaction and price willing to pay of agents under different loads; and The quotation functions submitted to the market by power generators and heat suppliers are also their respective cost functions, which represent the production costs under different power supply and heat supply. and P i G are the maximum and minimum output of the generator set, respectively. and are the maximum and minimum outputs of the heating supplier’s units, represents the segmented analytical mapping relationship corresponding to the CIES bidding cost-electric power-thermal power surface of park i at time t, P i,t It is the segmented analytical mapping relationship corresponding to the electric power-market electricity price declaration curve of park i at time t under the corresponding index, and T represents the total time.

8. The method for decoupling and clearing a park integrated energy system based on multi-parameter planning according to claim 7 is characterized in that: The objective function of the decentralized optimization clearing model is: Among them, μ i,t (H t ) and λ i,t (P t ) are the price-volume relationship curves extracted from the heat and electricity markets of park i at time t, based on the segmented analytical mapping relationship corresponding to the thermal power-market heat price declaration curve of park i at time t and the segmented analytical mapping relationship corresponding to the electric power-market electricity price declaration curve of park i at time t, respectively. H t is the thermal power traded with the market at time t, and are the clearing powers of the electricity and heat load agents at time t, respectively; and are the clearing power of the power generator and the heat supplier at time t respectively; and are the quotation functions submitted by electricity and heat load agents to the market, which are also their respective utility functions, indicating the satisfaction and price willing to pay of agents under different loads; and are the quotation functions submitted to the market by power generators and heat suppliers, which are also their respective cost functions, indicating the production costs under different power supply and heat supply, and T represents the total time.

9. The method for decoupling and clearing a park integrated energy system based on multi-parameter planning according to claim 7, characterized in that: The constraints of the centralized optimization clearing model and the decentralized optimization clearing model are: in, and They are the index collections of the park's integrated energy system, electric load agents, thermal load agents, power generators, and heat suppliers; and are the clearing powers of the electricity and heat load agents at time t, respectively; and are the clearing power of the generator and the heat supplier at time t, and P i G are the maximum and minimum output of the generator set, respectively. and They are the maximum and minimum outputs of the heating supplier's units respectively.

10. The method for decoupling and clearing a park integrated energy system based on multi-parameter planning according to claim 1, characterized in that: The objective function of the unified quotation model with multiple coupling characteristics of the park integrated energy system is: Among them, f t WT is the fan output cost; f t CHP is the output cost of CHP unit; t EU is the output cost of conventional generator; f t GB is the output cost of the gas boiler; f t EES and f t HES are the operating costs of electric energy storage and thermal energy storage respectively; t is the market electricity price at time t; P t is the electric power traded with the market at time t, P t >0 means selling electricity to the market, P t <0 means purchasing electricity from the market; μ t is the hot market price at time t; H t is the thermal power traded with the market at time t, H t >0 means selling hot to the market, H t <0 means buying heat from the market; T is the total time period; C OP The total operating cost of the park.