Targeted enterprise credit following system and method
Through the design of targeted enterprise credit follow-up system, the problems of incomplete enterprise financial warning system and unreasonable selection of early warning indicators in the existing technology are solved, and the full process tasks of enterprise credit risk and real-time and accurate risk warning are realized to help enterprises. Avoid high-risk project losses.
Patent Information
- Application Number
- CN202411127752.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-26
AI Technical Summary
The existing enterprise financial warning system is not sound, lacks systematicity and comprehensiveness, and the selection of warning indicators is unreasonable, resulting in poor warning results and it is difficult to meet the actual needs of different enterprises.
A targeted enterprise credit follow-up system was designed. By setting up a targeted enterprise credit follow-up platform, user end and technical backend, it is divided into four parts: data collection, indicator calculation, rule hit calculation and early warning notification, using task publisher and data Collect components such as workbench, indicator calculation workbench, rule executor and early warning executor to realize the full process of enterprise credit risk, calculate the company's historical project indicators and new project characteristics, and issue risk warning notifications based on the rule hit results.
It improves the real-time and accuracy of corporate credit risk warnings, realizes the forecast and warning of new projects of affiliated enterprises, and helps enterprises avoid losses caused by the development of high-risk projects.
Smart Images

Figure CN119027231A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of enterprise risk early warning, and in particular to a targeted enterprise credit tracking system and method. Background Art
[0002] In recent years, with the development of information technology, data, artificial intelligence and other technologies, the management of corporate financial early warning has been gradually applied, making corporate financial early warning gradually mature, the scope of application has been expanded, and management has become more accurate and efficient. Although the management of financial early warning of affiliated companies has achieved certain results, there are still some problems, such as information asymmetry and inaccurate data analysis. At the same time, with the intensification of market competition and the strengthening of regulatory policies, the management of financial early warning of affiliated companies faces greater challenges.
[0003] Disadvantages of existing technology:
[0004] 1. The corporate financial early warning system is not sound and lacks systematicness and comprehensiveness.
[0005] 2. Improper selection of early warning indicators leads to poor early warning effects.
[0006] 3. The early warning model is not very applicable and cannot meet the actual needs of different enterprises. Summary of the invention
[0007] The invention provides a targeted enterprise credit tracking system and method, which can improve the reliability of credit risk warning of associated enterprises.
[0008] To achieve the above-mentioned purpose, the present invention provides a targeted enterprise credit following system, which is provided with a targeted enterprise credit following platform, and a user terminal and a technical background connected to the targeted enterprise credit following platform through a network, wherein the key is that the targeted enterprise credit following platform is provided with a first task publisher, a second task publisher, a third task publisher and a fourth task publisher;
[0009] The first task publisher is connected to a data collection workbench, the data collection workbench is connected to a data collector and a business database, and the data collector is connected to a distributed data center and a business database;
[0010] The first task publisher is used to periodically publish data collection tasks to the data collection workbench, the data collection workbench is used to pull the monitoring list from the monitoring enterprise list library to the data collector, and the data collector is used to collect enterprise information data based on the monitoring list and store it in the monitoring enterprise information library.
[0011] The second task publisher is connected to the indicator calculation workbench, the indicator calculation workbench is connected to the business database, the user rule template library and the indicator calculator, and the indicator calculator is connected to the user rule template library and the big data HBase;
[0012] The second task publisher is used to periodically publish early warning indicator calculation tasks to the indicator calculation workbench, and the indicator calculation workbench is used to obtain enterprise information data from the monitoring enterprise information library, obtain indicator set data from the indicator set in the user rule template library, and send the enterprise information data and indicator set data to the indicator calculator; the indicator calculator is used to calculate various indicators.
[0013] The third task publisher is connected to the rule execution workbench, the rule execution workbench is connected to the rule hit executor, and the rule hit executor is connected to the user rule template library and the big data HBase;
[0014] The third task publisher is used to periodically publish warning rule execution tasks, and the rule hit executor is used to perform rule hit calculations based on indicator calculation results.
[0015] The fourth task publisher is connected to the warning executor, the warning executor is connected to the warning notification workbench and the user end, and the warning notification workbench is connected to the big data HBase, the monitoring enterprise user library and the warning content template library.
[0016] The fourth task publisher is used to periodically publish warning notification execution tasks to the warning executor; the warning notification workbench is used to obtain users from the monitored enterprise user library and the warning content from the warning content template library according to the rule hit results, and then send the warning content to the corresponding user end through the warning executor.
[0017] Through the above design, the enterprise credit risk warning process is divided into four parts: data collection, indicator calculation, rule hit calculation and warning notification. The whole process of enterprise credit risk warning is realized in a systematic and comprehensive manner, effectively improving the real-time and accuracy of enterprise credit risk warning.
[0018] As a preferred embodiment: the business database is provided with a monitoring enterprise list library and a monitoring enterprise information library, the monitoring enterprise list library is connected to the user terminal and the data collection workbench, and the monitoring enterprise information library is connected to the data collector and the indicator calculation workbench;
[0019] The distributed data center is provided with a credit steward special library.
[0020] The monitored enterprise list library is used to store the monitored list, and the monitored enterprise information library is used to store enterprise information data.
[0021] The distributed data center is used to obtain internal database data through an internal interface and collect external third-party data in real time through an external Internet interface, thereby ensuring the real-time and validity of the data.
[0022] Preferably, the user rule template library is provided with an indicator set, a rule set and an indicator library, the indicator set is connected to the indicator calculation workbench, the rule set is connected to the rule hit executor, and the indicator library is connected to the indicator calculator.
[0023] The indicator set contains various indicators that need to be calculated, the rule set contains various rules that need to be calculated for rule hits, and the indicator library contains various indicator calculators used for indicator calculation.
[0024] As a preferred embodiment: the index calculator is provided with an enterprise project index calculation module, and the enterprise project index calculation module is provided with a historical project index calculation unit, a new project feature extraction unit and an enterprise project comprehensive index calculation unit;
[0025] The historical project index calculation unit calculates the enterprise historical project index calculation result a according to the enterprise historical project data in the enterprise information data;
[0026] The calculation formula of the enterprise historical project indicator calculation result a is:
[0027]
[0028] Among them, a is the calculation result of the enterprise's historical project indicators, and a9 is the success rate of historical projects;
[0029] The calculation result a of the enterprise's historical project indicators includes the total number of historical projects a1, the number of successful main business projects a2, the number of successful non-main business projects a3, the number of successful innovation projects a4, the project execution cycle a5, the number of invention patents a6, the number of utility model patents a7, the average contract amount of the project a8, and the success rate of historical projects a9;
[0030] The new project feature extraction unit extracts the project features of the new project data from the enterprise information data according to the enterprise information data, and outputs a new project feature value b, wherein the new project feature value b includes the technical field b1 involved in the new project, the proportion of the new project investment amount in the enterprise's net assets b2, and the proportion of the new project investment amount in the investment amount of all currently carried out projects b3;
[0031] The calculation expression of the enterprise project comprehensive index calculation unit is:
[0032]
[0033] Among them, x is the calculation result of the comprehensive index of the enterprise project, MATCH is the search function, b1 is the technical field involved in the new project, a is the calculation result of the enterprise's historical project index, b2 is the proportion of the new project investment amount in the enterprise's net assets, b3 is the proportion of the new project investment amount in the investment amount of all currently carried out projects, a9 is the success rate of historical projects, w1 is the weight of the technical field involved in the new project, w2 is the weight of the proportion of the new project investment amount in the enterprise's net assets, w3 is the weight of the new project investment amount in the investment amount of all currently carried out projects, and w4 is the weight of the success rate of historical projects.
[0034] Through the above design, by calculating the enterprise's historical project indicators and extracting the enterprise's new project features, and obtaining the enterprise project comprehensive indicator calculation results based on the enterprise's historical project indicator calculation results and the enterprise's new project features, the rule hit executor performs rule hit calculation on the enterprise project comprehensive indicator calculation results. The larger the value of the enterprise project comprehensive indicator calculation result, the lower the enterprise project risk; when the enterprise project comprehensive indicator calculation result is lower than the enterprise project risk threshold, an enterprise risk warning is executed and the user is notified.
[0035] It realizes risk estimation for new projects of affiliated enterprises that enterprise users are preparing to cooperate with or are about to launch. When it is calculated that the risk of a new project of an affiliated enterprise is high, an early warning notification will be issued to predict and inform the user in advance of the feasibility and future development of the new project, and provide suggestions for the user and its affiliated enterprises to carry out new projects, so as to avoid large losses to the enterprise due to the implementation of high-risk projects in the future.
[0036] As a preferred embodiment: the index library includes counting index calculation, sum index calculation, maximum index calculation, minimum index calculation, average index calculation and index calculation filter;
[0037] The rule set includes single rule hit calculation and combined rule hit calculation.
[0038] As a preferred embodiment: the big data HBase is provided with an indicator calculation result library and a rule hit result library, and the indicator calculation result library is connected to the indicator calculator and the rule hit executor;
[0039] The rule hit result library is connected to the rule hit executor and the early warning notification workbench.
[0040] Preferably, the targeted enterprise credit following platform is further provided with a configuration workbench, and the configuration workbench is provided with a calculation script configuration unit, an indicator configuration unit, a rule configuration unit and an early warning configuration unit which are connected in sequence, the calculation script configuration unit is connected to the technical background, the early warning configuration unit is connected to the rule template publishing workbench, and the rule template publishing workbench is connected to the user rule template library.
[0041] Preferably, the configuration workbench is also connected to a basic element library, which includes a calculation script compiler, a calculation script executor, an indicator calculation expression, an indicator calculation executor, a rule expression parser, a rule executor, an early warning content parser and a metadata library.
[0042] A targeted corporate credit tracking method, the key of which is to include the following steps:
[0043] Step 1: The user adds the monitored enterprise to the monitored enterprise list in the business database through the user interface;
[0044] Step 2: The first task publisher periodically publishes the data collection task to the data collection workbench, and the data collection workbench pulls the monitoring list from the monitoring enterprise list library and sends the monitoring list to the data collector;
[0045] Step 3: The data collector obtains enterprise information data from the credit steward database in the distributed data center according to the monitoring list, and stores the enterprise information data in the monitoring enterprise information database in the business database;
[0046] Step 4: The second task publisher periodically publishes the warning indicator calculation task to the indicator calculation workbench, and the indicator calculation workbench obtains the enterprise information data from the monitoring enterprise information library, obtains the indicator set data from the indicator set in the user rule template library, and sends the enterprise information data and the indicator set data to the indicator calculator;
[0047] Step 5: The indicator calculator performs indicator calculation on the enterprise information data according to the indicator set data, and stores the indicator calculation results in the indicator calculation result library in the big data HBase;
[0048] Step 6: The third task publisher periodically publishes the warning rule execution task to the rule execution workbench, and the rule execution workbench sends the warning rule execution task to the rule hit executor;
[0049] Step 7: The rule hit executor obtains the indicator calculation result from the indicator calculation result library, obtains the rule set data from the rule set in the user rule template library, and performs rule hit calculation on the indicator calculation result according to the rule set data, and stores the rule hit result in the rule hit result library in the big data HBase;
[0050] Step 8: The fourth task publisher periodically publishes the early warning notification execution task to the early warning executor, and the early warning executor sends the early warning notification execution task to the early warning notification workbench;
[0051] Step 9: The warning notification workbench obtains the rule hit result from the rule hit result library, obtains the user from the monitoring enterprise user library according to the rule hit result, obtains the warning content from the warning content template library, and then sends the warning content to the corresponding user end through the warning executor.
[0052] The index calculation results include the calculation results of the enterprise project comprehensive index, the time of the most recent industrial and commercial change, the number of industrial and commercial changes in the past year, the number of industrial and commercial changes in the past two years, the number of times the enterprise was executed in the past three months, the number of times the enterprise was executed in the past year, the number of times the enterprise was executed in the past three years, the number of times the enterprise was executed as a defendant in the past year, the number of times the enterprise was executed in the past three years, etc.
[0053] The results of the rules hitting the target include frequent industrial and commercial changes, being listed as a person subject to execution multiple times, and frequent equity disputes.
[0054] Through the above design, data collection, indicator calculation, rule hit calculation and risk warning notification in the process of enterprise credit risk warning are realized, forming a systematic and complete enterprise credit risk warning process, ensuring the effectiveness and timeliness of risk warning notification.
[0055] The data collector has an upstream and downstream enterprise management network, which includes mutually authorized upstream and downstream enterprises into the targeted enterprise credit following platform for unified management according to legal agreements such as enterprise cooperation agreements and enterprise purchase and sales contracts, and obtains enterprise information data of each enterprise through legal channels. When the targeted enterprise credit following platform detects that a certain enterprise credit or project has risks, the early warning executor sends the risk warning content to the enterprise and its upstream and downstream enterprises.
[0056] It realizes risk warning notification for the enterprise itself and its affiliated enterprises, so that the enterprise can timely understand its own credit risk and the credit risk of its affiliated enterprises, and then adjust the enterprise development strategy in time according to the enterprise credit risk situation, formulate and implement risk prevention measures, and avoid huge losses caused by enterprise credit risk issues.
[0057] As a preferred embodiment, the technical background performs user rule template configuration through the following steps:
[0058] Step A1: Build a basic element library;
[0059] Step A2: The technical background uses the technical interface to sequentially configure the calculation script, indicator, rule, and warning based on the basic element library to obtain and publish the rule template.
[0060] Through the above design, the calculation scripts, indicators, rules and warning contents are respectively configured in response to form a systematic, complete and reasonable user rule template, which can realize the credit risk warning of enterprises in various industries and improve the reliability of enterprise risk warning.
[0061] The beneficial effects of the present invention are as follows: the enterprise credit risk early warning process is divided into four parts: data collection, indicator calculation, rule hit calculation and early warning notification, which systematically and comprehensively realizes the full process task of enterprise credit risk early warning, and effectively improves the real-time and accuracy of enterprise credit risk early warning. BRIEF DESCRIPTION OF THE DRAWINGS
[0062] Figure 1 It is a schematic diagram of the information flow of the present invention;
[0063] Figure 2 Schematic diagram of the structure of the indicator calculator in the embodiment. DETAILED DESCRIPTION
[0064] The present invention is further described in detail below in conjunction with the accompanying drawings and specific examples. The following examples or drawings are used to illustrate the present invention, but are not used to limit the scope of the present invention.
[0065] like Figure 1 As shown; a targeted enterprise credit following system is provided with a targeted enterprise credit following platform, and a user end and a technical background connected to the targeted enterprise credit following platform through a network, and the targeted enterprise credit following platform is provided with a first task publisher, a second task publisher, a third task publisher and a fourth task publisher;
[0066] The first task publisher is connected to a data collection workbench, the data collection workbench is connected to a data collector and a business database, and the data collector is connected to a distributed data center and a business database;
[0067] The second task publisher is connected to the indicator calculation workbench, the indicator calculation workbench is connected to the business database, the user rule template library and the indicator calculator, and the indicator calculator is connected to the user rule template library and the big data HBase;
[0068] The third task publisher is connected to the rule execution workbench, the rule execution workbench is connected to the rule hit executor, and the rule hit executor is connected to the user rule template library and the big data HBase;
[0069] The fourth task publisher is connected to the warning executor, the warning executor is connected to the warning notification workbench and the user end, and the warning notification workbench is connected to the big data HBase, the monitoring enterprise user library and the warning content template library.
[0070] The business database is provided with a monitoring enterprise list library and a monitoring enterprise information library, the monitoring enterprise list library is connected to the user terminal and the data collection workbench, and the monitoring enterprise information library is connected to the data collector and the indicator calculation workbench;
[0071] The distributed data center is provided with a credit steward special library.
[0072] The user rule template library is provided with an indicator set, a rule set and an indicator library, wherein the indicator set is connected to the indicator calculation workbench, the rule set is connected to the rule hit executor, and the indicator library is connected to the indicator calculator.
[0073] The indicator library includes counting indicator calculation, sum indicator calculation, maximum indicator calculation, minimum indicator calculation, average indicator calculation and indicator calculation filter;
[0074] The rule set includes single rule hit calculation and combined rule hit calculation.
[0075] The big data HBase is provided with an indicator calculation result library and a rule hit result library, and the indicator calculation result library is connected to the indicator calculator and the rule hit executor;
[0076] The rule hit result library is connected to the rule hit executor and the early warning notification workbench.
[0077] The targeted enterprise credit following platform is also provided with a configuration workbench, which is provided with a calculation script configuration unit, an indicator configuration unit, a rule configuration unit and an early warning configuration unit which are connected in sequence. The calculation script configuration unit is connected to the technical background, the early warning configuration unit is connected to the rule template publishing workbench, and the rule template publishing workbench is connected to the user rule template library.
[0078] The configuration workbench is also connected to a basic element library, which includes a calculation script compiler, a calculation script executor, an indicator calculation expression, an indicator calculation executor, a rule expression parser, a rule executor, an early warning content parser and a metadata library.
[0079] like Figure 2 As shown: the indicator calculator is provided with an enterprise project indicator calculation module, and the enterprise project indicator calculation module is provided with a historical project indicator calculation unit, a new project feature extraction unit and an enterprise project comprehensive indicator calculation unit;
[0080] The historical project index calculation unit calculates the enterprise historical project index calculation result a according to the enterprise historical project data in the enterprise information data;
[0081] The calculation formula of the enterprise historical project indicator calculation result a is:
[0082]
[0083] Among them, a is the calculation result of the enterprise's historical project indicators, and a9 is the success rate of historical projects;
[0084] The calculation result a of the enterprise's historical project indicators includes the total number of historical projects a1, the number of successful main business projects a2, the number of successful non-main business projects a3, the number of successful innovation projects a4, the project execution cycle a5, the number of invention patents a6, the number of utility model patents a7, the average contract amount of the project a8, and the success rate of historical projects a9;
[0085] The new project feature extraction unit extracts the project features of the new project data from the enterprise information data according to the enterprise information data, and outputs a new project feature value b, wherein the new project feature value b includes the technical field b1 involved in the new project, the proportion of the new project investment amount in the enterprise's net assets b2, and the proportion of the new project investment amount in the investment amount of all currently carried out projects b3;
[0086] The calculation expression of the enterprise project comprehensive index calculation unit is:
[0087]
[0088] Among them, x is the calculation result of the comprehensive index of the enterprise project, MATCH is the search function, b1 is the technical field involved in the new project, a is the calculation result of the enterprise's historical project index, b2 is the proportion of the new project investment amount in the enterprise's net assets, b3 is the proportion of the new project investment amount in the investment amount of all currently carried out projects, a9 is the success rate of historical projects, w1 is the weight of the technical field involved in the new project, w2 is the weight of the proportion of the new project investment amount in the enterprise's net assets, w3 is the weight of the new project investment amount in the investment amount of all currently carried out projects, and w4 is the weight of the success rate of historical projects.
[0089] A targeted enterprise credit tracking method comprises the following steps:
[0090] Step 1: The user adds the monitored enterprise to the monitored enterprise list in the business database through the user interface;
[0091] Step 2: The first task publisher periodically publishes the data collection task to the data collection workbench, and the data collection workbench pulls the monitoring list from the monitoring enterprise list library and sends the monitoring list to the data collector;
[0092] Step 3: The data collector obtains enterprise information data from the credit steward database in the distributed data center according to the monitoring list, and stores the enterprise information data in the monitoring enterprise information database in the business database;
[0093] Step 4: The second task publisher periodically publishes the warning indicator calculation task to the indicator calculation workbench, and the indicator calculation workbench obtains the enterprise information data from the monitoring enterprise information library, obtains the indicator set data from the indicator set in the user rule template library, and sends the enterprise information data and the indicator set data to the indicator calculator;
[0094] Step 5: The indicator calculator performs indicator calculation on the enterprise information data according to the indicator set data, and stores the indicator calculation results in the indicator calculation result library in the big data HBase;
[0095] Step 6: The third task publisher periodically publishes the warning rule execution task to the rule execution workbench, and the rule execution workbench sends the warning rule execution task to the rule hit executor;
[0096] Step 7: The rule hit executor obtains the indicator calculation result from the indicator calculation result library, obtains the rule set data from the rule set in the user rule template library, and performs rule hit calculation on the indicator calculation result according to the rule set data, and stores the rule hit result in the rule hit result library in the big data HBase;
[0097] Step 8: The fourth task publisher periodically publishes the early warning notification execution task to the early warning executor, and the early warning executor sends the early warning notification execution task to the early warning notification workbench;
[0098] Step 9: The warning notification workbench obtains the rule hit result from the rule hit result library, obtains the user from the monitoring enterprise user library according to the rule hit result, obtains the warning content from the warning content template library, and then sends the warning content to the corresponding user end through the warning executor.
[0099] The technical background performs user rule template configuration through the following steps:
[0100] Step A1: Build a basic element library;
[0101] Step A2: The technical background uses the technical interface to sequentially configure the calculation script, indicator, rule, and warning based on the basic element library to obtain and publish the rule template.
[0102] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A targeted enterprise credit following system, comprising a targeted enterprise credit following platform, and a user terminal and a technical background connected to the targeted enterprise credit following platform via a network, characterized in that: The targeted enterprise credit following platform is provided with a first task publisher, a second task publisher, a third task publisher and a fourth task publisher; The first task publisher is connected to a data collection workbench, the data collection workbench is connected to a data collector and a business database, and the data collector is connected to a distributed data center and a business database; The second task publisher is connected to the indicator calculation workbench, the indicator calculation workbench is connected to the business database, the user rule template library and the indicator calculator, and the indicator calculator is connected to the user rule template library and the big data HBase; The third task publisher is connected to the rule execution workbench, the rule execution workbench is connected to the rule hit executor, and the rule hit executor is connected to the user rule template library and the big data HBase; The fourth task publisher is connected to the warning executor, the warning executor is connected to the warning notification workbench and the user end, and the warning notification workbench is connected to the big data HBase, the monitoring enterprise user library and the warning content template library.
2. The targeted enterprise credit tracking system according to claim 1 is characterized by: The business database is provided with a monitoring enterprise list library and a monitoring enterprise information library, the monitoring enterprise list library is connected to the user terminal and the data collection workbench, and the monitoring enterprise information library is connected to the data collector and the indicator calculation workbench; The distributed data center is provided with a credit steward special library.
3. The targeted enterprise credit tracking system according to claim 1 is characterized by: The user rule template library is provided with an indicator set, a rule set and an indicator library, wherein the indicator set is connected to the indicator calculation workbench, the rule set is connected to the rule hit executor, and the indicator library is connected to the indicator calculator.
4. The targeted enterprise credit tracking system according to claim 1 is characterized by: The indicator calculator is provided with an enterprise project indicator calculation module, and the enterprise project indicator calculation module is provided with a historical project indicator calculation unit, a new project feature extraction unit and an enterprise project comprehensive indicator calculation unit; The historical project index calculation unit calculates the enterprise historical project index calculation result a according to the enterprise historical project data in the enterprise information data; The calculation formula of the enterprise historical project indicator calculation result a is: Among them, a is the calculation result of the enterprise's historical project indicators, and a9 is the success rate of historical projects; The calculation result a of the enterprise's historical project indicators includes the total number of historical projects a1, the number of successful main business projects a2, the number of successful non-main business projects a3, the number of successful innovation projects a4, the project execution cycle a5, the number of invention patents a6, the number of utility model patents a7, the average contract amount of the project a8, and the success rate of historical projects a9; The new project feature extraction unit extracts the project features of the new project data from the enterprise information data according to the enterprise information data, and outputs a new project feature value b, wherein the new project feature value b includes the technical field b1 involved in the new project, the proportion of the new project investment amount in the enterprise's net assets b2, and the proportion of the new project investment amount in the investment amount of all currently carried out projects b3; The calculation expression of the enterprise project comprehensive index calculation unit is: Among them, x is the calculation result of the comprehensive index of the enterprise project, MATCH is the search function, b1 is the technical field involved in the new project, a is the calculation result of the enterprise's historical project index, b2 is the proportion of the new project investment amount in the enterprise's net assets, b3 is the proportion of the new project investment amount in the investment amount of all currently carried out projects, a9 is the success rate of historical projects, w1 is the weight of the technical field involved in the new project, w2 is the weight of the proportion of the new project investment amount in the enterprise's net assets, w3 is the weight of the new project investment amount in the investment amount of all currently carried out projects, and w4 is the weight of the success rate of historical projects.
5. The targeted enterprise credit tracking system according to claim 3 is characterized by: The indicator library includes counting indicator calculation, sum indicator calculation, maximum indicator calculation, minimum indicator calculation, average indicator calculation and indicator calculation filter; The rule set includes single rule hit calculation and combined rule hit calculation.
6. The targeted enterprise credit tracking system according to claim 1 is characterized by: The big data HBase is provided with an indicator calculation result library and a rule hit result library, and the indicator calculation result library is connected to the indicator calculator and the rule hit executor; The rule hit result library is connected to the rule hit executor and the early warning notification workbench.
7. The targeted enterprise credit tracking system according to claim 1 is characterized by: The targeted enterprise credit following platform is also provided with a configuration workbench, which is provided with a calculation script configuration unit, an indicator configuration unit, a rule configuration unit and an early warning configuration unit which are connected in sequence. The calculation script configuration unit is connected to the technical background, the early warning configuration unit is connected to the rule template publishing workbench, and the rule template publishing workbench is connected to the user rule template library.
8. The targeted enterprise credit tracking system according to claim 7 is characterized by: The configuration workbench is also connected to a basic element library, which includes a calculation script compiler, a calculation script executor, an indicator calculation expression, an indicator calculation executor, a rule expression parser, a rule executor, an early warning content parser and a metadata library.
9. A targeted enterprise credit tracking method, characterized in that: The following steps are involved: Step 1: The user adds the monitored enterprise to the monitored enterprise list in the business database through the user interface; Step 2: The first task publisher periodically publishes the data collection task to the data collection workbench, and the data collection workbench pulls the monitoring list from the monitoring enterprise list library and sends the monitoring list to the data collector; Step 3: The data collector obtains enterprise information data from the credit steward database in the distributed data center according to the monitoring list, and stores the enterprise information data in the monitoring enterprise information database in the business database; Step 4: The second task publisher periodically publishes the warning indicator calculation task to the indicator calculation workbench, and the indicator calculation workbench obtains the enterprise information data from the monitoring enterprise information library, obtains the indicator set data from the indicator set in the user rule template library, and sends the enterprise information data and the indicator set data to the indicator calculator; Step 5: The indicator calculator performs indicator calculation on the enterprise information data according to the indicator set data, and stores the indicator calculation results in the indicator calculation result library in the big data HBase; Step 6: The third task publisher periodically publishes the warning rule execution task to the rule execution workbench, and the rule execution workbench sends the warning rule execution task to the rule hit executor; Step 7: The rule hit executor obtains the indicator calculation result from the indicator calculation result library, obtains the rule set data from the rule set in the user rule template library, and performs rule hit calculation on the indicator calculation result according to the rule set data, and stores the rule hit result in the rule hit result library in the big data HBase; Step 8: The fourth task publisher periodically publishes the early warning notification execution task to the early warning executor, and the early warning executor sends the early warning notification execution task to the early warning notification workbench; Step 9: The warning notification workbench obtains the rule hit result from the rule hit result library, obtains the user from the monitoring enterprise user library according to the rule hit result, obtains the warning content from the warning content template library, and then sends the warning content to the corresponding user end through the warning executor.
10. The targeted enterprise credit tracking method according to claim 9, characterized in that: The technical background performs user rule template configuration through the following steps: Step A1: Build a basic element library; Step A2: The technical background uses the technical interface to perform calculation script configuration, indicator configuration, rule configuration, and warning configuration in sequence based on the basic element library to obtain and publish the rule template.
Citation Information
Patent Citations
Enterprise risk early warning method and system based on relation graph
CN115115257A