Intelligent transformer and energy-saving and loss-reducing control method and application thereof
Through the multi-speed switching technology of intelligent transformers, the gears are automatically switched according to the load current, the high loss problem of transformers when the peak and valley gap is large, the energy saving and consumption reduction of distribution transformers are achieved, and the economy of the power system is improved. benefit.
Patent Information
- Application Number
- CN202310603330.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-26
- Publication Date
- 2024-11-26
AI Technical Summary
When the peak and valley gap of existing transformers are large, they often operate in a light load or no-load state, resulting in a large amount of power loss. The capacity configuration of the distribution transformer is too large, resulting in huge no-load loss, affecting the economic benefits of the power system.
Intelligent transformers with multiple capacity incremental gears are adopted, and gears are automatically switched through the optimal current switching point, and the transformer gears are switched according to the load current magnitude to minimize the overall power loss of the transformer.
When the peak and valley gap of electricity consumption is large, the distribution transformer can save energy and reduce energy consumption by automatically switching gears, reduce power loss, and improve the economic benefits of the power system.
Smart Images

Figure CN119028720A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of transformers and energy-saving and consumption-reduction technology, and in particular to an intelligent transformer and an energy-saving and loss-reduction control method and application thereof. Background Art
[0002] Transformer losses have become an important part of the entire power grid loss, so energy saving and loss reduction of transformers are of great significance to improving the economic benefits of the entire power system.
[0003] According to estimates, there are about 17 million transformers in operation in my country, with a total capacity of about 11 billion kilovolt-amperes and an annual power loss of about 250 billion kilowatt-hours. Among them, the distribution network in rural areas, urban commercial areas, industrial areas and other regions has the characteristics of relatively concentrated power consumption time, short peak load duration, large daily load peak-to-valley difference, and large seasonal load variation. In order to meet the power demand during peak load, transformers have to be configured according to the maximum load when selecting transformers, resulting in distribution transformers often running under light load or no-load conditions, making the annual utilization hours of distribution transformers in these areas low, and the no-load loss huge, resulting in a large amount of unnecessary waste of power resources. According to statistics, of the medium and low voltage power grid losses, which account for 60% to 65% of the total power grid losses, about 70% of the losses are in distribution transformers.
[0004] Transformer loss includes no-load loss and load loss. Generally, the larger the transformer capacity, the greater the no-load loss. When configuring transformers in the industry, the transformer capacity is usually selected based on 120% of the maximum load. This causes the distribution transformer to operate under light load or even no-load conditions for a long time, resulting in higher energy loss.
[0005] It can be seen that the energy consumption of the distribution system is not only related to the quality of electricity used by thousands of households, but also an important factor that directly affects the economic benefits of power supply companies. On the premise of meeting the regional electricity demand, achieving energy saving and consumption reduction of distribution transformers has become an urgent goal to be achieved. Summary of the invention
[0006] The embodiment of the present invention provides an intelligent transformer and its energy-saving and loss-reduction control method and application. The technical solution can help achieve the goal of energy saving and consumption reduction of distribution transformers when the difference between peak and valley power consumption is large.
[0007] In the first aspect, an intelligent transformer is proposed, which has M capacity increasing gears, M>1, and has an optimal current switching point d between adjacent gears. i , i = 1, 2, 3...M-1, and as the gear increases, the d i Increasing.
[0008] Preferably, the low voltage winding of the transformer includes a plurality of windings connected in parallel, in series or inverse combination.
[0009] Preferably, the winding of the high-voltage winding of the transformer adopts a delta connection method or a star connection method.
[0010] Secondly, a transformer energy saving and loss reduction control method is proposed. The method uses a transformer with M capacity increasing gears, M>1. In different scenarios or facing different needs, transformers with different numbers of gears can be used. These transformers have optimal current switching points d between adjacent gears. i , i = 1, 2, 3...M-1, and as the gear increases, the d i Incremental;
[0011] Taking the load current as the control condition, obtain the current load current d, compare the load current with the size of each optimal current switching point, and switch the transformer gear according to the comparison result:
[0012] When d≦d1, the transformer switches to the first gear;
[0013] When i <d≦d i+1 , the transformer switches to the i+1th gear.
[0014] The present invention adopts a transformer with multiple capacity gears, utilizes the optimal current switching point between adjacent gears of these transformers, and automatically switches the gear of the transformer according to the size of the current load current d, so that under the same current load current d, the comprehensive power loss of the transformer is automatically switched to the minimum state, and the goal of energy saving and consumption reduction of the distribution transformer is achieved when the difference between peak and valley power consumption is large.
[0015] Preferably, the optimal current switching point d i Obtained through calculation, the relevant calculation formula is: d i 2 =(C i+1 -C i ) / (A i / S i 2 -A i+1 / S i+1 2 );in,
[0016] C i is the no-load loss of the transformer at the current gear;
[0017] A i is the rated load loss of the transformer at the current gear;
[0018] S i It is the rated capacity of the transformer at the current gear.
[0019] Preferably, the power loss curves of the transformer at the i-th gear and the i+1-th gear are drawn respectively with the current load current d as the variable, and the intersection of the power loss curves of the two gears is the optimal current switching point d between the two gears. i .
[0020] In the third aspect, a transformer energy-saving and loss-reduction control system is proposed, comprising:
[0021] A transformer with M capacity increasing gears, M>1, and there is an optimal current switching point d between adjacent gears i , i = 1, 2, 3...M-1, and as the gear increases, the d i Incremental;
[0022] Data acquisition module, collecting current load current d;
[0023] The data processing module takes the load current as the control condition, receives the current load current d and compares the load current with each optimal current switching point: when d≦d1, the transformer switches to the first gear; when d i <d≦d i+1 , the transformer switches to the i+1th gear.
[0024] In a fourth aspect, a transformer energy saving and loss reduction control device is provided, comprising: a memory, a processor, and the intelligent transformer described in the first aspect. The memory stores executable code, and when the executable code is executed by the processor, the processor executes the transformer energy saving and loss reduction control method described in the second aspect.
[0025] In a fifth aspect, an embodiment of the invention provides a non-temporary machine-readable storage medium having executable code stored thereon. When the executable code is executed by a processor of an electronic device, the processor can at least implement the transformer energy-saving and loss-reduction control method in the second aspect.
[0026] In the embodiment of the present invention, an intelligent transformer and its energy-saving and loss-reduction control method and application are provided, which have the following beneficial effects:
[0027] 1. Propose a transformer with multiple switching gears to make the transformer flexible and changeable, so as to prepare for subsequent energy-saving control;
[0028] 2. Use transformers with multiple gears and propose the concept of the best current switching point, which can achieve the goal of energy saving and consumption reduction of distribution transformers when there is a large difference between peak and valley power consumption;
[0029] 3. Provide a method for obtaining the optimal current switching point;
[0030] 4. A transformer has multiple capacity gears available for switching. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The drawings described herein are used to provide further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0032] in:
[0033] Figure 1 is a graph of the comprehensive power loss versus the average load factor;
[0034] Figure 2 A graph of the overall power loss versus the amount of current;
[0035] Figure 3 It is a schematic diagram of two windings connected in parallel and in series;
[0036] Figure 4 It is a schematic diagram of two windings connected in parallel, in series, and in reverse;
[0037] Figure 5 It is a schematic diagram of a low-voltage four-section winding variable capacity switch circuit. DETAILED DESCRIPTION
[0038] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be described clearly and completely below. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] The terms used in the embodiments of the present invention are only for the purpose of describing specific embodiments, and are not intended to limit the present invention. The singular forms "a", "said" and "the" used in the embodiments of the present invention and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings, and "multiple" generally includes at least two.
[0040] As used herein, the words "if" and "if" may be interpreted as "at the time of" or "when" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrases "if it is determined" or "if (stated condition or event) is detected" may be interpreted as "when it is determined" or "in response to determining" or "when detecting (stated condition or event)" or "in response to detecting (stated condition or event)", depending on the context.
[0041] Transformer loss includes no-load loss and load loss. Generally, the larger the transformer capacity, the greater the no-load loss. When configuring transformers in the industry, the transformer capacity is usually selected based on 120% of the maximum load. This causes the distribution transformer to operate under light load or even no-load conditions for a long time, resulting in high energy loss. The energy consumption of the distribution system is related to the quality of electricity used by thousands of households, and is also an important factor that directly affects the economic benefits of power supply companies. On the premise of meeting regional electricity demand, achieving energy conservation and consumption reduction of distribution transformers has become an urgent goal.
[0042] In view of the above problems and objectives, the present invention proposes a transformer energy-saving and loss-reduction control method, which switches the transformer capacity according to the current power consumption to achieve the purpose of reducing the transformer power loss.
[0043] The implementation principles of the method, system, device and medium of the present invention are similar and will not be repeated here.
[0044] After introducing the basic principles of the present invention, various non-limiting embodiments of the present invention are specifically introduced below. It should be noted that the embodiments provided by the present invention are only shown to facilitate understanding of the spirit and principles of the present invention, and the embodiments of the present invention are not subject to any limitation in this respect. On the contrary, the embodiments of the present invention can be applied to any applicable system.
[0045] Embodiment 1:
[0046] A transformer energy saving and loss reduction control method is proposed. The method uses a transformer with M capacity increasing gears, M>1. In different scenarios or facing different needs, transformers with different numbers of gears can be used. These transformers have optimal current switching points d between adjacent gears. i , i = 1, 2, 3...M-1, and as the gear increases, the d i Increasing.
[0047] Taking the load current as the control condition, obtain the current load current d, compare the load current with the size of each optimal current switching point, and switch the transformer gear according to the comparison result:
[0048] When d≦d1, the transformer switches to the first gear;
[0049] When i <d≦d i+1 , the transformer switches to the i+1th gear.
[0050] In this embodiment, the optimal current switching point d i Obtained through calculation, the relevant calculation formula is: d i 2 =(C i+1 -C i ) / (Ai / S i 2 -A i+1 / S i+1 2 );in,
[0051] C i is the no-load loss of the transformer at the current gear;
[0052] A i is the rated load loss of the transformer at the current gear;
[0053] S i It is the rated capacity of the transformer at the current gear.
[0054] The following is the origin of the above calculation formula:
[0055] 1. Calculate the power loss curve for each gear first
[0056] First, the transformer power loss is calculated as follows:
[0057] 1. Useful power loss: ΔP=P0+K T β 2 P k
[0058] 2. Useless power loss: ΔQ = Q0 + K T β 2 Q k
[0059] 3. Comprehensive power loss (electric loss): ΔP z =ΔP+K Q ΔQ
[0060] Where, Q0≈I0%S N , Q k ≈U k %S N
[0061] Where:
[0062] Q0——no-load useless power loss (kvar, kilovar, useless power unit);
[0063] P0——no-load loss (kW);
[0064] P K —Rated load loss (kW);
[0065] S N ——transformer rated capacity (kVA);
[0066] I0%——Transformer no-load current percentage;
[0067] U k %——short circuit voltage percentage;
[0068] β——average load factor;
[0069] K T ——Load fluctuation loss coefficient, generally K can be taken for calculation T =1.05;
[0070] Q k ——Rated load leakage power (kvar);
[0071] K Q ——Economic equivalent of useless work (kW / kvar). When the 6kV~10kV step-down transformers in urban power grids and industrial enterprise power grids take the minimum load of the system, the useless work equivalent K Q =0.1kW / kvar.
[0072] After conversion, we can get:
[0073] Power loss ΔP z =ΔP+K Q ΔQ=P0+K T β 2 P k +K Q (Q0+K T β 2 Q k )=P0+K Q Q0+(K T P k +K T K Q Q k )β 2
[0074] Let C = P0 + K Q Q0, A = K T P K +K T K Q Q k , there is ΔP Z =C+Aβ 2 , where K T Take 1.05, K Q When 0.1kW / kvar is taken, since P0 and Q0 are constants for a specific transformer, A and C are both constants greater than 0, that is, the comprehensive power loss of the transformer is an upward-opening parabolic function about the average load rate, such as Figure 1 .
[0075] By collecting the power loss ΔP corresponding to multiple average load factors β Z, C and A can be fitted. C and A can also be calculated by the no-load loss and rated load loss of each gear. When no-load, β=0, ΔP Z =C = no-load loss, β = 1 at full load, ΔP Z =C+A=no-load loss+rated load loss, so A=rated load loss.
[0076] 2. Calculate the optimal current switching point d between two adjacent gears i
[0077] Let the load rate of the i-th gear be β i , rated capacity is S i , the power loss is Y i =C i +A i β i 2 ,
[0078] The load rate of the i+1th gear is β i+1 , rated capacity is S i+1 , the power loss is Y i+1 =C i+1 +A i+1 β i+1 2 ,
[0079] The current load current is d, β i =d / S i , β i+1 =d / S i+1 =(d / S i ) / (S i+1 / S i )=β i S i / S i+1 ,
[0080] According to the gear description, 0 i i+1 , so S i / S i+1 <1, and because C in the power loss formula i , A i , C i+1 , A i+1 is a constant, Y i and Y i+1 The growth rate is mainly affected by the quadratic variable β i and β i+1 As the load current d increases, Y i Must wear Y i+1 , that is, the two power loss curves intersect.
[0081] Let the load current at the intersection of the two power loss curves be d i , when load current = d i When i =d i / S i , β i+1 =d i / S i+1 , Y i =Y i+1 , so there is
[0082] C i +A i β i 2 =C i +A i d i 2 / S i 2 =C i+1 +A i+1 β i+1 2 =C i+1 +A i+1 d i 2 / S i+1 2 ,
[0083] d i 2 =(C i+1 -C i ) / (A i / S i 2 -A i+1 / S i+1 2 ).
[0084] It can be seen that the optimal switching point d i It exists and can be obtained.
[0085] If the rated capacity of the smart transformer has m gears from small to large, m>1, then there is a unique optimal switching point d between two adjacent gears. i , and this optimal switching point d i At the intersection of the two power loss curves corresponding to these two gears.
[0086] According to the Technical Parameters and Requirements for Oil-Immersed Power Transformers, National Standard of the People's Republic of China GB / T6451-2015, the higher the transformer capacity, the higher its no-load loss and rated load loss. That is, the no-load loss of the i-th gear is less than the no-load loss of the i+1-th gear. The electric loss curve for different gears of the current current can be obtained, such as Figure 2, so when the load current is less than the intersection current d i When , the power loss of the i-th gear is lower than that of the i+1-th gear, that is, when the current is 0, the power loss curve of the i-th gear is below the power loss curve of the i+1-th gear. Figure 2 It can be seen that after passing the intersection point, the power loss of the i-th gear is higher than the power loss of the i+1-th gear. At this time, the power loss curve of the i-th gear is above the power loss curve of the i+1-th gear.
[0087] In other embodiments, the optimal current switching point d i The acquisition can be done by: using the current load current d as a variable to draw the power loss curves of the transformer at the i-th gear and the i+1-th gear respectively. The intersection of the power loss curves of the two gears is the optimal current switching point d between the two gears. i .
[0088] Embodiment 2:
[0089] An intelligent transformer has M capacity increasing gears, M>1, and there is an optimal current switching point d between adjacent gears i , i = 1, 2, 3...M-1, and as the gear increases, the d i The transformer can implement the transformer energy saving and loss reduction control method described in the first embodiment.
[0090] Specifically, the winding of the high voltage winding of the transformer adopts a delta connection or a star connection. The low voltage winding of the transformer includes a plurality of windings connected in parallel, in series or inversely.
[0091] Example 1: Four-speed adjustable capacity transformer
[0092] The high voltage adopts two connection groups: Dyn11 and Yyn0, and the high voltage winding has variable turns: 1273 and 1470; the low voltage has four windings, namely 2 20-turn windings and 2 8-turn windings, and their gear positions and loss information are shown in Table 1.
[0093] The first gear: capacity 125kVA, high voltage turns 1470, low voltage turns 56, four low voltage windings are connected in series, equal to 20+20+8+8=56 (turns).
[0094] The second gear: capacity 200kVA, high voltage turns 1273, low voltage 48 turns, low voltage 20 and 20 in series, 8 and 8 in parallel, and then in series, equal to 20+20+8=48 (turns).
[0095] The third gear: capacity 250kVA, high voltage turns 1470, low voltage 32 turns, low voltage 20 and 20 in series, 8 and 8 in parallel, and then reversed, equal to 20+20-8=32 (turns).
[0096] The fourth gear: capacity 400kVA, high voltage turns 1273, low voltage 28 turns, low voltage 20 and 20 in parallel, 8 and 8 in parallel, and then connected in series, equal to 28 (turns).
[0097]
[0098] Table 1 Gear position and loss information
[0099] Example 2: Number of turns and resistance change at the low voltage end
[0100] Assume that there are four secondary windings at the low voltage end, marked as section I, section II, section III, and section IV, where section I and section II have the same number of turns, and section III and section IV have the same number of turns. In this way, we can have the following four wiring schemes with the same number of turns: (Here "*" indicates parallel connection, and "+" indicates series connection). Compared with a single winding, parallel connection changes the resistance (capacitance), and series connection changes the number of turns.
[0101] 1) Segment I + Segment III
[0102] 2) Segment I + Segment III * Segment IV
[0103] 3) Segment I*Segment II+Segment III
[0104] 4) Segment I*Segment II+Segment III*Segment IV
[0105] Obviously, the above four connection methods correspond to four different resistances, and under the condition of constant voltage, they also correspond to four different maximum currents and four different transformer capacities.
[0106] like Figure 3 , is a schematic diagram of two windings connected in parallel or in series, where S1, S2, and S3 are connection switches. The windings can be connected in parallel or in series by disconnecting or connecting S1, S2, and S3. The connection relationship is shown in Table 2.
[0107] S1 S2 S3 Two windings in parallel connect disconnect connect Two windings in series disconnect connect disconnect Single winding disconnect disconnect connect
[0108] Table 2
[0109] like Figure 4 , is a schematic diagram of two windings connected in parallel, in series, and inversely, where S1, S2, S3, S4, S5, S6, and S7 are connection switches. The windings can be connected in parallel, in series, and inversely by disconnecting or connecting S1, S2, S3, S4, S5, S6, and S7. The connection relationship is shown in Table 3.
[0110] S1 S2 S3 S4 S5 S6 S7 in parallel connect disconnect connect disconnect connect disconnect connect Series Connection disconnect connect disconnect disconnect connect disconnect connect Parallel connection, reverse connection connect disconnect connect connect disconnect connect disconnect Series connection, reverse connection disconnect connect disconnect connect disconnect connect disconnect
[0111] Table 3
[0112] like Figure 5, is a schematic diagram of a low-voltage four-section winding variable capacity switch circuit.
[0113] In practical applications, more combinations of series connection, parallel connection, and reverse connection can be made between the windings as needed to achieve more capacity gears.
[0114] Embodiment three:
[0115] A transformer energy-saving and loss-reducing control system, comprising a transformer with M capacity increasing gears, M>1, and an optimal current switching point d between adjacent gears. i , i = 1, 2, 3...M-1, and as the gear increases, the d i Incremental;
[0116] Data acquisition module, collecting current load current d;
[0117] The data processing module takes the load current as the control condition, receives the current load current d and compares the load current with each optimal current switching point: when d≦d1, the transformer switches to the first gear; when d i <d≦d i+1 , the transformer switches to the i+1th gear.
[0118] Embodiment 4:
[0119] A transformer energy-saving and loss-reduction control device comprises: a memory and a processor. The memory stores executable codes, and when the executable codes are executed by the processor, the processor executes the transformer energy-saving and loss-reduction control method as described in the first embodiment.
[0120] Embodiment five:
[0121] A non-transitory machine-readable storage medium having executable code stored thereon, when the executable code is executed by a processor of an electronic device, the processor can at least implement the transformer energy saving and loss reduction control method in embodiment one.
[0122] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An intelligent transformer, characterized in that: There are M capacity increasing gears, M>1, and there is an optimal current switching point d between adjacent gears i , i = 1, 2, 3...M-1, and as the gear increases, the d i Increasing.
2. The intelligent transformer according to claim 1, characterized in that: The low voltage winding of the transformer comprises a plurality of windings connected in parallel, in series or in reverse combination.
3. The intelligent transformer according to claim 1, characterized in that: The winding of the high-voltage winding of the transformer adopts a delta connection method or a star connection method.
4. A transformer energy saving and loss reduction control method, characterized in that: The intelligent transformer according to any one of claims 1 to 3 is used, and the load current is used as a control condition to obtain the current load current d, and compare the load current with each optimal current switching point: when d≦d1, the transformer switches to the first gear; when d i <d≦d i+1 , the transformer switches to the i+1th gear.
5. A transformer energy saving and loss reduction control method according to claim 4, characterized in that: The optimal current switching point d i The relevant calculation formula is: i 2 =(C i+1 -C i ) / (A i / S i 2 -A i+1 / S i+1 2 );in, C i is the no-load loss of the transformer at the current gear; A i is the rated load loss of the transformer at the current gear; S i It is the rated capacity of the transformer at the current gear.
6. A transformer energy saving and loss reduction control method according to claim 4, characterized in that: Taking the current load current d as the variable, the power loss curves of the transformer at the i-th gear and the i+1-th gear are plotted respectively. The intersection of the power loss curves of the two gears is the optimal current switching point d between the two gears. i .
7. A transformer energy-saving and loss-reduction control system, characterized in that: include: Using the smart transformer according to any one of claims 1 to 3; Data acquisition module, collecting current load current d; The data processing module takes the load current as the control condition, receives the current load current d and compares the load current with each optimal current switching point: when d≦d1, the transformer switches to the first gear; when d i <d≦d i+1 , the transformer switches to the i+1th gear.
8. A transformer energy saving and loss reduction control device, characterized in that: include: A memory, a processor and the smart transformer according to any one of claims 1 to 3; the memory stores executable code, and when the executable code is executed by the processor, the processor executes a transformer energy-saving and loss-reduction control method: taking the load current as the control condition, obtaining the current load current d, and comparing the load current with each optimal current switching point: when d≦d1, the transformer switches to the first gear; when d i <d≦d i+1 , the transformer switches to the i+1th gear.
9. The transformer energy saving and loss reduction control device according to claim 8, characterized in that: The relevant calculation formula of the optimal current switching point di is: di2=(Ci+1-Ci) / (Ai / Si2-Ai+1 / Si+12); wherein, Ci is the no-load loss of the transformer at the current gear; Ai is the rated load loss of the transformer at the current gear; Si is the rated capacity of the transformer at the current gear.