Positioning verticality adjusting device and steel pipe column positioning construction method
By using positioning and vertical adjustment devices in steel pipe string installation, using hydraulic jacks and angle sensors to adjust verticality and horizontality in real time, the problems of long installation time, high cost and high safety risks in the prior art are solved, and high efficiency is achieved , accurate steel pipe string installation.
Patent Information
- Application Number
- CN202411300451.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2024-11-29
AI Technical Summary
The existing steel pipe columns are installed in underground buildings with long construction periods, complex processes, high safety risks and high construction costs, especially in the reverse approach, where the positioning accuracy and verticality are high but difficult to achieve.
A positioning and vertical adjustment device is designed, including a foundation cushion layer, steel casing, bottom adjustment structure, upper adjustment structure and angle sensor. The verticality and horizontality of the steel pipe column are monitored and adjusted in real time through hydraulic jacks and adjustment screws to ensure installation. Accuracy.
It realizes efficient and precise installation of steel pipe columns, reduces construction costs and construction periods, improves construction safety and accuracy, and simplifies construction process.
Smart Images

Figure CN119041723A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a positioning and vertical adjustment device and a steel pipe column positioning construction method. Background Art
[0002] In recent years, with the rapid development of infrastructure construction in my country, more and more projects have been built using the reverse construction method in rail transit and high-rise basement construction. The reverse construction method has many advantages, but also many difficulties, such as the verticality of steel pipe column installation, high positioning accuracy requirements and large construction depth.
[0003] In the related art, the installation of steel pipe columns in underground buildings mostly adopts two construction methods: (1) manually breaking the pile head after burying the steel casing and installing the locator to fix the steel pipe column; (2) using HPE hydraulic machine to vertically insert the steel pipe column. The first traditional method of manually breaking the pile head and installing the locator to locate the steel pipe column has the disadvantages of long construction period, complicated procedures and high construction safety risks. The second method of vertically inserting the HPE hydraulic machine to locate the steel pipe column has the disadvantages of high requirements for the construction site (the bottom foundation of the hydraulic equipment needs to be hardened and leveled) and high construction cost. Summary of the invention
[0004] The main purpose of the present invention is to provide a positioning and vertical adjustment device and a steel pipe column positioning construction method, aiming to provide a positioning and vertical adjustment device with simple structure and low cost.
[0005] To achieve the above-mentioned purpose, the positioning and vertical adjustment device proposed in the present invention is used for installing a steel pipe column, comprising a foundation cushion layer and a steel casing, wherein the foundation cushion layer is provided with a pile hole, and the steel casing is arranged in the pile hole. The positioning and vertical adjustment device comprises:
[0006] A bottom adjustment structure, the bottom adjustment structure comprising a channel steel support and a tool column, the channel steel support is arranged on the foundation cushion layer, the tool column is passed through the channel steel support and is partially located in the steel casing;
[0007] An upper adjustment structure, the upper adjustment structure comprising a support platform and four hydraulic jacks, the support platform is arranged on the foundation cushion layer and is located above the channel steel bracket, the support platform is provided with a first positioning hole, the first positioning hole is arranged corresponding to the tool column, and the four hydraulic jacks are arranged on the support platform at intervals along the circumference of the first positioning hole; and
[0008] An angle sensor is arranged at the bottom end of the steel pipe column, and the steel pipe column passes through the first positioning hole and is located in the tool column.
[0009] In one embodiment, the bottom adjustment structure includes a support ring plate, and the support ring plate is sleeved on the tool column and connected to the channel steel bracket.
[0010] In one embodiment, the bottom adjustment structure includes fasteners, and the fasteners are penetrated through the support ring plate and the channel steel bracket to connect the support ring plate and the channel steel bracket.
[0011] In one embodiment, the channel steel bracket includes a bearing platform and a support frame, the bearing platform is connected to the support frame, the bearing platform is provided with a second positioning hole, the tool column is arranged in the second positioning hole and partially exposed in the second positioning hole.
[0012] In one embodiment, the positioning and vertical adjustment device includes two adjusting screws, which are spaced apart and penetrate the side wall of the tool column and are located between the hydraulic jack and the angle sensor and abut against the steel pipe column.
[0013] In one embodiment, the upper adjustment structure includes a plurality of support rods and a plurality of connecting rods, wherein both ends of each support rod are respectively connected to the base cushion layer and the support platform, and both ends of each connecting rod are respectively connected to the support rod and the support platform.
[0014] The present invention further provides a steel pipe column positioning construction method, using any of the positioning and vertical adjustment devices described above, the steel pipe column positioning construction method comprising:
[0015] Obtain and mark the center point of the pile position;
[0016] Burying the steel casing and checking the alignment of the center of the steel casing with the center of the pile position;
[0017] Drilling the pile hole and cleaning the hole;
[0018] Install the steel cage to the specified elevation in the pile hole, and pour underwater concrete to the designed pile top elevation;
[0019] Harden the site around the pile hole, pour the foundation cushion with C30 concrete, and install the channel steel bracket, the tool column and the support platform;
[0020] Hanging the steel pipe column and keeping it vertically inserted into the tool column;
[0021] Pour underwater concrete, remove the positioning and vertical adjustment device, and backfill the pile hole.
[0022] In one embodiment, the steps of burying the steel casing and verifying the alignment of the center of the steel casing with the center point of the pile position include: the thickness of the steel casing is 16 mm, 1 to 2 overflow holes are opened on the upper part of the steel casing, the burial depth of the steel casing is not less than 2.5 m, the diameter of the steel casing is 200 mm larger than the diameter of the steel pipe column, after burying the steel casing, the center of the steel casing is verified according to the cross pile guide, the difference between the center line of the steel casing and the center line of the pile position shall not be greater than 10 mm, and the steel casing is perpendicular to the foundation cushion layer.
[0023] In one embodiment, the step of drilling the pile hole and cleaning the hole includes: the pile hole is drilled by a rotary drilling method, and after the hole is cleaned, an ultrasonic detector is used to check the hole depth, hole diameter and verticality, and the verticality is ensured to be controlled within 1 / 500.
[0024] In one embodiment, the step of hoisting the steel pipe column and keeping it vertically inserted into the tool column includes: using a total station to monitor the verticality of the steel pipe column, real-time monitoring of the angle sensor data during the lowering of the steel pipe column, and when a deviation occurs, the hydraulic jack adjusts the steel pipe column until the data detected by the angle sensor is zero.
[0025] In the technical solution of the present invention, during the process of installing the steel pipe column into the steel casing, the verticality and horizontality of the steel pipe column are detected in real time by the angle sensor. When the verticality or horizontality of the steel pipe column deviates, the four hydraulic jacks work together to apply horizontal pressure to the steel pipe column to adjust the verticality and horizontality of the steel pipe column to within the required range until the installation of the steel pipe column is completed so that its verticality and horizontality meet the installation requirements. The positioning and vertical adjustment device is set, which has a simple structure and low cost, and can effectively control the verticality of the steel pipe column during installation while improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.
[0027] Figure 1 A structural schematic diagram of an embodiment of a positioning and vertical adjustment device is provided for the present invention;
[0028] Figure 2 A top view of an embodiment of a bottom adjustment structure is provided for the present invention;
[0029] Figure 3 A top view of an embodiment of an upper adjustment structure is provided for the present invention;
[0030] Figure 4 The present invention provides a flow chart of an embodiment of a steel pipe column positioning construction method.
[0031] Description of Figure Numbers:
[0032] 100, positioning and vertical adjustment device; 1, bottom adjustment structure; 11, channel steel bracket; 111, bearing platform; 111a, second positioning hole; 112, support frame; 12, tool column; 13, support ring plate; 14, fastener; 2, upper adjustment structure; 21, support platform; 211, first positioning hole; 22, hydraulic jack; 23, support rod; 24, connecting rod; 3, angle sensor; 4, adjustment screw;
[0033] 200, foundation cushion; 210, pile hole; 300, steel casing; 400, steel pipe column.
[0034] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.
[0037] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features limited to "first" and "second" may explicitly or implicitly include at least one of the features. In addition, if "and / or" or "and / or" appears in the full text, its meaning includes three parallel solutions. Taking "A and / or B" as an example, it includes solution A, solution B, or solutions that satisfy both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0038] The present invention provides a positioning and vertical adjustment device 100 .
[0039] See also Figures 1 to 3 In one embodiment of the present invention, the positioning and vertical adjustment device 100 is used to install a steel pipe column 400, including a foundation cushion layer 200 and a steel casing 300, wherein the foundation cushion layer 200 is provided with a pile hole 210, and the steel casing 300 is arranged in the pile hole 210, and the positioning and vertical adjustment device 100 includes a bottom adjustment structure 1, an upper adjustment structure 2 and an angle sensor 3, wherein the bottom adjustment structure 1 includes a channel steel bracket 11 and a tool column 12, wherein the channel steel bracket 11 is arranged on the foundation cushion layer 200, and the tool column 12 is penetrated through the channel steel bracket 11 and is partially located on the steel casing 300; the upper adjustment structure 2 includes a support platform 21 and four hydraulic jacks 22, the support platform 21 is arranged on the foundation cushion layer 200, and is located above the channel steel bracket 11, the support platform 21 is provided with a first positioning hole 211, the first positioning hole 211 is arranged corresponding to the tool column 12, and the four hydraulic jacks 22 are arranged on the support platform 21 along the circumferential interval of the first positioning hole 211; the angle sensor 3 is arranged at the bottom end of the steel pipe column 400, and the steel pipe column 400 passes through the first positioning hole 211 and is located in the tool column 12.
[0040] In the technical solution of the present invention, during the process of installing the steel pipe column 400 into the steel casing 300, the verticality and horizontality of the steel pipe column 400 are detected in real time by the angle sensor 3. When the verticality or horizontality of the steel pipe column 400 deviates, the four hydraulic jacks 22 work together to apply horizontal pressure to the steel pipe column 400 to adjust the verticality and horizontality of the steel pipe column 400 to within the required range until the installation of the steel pipe column 400 is completed so that its verticality and horizontality meet the installation requirements. The positioning and vertical adjustment device 100 is provided, which has a simple structure and low cost, and can effectively control the verticality of the steel pipe column 400 during installation while improving construction efficiency.
[0041] To connect the tool column 12 and the channel steel bracket 11, refer to Figure 1 and Figure 2 In one embodiment of the present invention, the bottom adjustment structure 1 includes a support ring plate 13, which is sleeved on the tool column 12 and connected to the channel steel bracket 11. The support ring plate 13 is sleeved on the tool column 12 and welded to the tool column 12 to fix the tool column 12 and ensure that the center of the tool column 12 coincides with the center of the steel casing 300, thereby further reducing the verticality error of the steel pipe column 400 when installing the steel pipe column 400 and improving the installation accuracy of the steel pipe column 400.
[0042] To achieve the connection between the support ring plate 13 and the channel steel bracket 11, please refer to Figure 1 and Figure 2 In one embodiment of the present invention, the bottom adjustment structure 1 includes a fastener 14, and the fastener 14 is inserted through the support ring plate 13 and the channel steel bracket 11 to connect the support ring plate 13 and the channel steel bracket 11. The fastener 14 can be a screw, or a bolt and a nut, and the present invention does not limit this; the fastener 14 can be used to connect or disassemble the channel steel bracket 11 and the support ring plate 13, which provides great flexibility for installation, maintenance and modification, making the operation easier. The use of the fastener 14 connection allows fine-tuning when necessary. After determining that the center of the tool column 12 coincides with the center of the steel casing 300, the support ring plate 13 is connected to the channel steel bracket 11, which can also ensure the accuracy and stability of the connection. When it is necessary to disassemble or replace parts, it can be easily disassembled without causing irreversible effects on other components.
[0043] Specifically, see Figure 1In one embodiment of the present invention, the channel steel support 11 includes a bearing platform 111 and a support frame 112. The bearing platform 111 is connected to the support frame 112. The bearing platform 111 is provided with a second positioning hole 111a. The tool column 12 is arranged in the second positioning hole 111a and partially exposed in the second positioning hole 111a. The channel steel support 11 is formed by the combination of the bearing platform 111 and the support frame 112 to form a stable structural system. The support frame 112 provides a solid support for the bearing platform 111, and the bearing platform 111 can effectively disperse and bear the load from above, thereby ensuring the stability of the entire structure; the second positioning hole 111a is arranged in alignment with the steel casing 300, and the tool column 12 passes through the second positioning hole 111a and remains coaxial with the steel casing 300, thereby ensuring that the verticality of the steel pipe column 400 is improved in the next step of installation.
[0044] To better control the verticality of the steel pipe column 400, please refer to Figure 1 In one embodiment of the present invention, the positioning and vertical adjustment device 100 includes two adjusting screws 4, which are arranged at intervals through the side wall of the tool column 12, and are located between the hydraulic jack 22 and the angle sensor 3 and abut against the steel pipe column 400. During the installation of the steel pipe column 400, the angle sensor 3 detects the verticality of the steel pipe column 400. When the verticality of the steel pipe column 400 deviates, the four hydraulic jacks 22 apply horizontal pressure to the upper part of the steel pipe column 400, and the adjusting screw 4 adjusts the center of the steel pipe column 400 to coincide with the center of the tool column 12 in the middle of the steel pipe column 400. The hydraulic jack 22 and the adjusting screw 4 operate simultaneously to better control the verticality of the steel pipe column 400.
[0045] To improve the stability of the upper adjustment structure 2, please refer to Figure 1 In one embodiment of the present invention, the upper adjustment structure 2 includes a plurality of support rods 23 and a plurality of connecting rods 24, and the two ends of each of the support rods 23 are respectively connected to the base cushion layer 200 and the support platform 21, and the two ends of each of the connecting rods 24 are respectively connected to the support rod 23 and the support platform 21. The support platform 21 is connected to the base cushion layer 200 through the plurality of support rods 23 and the plurality of connecting rods 24 to form a stable upper adjustment structure 2, and the support rods 23 and the connecting rods 24 provide solid support for the support platform 21, and the support platform 21 can effectively disperse and bear the load from above, thereby ensuring the stability of the entire structure.
[0046] The present invention also proposes a steel pipe column positioning construction method, which adopts any of the positioning and vertical adjustment devices 100 described above. The specific structure of the positioning and vertical adjustment device 100 refers to the above embodiments. Since the steel pipe column positioning construction method adopts all the technical solutions of all the above embodiments, it at least has all the beneficial effects brought by the technical solutions of the above embodiments, which will not be described one by one here. Among them, the steel pipe column positioning construction method includes:
[0047] Step S100: Acquire and mark the pile position center point;
[0048] In this embodiment, the site is first leveled, the center coordinates of the piles are measured using a total station, cross lines are drawn around the piles with steel bars to position them, and a triangular mark is made with red paint to mark the center point.
[0049] Step S200: burying the steel casing 300 and checking whether the center of the steel casing 300 is aligned with the center point of the pile position;
[0050] In this embodiment, after confirming the center of the pile position, the buried depth of the steel casing 300 is determined. The buried depth is not less than 2.5m. The top of the buried steel casing 300 is 0.3m higher than the construction ground. After burying the steel casing 300, the center point of the steel casing 300 and the center point of the pile position are checked according to the cross pile guide.
[0051] Step S300: drilling the pile hole 210 and cleaning the hole;
[0052] In this embodiment, the pile hole 210 is drilled by rotary drilling. After the hole is cleaned, an ultrasonic detector is used to check the hole depth, hole diameter and verticality, and ensure that the verticality is controlled within 1 / 500.
[0053] Step S400: installing the steel cage to a specified elevation in the pile hole 210, and pouring underwater concrete to the designed pile top elevation;
[0054] In this embodiment, the steel cage is hoisted to a designated location, and underwater concrete is poured to the designed pile top elevation using the conduit method.
[0055] Step S500: hardening the area around the pile hole 210, pouring the foundation cushion layer 200 with C30 concrete, and installing the channel steel bracket 11, the tool column 12 and the support platform 21;
[0056] In this embodiment, the site around the pile hole 210 is hardened, the bottom adjustment structure 1 is installed, the tool column 12 is suspended, and monitoring is performed using a total station. After determining that the center of the tool column 12 coincides with the center of the pile position, the tool column 12 is fixed, and after the fixing is completed, the upper adjustment structure 2 is installed.
[0057] Step S600: hanging the steel pipe column 400 and inserting it vertically into the tool column 12;
[0058] In this embodiment, after the concrete strength reaches the design requirement, two cranes are used to lower the steel pipe column 400. Before lifting, an angle sensor 3 is installed at the bottom of the steel pipe column 400. When the steel pipe column 400 is lifted and kept naturally vertical, the sensor data is checked. After confirmation, the steel pipe column 400 is inserted into the tool column 12. At the same time, the steel pipe column 400 is adjusted to a horizontal position by the hydraulic jack 22. The verticality of the steel pipe column 400 is monitored by the total station. By adjusting the bolts and the upper hydraulic jack 22, the center of the steel pipe column 400 and the center of the pile position are coincident, and then the steel pipe column 400 is continued to be lowered. During the lowering process, the sensor data is monitored in real time. When a deviation occurs, the hydraulic jack 22 is used for fine adjustment until the sensor data is zero.
[0059] Step S700: pouring underwater concrete, removing the positioning and vertical adjustment device 100, and backfilling the pile hole 210;
[0060] In this embodiment, after the steel pipe column 400 reaches the designed elevation, the steel pipe column 400 is fixed, and underwater concrete is poured through a conduit. After the pouring is completed, the positioning and vertical adjustment device 100 is removed and the pile hole 210 is backfilled.
[0061] In one embodiment of the present invention, the steps of burying the steel casing 300 and verifying the alignment of the center of the steel casing 300 with the center point of the pile position include: the thickness of the steel casing 300 is 16 mm, 1 to 2 overflow holes are opened on the upper part of the steel casing 300, the burial depth of the steel casing 300 is not less than 2.5 m, the diameter of the steel casing 300 is 200 mm larger than the diameter of the steel pipe column 400, after burying the steel casing 300, the center of the steel casing 300 is verified according to the cross pile guide, the difference between the center line of the steel casing 300 and the center line of the pile position shall not be greater than 10 mm, and the steel casing 300 is perpendicular to the foundation cushion layer 200. One of the main functions of the steel casing 300 is to ensure that the positioning of the pile does not deviate. The overflow hole is opened to judge the concrete pouring situation by overflowing concrete during the concrete pouring process to ensure the accurate positioning of the pile; the steel casing 300 also has the functions of protecting the hole mouth, preventing ground water from flowing in, increasing the water pressure in the hole, and preventing hole collapse. During the concrete pouring process, the pressure in the hole will increase. The overflow hole can balance the pressure inside and outside the hole and reduce the risk of hole collapse; the setting of the steel casing 300 can also prevent the overflow of mud in the hole during construction from causing on-site pollution. Through the overflow hole, the excess mud and air in the hole can be removed to keep the hole clean and prevent mud from overflowing; during the concrete pouring process, the amount of concrete poured can be accurately judged by observing the overflow of slurry and concrete from the overflow hole, avoiding the waste of concrete or the problem of insufficient strength of concrete on the pile top.
[0062] In one embodiment of the present invention, the step of drilling the pile hole 210 and cleaning the hole includes: the pile hole 210 is drilled by rotary drilling, and after the hole is cleaned, an ultrasonic detector is used to check the hole depth, hole diameter and verticality, and ensure that the verticality is controlled within 1 / 500. The rotary drilling method is used to drill the hole. In order to ensure the stability of the rotary drilling rig, two 30mm thick steel plates of 6m×2.2m× are placed under the drill track to increase the contact area between the drill track and the ground, so as to prevent the drilling rig from being unstable due to uneven settlement of the soil during construction. After the hole is cleaned, the hole depth, hole diameter and verticality are checked by an ultrasonic detector to ensure that the verticality of the pile hole 210 is controlled within 1 / 500.
[0063] In one embodiment of the present invention, the step of hanging the steel pipe column 400 and keeping it vertically inserted into the tool column 12 includes: using a total station to monitor the verticality of the steel pipe column 400, the steel pipe column 400 monitors the angle sensor 3 data in real time during the lowering process, and when a deviation occurs, the hydraulic jack 22 adjusts the steel pipe column 400 until the data detected by the angle sensor 3 is zero. The steel pipe column 400 adjusts its verticality in time during the installation process, and the use of this device and method effectively controls the verticality of the steel pipe column 400 during installation while improving construction efficiency.
[0064] The above description is only an exemplary embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the technical concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.
Claims
1. A positioning and vertical adjustment device for installing a steel pipe column, comprising a foundation cushion layer and a steel casing, wherein the foundation cushion layer is provided with a pile hole, and the steel casing is arranged in the pile hole, characterized in that: The positioning and vertical adjustment device comprises: A bottom adjustment structure, the bottom adjustment structure comprising a channel steel support and a tool column, the channel steel support is arranged on the foundation cushion layer, the tool column is passed through the channel steel support and is partially located in the steel casing; An upper adjustment structure, the upper adjustment structure comprising a support platform and four hydraulic jacks, the support platform is arranged on the foundation cushion layer and is located above the channel steel bracket, the support platform is provided with a first positioning hole, the first positioning hole is arranged corresponding to the tool column, and the four hydraulic jacks are arranged on the support platform at intervals along the circumference of the first positioning hole; and An angle sensor is arranged at the bottom end of the steel pipe column, and the steel pipe column passes through the first positioning hole and is located in the tool column.
2. The positioning and vertical adjustment device according to claim 1, characterized in that: The bottom adjustment structure comprises a supporting ring plate, which is sleeved on the tool column and connected to the channel steel bracket.
3. The positioning and vertical adjustment device according to claim 2, characterized in that: The bottom adjustment structure includes fasteners, and the fasteners are penetrated through the support ring plate and the channel steel bracket to connect the support ring plate and the channel steel bracket.
4. The positioning and vertical adjustment device according to claim 1, characterized in that: The channel steel bracket includes a bearing platform and a support frame, the bearing platform is connected to the support frame, the bearing platform is provided with a second positioning hole, the tool column is arranged in the second positioning hole and partially exposed in the second positioning hole.
5. The positioning and vertical adjustment device according to claim 1, characterized in that: The positioning and vertical adjustment device comprises two adjusting screws, which are arranged at intervals through the side wall of the tool column, and are located between the hydraulic jack and the angle sensor and abut against the steel pipe column.
6. The positioning and vertical adjustment device according to claim 1, characterized in that: The upper adjustment structure includes a plurality of support rods and a plurality of connecting rods, the two ends of each of the support rods are respectively connected to the base cushion layer and the support platform, and the two ends of each of the connecting rods are respectively connected to the support rod and the support platform.
7. A method for positioning and constructing a steel pipe column, using the positioning and vertical adjustment device according to any one of claims 1 to 6, characterized in that: The steel pipe column positioning construction method comprises: Obtain and mark the center point of the pile position; Burying the steel casing and checking the alignment of the center of the steel casing with the center of the pile position; Drilling the pile hole and cleaning the hole; Install the steel cage to the specified elevation in the pile hole, and pour underwater concrete to the designed pile top elevation; Harden the site around the pile hole, pour the foundation cushion with C30 concrete, and install the channel steel bracket, the tool column and the support platform; Hanging the steel pipe column and keeping it vertically inserted into the tool column; Pour underwater concrete, remove the positioning and vertical adjustment device, and backfill the pile hole.
8. The steel pipe column positioning construction method according to claim 7, characterized in that: The steps of burying the steel casing and verifying the alignment of the center of the steel casing with the center point of the pile position include: the thickness of the steel casing is 16 mm, 1 to 2 overflow holes are opened on the upper part of the steel casing, the buried depth of the steel casing is not less than 2.5 m, the diameter of the steel casing is 200 mm larger than the diameter of the steel pipe column, after burying the steel casing, the center of the steel casing is verified according to the cross pile guide, the difference between the center line of the steel casing and the center line of the pile position shall not be greater than 10 mm, and the steel casing is perpendicular to the foundation cushion layer.
9. The steel pipe column positioning construction method according to claim 7, characterized in that: The steps of drilling the pile hole and cleaning the hole include: the pile hole is drilled by a rotary drilling method, and after the hole is cleaned, an ultrasonic detector is used to check the hole depth, hole diameter and verticality, and the verticality is ensured to be controlled within 1 / 500.
10. The steel pipe column positioning construction method according to claim 7, characterized in that: The step of hoisting the steel pipe column and keeping it vertically inserted into the tool column includes: using a total station to monitor the verticality of the steel pipe column, real-time monitoring of the angle sensor data during the lowering of the steel pipe column, and when a deviation occurs, the hydraulic jack adjusts the steel pipe column until the data detected by the angle sensor is zero.
Citation Information
Cited By
Adjusting device for embedded bolt assembly of overhead line system and using method of adjusting device
CN121697511A
Fabricated flexible support under complex geological conditions and construction method
CN122589039A
An assembled flexible support under complex geological conditions and a construction method thereof
CN122589039B