Built-in partial discharge on-line monitoring device for converter transformer

Through the built-in local discharge online monitoring device, the signal is collected in the converter transformer by using the adapter empty cylinder and fiber optic sensor, which solves the problem of misreporting false alarms of external sensors, improves monitoring accuracy and anti-interference ability, and meets the replacement The high sensitivity and strong anti-interference requirements of rheological transformers.

CN119044684APending Publication Date: 2024-11-29CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410973576.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The external installation of existing converter transformers online monitoring ultra-high frequency sensors results in high local discharge leakage false alarm rate, making it difficult to accurately capture the early local discharge signals of internal insulation, and the metal oil tank sealing structure shields the internal fault electromagnetic wave signals.

Method used

Design a built-in local discharge online monitoring device, which connects to the converter transformer through the adapter cylinder, and the built-in online monitoring component for signal acquisition. It uses optical fiber sensor and flange docking structure to avoid external interference, enhance signal strength and anti-interference ability .

Benefits of technology

It improves the accuracy and sensitivity of monitoring, reduces the rate of missed reports, enhances the ability to capture internal fault signals, meets the requirements of high sensitivity and strong anti-interference, and ensures fuel tank sealing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119044684A_ABST
    Figure CN119044684A_ABST
Patent Text Reader

Abstract

The invention provides a built-in partial discharge on-line monitoring device for a converter transformer, and the device comprises a switching empty cylinder which is installed at a hole position of the converter transformer and is communicated with the interior of the converter transformer; and the on-line monitoring assembly is arranged in the adapter empty cylinder and is used for monitoring the interior of the adapter empty cylinder so as to monitor and collect partial discharge signals in the converter transformer. On the premise of not changing the oil tank structure of the converter transformer and not influencing the distribution of an electromagnetic field in the converter transformer, a built-in mounting position is provided for the signal acquisition unit, namely the on-line monitoring assembly; the hidden danger that the sensing unit is directly installed through a man / hand hole in the side wall of the transformer to possibly disturb electromagnetic field distribution in the converter transformer and even cause a transformer winding to discharge electricity to the ground through the built-in sensing unit is avoided, and the defect that after the sensing unit is installed through the oil drain valve of the converter transformer, the oil drain valve cannot be normally used is avoided. The technical problem that an existing converter transformer lacks a sensor built-in installation point position is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power transformers, and in particular to a built-in partial discharge online monitoring device for a converter transformer. Background Art

[0002] The converter transformer is the core equipment in the DC transmission system. During the operation of the converter transformer, defects are formed due to manufacturing process, external damage, excessive load voltage / current, etc., which cause partial discharge. The partial discharge will lead to further development of defects, and eventually lead to breakdown of the overall insulation components of the converter transformer, fire, explosion and other serious accidents. Therefore, the monitoring of partial discharge signals during the operation of the converter transformer should be strengthened to avoid major accidents. The partial discharge inside the converter transformer can generate high-frequency electromagnetic waves, so the partial discharge defect detection of the converter transformer equipment can be carried out through the ultra-high frequency band detection technology, and the propagation time of the electromagnetic wave can be used to determine the specific location of the discharge source.

[0003] Since there are no design points for installing UHF sensors inside the converter transformer oil tank and other locations, the UHF sensors for online monitoring of converter transformers are currently installed externally.

[0004] On the one hand, the operating electromagnetic environment of the converter transformer is complex, the operating environment noise seriously interferes with the external sensor unit, and the partial discharge underreporting and false alarm rates are relatively high.

[0005] On the other hand, the closed structure of the metal oil tank of the converter transformer has a strong shielding effect on the electromagnetic wave signals generated by internal faults, and it is difficult for external UHF sensors to accurately capture the early partial discharge signals of the internal insulation of the converter transformer. Summary of the invention

[0006] In view of this, the present invention proposes a built-in online partial discharge monitoring device for a converter transformer, aiming to solve the problem that the existing ultra-high frequency sensors for online monitoring of converter transformers are all installed externally, resulting in a high false alarm rate of partial discharge omissions and difficulty in accurately capturing early partial discharge signals of the internal insulation of the converter transformer.

[0007] The present invention proposes a built-in partial discharge online monitoring device for a converter transformer, which comprises: a switching empty cylinder, which is used to be installed on a hole of the converter transformer and is connected to the interior of the converter transformer; and an online monitoring component, which is arranged inside the switching empty cylinder and is used to monitor the interior of the switching empty cylinder to monitor and collect partial discharge signals in the converter transformer.

[0008] Furthermore, in the above-mentioned built-in partial discharge online monitoring device for converter transformer, a docking-mounted empty cylinder is provided on the side wall of the adapter empty cylinder, and the docking-mounted empty cylinder is communicated with the adapter empty cylinder; the online monitoring component is arranged inside the docking-mounted empty cylinder, and is used for monitoring the docking-mounted empty cylinder connected to the inside of the converter transformer, so as to realize the monitoring and collection of partial discharge signals in the converter transformer.

[0009] Furthermore, in the above-mentioned built-in partial discharge online monitoring device for converter transformer, a connecting hole is provided on the adapter empty cylinder, and both ends of the docking-mounted empty cylinder are opened, the first opening end is connected to the connecting hole of the adapter empty cylinder, and a sealing member is provided at the second opening end for sealing the second opening end of the docking-mounted empty cylinder.

[0010] Furthermore, in the above-mentioned built-in partial discharge online monitoring device for converter transformer, the online monitoring component is arranged on the side wall of the sealing member close to the inside of the transfer hollow cylinder.

[0011] Furthermore, in the above-mentioned built-in partial discharge online monitoring device for converter transformer, the blocking member is a flange structure, a first connecting flange is provided on the second open end of the butt-mounted hollow cylinder, and the flange structure is connected to the connecting flange.

[0012] Furthermore, in the above-mentioned built-in partial discharge online monitoring device for converter transformer, a signal output unit is also provided on the side wall of the sealing member facing away from the online monitoring component, for transmitting the partial discharge signal monitored and collected by the online monitoring component to a remote signal processing device.

[0013] Furthermore, in the above-mentioned built-in partial discharge online monitoring device for converter transformer, the two ends of the transfer hollow cylinder are arranged with openings, which is used to be installed between the converter transformer and the explosion-proof device installed on the converter transformer, and connect the converter transformer and the explosion-proof device to serve as a pressure release channel for transferring the internal pressure of the converter transformer to the explosion-proof device.

[0014] Furthermore, in the above-mentioned built-in partial discharge online monitoring device for converter transformer, one open end of the adapter empty cylinder is provided with a second connecting flange for connecting to the hand hole flange of the converter transformer; the other open end of the adapter empty cylinder is provided with a third connecting flange for connecting to the connection port flange of the explosion-proof device of the converter transformer.

[0015] Furthermore, in the above-mentioned built-in partial discharge online monitoring device for converter transformer, the online monitoring component is a fiber optic sensor, which is arranged on the inner wall of the adapter hollow cylinder; a fiber optic through-hole is provided on the side wall of the adapter hollow cylinder, and its optical fiber is connected to the fiber optic sensor for transmitting the partial discharge signal collected by the fiber optic sensor.

[0016] Furthermore, in the above-mentioned built-in partial discharge online monitoring device for converter transformer, a valve switch assembly is provided at the end of the transfer empty cylinder for controlling the connection and disconnection between the transfer empty cylinder and the converter transformer.

[0017] The built-in partial discharge online monitoring device for converter transformer provided by the present invention is arranged on the converter transformer and communicated with the converter transformer through an adapter empty cylinder. Through the online monitoring component arranged in the adapter empty cylinder, the interior of the adapter empty cylinder is monitored in a built-in manner to monitor and collect the partial discharge signal in the converter transformer. That is to say, the device provides a built-in installation position for the signal collection unit, i.e., the online monitoring component, without changing the oil tank structure of the converter transformer and without affecting the electromagnetic field distribution inside the converter transformer, thereby avoiding the hidden danger that the sensor unit may be directly installed through the manhole / hand hole on the side wall of the transformer, which may disturb the electromagnetic field distribution inside the converter transformer and even cause the transformer winding to discharge to the ground through the built-in sensor unit, and avoiding the disadvantage that the oil drain valve cannot be used normally after the sensor unit is installed through the oil drain valve of the converter transformer, thereby solving the technical problem of the lack of built-in installation points for sensors in the current converter transformer. At the same time, the device installs the online monitoring component inside the converter transformer, and utilizes the metal shielding structure of the converter transformer oil tank to avoid the weakening effect of the metal shielding structure of the converter transformer oil tank on the transmission of the ultra-high frequency electromagnetic wave signal generated by the internal fault, thereby enhancing the signal strength of the fault signal reaching the sensor unit of the ultra-high frequency online monitoring device, and improving the monitoring range and sensitivity of the sensor unit. At the same time, it eliminates the interference of external environmental noise, electromagnetic interference, etc. on the sensor unit of the online monitoring device during the on-site operation of the converter transformer, and improves the anti-interference ability of the ultra-high frequency partial discharge sensor unit. It can meet the requirements of high sensitivity and strong anti-interference of the converter transformer fault online monitoring device, and make up for the lack of built-in installation points and external installation methods of the sensor unit of the existing converter transformer ultra-high frequency monitoring device.

[0018] Furthermore, the device ensures the sealing of the converter transformer oil tank by flange docking and sealing the flange docking surface with a sealing ring, thereby preventing leakage of transformer oil in the converter transformer. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings: Figure 1 A schematic structural diagram of a built-in partial discharge online monitoring device for a converter transformer provided in an embodiment of the present invention; Figure 2A schematic diagram of the structure of a transfer empty cylinder and a docking installation empty cylinder provided in an embodiment of the present invention; Figure 3 A schematic diagram of the structure of an online monitoring assembly and a plugging member provided in an embodiment of the present invention; Figure 4 A diagram showing the simulation results of the electric field distribution of the converter transformer in the vicinity of the online monitoring component in the built-in partial discharge online monitoring device for the converter transformer provided by the embodiment of the present invention; Figure 5 Simulation result diagram of pressure relief flow for installing explosion-proof device on converter transformer; Figure 6 A diagram showing the simulation results of the pressure relief flow rate of the built-in partial discharge online monitoring component of the converter transformer provided in an embodiment of the present invention; Figure 7 A background noise detection diagram of an external UHF sensor provided in an embodiment of the present invention; Figure 8 A background noise detection diagram of a built-in online monitoring component in a built-in partial discharge online monitoring device for a converter transformer provided by an embodiment of the present invention; Fig. 9 A diagram showing simulation results of signal attenuation at different locations in a built-in partial discharge online monitoring device for a converter transformer provided by an embodiment of the present invention; Description of reference numerals: 1-transfer empty cylinder, 11-threaded connection hole, 12-limiting ring, 13-connecting hole, 2-butt-mounted empty cylinder, 3-online monitoring component, 4-optical fiber through-hole, 41-connecting piece, 42-optical fiber, 5-sealing piece, 6-first connecting flange, 7-signal output unit, 8-second connecting flange, 9-third connecting flange. DETAILED DESCRIPTION

[0020] Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present disclosure and to be able to fully convey the scope of the present disclosure to those skilled in the art. It should be noted that, in the absence of conflict, the embodiments of the present invention and the features described in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0021] See also Figure 1 , which is a schematic diagram of the structure of the built-in partial discharge online monitoring device for converter transformers provided by an embodiment of the present invention. As shown in the figure, the device includes: a transfer empty cylinder, a docking installation empty cylinder and an online monitoring component; wherein, The adapter hollow cylinder is used to be installed on the converter transformer (not shown in the figure) and is connected to the inside of the converter transformer (not shown in the figure). Specifically, the adapter hollow cylinder can be a cylindrical hollow cylinder structure to adapt to the corresponding structure of the converter transformer. Of course, it can also be other structures, and the connection with the converter transformer can be adapted to a circular structure. Among them, the adapter hollow cylinder can be a metal hollow cylinder, which is not only high in strength, but also the metal material can form a metal shielding structure with the oil tank of the converter transformer to shield external electromagnetic interference signals and play an interference suppression effect.

[0022] The online monitoring component is arranged inside the transfer empty cylinder, and is used to monitor the inside of the transfer empty cylinder to monitor and collect the local discharge signal in the converter transformer. Specifically, the online monitoring component can be a local discharge sensor, which can be arranged inside the transfer empty cylinder in a built-in manner. Since the transfer empty cylinder is connected to the inside of the converter transformer, unimpeded signal transmission and signal monitoring can be carried out between the two, so as to accurately capture the local discharge signal in the converter transformer. In an embodiment, the online monitoring component can be a UHF sensor, which can detect and locate the local discharge in the converter transformer by receiving the UHF discharge signal excited by the discharge pulse when the converter transformer has a local discharge. In this embodiment, the online monitoring component can be 3, and of course it can also be other numbers, all of which adopt a built-in method to collect and monitor the local discharge signal.

[0023] Continue to see Figure 1 In this embodiment, an online monitoring component is built-in, and the online monitoring component is an optical fiber sensor, which is arranged on the inner wall of the transfer hollow tube; an optical fiber through-hole is arranged on the side wall of the transfer hollow tube, and its optical fiber is connected to the optical fiber sensor, which is used to transmit the partial discharge signal collected by the optical fiber sensor. Specifically, the optical fiber sensor can be arranged close to the inner wall of the transfer hollow tube, and the optical fiber sensor is connected to the transfer hollow tube through the optical fiber through-hole.

[0024] Continue to see Figure 1 and Figure 2 , a threaded connection hole may be provided on the adapter hollow tube, and the optical fiber penetrator may be threadedly connected at the threaded connection hole, so as to realize the transmission of the signal collected by the built-in optical fiber sensor, and also to seal the threaded connection hole of the adapter hollow tube. Specifically, a limit ring may be extended at the threaded connection hole to limit the position of the optical fiber penetrator so as to make the optical fiber penetrator on the connector. The optical fiber of the optical fiber penetrator is connected to the optical fiber sensor to transmit the local discharge signal collected by the optical fiber sensor through the optical fiber. The optical fiber of the optical fiber penetrator may also be connected to an external signal processing unit (not shown in the figure), especially a remote signal processing unit, so as to realize the connection between the built-in optical fiber penetrator and the remote signal processing unit.

[0025] Continue to see Figure 1 and Figure 2In another built-in mode of the online monitoring component in this embodiment, a docking-mounted empty cylinder is provided on the side wall of the adapter empty cylinder, and the docking-mounted empty cylinder is connected with the adapter empty cylinder; the online monitoring component is arranged inside the docking-mounted empty cylinder, and is used to monitor the docking-mounted empty cylinder connected with the inside of the converter transformer, so as to realize the monitoring and collection of local discharge signals in the converter transformer. Specifically, a connecting hole is provided on the side wall of the adapter empty cylinder, and the docking-mounted empty cylinder is installed at the connecting hole of the adapter empty cylinder. The docking-mounted empty cylinder and the adapter empty cylinder can be connected by welding. Of course, the docking-mounted empty cylinder and the adapter empty cylinder can also be an integrated structure, which is not limited in this embodiment. Among them, the two ends of the docking-mounted empty cylinder are set with openings, and the first opening end (such as Figure 1 The right end of the left side docking installation empty cylinder shown in the figure) is connected to the connecting hole of the transfer empty cylinder, and the second open end (as shown in the figure) is connected to the connecting hole of the transfer empty cylinder. Figure 1 A plugging piece is provided at the left end of the left docking installation hollow cylinder shown in the figure, which is used to plug the second open end of the docking installation hollow cylinder to prevent the leakage of transformer oil in the converter transformer at the second open end. Among them, the docking installation hollow cylinder serves as a branch pipe of the transfer hollow cylinder, and the online monitoring component is arranged inside the docking installation hollow cylinder, which is used to monitor the docking installation hollow cylinder connected to the inside of the converter transformer, so as to realize the monitoring and collection of local discharge signals in the converter transformer, which can facilitate the installation and replacement of the online monitoring component. Among them, the interior of the docking installation hollow cylinder can be a cylindrical cavity structure, which can provide the space required for the built-in installation of the online monitoring component. The height, radius and penetration angle of the docking installation hollow cylinder with the side wall of the transfer cavity can be adjusted and determined according to the size, installation angle and other requirements of the online monitoring component.

[0026] In this embodiment, if Figure 1 and Figure 3 As shown, the online monitoring component is arranged on the side wall of the plugging member (such as Figure 3The left side wall shown in the figure is used for placing the online monitoring assembly in the adapter empty cylinder when the plugging piece is plugged on the second open end of the docking installation empty cylinder, so that the online monitoring assembly can be installed and fixed synchronously with the plugging piece. Specifically, the online monitoring assembly can be fixedly installed on the side wall of the plugging piece, and can be installed synchronously with the plugging piece, so that the plugging piece and the online monitoring assembly can be installed quickly and conveniently. A first connecting flange can be provided on the second open end of the docking installation empty cylinder, which can be an annular structure, and the plugging piece is a flange structure, which can be a circular plate structure. The flange structure and the connecting flange can be connected by bolts to achieve the plugging of the docking installation empty cylinder and the installation and fixation of the online monitoring assembly. In this embodiment, in order to further avoid the leakage of transformer oil at the plugging piece, preferably, a sealing ring can also be provided between the first connecting flange and the plugging piece, and the sealing ring can be a rubber sealing ring to ensure the sealing of the converter transformer, thereby ensuring that there is no leakage of transformer oil, etc. at the docking position. Of course, the plugging piece can also be a flange ring structure, and the supporting disc of the online monitoring assembly can be installed on the flange ring structure to form an integral circular plate structure. In this embodiment, the online monitoring component can be set at the position where the ultra-high frequency electromagnetic wave signal is the largest, so as to further improve the monitoring accuracy of the device.

[0027] Continue to see Figure 1 and Figure 3 , the plugging piece faces away from the side wall of the online monitoring component (such as Figure 3 A signal output unit is also provided on the right side wall of the plugging member (as shown in the figure), which is used to transmit the partial discharge signal monitored and collected by the online monitoring component to the remote signal processing device. Specifically, the signal output unit can be fixedly installed on the side wall of the plugging member facing away from the online monitoring component, and the signal output unit is also connected to the online monitoring component, and can transmit the partial discharge signal collected by the online monitoring component, and can transmit the partial discharge signal to the remote signal processing device by wire or wirelessly.

[0028] Continue to see Figure 1 and Figure 2 , both ends of the transfer cylinder can be arranged with openings, and are used to be installed between the converter transformer and the explosion-proof device installed on the converter transformer, and connect the converter transformer and the explosion-proof device to serve as a pressure release channel for transferring the internal pressure of the converter transformer to the explosion-proof device. Specifically, the manhole of the converter transformer is connected to the explosion-proof device, and the manhole is connected to the manhole flange, and the connection hole of the explosion-proof device is provided with an explosion-proof connecting flange, and the connection between the explosion-proof device and the converter transformer is achieved through the connection between the explosion-proof connecting flange and the manhole flange. In this embodiment, in order to avoid changing the structure of the original converter transformer, preferably, the transfer cylinder can be installed between the converter transformer and the explosion-proof device installed on the converter transformer to avoid affecting the internal electric field distribution of the converter transformer. One open end of the transfer cylinder (such as Figure 1The bottom end shown in the figure is provided with a second connecting flange for connecting to the hand hole flange of the converter transformer; the other open end of the transfer empty cylinder (as shown in the figure) is provided with a second connecting flange for connecting to the hand hole flange of the converter transformer; Figure 1 The top of the converter transformer (shown in FIG. 1 ) is provided with a third connecting flange for connecting to the connecting port flange of the explosion-proof device of the converter transformer, thereby realizing the connection between the converter transformer, the transfer empty cylinder and the explosion-proof device, so that the transfer empty cylinder can be used as a pressure release channel for transferring the internal pressure of the converter transformer to the explosion-proof device, and can also provide the required supporting layout position for the online monitoring component. Among them, a sealing ring can be provided between the second connecting flange and the hand hole flange, and a sealing ring can also be provided between the third connecting flange and the connecting port flange of the explosion-proof device to ensure the sealing of the device installation. In this embodiment, the converter transformer, the transfer empty cylinder and the explosion-proof device are all connected, and the transfer empty cylinder explosion-proof device is provided with an explosion-proof membrane. When the internal pressure of the converter transformer is greater than the action pressure of the explosion-proof membrane, the explosion-proof membrane is actuated, and the transformer oil is ejected from the explosion-proof device to release the internal pressure of the transformer, which can prevent the transformer from exploding due to excessive pressure. Of course, an explosion-proof spring can also be provided on the explosion-proof device to achieve pressure release through the explosion-proof spring.

[0029] In this embodiment, a valve switch assembly may be provided at the end of the transfer empty cylinder to control the on-off between the transfer empty cylinder and the converter transformer. In particular, the valve switch assembly may be opened when the converter transformer is operating normally, and the partial discharge signal may be monitored. When the device or the explosion-proof device fails, the valve switch assembly may be closed for maintenance or replacement. Specifically, the valve switch assembly may be provided between the second connecting flange and the hand hole flange of the converter transformer, and may control the on-off between the transfer empty cylinder and the converter transformer, so as to facilitate the maintenance or replacement of the built-in partial discharge online monitoring device and / or the explosion-proof device of the converter transformer.

[0030] In this embodiment, the built-in partial discharge online monitoring device for converter transformer can be simulated and analyzed, and in particular, the simulation results of the influence of the built-in partial discharge online monitoring device for converter transformer on the internal electric field distribution of the converter transformer can be obtained, such as Figure 4 As shown in the figure, according to the simulation results, the electric field distribution in the area near the online monitoring component is uniform and has no obvious distortion, which proves that the device of this embodiment has no harmful effect on the internal electric field distribution of the converter transformer. At the same time, the simulation results of the influence of the built-in partial discharge online monitoring device of the converter transformer on the pressure relief flow of the explosion-proof device can also be obtained, such as Figure 5 and Figure 6As shown in the figure, according to the simulation results, the average value of the explosion-proof device pressure relief volume flow rate is obtained as the pressure relief flow rate of the explosion-proof device. After the device of this embodiment is used, the pressure relief flow rate of the explosion-proof device changes from 347.3 L / s to 345.1 L / s, with an impact of only 0.63%, which proves that the impact of the device of this embodiment on the pressure relief function of the converter transformer explosion-proof device is within the range of the explosion-proof device product parameter requirements. In addition, the suppression effect of the built-in partial discharge online monitoring device of the converter transformer on the background noise of the UHF sensor on-site detection can also be obtained, as shown in Figures 7 and 8 As shown in the figure, according to the simulation results, it can be seen that after the UHF sensor is installed in the device of this embodiment, the monitoring background noise is significantly suppressed. In addition, the transmission of the signal can be simulated and analyzed. The simulation results of the attenuation of the UHF electromagnetic wave generated by the internal fault of the converter transformer transmitted to the device are shown in the figure. Fig. 9 As shown in FIG. 1 , in the range of 0.3 to 1.5 GHz, the ultra-high frequency electromagnetic wave signal in the device of this embodiment has no obvious attenuation compared with the inside of the converter transformer, which proves the effectiveness of the built-in partial discharge online monitoring device for the converter transformer proposed in this embodiment; wherein, in Fig. 9 In the figure, A is a point on the inner wall of the transformer, and B~E are different positions selected inside the built-in partial discharge online monitoring device of the converter transformer.

[0031] In summary, the built-in partial discharge online monitoring device for converter transformer provided in the present embodiment is arranged on the converter transformer through an adapter empty cylinder and is connected to the converter transformer. Through the online monitoring component arranged in the adapter empty cylinder, the interior of the adapter empty cylinder is monitored in a built-in manner to monitor and collect the partial discharge signal in the converter transformer. That is to say, the device provides a built-in installation position for the signal acquisition unit, i.e., the online monitoring component, without changing the oil tank structure of the converter transformer and without affecting the electromagnetic field distribution inside the converter transformer. It avoids the hidden danger that the sensor unit may be directly installed through the manhole / hand hole on the side wall of the transformer, which may disturb the electromagnetic field distribution inside the converter transformer and even cause the transformer winding to discharge to the ground through the built-in sensor unit. It also avoids the disadvantage that the oil drain valve cannot be used normally after the sensor unit is installed through the oil drain valve of the converter transformer. It solves the technical problem that the current converter transformer lacks built-in sensor installation points. At the same time, the device installs the online monitoring component inside the converter transformer, and utilizes the metal shielding structure of the converter transformer oil tank to avoid the weakening effect of the metal shielding structure of the converter transformer oil tank on the transmission of the ultra-high frequency electromagnetic wave signal generated by the internal fault, thereby enhancing the signal strength of the fault signal reaching the sensor unit of the ultra-high frequency online monitoring device, and improving the monitoring range and sensitivity of the sensor unit. At the same time, it eliminates the interference of external environmental noise, electromagnetic interference, etc. on the sensor unit of the online monitoring device during the on-site operation of the converter transformer, and improves the anti-interference ability of the ultra-high frequency partial discharge sensor unit. It can meet the requirements of high sensitivity and strong anti-interference of the converter transformer fault online monitoring device, and make up for the lack of built-in installation points and external installation methods of the sensor unit of the existing converter transformer ultra-high frequency monitoring device.

[0032] Furthermore, the device ensures the sealing of the converter transformer oil tank by flange docking and sealing the flange docking surface with a sealing ring, thereby preventing leakage of transformer oil in the converter transformer.

[0033] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.

[0034] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0035] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A built-in partial discharge online monitoring device for a converter transformer, characterized in that: include: A transfer hollow cylinder, which is used to be installed on the hole of the converter transformer and communicated with the interior of the converter transformer; The online monitoring component is arranged inside the transfer empty cylinder and is used to monitor the inside of the transfer empty cylinder to monitor and collect the partial discharge signal in the converter transformer.

2. The built-in partial discharge online monitoring device for converter transformer according to claim 1 is characterized in that: A butt-jointed empty cylinder is provided on the side wall of the transfer empty cylinder, and the butt-jointed empty cylinder is connected to the transfer empty cylinder; The online monitoring component is arranged inside the butt-mounted empty cylinder and is used to monitor the butt-mounted empty cylinder connected to the inside of the converter transformer, so as to realize the monitoring and collection of partial discharge signals in the converter transformer.

3. The built-in partial discharge online monitoring device for converter transformer according to claim 2 is characterized in that: A connecting hole is provided on the adapter empty cylinder, and openings are provided at both ends of the docking installation empty cylinder. The first opening end of the openings at both ends of the docking installation empty cylinder is connected to the connecting hole of the adapter empty cylinder, and a blocking piece is provided at the second opening end of the openings at both ends of the docking installation empty cylinder, which is used to block the second opening end of the docking installation empty cylinder.

4. The converter transformer built-in partial discharge online monitoring device according to claim 3 is characterized in that: The online monitoring component is arranged on the side wall of the sealing member close to the interior of the transfer empty cylinder.

5. The built-in partial discharge online monitoring device for converter transformer according to claim 3 is characterized in that: The blocking member is a flange structure, a first connecting flange is arranged on the second open end of the butt-mounted hollow cylinder, and the flange structure is connected to the connecting flange.

6. The built-in partial discharge online monitoring device for converter transformer according to claim 3, characterized in that: A signal output unit is also provided on the side wall of the blocking member facing away from the online monitoring component, which is used to transmit the partial discharge signal monitored and collected by the online monitoring component to a remote signal processing device.

7. The converter transformer built-in partial discharge online monitoring device according to any one of claims 1 to 6, characterized in that: The two ends of the transfer hollow cylinder are opened for installation between the converter transformer and an explosion-proof device installed on the converter transformer, and for connecting the converter transformer and the explosion-proof device to serve as a pressure release channel for transferring the internal pressure of the converter transformer to the explosion-proof device.

8. The converter transformer built-in partial discharge online monitoring device according to claim 7, characterized in that: A second connecting flange is provided at an open end of the transfer hollow cylinder for connecting to a hand hole flange of the converter transformer; The other open end of the transfer empty cylinder is provided with a third connecting flange for connecting to the connecting port flange of the explosion-proof device of the converter transformer.

9. The converter transformer built-in partial discharge online monitoring device according to any one of claims 1 to 6, characterized in that: The online monitoring component is an optical fiber sensor, which is arranged on the inner wall of the transfer empty cylinder; An optical fiber through-hole is arranged on the side wall of the transfer hollow cylinder, and the optical fiber of the optical fiber through-hole is connected with the optical fiber sensor for transmitting the partial discharge signal collected by the optical fiber sensor.

10. The converter transformer built-in partial discharge online monitoring device according to any one of claims 1 to 6, characterized in that: A valve switch assembly is provided at the end of the transfer empty cylinder for controlling the connection and disconnection between the transfer empty cylinder and the converter transformer.