Surface mine geologic modeling method and system based on multiple data sources
By integrating open-pit mine geological modeling methods with multiple data sources, using geographic information systems and learning algorithms, the problems of low data fusion efficiency and inaccurate models of traditional geological modeling methods are solved, and more comprehensive geological information display and improvement are achieved Efficient resource utilization.
Patent Information
- Application Number
- CN202411121704.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional geological modeling methods rely on a single data source, resulting in the limitations and inaccuracies of models under complex geological structures, and the data fusion efficiency is low, so it cannot fully reflect the geological conditions of the mining area. Two-dimensional modeling cannot intuitively display complex structures, and three-dimensional construction The model is complicated and the operation requirements are high.
Adopt open-pit mine geological modeling method based on multiple data sources to integrate surface geological surveys, drilling, remote sensing and geophysical data, and perform data preprocessing, spatial analysis and visualization through geographic information systems, and extract geological features in combination with learning algorithms to construct and optimize Geological model, providing three-dimensional geological structure display.
It realizes the effective integration of data and accurately reflects the geological structure of open-pit mining areas, improves resource utilization efficiency and mine safety production level, provides more comprehensive, accurate and detailed geological information, simplifies the operation process, improves the prediction accuracy of the model and reliability.
Smart Images

Figure CN119047310A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of mine geological modeling, and more specifically, it particularly relates to an open-pit mine geological modeling method based on multiple data sources. Meanwhile, the present invention also relates to an open-pit mine geological modeling system based on multiple data sources. Background Art
[0002] With the continuous advancement of mineral resource development technology, the exploration and mining activities of open-pit mines have become more accurate and efficient. Geological modeling is an important part of open-pit mine design and mining planning, and its accuracy directly affects resource assessment, mining plan formulation and mine safety production. Traditional geological modeling methods usually rely on a single data source, such as surface geological surveys or drilling results, which often leads to limitations and inaccuracies in models under complex geological structures.
[0003] In existing technologies, although remote sensing data and geophysical data have begun to be incorporated into the geological modeling process, the integration and utilization efficiency of these data is still low. The integration between data sources is not sufficient, resulting in the geological model being unable to fully reflect the actual geological conditions of the mining area. In addition, the two-dimensional modeling method cannot intuitively display complex geological structures, while the three-dimensional modeling process may be too cumbersome and require high professional skills of operators;
[0004] Therefore, we propose an open-pit mine geological modeling method and system based on multiple data sources to solve the above problems. Summary of the invention
[0005] The purpose of the present invention is to solve the shortcomings existing in the prior art, and to propose an open-pit mine geological modeling method and system based on multiple data sources, which can integrate multiple geological data sources, have a high degree of automation, be easy to operate, and can accurately reflect the geological structure of the open-pit mining area, realize effective data fusion, and provide an intuitive display of the three-dimensional geological structure. It can also be applied to the exploration, design and mining process of open-pit mines to improve the utilization efficiency of resources and the safety production level of mines.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] The method of geological modeling for open-pit mines based on multiple data sources includes the following steps:
[0008] S1. Collect geological data sources, including but not limited to surface geological survey data, drilling data, remote sensing data and geophysical data;
[0009] S2. Preprocess the collected geological data, including data cleaning, format conversion and data fusion;
[0010] S3, using geographic information system to perform spatial analysis and visualization of the pre-processed geological data;
[0011] S4, combined with learning algorithms, interpret and classify geological data and extract geological features;
[0012] S5. Construct an open-pit mine geological model based on the extracted geological features, including stratum distribution, rock properties, and ore body morphology;
[0013] S6. Verify and optimize the constructed geological model to improve the accuracy and reliability of the model;
[0014] S7. Apply the optimized geological model to the exploration, design and mining process of open-pit mines.
[0015] Preferably, step S1 specifically comprises:
[0016] S11. Planning and designing geological data collection plan: Develop a detailed geological data collection plan based on the needs of open pit mine exploration and development, including determining the geographical scope of data collection, the types of data required, and their resolution and accuracy requirements;
[0017] S12. Surface geological survey data collection: Organize a team of geological experts to conduct field surveys to record surface geological information such as lithology, stratigraphic sequence, faults, and folds, including collecting rock, mineral and soil samples for laboratory analysis;
[0018] S13, drilling data acquisition: drilling operations are performed at predetermined locations, and drilling data, including cores, logging data, and drilling trajectories, are collected;
[0019] S14. Remote sensing data acquisition: Use satellite or aerial photography to obtain remote sensing images of the mining area, and analyze the remote sensing images to obtain large-scale structural features, topography, and vegetation coverage information;
[0020] S15. Geophysical data acquisition: Conduct seismic, electromagnetic and gravity geophysical surveys to obtain geophysical field data;
[0021] S16. Multi-source data integration and management: Archive and store all collected data, establish a comprehensive geological database, and ensure data integrity and queryability;
[0022] S17. Quality control: Conduct quality checks on the collected data to ensure its accuracy and reliability, and eliminate erroneous and abnormal data.
[0023] Preferably, step S2 specifically comprises:
[0024] S21. Data cleaning:
[0025] Identify and correct errors or inconsistencies in data, fill in missing values, and correct obvious data entry errors;
[0026] Standardize data formats from different sources and convert data from different units or coding systems into a unified standard format;
[0027] Eliminate data that is irrelevant to geological modeling or of low quality to ensure that the data quality meets the modeling requirements;
[0028] S22. Format conversion:
[0029] Convert the collected data into a unified format for subsequent processing and use, including converting text data into numerical data or converting unstructured data into structured data;
[0030] Ensure that the coordinate system, projection system and scale of all data are consistent;
[0031] S23. Data Fusion:
[0032] Integrate data from different sources covering the same area or geological body, eliminate duplicate information, and merge relevant attributes;
[0033] Multi-source data fusion is used to combine data from surface surveys, drilling, remote sensing and geophysical exploration.
[0034] Preferably, step S3 specifically comprises:
[0035] S31. Data loading and format conversion:
[0036] Import the preprocessed data into the geographic information system;
[0037] Ensure all data is correctly aligned in the GIS and has consistent coordinate reference system and projection settings;
[0038] S32. Spatial analysis:
[0039] Perform spatial analysis to reveal geographic distribution characteristics and patterns in geological data, including identifying the spatial extent of specific geological features through buffer analysis or using overlay analysis to compare the relationships between different data sets;
[0040] Apply spatial statistical methods, such as hot spot analysis or spatial autocorrelation analysis, to identify clusters or trends of geological features;
[0041] S33, Visual display:
[0042] Use map making tools to create various types of maps, such as point maps, strip maps, and heat maps, to intuitively display the characteristics of geological data;
[0043] Customize map colors, symbols, and labels as needed to ensure that the map is both aesthetically pleasing and informative;
[0044] Generate interactive maps that allow users to filter and view data based on different parameters, enhancing user experience.
[0045] Preferably, step S4 is specifically:
[0046] 1) Calculate the frequency of occurrence of each geological category in the data set, wherein each geological category includes different types of ore bodies and strata of different ages;
[0047] 2) For each feature and category, calculate the probability of the feature value appearing in the category, the features include rock type, mineral content, geological age;
[0048] 3) Calculate the posterior probability of the sample belonging to each category under a given feature vector. The calculation formula is:
[0049]
[0050] Where P(C|X) is the posterior probability, P(X|C) is the conditional probability of sample X under category C, P(C) is the prior probability of category C, and P(X) is the probability of sample X. Since P(X) is the same for all categories, it is omitted.
[0051] 4) For each sample to be classified, calculate the posterior probability of it belonging to each category, and then select the category with the largest posterior probability as the predicted category of the sample.
[0052] Preferably, step S5 is specifically:
[0053] Use the training data to train the SVM model; the expression is:
[0054] K(x,x i )=exp(-γ||xx i || 2 );
[0055] In the formula, K(x,x i ) is a function that measures the similarity between two data points in the feature space. By adjusting the parameter γ, the sensitivity of the similarity is controlled. i are two data points and γ is the kernel parameter.
[0056] Preferably, in step S6, the expression for verifying and optimizing the constructed geological model is:
[0057] Limited by α i ≥0 and
[0058] In the formula, α i is the Lagrange multiplier obtained through the training process, indicating the importance of each support vector;
[0059] y i is the category label of the support vector, that is, the actual category corresponding to each support vector;
[0060] K(x,x i ) is the kernel function, which calculates the relationship between the test sample x and the i-th support vector x i The similarity between
[0061] b is the bias term, which adjusts the position of the decision boundary to maximize the interval between the two categories;
[0062] is the objective function, representing the inverse of the classification interval, which needs to be minimized to increase the interval;
[0063] It is to maximize the interval while making more data points become support vectors;
[0064] α i ≥0 ensures that the influence of each data point is non-negative;
[0065] Make sure the decision boundary is in the middle of the two classes of data.
[0066] Based on a multi-data source open-pit mine geological modeling system, the system is used to implement the above method, and the system includes:
[0067] A data collection module for collecting geological data sources, including but not limited to surface geological survey data, drilling data, remote sensing data, and geophysical data;
[0068] Data preprocessing module, which cleans, converts formats and fuses the collected geological data;
[0069] Spatial analysis and visualization module, which uses geographic information system to perform spatial analysis and visualization of pre-processed geological data;
[0070] The learning algorithm module interprets and classifies geological data and extracts geological features by combining learning algorithms;
[0071] Model building module, which builds the open-pit mine geological model based on the extracted geological features, including stratum distribution, rock properties, and ore body morphology;
[0072] Model verification and optimization module verifies and optimizes the constructed geological model to improve the accuracy and reliability of the model;
[0073] Application module, which applies the optimized geological model to the exploration, design and mining process of open-pit mines.
[0074] Preferably, the spatial analysis and visualization module also includes two-dimensional and three-dimensional geological modeling functions to provide a more intuitive display of the geological structure. The two-dimensional geological modeling function is used to generate geological profiles and plan views for understanding the geological structure, rock layer distribution, etc. of the mining area; the three-dimensional geological modeling function can generate a three-dimensional geological model for intuitively observing the geological structure of the mining area and more accurately judging the shape, scale and distribution information of the ore body.
[0075] The method and system for open-pit mine geological modeling based on multiple data sources provided by the present invention have the following advantages compared with the prior art:
[0076] Comprehensiveness: By combining multiple data sources such as surface geological surveys, drilling, remote sensing and geophysics, it can provide more comprehensive geological information, thereby constructing a more accurate and detailed geological model;
[0077] Efficiency: Using geographic information systems for spatial analysis and visualization can efficiently process and interpret large amounts of complex geological data and improve the efficiency of geological modeling;
[0078] Accuracy: Using machine learning algorithms to classify and extract features from geological data can improve the prediction accuracy and reliability of the model;
[0079] Practicality: The constructed geological model can be applied to multiple stages of open-pit mine exploration, design and mining, providing a scientific basis for mine planning and decision-making, increasing economic benefits and reducing risks;
[0080] Updatability: As new data is acquired and mining progresses, the model can be continuously updated and optimized to ensure its continued accuracy and applicability;
[0081] Intuitiveness: Through 2D and 3D geological modeling functions, the geological structure can be displayed intuitively, helping geologists and engineers to better understand the geological conditions of the mining area and make more reasonable judgments and decisions. BRIEF DESCRIPTION OF THE DRAWINGS
[0082] Figure 1 This is a flow chart of the method for geological modeling of open-pit mines based on multiple data sources of the present invention;
[0083] Figure 2 A specific flow chart of collecting geological data sources in an embodiment of the present invention;
[0084] Figure 3 The figure is a flow chart of preprocessing the collected geological data in an embodiment of the present invention. DETAILED DESCRIPTION
[0085] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0086] The present invention provides an open-pit mine geological modeling method based on multiple data sources. With its comprehensiveness, high efficiency, accuracy, practicality, updatability and intuitiveness, it provides a scientific and effective solution for the geological modeling of open-pit mines, which is of great significance for improving the development efficiency and safety of mineral resources.
[0087] like Figure 1 As shown, the method includes:
[0088] S1. Collect geological data sources, including but not limited to surface geological survey data, drilling data, remote sensing data and geophysical data; Figure 2 As shown, step S1 is specifically as follows:
[0089] S11. Planning and designing geological data collection plan: Develop a detailed geological data collection plan based on the needs of open pit mine exploration and development, including determining the geographical scope of data collection, the types of data required, and their resolution and accuracy requirements;
[0090] S12. Surface geological survey data collection: Organize a team of geological experts to conduct field surveys to record surface geological information such as lithology, stratigraphic sequence, faults, and folds, including collecting rock, mineral and soil samples for laboratory analysis;
[0091] S13, drilling data acquisition: drilling operations are performed at predetermined locations, and drilling data, including cores, logging data, and drilling trajectories, are collected;
[0092] S14. Remote sensing data acquisition: Use satellite or aerial photography to obtain remote sensing images of the mining area, and analyze the remote sensing images to obtain large-scale structural features, topography, and vegetation coverage information;
[0093] S15. Geophysical data acquisition: Conduct seismic, electromagnetic and gravity geophysical surveys to obtain geophysical field data;
[0094] S16. Multi-source data integration and management: Archive and store all collected data, establish a comprehensive geological database, and ensure data integrity and queryability;
[0095] S17. Quality control: Conduct quality checks on the collected data to ensure its accuracy and reliability, and eliminate erroneous and abnormal data.
[0096] S2. Preprocess the collected geological data, including data cleaning, format conversion and data fusion; e.g. Figure 3 As shown, step S2 is specifically as follows:
[0097] S21. Data cleaning:
[0098] Identify and correct errors or inconsistencies in data, fill in missing values, and correct obvious data entry errors;
[0099] Standardize data formats from different sources and convert data from different units or coding systems into a unified standard format;
[0100] Eliminate data that is irrelevant to geological modeling or of low quality to ensure that the data quality meets the modeling requirements;
[0101] S22. Format conversion:
[0102] Convert the collected data into a unified format for subsequent processing and use, including converting text data into numerical data or converting unstructured data into structured data;
[0103] Ensure that the coordinate system, projection system and scale of all data are consistent;
[0104] S23. Data Fusion:
[0105] Integrate data from different sources covering the same area or geological body, eliminate duplicate information, and merge relevant attributes;
[0106] Multi-source data fusion is used to combine data from surface surveys, drilling, remote sensing and geophysical exploration.
[0107] S3, using a geographic information system to perform spatial analysis and visual display on the pre-processed geological data; step S3 specifically comprises:
[0108] S31. Data loading and format conversion:
[0109] Import the preprocessed data into the geographic information system;
[0110] Ensure all data is correctly aligned in the GIS and has consistent coordinate reference system and projection settings;
[0111] S32. Spatial analysis:
[0112] Perform spatial analysis to reveal geographic distribution characteristics and patterns in geological data, including identifying the spatial extent of specific geological features through buffer analysis or using overlay analysis to compare the relationships between different data sets;
[0113] Apply spatial statistical methods, such as hot spot analysis or spatial autocorrelation analysis, to identify clusters or trends of geological features;
[0114] S33, Visual display:
[0115] Use map making tools to create various types of maps, such as point maps, strip maps, and heat maps, to intuitively display the characteristics of geological data;
[0116] Customize map colors, symbols, and labels as needed to ensure that the map is both aesthetically pleasing and informative;
[0117] Generate interactive maps that allow users to filter and view data based on different parameters, enhancing user experience.
[0118] S4, combining the learning algorithm, interpreting and classifying the geological data, and extracting geological features; step S4 is specifically:
[0119] 1) Calculate the frequency of occurrence of each geological category in the data set, including different types of ore bodies and strata of different ages;
[0120] 2) For each feature and category, calculate the probability of the feature value appearing in the category. The features include rock type, mineral content, and geological age;
[0121] 3) Calculate the posterior probability of the sample belonging to each category under a given feature vector. The calculation formula is:
[0122]
[0123] Where P(C|X) is the posterior probability, P(X|C) is the conditional probability of sample X under category C, P(C) is the prior probability of category C, and P(X) is the probability of sample X. Since P(X) is the same for all categories, it is omitted.
[0124] 4) For each sample to be classified, calculate the posterior probability of it belonging to each category, and then select the category with the largest posterior probability as the predicted category of the sample.
[0125] S5. Construct an open-pit mine geological model based on the extracted geological features, including stratum distribution, rock properties, and ore body morphology;
[0126] Step S5 is specifically as follows:
[0127] Use the training data to train the SVM model; the expression is:
[0128] K(x,x i )=exp(-γ||xx i || 2 );
[0129] In the formula, K(x,x i ) is a function that measures the similarity between two data points in the feature space. By adjusting the parameter γ, the sensitivity of the similarity is controlled. i are two data points and γ is the kernel parameter.
[0130] S6, verifying and optimizing the constructed geological model to improve the accuracy and reliability of the model; in step S6, the expression for verifying and optimizing the constructed geological model is:
[0131] Limited by α i ≥0 and
[0132] In the formula, α i is the Lagrange multiplier obtained through the training process, indicating the importance of each support vector;
[0133] y i is the category label of the support vector, that is, the actual category corresponding to each support vector;
[0134] K(x,x i ) is the kernel function, which calculates the relationship between the test sample x and the i-th support vector x i The similarity between
[0135] b is the bias term, which adjusts the position of the decision boundary to maximize the interval between the two categories;
[0136] is the objective function, representing the inverse of the classification interval, which needs to be minimized to increase the interval;
[0137] It is to maximize the interval while making more data points become support vectors;
[0138] α i ≥0 ensures that the influence of each data point is non-negative;
[0139] Make sure the decision boundary is in the middle of the two classes of data.
[0140] S7. Apply the optimized geological model to the exploration, design and mining process of open-pit mines.
[0141] Furthermore, the above method is specifically implemented as follows:
[0142] Exploration Phase
[0143] Resource assessment: Geological models can help determine the distribution, size and enrichment of different ore bodies within a mining area, which is crucial for resource assessment. The model can predict the shape and extension of the ore body, thereby guiding the layout of exploration drilling holes.
[0144] Risk reduction: During the exploration phase, accurate geological models can reduce exploration risks by predicting the continuity and variability of ore bodies and reducing uncertainty through detailed interpretation of geological structure, lithology and mineralization characteristics.
[0145] Target positioning: The optimized model can locate potential ore targets more accurately, provide a clear direction for exploration activities, and improve exploration efficiency.
[0146] Design Phase
[0147] Mine planning: The geological model plays a central role in the mine design phase, influencing the selection of mining methods, mining sequence and mine layout. The design team can plan mining benches, haul roads and waste rock dumps based on the geological information in the model.
[0148] Facility Layout: Accurate location information helps to rationally layout processing plants, ore storage yards and infrastructure to minimize transportation costs and environmental impact.
[0149] Environmental Management: Geological models can also assist in assessing potential environmental issues such as acid rock drainage, groundwater flow, and surface subsidence, allowing preventive measures to be taken during the design phase.
[0150] Mining stage
[0151] Mining optimization: The geological model can be updated in real time to reflect the difference between the actual mining situation and the expected model, guiding the adjustment of mining operations. This includes ore quality control, mining progress monitoring and ore dilution management.
[0152] Safety improvement: Geological models help identify potential geological hazards, such as unstable geological structures, groundwater problems and accumulation of hazardous gases, so that measures can be taken in advance to ensure worker safety.
[0153] Production management: Through geological models, ore production and grade can be estimated more accurately, ore blending and scheduling can be optimized, and economic benefits can be improved.
[0154] Subsequent stages
[0155] Reclamation planning: At the end of a mine’s life cycle, geological models can help plan land reclamation efforts to ensure the stability and environmental protection of the mining area.
[0156] Knowledge accumulation: The optimized geological model provides the mine with valuable data assets, which can be used as a reference for future projects or as educational training materials to pass on experience.
[0157] Technology Application
[0158] 3D modeling: 3D geological modeling software can transform geological data into interactive 3D views, allowing engineers and managers to intuitively understand geological structures.
[0159] Real-time monitoring: Combining ground and satellite remote sensing data, we can achieve real-time monitoring of the mining area, update the geological model in time, and ensure the efficiency and safety of mining activities.
[0160] Integrated system: Integrate geological models with mine management systems to achieve data interconnection and improve the speed and accuracy of decision-making.
[0161] The above geological model plays an indispensable role in the exploration, design and mining process of open-pit mines. It not only improves the efficiency of resource utilization, but also ensures the safety of operations, reduces environmental impact, and improves the economic benefits and sustainability of the entire mine.
[0162] This embodiment also proposes an open-pit mine geological modeling system based on multiple data sources, which is used to implement the above method. The system includes:
[0163] The data collection module is used to collect geological data sources, including but not limited to surface geological survey data, drilling data, remote sensing data and geophysical data; the module supports the collection of a variety of traditional geological data, including surface geological survey data and drilling data, and also supports the collection of modern remote sensing technology data, including satellite images and aerial remote sensing data; the module has a built-in data quality control mechanism to ensure the accuracy and completeness of the collected data; the module has the advantages of being able to process multi-source heterogeneous data, improve data utilization and the comprehensiveness of the model, as well as an automated data update and expansion mechanism to maintain data timeliness and dynamically track changes in mining areas.
[0164] Data preprocessing module, which cleans, converts formats and fuses the collected geological data;
[0165] The spatial analysis and visualization module uses the geographic information system to perform spatial analysis and visualization on the pre-processed geological data; the spatial analysis and visualization module also includes two-dimensional and three-dimensional geological modeling functions to provide a more intuitive display of geological structures. The two-dimensional geological modeling function is used to generate geological profiles and plane maps to understand the geological structure and rock layer distribution of the mining area; the three-dimensional geological modeling function can generate a three-dimensional geological model to intuitively observe the geological structure of the mining area and more accurately determine the shape, scale and distribution information of the ore body;
[0166] The learning algorithm module interprets and classifies geological data and extracts geological features by combining learning algorithms;
[0167] Model building module, which builds the open-pit mine geological model based on the extracted geological features, including stratum distribution, rock properties, and ore body morphology;
[0168] Model verification and optimization module verifies and optimizes the constructed geological model to improve the accuracy and reliability of the model;
[0169] Application module, which applies the optimized geological model to the exploration, design and mining process of open-pit mines.
[0170] In summary, compared with the prior art, the present invention has the following advantages:
[0171] Comprehensiveness: By combining multiple data sources such as surface geological surveys, drilling, remote sensing and geophysics, it can provide more comprehensive geological information, thereby constructing a more accurate and detailed geological model;
[0172] Efficiency: Using geographic information systems for spatial analysis and visualization can efficiently process and interpret large amounts of complex geological data and improve the efficiency of geological modeling;
[0173] Accuracy: Using machine learning algorithms to classify and extract features from geological data can improve the prediction accuracy and reliability of the model;
[0174] Practicality: The constructed geological model can be applied to multiple stages of open-pit mine exploration, design and mining, providing a scientific basis for mine planning and decision-making, increasing economic benefits and reducing risks;
[0175] Updatability: As new data is acquired and mining progresses, the model can be continuously updated and optimized to ensure its continued accuracy and applicability;
[0176] Intuitiveness: Through 2D and 3D geological modeling functions, the geological structure can be displayed intuitively, helping geologists and engineers to better understand the geological conditions of the mining area and make more reasonable judgments and decisions.
[0177] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for geological modeling of open-pit mines based on multiple data sources, characterized in that: The steps include: S1. Collect geological data sources, including but not limited to surface geological survey data, drilling data, remote sensing data and geophysical data; S2. Preprocess the collected geological data, including data cleaning, format conversion and data fusion; S3, using geographic information system to perform spatial analysis and visualization of the pre-processed geological data; S4, combined with learning algorithms, interpret and classify geological data and extract geological features; S5. Construct an open-pit mine geological model based on the extracted geological features, including stratum distribution, rock properties, and ore body morphology; S6. Verify and optimize the constructed geological model to improve the accuracy and reliability of the model; S7. Apply the optimized geological model to the exploration, design and mining process of open-pit mines.
2. The method for geological modeling of an open-pit mine based on multiple data sources according to claim 1, characterized in that: Step S1 is specifically as follows: S11. Planning and designing geological data collection plan: Develop a detailed geological data collection plan based on the needs of open pit mine exploration and development, including determining the geographical scope of data collection, the types of data required, and their resolution and accuracy requirements; S12. Surface geological survey data collection: Organize a team of geological experts to conduct field surveys to record surface geological information such as lithology, stratigraphic sequence, faults, and folds, including collecting rock, mineral and soil samples for laboratory analysis; S13, drilling data acquisition: drilling operations are performed at predetermined locations, and drilling data, including cores, logging data, and drilling trajectories, are collected; S14. Remote sensing data acquisition: Use satellite or aerial photography to obtain remote sensing images of the mining area, and analyze the remote sensing images to obtain large-scale structural features, topography, and vegetation coverage information; S15. Geophysical data acquisition: Conduct seismic, electromagnetic and gravity geophysical surveys to obtain geophysical field data; S16. Multi-source data integration and management: Archive and store all collected data, establish a comprehensive geological database, and ensure data integrity and queryability; S17. Quality control: Conduct quality checks on the collected data to ensure its accuracy and reliability, and eliminate erroneous and abnormal data.
3. The method for geological modeling of an open-pit mine based on multiple data sources according to claim 1, characterized in that: Step S2 is specifically as follows: S21. Data cleaning: Identify and correct errors or inconsistencies in data, fill in missing values, and correct obvious data entry errors; Standardize data formats from different sources and convert data from different units or coding systems into a unified standard format; Eliminate data that is irrelevant to geological modeling or of low quality to ensure that the data quality meets the modeling requirements; S22. Format conversion: Convert the collected data into a unified format for subsequent processing and use, including converting text data into numerical data or converting unstructured data into structured data; Ensure that the coordinate system, projection system and scale of all data are consistent; S23. Data Fusion: Integrate data from different sources covering the same area or geological body, eliminate duplicate information, and merge relevant attributes; Multi-source data fusion is used to combine data from surface surveys, drilling, remote sensing and geophysical exploration.
4. The method for geological modeling of an open-pit mine based on multiple data sources according to claim 1, characterized in that: Step S3 is specifically as follows: S31. Data loading and format conversion: Import the preprocessed data into the geographic information system; Ensure all data is correctly aligned in the GIS and has consistent coordinate reference system and projection settings; S32. Spatial analysis: Perform spatial analysis to reveal geographic distribution characteristics and patterns in geological data, including identifying the spatial extent of specific geological features through buffer analysis or using overlay analysis to compare the relationships between different data sets; Apply spatial statistical methods, such as hot spot analysis or spatial autocorrelation analysis, to identify clusters or trends of geological features; S33, Visual display: Use map making tools to create various types of maps, such as point maps, strip maps, and heat maps, to intuitively display the characteristics of geological data; Customize map colors, symbols, and labels as needed to ensure that the map is both aesthetically pleasing and informative; Generate interactive maps that allow users to filter and view data based on different parameters, enhancing user experience.
5. The method for geological modeling of an open-pit mine based on multiple data sources according to claim 1, characterized in that: Step S4 is specifically as follows: 1) Calculate the frequency of occurrence of each geological category in the data set, including different types of ore bodies and strata of different ages; 2) For each feature and category, calculate the probability of the feature value appearing in the category, the features include rock type, mineral content, geological age; 3) Calculate the posterior probability of the sample belonging to each category under a given feature vector. The calculation formula is: ; Where P(C|X) is the posterior probability, P(X|C) is the conditional probability of sample X under category C, P(C) is the prior probability of category C, and P(X) is the probability of sample X. Since P(X) is the same for all categories, it is omitted. 4) For each sample to be classified, calculate the posterior probability of it belonging to each category, and then select the category with the largest posterior probability as the predicted category of the sample.
6. The method for geological modeling of an open-pit mine based on multiple data sources according to claim 1, characterized in that: Step S5 is specifically as follows: Use the training data to train the SVM model; the expression is: ; In the formula, K(x,x i ) is a function that measures the similarity between two data points in the feature space. By adjusting the parameter γ, the sensitivity of the similarity is controlled. i are two data points and γ is the kernel parameter.
7. The method for geological modeling of an open-pit mine based on multiple data sources according to claim 1, characterized in that: In step S6, the expression for verifying and optimizing the constructed geological model is: , limited by and ; In the formula, α i is the Lagrange multiplier obtained through the training process, indicating the importance of each support vector; y i is the category label of the support vector, that is, the actual category corresponding to each support vector; K(x,x i ) is the kernel function, which calculates the relationship between the test sample x and the i-th support vector x i The similarity between b is the bias term, which adjusts the position of the decision boundary to maximize the interval between the two categories; is the objective function, representing the inverse of the classification interval, which needs to be minimized to increase the interval; It is to maximize the interval while making more data points become support vectors; Ensure that the impact of each data point is non-negative; Make sure the decision boundary is in the middle of the two classes of data.
8. An open-pit mine geological modeling system based on multiple data sources, the system being used to implement the method of any one of claims 1 to 7, characterized in that: The system includes: A data collection module for collecting geological data sources, including but not limited to surface geological survey data, drilling data, remote sensing data, and geophysical data; Data preprocessing module, which cleans, converts formats and fuses the collected geological data; Spatial analysis and visualization module, which uses geographic information system to perform spatial analysis and visualization of pre-processed geological data; The learning algorithm module interprets and classifies geological data and extracts geological features by combining learning algorithms; Model building module, which builds the open-pit mine geological model based on the extracted geological features, including stratum distribution, rock properties, and ore body morphology; Model verification and optimization module verifies and optimizes the constructed geological model to improve the accuracy and reliability of the model; Application module, which applies the optimized geological model to the exploration, design and mining process of open-pit mines.
9. The open-pit mine geological modeling system based on multiple data sources according to claim 8 is characterized in that: The spatial analysis and visualization module also includes two-dimensional and three-dimensional geological modeling functions to provide a more intuitive display of geological structures. The two-dimensional geological modeling function is used to generate geological profiles and plan views to understand the geological structure, rock layer distribution, etc. of the mining area; the three-dimensional geological modeling function can generate a three-dimensional geological model to intuitively observe the geological structure of the mining area and more accurately judge the shape, scale and distribution information of the ore body.
Citation Information
Patent Citations
A multi-well complex lithology intelligent identification method and system based on logging data
CN109919184A
Strip mine geological modeling system
CN116452765A
Graphite gold ore prospecting method based on Gaussian mixture clustering analysis
CN117216576A
Surveying and mapping method for geological exploration
CN117274520A
Mass spectrum data classification method based on support vector machine
CN117407779A
Cited By
Three-dimensional geological modeling parameter optimization method and system based on deep learning
CN119251423A
Coal mine digital twin geologic model construction method and system based on precise exploration
CN119762698A
Geological mineral exploration data extraction method and system
CN120103519A
Construction method and system for deep multi-source heterogeneous big database
CN120123440A
Strip mine slope multi-element engineering geological information identification and fusion modeling method
CN120259583A
