Ecological scheduling method for inhibiting reservoir tributary algal bloom

By analyzing the relationship between water level variation and algae biomass, combining the reservoir scheduling procedures and flow data, the reservoir water level is regulated to suppress water blooms, and the problem of mismatch of the dispatch constraints of water blooms in the existing technology has been solved, achieving efficient multi-dimensional The coordinated management of the target significantly improves the ecological and economic benefits of the reservoir.

CN119047680AActive Publication Date: 2024-11-29CHINA THREE GORGES CORPORATION
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410960895.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-29
Estimated Expiration
2044-07-17

AI Technical Summary

Technical Problem

The existing water-hua ecological scheduling methods of the existing reservoir tributary do not match the constraints such as flood control, power generation, and shipping, resulting in low scheduling efficiency and great impact on the ecological environment.

Method used

By collecting historical data on water bloom monitoring, statistically analyzing the relationship between water level change and algae biomass, combining the reservoir scheduling procedures and inlet and exit flow data, the reservoir water level is regulated to destroy water temperature stratification, inhibit water bloom, and meet flood control, power generation, and shipping. Scheduling is implemented under the premise of requirements, and a multi-objective optimization algorithm and dynamic feedback mechanism are used for real-time adjustments.

Benefits of technology

It effectively inhibited the occurrence of water blossoms in the tributary of the reservoir, improved the water ecological environment, achieved multi-target collaborative management, improved the convenience of scheduling and practical application value, and significantly improved the ecological and economic benefits of the reservoir area.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119047680A_ABST
    Figure CN119047680A_ABST
Patent Text Reader

Abstract

The invention relates to an ecological scheduling method for inhibiting water bloom of reservoir tributaries, which comprises the following steps: collecting water bloom monitoring historical data, analyzing the relationship between water level variation and algae biomass, determining a water level variation threshold for inhibiting water bloom, and calculating and determining a scheduling time period meeting water bloom inhibiting requirements on the basis of combining reservoir scheduling regulations and in-out reservoir flow data; in the dispatching time period, the water level of the reservoir is regulated and controlled to be within the preset range and rises and falls according to the preset amplitude and frequency, water temperature layering is destroyed, and therefore branch water blooms are effectively restrained, the method is implemented on the premise that the flood control, power generation and shipping requirements are met, multi-target collaborative management is achieved, operation is convenient and fast, and the method has the practical application value and is worthy of popularization. The method has important significance in improving the ecological environment of reservoir water and protecting the safety of water resources; meanwhile, a scheduling strategy can be dynamically adjusted according to real-time monitoring data so as to adapt to water bloom prevention and control requirements under different seasons and different meteorological conditions, and other ecological engineering technologies can be combined so that the water bloom prevention and control effect can be further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of water conservancy project dispatching, and in particular to an ecological dispatching method for suppressing algal bloom in reservoir tributaries. Background Art

[0002] The Three Gorges Project is a key backbone project on the Yangtze River in my country, and has played a huge role in flood control, power generation, shipping, and water resource utilization. However, algal blooms occur frequently in some tributaries of the Three Gorges Reservoir. Algal blooms can easily cause water hypoxia and significant changes in water color. Some algal blooms even produce algal toxins and odors, affecting the water ecological environment of the reservoir and the lives of surrounding residents. Although the existing scheduling methods have proposed water level scheduling thresholds and scheduling methods for different seasons, they do not match the constraints of flood control, power generation, and shipping in the existing scheduling regulations.

[0003] For example, CN109319853A discloses an ecological dispatching method for controlling algal bloom by adjusting the flow rate of upstream tributaries, the method being as follows: adjusting the flow rate of upstream tributaries according to the changes in reservoir water level, the state of tributary bay and the temperature of upstream tributary flow, forming a middle-layer backflow or non-stratified flow state in the algal bloom-prone area, or reducing the intensity of surface backflow to suppress the outbreak of algal bloom; the present invention, based on an in-depth study of the outbreak mechanism of algal bloom in tributaries of river-type reservoirs and the law of flow state changes in algal bloom-prone areas, proposes an ecological dispatching method for preventing and controlling algal bloom by adjusting the flow rate of upstream tributaries according to the changes in reservoir water level, forming a flow state that is not conducive to the outbreak of algal bloom in the algal bloom-prone area; the method is to prevent and control algal bloom by changing the flow rate of upstream tributaries; there is still a situation where the constraints such as flood control, power generation, and shipping do not match.

[0004] Therefore, how to optimize the ecological scheduling strategy, strengthen multi-objective collaborative management, and improve the convenience of actual operations are the technical problems to be solved by the present invention. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide an ecological dispatching method for suppressing algal bloom in reservoir tributaries, so as to solve the problem that the ecological dispatching method in the prior art does not match the constraints in flood control, power generation and shipping.

[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is: an ecological dispatching method for suppressing algal bloom in reservoir tributaries, comprising the following steps: Step 1: Collect historical data on algal bloom monitoring, including the annual distribution of algal bloom frequency, algal biomass during the algal bloom monitoring period in reservoir tributaries, reservoir water level, and inflow and outflow data; Step 2: Determine the water level fluctuation threshold for inhibiting algal blooms by statistically analyzing the relationship between water level fluctuation and algal biomass; Step 3: Combined with the reservoir dispatching regulations and the inflow and outflow data at different periods, calculate whether the water level fluctuation meets the requirements for suppressing algal blooms, and determine the period for carrying out the dispatching to suppress algal blooms. During this period, the reservoir water level is adjusted to the predetermined water level range, so that the water level rises and falls according to the preset amplitude and frequency, thereby destroying the water temperature stratification and suppressing algal blooms in tributaries; Step 4: Analyze the dispatching conditions and implement dispatching on the premise of meeting the requirements of flood control, power generation and shipping.

[0007] In a preferred embodiment, the water level is within the predetermined range, and the water level rises at a daily average rate not less than the set value for at least three consecutive days.

[0008] In a preferred solution, in Step 4, the analysis of scheduling conditions includes: Step 4.1: In terms of flood control, according to the reservoir dispatching regulations, when the inflow is less than the preset threshold and the inflow in the next three days does not exceed another preset threshold, dispatching is carried out; Step 4.2: In terms of shipping, the water level of the downstream Gezhouba Dam should be ensured not to be lower than the preset value during the dispatching process to ensure shipping safety; Step 4.3: In terms of power generation, dispatching is carried out under the premise of meeting the peak-shaving needs of the power grid.

[0009] In the preferred scheme, in Step 4, in June and July-August when algal blooms occur frequently, when the reservoir inflow is greater than the minimum scheduling threshold set for this month, and the inflow for the next three days is not greater than the maximum scheduling threshold set for this month, scheduling is implemented; the minimum scheduling threshold and the maximum scheduling threshold set for June are different from those for July-August.

[0010] In the preferred scheme, in July and August, when the inflow is greater than the maximum set threshold, the scheduling is mainly for small and medium-sized floods, while taking into account the scheduling to suppress algal blooms, to ensure that the reservoir water level rises by no less than the set water level value for at least three consecutive days.

[0011] In a preferred solution, in Step 4, during the scheduling process, the water level is reduced according to the forecast flow after scheduling to avoid water abandonment.

[0012] In the preferred scheme, in Step 4, during the scheduling process, a multi-objective optimization algorithm is adopted to comprehensively consider multiple factors such as water quality improvement, water resource utilization, and ecological protection to achieve the optimal decision for ecological scheduling; at the same time, a dynamic feedback mechanism is introduced to adjust the scheduling plan in real time to adapt to changing hydrological conditions and ecological environmental needs.

[0013] In the preferred scheme, in Step 4, during the scheduling process, an intelligent prediction model is introduced to predict the occurrence trend of algal bloom in reservoir tributaries, providing a scientific basis for scheduling; at the same time, combined with water environment automatic monitoring technology, the water quality and algal bloom situation of reservoir tributaries are monitored in real time to provide data support for the adjustment of the scheduling plan.

[0014] In the preferred solution, in Step 4, during the scheduling process, a reservoir tributary algal bloom risk assessment system is established, and the priority and urgency of the scheduling plan are determined based on the assessment results to ensure that effective response measures can be taken quickly when algal bloom risks occur to reduce the impact of algal blooms on the ecological environment.

[0015] In the preferred solution, in Step 4, a dynamic update mechanism for risk assessment is introduced during the scheduling process, and the risk assessment results are continuously revised and adjusted according to real-time data and hydrological conditions to ensure the pertinence and effectiveness of the scheduling plan; at the same time, an emergency response plan is established to clarify the response measures and disposal processes for algal bloom risks at all levels, and to improve the rapid response capability to algal bloom risks.

[0016] The ecological dispatching method for suppressing algal bloom in reservoir tributaries provided by the present invention has the following beneficial effects: 1. The present invention solves the problem of mismatching constraints in flood control, power generation and shipping in the ecological scheduling method of the prior art.

[0017] 2. The present invention can effectively suppress the occurrence of algal bloom in tributaries and improve the water ecological environment in the reservoir area by accurately regulating the reservoir water level.

[0018] 3. The present invention performs scheduling on the premise of meeting the requirements of flood control, power generation, shipping, etc., and realizes multi-objective collaborative management.

[0019] 4. The scheduling method of the present invention is easy to operate and has high practical application value.

[0020] 5. The implementation cases of the present invention show that compared with traditional methods, this method can significantly improve the ecological and economic benefits of the reservoir area; in addition, the method can also be flexibly adjusted according to actual conditions to adapt to the ecological environment and economic development needs of different regions.

[0021] 6. The present invention realizes real-time monitoring and prediction of algal blooms in reservoir tributaries by integrating advanced monitoring technologies and data analysis methods, providing a scientific basis for ecological scheduling and further improving its effect and application scope.

[0022] 7. The scheduling scheme of the present invention also has significant advantages in reducing water resource waste and improving water resource utilization efficiency. Through refined management and optimized scheduling, sustainable utilization of water resources is achieved, providing new ideas and methods for reservoir management.

[0023] 8. The present invention reduces the water level according to the forecast flow after scheduling to avoid water abandonment; at the same time, the scheduling scheme of the present invention also fully considers the needs of the ecological environment, protects the living environment of aquatic organisms through reasonable flow control, and promotes the healthy development of the water ecosystem.

[0024] 9. The present invention adopts a multi-objective optimization algorithm in the scheduling process, and realizes global optimization of task allocation and scheduling by comprehensively evaluating multiple key indicators such as system resource utilization, task execution time and energy consumption; this algorithm can effectively improve the overall performance and efficiency of the system, reduce operating costs, and has good scalability and adaptability.

[0025] 10. The present invention introduces a dynamic feedback mechanism in the scheduling process to adjust the scheduling plan in real time to adapt to changing hydrological conditions and ecological environmental needs, and introduces advanced monitoring technology to collect and analyze hydrological data in real time to quickly respond to changes in water level, flow, etc. At the same time, we work closely with ecological experts to ensure that the scheduling plan minimizes the negative impact on the ecological environment while ensuring the safe and stable operation of water conservancy facilities.

[0026] 11. The present invention introduces an intelligent prediction model in the scheduling process, which collects and analyzes system data in real time to predict future load changes and resource requirements; this intelligent prediction model can identify potential resource bottlenecks in advance, thereby automatically adjusting resource allocation strategies to ensure efficient operation of the system and maximum utilization of resources.

[0027] 12. The present invention monitors the water quality and algal bloom of reservoir tributaries in real time during the scheduling process, providing data support for the adjustment of the scheduling plan; at the same time, the present invention also introduces big data analysis technology to mine and analyze historical data, predict future water quality trends, and provide a scientific basis for long-term scheduling planning; through this series of technical applications, the present invention can ensure the scientificity and efficiency of reservoir scheduling.

[0028] 13. During the dispatching process, the present invention establishes a risk assessment system for algal bloom in reservoir tributaries. By real-time monitoring of water quality data, combining historical data and meteorological information, and using machine learning and data mining technology, the risk of algal bloom in reservoir tributaries is predicted and assessed. At the same time, combined with the dispatching plan, water resource allocation is optimized, the risk of algal bloom is reduced, and the sustainable use of water resources is ensured.

[0029] 14. The present invention introduces a dynamic update mechanism for risk assessment in the scheduling process. Before each task scheduling, risk assessment is performed and the risk assessment model is updated based on the current state of the system and the specific requirements of the task. The security and stability of task scheduling are ensured by real-time monitoring of various key indicators during task execution.

[0030] 15. The present invention establishes an emergency response plan, clarifies the response measures and disposal procedures for algal bloom risks at all levels, and improves the rapid response capability to algal bloom risks; through real-time monitoring of water status, advanced data analysis technology is used to predict the trend of algal bloom, and early warning information is issued in a timely manner; at the same time, cooperation with relevant departments is strengthened to form a joint force to jointly respond to algal bloom risks and ensure the stability and sustainable development of the water ecological environment.

[0031] 16. The present invention integrates multiple technologies such as intelligent scheduling, risk assessment, dynamic update and emergency response to form a comprehensive, efficient and intelligent reservoir scheduling and management system, which provides strong technical support for the safe operation of reservoirs and the sustainable use of water resources.

[0032] 17. The present invention also uses big data analysis technology to monitor the entire reservoir scheduling process, collect and analyze scheduling data in real time, discover potential problems and adjust scheduling strategies in a timely manner to ensure the accuracy and reliability of reservoir scheduling; in addition, the present invention also supports remote monitoring and mobile office, which improves the convenience and flexibility of reservoir scheduling management.

[0033] 18. The present invention also introduces a machine learning algorithm to continuously optimize the scheduling strategy to adapt to the reservoir scheduling needs in different seasons and different climatic conditions; at the same time, the present invention also takes into account the impact of reservoir scheduling on the surrounding environment and takes a series of measures to reduce interference with the surrounding ecological environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] The present invention will be further described below in conjunction with the accompanying drawings and implementation examples: Figure 1 This is a flow chart of the method for calculating ecological dispatching parameters for suppressing algal bloom in reservoir tributaries according to the present invention; Figure 2 The annual distribution diagram of the cumulative frequency of algal blooms in previous years as calculated by the present invention; Figure 3 This is a scatter plot of the statistical relationship between the water level variation of Xiaojiang River and the algae biomass in 2016, 2018 and 2019 of the present invention; Figure 4 It is the monitoring point of Xiaojiang algae bloom in the embodiment of the present invention; Figure 5 The inflow and outflow of the reservoir and the water level in front of the dam during the ecological dispatching period in the embodiment of the present invention; Figure 6 is the spawning amount of drifting egg-laying fish in Yidu section before and after ecological regulation in the embodiment of the present invention; Figure 7 This is a relationship diagram between the mean chlorophyll a value representing the algae biomass and the water level in the river sections with severe algal blooms (XJ01-XJ03) during the scheduling period of the present invention. DETAILED DESCRIPTION

[0035] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments: Embodiment 1: like Figure 1 As shown, an ecological dispatching method for suppressing algal bloom in reservoir tributaries comprises the following steps: Step 1: Collect historical data on algal bloom monitoring, including the annual distribution of algal bloom frequency, algal biomass during the algal bloom monitoring period in reservoir tributaries, reservoir water level, and inflow and outflow data; Step 2: Determine the water level fluctuation threshold for inhibiting algal blooms by statistically analyzing the relationship between water level fluctuation and algal biomass; Step 3: Combined with the reservoir dispatching regulations and the inflow and outflow data at different periods, calculate whether the water level fluctuation meets the requirements for suppressing algal blooms, and determine the period for carrying out the dispatching to suppress algal blooms. During this period, the reservoir water level is adjusted to the predetermined water level range, so that the water level rises and falls according to the preset amplitude and frequency, thereby destroying the water temperature stratification and suppressing algal blooms in tributaries; Step 4: Analyze the dispatching conditions and implement dispatching on the premise of meeting the requirements of flood control, power generation and shipping.

[0036] In this embodiment, the predetermined water level range is 145-148 m, and the water level rises at an average daily rate of at least 0.7 m / d for at least three consecutive days.

[0037] Furthermore, in Step 4, the analysis of the scheduling conditions includes: Step 4.1: In terms of flood control, according to the reservoir dispatching regulations, when the inflow is less than the preset threshold and the inflow in the next three days does not exceed another preset threshold, dispatching is carried out; Step 4.2: In terms of shipping, the water level of the downstream Gezhouba Dam should be ensured not to be lower than the preset value during the dispatching process to ensure shipping safety; Step 4.3: In terms of power generation, dispatching is carried out under the premise of meeting the peak-shaving needs of the power grid.

[0038] Furthermore, in Step 4, in June, when the reservoir inflow is greater than 18,000 m³ / s and the inflow in the next three days is not greater than 28,000 m³ / s, scheduling is implemented; in July and August, when the inflow is greater than 21,800 m³ / s and the inflow in the next three days is not greater than 28,000 m³ / s, scheduling is implemented.

[0039] Furthermore, in July and August, when the inflow is greater than 35,000 m³ / s, the regulation will be mainly for small and medium-sized floods, while taking into account the regulation to suppress algal blooms, to ensure that the reservoir water level rises by at least 2m for at least three consecutive days.

[0040] Furthermore, in Step 4, during the scheduling process, the water level is reduced according to the forecast flow after scheduling to avoid water abandonment.

[0041] Furthermore, in Step 4, during the scheduling process, a multi-objective optimization algorithm is adopted to comprehensively consider multiple factors such as water quality improvement, water resource utilization, and ecological protection to achieve the optimal decision for ecological scheduling; at the same time, a dynamic feedback mechanism is introduced to adjust the scheduling plan in real time to adapt to changing hydrological conditions and ecological environmental needs.

[0042] Furthermore, in the Step 4, during the dispatching process, an intelligent prediction model is introduced to predict the occurrence trend of algal bloom in reservoir tributaries, providing a scientific basis for dispatching; at the same time, combined with the automatic water environment monitoring technology, the water quality and algal bloom situation of reservoir tributaries are monitored in real time to provide data support for the adjustment of the dispatching plan.

[0043] Furthermore, in Step 4, during the dispatching process, an algal bloom risk assessment system for reservoir tributaries is established, and the priority and urgency of the dispatching plan are determined based on the assessment results to ensure that effective response measures can be taken quickly when the risk of algal bloom occurs to reduce the impact of algal bloom on the ecological environment.

[0044] Furthermore, in the Step 4, a dynamic update mechanism for risk assessment is introduced during the scheduling process. According to real-time data and hydrological conditions, the risk assessment results are continuously revised and adjusted to ensure the pertinence and effectiveness of the scheduling plan. At the same time, an emergency response plan is established to clarify the response measures and disposal processes for algal bloom risks at all levels, so as to improve the rapid response capability to algal bloom risks.

[0045] Embodiment 2: In another preferred embodiment, based on the above embodiment 1, Figures 4 to 7 As shown, an ecological dispatching method for suppressing algal bloom in reservoir tributaries, taking the Three Gorges Reservoir as an example, includes the following steps: Step 1: Collect historical data on algal bloom monitoring, including the annual distribution of algal bloom frequency. Figure 2 As shown, the algal biomass (chlorophyll a value), water level of the Three Gorges Reservoir, and inflow and outflow data during the water bloom monitoring period in the Three Gorges Reservoir tributaries; Step 2: Count the main periods of algal bloom prevention and control, and analyze the relationship between water level fluctuation and algal biomass through scatter plots, such as Figure 3 As shown in the figure, the water level fluctuation threshold for inhibiting algal blooms is determined; when the daily water level fluctuation is between -1 and 1 m / d, chlorophyll a peaks.

[0046] Step 3: Combine the Three Gorges Reservoir dispatching procedures and the inflow and outflow data at different times to calculate whether the water level fluctuation meets the requirements for suppressing algal blooms. Accurately determine the time period for carrying out dispatching to suppress algal blooms. The conditions for dispatching algal blooms are met from June to August, and the dispatching of small and medium-sized floods is the main focus from July to August, while taking into account the dispatching of algal blooms.

[0047] Under the conditions for implementing water bloom dispatching, the corresponding reservoir capacities of the initial and final water levels are V1 and V2 respectively; the inflows for three consecutive days are Q1, Q2, and Q3 respectively; and the corresponding duration of the three days is 3 days. To ensure that the output curves are consistent within the dispatching period, the average power generation flow Q for three days is equal, and Q= (Q1+Q2+Q3) / 3-(V2-V1) / 3d is calculated. After the water level rises to the highest point, it drops to the initial water level of the dispatching under the flow constraints and water level drop constraints of the dispatching regulations.

[0048] According to historical monitoring data, the greater the water level rise and the longer it lasts, the lower the algae biomass. When the daily water level rise is higher than 1m / day, the algae biomass is at a low level; when the daily water level rise approaches 0, the probability of a peak in algae biomass is high. According to analysis, there is 3m of dispatching space at 145~148m, of which about 1m is used for power station peak regulation, and the remaining 2m is used for dispatching. The dispatching time is at least 3 days, so the average daily water level rises by at least 0.7m / d. If conditions permit, the amplitude can be increased and the dispatching time can be extended, as shown in Table 1 below: Table 1 Effect of lifting duration on algal biomass

[0049] Step 4, analysis of dispatching conditions: After the water level drops to 145m in June, ecological dispatching will be carried out at an appropriate time during the reservoir storage stage, taking into account the impact on flood control, power generation and shipping.

[0050] In terms of flood prevention, according to the latest dispatching regulations of the Three Gorges Dam, the inflow during the flood season is less than 28,000 m³ / s, and the inflow in the next three days will not exceed 30,000 m³ / s. The water levels in Shashi and Chenglingji are lower than 41m and 30.5m respectively. There will be no moderate or above rainfall in the next three days, and the water level can fluctuate between 145m and 148m. In terms of shipping, the minimum discharge flow of Gezhouba Dam should meet the requirement that the water level of Miaozui downstream of Gezhouba Dam is not less than 39.0m, that is, the discharge flow should be greater than 6,000 m³ / s. In August, the average daily outflow of the Three Gorges Reservoir should be no less than 18,000 m³ / s as much as possible. When the inflow is less than or equal to 18,000 m³ / s, the discharge will be based on the inflow. In terms of power generation, the peak-shaving effect of the Three Gorges Power Station on the power grid is mainly considered. The daily peak-shaving volume from 2019 to June 2021 is counted. In recent years, the peak-shaving volume of the power grid has increased year by year. The average peak-shaving volume in June 2021 was 4.43 million KW, and the maximum peak-shaving volume was 7.2 million KW.

[0051] Under the premise of meeting the requirements of flood control and power generation, when the inflow into the Three Gorges Reservoir is less than 28,000 m³ / s and the inflow into the reservoir in the next three days is no more than 30,000 m³ / s, the water level of the Three Gorges in June is generally between 145 and 148 m. For every 1 m increase in the water level, the corresponding increase in reservoir water capacity is about 500 million m³. According to statistics, the minimum power generation flow in the middle and late June of 2019 to 2021 in the past three years is 7932 m³ / s. On the basis of meeting the working conditions of extreme peak-shaving needs and the minimum power generation flow at the time, the reservoir water level rises by 2 m within three days, and the required three-day average inflow is at least 17977 m³ / s. This flow value is the minimum flow that can be dispatched. When the starting water level is higher than 146 m, the dispatch process will briefly exceed 148 m. At the same time, in order to ensure that no water abandonment occurs in the later stage of dispatching, it should be reduced according to the forecast flow after dispatching, and no water abandonment should be used as one of the conditions for the implementation of water bloom dispatching.

[0052] From July to August, when the inflow is less than 28,000 m³ / s, according to the dispatching method in June, on the basis of satisfying the water level rising by 2m within three days, the discharge flow should also be at least greater than 18,000 m³ / s. Therefore, the three-day average inflow is at least 21,858 m³ / s. When the inflow reaches 28,000 m³ / s and the inflow does not exceed 35,000 m³ / s in the next three days, according to the dispatching regulations, the maximum water level shall not exceed 146.5m. If dispatching is carried out, the water level limit will be exceeded. When the inflow is greater than 35,000 m³ / s in the next three days, it will be dispatched according to small and medium-sized floods. When intercepting and storing floods, the water level can rise by 2m within three days.

[0053] Step 5: The phased (flow) hierarchical scheduling scheme is summarized as shown in Table 2: In mid-to-late June, the algae biomass reached 30μg / L, and the affected range reached 2km and above. When the inflow into the Three Gorges Reservoir was greater than 18,000m³ / s and the inflow in the next three days was no more than 28,000m³ / s, the reservoir water level would rise by at least 2m in three days and then drop to the flood limit water level.

[0054] From July to August, the algae biomass reaches 30μg / L, and the affected range reaches 2km and above. When the inflow into the Three Gorges Reservoir is greater than 21,800m³ / s and the inflow in the next three days is no more than 28,000m³ / s, the reservoir water level will rise by at least 2m in three days, and then drop to the flood limit water level. If conditions permit, it will be implemented at least 3m in three days.

[0055] From July to August, the algae biomass reached 30μg / L, and the impact range reached 2km and above, the inflow was greater than 35,000m³ / s, and the scheduling of small and medium-sized floods was mainly carried out, while taking into account the scheduling of suppressing algal blooms. The reservoir water level rose by at least 2m every 3 days.

[0056] From July to August, the algae biomass reaches 30μg / L, and the impact range reaches 2km and above. When the inflow into the Three Gorges Reservoir is greater than 28,000m³ / s and the inflow in the next three days is no more than 35,000m³ / s, according to the dispatching regulations, the Three Gorges Reservoir shall not exceed 146.5m. When there is a need for flood control downstream, ecological dispatching to suppress algal blooms may be implemented as appropriate.

[0057] Table 2 Scheduling scheme

[0058] Embodiment 3: In another preferred embodiment, based on the above embodiment 2, as Figure 3 , 4 As shown, the Three Gorges Reservoir has carried out ecological regulation that takes into account both the promotion of natural reproduction of the four major carps and the prevention and control of algal blooms in the reservoir tributaries. Artificial monitoring has been carried out in Xiaojiang, a tributary with serious algal blooms. The monitoring indicators include five conventional water parameters, nitrogen and phosphorus nutrients, and algae biomass. During the regulation period, the maximum inflow of the Three Gorges Reservoir was 37,000 m³ / s (20:00 on the 27th), the minimum inflow was 20,800 m³ / s (2:00 on the 23rd), and the average inflow was 28,000 m³ / s; the maximum outflow was 31,700 m³ / s (20:00 on the 28th), the minimum outflow was 19,200 m³ / s (2:00 on the 23rd), and the average outflow was 24,300 m3 / s.

[0059] During the dispatching process, it was monitored that blue algae bloom occurred in Xiaojiang Reservoir Bay, and the serious river section (XJ01-XJ03 from Xiaojiang River estuary to Huangshi Town) Figure 4 As shown, the average chlorophyll a concentration in the water surface reached 58.33 μg / L.

[0060] More than 14,000 fish eggs were collected from the Yichang to Yidu section of the river, and the total amount of fish eggs was estimated to be 15.3 billion, of which about 8.8 billion were from the four major fish species. The peak of spawning was mainly concentrated on June 28, with an average daily total egg density of 7,000 eggs / 1,000m 3 .

[0061] During the dispatching process, the water level of the Three Gorges Reservoir was between 145.53 and 145.74 m. During the ecological dispatching period for preventing and controlling algal blooms, the water level continued to rise from 145.8 m to 148.54 m. The water level rose by 2.74 m in three days, with an average daily increase of 0.91 m. The water level rose by 0.67 m, 0.92 m, and 0.99 m in three days, with the largest increase on the third day, after which the water level tended to stabilize.

[0062] As the water level rises, the average chlorophyll a concentration in the serious river section shows a downward trend, and drops to about 10μg / L on the first day after the dispatch. The serious algal bloom in the river section of about 6km from Shuangjiang Bridge to Huangshi Town, Yunyang County has basically subsided. The daily average chlorophyll a value in the serious algal bloom section (XJ-HS section) is significantly negatively correlated with the water level, and the determination coefficient R ² The monitoring results show that the reservoir regulation in the flood season has a good inhibitory effect on the algal bloom in Xiaojiang River.

[0063] This ecological dispatch is a coordinated dispatch that takes into account both promoting fish reproduction and preventing and controlling algal blooms in tributaries. It is calculated that the power generation increased by about 81 million kWh compared with conventional dispatch, fully exerting the ecological and economic benefits of the Three Gorges Reservoir.

[0064] In the preferred scheme, the water level range is predetermined in Step 3, and the water level rises at a daily average rate of not less than the set rate for at least three consecutive days; the above settings ensure the stability and reliability of water level changes and effectively avoid misjudgments due to accidental factors; at the same time, this setting also takes into account climate change and seasonal factors, making water level management more scientific and reasonable.

[0065] In the preferred scheme, in Step 4, in June and July-August when algal blooms frequently occur, when the reservoir inflow is greater than the minimum scheduling threshold set for this month, and the inflow for the next three days is not greater than the maximum scheduling threshold set for this month, scheduling is implemented, and the minimum scheduling threshold and the maximum scheduling threshold set for June are different from those for July-August; the above settings can ensure that the reservoir is reasonably scheduled during the high incidence period of algal blooms, which not only ensures the water storage capacity of the reservoir, but also avoids the outbreak of algal blooms due to excessive water volume.

[0066] In the preferred scheme, in July and August, when the inflow is greater than the highest set threshold, small and medium-sized floods will be mainly dispatched, while taking into account the dispatching to suppress algal blooms, to ensure that the reservoir water level rises by no less than the set water level value for at least three consecutive days; the above settings can reduce flood control pressure and effectively suppress the occurrence of algal blooms through reasonable dispatching when the water volume in the reservoir is large; in addition, when the inflow continues to be lower than the lowest set threshold, water-saving dispatching will be implemented to cope with possible drought conditions.

[0067] In the preferred solution, in Step 4, during the dispatching process, the water level is reduced according to the forecast flow after dispatching to avoid water abandonment; the above settings not only ensure the safe operation of the reservoir, but also make full use of water resources. At the same time, we have also integrated a real-time monitoring module into the system, which can detect and solve potential problems in time to ensure the smooth progress of the entire dispatching process.

[0068] In the preferred scheme, in Step 4, during the scheduling process, a multi-objective optimization algorithm is adopted to comprehensively consider multiple factors such as water quality improvement, water resource utilization, and ecological protection to achieve the optimal decision of ecological scheduling; at the same time, a dynamic feedback mechanism is introduced to adjust the scheduling plan in real time to adapt to changing hydrological conditions and ecological environmental needs; the above settings effectively improve the flexibility and adaptability of scheduling, and ensure the scientificity and effectiveness of the scheduling plan; in addition, it also strengthens collaboration with other relevant departments to jointly promote the sustainable utilization of water resources and the protection of the ecological environment.

[0069] In the preferred scheme, in Step 4, during the dispatching process, an intelligent prediction model is introduced to predict the occurrence trend of algal bloom in reservoir tributaries, providing a scientific basis for dispatching; at the same time, combined with water environment automatic monitoring technology, the water quality and algal bloom of reservoir tributaries are monitored in real time to provide data support for the adjustment of the dispatching plan; the above settings ensure the accuracy and timeliness of the dispatching process, effectively reduce the risk of algal bloom, and ensure the water ecological safety of the reservoir and its surrounding areas; at the same time, this also provides reference experience and methods for similar reservoir management.

[0070] In the preferred scheme, in the Step 4, during the dispatching process, a reservoir tributary algal bloom risk assessment system is established, and the priority and urgency of the dispatching scheme are determined by the assessment results to ensure that effective response measures can be taken quickly when the risk of algal bloom occurs to reduce the impact of algal bloom on the ecological environment; the above settings, through refined management and timely response, achieve the optimal allocation of water resources and the protection of the ecological environment; at the same time, the scheme also takes into account the coordinated development of reservoir dispatching and the surrounding environment, and promotes a win-win situation for ecology and economy.

[0071] In the preferred solution, in Step 4, during the scheduling process, a dynamic update mechanism for risk assessment is introduced, and the risk assessment results are continuously revised and adjusted according to real-time data and hydrological conditions to ensure the pertinence and effectiveness of the scheduling plan; at the same time, an emergency response plan is established to clarify the response measures and disposal processes for algal bloom risks at all levels, and to improve the rapid response capability to algal bloom risks; the above settings will greatly enhance the flexibility and reliability of the scheduling system, provide strong guarantees for coping with complex and changeable hydrological environments, and reduce the impact of algal bloom risks on ecosystems and water resource security.

[0072] In summary, the present invention provides an ecological scheduling method for suppressing algal bloom in reservoir tributaries, which solves the problem of mismatching constraints of the ecological scheduling method in the prior art in flood control, power generation, and shipping; by accurately regulating the reservoir water level, the occurrence of algal bloom in tributaries is effectively suppressed, and the water ecological environment in the reservoir area is improved; scheduling is performed under the premise of meeting the requirements of flood control, power generation, shipping, etc., and multi-objective collaborative management is achieved; and the ecological scheduling method is simple to operate, low-cost, and suitable for the management of algal bloom in various reservoir tributaries; the present invention is of great significance for maintaining the ecological balance of reservoirs and promoting the sustainable use of water resources; in addition, the present invention can also serve as an important supplement to reservoir management strategies, provide a scientific basis for reservoir management, further promote the development of reservoir management in a scientific, refined and intelligent direction, and achieve a comprehensive improvement in the ecological, economic and social benefits of reservoirs; the implementation of the present invention not only enhances the ability of reservoirs to respond to algal bloom events, but also improves the overall operating efficiency and resource utilization efficiency of reservoirs through multi-objective collaborative management, laying a solid foundation for achieving sustainable development of reservoirs. At the same time, the application of this ecological scheduling method can also promote the research and development and innovation of related technologies, and provide strong support for technological progress in the field of reservoir management; in the future, with the continuous development and improvement of technology, it is believed that the ecological scheduling method of the present invention will play a more important role in reservoir management.

Claims

1. An ecological dispatching method for suppressing algal bloom in reservoir tributaries, characterized in that: The method comprises the following steps: Step 1: Collect historical data on algal bloom monitoring, including the annual distribution of algal bloom frequency, algal biomass during the algal bloom monitoring period in reservoir tributaries, reservoir water level, and inflow and outflow data; Step 2: Determine the water level fluctuation threshold for inhibiting algal blooms by statistically analyzing the relationship between water level fluctuation and algal biomass; Step 3: Combined with the reservoir dispatching regulations and the inflow and outflow data at different periods, calculate whether the water level fluctuation meets the requirements for suppressing algal blooms, and determine the period for carrying out the dispatching to suppress algal blooms. During this period, the reservoir water level is adjusted to the predetermined water level range, so that the water level rises and falls according to the preset amplitude and frequency, thereby destroying the water temperature stratification and suppressing algal blooms in tributaries; Step 4: Analyze the dispatching conditions and implement dispatching on the premise of meeting the requirements of flood control, power generation and shipping.

2. The ecological dispatching method for suppressing algal bloom in reservoir tributaries according to claim 1, characterized in that: The water level range is predetermined in Step 3, and the water level rises at a daily average rate not less than the set range for at least three consecutive days.

3. The ecological dispatching method for suppressing algal bloom in reservoir tributaries according to claim 1, characterized in that: In Step 4, the analysis of scheduling conditions includes: Step 4.1: In terms of flood control, according to the reservoir dispatching regulations, when the inflow is less than the preset threshold and the inflow in the next three days does not exceed another preset threshold, dispatching is carried out; Step 4.2: In terms of shipping, the water level of the downstream Gezhouba Dam should be ensured not to be lower than the preset value during the dispatching process to ensure shipping safety; Step 4.3: In terms of power generation, dispatching is carried out under the premise of meeting the peak-shaving needs of the power grid.

4. The ecological dispatching method for suppressing algal bloom in reservoir tributaries according to claim 3 is characterized in that: In the Step 4, in June and July-August when algal blooms occur frequently, when the reservoir inflow is greater than the minimum scheduling threshold set for this month and the inflow for the next three days is not greater than the maximum scheduling threshold set for this month, scheduling is implemented. The minimum scheduling threshold and the maximum scheduling threshold set for June are different from those for July-August.

5. The ecological dispatching method for suppressing algal bloom in reservoir tributaries according to claim 4 is characterized in that: In July and August, when the inflow is greater than the maximum set threshold, the focus will be on small and medium-sized flood dispatching, while taking into account the dispatching to suppress algal blooms to ensure that the reservoir water level rises by no less than the set water level value for at least three consecutive days.

6. The ecological dispatching method for suppressing algal bloom in reservoir tributaries according to claim 5, characterized in that: In Step 4, during the scheduling process, the water level is reduced according to the forecast flow after scheduling to avoid water abandonment.

7. The ecological dispatching method for suppressing algal bloom in reservoir tributaries according to claim 6, characterized in that: In Step 4, during the scheduling process, a multi-objective optimization algorithm is used to comprehensively consider factors such as water quality improvement, water resource utilization, and ecological protection to achieve the optimal decision for ecological scheduling; at the same time, a dynamic feedback mechanism is introduced to adjust the scheduling plan in real time to adapt to changing hydrological conditions and ecological environmental needs.

8. The ecological dispatching method for suppressing algal bloom in reservoir tributaries according to claim 7, characterized in that: In Step 4, during the dispatching process, an intelligent prediction model is introduced to predict the occurrence trend of algal bloom in reservoir tributaries, providing a scientific basis for dispatching; at the same time, combined with water environment automatic monitoring technology, the water quality and algal bloom situation of reservoir tributaries are monitored in real time to provide data support for the adjustment of the dispatching plan.

9. The ecological dispatching method for suppressing algal bloom in reservoir tributaries according to claim 8, characterized in that: In the Step 4, during the dispatching process, an algal bloom risk assessment system for reservoir tributaries is established, and the priority and urgency of the dispatching plan are determined based on the assessment results to ensure that effective response measures can be taken quickly when the risk of algal bloom occurs to reduce the impact of algal bloom on the ecological environment.

10. The ecological dispatching method for suppressing algal bloom in reservoir tributaries according to claim 9, characterized in that: In Step 4, a dynamic update mechanism for risk assessment is introduced during the scheduling process. According to real-time data and hydrological conditions, the risk assessment results are continuously revised and adjusted to ensure the pertinence and effectiveness of the scheduling plan. At the same time, an emergency response plan is established to clarify the response measures and disposal processes for algal bloom risks at all levels, so as to improve the rapid response capability to algal bloom risks.

Citation Information

Patent Citations

  • Cascade hydropower station community ecological regulation intelligent control system and method

    CN105223937A

  • Flood pulse design method for ecological flow process

    CN111460674A

  • Water bloom prevention and control oriented multi-objective optimization scheduling method for water engineering

    CN115659641A

  • Reservoir flow rate regulating method and apparatus, electronic device, and storage medium

    EP4303785A1