Method and system for managing electric power marketing of digitized internet-based office

Through the digital one-stop power marketing management method, the best handling strategy for identifying and online decision-making of abnormal power marketing events has been solved, and the problems of low efficiency and high labor costs of abnormal power marketing events have been realized, and the level of power marketing management has been improved. .

CN119047884APending Publication Date: 2024-11-29STATE GRID SHANXI MARKETING SERVICE CENT
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411175105.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The efficiency of handling abnormal events of power marketing is low and the labor costs are high. It is difficult for the existing technology to effectively solve the unexpected power load changes and power supply problems in power marketing management.

Method used

The digital one-stop power marketing management method is adopted to identify abnormal electricity marketing events, make the best processing strategies online, and process them based on the strategy decision knowledge base and duration value database, reducing manual intervention and improving processing efficiency.

Benefits of technology

It realizes the automated handling of abnormal events in power marketing, reduces labor costs, and improves the level of power marketing management and processing efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119047884A_ABST
    Figure CN119047884A_ABST
Patent Text Reader

Abstract

The invention provides an electric power marketing management method and an electric power marketing management system for a digitized one-network communication office. The method comprises the following steps: identifying electric power marketing abnormal events of a plurality of electric power marketing nodes in a power grid; the optimal processing strategy of the power marketing abnormal event is decided online; and based on the optimal processing strategy, performing corresponding processing on the power marketing abnormal event. According to the digitized one-network-communication electric power marketing management method and system, the electric power marketing abnormal events of the multiple electric power marketing nodes in the power grid are identified, the optimal processing strategy of the electric power marketing abnormal events is decided online, the electric power marketing abnormal events are processed correspondingly based on the optimal processing strategy, and the power marketing management efficiency is improved. According to the invention, the method achieves the digital one-network communication of the power marketing abnormal events in the power grid, does not need a power marketing manager to process the power marketing abnormal events completely manually, reduces the labor cost, improves the processing efficiency, and improves the power marketing management level.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power marketing management, and in particular to a digital one-stop power marketing management method and system. Background Art

[0002] At present, with the marketization of power supply, power grid companies will carry out a series of power marketing. However, power marketing needs to take into account multiple factors such as power load, market price, supply and demand, and some abnormal power marketing events may occur, such as unexpected power load changes or power supply problems caused by sudden changes in weather. Generally, when encountering abnormal power marketing events, they are mostly handled by power marketing managers. However, this has a high manpower cost and low processing efficiency, which reduces the level of power marketing management. Therefore, a digital intelligent solution is urgently needed. Summary of the invention

[0003] One of the purposes of the present invention is to provide a digital one-stop power marketing management method, identify power marketing abnormal events of multiple power marketing nodes in a power grid, make online decisions on the best processing strategy for power marketing abnormal events, and based on the best processing strategy, perform corresponding processing on the power marketing abnormal events, thereby realizing digital one-stop processing of power marketing abnormal events in the power grid, eliminating the need for power marketing management personnel to manually process power marketing abnormal events, reducing labor costs, improving processing efficiency, and improving the level of power marketing management.

[0004] The digital one-stop electricity marketing management method provided by the embodiment of the present invention includes:

[0005] Identify abnormal power marketing events at multiple power marketing nodes within the power grid;

[0006] Online decision-making on the best handling strategy for abnormal events in power marketing;

[0007] Based on the optimal processing strategy, abnormal events in power marketing are handled accordingly.

[0008] Preferably, the optimal processing strategy for online decision-making of abnormal power marketing events includes:

[0009] Based on the strategic decision knowledge base, determine the best processing decision suggestion for power marketing abnormal events; the best processing decision suggestion includes: the first processing sub-strategy of multiple processing stages, the estimated effectiveness value corresponding to the first processing sub-strategy, and the stage sequence of each processing stage;

[0010] When the evaluation values ​​corresponding to all the first processing sub-strategies are greater than or equal to the first evaluation threshold, the first processing sub-strategies of each processing stage are sorted according to the order of the stages to obtain the best processing strategy; otherwise, a visualization model of the power marketing abnormal event is created and displayed to the online experts;

[0011] Traverse each processing stage in sequence according to the stage sequence;

[0012] During each traversal, the duration value corresponding to the estimated effectiveness value corresponding to the first processing sub-strategy of the traversed processing stage is determined from the duration value library;

[0013] After the target waiting time, based on the multimodal information generated by the online expert within the target waiting time and the first processing sub-strategy of the traversed processing stage, the visualization model is adaptively configured, and the adaptively configured visualization model is displayed to the online expert;

[0014] When the online expert inputs the second processing sub-strategy based on the adaptively configured visualization model, the processing stages traversed by the second processing sub-strategy are associated, and the next processing stage is continued to be traversed;

[0015] After traversing each processing stage, the associated second processing sub-strategies of each processing stage are sorted according to the order of the stages to obtain the best processing strategy.

[0016] Preferably, the adaptive configuration of the visualization model based on the multimodal information generated by the online expert within the target waiting time and the first processing sub-strategy of the traversed processing stage includes:

[0017] When there is a first association relationship between the multimodal information and the first processing sub-strategy and the sum of the relationship weights of the existing first association relationships is greater than or equal to the weight and threshold, a template is generated based on the first perspective visual content requirement of the first association relationship, and the first perspective visual content requirement is generated according to the multimodal information and the first processing sub-strategy;

[0018] Based on the first-perspective visual content requirement, a first model viewing perspective is generated in the visualization model and provided for selection by the online expert; when the online expert selects the first model viewing perspective, a model screen of the visualization model viewed from the first model viewing perspective is displayed to the online expert;

[0019] and / or,

[0020] When the multimodal information includes a processing pre-strategy input by an online expert based on a visualization model, if the estimated effectiveness value corresponding to the first processing sub-strategy of the traversed processing stage is greater than or equal to the second estimated effectiveness value threshold, a template for generating the second perspective visual content requirement based on the second association relationship between the processing pre-strategy and the first processing sub-strategy is generated, and the second perspective visual content requirement is generated according to the multimodal information and the first processing sub-strategy;

[0021] Based on the second-perspective visual content requirement, a second model viewing perspective is generated in the visualization model, and a model screen for viewing the visualization model from the second model viewing perspective is displayed to the online expert.

[0022] Preferably, the digital one-stop electricity marketing management method further includes:

[0023] Obtain information on the handling of abnormal events in power marketing;

[0024] Evaluate the processing situation information and obtain an evaluation value;

[0025] When the evaluation value is less than or equal to the evaluation threshold, an early warning is issued.

[0026] Preferably, the step of evaluating the processing information to obtain an evaluation value includes:

[0027] Based on a preset evaluation system, the processing situation information is evaluated to obtain an evaluation value.

[0028] The digital one-stop power marketing management system provided by the embodiment of the present invention includes:

[0029] An identification module, used to identify abnormal power marketing events of multiple power marketing nodes in the power grid;

[0030] Decision-making module, used to make online decisions on the best handling strategy for abnormal events in power marketing;

[0031] The processing module is used to handle abnormal events in power marketing based on the best processing strategy.

[0032] Preferably, the decision module makes online decisions on the best handling strategy for abnormal power marketing events, including:

[0033] Based on the strategic decision knowledge base, determine the best processing decision suggestion for power marketing abnormal events; the best processing decision suggestion includes: the first processing sub-strategy of multiple processing stages, the estimated effectiveness value corresponding to the first processing sub-strategy, and the stage sequence of each processing stage;

[0034] When the evaluation values ​​corresponding to all the first processing sub-strategies are greater than or equal to the first evaluation threshold, the first processing sub-strategies of each processing stage are sorted according to the order of the stages to obtain the best processing strategy; otherwise, a visualization model of the power marketing abnormal event is created and displayed to the online experts;

[0035] Traverse each processing stage in sequence according to the stage sequence;

[0036] During each traversal, the duration value corresponding to the estimated effectiveness value corresponding to the first processing sub-strategy of the traversed processing stage is determined from the duration value library;

[0037] After the target waiting time, based on the multimodal information generated by the online expert within the target waiting time and the first processing sub-strategy of the traversed processing stage, the visualization model is adaptively configured, and the adaptively configured visualization model is displayed to the online expert;

[0038] When the online expert inputs the second processing sub-strategy based on the adaptively configured visualization model, the processing stages traversed by the second processing sub-strategy are associated, and the next processing stage is continued to be traversed;

[0039] After traversing each processing stage, the associated second processing sub-strategies of each processing stage are sorted according to the order of the stages to obtain the best processing strategy.

[0040] Preferably, the decision module adaptively configures the visualization model based on the multimodal information generated by the online expert within the target waiting time and the first processing sub-strategy of the traversed processing stage, including:

[0041] When there is a first association relationship between the multimodal information and the first processing sub-strategy and the sum of the relationship weights of the existing first association relationships is greater than or equal to the weight and threshold, a template is generated based on the first perspective visual content requirement of the first association relationship, and the first perspective visual content requirement is generated according to the multimodal information and the first processing sub-strategy;

[0042] Based on the first-perspective visual content requirement, a first model viewing perspective is generated in the visualization model and provided for selection by the online expert; when the online expert selects the first model viewing perspective, a model screen of the visualization model viewed from the first model viewing perspective is displayed to the online expert;

[0043] and / or,

[0044] When the multimodal information includes a processing pre-strategy input by an online expert based on a visualization model, if the estimated effectiveness value corresponding to the first processing sub-strategy of the traversed processing stage is greater than or equal to the second estimated effectiveness value threshold, a template for generating the second perspective visual content requirement based on the second association relationship between the processing pre-strategy and the first processing sub-strategy is generated, and the second perspective visual content requirement is generated according to the multimodal information and the first processing sub-strategy;

[0045] Based on the second-perspective visual content requirement, a second model viewing perspective is generated in the visualization model, and a model screen for viewing the visualization model from the second model viewing perspective is displayed to the online expert.

[0046] Preferably, the digital one-stop power marketing management system also includes:

[0047] The early warning module includes:

[0048] Obtain information on the handling of abnormal events in power marketing;

[0049] Evaluate the processing situation information and obtain an evaluation value;

[0050] When the evaluation value is less than or equal to the evaluation threshold, an early warning is issued.

[0051] Preferably, in the digital one-stop power marketing management system, the early warning module evaluates the processing information and obtains the evaluation value, including:

[0052] Based on a preset evaluation system, the processing situation information is evaluated to obtain an evaluation value.

[0053] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings.

[0054] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0056] Figure 1 A schematic diagram of a digital one-stop electricity marketing management method in an embodiment of the present invention;

[0057] Figure 2 It is a schematic diagram of a digital one-stop power marketing management system in an embodiment of the present invention. DETAILED DESCRIPTION

[0058] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0059] The embodiment of the present invention provides a digital one-stop power marketing management method, such as Figure 1 As shown, including:

[0060] S1. Identify abnormal power marketing events of multiple power marketing nodes in the power grid;

[0061] S2, online decision-making on the best handling strategy for abnormal events in power marketing;

[0062] S3. Based on the optimal processing strategy, handle abnormal events in power marketing accordingly.

[0063] The power marketing nodes are the power grid enterprises in various regions within the power grid; power marketing abnormal events are abnormal events encountered by power grid enterprises when conducting power marketing, such as: failures of suppliers or trading platforms, technical problems or operational errors, which lead to abnormalities in the power marketing process, such as order loss, information delays, and failures of power generation equipment or transmission equipment may cause power supply interruptions or instability; the system makes online decisions on the best processing strategy for power marketing abnormal events, and the best processing strategy is the most suitable execution strategy for processing power marketing abnormal events; the system handles power marketing abnormal events accordingly based on the best processing strategy.

[0064] This application identifies abnormal power marketing events at multiple power marketing nodes within a power grid, makes online decisions on the best processing strategy for abnormal power marketing events, and handles the abnormal power marketing events accordingly based on the best processing strategy, thereby realizing digital one-stop processing of abnormal power marketing events within the power grid. There is no need for power marketing management personnel to manually process abnormal power marketing events, which reduces labor costs, improves processing efficiency, and improves the level of power marketing management.

[0065] In one embodiment, the online decision-making of the best processing strategy for abnormal power marketing events includes:

[0066] Based on the strategic decision knowledge base, determine the best processing decision suggestion for power marketing abnormal events; the best processing decision suggestion includes: the first processing sub-strategy of multiple processing stages, the estimated effectiveness value corresponding to the first processing sub-strategy, and the stage sequence of each processing stage;

[0067] When the evaluation values ​​corresponding to all the first processing sub-strategies are greater than or equal to the first evaluation threshold, the first processing sub-strategies of each processing stage are sorted according to the order of the stages to obtain the best processing strategy; otherwise, a visualization model of the power marketing abnormal event is created and displayed to the online experts;

[0068] Traverse each processing stage in sequence according to the stage sequence;

[0069] During each traversal, the duration value corresponding to the estimated effectiveness value corresponding to the first processing sub-strategy of the traversed processing stage is determined from the duration value library;

[0070] After the target waiting time, based on the multimodal information generated by the online expert within the target waiting time and the first processing sub-strategy of the traversed processing stage, the visualization model is adaptively configured, and the adaptively configured visualization model is displayed to the online expert;

[0071] When the online expert inputs the second processing sub-strategy based on the adaptively configured visualization model, the processing stages traversed by the second processing sub-strategy are associated, and the next processing stage is continued to be traversed;

[0072] After traversing each processing stage, the associated second processing sub-strategies of each processing stage are sorted according to the order of the stages to obtain the best processing strategy.

[0073] There is a large amount of strategic decision knowledge in the strategic decision knowledge base. The strategic decision knowledge can be the historical experience knowledge of experts in handling abnormal power marketing events. Based on the strategic decision knowledge in the strategic decision knowledge base, the best processing decision suggestions for abnormal power marketing events are determined. The best processing decision suggestions include the first processing sub-strategies of multiple processing stages. The processing stage is the stage for handling abnormal power marketing events. The first processing sub-strategy is the strategy for handling abnormal power marketing events executed in the processing stage. Each processing sub-strategy has a corresponding effectiveness value. The effectiveness value represents the degree of effectiveness of handling abnormal power marketing events after the execution of the first processing sub-strategy, and also includes the sequence of stages of each processing stage. The historical experience knowledge of experts in handling abnormal power marketing events can indicate how to solve abnormal power marketing events. Therefore, the first processing sub-strategies of multiple processing stages can be determined. When determining the first processing sub-strategy, the matching degree between the applicable abnormal situation of the historical experience knowledge of experts in handling abnormal power marketing events and the abnormal situation of abnormal power marketing events can be used as the effectiveness value corresponding to the first processing sub-strategy; the first effectiveness value The value threshold may be, for example, 80; when the estimated effectiveness values ​​corresponding to all first processing sub-strategies are greater than or equal to the first estimated effectiveness threshold, it indicates that the optimal processing decision suggestion for power marketing abnormal events determined based on the strategy decision knowledge base is applicable to processing power marketing abnormal events; the first processing sub-strategies of each processing stage are sorted according to the sequence of stages to obtain the optimal processing strategy; there are duration values ​​corresponding to different estimated effectiveness values ​​in the duration value library, the larger the estimated effectiveness value, the better the estimated effect after the execution of the first processing strategy, and the smaller the corresponding duration value, the shorter the time for waiting for the online expert to make a processing decision independently; the multimodal information may be the operation information of the visualization model performed by the online expert during the target waiting time, etc.; the visualization model is adaptively configured, and the adaptively configured visualization model is displayed to the online expert, so as to help the online expert quickly make more effective decisions and analysis based on the visualization model; after viewing the adaptively configured visualization model, the online expert will comprehensively decide on the second processing strategy suitable for the processing stage traversed, and input it; after traversing each processing stage, the associated second processing sub-strategies of each processing stage are sorted according to the sequence of stages to obtain the optimal processing strategy.

[0074] In general, when the system handles abnormal events in power marketing on its own, especially in the early stage of the system being put into use in the power grid, some unreasonable handling situations may occur. The system needs to be continuously improved and updated to have the best ability to handle abnormal events in power marketing on its own. In view of this special situation, the embodiment of the present invention introduces a strategy decision knowledge base, determines the first processing sub-strategies of multiple processing stages and the estimated effectiveness values ​​corresponding to the first processing sub-strategies, and determines whether to introduce online experts based on the estimated effectiveness values. When introduced, the visualization model is adaptively configured based on the multimodal information generated by the online experts within the target waiting time and the first processing sub-strategy of the traversed processing stage, and the adaptively configured visualization model is used to assist the online experts in quickly making decisions on the second processing strategy.

[0075] In one embodiment, the adaptive configuration of the visualization model based on the multimodal information generated by the online expert within the target waiting time and the first processing sub-strategy of the traversed processing stage includes:

[0076] When there is a first association relationship between the multimodal information and the first processing sub-strategy and the sum of the relationship weights of the existing first association relationships is greater than or equal to the weight and threshold, a template is generated based on the first perspective visual content requirement of the first association relationship, and the first perspective visual content requirement is generated according to the multimodal information and the first processing sub-strategy;

[0077] Based on the first-perspective visual content requirement, a first model viewing perspective is generated in the visualization model and provided for selection by the online expert; when the online expert selects the first model viewing perspective, a model screen of the visualization model viewed from the first model viewing perspective is displayed to the online expert;

[0078] and / or,

[0079] When the multimodal information includes a processing pre-strategy input by an online expert based on a visualization model, if the estimated effectiveness value corresponding to the first processing sub-strategy of the traversed processing stage is greater than or equal to the second estimated effectiveness value threshold, a template for generating the second perspective visual content requirement based on the second association relationship between the processing pre-strategy and the first processing sub-strategy is generated, and the second perspective visual content requirement is generated according to the multimodal information and the first processing sub-strategy;

[0080] Based on the second-perspective visual content requirement, a second model viewing perspective is generated in the visualization model, and a model screen for viewing the visualization model from the second model viewing perspective is displayed to the online expert.

[0081] When there is a first association relationship between the multimodal information and the first processing sub-strategy, it means that the multimodal information reflects that the result of the online expert's decision on the processing of the power marketing abnormal event is close to the first processing sub-strategy. The larger the relationship weight of the first association relationship, the closer it is. For example, the first association relationship is that the decision control object of the decision process in the multimodal information (for example, the online expert operates the visualization model to view the faulty device A) is the same as the control object of the first processing sub-strategy (for example, the faulty device A); the weight and threshold can be, for example, 80; when the sum of the relationship weights is greater than or equal to the weight and threshold, it means that the result of the online expert's decision on the processing of the power marketing abnormal event is very close to the first processing strategy. According to the multimodal information and the first processing sub-strategy, a first-perspective visual content requirement is generated. When generated, the first-perspective visual content requirement is to make the visual content of the generated first model viewing perspective in the visualization model contain content that can indicate that the online expert can decide on the first processing strategy. For example, the first processing strategy is to switch the backup power supply to the faulty device A, then the generated first-perspective visual content requirement is that the visual content of the generated first model viewing perspective in the visualization model contains the backup power supply, so that the online expert can view, Make decisions quickly; the first perspective visual content requires that the template generated is a system execution template that completes this generation process; the processing pre-strategy is a candidate strategy for processing abnormal power marketing events input by online experts; the second evaluation value threshold can be, for example, 10; when the evaluation value corresponding to the first processing sub-strategy of the traversed processing stage is greater than or equal to the second evaluation value threshold, it means that the system execution of the first processing sub-strategy of the traversed processing stage has a greater chance of being effective; based on the second association relationship between the processing pre-strategy and the first processing sub-strategy is the content difference relationship between the processing pre-strategy and the first processing sub-strategy; the second perspective visual content requirement is to make the generated second model viewing perspective contain the difference content corresponding to the content difference relationship between the processing pre-strategy and the first processing sub-strategy in the visual content of the visualization model, for example: the control objects between the processing pre-strategy and the first processing sub-strategy are different, and the second perspective visual content requirement generation template is a system execution template generated to complete this second perspective visual content requirement; based on the second perspective visual content requirement, generate a second model viewing perspective in the visualization model, and display the model screen of the visualization model viewed from the second model viewing perspective to the online experts; assist online experts to change decisions as soon as possible.

[0082] In one embodiment, the digital one-stop electricity marketing management method further includes:

[0083] Obtain information on the handling of abnormal events in power marketing;

[0084] Evaluate the processing situation information and obtain an evaluation value;

[0085] When the evaluation value is less than or equal to the evaluation threshold, an early warning is issued.

[0086] The step of evaluating the processing information and obtaining an evaluation value includes:

[0087] Based on a preset evaluation system, the processing situation information is evaluated to obtain an evaluation value.

[0088] Technical personnel can preset an evaluation system and conduct an evaluation after obtaining information on the handling of abnormal power marketing events. When the evaluation value is small, it means that the handling of abnormal power marketing events is poor, and timely warnings are issued.

[0089] The embodiment of the present invention provides a digital one-stop power marketing management system, such as Figure 2 As shown, including:

[0090] Identification module 1, used to identify abnormal power marketing events of multiple power marketing nodes in the power grid;

[0091] Decision module 2, used to make online decisions on the best handling strategy for abnormal events in power marketing;

[0092] The processing module 3 is used to process abnormal power marketing events accordingly based on the best processing strategy.

[0093] The decision module makes online decisions on the best handling strategy for abnormal power marketing events, including:

[0094] Based on the strategic decision knowledge base, determine the best processing decision suggestion for power marketing abnormal events; the best processing decision suggestion includes: the first processing sub-strategy of multiple processing stages, the estimated effectiveness value corresponding to the first processing sub-strategy, and the stage sequence of each processing stage;

[0095] When the evaluation values ​​corresponding to all the first processing sub-strategies are greater than or equal to the first evaluation threshold, the first processing sub-strategies of each processing stage are sorted according to the order of the stages to obtain the best processing strategy; otherwise, a visualization model of the power marketing abnormal event is created and displayed to the online experts;

[0096] Traverse each processing stage in sequence according to the stage sequence;

[0097] During each traversal, the duration value corresponding to the estimated effectiveness value corresponding to the first processing sub-strategy of the traversed processing stage is determined from the duration value library;

[0098] After the target waiting time, based on the multimodal information generated by the online expert within the target waiting time and the first processing sub-strategy of the traversed processing stage, the visualization model is adaptively configured, and the adaptively configured visualization model is displayed to the online expert;

[0099] When the online expert inputs the second processing sub-strategy based on the adaptively configured visualization model, the processing stages traversed by the second processing sub-strategy are associated, and the next processing stage is continued to be traversed;

[0100] After traversing each processing stage, the associated second processing sub-strategies of each processing stage are sorted according to the order of the stages to obtain the best processing strategy.

[0101] The decision module adaptively configures the visualization model based on the multimodal information generated by the online expert within the target waiting time and the first processing sub-strategy of the traversed processing stage, including:

[0102] When there is a first association relationship between the multimodal information and the first processing sub-strategy and the sum of the relationship weights of the existing first association relationships is greater than or equal to the weight and threshold, a template is generated based on the first perspective visual content requirement of the first association relationship, and the first perspective visual content requirement is generated according to the multimodal information and the first processing sub-strategy;

[0103] Based on the first-perspective visual content requirement, a first model viewing perspective is generated in the visualization model and provided for selection by the online expert; when the online expert selects the first model viewing perspective, a model screen of the visualization model viewed from the first model viewing perspective is displayed to the online expert;

[0104] and / or,

[0105] When the multimodal information includes a processing pre-strategy input by an online expert based on a visualization model, if the estimated effectiveness value corresponding to the first processing sub-strategy of the traversed processing stage is greater than or equal to the second estimated effectiveness value threshold, a template for generating the second perspective visual content requirement based on the second association relationship between the processing pre-strategy and the first processing sub-strategy is generated, and the second perspective visual content requirement is generated according to the multimodal information and the first processing sub-strategy;

[0106] Based on the second-perspective visual content requirement, a second model viewing perspective is generated in the visualization model, and a model screen for viewing the visualization model from the second model viewing perspective is displayed to the online expert.

[0107] The digital one-stop power marketing management system also includes:

[0108] The early warning module includes:

[0109] Obtain information on the handling of abnormal events in power marketing;

[0110] Evaluate the processing situation information and obtain an evaluation value;

[0111] When the evaluation value is less than or equal to the evaluation threshold, an early warning is issued.

[0112] The early warning module evaluates the processing situation information and obtains an evaluation value, including:

[0113] Based on a preset evaluation system, the processing situation information is evaluated to obtain an evaluation value.

[0114] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A digital one-stop electricity marketing management method, characterized in that: include: Identify abnormal power marketing events at multiple power marketing nodes within the power grid; Online decision-making on the best handling strategy for abnormal events in power marketing; Based on the optimal processing strategy, abnormal events in power marketing are handled accordingly.

2. The digital one-stop electricity marketing management method according to claim 1, characterized in that: The optimal handling strategy for abnormal events in online decision-making power marketing includes: Based on the strategic decision knowledge base, determine the best processing decision suggestion for power marketing abnormal events; the best processing decision suggestion includes: the first processing sub-strategy of multiple processing stages, the estimated effectiveness value corresponding to the first processing sub-strategy, and the stage sequence of each processing stage; When the estimated effectiveness values ​​corresponding to all first processing sub-strategies are greater than or equal to the first estimated effectiveness threshold, the first processing sub-strategies of each processing stage are sorted according to the order of the stages to obtain the best processing strategy; otherwise, a visualization model of abnormal power marketing events is created and displayed to online experts; Traverse each processing stage in sequence according to the stage sequence; During each traversal, the duration value corresponding to the estimated effectiveness value corresponding to the first processing sub-strategy of the traversed processing stage is determined from the duration value library; After the target duration of the waiting time value, adaptively configure the visualization model based on the multimodal information generated by the online expert within the target duration of the waiting time and the first processing sub-strategy of the traversed processing stage, and display the adaptively configured visualization model to the online expert; When the online expert inputs the second processing sub-strategy based on the adaptively configured visualization model, the processing stages traversed by the second processing sub-strategy are associated, and the next processing stage is continued to be traversed; After traversing each processing stage, the associated second processing sub-strategies of each processing stage are sorted according to the order of the stages to obtain the best processing strategy.

3. The digital one-stop electricity marketing management method according to claim 2, characterized in that: The adaptive configuration of the visualization model based on the multimodal information generated by the online expert within the target waiting time and the first processing sub-strategy of the traversed processing stage includes: When there is a first association relationship between the multimodal information and the first processing sub-strategy and the sum of the relationship weights of the existing first association relationships is greater than or equal to the weight and threshold, a template is generated based on the first perspective visual content requirement of the first association relationship, and the first perspective visual content requirement is generated according to the multimodal information and the first processing sub-strategy; Based on the first-perspective visual content requirement, a first model viewing perspective is generated in the visualization model and provided for selection by the online expert; when the online expert selects the first model viewing perspective, a model screen of the visualization model viewed from the first model viewing perspective is displayed to the online expert; and / or, When the multimodal information includes a processing pre-strategy input by an online expert based on a visualization model, if the estimated effectiveness value corresponding to the first processing sub-strategy of the traversed processing stage is greater than or equal to the second estimated effectiveness value threshold, a template for generating the second perspective visual content requirement based on the second association relationship between the processing pre-strategy and the first processing sub-strategy is generated, and the second perspective visual content requirement is generated according to the multimodal information and the first processing sub-strategy; Based on the second-perspective visual content requirement, a second model viewing perspective is generated in the visualization model, and a model screen for viewing the visualization model from the second model viewing perspective is displayed to the online expert.

4. The digital one-stop electricity marketing management method according to claim 1, characterized in that: Also includes: Obtain information on the handling of abnormal events in power marketing; Evaluate the processing situation information and obtain an evaluation value; When the evaluation value is less than or equal to the evaluation threshold, an early warning is issued.

5. The digital one-stop electricity marketing management method according to claim 4, characterized in that: The step of evaluating the processing information and obtaining an evaluation value includes: Based on a preset evaluation system, the processing situation information is evaluated to obtain an evaluation value.

6. Digital one-stop power marketing management system, characterized by: include: An identification module, used to identify abnormal power marketing events of multiple power marketing nodes in the power grid; Decision-making module, used to make online decisions on the best handling strategy for abnormal events in power marketing; The processing module is used to handle abnormal events in power marketing based on the best processing strategy.

7. The digital one-stop power marketing management system according to claim 6, characterized in that: The decision module makes online decisions on the best handling strategy for abnormal power marketing events, including: Based on the strategic decision knowledge base, determine the best processing decision suggestion for power marketing abnormal events; the best processing decision suggestion includes: the first processing sub-strategy of multiple processing stages, the estimated effectiveness value corresponding to the first processing sub-strategy, and the stage sequence of each processing stage; When the estimated effectiveness values ​​corresponding to all first processing sub-strategies are greater than or equal to the first estimated effectiveness threshold, the first processing sub-strategies of each processing stage are sorted according to the order of the stages to obtain the best processing strategy; otherwise, a visualization model of abnormal power marketing events is created and displayed to online experts; Traverse each processing stage in sequence according to the stage sequence; During each traversal, the duration value corresponding to the estimated effectiveness value corresponding to the first processing sub-strategy of the traversed processing stage is determined from the duration value library; After the target duration of the waiting time value, adaptively configure the visualization model based on the multimodal information generated by the online expert within the target duration of the waiting time and the first processing sub-strategy of the traversed processing stage, and display the adaptively configured visualization model to the online expert; When the online expert inputs the second processing sub-strategy based on the adaptively configured visualization model, the processing stages traversed by the second processing sub-strategy are associated, and the next processing stage is continued to be traversed; After traversing each processing stage, the associated second processing sub-strategies of each processing stage are sorted according to the order of the stages to obtain the best processing strategy.

8. The digital one-stop power marketing management system according to claim 7, characterized in that: The decision module adaptively configures the visualization model based on the multimodal information generated by the online expert within the target waiting time and the first processing sub-strategy of the traversed processing stage, including: When there is a first association relationship between the multimodal information and the first processing sub-strategy and the sum of the relationship weights of the existing first association relationships is greater than or equal to the weight and threshold, a template is generated based on the first perspective visual content requirement of the first association relationship, and the first perspective visual content requirement is generated according to the multimodal information and the first processing sub-strategy; Based on the first-perspective visual content requirement, a first model viewing perspective is generated in the visualization model and provided for selection by the online expert; when the online expert selects the first model viewing perspective, a model screen of the visualization model viewed from the first model viewing perspective is displayed to the online expert; and / or, When the multimodal information includes a processing pre-strategy input by an online expert based on a visualization model, if the estimated effectiveness value corresponding to the first processing sub-strategy of the traversed processing stage is greater than or equal to the second estimated effectiveness value threshold, a template for generating the second perspective visual content requirement based on the second association relationship between the processing pre-strategy and the first processing sub-strategy is generated, and the second perspective visual content requirement is generated according to the multimodal information and the first processing sub-strategy; Based on the second-perspective visual content requirement, a second model viewing perspective is generated in the visualization model, and a model screen for viewing the visualization model from the second model viewing perspective is displayed to the online expert.

9. The digital one-stop power marketing management system according to claim 6, characterized in that: Also includes: The early warning module includes: Obtain information on the handling of abnormal events in power marketing; Evaluate the processing situation information and obtain an evaluation value; When the evaluation value is less than or equal to the evaluation threshold, an early warning is issued.

10. The digital one-stop power marketing management system according to claim 9, characterized in that: The early warning module evaluates the processing situation information and obtains an evaluation value, including: Based on a preset evaluation system, the processing situation information is evaluated to obtain an evaluation value.

Citation Information

Cited By

  • Intelligent decision support method and system for power transmission channel carbon sink estimation and recovery potential optimization, storage medium and electronic equipment

    CN120471476A