Substation one-key sequential control uninterrupted power automatic acceptance method, device, equipment and medium

Through natural language processing and static verification combined with virtual simulation technology, the substation's one-click sequence operation ticket and pre-installed library are automatically verified, which solves the problem of low acceptance efficiency caused by manual dependence and achieves efficient and accurate automatic acceptance.

CN119051255APending Publication Date: 2024-11-29WENZHOU ELECTRIC POWER BUREAU
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202411121267.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The existing technology relies on manual operations in one-click sequence acceptance of substations, resulting in an overdue problem of power outage in the power outage window, affecting acceptance efficiency and progress.

Method used

The Ali semantic segmentation model based on natural language processing is used for semantic analysis, combined with static verification and virtual simulation technology, automatically verify the correctness of one-click sequence operation tickets and preset libraries, and build a virtual simulation test system to achieve logical verification.

Benefits of technology

It improves the automation of one-click sequence acceptance of substations, reduces manual intervention, improves acceptance efficiency and accuracy, and avoids the problem of overdue power outages in the power outage window.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119051255A_ABST
    Figure CN119051255A_ABST
Patent Text Reader

Abstract

The invention discloses a substation one-key sequential control uninterrupted power automatic acceptance method, device and equipment and a medium, and the method comprises the steps: obtaining a one-key sequential control operation ticket of a target substation sequential control host, carrying out the semantic analysis of the one-key sequential control operation ticket based on a natural language processing Ali semantic segmentation model, and obtaining a first key field data set; performing static checking on the first key field data set and a bottom layer preset database of a sequence control host, and constructing a sequence control instruction set according to the first key field data set after static checking; analyzing the automatic configuration file information of the target substation and generating a simulation interval parameter, and constructing a virtual simulation one-key sequence control test system according to an analysis result and the simulation interval parameter; and inputting each instruction in the sequence control instruction set into the one-key sequence control test system in sequence for logic verification, and realizing one-key sequence control acceptance of the target substation according to a logic verification result. According to the method, the one-key sequential control acceptance efficiency can be greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of automatic control of electric power systems, and in particular to a method, device, equipment and medium for automatic acceptance of a substation with one-key sequential control and no power outage. Background Art

[0002] The one-key sequential control technology for substations can realize intelligent functional applications such as operation ticket prefabrication, operation task generation, automatic equipment status identification, intelligent verification of anti-error interlocking, one-key start of operation steps, and automatic sequential execution of operation processes. It can efficiently, automatically and intelligently complete the switching operations of primary and secondary equipment in the power grid, adjustment of operating modes, fault isolation and other tasks, greatly improving the power outage efficiency and operational safety margin of substations, and eliminating the possibility of accidental tripping due to human factors.

[0003] In the actual one-button sequential control renovation project of newly built or renovated substations, the prior art generally installs magnetic induction devices, micro switches, video image monitoring, posture sensors and other devices on the operating mechanisms of the switches, switches and trolleys, and cooperates with the signal receiver in the operating mechanism box to form an auxiliary criterion source of "double position confirmation". When the operation and maintenance personnel issue a one-button sequential control operation instruction on the sequential control host, each step needs to be successfully verified on the intelligent anti-error host before it can be executed. There are many personnel verification links involved. At the same time, only after the auxiliary criterion source transmits the actual position signal to the monitoring background through the public measurement and control screen and performs a "logical and" operation with the main criterion signal of the electrical auxiliary node, the on-site operation is judged to be in place after the verification is consistent, and the manual operation process is relatively cumbersome.

[0004] Therefore, traditionally, the verification of the one-button sequential control preset library and control loop information flow of newly built or renovated substations relies heavily on manual operation. As a result, there is often a problem of power outage window expiration, which seriously affects the progress of the one-button sequential control on-site installation and commissioning, as well as the process cycle of the formal launch later. Summary of the invention

[0005] The present invention aims to provide a method, device, equipment and medium for automatic acceptance of substation one-key sequential control without power outage, so as to improve the efficiency of one-key sequential control acceptance.

[0006] In order to solve the above technical problems, an embodiment of the present invention provides a substation one-key sequential control non-power-off automatic acceptance method, comprising:

[0007] Obtain a one-key sequential control operation ticket for the target substation sequential control host, and perform semantic analysis on the one-key sequential control operation ticket based on Alibaba's semantic segmentation model for natural language processing to obtain a first key field data set;

[0008] Static verification is performed on the first key field data set and the underlying preset database of the sequence control host, and a sequence control instruction set is constructed according to the first key field data set after static verification, wherein the sequence control instruction set reflects the preset order of instructions for the to-be-controlled equipment in the target substation;

[0009] Parsing the automation configuration file information of the target substation and generating simulation interval parameters, and constructing a virtual simulation one-key sequential control test system according to the parsing result and the simulation interval parameters;

[0010] Each instruction in the sequence control instruction set is sequentially input into the one-key sequence control test system for logic verification, and the one-key sequence control acceptance of the target substation is implemented according to the result of the logic verification.

[0011] As one of the preferred solutions, the Alibaba semantic segmentation model based on natural language processing performs semantic analysis on the one-key sequential control operation ticket to obtain a first key field data set, including:

[0012] Preprocessing each operation text information in the one-key sequential control operation ticket, and converting each of the preprocessed operation text information into a corresponding numerical vector;

[0013] Input each of the numerical vectors into a Transformer model, and use the output of the Transformer model as a sentence vector corresponding to each of the operation text information;

[0014] Encoding each of the sentence vectors using a global mean pooling method to obtain a sentence encoding of each of the operation text information;

[0015] Each of the sentence codes is input into a softmax binary classifier for processing, and the first key field data set corresponding to each of the operation text information is constructed according to the processing result.

[0016] As one of the preferred solutions, the preprocessing of each operation text information in the one-key sequential control operation ticket and converting each of the preprocessed operation text information into a corresponding numerical vector includes:

[0017] Traversing each operation text information in the one-key sequential control operation ticket in ascending order according to the operation instructions; and,

[0018] Perform word segmentation processing on each of the operation text information by a word segmenter;

[0019] The result of word segmentation processing is encoded based on word embedding technology to obtain the numerical vector.

[0020] As one of the preferred solutions, the static verification of the first key field data set with the underlying preset database of the sequential control host includes:

[0021] Obtaining an underlying preset database of the sequential control host, encoding the underlying preset database using a global mean pooling method, and obtaining a second key field data set corresponding to the underlying preset database;

[0022] Based on a preset matching rule and the second key field data set, performing a logical consistency matching check on the first key field data set;

[0023] The verification results are compared item by item according to the selected verification rules to realize static verification.

[0024] As one of the preferred solutions, the automation configuration information file includes the SCD file, CID file, and ICD file of the target substation;

[0025] The step of parsing the automation configuration file information of the target substation and generating simulation interval parameters, and constructing a virtual simulation one-key sequential control test system according to the parsing result and the simulation interval parameters, comprises:

[0026] By parsing the SCD file, CID file, and ICD file of the target substation, the equipment information, association relationship, and configuration parameters of the target substation are obtained;

[0027] Determine a simulation interval parameter according to the device information, the association relationship and the configuration parameter;

[0028] Constructing a simulation model of the target substation according to the simulation interval parameter, the device information, the association relationship and the configuration parameter;

[0029] A one-key sequence control test system is constructed based on the simulation model, including a sequence control host, the simulation model and a test module.

[0030] As one of the preferred solutions, the step of sequentially inputting the instructions in the sequence control instruction set into the one-key sequence control test system for logic verification includes:

[0031] Sending a sequence control instruction to the simulation model through the sequence control host;

[0032] When the simulation model receives the sequential control instruction, it simulates the response process of the target substation according to the sequential control instruction, and returns the obtained telesignaling data reflecting the status of the primary and secondary equipment to the test module;

[0033] The remote signaling data is received by the test module, the remote signaling data is compared with the expected result, and it is determined whether the one-key sequential control operation is successful, so as to realize logic verification.

[0034] As one of the preferred solutions, the simulating the response process of the target substation according to the primary and secondary equipment sequential control instructions also includes:

[0035] Calculate the power flow distribution state of the target substation based on the simulation interval and power flow simulation method;

[0036] By analyzing the power grid power flow distribution state under different conditions, the feasibility of the sequential control instruction is verified.

[0037] Another embodiment of the present invention provides a substation one-key sequential control non-power-off automatic acceptance device, comprising:

[0038] An acquisition module is used to obtain a one-key sequential control operation ticket of a target substation sequential control host, and perform semantic analysis on the one-key sequential control operation ticket based on Alibaba semantic segmentation model for natural language processing to obtain a first key field data set;

[0039] A static verification module, used for statically verifying the first key field data set with the underlying preset database of the sequence control host, and constructing a sequence control instruction set according to the first key field data set after static verification, wherein the sequence control instruction set reflects the preset order of instructions of the to-be-controlled equipment in the target substation;

[0040] A construction module, used to parse the automation configuration file information of the target substation and generate simulation interval parameters, and to construct a virtual simulation one-key sequential control test system according to the parsing result and the simulation interval parameters;

[0041] The logic verification module is used to input each instruction in the sequence control instruction set into the one-key sequence control test system in sequence for logic verification, and realize the one-key sequence control acceptance of the target substation according to the result of the logic verification.

[0042] Another embodiment of the present invention provides a substation one-button sequential control non-power outage automatic acceptance device, including a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor. When the processor executes the computer program, it implements the substation one-button sequential control non-power outage automatic acceptance method as described above.

[0043] Yet another embodiment of the present invention provides a computer-readable storage medium storing a computer program, wherein when the device where the computer-readable storage medium is located executes the computer program, the one-key sequential control non-power-off automatic acceptance method for the substation as described above is implemented.

[0044] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:

[0045] The present invention innovatively applies a one-button sequential control non-stop automatic acceptance method for substations based on "static verification + virtual simulation" verification, statically verifies the sequential control host preset library and typical operation tickets for operation and maintenance through an expert text semantic recognition algorithm, and then builds a panoramic digital virtual simulation test through a model file parsing module constructed based on SCD, CID, and ICD model files, thereby verifying the correctness of the one-button sequential control full-station and full-interval operation information loop mapping, providing technical support for the transformation from traditional manual acceptance to intelligent non-stop acceptance methods. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 It is a flow chart of a method for automatic acceptance of a substation with one-key sequential control and no power outage in one embodiment of the present invention;

[0047] Figure 2 It is a schematic diagram of key field segmentation information of a one-key sequential control operation ticket in one embodiment of the present invention;

[0048] Figure 3 It is a flow chart of segmenting key fields of a one-key sequential control operation ticket based on Alibaba semantic segmentation Seqmodel in one embodiment of the present invention;

[0049] Figure 4 It is a flowchart of rapid verification, comparison and report generation based on correct word segmentation results in one embodiment of the present invention;

[0050] Figure 5 It is a schematic diagram of a one-key sequential control virtual simulation test principle of a substation in one embodiment of the present invention;

[0051] Figure 6 It is a flow chart of a one-key sequence control virtual simulation test at a plant end in one embodiment of the present invention;

[0052] Figure 7 This is a flow chart of a one-key sequential control virtual simulation test at a master station in one embodiment of the present invention;

[0053] Figure 8 It is a structural schematic diagram of a substation one-button sequential control non-power-off automatic acceptance device in one embodiment of the present invention;

[0054] Fig. 9 It is a schematic diagram of a substation one-button sequential control non-power-off automatic acceptance device in one embodiment of the present invention. DETAILED DESCRIPTION

[0055] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. The purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0056] In the description of this application, the terms "first", "second", "third", etc. are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first", "second", "third", etc. may explicitly or implicitly include one or more of the feature. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0057] In the description of the present application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be a connection between the two elements. The terms "vertical", "horizontal", "left", "right", "upper", "lower" and similar expressions used herein are only for illustrative purposes, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0058] In the description of this application, it should be noted that, unless otherwise defined, all technical and scientific terms used in the present invention have the same meaning as those commonly understood by those skilled in the art. The terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood by specific circumstances.

[0059] An embodiment of the present invention provides a substation one-key sequential control non-stop automatic acceptance method. For details, see Figure 1 , Figure 1 The flowchart of the one-key sequential control non-power-off automatic acceptance method for a substation provided in one embodiment of the present invention is shown. It includes steps S1 to S4:

[0060] S1. Obtain a one-key sequential control operation ticket for the target substation sequential control host, and perform semantic analysis on the one-key sequential control operation ticket based on Alibaba's semantic segmentation model for natural language processing to obtain a first key field data set;

[0061] S2, statically verifying the first key field data set with the underlying preset database of the sequence control host, and constructing a sequence control instruction set according to the first key field data set after static verification, wherein the sequence control instruction set reflects the preset order of instructions for the to-be-controlled equipment in the target substation;

[0062] S3, parsing the automation configuration file information of the target substation and generating simulation interval parameters, and constructing a virtual simulation one-key sequential control test system according to the parsing result and the simulation interval parameters;

[0063] S4. Input each instruction in the sequence control instruction set into the one-key sequence control test system in sequence for logic verification, and implement the one-key sequence control acceptance of the target substation according to the result of the logic verification.

[0064] The one-key sequential control automatic acceptance of the substation integrating "static verification + virtual simulation" proposed in the embodiment of the present invention mainly includes: 1) automatic splitting and comparison between the underlying preset library of the sequential control host and the typical operation ticket of the substation; 2) automatic parsing and verification of the logical library configuration and functional information flow based on the partition layer in the substation SCD configuration file. The former is to associate the key field information of the operation ticket with the underlying preset library of the sequential control host, and perform a "1 to 1" fast traversal verification and comparison after intelligent semantic segmentation; the latter is to build a virtual one-key sequential control module operating environment, simulate the substation main wiring flow simulation, and the secondary equipment information flow simulation technology to send the real-time telemetry and telesignaling data to the sequential control host, and receive the remote control instructions issued by the sequential control host to control the change of the position status of the switches and switches corresponding to the corresponding operation, hot standby and cold standby in the substation flow simulation system, and return to check, so as to realize the automatic verification of massive one-key sequential control tickets item by item without power outage.

[0065] The static verification of the preset library mainly explores the association between the field features and sentence naming potential semantic rules between the underlying preset library of the sequential control host and the typical operation ticket, and performs semantic recognition based on the Alibaba semantic segmentation model of natural language processing (NLP). The segmentation model simultaneously encodes the sentences of multiple operation steps in the operation ticket and uses an adaptive sliding window method to model the dependent operation logical relationship between longer contexts and then calculate the sentence vector. It is trained with a conventional sentence rule library and then segmented by the WordPiece word segmenter. Finally, it predicts whether the text is correctly segmented after each operation step.

[0066] For details, see Figure 2 , Figure 2 A schematic diagram of key field segmentation information of a one-key sequential control operation ticket provided in one embodiment of the present invention is shown.

[0067] Preferably, in an embodiment of the present invention, the Alibaba semantic segmentation model based on natural language processing performs semantic analysis on the one-key sequential control operation ticket to obtain a first key field data set, including:

[0068] Preprocessing each operation text information in the one-key sequential control operation ticket, and converting each of the preprocessed operation text information into a corresponding numerical vector;

[0069] Input each of the numerical vectors into a Transformer model, and use the output of the Transformer model as a sentence vector corresponding to each of the operation text information;

[0070] Encoding each of the sentence vectors using a global mean pooling method to obtain a sentence encoding of each of the operation text information;

[0071] Each of the sentence codes is input into a softmax binary classifier for processing, and the first key field data set corresponding to each of the operation text information is constructed according to the processing result.

[0072] Preferably, in an embodiment of the present invention, the preprocessing of each operation text information in the one-key sequential control operation ticket and converting each of the preprocessed operation text information into a corresponding numerical vector includes:

[0073] Traversing each operation text information in the one-key sequential control operation ticket in ascending order according to the operation instructions; and,

[0074] Perform word segmentation processing on each of the operation text information by a word segmenter;

[0075] The result of word segmentation processing is encoded based on word embedding technology to obtain the numerical vector.

[0076] Figure 3 The figure shows a schematic diagram of the process of segmenting the key fields of a one-key sequential control operation ticket based on Alibaba semantic segmentation Seqmodel in one embodiment of the present invention. Figure 3As shown in the figure, two texts with inconsistent formats are mainly checked through the following steps: 1) Data preprocessing and format unification of the text, and storage in two databases; 2) Traversing the operation numbers in ascending order according to the operation tasks and operation steps, and segmenting each operation step statement with the WordPiece word segmenter; 3) Then, the operation content is encoded according to the input representation layer composed of "Token embedding, position embedding and sentence structure embedding"; 4) The embedded information is transmitted to the Transformer encoder, and the hidden state corresponding to the k tokens is output. And use the global mean pooling method to encode the operation ticket and preset library content; 5) Finally, all sentences Sentence encoding Input softmax binary classifier to determine whether each sentence is a key field information boundary, and the training goal is to minimize the softmax cross entropy loss; 6) Finally, based on the above correct word segmentation results, the key field information of the two databases is classified as follows Figure 4 In the verification process shown, inconsistent information is set to "0", consistent information is set to "1", and a static verification report is automatically generated.

[0077] For details, see Figure 4 , Figure 4 Shown is a flowchart of rapid verification, comparison and report generation based on correct word segmentation results.

[0078] Preferably, in an embodiment of the present invention, the static verification of the first key field data set with the underlying preset database of the sequence control host includes:

[0079] Obtaining an underlying preset database of the sequential control host, encoding the underlying preset database using a global mean pooling method, and obtaining a second key field data set corresponding to the underlying preset database;

[0080] Based on a preset matching rule and the second key field data set, performing a logical consistency matching check on the first key field data set;

[0081] The verification results are compared item by item according to the selected verification rules to realize static verification.

[0082] In order to ensure the uniqueness and correctness of the remote control operation of the switch mechanism box of the primary equipment on site after the one-button sequential control command is issued, it is necessary to verify the correctness of the double confirmation device after installation, the completeness of the intelligent anti-error host verification, and the correctness of the operation content and logic of the operation ticket. Especially in the intelligent substation, the secondary equipment systems such as protection, measurement and control, intelligent terminals, and merging units are strongly related to the substation SCD configuration file. In the secondary system of the intelligent substation, SCD file parsing is a key step to obtain all intelligent electronic devices (Intelligent Electronic Device, IED) model information. The logic library configuration and function implementation of the one-button sequential control depends on the in-depth analysis and configuration of the interval layer devices defined in the SCD file. Through the MMS protocol communication mechanism, these configuration information interacts with the actual IED device. Therefore, the core technology of virtual simulation testing is to build a manufacturing message specification (MMS) simulation test system for intelligent substations, so as to provide a simulation environment consistent with the actual substation operation characteristics for verifying the business functions such as one-button sequential control logic judgment and three remote (remote signal, remote control, and telemetry) simulation.

[0083] Therefore, the virtual simulation test system for the sequential control function developed by the present invention needs to perform closed-loop verification on the functional execution and remote signaling and telemetry signal circuit correctness of the one-button sequential control host to the switch and knife operating mechanism box on the basis of the correct remote control point verification of the early protection manufacturer and maintenance unit and the correct static verification of the underlying preset library of the one-button sequential control host.

[0084] For details, see Figure 5 , Figure 5 The figure shows the principle diagram of one-button sequence control virtual simulation test. Figure 5 As shown, a virtual simulation one-key sequential control test system is built, and a model file parsing module is built based on the SCD, CID, and ICD model files, and primary and secondary equipment states, switching operation tickets, and main wiring diagram configuration modules are configured. The one-key sequential control host checks whether the current equipment state meets the requirements by calling the underlying preset operation tickets. If so, it will batch send the preset sequence of operation tasks and operation instructions to the virtual simulation system through MMS protocol communication to trigger changes. After the execution is completed, the change signal of the sequential control interface will be called to verify the correctness of the signal configuration, equipment state, operation process, and interlock full logic test.

[0085] Preferably, in an embodiment of the present invention, the automation configuration information file includes an SCD file, a CID file, and an ICD file of the target substation;

[0086] The step of parsing the automation configuration file information of the target substation and generating simulation interval parameters, and constructing a virtual simulation one-key sequential control test system according to the parsing result and the simulation interval parameters, comprises:

[0087] By parsing the SCD file, CID file, and ICD file of the target substation, the equipment information, association relationship, and configuration parameters of the target substation are obtained;

[0088] Determine a simulation interval parameter according to the device information, the association relationship and the configuration parameter;

[0089] Constructing a simulation model of the target substation according to the simulation interval parameter, the device information, the association relationship and the configuration parameter;

[0090] A one-key sequence control test system is constructed based on the simulation model, including a sequence control host, the simulation model and a test module.

[0091] Preferably, in an embodiment of the present invention, the step of sequentially inputting each instruction in the sequence control instruction set into the one-key sequence control test system for logic verification includes:

[0092] Sending a sequence control instruction to the simulation model through the sequence control host;

[0093] When the simulation model receives the sequential control instruction, it simulates the response process of the target substation according to the sequential control instruction, and returns the obtained telesignaling data reflecting the status of the primary and secondary equipment to the test module;

[0094] The remote signaling data is received by the test module, the remote signaling data is compared with the expected result, and it is determined whether the one-key sequential control operation is successful, so as to realize logic verification.

[0095] Preferably, in the embodiment of the present invention, the simulating the response process of the target substation according to the primary and secondary equipment sequential control instructions further includes:

[0096] Calculate the power flow distribution state of the target substation based on the simulation interval and power flow simulation method;

[0097] By analyzing the power grid power flow distribution state under different conditions, the feasibility of the sequential control instruction is verified.

[0098] For details, see Figure 6 , Figure 7 , Figure 6 The following is a flow chart of the one-key sequence control virtual simulation test at the plant side. Figure 7 The figure shows the flow chart of the one-button sequential control virtual simulation test at the master station.

[0099] The steps of the entire virtual simulation test are mainly summarized as follows:

[0100] The sequence control host and the virtual simulation test system exchange instructions and send position signals through the station control layer switch, and are connected by the IEC61850 protocol. The sequence control host performs one-key sequence control operations according to the preset operation task array, and automatically sends primary and secondary equipment sequence control instructions;

[0101] After receiving the sequential control instruction of step n-1, the virtual simulation test system performs logical judgment and verification with the intelligent anti-error host before execution, and calculates the power flow data and topology according to the state change;

[0102] After automatically executing the operation instructions, the remote signal data of the primary and secondary equipment status is returned to the sequence control host, and the sequence control host performs logic verification after receiving it;

[0103] If the execution fails or the logic verification is wrong, it will be saved to the SQL database to be verified;

[0104] Continue to execute step n in sequence until all sequential control instructions are checked and the virtual simulation acceptance report is automatically exported.

[0105] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:

[0106] The present invention innovatively applies a one-key sequential control automatic acceptance method based on "static verification + virtual simulation" verification, statically verifies the sequential control host preset library and typical operation tickets of operation and maintenance through an expert text semantic recognition algorithm, and then builds a panoramic digital virtual simulation test through a model file parsing module constructed based on SCD, CID, and ICD model files, thereby verifying the correctness of the one-key sequential control full-station and full-interval operation information loop mapping, providing technical support for the transformation from traditional manual acceptance to intelligent non-power outage acceptance methods.

[0107] Another embodiment of the present invention provides a one-button sequential control non-stop automatic acceptance device for a substation. For details, see Figure 8 , Figure 8 The schematic diagram of the structure of the substation one-key sequential control non-stop automatic acceptance device provided by the embodiment of the present invention comprises: an acquisition module 11, a static verification module 12, a construction module 13, and a logic verification module 14, wherein:

[0108] An acquisition module 11 is used to acquire a one-key sequential control operation ticket of a target substation sequential control host, and perform semantic analysis on the one-key sequential control operation ticket based on the Alibaba semantic segmentation model of natural language processing to obtain a first key field data set;

[0109] A static verification module 12 is used to statically verify the first key field data set with the underlying preset database of the sequence control host, and to construct a sequence control instruction set according to the first key field data set after the static verification, wherein the sequence control instruction set reflects the preset order of the instructions of the to-be-controlled equipment in the target substation;

[0110] A construction module 13 is used to parse the automation configuration file information of the target substation and generate simulation interval parameters, and to construct a virtual simulation one-key sequential control test system according to the parsing result and the simulation interval parameters;

[0111] The logic verification module 14 is used to input each instruction in the sequence control instruction set into the one-key sequence control test system in sequence for logic verification, and implement the one-key sequence control acceptance of the target substation according to the result of the logic verification.

[0112] Another embodiment of the present invention provides a substation one-button sequential control non-stop automatic acceptance device, see Fig. 9 , Fig. 9 A schematic diagram of a substation one-key sequential control non-stop power automatic acceptance device provided by an embodiment of the present invention is shown, comprising a processor 21, a memory 22, and a computer program stored in the memory 22 and configured to be executed by the processor 21. When the processor 21 executes the computer program, the steps in the above-mentioned substation one-key sequential control non-stop power automatic acceptance method embodiment are implemented, such as Figure 1 or, the processor 21 implements the functions of each module in the above-mentioned device embodiments, such as the acquisition module 11, when executing the computer program.

[0113] Exemplarily, the computer program can be divided into one or more modules, and the one or more modules are stored in the memory 22 and executed by the processor 21 to complete the present invention. The one or more modules can be a series of computer program instruction segments that can complete specific functions, and the instruction segments are used to describe the execution process of the computer program in the substation one-key sequential control non-stop automatic acceptance device. For example, the computer program can be divided into an acquisition module 11, a static verification module 12, a construction module 13, and a logic verification module 14.

[0114] The processor 21 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or any conventional processor, etc. The processor 21 is the control center of the substation one-key sequential control non-stop power automatic acceptance device, and uses various interfaces and lines to connect various parts of the entire substation one-key sequential control non-stop power automatic acceptance device.

[0115] The memory 22 can be used to store the computer program and / or module. The processor 21 realizes various functions of the substation one-key sequential control non-power outage automatic acceptance device by running or executing the computer program and / or module stored in the memory 22 and calling the data stored in the memory 22. The memory 22 can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.); the data storage area can store data created according to the use of the mobile phone (such as audio data, a phone book, etc.). In addition, the memory 22 can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.

[0116] Wherein, if the module integrated in the substation one-button sequential control non-power-off automatic acceptance equipment is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on such an understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Wherein, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form, etc. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium, etc.

[0117] A person skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium, and when the program is executed, it can include the processes of the embodiments of the above-mentioned methods. The storage medium can be a disk, an optical disk, a read-only memory (ROM) or a random access memory (RAM), etc.

[0118] Accordingly, an embodiment of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute the steps in the substation one-key sequential control non-stop automatic acceptance method of the above embodiment, such as Figure 1 Steps S1 to S4 described in .

[0119] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A one-button sequential control non-stop automatic acceptance method for a substation, characterized in that: The following steps are involved: Obtain a one-key sequential control operation ticket for the target substation sequential control host, and perform semantic analysis on the one-key sequential control operation ticket based on Alibaba's semantic segmentation model for natural language processing to obtain a first key field data set; Static verification is performed on the first key field data set and the underlying preset database of the sequence control host, and a sequence control instruction set is constructed according to the first key field data set after static verification, wherein the sequence control instruction set reflects the preset order of instructions for the to-be-controlled equipment in the target substation; Parsing the automation configuration file information of the target substation and generating simulation interval parameters, and constructing a virtual simulation one-key sequential control test system according to the parsing result and the simulation interval parameters; Each instruction in the sequence control instruction set is sequentially input into the one-key sequence control test system for logic verification, and the one-key sequence control acceptance of the target substation is implemented according to the result of the logic verification.

2. The substation one-button sequential control non-power-off automatic acceptance method according to claim 1 is characterized in that: The Alibaba semantic segmentation model based on natural language processing performs semantic analysis on the one-key sequential control operation ticket to obtain a first key field data set, including: Preprocessing each operation text information in the one-key sequential control operation ticket, and converting each of the preprocessed operation text information into a corresponding numerical vector; Input each of the numerical vectors into a Transformer model, and use the output of the Transformer model as a sentence vector corresponding to each of the operation text information; Encoding each of the sentence vectors using a global mean pooling method to obtain a sentence encoding of each of the operation text information; Each of the sentence codes is input into a softmax binary classifier for processing, and the first key field data set corresponding to each of the operation text information is constructed according to the processing result.

3. The substation one-button sequential control non-power-off automatic acceptance method according to claim 2 is characterized in that: The preprocessing of each operation text information in the one-key sequential control operation ticket and converting each of the preprocessed operation text information into a corresponding numerical vector includes: Traversing each operation text information in the one-key sequential control operation ticket in ascending order according to the operation instructions; and, Perform word segmentation processing on each of the operation text information by a word segmenter; The result of word segmentation processing is encoded based on word embedding technology to obtain the numerical vector.

4. The substation one-button sequential control non-power-off automatic acceptance method according to claim 1 is characterized in that: The static verification of the first key field data set with the underlying preset database of the sequential control host includes: Obtaining an underlying preset database of the sequential control host, encoding the underlying preset database using a global mean pooling method, and obtaining a second key field data set corresponding to the underlying preset database; Based on a preset matching rule and the second key field data set, performing a logical consistency matching check on the first key field data set; The verification results are compared item by item according to the selected verification rules to realize static verification.

5. The substation one-button sequential control non-power-off automatic acceptance method according to claim 1 is characterized in that: The automation configuration information file includes the SCD file, CID file, and ICD file of the target substation; The step of parsing the automation configuration file information of the target substation and generating simulation interval parameters, and constructing a virtual simulation one-key sequential control test system according to the parsing result and the simulation interval parameters, comprises: By parsing the SCD file, CID file, and ICD file of the target substation, the equipment information, association relationship, and configuration parameters of the target substation are obtained; Determine a simulation interval parameter according to the device information, the association relationship and the configuration parameter; Constructing a simulation model of the target substation according to the simulation interval parameter, the device information, the association relationship and the configuration parameter; A one-key sequence control test system is constructed based on the simulation model, including a sequence control host, the simulation model and a test module.

6. The substation one-button sequential control non-stop automatic acceptance method according to any one of claims 1 or 5, characterized in that: The step of sequentially inputting each instruction in the sequence control instruction set into the one-key sequence control test system for logic verification includes: Sending a sequence control instruction to the simulation model through the sequence control host; When the simulation model receives the sequential control instruction, it simulates the response process of the target substation according to the sequential control instruction, and returns the obtained telesignaling data reflecting the status of the primary and secondary equipment to the test module; The remote signaling data is received by the test module, the remote signaling data is compared with the expected result, and it is determined whether the one-key sequential control operation is successful, so as to realize logic verification.

7. The substation one-button sequential control non-stop automatic acceptance method according to claim 6 is characterized in that: The step of simulating the response process of the target substation according to the primary and secondary equipment sequential control instructions further includes: Calculate the power flow distribution state of the target substation based on the simulation interval and power flow simulation method; By analyzing the power grid power flow distribution state under different conditions, the feasibility of the sequential control instruction is verified.

8. A one-button sequential control non-stop automatic acceptance device for a substation, characterized in that: Includes the following modules: An acquisition module is used to obtain a one-key sequential control operation ticket of a target substation sequential control host, and perform semantic analysis on the one-key sequential control operation ticket based on Alibaba semantic segmentation model for natural language processing to obtain a first key field data set; A static verification module, used for statically verifying the first key field data set with the underlying preset database of the sequence control host, and constructing a sequence control instruction set according to the first key field data set after static verification, wherein the sequence control instruction set reflects the preset order of instructions of the to-be-controlled equipment in the target substation; A construction module, used to parse the automation configuration file information of the target substation and generate simulation interval parameters, and to construct a virtual simulation one-key sequential control test system according to the parsing result and the simulation interval parameters; The logic verification module is used to input each instruction in the sequence control instruction set into the one-key sequence control test system in sequence for logic verification, and realize the one-key sequence control acceptance of the target substation according to the result of the logic verification.

9. A one-button sequential control non-stop automatic acceptance equipment for substations, characterized in that: The method comprises a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the method for automatic acceptance of a substation with one-key sequential control and without power outage as described in any one of claims 1 to 7 is implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by the processor, the substation one-key sequential control non-power-off automatic acceptance method as described in any one of claims 1 to 7 is implemented.

Citation Information

Cited By

  • One-key sequence control knife switch double-confirmation simulation acceptance device

    CN119995141A

  • Scheduling method and device for intelligent anti-error control of power grid

    CN120090186A

  • Substation one-key sequential control automatic acceptance method and medium

    CN120474190A