Intelligent management and control method and system based on power grid distribution

Through the interaction between user terminals and intelligent control servers, real-time monitoring and fault diagnosis of power grid equipment are realized, energy value accumulation and trading mechanisms are introduced, and the problem of insufficient automation and real-time performance of existing power grid management systems is solved, and the grid operation efficiency and reliability.

CN119051269APending Publication Date: 2024-11-29STATE GRID SHANXI MARKETING SERVICE CENT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411218634.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The existing power grid management system lacks automation and real-time performance, making it difficult to achieve rapid monitoring and fault diagnosis of power grid equipment, lack of load prediction accuracy, and lack of effective energy value management and user participation mechanisms, resulting in insufficient grid operation efficiency and reliability.

Method used

Through the interaction between the user terminal and the intelligent control server, real-time monitoring, fault diagnosis and load prediction of power grid equipment are realized, energy value accumulation and trading mechanism are introduced, user terminals receive operation instructions, intelligent control servers generate energy values ​​and update accumulated energy values , promote the rational distribution and efficient utilization of energy.

Benefits of technology

Improve the automation and intelligence level of power grid management, enhance the real-time monitoring capability of power grid operation status, promote the rational allocation and efficient utilization of energy, improve the overall operation efficiency and reliability of the power grid, and be able to respond more flexibly to the power grid operation. changes and challenges.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119051269A_ABST
    Figure CN119051269A_ABST
Patent Text Reader

Abstract

The invention provides an intelligent management and control method and system based on power grid distribution. The method comprises the steps that a user terminal receives a first operation instruction input by a user; receiving and displaying the power grid data corresponding to the task identifier, generating operation feedback when the display is completed, and sending the operation feedback to the intelligent management and control server; the operation feedback comprises task execution completion time; the intelligent management and control server generates a first energy value according to the task execution starting time and the task execution finishing time, and sends the first energy value to the user terminal; the user terminal receives at least one second operation instruction input by the user; and sending the second operation instruction to an intelligent management and control server, so that the intelligent management and control server obtains power grid data corresponding to the prediction task identifier according to the second operation instruction, and determines the execution completion time of the prediction task and the execution frequency of the prediction task. The operation efficiency and reliability of the power grid can be improved, and reasonable distribution and efficient utilization of energy are promoted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of management and control technology of smart grids, and more specifically, to an intelligent management and control method and system based on power distribution in a power grid. Background Art

[0002] In the field of smart grid management, with the complexity of power systems and the diversification of user needs, traditional grid management methods have been unable to meet the needs of efficient, safe and economical operation of modern power grids. Existing grid management systems mainly rely on manual monitoring and operation, which is not only inefficient but also prone to errors. Especially in terms of grid equipment monitoring, fault diagnosis, load forecasting, etc., existing technical means often lack real-time and accuracy, and it is difficult to respond to various changes and problems in grid operation in a timely manner.

[0003] In the process of implementing the embodiments of the present invention, the inventors found that there are at least the following problems or defects in the prior art: First, the degree of automation of power grid equipment monitoring and fault diagnosis is not high, and it relies on manual operation, with a long response time, making it difficult to achieve real-time monitoring and rapid diagnosis. Secondly, the accuracy of power grid load forecasting is insufficient, making it difficult to provide reliable data support for the optimal scheduling of the power grid. Thirdly, the power grid optimization management lacks an effective energy value management and trading mechanism, and cannot fully utilize user participation and behavior patterns to optimize the overall operating efficiency of the power grid. In addition, the processing and response mechanism of power grid events is not flexible enough, making it difficult to respond to emergencies in power grid operation in a timely manner. Summary of the invention

[0004] The first aspect of the present invention provides an intelligent management and control method based on power grid distribution, comprising:

[0005] The user terminal receives a first operation instruction input by a user; the first operation instruction includes a user identifier, a task identifier and a task execution start time; wherein, when the first operation instruction is a power grid equipment monitoring instruction, the task identifier is a power grid equipment monitoring task, and the task execution start time is the start time of the power grid equipment monitoring; when the first operation instruction is a power grid fault diagnosis instruction, the task identifier is a fault diagnosis task, and the task execution start time is the start time of the fault diagnosis;

[0006] The user terminal sends the first operation instruction to the intelligent management and control server, so that the intelligent management and control server obtains the power grid data corresponding to the task identifier according to the first operation instruction;

[0007] The user terminal receives and displays the power grid data corresponding to the task identifier, generates operation feedback when the display is completed, and sends the operation feedback to the intelligent management and control server; the operation feedback includes the task execution completion time;

[0008] The intelligent management and control server generates a first energy value according to the task execution start time and the task execution completion time, and sends the first energy value to the user terminal; when the power grid equipment monitoring is performed first and the fault diagnosis is performed subsequently, the first energy value is determined according to the sum of the energy value corresponding to the power grid equipment monitoring and the energy value corresponding to the fault diagnosis;

[0009] The user terminal receives at least one second operation instruction input by the user; the second operation instruction includes a user identifier, a prediction task identifier and a prediction task execution start time; the second operation instruction corresponds to a power grid load prediction task; the prediction task execution start time is the start time of the load prediction;

[0010] The user terminal sends the second operation instruction to the intelligent management and control server, so that the intelligent management and control server obtains the power grid data corresponding to the prediction task identifier according to the second operation instruction, and determines the prediction task execution completion time and the prediction task execution number;

[0011] The intelligent management and control server generates a second energy value according to the predicted task execution start time and completion time, and the predicted task execution times, and sends the second energy value to the user terminal;

[0012] The user terminal updates the accumulated energy value corresponding to the user identifier according to the first energy value and the second energy value.

[0013] Furthermore, the intelligent management and control server generates a second energy value according to the predicted task execution start time and completion time, and the predicted task execution times, specifically including:

[0014] The intelligent management and control server obtains the original second energy value according to the predicted task execution start time and completion time;

[0015] The intelligent management and control server determines whether the number of executions of the prediction task is greater than a preset number threshold;

[0016] When the number of executions of the prediction task is not less than the preset number threshold, the first number energy value corresponding to the number threshold is obtained;

[0017] When the number of executions of the prediction task is less than the preset number threshold, the second number energy value is calculated according to the current number of executions of the prediction task;

[0018] A second energy value is generated according to the original second energy value and the first order energy value, or according to the original second energy value and the second order energy value.

[0019] Further, the user terminal updates the accumulated energy value corresponding to the user identifier according to the first energy value and the second energy value, specifically including:

[0020] Obtaining a target energy value according to the first energy value and the first weighting coefficient, and the second energy value and the second weighting coefficient;

[0021] According to the target energy value, the accumulated energy value corresponding to the user identifier is updated.

[0022] Furthermore, the method further comprises:

[0023] The user terminal generates transaction information of energy value to be exchanged according to the operation instruction input by the user;

[0024] The transaction information includes the amount of energy value to be exchanged and the user identification;

[0025] The user terminal sends the transaction information to other user terminals, so that the other user terminals obtain the energy value to be exchanged according to the received transaction information.

[0026] Furthermore, the method further comprises:

[0027] The user terminal receives a third operation instruction input by a user; the third operation instruction includes a user identifier and a power grid optimization task identifier;

[0028] The user terminal generates a power grid optimization request message according to the power grid optimization task identifier; the power grid optimization request message includes the power grid optimization task identifier;

[0029] The user terminal sends the power grid optimization request message to the intelligent management and control server;

[0030] The intelligent management and control server sends power grid optimization plan information to the user terminal according to the power grid optimization request message; the power grid optimization plan information includes the power grid optimization task identifier and the energy value to be deducted corresponding to the power grid optimization task identifier;

[0031] The user terminal receives the confirmation operation instruction input by the user according to the power grid optimization plan information, and generates a power grid optimization task confirmation request according to the confirmation operation instruction and sends it to the intelligent management and control server; the power grid optimization task confirmation request includes: user identification, power grid optimization task identification, confirmation data and the amount of energy value to be deducted;

[0032] The intelligent management and control server generates energy value deduction information according to the power grid optimization task confirmation request, and sends the energy value deduction information to the intelligent management and control server;

[0033] The intelligent management and control server deducts the amount of energy values ​​to be deducted from the amount of accumulated energy values ​​corresponding to the user identifier according to the energy value deduction information.

[0034] Furthermore, the method further comprises:

[0035] The user terminal receives power grid event request information sent by other terminals; the power grid event request information includes energy value quantity and power grid event identifier;

[0036] When the user terminal receives the completion information for the power grid event identifier input by the user, the user terminal adds the energy value amount to the accumulated energy value.

[0037] Furthermore, the method further comprises:

[0038] The user terminal receives basic information of the power grid input by the user;

[0039] Calculating the participation degree of the basic information of the power grid;

[0040] An energy value is determined according to the degree of participation of the basic information of the power grid, and the energy value is added to the accumulated energy value.

[0041] Furthermore, when the intelligent management and control server generates the first energy value, it also includes:

[0042] The intelligent management and control server calculates the task execution duration T according to the task execution start time and the task execution completion time;

[0043] The intelligent management and control server calculates the task difficulty coefficient K according to the task execution duration T and the task type, wherein the calculation formula of the task difficulty coefficient is: K = a·T 2 +b·sin(c·T)+d·ln(T+1)+e·exp(f·T)

[0044] Among them, a, b, c, d, e, and f are weight coefficients determined according to the task type;

[0045] The intelligent management and control server further calculates the first energy value E according to the task difficulty coefficient K and the task execution duration T by the following formula:

[0046]

[0047] In the formula, E is the first energy value, which reflects the overall energy consumption or output of the task; K is the task difficulty coefficient; T is the task execution duration; g, h, i, i are adjustment coefficients, which are determined according to the task type and power grid characteristics and are used to adjust the calculation results of the energy value to ensure its rationality and accuracy; It is the square root of the task execution duration and is used to introduce nonlinear factors in the energy value calculation.

[0048] Furthermore, when generating the second energy value, the intelligent management and control server further includes:

[0049] The intelligent management and control server calculates the predicted task execution duration according to the predicted task execution start time and completion time;

[0050] The intelligent management and control server calculates the difficulty coefficient of the prediction task according to the prediction task execution duration and the prediction task type;

[0051] The intelligent management and control server calculates the second energy value according to the predicted task difficulty coefficient and the predicted task execution duration.

[0052] Furthermore, when the user terminal updates the accumulated energy value, it further includes:

[0053] The user terminal calculates a user behavior coefficient according to the accumulated energy value corresponding to the user identifier and the user behavior pattern;

[0054] The user terminal adjusts the updating rate of the accumulated energy value according to the user behavior coefficient and the accumulated energy value.

[0055] A second aspect of the present invention provides an intelligent management and control system based on power grid distribution, comprising:

[0056] The user terminal is used to receive a first operation instruction input by a user, the instruction including a user identifier, a task identifier and a task execution start time, and send the first operation instruction to the intelligent management and control server;

[0057] The intelligent management and control server is used to obtain the power grid data corresponding to the task identifier according to the received first operation instruction, and send the power grid data to the user terminal;

[0058] A display unit, integrated in the user terminal, is used to receive and display power grid data, generate operation feedback after the task is completed, and send the operation feedback to the intelligent management and control server;

[0059] An energy value generating unit, integrated in the intelligent management and control server, is used to generate a first energy value according to the task execution start time and the task execution completion time, and send the first energy value to the user terminal;

[0060] A second operation instruction receiving unit, integrated in the user terminal, for receiving at least one second operation instruction input by a user, the instruction including a user identifier, a prediction task identifier and a prediction task execution start time;

[0061] A load prediction processing unit, integrated in the intelligent management and control server, is used to obtain power grid data according to the second operation instruction, determine the completion time and number of execution of the prediction task, generate a second energy value, and send the second energy value to the user terminal;

[0062] The accumulated energy value updating unit is integrated in the user terminal and is used to update the accumulated energy value corresponding to the user identification according to the first energy value and the second energy value.

[0063] According to the above embodiments of the present invention, at least the following beneficial effects are achieved: the intelligent management and control method of the present invention can realize real-time monitoring, fault diagnosis, load prediction and optimization management of power grid equipment through effective interaction between the user terminal and the intelligent management and control server. The user terminal receives the operation instructions input by the user, and the intelligent management and control server obtains relevant power grid data according to these instructions and generates corresponding energy values. This method can not only improve the automation and intelligence level of power grid management, but also enhance the real-time monitoring capability of the power grid operation status. The user terminal receives and displays the power grid data, generates operation feedback, and the intelligent management and control server generates energy values ​​according to these feedbacks and sends them back to the user terminal, thereby realizing closed-loop management of task execution. In addition, the method also introduces an energy value accumulation and transaction mechanism, receives the second operation instruction and the third operation instruction input by the user through the user terminal, and the intelligent management and control server generates the second energy value and the power grid optimization scheme information, and the user terminal updates the accumulated energy value corresponding to the user identifier according to these information. This mechanism can not only promote the reasonable allocation and efficient utilization of energy, but also enhance the enthusiasm of users to participate in power grid management and improve the overall operation efficiency and reliability of the power grid. In this way, power grid management can be more flexible and efficient, and can better cope with various changes and challenges in power grid operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] The above and other objects, features and advantages of the exemplary embodiments of the present invention will become readily understood by reading the detailed description below with reference to the accompanying drawings. In the accompanying drawings, several embodiments of the present invention are shown in an exemplary and non-limiting manner, in which:

[0065] Figure 1 A schematic diagram of a flow chart of an intelligent control method based on power grid distribution provided by an embodiment of the present invention;

[0066] Figure 2 A schematic diagram of a flow chart of an intelligent control method based on power grid distribution provided in one embodiment of the present invention. DETAILED DESCRIPTION

[0068] The principles and spirit of the present invention will be described below with reference to several exemplary embodiments. It should be understood that these embodiments are provided only to enable those skilled in the art to better understand and implement the present invention, and are not intended to limit the scope of the present invention in any way. On the contrary, these embodiments are provided to make the present invention more thorough and complete, and to fully convey the scope of the present invention to those skilled in the art.

[0069] Those skilled in the art know that the embodiments of the present invention can be implemented as a system, device, apparatus, method or computer program product. Therefore, the present invention can be specifically implemented in the following forms, namely: complete hardware, complete software (including firmware, resident software, microcode, etc.), or a combination of hardware and software.

[0070] It should be noted that any number of elements in the drawings is for illustration rather than limitation, and any naming is only for distinction and does not have any limiting meaning.

[0071] Reference below Figure 1 , Figure 1 The figure is a flow chart of an intelligent control method based on power grid distribution provided by an embodiment of the present invention. Figure 1 As shown in FIG. 1 , the intelligent control method based on power grid distribution includes:

[0072] The user terminal receives a first operation instruction input by a user; the first operation instruction includes a user identifier, a task identifier and a task execution start time; wherein, when the first operation instruction is a power grid equipment monitoring instruction, the task identifier is a power grid equipment monitoring task, and the task execution start time is the start time of the power grid equipment monitoring; when the first operation instruction is a power grid fault diagnosis instruction, the task identifier is a fault diagnosis task, and the task execution start time is the start time of the fault diagnosis;

[0073] The user terminal sends the first operation instruction to the intelligent management and control server, so that the intelligent management and control server obtains the power grid data corresponding to the task identifier according to the first operation instruction;

[0074] The user terminal receives and displays the power grid data corresponding to the task identifier, generates operation feedback when the display is completed, and sends the operation feedback to the intelligent management and control server; the operation feedback includes the task execution completion time;

[0075] The intelligent management and control server generates a first energy value according to the task execution start time and the task execution completion time, and sends the first energy value to the user terminal; when the power grid equipment monitoring is performed first and the fault diagnosis is performed subsequently, the first energy value is determined according to the sum of the energy value corresponding to the power grid equipment monitoring and the energy value corresponding to the fault diagnosis;

[0076] The user terminal receives at least one second operation instruction input by the user; the second operation instruction includes a user identifier, a prediction task identifier and a prediction task execution start time; the second operation instruction corresponds to a power grid load prediction task; the prediction task execution start time is the start time of the load prediction;

[0077] The user terminal sends the second operation instruction to the intelligent management and control server, so that the intelligent management and control server obtains the power grid data corresponding to the prediction task identifier according to the second operation instruction, and determines the prediction task execution completion time and the prediction task execution number;

[0078] The intelligent management and control server generates a second energy value according to the predicted task execution start time and completion time, and the predicted task execution times, and sends the second energy value to the user terminal;

[0079] The user terminal updates the accumulated energy value corresponding to the user identifier according to the first energy value and the second energy value.

[0080] It should be noted that the user terminal receives the first operation instruction input by the user, which involves the user inputting a specific instruction through a graphical user interface (GUI) or a command line interface (CLI) to start tasks such as power grid monitoring or fault diagnosis. For example, the user needs to select the monitored power grid equipment, specify the monitoring time period, or input specific parameters for fault diagnosis. These operation instructions will include a user identifier to ensure the traceability of the operation; a task identifier to clarify the nature of the task; and a task execution start time to provide a time reference for the execution of the task.

[0081] Specifically, the user terminal can be an intelligent device with a specific software application, such as a smartphone, tablet computer, or dedicated monitoring workstation. The user identifier includes a user account, device ID, or other unique identifier. The task identifier can be a predefined task code or name, such as "equipment monitoring" or "fault analysis". The task execution start time can be a specific time point entered by the user or a timestamp automatically generated by the system based on the current time. Based on this information, the intelligent management and control server will obtain the power grid data corresponding to the task identifier through internal algorithms and database queries.

[0082] Preferably, the user terminal can provide a set of standardized task templates, and the user can quickly generate operation instructions by selecting the template. For example, for the power grid equipment monitoring task, the user can select the "daily peak period monitoring" template, and the system will automatically fill in the user ID, task ID and start time as a specific peak period of the day. More specifically, when acquiring power grid data, the intelligent management and control server can use multi-threaded processing or distributed computing technology to improve the efficiency and response speed of data processing. In addition, the server can also predict fault points or load peaks based on the changing trend and historical data of the power grid data, so as to adjust the power grid resource allocation in advance and optimize the power grid operation.

[0083] like Figure 2 As shown, the intelligent management and control server generates a second energy value according to the predicted task execution start time and completion time, and the predicted task execution times, specifically including:

[0084] The intelligent management and control server obtains the original second energy value according to the predicted task execution start time and completion time;

[0085] The intelligent management and control server determines whether the number of executions of the prediction task is greater than a preset number threshold;

[0086] When the number of executions of the prediction task is not less than the preset number threshold, the first number energy value corresponding to the number threshold is obtained;

[0087] When the number of executions of the prediction task is less than the preset number threshold, the second number energy value is calculated according to the current number of executions of the prediction task;

[0088] A second energy value is generated according to the original second energy value and the first order energy value, or according to the original second energy value and the second order energy value.

[0089] It should be noted that the process of the intelligent management and control server generating the second energy value involves a detailed analysis and calculation of the execution of the predicted task. This process first requires the server to calculate an original second energy value based on the start time and completion time of the predicted task. This original energy value is a direct measure of the task execution time, reflecting the time consumption or output of the task.

[0090] Specifically, the original second energy value can be calculated by a simple time difference. For example, if the forecast task starts at 10:00 and ends at 11:00, then the original energy value is the time span of this one hour. In addition, the intelligent management and control server also needs to determine whether the number of executions of the forecast task reaches or exceeds a preset number threshold. This threshold is a parameter that can be set according to the actual operation of the power grid and the importance of the forecast task. For example, if the forecast task is executed 5 times and the threshold is set to 3 times, then it can be considered that the number of task executions meets the conditions.

[0091] Preferably, when generating the second energy value, the intelligent management and control server can use a more complex algorithm to consider the impact of the number of task executions on the energy value. For example, if the number of executions is not less than the threshold, the server uses a weighted average method to calculate the first numerical energy value, where the weight can be assigned based on the importance or urgency of the task. If the number of executions is less than the threshold, the server calculates the second numerical energy value based on the current number and some predetermined attenuation factors to reflect the impact of the task execution frequency on the energy value. More specifically, the intelligent management and control server can also introduce a machine learning algorithm to predict the trend of task execution, and adjust the calculation of the energy value accordingly to more accurately reflect the complexity of the grid load forecasting task and its impact on grid operation.

[0092] In some embodiments, the user terminal updates the accumulated energy value corresponding to the user identifier according to the first energy value and the second energy value, specifically including:

[0093] Obtaining a target energy value according to the first energy value and the first weighting coefficient, and the second energy value and the second weighting coefficient;

[0094] According to the target energy value, the accumulated energy value corresponding to the user identifier is updated.

[0095] It should be noted that the process of updating the accumulated energy value corresponding to the user identification by the user terminal involves a comprehensive consideration of the first energy value and the second energy value. This process first needs to calculate a target energy value based on the first energy value and the second energy value, as well as the corresponding weighting coefficient. This target energy value is the basis for updating the accumulated energy value of the user terminal, and reflects the user's activity and contribution in power grid management.

[0096] Specifically, the first energy value and the second energy value represent the energy consumption or output of the power grid equipment monitoring or fault diagnosis task and the power grid load forecasting task, respectively. The weighting coefficient is a parameter used to adjust the proportion of these two energy values ​​in the cumulative energy value, which can be set according to the type, importance or urgency of the task. For example, if the power grid equipment monitoring task is crucial to the stable operation of the power grid, then the corresponding first weighting coefficient is set higher. The user terminal calculates the target energy value based on these parameters through a specific algorithm, and updates the cumulative energy value corresponding to the user identifier accordingly.

[0097] Preferably, the user terminal can introduce a more complex user behavior analysis mechanism when updating the accumulated energy value. For example, the user terminal can calculate the user behavior coefficient based on the user's historical operation data, and this coefficient can reflect the user's response speed and accuracy to the power grid management task. More specifically, the user terminal can also dynamically adjust the weighting coefficient according to the real-time operation status of the power grid and the user's operation history to more accurately reflect the user's contribution to power grid management. In addition, the user terminal can also provide a visual display of the energy value, so that the user can intuitively understand the changes in his or her energy value, thereby encouraging the user to participate more actively in power grid management.

[0098] In some embodiments, the method further comprises:

[0099] The user terminal generates transaction information of energy value to be exchanged according to the operation instruction input by the user;

[0100] The transaction information includes the amount of energy value to be exchanged and the user identification;

[0101] The user terminal sends the transaction information to other user terminals, so that the other user terminals obtain the energy value to be exchanged according to the received transaction information.

[0102] It should be noted that the user terminal generates transaction information of energy values ​​to be exchanged, which involves the interaction of users in grid management and the circulation of energy values. Users decide to exchange a certain amount of energy values ​​with other users based on their needs and the operation of the grid. The generation of transaction information is the basis for realizing the circulation of energy values, which allows users to exchange energy values ​​to optimize their respective grid management strategies.

[0103] Specifically, transaction information may include the amount of energy to be exchanged, user identification, and transaction conditions or time limits. User identification ensures the traceability and security of the transaction, while the amount of energy is the core content of the transaction. Parameter settings include the minimum unit of energy value of the transaction, the validity period of the transaction, the priority of the transaction, etc. Conceptually, transaction information can be regarded as a virtual currency or points that users can use to obtain or provide grid services.

[0104] Preferably, when generating transaction information, the user terminal can introduce an intelligent recommendation system to help the user decide the amount of energy value to be exchanged. For example, the system can recommend a reasonable exchange amount based on the user's cumulative energy value, historical transaction behavior, and the current demand of the power grid. More specifically, the user terminal can also provide a trading market interface on which users can publish their own transaction needs, browse other users' transaction information, and exchange energy values. In addition, in order to improve the transparency and security of transactions, the user terminal can use blockchain technology to record and verify each transaction to ensure the immutability and traceability of the transaction.

[0105] In some embodiments, the method further comprises:

[0106] The user terminal receives a third operation instruction input by a user; the third operation instruction includes a user identifier and a power grid optimization task identifier;

[0107] The user terminal generates a power grid optimization request message according to the power grid optimization task identifier; the power grid optimization request message includes the power grid optimization task identifier;

[0108] The user terminal sends the power grid optimization request message to the intelligent management and control server;

[0109] The intelligent management and control server sends power grid optimization plan information to the user terminal according to the power grid optimization request message; the power grid optimization plan information includes the power grid optimization task identifier and the energy value to be deducted corresponding to the power grid optimization task identifier;

[0110] The user terminal receives the confirmation operation instruction input by the user according to the power grid optimization plan information, and generates a power grid optimization task confirmation request according to the confirmation operation instruction and sends it to the intelligent management and control server; the power grid optimization task confirmation request includes: user identification, power grid optimization task identification, confirmation data and the amount of energy value to be deducted;

[0111] The intelligent management and control server generates energy value deduction information according to the power grid optimization task confirmation request, and sends the energy value deduction information to the intelligent management and control server;

[0112] The intelligent management and control server deducts the amount of energy values ​​to be deducted from the amount of accumulated energy values ​​corresponding to the user identifier according to the energy value deduction information.

[0113] It should be noted that the user terminal receives the third operation instruction input by the user, which involves the user's specific request for the power grid optimization task. The user enters a specific operation instruction through the user terminal, including a user identifier and a power grid optimization task identifier, to indicate that they want to perform a power grid optimization task. The power grid optimization task includes adjusting the power grid load, improving energy distribution, or enhancing the stability of the power grid.

[0114] Specifically, the user identifier in the third operation instruction can be the user's account information or device identifier, ensuring the personalization and pertinence of the request. The power grid optimization task identifier is a predefined code or description that indicates the specific type of optimization that the user wishes to perform. For example, the user selects an optimization task identified as "load balancing" to request the intelligent management and control server to provide a load redistribution solution. Parameter settings include detailed parameters of the optimization task, such as optimization objectives, expected effects, time windows, etc.

[0115] Preferably, after receiving the grid optimization request, the user terminal can provide an interactive user interface to guide the user to complete the detailed settings of the grid optimization task. For example, the user can select the specific area to be optimized, set the target parameters for optimization, or define the priority of the optimization task through the graphical interface. More specifically, after receiving the grid optimization request message, the intelligent management and control server can use advanced algorithms, such as machine learning or optimization algorithms, to generate one or more grid optimization schemes and provide corresponding energy values ​​to be deducted. In addition, the intelligent management and control server can also automatically adjust the energy value deduction information according to the user's grid optimization task confirmation request to achieve dynamic management and optimization of the energy value.

[0116] In some embodiments, the method further comprises:

[0117] The user terminal receives power grid event request information sent by other terminals; the power grid event request information includes energy value quantity and power grid event identifier;

[0118] When the user terminal receives the completion information for the power grid event identifier input by the user, the user terminal adds the energy value amount to the accumulated energy value.

[0119] It should be noted that the user terminal receives the grid event request information sent by other terminals, which involves information interaction and collaboration between different users or devices in the grid system. The grid event request information contains the identifier of a specific grid event and the amount of energy value required, which is used to trigger or respond to a specific event or operation in the grid.

[0120] Specifically, the "energy value quantity" in the grid event request information refers to the energy value required to complete the grid event. These energy values ​​can be preset values ​​or dynamically calculated according to actual needs. The "grid event identifier" is used to uniquely identify specific events that occur in the grid, such as sudden increase in grid load, equipment failure, etc. Parameter settings include the type, severity, and scope of impact of the event. These parameters can help user terminals identify and respond to grid events more accurately.

[0121] Preferably, after receiving the grid event request information, the user terminal can automatically trigger a preset response process. For example, if the grid event is identified as "equipment failure", the user terminal can automatically send a fault handling request to the intelligent management and control server and request the corresponding energy value. More specifically, the user terminal can also dynamically adjust the energy value allocation strategy according to the urgency and impact range of the grid event to ensure the stable operation of the power grid. In addition, the user terminal can also provide a user interface that allows users to manually confirm or modify the grid event request information, thereby increasing the flexibility of the system and user participation. Alternative solutions include using automated scripts or smart contracts to automatically handle grid events, reduce human intervention, and improve response speed and accuracy.

[0122] In some embodiments, the method further comprises:

[0123] The user terminal receives basic information of the power grid input by the user;

[0124] Calculating the participation degree of the basic information of the power grid;

[0125] An energy value is determined according to the degree of participation of the basic information of the power grid, and the energy value is added to the accumulated energy value.

[0126] It should be noted that the user terminal receives the basic information of the power grid input by the user, which involves the user actively providing or updating the data and parameters related to the power grid. The basic information of the power grid includes key information such as the capacity, load characteristics, and equipment status of the power grid, which is crucial for the stable operation and optimized management of the power grid.

[0127] Specifically, basic grid information may include the voltage level, current capacity, equipment model, maintenance records, etc. of the grid. Parameter settings involve real-time load data, historical load data, equipment failure rate, etc. of the grid. These parameters can be input by the user or automatically collected and uploaded by smart devices. Conceptually, the participation of basic grid information can be defined as the degree of user contribution to grid data, which can be measured by the accuracy, timeliness, and completeness of the data input by the user.

[0128] Preferably, when receiving basic information about the power grid, the user terminal can use a variety of data verification mechanisms to ensure the accuracy and reliability of the data. For example, the user terminal can verify the basic information about the power grid input by the user by comparing historical data and real-time data. More specifically, the user terminal can also use a weighted algorithm to determine the distribution of energy values ​​based on the degree of participation in the basic information of the power grid. For example, if the data entered by the user plays a key role in the optimization of the power grid, they can receive a higher energy value reward. In addition, the user terminal can also provide a feedback mechanism that allows users to self-assess the accuracy of the basic information of the power grid, thereby further improving the quality and participation of the data. Alternatives include using machine learning algorithms to automatically analyze and verify basic information about the power grid, reducing the need for manual input and improving the degree of automation in data processing.

[0129] In some embodiments, when the intelligent management and control server generates the first energy value, it further includes:

[0130] The intelligent management and control server calculates the task execution duration T according to the task execution start time and the task execution completion time;

[0131] The intelligent management and control server calculates the task difficulty coefficient K according to the task execution duration T and the task type, wherein the calculation formula of the task difficulty coefficient is: K = a·T 2 +b·sin(c·T)+d·ln(T+1)+e·exp(f·T)

[0132] Among them, a, b, c, d, e, and f are weight coefficients determined according to the task type;

[0133] The intelligent management and control server further calculates the first energy value E according to the task difficulty coefficient K and the task execution duration T by the following formula:

[0134]

[0135] In the formula, E is the first energy value, which reflects the overall energy consumption or output of the task; K is the task difficulty coefficient, which comprehensively considers the influence of the square, sine, natural logarithm and exponential function of the task execution time; T is the task execution duration, which is the basic time parameter for calculating the energy value; g, h, i, j are adjustment coefficients, which are determined according to the task type and power grid characteristics and are used to adjust the calculation results of the energy value to ensure its rationality and accuracy;

[0136] Represents the square root of the task execution duration, which is used to introduce nonlinear factors in the energy value calculation.

[0137] It should be noted that when the intelligent management and control server generates the first energy value, it involves the evaluation of the complexity and duration of the power grid task execution. This process first requires the server to calculate the task execution duration T based on the task execution start time and task execution completion time. This duration is the basis for evaluating the task difficulty and energy consumption, and directly affects the final energy value calculation.

[0138] Specifically, the task execution duration T can be calculated by a simple time difference. For example, if the task starts at 10:00 and ends at 11:00, then T is 1 hour. The task type determines the calculation method of the task difficulty coefficient K, including monitoring tasks, fault diagnosis tasks, etc. Parameter settings involve weight coefficients a, b, c, d, e, and f. These coefficients are determined according to the task type and reflect the impact of different task types on energy consumption. The calculation formula of the task difficulty coefficient K comprehensively considers the influence of the square, sine, natural logarithm and exponential functions of the task execution time, ensuring the rationality and accuracy of the energy value.

[0139] Preferably, when calculating the first energy value E, the intelligent management and control server can use a more sophisticated algorithm to adjust the calculation result of the energy value. For example, the server can dynamically adjust the weight coefficients a, b, c, d, e, and f according to the actual operation of the power grid and historical data to more accurately reflect the difficulty and energy consumption of the task. More specifically, the server can also introduce a machine learning algorithm to predict the execution difficulty and duration of the task, so as to adjust the calculation of the energy value in advance. In addition, the intelligent management and control server can also provide a user interface that allows operators to input or adjust the weight coefficients based on actual experience, thereby increasing the flexibility and adaptability of the system. Alternatives include using fuzzy logic or neural networks to handle the calculation of task difficulty coefficients to improve the robustness and accuracy of the system.

[0140] In some embodiments, when the intelligent management and control server generates the second energy value, it further includes:

[0141] The intelligent management and control server calculates the predicted task execution duration according to the predicted task execution start time and completion time;

[0142] The intelligent management and control server calculates the difficulty coefficient of the prediction task according to the prediction task execution duration and the prediction task type;

[0143] The intelligent management and control server calculates the second energy value according to the predicted task difficulty coefficient and the predicted task execution duration.

[0144] It should be noted that when the intelligent management and control server generates the second energy value, it involves a comprehensive analysis of the execution of the power grid load forecasting task. This process first requires the server to calculate the execution duration of the forecasting task based on the start time and completion time of the forecasting task. This duration is the basis for evaluating the difficulty and energy consumption of the forecasting task, and directly affects the final energy value calculation.

[0145] Specifically, the duration of the forecast task execution can be calculated by a simple time difference calculation. For example, if the forecast task starts at 10:00 and ends at 12:00, the duration is 2 hours. The forecast task type determines the calculation method of the forecast task difficulty coefficient, including short-term load forecasting, medium-term load forecasting, etc. Parameter setting involves the calculation of the forecast task difficulty coefficient, which usually needs to consider the complexity of the forecast task, the accuracy requirements, and the impact on the operation of the power grid. The calculation of the forecast task difficulty coefficient can be based on factors such as historical data, the complexity of the forecast model, and the accuracy of the forecast results.

[0146] Preferably, when generating the second energy value, the intelligent management and control server can use a more sophisticated algorithm to adjust the calculation result of the energy value. For example, the server can dynamically adjust the calculation method of the difficulty coefficient of the prediction task according to the accuracy of the prediction task and the changes in the actual load of the power grid. More specifically, the server can also introduce machine learning algorithms to optimize the prediction model and improve the accuracy of the prediction task, so as to calculate the energy value more accurately. In addition, the intelligent management and control server can also provide a feedback mechanism, allowing power grid operators to adjust the difficulty coefficient of the prediction task and the calculation method of the energy value according to the actual effect of the prediction results, thereby increasing the flexibility and adaptability of the system. Alternatives include using an adaptive algorithm to automatically adjust the difficulty coefficient of the prediction task, or using a multi-model fusion method to improve the accuracy and robustness of the prediction.

[0147] In some embodiments, when the user terminal updates the accumulated energy value, it further includes:

[0148] The user terminal calculates a user behavior coefficient according to the accumulated energy value corresponding to the user identifier and the user behavior pattern;

[0149] The user terminal adjusts the updating rate of the accumulated energy value according to the user behavior coefficient and the accumulated energy value.

[0150] It should be noted that when the user terminal updates the accumulated energy value, it involves an in-depth analysis of the user behavior and the grid management task. This process first requires the user terminal to calculate the user behavior coefficient based on the accumulated energy value corresponding to the user ID and the user behavior pattern. This coefficient is a key indicator for evaluating the user's activity and contribution in grid management, and directly affects the update rate of the accumulated energy value.

[0151] Specifically, user behavior patterns include the frequency of user participation in grid management, the speed of responding to grid events, and the accuracy of completing grid tasks. Parameter setting involves the calculation method of user behavior coefficients, which usually needs to consider the user's behavior history, task completion, and real-time needs of the grid. For example, if users often respond to grid events in a timely manner and complete tasks accurately, their behavior coefficients will be higher. The calculation of user behavior coefficients can be based on factors such as the user's operation history, task completion rate, and contribution to grid optimization.

[0152] Preferably, the user terminal can use a more sophisticated algorithm to adjust the update rate when updating the accumulated energy value. For example, the user terminal can dynamically adjust the calculation method of the user behavior coefficient according to the user's behavior history and the real-time needs of the power grid. More specifically, the user terminal can also introduce a machine learning algorithm to analyze user behavior patterns and predict the user's future participation and contribution, so as to more accurately adjust the update rate of the accumulated energy value. In addition, the user terminal can also provide a user interface that allows users to view and understand their behavior coefficients and how they affect the update of the accumulated energy value, increasing the transparency of the system and user participation. Alternatives include using behavioral analysis tools to automatically monitor and evaluate user behavior patterns, or adopting incentive mechanisms to encourage users to participate more actively in power grid management tasks.

[0153] The above-mentioned embodiments of the present invention have the following beneficial effects: the intelligent management and control method of the present invention can significantly improve the operating efficiency and reliability of the power grid, and the effective interaction between the user terminal and the intelligent management and control server makes the tasks such as power grid equipment monitoring, fault diagnosis, load forecasting and optimization management more automated and intelligent. This real-time response mechanism can not only improve the accuracy and timeliness of power grid management, but also enhance the monitoring ability of the power grid operation status. Users participate in power grid management through operation instructions, and the intelligent management and control server generates energy values ​​according to these instructions and power grid data, thereby affecting the cumulative energy value of the user terminal, which can promote the reasonable allocation and efficient utilization of energy. In addition, the energy value trading mechanism and the confirmation process of the power grid optimization task introduced by the present invention can further enhance the enthusiasm of users to participate in power grid management and the self-regulation ability of the power grid. Users can exchange energy values ​​with other users according to the real-time demand of the power grid and their own energy value, and optimize the load balance and resource allocation of the power grid. At the same time, the implementation and confirmation mechanism of the power grid optimization task ensures the effective execution of the power grid optimization plan and the reasonable deduction of energy value, thereby improving the overall operation efficiency and stability of the power grid.

[0154] In some embodiments, the intelligent management and control system based on power grid distribution includes:

[0155] The user terminal is used to receive a first operation instruction input by a user, the instruction including a user identifier, a task identifier and a task execution start time, and send the first operation instruction to the intelligent management and control server;

[0156] The intelligent management and control server is used to obtain the power grid data corresponding to the task identifier according to the received first operation instruction, and send the power grid data to the user terminal;

[0157] A display unit, integrated in the user terminal, is used to receive and display power grid data, generate operation feedback after the task is completed, and send the operation feedback to the intelligent management and control server;

[0158] An energy value generating unit, integrated in the intelligent management and control server, is used to generate a first energy value according to the task execution start time and the task execution completion time, and send the first energy value to the user terminal;

[0159] A second operation instruction receiving unit, integrated in the user terminal, for receiving at least one second operation instruction input by a user, the instruction including a user identifier, a prediction task identifier and a prediction task execution start time;

[0160] A load forecasting processing unit, integrated in the intelligent management and control server, is used to obtain power grid data according to the second operation instruction, determine the completion time and number of execution of the forecasting task, generate a second energy value, and send the second energy value to the user terminal;

[0161] The accumulated energy value updating unit is integrated in the user terminal and is used to update the accumulated energy value corresponding to the user identification according to the first energy value and the second energy value.

[0162] It is understandable that the modules recorded in the intelligent control system based on power grid distribution are similar to those in the reference Figure 1 Therefore, the operations, features and beneficial effects described above for the intelligent control method based on power grid distribution are also applicable to the intelligent control system based on power grid distribution and the modules contained therein, and will not be repeated here.

[0163] The electronic devices in some embodiments of the present disclosure may include but are not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc.

[0166] It should be noted that some embodiments of the present disclosure may also include a computer-readable medium, and the computer-readable storage medium may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In some embodiments of the present disclosure, a computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, device or device. In some embodiments of the present disclosure, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, in which a computer-readable program code is carried. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. The computer readable signal medium may also be any computer readable medium other than a computer readable storage medium, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.

[0167] In some embodiments, the client and the server may communicate using any currently known or future developed network protocol such as HTTP (HyperText Transfer Protocol), and may be interconnected with any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include a local area network ("LAN"), a wide area network ("WAN"), an internet (e.g., the Internet), and a peer-to-peer network (e.g., an ad hoc peer-to-peer network), as well as any currently known or future developed network.

[0168] The computer-readable medium may be included in the electronic device; or it may exist alone without being assembled into the electronic device. The flowcharts and block diagrams in the accompanying drawings illustrate the possible architecture, functions and operations of the systems, methods and computer program products according to various embodiments of the present disclosure. In this regard, each box in the flowchart or block diagram may represent a module, a program segment, or a part of a code, which contains one or more executable instructions for implementing the specified logical functions. It should also be noted that in some alternative implementations, the functions marked in the box may also occur in an order different from that marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, and they may sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram and / or flowchart, and the combination of boxes in the block diagram and / or flowchart, can be implemented with a dedicated hardware-based system that performs the specified functions or operations, or can be implemented with a combination of dedicated hardware and computer instructions.

[0169] The units described in some embodiments of the present disclosure may be implemented in software or in hardware. The units described may also be provided in a processor, and the functions described above herein may be performed at least in part by one or more hardware logic components. For example, and without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.

[0170] The above description is only some preferred embodiments of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the embodiments of the present disclosure is not limited to the technical solutions formed by the specific combination of the above-mentioned technical features, but should also cover other technical solutions formed by any combination of the above-mentioned technical features or their equivalent features without departing from the above-mentioned inventive concept. For example, the above-mentioned features are replaced with the technical features with similar functions disclosed in the embodiments of the present disclosure (but not limited to) to form a technical solution. The above description is only some preferred embodiments of the present invention and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the embodiments of the present invention is not limited to the technical solutions formed by the specific combination of the above-mentioned technical features, but should also cover other technical solutions formed by any combination of the above-mentioned technical features or their equivalent features without departing from the above-mentioned inventive concept. For example, the above-mentioned features are replaced with the technical features with similar functions disclosed in the embodiments of the present invention (but not limited to) to form a technical solution.

Claims

1. An intelligent control method based on power grid distribution, characterized in that: The method comprises: The user terminal receives a first operation instruction input by a user; the first operation instruction includes a user identifier, a task identifier and a task execution start time; wherein, when the first operation instruction is a power grid equipment monitoring instruction, the task identifier is a power grid equipment monitoring task, and the task execution start time is the start time of the power grid equipment monitoring; when the first operation instruction is a power grid fault diagnosis instruction, the task identifier is a fault diagnosis task, and the task execution start time is the start time of the fault diagnosis; The user terminal sends the first operation instruction to the intelligent management and control server, so that the intelligent management and control server obtains the power grid data corresponding to the task identifier according to the first operation instruction; The user terminal receives and displays the power grid data corresponding to the task identifier, generates operation feedback when the display is completed, and sends the operation feedback to the intelligent management and control server; the operation feedback includes the task execution completion time; The intelligent management and control server generates a first energy value according to the task execution start time and the task execution completion time, and sends the first energy value to the user terminal; when the power grid equipment monitoring is performed first and the fault diagnosis is performed subsequently, the first energy value is determined according to the sum of the energy value corresponding to the power grid equipment monitoring and the energy value corresponding to the fault diagnosis; The user terminal receives at least one second operation instruction input by the user; the second operation instruction includes a user identifier, a prediction task identifier and a prediction task execution start time; the second operation instruction corresponds to a power grid load prediction task; the prediction task execution start time is the start time of the load prediction; The user terminal sends the second operation instruction to the intelligent management and control server, so that the intelligent management and control server obtains the power grid data corresponding to the prediction task identifier according to the second operation instruction, and determines the prediction task execution completion time and the prediction task execution number; The intelligent management and control server generates a second energy value according to the predicted task execution start time and completion time, and the predicted task execution times, and sends the second energy value to the user terminal; The user terminal updates the accumulated energy value corresponding to the user identifier according to the first energy value and the second energy value.

2. The method according to claim 1, characterized in that The intelligent management and control server generates a second energy value according to the predicted task execution start time and completion time, and the predicted task execution times, specifically including: The intelligent management and control server obtains the original second energy value according to the predicted task execution start time and completion time; The intelligent management and control server determines whether the number of executions of the prediction task is greater than a preset number threshold; When the number of executions of the prediction task is not less than the preset number threshold, the first number energy value corresponding to the number threshold is obtained; When the number of executions of the prediction task is less than the preset number threshold, the second number energy value is calculated according to the current number of executions of the prediction task; A second energy value is generated according to the original second energy value and the first order energy value, or according to the original second energy value and the second order energy value.

3. The method according to claim 1, characterized in that The user terminal updates the accumulated energy value corresponding to the user identifier according to the first energy value and the second energy value, specifically including: Obtaining a target energy value according to the first energy value and the first weighting coefficient, and the second energy value and the second weighting coefficient; According to the target energy value, the accumulated energy value corresponding to the user identifier is updated.

4. The method according to claim 1, characterized in that: The method further comprises: The user terminal generates transaction information of energy value to be exchanged according to the operation instruction input by the user; The transaction information includes the amount of energy value to be exchanged and the user identification; The user terminal sends the transaction information to other user terminals, so that the other user terminals obtain the energy value to be exchanged according to the received transaction information.

5. The method according to claim 1, characterized in that The method further comprises: The user terminal receives a third operation instruction input by a user; the third operation instruction includes a user identifier and a power grid optimization task identifier; The user terminal generates a power grid optimization request message according to the power grid optimization task identifier; the power grid optimization request message includes the power grid optimization task identifier; The user terminal sends the power grid optimization request message to the intelligent management and control server; The intelligent management and control server sends power grid optimization plan information to the user terminal according to the power grid optimization request message; the power grid optimization plan information includes the power grid optimization task identifier and the energy value to be deducted corresponding to the power grid optimization task identifier; The user terminal receives the confirmation operation instruction input by the user according to the power grid optimization plan information, and generates a power grid optimization task confirmation request according to the confirmation operation instruction and sends it to the intelligent management and control server; the power grid optimization task confirmation request includes: user identification, power grid optimization task identification, confirmation data and the amount of energy value to be deducted; The intelligent management and control server generates energy value deduction information according to the power grid optimization task confirmation request, and sends the energy value deduction information to the intelligent management and control server; The intelligent management and control server deducts the amount of energy values ​​to be deducted from the amount of accumulated energy values ​​corresponding to the user identifier according to the energy value deduction information.

6. The method according to claim 1, characterized in that The method further comprises: The user terminal receives power grid event request information sent by other terminals; the power grid event request information includes energy value quantity and power grid event identifier; When the user terminal receives the completion information for the power grid event identifier input by the user, the user terminal adds the energy value amount to the accumulated energy value.

7. The method according to claim 1, characterized in that The method further comprises: The user terminal receives basic information of the power grid input by the user; Calculating the participation degree of the basic information of the power grid; An energy value is determined according to the degree of participation of the basic information of the power grid, and the energy value is added to the accumulated energy value.

8. The method according to claim 1, characterized in that When generating the first energy value, the intelligent management and control server further includes: The intelligent management and control server calculates the task execution duration T according to the task execution start time and the task execution completion time; The intelligent management and control server calculates the task difficulty coefficient K according to the task execution duration T and the task type, wherein the calculation formula of the task difficulty coefficient is: K=a·T 2 +b·sin(c·T)+d·ln(T+1)+e·exp(f·T) Among them, a, b, c, d, e, and f are weight coefficients determined according to the task type; The intelligent management and control server further calculates the first energy value E according to the task difficulty coefficient K and the task execution duration T by the following formula: In the formula, E is the first energy value, which reflects the overall energy consumption or output of the task; K is the task difficulty coefficient; T is the task execution duration; g, h, i, i are adjustment coefficients, which are determined according to the task type and power grid characteristics and are used to adjust the calculation results of the energy value to ensure its rationality and accuracy; It is the square root of the task execution duration and is used to introduce nonlinear factors in the energy value calculation.

9. The method according to claim 1, characterized in that: When generating the second energy value, the intelligent management and control server further includes: The intelligent management and control server calculates the predicted task execution duration according to the predicted task execution start time and completion time; The intelligent management and control server calculates the difficulty coefficient of the prediction task according to the prediction task execution duration and the prediction task type; The intelligent management and control server calculates the second energy value according to the predicted task difficulty coefficient and the predicted task execution duration; When the user terminal updates the accumulated energy value, it also includes: The user terminal calculates a user behavior coefficient according to the accumulated energy value corresponding to the user identifier and the user behavior pattern; The user terminal adjusts the updating rate of the accumulated energy value according to the user behavior coefficient and the accumulated energy value.

10. An intelligent management and control system based on power grid distribution, characterized in that: The system comprises: The user terminal is used to receive a first operation instruction input by a user, the instruction including a user identifier, a task identifier and a task execution start time, and send the first operation instruction to the intelligent management and control server; The intelligent management and control server is used to obtain the power grid data corresponding to the task identifier according to the received first operation instruction, and send the power grid data to the user terminal; A display unit, integrated in the user terminal, is used to receive and display power grid data, generate operation feedback after the task is completed, and send the operation feedback to the intelligent management and control server; An energy value generating unit, integrated in the intelligent management and control server, is used to generate a first energy value according to the task execution start time and the task execution completion time, and send the first energy value to the user terminal; A second operation instruction receiving unit, integrated in the user terminal, for receiving at least one second operation instruction input by a user, the instruction including a user identifier, a prediction task identifier and a prediction task execution start time; A load forecasting processing unit, integrated in the intelligent management and control server, is used to obtain power grid data according to the second operation instruction, determine the completion time and number of execution of the forecasting task, generate a second energy value, and send the second energy value to the user terminal; The accumulated energy value updating unit is integrated in the user terminal and is used to update the accumulated energy value corresponding to the user identification according to the first energy value and the second energy value.