Ultra-high performance material fabricated stair and construction method thereof
By using UHPC materials and PC steel rods in the stairs, the structural design is optimized, and the major problem of prefabricated stairs is solved, efficient transportation and lifting is achieved, material usage and construction costs are reduced, and the application of prefabricated stairs is promoted.
Patent Information
- Application Number
- CN202411092084.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-12-03
AI Technical Summary
The existing prefabricated reinforced concrete stairs have a large weight, resulting in large safety hazards, high material consumption and low transportation efficiency during lifting.
Utilize ultra-high performance materials, including ladder beams, pedals and vertical kick plates, and use UHPC materials and PC steel rods to optimize structure and material combinations through design, reduce material usage and increase the stiffness and bearing capacity of the stairs, and set up hoisting components to facilitate Transport and hoist.
Effectively reduce the weight of stairs, improve the efficiency of transportation and lifting construction, ensure the mechanical properties of stairs, and reduce the amount of materials to promote the application of prefabricated stairs.
Smart Images

Figure CN119062079A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of construction engineering, and in particular relates to an ultra-high performance material assembled staircase and a construction method thereof. Background Art
[0002] As an important vertical transportation tool between floors, stairs are an indispensable component for the normal use of buildings. The industrialization of stairs has a positive role in promoting the industrialization of buildings. The promotion and application of prefabricated reinforced concrete stairs is an important way to industrialize stairs. With the new trend of the construction industry towards prefabricated buildings, prefabricated stairs have gradually become the most technologically mature component among prefabricated parts of prefabricated buildings.
[0003] According to the architectural standard design atlas "Prefabricated reinforced concrete slab stairs", for high-rise prefabricated structures with a standard floor height of 2.9m or 3m, the deadweight of a single piece of prefabricated reinforced concrete scissor stairs is between 4.5 tons and 5.2 tons. However, the QTZ 63 tower crane is widely used in the hoisting construction of prefabricated building components. Its maximum lifting capacity is 5 tons, while the maximum lifting capacity at the arm end is only 1 ton. The existing prefabricated reinforced concrete stairs have a large deadweight problem that is difficult to solve. During the hoisting process, the weight of the prefabricated reinforced concrete stairs is basically close to or even exceeds the maximum lifting weight allowed by the tower crane, which poses a great threat to the safe operation of the tower crane and poses a major construction safety hazard. In addition, the prefabricated reinforced concrete stairs with a large deadweight not only consume a large amount of raw materials such as steel bars and concrete, but also reduce the transportation efficiency and hoisting construction efficiency. Summary of the invention
[0004] The present invention aims to solve one of the technical problems in the related art to at least a certain extent. To this end, the embodiments of the present invention propose an ultra-high performance material assembled staircase and a construction method thereof. The lightweight staircase of the present application can not only greatly reduce the amount of materials used, but also reduce the weight of the staircase as much as possible while ensuring that the staircase has sufficient rigidity and bearing capacity, thereby facilitating the transportation, hoisting and normal use of the assembled staircase, and providing a simple and reliable construction method for the realization of the ultra-high performance material assembled staircase, which is conducive to the promotion of prefabricated stairs.
[0005] The ultra-high performance material assembled staircase according to the embodiment of the present invention comprises: a ladder beam, wherein there are two ladder beams, the two ladder beams are arranged at intervals along a first preset direction, and the two ladder beams are each provided with a first reinforcing rib assembly and a lifting assembly; there are two ear seats, the two ear seats are arranged at both ends of the two ladder beams at intervals along a second preset direction, and the ear seats are integrally formed with the ladder beams; there are multiple pedals, each of which is provided with a second reinforcing rib assembly, and the two ends of the pedals are respectively connected to the two ladder beams; and a vertical kick plate, wherein there are multiple vertical kick plates, the multiple vertical kick plates and the multiple pedals are alternately arranged along the second preset direction and perpendicular to each other, and the two ends of the vertical kick plate are respectively connected to the two ladder beams.
[0006] The ultra-high performance material assembled staircase according to the embodiment of the present invention greatly reduces the material consumption, while reducing the dead weight of the concrete staircase, ensuring that the staircase has sufficient rigidity and bearing capacity, and is easy to transport and hoist for construction, which is conducive to the promotion and application of prefabricated stairs.
[0007] Optionally, both ends of the pedal and the vertical kick plate extend into the ladder beams on both sides, and the length of the pedal and the vertical kick plate extending into the ladder beams is 40mm-80mm, and the width of the ladder beams on both sides is 80mm-120mm.
[0008] Optionally, the first reinforcement rib assembly includes a first PC steel bar, both ends of which are provided with a first high-strength nut and a first steel plate; the second reinforcement rib assembly includes a second PC steel bar, both ends of which are provided with a second high-strength nut and a second steel plate.
[0009] Optionally, the length of the first PC steel rod in the first stiffener assembly is greater than the length of the second PC steel rod in the second stiffener assembly.
[0010] Optionally, the length direction of the first PC steel bar is consistent with the length direction of the ladder beam and the second preset direction, the length direction of the second PC steel bar is consistent with the length direction of the pedal and the first preset direction, and the first preset direction is perpendicular to the second preset direction.
[0011] Optionally, two of the hoisting assemblies are arranged in each of the ladder beams, and the hoisting assemblies include hanging nails and hanging nail reinforcement ribs, the hanging nails are arranged on the upper surface of the ladder beam, and the hanging nail reinforcement ribs are arranged below the hanging nails.
[0012] Optionally, the two ear seats are an upper ear seat and a lower ear seat respectively, and two assembly holes are provided in each of the upper ear seat and the lower ear seat.
[0013] Optionally, the vertical kick plate is made of steel plate or aluminum alloy plate with a thickness of 3mm-8mm.
[0014] Optionally, ordinary steel bars, stirrups or steel wire meshes are also provided in the ladder beams, ear seats and pedals.
[0015] The method for constructing an ultra-high performance material assembled staircase according to an embodiment of the present invention comprises the following steps: S1: Prefabricated pedal and vertical kick plate: First, process and make the threads at both ends of the first PC steel rod and the second PC steel rod, then insert both ends of the first PC steel rod into the first steel plate and screw on the first high-strength nut, and insert both ends of the second PC steel rod into the second steel plate and screw on the second high-strength nut; then make the pedal template, and then pour the second PC steel rod with the second high-strength nut and the second steel plate and high-strength concrete into the prepared pedal template, and then perform high-temperature steam curing to form a prefabricated pedal; in addition, process and make the vertical kick plate according to the designed size; S2: Make ladder beam and ear seat templates: first set up the template support, then make ladder beam templates and two ear seat templates on both sides according to the design requirements, and fix the ladder beam templates and two ear seat templates on both sides to the template support; then fix the first PC steel rod with the first high-strength nut and the first steel pad, the hanging nail, the hanging nail reinforcement, and the prefabricated pedals and vertical kick plates on the ladder beam templates on both sides; S3: Casting and forming: high-strength concrete is poured into the ladder beam formwork on both sides and the two ear seat formworks, and then cured. After the curing is completed, the formwork is removed to finally form an ultra-high performance material assembled staircase.
[0016] The construction method of the ultra-high performance material assembled stairs according to the embodiment of the present invention provides a simple and reliable construction method for the realization of the ultra-high performance material assembled stairs, which is conducive to the promotion of prefabricated stairs.
[0017] The beneficial effects of the present invention are as follows: (1) UHPC materials, high-strength concrete and PC steel bars are used to replace ordinary concrete and ordinary steel bars in prefabricated reinforced concrete stairs, respectively, and the ultra-high strength characteristics of UHPC materials, high-strength concrete and PC steel bars are fully utilized, which greatly reduces the cross-sectional area and material consumption of the stairs, can effectively reduce the dead weight of the stairs, and is beneficial to the transportation and hoisting construction of the prefabricated stairs; (2) Ladder beams are arranged on both sides of the prefabricated stairs, and PC steel bars are arranged at the bottom of the ladder beams, so as to ensure that the stairs have sufficient rigidity and bearing capacity, and ensure that the stairs have sufficient mechanical properties. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 4 is a top view of an ultra-high performance material assembled staircase according to an embodiment of the present invention.
[0019] Figure 2 yes Figure 1Middle AA cross section.
[0020] Figure 3 yes Figure 1 Middle BB cross section.
[0021] Figure 4 yes Figure 1 Middle CC cross-section.
[0022] Figure 5 yes Figure 1 Middle DD cross-section.
[0023] Figure 6 It is a structural schematic diagram of the first reinforcement rib assembly.
[0024] Reference numerals: Upper ear seat 1; lower ear seat 2; pedal 3; vertical kick plate 4; ladder beam 5; First reinforcing rib assembly 6; first PC steel rod 601; first high-strength nut 602; first steel backing plate 603; Second reinforcing rib assembly 7; second PC steel rod 701; second high-strength nut 702; second steel backing plate 703; Assembly hole 8; hanging nail 9; hanging nail reinforcement rib 10; upper platform beam 20; upper platform 21; lower platform beam 30; lower platform 31. DETAILED DESCRIPTION
[0025] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.
[0026] like Figure 1-Figure 6 As shown, the ultra-high performance material assembled staircase according to an embodiment of the present invention comprises a ladder beam 5, an ear seat, a tread 3 and a vertical kick plate 4. The filling materials in the tread 3, the ear seat and the ladder beam 5 are all ultra-high strength concrete (UHPC). There are two ladder beams 5, and the two ladder beams 5 are arranged at intervals along the first preset direction. The ladder beams 5 are arranged on both sides of the stairs, which can effectively improve the overall rigidity of the stairs and reduce the deflection of the stairs under load.
[0027] There are two ear seats, which are arranged at both ends of the two ladder beams 5 at intervals along the second preset direction, and the ear seats and the ladder beams 5 are integrally formed; that is, one ear seat is arranged at one end of the two ladder beams 5, and the other ear seat is arranged at the other end of the two ladder beams 5, and the two ear seats are connected to the two ladder beams 5 together, forming an integrally formed structure. The two ear seats are respectively an upper ear seat 1 and a lower ear seat 2, and two assembly holes 8 are provided in the upper ear seat 1 and the lower ear seat 2. The upper ends of the two ladder beams 5 and the end of the upper ear seat 1 are integrally cast by concrete, and the lower ends of the two ladder beams 5 and the end of the lower ear seat 2 are integrally cast by concrete.
[0028] When the stairs are assembled, the upper ear seat 1 is fixedly mounted on the upper platform beam 20 through the assembly hole 8, and the lower ear seat 2 is fixedly mounted on the lower platform beam 30 through the assembly hole 8. The upper platform beam 20 is connected to the upper platform 21, and the lower platform beam 30 is connected to the lower platform 31.
[0029] There are a plurality of pedals 3 , and both ends of the pedals 3 are respectively connected to two ladder beams 5 , that is, the pedals 3 are arranged between the two ladder beams 5 .
[0030] There are multiple vertical kick plates 4, and the multiple vertical kick plates 4 and the multiple pedals 3 are alternately arranged along the second preset direction and are perpendicular to each other, and the two ends of the vertical kick plate 4 are respectively connected to the two ladder beams 5. That is, the vertical kick plate 4 is also arranged between the two ladder beams 5, and the vertical kick plate 4 and the pedals 3 are alternately arranged between the two ladder beams 5 along the second preset direction, the pedals 3 are arranged along the horizontal direction, and the vertical kick plate 4 is arranged along the vertical direction.
[0031] The pedals 3 are all I-shaped horizontal plates, and the vertical kick plates 4 are I-shaped vertical plates. The vertical kick plates 4 are arranged between the pedals 3 and the pedals 3. The two ends of each pedal 3 and the two ends of each vertical kick plate 4 are fixedly connected to the ladder beam 5 by pouring concrete.
[0032] The material of the vertical kick plate 4 is a steel plate or an aluminum alloy plate with a thickness of 3-8 mm. The use of the vertical kick plate 4 also reduces the deadweight of the assembled staircase as much as possible.
[0033] Both ends of the tread 3 and the vertical kick plate 4 extend into the ladder beams 5 on both sides, the width of the ladder beams 5 on both sides is 80-120 mm, and the length of the tread 3 and the vertical kick plate 4 extending into the ladder beam 5 is 40-80 mm. The tread 3 and the vertical kick plate 4 are fixedly connected to the ladder beam 5 by pouring high-strength concrete of the ladder beam 5, so that the load can be effectively transferred between the tread 3 and the ladder beam 5, thereby enhancing the overall performance of the stairs.
[0034] The first reinforcing rib assembly 6 is provided in both ladder beams 5, and two first reinforcing rib assemblies 6 are arranged side by side in each ladder beam 5. The first reinforcing rib assembly 6 includes a first PC steel bar 601, a first high-strength nut 602 and a first steel pad 603. The first high-strength nut 602 and the first steel pad 603 are provided at both ends of the first PC steel bar 601. The first reinforcing rib assembly 6 is provided to ensure that the ladder beam 5 has sufficient rigidity and bearing capacity. The first reinforcing rib assembly 6 is provided at the lower part of the ladder beam 5. The lower part of the ladder beam 5 of the stairs adopts PC steel bars as stress-bearing steel bars. The ladder beam 5 itself is cast with high-strength concrete, which can not only reduce the cross-sectional area, material consumption and deadweight of the ladder beam 5, but also maximize the use of the ultra-high strength characteristics of the PC steel bars and high-strength concrete to improve the bearing capacity of the ladder beam 5 and the stairs.
[0035] Each pedal 3 is provided with a second reinforcing rib assembly 7, and each pedal 3 is provided with two second reinforcing rib assemblies 7 side by side, the second reinforcing rib assembly 7 includes a second PC steel bar 701, a second high-strength nut 702 and a second steel pad 703, and both ends of the second PC steel bar 701 are provided with a second high-strength nut 702 and a second steel pad 703. The second reinforcing rib assembly 7 is provided to ensure that the pedal 3 has sufficient rigidity and bearing capacity. The pedal 3 uses PC steel bars as stress-bearing steel bars, and the pedal 3 itself is cast with UHPC, which can not only reduce the cross-sectional area, material consumption and deadweight of the pedal 3, but also maximize the use of the ultra-high strength characteristics of the PC steel bars and UHPC to improve the bearing capacity of the pedal 3 itself.
[0036] The tensile strength of the UHPC in the ultra-high performance material prefabricated staircase according to the embodiment of the present invention is not less than 8MPa, the compressive strength is not less than 120MPa, and the compressive strength of the high-strength concrete is not less than 60MPa; the yield strength of the PC steel bar is not less than 1200MPa. In order to give full play to the ultra-high strength characteristics of the PC steel bar and prevent the PC steel bar from being pulled out and damaged after being pulled, the end of the PC steel bar is anchored in the UHPC with a high-strength nut and a steel plate.
[0037] The length of the first PC steel rod 601 in the first reinforcement rib assembly 6 is greater than the length of the second PC steel rod 701 in the second reinforcement rib assembly 7 .
[0038] The length direction of the first PC steel bar 601 is consistent with the length direction of the ladder beam 5 and the second preset direction, the length direction of the second PC steel bar 701 is consistent with the length direction of the pedal 3 and the first preset direction, the first preset direction is also consistent with the horizontal direction, and the first preset direction is perpendicular to the second preset direction.
[0039] Two hoisting assemblies are arranged in each ladder beam 5, and the hoisting assemblies include a hanging nail 9 and a hanging nail reinforcement rib 10. The hanging nail 9 is arranged on the upper surface of the ladder beam 5, and the hanging nail reinforcement rib 10 is arranged below the hanging nail 9. The arrangement of the hoisting assembly is to facilitate the transportation and hoisting construction of the assembled staircase.
[0040] Optionally, ordinary steel bars, stirrups or steel meshes are also provided in the ladder beam 5, the upper ear seat 1, the lower ear seat 2 and the pedal 3 to restrain and improve the overall performance of UHPC and high-strength concrete and reduce concrete cracks.
[0041] The ultra-high performance material assembled staircase according to the embodiment of the present invention greatly reduces the material consumption, while reducing the dead weight of the concrete staircase, ensuring that the staircase has sufficient rigidity and bearing capacity, and is easy to transport and hoist for construction, which is conducive to the promotion and application of prefabricated stairs.
[0042] The method for constructing an ultra-high performance material assembled staircase according to an embodiment of the present invention comprises the following steps: S1: Prefabricated pedal 3 and vertical kick plate 4: First, process and make threads at both ends of the first PC steel rod 601 and the second PC steel rod 701, then insert both ends of the first PC steel rod 601 into the first steel pad 603 and screw on the first high-strength nut 602, and insert both ends of the second PC steel rod 701 into the second steel pad 703 and screw on the second high-strength nut 702; then make a pedal template, and then pour the second PC steel rod 701 with the second high-strength nut 702 and the second steel pad 703 and high-strength concrete into the prepared pedal template, and then perform high-temperature steam curing to form the prefabricated pedal 3; in addition, process and make the vertical kick plate 4 according to the designed size; S2: Making ladder beam 5 and ear seat templates: first, set up the template support, then make ladder beam templates and two ear seat templates on both sides according to the design requirements, and fix the ladder beam templates and two ear seat templates on both sides to the template support; then fix the first PC steel rod 601 with the first high-strength nut 602 and the first steel pad 603, the hanging nail 9, the hanging nail reinforcement 10 and the prefabricated pedal 3 and the vertical kick plate 4 on the ladder beam templates on both sides; S3: Casting and forming: high-strength concrete is poured into the ladder beam formwork on both sides and the two ear seat formworks, and then cured. After the curing is completed, the formwork is removed to finally form an ultra-high performance material assembled staircase.
[0043] The construction method of the ultra-high performance material assembled stairs according to the embodiment of the present invention provides a simple and reliable construction method for the realization of the ultra-high performance material assembled stairs, which is conducive to the promotion of prefabricated stairs.
[0044] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0045] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0046] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0047] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0048] In the present invention, the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0049] Although the above embodiments have been shown and described, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations on the present invention. Changes, modifications, substitutions and variations of the above embodiments by those of ordinary skill in the art are all within the scope of protection of the present invention.
Claims
1. An ultra-high performance material assembled staircase, characterized in that: include: Ladder beams, wherein there are two ladder beams, the two ladder beams are arranged at intervals along a first preset direction, and the two ladder beams are both provided with a first reinforcing rib assembly and a hoisting assembly; Ear seats, there are two ear seats, the two ear seats are arranged at two ends of the two ladder beams at intervals along the second preset direction, and the ear seats are integrally formed with the ladder beams; A pedal, wherein there are a plurality of pedals, each of which is provided with a second reinforcing rib assembly, and both ends of the pedal are respectively connected to the two ladder beams; and A vertical kick plate, wherein there are multiple vertical kick plates, the multiple vertical kick plates and the multiple pedals are alternately arranged along the second preset direction and are perpendicular to each other, and the two ends of the vertical kick plate are respectively connected to the two ladder beams.
2. The ultra-high performance material assembled staircase according to claim 1, characterized in that: Both ends of the pedal and the vertical kick plate extend into the ladder beams on both sides, and the length of the pedal and the vertical kick plate extending into the ladder beams is 40mm-80mm, and the width of the ladder beams on both sides is 80mm-120mm.
3. The ultra-high performance material assembled staircase according to claim 1, characterized in that: The first reinforcing rib assembly comprises a first PC steel bar, both ends of which are provided with a first high-strength nut and a first steel pad; The second reinforcing rib assembly includes a second PC steel bar, and both ends of the second PC steel bar are provided with a second high-strength nut and a second steel pad.
4. The ultra-high performance material assembled staircase according to claim 3, characterized in that: The length of the first PC steel rod in the first stiffener assembly is greater than the length of the second PC steel rod in the second stiffener assembly.
5. The ultra-high performance material assembled staircase according to claim 4, characterized in that: The length direction of the first PC steel bar is consistent with the length direction of the ladder beam and the second preset direction, the length direction of the second PC steel bar is consistent with the length direction of the pedal and the first preset direction, and the first preset direction is perpendicular to the second preset direction.
6. The ultra-high performance material assembled staircase according to claim 1, characterized in that: Two of the hoisting assemblies are arranged in each ladder beam, and the hoisting assemblies include hanging nails and hanging nail reinforcement ribs. The hanging nails are arranged on the upper surface of the ladder beam, and the hanging nail reinforcement ribs are arranged below the hanging nails.
7. The ultra-high performance material assembled staircase according to claim 1, characterized in that: The two ear seats are an upper ear seat and a lower ear seat respectively, and two assembly holes are arranged in each of the upper ear seat and the lower ear seat.
8. The ultra-high performance material assembled staircase according to claim 1, characterized in that: The material of the vertical kick plate is a steel plate or an aluminum alloy plate with a thickness of 3mm-8mm.
9. The ultra-high performance material assembled staircase according to claim 1, characterized in that: Ordinary steel bars, stirrups or steel wire meshes are also arranged in the ladder beams, ear seats and pedals.
10. A method for constructing an ultra-high performance material assembled staircase according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1: Prefabricated pedal and vertical kick plate: First, process and make the threads at both ends of the first PC steel rod and the second PC steel rod, then insert both ends of the first PC steel rod into the first steel plate and screw on the first high-strength nut, and insert both ends of the second PC steel rod into the second steel plate and screw on the second high-strength nut; then make the pedal template, and then pour the second PC steel rod with the second high-strength nut and the second steel plate and high-strength concrete into the prepared pedal template, and then perform high-temperature steam curing to form a prefabricated pedal; in addition, process and make the vertical kick plate according to the designed size; S2: Make ladder beam and ear seat templates: first set up the template support, then make ladder beam templates and two ear seat templates on both sides according to the design requirements, and fix the ladder beam templates and two ear seat templates on both sides to the template support; then fix the first PC steel rod with the first high-strength nut and the first steel pad, the hanging nail, the hanging nail reinforcement, and the prefabricated pedals and vertical kick plates on the ladder beam templates on both sides; S3: Casting and forming: high-strength concrete is poured into the ladder beam formwork on both sides and the two ear seat formworks, and then cured. After the curing is completed, the formwork is removed to finally form an ultra-high performance material assembled staircase.