Condensate water treatment method and device of air conditioning equipment and air conditioning equipment

By combining outdoor temperature and defrost process judgment, the condensate is treated with bypass heating pipelines and drainage devices, the problem of condensate freezing in air-conditioning equipment is solved, and the reliability and reuse efficiency of the condensate treatment system are improved.

CN119063238APending Publication Date: 2024-12-03GD MIDEA AIR CONDITIONING EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310638541.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-31
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The condensate generated by air conditioning equipment during heating is easily frozen when the outdoor temperature is low, resulting in inability to discharge and reuse, affecting the heat exchange effect.

Method used

By combining outdoor temperature and defrost process judgment, determine whether to perform condensation and ice dehydration procedures, use the bypass heating pipeline and drainage device to treat condensate to ensure that the condensate does not freeze and achieve effective treatment of condensate.

Benefits of technology

Without adding hardware, accurately judge and handle condensate water, solve the problem of condensate freezing, improve the operational reliability of the condensate treatment system, and ensure effective discharge and reuse of condensate water.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119063238A_ABST
    Figure CN119063238A_ABST
Patent Text Reader

Abstract

The invention discloses a condensate water treatment method and device of air conditioning equipment and the air conditioning equipment, the air conditioning equipment comprises a refrigerant circulation system and a condensate water treatment system.The method comprises the steps that in response to current defrosting of the refrigerant circulation system, the condensate water treatment system is started to treat condensate water accumulated in the current defrosting process, and the condensate water accumulated in the current defrosting process is treated; the current outdoor temperature and the current interval time are obtained, and the current interval time is the interval time between the current defrosting time and the last condensate water deicing program; if the current outdoor temperature is within the preset temperature range and the current interval time is larger than a preset time threshold value, a target temperature interval where the current outdoor temperature is located is determined; and according to a preset deicing condition corresponding to the target temperature interval, whether a condensate water deicing program of the condensate water treatment system is executed or not after current defrosting is finished is judged. According to the condensate water treatment system, the technical problem that condensate water is frozen and cannot be discharged and recycled is solved, and the operation reliability of the condensate water treatment system can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of air conditioning, and in particular relates to a condensate treatment method and device for air conditioning equipment, and air conditioning equipment. Background Art

[0002] Air conditioning equipment will produce condensed water during the heating or cooling process. The condensed water can be collected in the water collection tank and used for the air conditioning equipment's own consumption, achieving the purpose of reusing the condensed water without the need for drainage. The reuse of condensed water can improve the efficiency of the heat exchanger and solve the problem of condensed water discharge.

[0003] For cooling and heating air conditioners, condensed water is generated outdoors in heating mode, and the condensed water needs to be concentrated indoors for reuse or directly reused outdoors. If the outdoor temperature is very low during the heating process of the air conditioner, the condensed water accumulated outdoors is likely to freeze, making it impossible to drain and reuse the condensed water outdoors, affecting the heat exchange effect of the air conditioner. Summary of the invention

[0004] The embodiments of the present invention provide a condensate treatment method, device and air-conditioning equipment for air-conditioning equipment. By combining the outdoor temperature and the defrost process to perform defrosting judgment, it is possible to judge whether the condensate treatment system needs defrosting and perform defrosting after the judgment without adding hardware. This solves the technical problem of the collected condensate being frozen and unable to be discharged and reused to a certain extent, and can improve the operating reliability of the condensate treatment system.

[0005] In a first aspect, an embodiment of the present invention provides a condensate water treatment method for air-conditioning equipment, the air-conditioning equipment comprising a refrigerant circulation system and a condensate water treatment system, the method comprising: in response to a current defrost of the refrigerant circulation system, starting the condensate water treatment system to treat the condensate accumulated in the current defrost process, and obtaining the current outdoor temperature and the current interval time, the current interval time being the interval time between the current defrost and the last execution of the condensate water defrosting program; if the current outdoor temperature is within a preset temperature range and the current interval time is greater than a preset time threshold, determining a target temperature range in which the current outdoor temperature is located; and judging whether to execute the condensate water defrosting program for the condensate water treatment system after the current defrost is completed according to the preset defrosting conditions corresponding to the target temperature range.

[0006] In combination with the first aspect, in some embodiments, determining the target temperature interval in which the current outdoor temperature is located includes: matching a temperature interval in which the current outdoor temperature is located from M pre-divided temperature intervals as the target temperature interval, and M is an integer greater than 1; wherein the M temperature intervals are formed by dividing the preset temperature range based on M-1 boundary temperature values, and the preset defrosting conditions corresponding to the M temperature intervals are different from each other.

[0007] In combination with the first aspect, in some embodiments, the condensate treatment system includes an external water collection tank corresponding to the external heat exchanger of the refrigerant circulation system, an internal water collection tank corresponding to the internal heat exchanger of the refrigerant circulation system, a first drainage device for draining water from the external water collection tank to the internal water collection tank, and a second drainage device for gasifying or atomizing the condensate in the internal water collection tank and discharging it to the outdoor environment; the preset defrosting conditions corresponding to the first temperature range are that the current defrosting ends, and the current defrosting triggers a water level alarm in the internal water collection tank, and the current defrosting triggers the The occurrence of a water level alarm in the inner water collection tank indicates that the condensed water discharged into the inner water collection tank through the first drainage device cannot be discharged to the outdoor environment through the second drainage device; the preset defrosting condition corresponding to the second temperature interval is the end of the current defrost; the preset defrosting condition corresponding to the third temperature interval is the end of the current defrost, and the condensed water defrosting procedure of the condensed water treatment system has not been executed after the end of N consecutive historical defrosts before the current defrost, N is an integer greater than 1, and the first temperature interval, the second temperature interval and the third temperature interval satisfy that the temperature values ​​gradually decrease.

[0008] In combination with the first aspect, in some embodiments, the preset defrosting conditions corresponding to the target temperature range are used to determine whether to execute the condensate defrosting program for the condensate treatment system after the current defrost is completed, including: if the current outdoor temperature is within the first temperature range, and the current defrost triggers a water level alarm in the sump, in response to an end signal indicating the end of the current defrost, the condensate defrosting program for the condensate treatment system is executed; if the current outdoor temperature is within the second temperature range, in response to an end signal indicating the end of the current defrost, the condensate defrosting program for the condensate treatment system is executed; if the current outdoor temperature is within the third temperature range, and the condensate defrosting program for the condensate treatment system has not been executed after N consecutive historical defrosts before the current defrost, in response to an end signal indicating the end of the current defrost, the condensate defrosting program for the condensate treatment system is executed.

[0009] In combination with the first aspect, in some embodiments, the condensate treatment system also includes a bypass heating pipeline arranged in the outer water collection tank and connected to the external unit heat exchanger, and the execution of the condensate defrosting program of the condensate treatment system includes: increasing the heat released by the bypass heating pipeline into the outer water collection tank by adjusting the operating parameters of the refrigerant circulation system; turning on the first drainage device to pump water from the outer water collection tank to the inner water collection tank; during the process of the first drainage device draining water from the outer water collection tank to the inner water collection tank, if a water level alarm is detected in the inner water collection tank, turning on the second drainage device to atomize or vaporize the condensate in the inner water collection tank and discharging it to the outdoor environment until the condensate defrosting program is exited.

[0010] In combination with the first aspect, in some embodiments, the condensate treatment system includes an internal water collection tank arranged corresponding to the indoor heat exchanger of the refrigerant circulation system, and a spraying device for spraying the condensate in the internal water collection tank toward the indoor heat exchanger. The method also includes: if the preset humidification condition is met at the current moment, turning on the spraying device so that the spraying device sprays the condensate in the internal water collection tank toward the indoor heat exchanger; wherein the preset humidification condition at least includes that the current indoor humidity is less than the set humidity.

[0011] In combination with the first aspect, in some embodiments, the condensate treatment system includes an inner water collection tank corresponding to the indoor heat exchanger of the refrigerant circulation system, an outer water collection tank corresponding to the outdoor heat exchanger of the refrigerant circulation system, a first drainage device for draining water from the outer water collection tank to the inner water collection tank, and a second drainage device for spraying the condensate in the inner water collection tank to the outdoor environment. The method also includes: during the heating or cooling operation of the refrigerant circulation system, monitoring the water level of the inner water collection tank; if a water level alarm is detected in the inner water collection tank, controlling the start and stop of the second drainage device according to a preset first drainage time, so that the second drainage device atomizes or vaporizes the condensate in the inner water collection tank within the first drainage time and then discharges it to the outdoor environment.

[0012] In combination with the first aspect, in some embodiments, the method also includes: monitoring the water level of the inner water collection tank during the first drainage time period; if it is monitored that the inner water collection tank is continuously or intermittently in a water level alarm state during the first drainage time period, controlling the second drainage device to shut down and outputting a first fault message, wherein the first fault message is used to indicate that a fault has occurred in the second drainage device; and prohibiting the first drainage device from operating.

[0013] In combination with the first aspect, in some embodiments, the method also includes: during the heating operation of the refrigerant circulation system, monitoring the water level of the external water collection tank; if a water level alarm is detected in the external water collection tank, controlling the start and stop of the first drainage device according to a preset second drainage time, so that the first drainage device performs the action of draining water from the external water collection tank to the inner water collection tank within the second drainage time.

[0014] In combination with the first aspect, in some embodiments, the method also includes: monitoring the water level of the external water collection tank during the second drainage time period; if it is monitored that the external water collection tank is continuously or intermittently in a water level alarm state during the second drainage time period, controlling the first drainage device to shut down and outputting second fault information, wherein the second fault information is used to indicate that a fault has occurred in the first drainage device.

[0015] In combination with the first aspect, in some embodiments, in response to the current defrost of the refrigerant circulation system, the condensate treatment system is turned on to perform condensate treatment, including: in response to a start signal characterizing the start of the current defrost, obtaining the coil temperature difference of the outdoor heat exchanger of the refrigerant circulation system at a preset interval time; if the coil temperature difference is greater than the preset temperature difference threshold, triggering the turning on of the condensate treatment system to process the condensate accumulated during the defrost process.

[0016] In combination with the first aspect, in some embodiments, the condensate treatment system includes an external water collection tank corresponding to the external unit heat exchanger of the refrigerant circulation system, an internal water collection tank corresponding to the internal unit heat exchanger of the refrigerant circulation system, a first drainage device for draining water from the external water collection tank to the internal water collection tank, and a second drainage device for vaporizing or atomizing the condensate in the internal water collection tank and discharging it to the outdoor environment. After the condensate treatment system is turned on, the condensate accumulated in the current defrosting process is treated, including: during the current defrosting process of the refrigerant circulation system, the first drainage device and the second drainage device are controlled to operate alternately; wherein, when the current operation of the first drainage device causes a water level alarm in the internal water collection tank, the first drainage device is triggered to shut down and the second drainage device is turned on, and when the current operation time of the second drainage device reaches a preset third drainage time, the first drainage device is triggered to be reopened until the current defrosting is completed.

[0017] In combination with the first aspect, in some embodiments, the method also includes: continuously monitoring the current outdoor temperature in the heating mode of the air-conditioning equipment; if the current outdoor temperature is within the preset temperature range, in response to a start signal characterizing the start of the current defrost, obtaining the current interval time; and determining whether the current interval time is greater than a preset time threshold.

[0018] In a second aspect, an embodiment of the present invention provides a condensate water treatment device for air-conditioning equipment, wherein the air-conditioning equipment includes a refrigerant circulation system and a condensate water treatment system, wherein the condensate water treatment device includes: a defrost response unit, for responding to the current defrost of the refrigerant circulation system, turning on the condensate water treatment system to process the condensate accumulated during the current defrost, and obtaining the current outdoor temperature and the current interval time, wherein the current interval time is the interval time between the current defrost and the last execution of the condensate defrosting program; a temperature determination unit, for determining the target temperature range in which the current outdoor temperature is located if the current outdoor temperature is within a preset temperature range and the current interval time is greater than a preset time threshold; and a defrosting judgment unit, for judging whether to execute the condensate defrosting program for the condensate water treatment system after the current defrost is completed according to the preset defrosting conditions corresponding to the target temperature range.

[0019] In a third aspect, an embodiment of the present invention provides an air-conditioning device, which includes a refrigerant circulation system, a condensate treatment system and a controller. The controller includes a memory, a processor and a computer program stored in the memory and executable on the processor. The processor executes the program to implement the method described in any embodiment of the first aspect.

[0020] One or more technical solutions provided by the embodiments of the present invention achieve at least the following technical effects or advantages:

[0021] In response to the current defrosting of the refrigerant circulation system, the condensate treatment system is turned on to treat the condensate accumulated during the current defrosting process, and the current outdoor temperature and the current interval time are obtained, the current interval time being the interval time between the current defrosting and the last execution of the condensate defrosting program; if the current outdoor temperature is within the preset temperature range, and the current interval time is greater than the preset time threshold, the target temperature interval in which the current outdoor temperature is located is determined; according to the preset defrosting conditions corresponding to the target temperature interval, it is determined whether to execute the condensate defrosting program of the condensate treatment system after the current defrosting is completed. The above technical solution determines whether to defrost the condensate treatment system by combining the outdoor temperature and the defrosting process, and does not require additional sensors to be set for the condensate treatment system. Therefore, it realizes accurate judgment on whether to defrost the condensate without increasing hardware, and can solve the technical problem that the collected condensate is frozen and cannot be discharged and reused, thereby improving the operating reliability of the condensate treatment system without increasing equipment costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0023] Figure 1 The first structure of the air conditioning device in the embodiment of the present invention is shown;

[0024] Figure 2 A condensate treatment method for air conditioning equipment in an embodiment of the present invention is shown;

[0025] Figure 3 The ice melting judgment process in the embodiment of the present invention is shown;

[0026] Figure 4 The bypass heating pipeline of the condensate treatment system in the embodiment of the present invention is shown;

[0027] Figure 5 The second structure of the air conditioning device in the embodiment of the present invention is shown;

[0028] Figure 6 The structure of the condensate treatment device of the air conditioner in the embodiment of the present invention is shown;

[0029] Figure 7 The structure of the controller in the embodiment of the present invention is shown. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] In addition, in the present invention, descriptions such as "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0032] refer to Figure 1As shown, an embodiment of the present invention provides an air conditioning device, which can be an integrated window air conditioner, or an air conditioner with an indoor unit and an outdoor unit, and the air conditioning device at least includes a refrigerant circulation system and a condensed water treatment system. The condensed water treatment system is used to collect and treat the condensed water generated during the operation of the refrigerant circulation system, wherein the refrigerant circulation system includes an outdoor heat exchanger 10 for being arranged outdoors, an indoor heat exchanger 20 for being arranged indoors, and a compressor (not shown), and the condensed water treatment system at least includes an outer water collection tank 310 for collecting the condensed water generated by the outdoor heat exchanger 10, an inner water collection tank 320 for collecting the condensed water generated by the indoor heat exchanger 20, a first drainage device 330 and a second drainage device 340, the first drainage device 330 is used to transport the condensed water accumulated in the outer water collection tank 310 to the inner water collection tank 320, and the second drainage device 340 is used to atomize or gasify the condensed water accumulated in the inner water collection tank 320 and then discharge it to the outdoor environment. It is understandable that the air conditioning device may further include an external fan 40 provided corresponding to the external heat exchanger 10, an internal fan 50 provided corresponding to the internal heat exchanger 20, and so on, which are not listed one by one here.

[0033] The embodiment of the present invention provides a condensate treatment method for air conditioning equipment, which can be applied to Figure 1 The air conditioning equipment shown. Combined with reference Figure 1 and Figure 2 As shown, the condensate treatment method of the air conditioning equipment includes the following steps:

[0034] S101. In response to the current defrost of the refrigerant circulation system, the condensate treatment system is turned on to treat the condensate accumulated in the current defrost process, and the current outdoor temperature and the current interval time are obtained. The current interval time is the interval time between the current defrost and the last execution of the condensate defrosting program.

[0035] In step S101, it can be: in the heating mode of the air-conditioning device, the current outdoor temperature is continuously monitored; if the current outdoor temperature is within the preset temperature range, in response to the start signal indicating the start of the current defrosting of the refrigerant circulation system, the current interval time is obtained, and it is determined whether the current interval time is greater than the preset time threshold. It can also be: in response to the start signal indicating the start of the current defrosting of the refrigerant circulation system, the current outdoor temperature and the current interval time are triggered.

[0036] The preset temperature range is the temperature range in which the condensed water collected by the condensed water treatment system has the risk of freezing. The preset temperature range is set based on the first boundary temperature value used to distinguish the freezing of the condensed water. Therefore, the first boundary temperature value can be 0°C or set to a value 1°C to 2°C higher than 0°C. For example, the first boundary temperature value can be 2°C, then the preset temperature range is (-

[0037] ∞℃, 2℃].

[0038] It should be noted that in response to the current defrosting of the refrigerant circulation system, the condensate treatment system is started to treat the condensate accumulated during the current defrosting process, including: during the current defrosting process, the condensate flowing into the outer water collection tank 310 from the outdoor heat exchanger 10 will be transferred to the inner water collection tank 320 through the first drainage device 330, and then the condensate transferred to the inner water collection tank 320 will be gasified or atomized and then discharged to the outdoor environment through the second drainage device 340. If the condensate remaining in the second drainage device 340 is in a frozen state, it will result in the inability to normally discharge the condensate transferred to the inner water collection tank 320 during the current defrosting process to the outdoor environment.

[0039] refer to Figure 1 As shown, the first drainage device 330 may include a drainage pipeline 330a and a first pump 330b disposed in the outer water collection tank 310, one end of the drainage pipeline 330a is disposed in the inner water collection tank 320, and the other end of the drainage pipeline 330a is connected to the first pump 330b. The first drainage device 330 is made to drain water from the outer water collection tank 310 to the inner water collection tank 320 by controlling the start and stop of the first pump 330b. The second drainage device 340 may include a spray head 340a, a spray pipeline 340b and a second pump 340c connected in sequence, the second pump 340c is disposed in the inner water collection tank 320, part of the spray pipeline 340c and the spray head 340a are located outdoors, and the condensed water in the outdoor part is easily frozen. By controlling the start and stop of the second pump 340c, the second drainage device 340 atomizes or gasifies the condensed water in the inner water collection tank 320 and discharges it to the outdoor environment.

[0040] S102: If the current outdoor temperature is within a preset temperature range and the current interval time is greater than a preset time threshold, determine a target temperature interval in which the current outdoor temperature is located.

[0041] It should be understood that in order to avoid frequently executing the condensate defrosting procedure on the condensate treatment system, even if the current outdoor temperature is within the preset temperature range, the current interval time must be greater than the preset time threshold to trigger the determination of the target temperature range in which the current outdoor temperature is located. If the interval time between the current defrosting and the last execution of the condensate defrosting procedure is not greater than the preset time threshold, it indicates that the interval time from the current moment to the last defrosting is short, and the condensate defrosting procedure does not need to be executed on the condensate treatment system at present, and the determination of the target temperature range in which the current outdoor temperature is located will not be triggered.

[0042] It can be understood that, from the pre-divided M temperature intervals, a temperature interval where the current outdoor temperature is located is matched as the target temperature interval, and M is an integer greater than 1. It should be noted that the M temperature intervals are formed by dividing the preset temperature range based on M-1 boundary temperature values, and the preset defrosting conditions configured one-to-one with the M temperature intervals are different from each other.

[0043] Specifically, taking the first boundary temperature value TA as an example, the preset temperature range (-∞, TA] can be divided into a first temperature interval, a second temperature interval and a third temperature interval that satisfy the gradually decreasing temperature value based on the second boundary temperature value TB and the second boundary temperature value TC. Please refer to the following Table 1:

[0044] Table 1.

[0045] The first temperature range (TB,TA] The second temperature range (TC, TB] The third temperature range (-∞, TC]

[0046] It should be noted that the first boundary temperature value TA, the second boundary temperature value TB, and the third boundary temperature value satisfy the decreasing order. The second boundary temperature value TB can be set to -10°C or other similar values, and the third boundary temperature value TC can be set to -20°C or other similar values.

[0047] It can be understood that the preset defrosting condition corresponding to the first temperature range is satisfied at the same time: the current defrosting of the refrigerant circulation system is completed, and the water level alarm occurs in the inner water collection tank 320 when the current defrosting is completed. Among them, the water level alarm occurs in the inner water collection tank 320, indicating that the condensed water in the second drainage device 340 is in a frozen state, resulting in the condensed water flowing into the outer water collection tank 310 during the defrosting process being transported to the inner water collection tank 320 through the first drainage device 330, but cannot be discharged from the indoor unit through the second drainage device 340. It is necessary to perform a condensed water defrosting procedure on the condensed water treatment system to defrost the condensed water in the second drainage device 340 in a frozen state.

[0048] It is understandable that the preset defrosting condition corresponding to the second temperature interval is that the current defrosting of the refrigerant circulation system is completed. The preset defrosting condition corresponding to the third temperature interval can be satisfied at the same time: the current defrosting of the refrigerant circulation system is completed, and the condensate defrosting program of the condensate treatment system has not been executed after N consecutive historical defrosts have been completed. It should be noted that, more precisely, the outdoor temperature during N consecutive historical defrosts is in the third temperature interval, but the condensate defrosting program of the condensate treatment system has not been executed after these N consecutive historical defrosts have been completed, wherein these N consecutive historical defrosts are the most recent N historical defrosts before the current defrost.

[0049] S103: According to the preset defrosting conditions corresponding to the target temperature range, it is determined whether to execute the condensed water defrosting procedure of the condensed water treatment system after the current defrosting is completed.

[0050] It can be understood that, based on the preset defrosting conditions corresponding to the target temperature range, whether to execute the condensed water defrosting program of the condensed water treatment system after the current defrost is completed can be determined, which can be divided into the following three situations: if the current outdoor temperature is within the first temperature range, and if the water level alarm occurs in the internal sump 320 when the current defrost is triggered, the condensed water defrosting program of the condensed water treatment system is executed in response to the end signal representing the end of the current defrost; if the current outdoor temperature is within the second temperature range, the condensed water defrosting program of the condensed water treatment system is executed in response to the end signal representing the end of the current defrost; if the current outdoor temperature is within the third temperature range, the condensed water defrosting program of the condensed water treatment system has not been executed after the end of N consecutive historical defrosts before the current defrost, and the condensed water defrosting program of the condensed water treatment system is executed in response to the end signal representing the end of the current defrost, and M is an integer greater than 1.

[0051] It should be understood that the preset temperature range can also be divided into two temperature intervals. For example, based on a boundary temperature value of -20°C, the preset temperature range (-∞~2°C] is divided into two temperature intervals (-20~2°C] and (-∞~-20]. The preset defrosting condition corresponding to one temperature interval (-20~2°C] is that the current defrosting is over; the preset defrosting condition corresponding to the other temperature interval (-∞~-20] needs to be satisfied at the same time: when the current defrosting is over, and after the N consecutive historical defrostings before the current defrosting have been completed, the condensed water defrosting program of the condensed water treatment system has not been executed.

[0052] In order to understand the above technical solution, refer to Figure 3 The judgment process of whether to defrost condensed water in the embodiment of the present invention is described, but it is not intended to limit the embodiment of the present invention:

[0053] Execute step A1: during the heating operation of the air-conditioning device, monitor the current outdoor temperature where the air-conditioning device is located;

[0054] Step A2: Determine whether the current outdoor temperature is not greater than the first boundary temperature value TA; if so, execute step A3; if not, return to step A1;

[0055] Step A3: whether a start signal indicating the start of the current defrosting is obtained, if so, execute step A4, otherwise, return to step A1;

[0056] Step A4: Execute the current defrost action and start the condensate treatment system in conjunction with the current defrost action;

[0057] Step A5: Determine whether the interval between the current defrosting and the last condensed water defrosting process is greater than a preset time threshold (e.g., 30 minutes). If so, execute step A6; if not, jump to step A11;

[0058] Step A6: Determine whether the current outdoor temperature is within the first temperature range (-10°C to 2°C). If so, jump to step A7; if not, jump to step A8.

[0059] Step A7: Determine whether the current defrosting triggers a water level alarm in the inner water collection tank 320; if so, jump to step A10; if not, jump to step A11;

[0060] Step A8: Determine whether the current outdoor temperature is within the second temperature range (-20°C to -10°C); if so, jump to step A10; if not, it indicates that the current outdoor temperature is within the third temperature range (-∞ to -20°C), jump to step A9;

[0061] Step A9: when the current defrost ends, determine whether the outdoor temperature during N consecutive historical defrosts (for example, 3 times) is in the third temperature range (-∞~-20°C], and whether the condensed water defrosting program of the condensed water treatment system is not executed after the N consecutive historical defrosts end; if so, jump to step A10; if not, jump to step A11;

[0062] Step A10: In response to the end signal of the current defrosting, a condensed water defrosting procedure of the condensed water treatment system is executed.

[0063] Step A11: After the current defrosting is completed, the condensed water defrosting procedure of the condensed water treatment system is not executed.

[0064] refer to Figure 4 As shown, the condensate treatment system in the embodiment of the present invention further includes a bypass heating pipeline 380 disposed in the external water collection tank 310, and the bypass heating pipeline 380 is connected to the external heat exchanger 10 of the refrigerant circulation system. On this basis, the condensate defrosting procedure of the condensate treatment system is executed, including the following steps 1 to 3:

[0065] Step 1: Increase the heat released from the bypass heating pipeline 380 to the outer water collection tank 310 by adjusting the operating parameters of the refrigerant circulation system, wherein the operating parameter adjustment includes executing one or more of the following operating parameter adjustments of the refrigerant circulation system: lowering the speed of the inner fan 50 of the refrigerant circulation system, lowering the speed of the outer fan 40 of the refrigerant circulation system, and increasing the operating frequency of the compressor of the refrigerant circulation system. Among them, lowering the speed of the inner fan 50 is specifically lowering it to a relatively low or lowest first preset speed; lowering the speed of the outer fan 40 is specifically lowering it to a relatively low or lowest second preset speed, and increasing the operating frequency of the compressor is specifically increasing the operating frequency of the compressor to a relatively high or highest operating frequency.

[0066] Step 2: Open the first drainage device 330 to allow the first drainage device 330 to drain water from the outer water collection tank 310 to the inner water collection tank 320 .

[0067] Step 3: When the first drainage device 330 drains water from the outer water collection tank 310 to the inner water collection tank 320, if the inner water collection tank 320 generates a water level alarm, the second drainage device 340 is turned on to atomize or vaporize the condensed water in the inner water collection tank 320 and then discharge it to the outdoor environment until the condensed water de-icing program is exited. In the specific implementation process, the condensed water de-icing program can be exited when the second drainage device 340 is turned on for a certain fixed time. Alternatively, the condensed water de-icing program can be exited when the first water level switch 350 set in the inner water collection tank 320 detects that the water level is lower than the preset water level lower limit.

[0068] It should be understood that the actions required to exit the condensed water defrosting program include: restoring the rotation speed of the inner fan 50, the rotation speed of the outer fan 40 and the operating frequency of the compressor of the refrigerant circulation system.

[0069] In an embodiment of the present invention, if the air-conditioning device is not in the defrosting operation process but in other states, the condensed water treatment system may process the accumulated condensed water using one or more of the following corresponding condensed water treatment methods according to whether the air-conditioning device is in the heating operation process or the cooling operation process:

[0070] Condensate treatment method 1: Use condensed water to humidify the indoor environment:

[0071] refer to Figure 5As shown, the condensate treatment system may further include a spray device 360, which is used to spray the condensate in the inner water collection tank 320 toward the indoor heat exchanger 20 of the refrigerant circulation system. Based on this, in the condensate treatment method provided by the embodiment of the present invention, the air conditioning equipment is equipped with a humidification function. When the humidification function is turned on, humidifying the indoor environment with condensate includes: if the preset humidification condition is met at the current moment, turning on the spray device 360 ​​so that the spray device 360 ​​sprays the condensate in the inner water collection tank 320 toward the indoor heat exchanger 20; wherein the preset humidification condition at least includes that the current indoor humidity is less than the set humidity.

[0072] It is understandable that the current indoor humidity is monitored, and it is determined whether the current indoor humidity is less than the set humidity; if the current indoor environment humidity is less than the set humidity, it indicates that the preset humidification condition is met at the current moment, and the spray device 360 ​​is turned on, so that the spray device 360 ​​performs water extraction from the inner water collection tank 320 and sprays to the indoor heat exchanger 20 to humidify the indoor environment. Further, when the indoor humidity reaches the target humidity (the target humidity is greater than the set temperature), the spray device 360 ​​can be controlled to stop. Thus, the collected condensed water is used to increase the humidity of the indoor environment.

[0073] It should be understood that the condensate treatment method 1 should be operated in the heating mode of the air-conditioning equipment, that is, it is necessary to monitor whether the preset humidification conditions are met at the current moment during the heating operation of the refrigerant circulation system.

[0074] In order to reduce the power consumption of the condensate water treatment process, the so-called preset humidification conditions are: in addition to satisfying that the current indoor humidity is less than the set humidity, it is also necessary to simultaneously satisfy that the second drainage device 340 and the first drainage device 330 are in a shutdown state, so that only one device's motor (the second drainage device 340, the spray device 360, and the motor of one of the first drainage device 330) is always running in the condensate water treatment system, thereby reducing the power consumption of the condensate water treatment process, and further reducing the impact of the condensate water treatment process on the normal heating operation of the air conditioner.

[0075] In order to improve the indoor humidification effect, the indoor fan 50 can be controlled to maintain a relatively high target speed in conjunction with the operation of the spray device 360. If the indoor fan 50 is in a stopped state before the spray device 360 ​​is turned on, the speed of the indoor fan 50 is adjusted to a relatively high target speed after the indoor fan 50 is turned on. The specific speed value is not limited. Figure 3 As shown, the operation of the indoor fan 50 causes air to flow from the air inlet through the indoor heat exchanger 20, taking away the moisture sprayed on the surface of the indoor heat exchanger 20, thereby humidifying the indoor air.

[0076] refer to Figure 3As shown, the spray device 360 ​​may include a third water pump 360 a and a humidification pipeline 360 ​​b which are connected in sequence. The third water pump 360 a is disposed in the inner water collection tank 320 , and the humidification pipeline 360 ​​b is used for spraying toward the indoor heat exchanger 20 .

[0077] Condensate treatment method 2: Condensate treatment in cooling mode:

[0078] It is understandable that if the air conditioner is in the cooling mode, condensed water is generated on the indoor side, and condensed water will not accumulate in the outer water collection tank 310. Therefore, in the cooling mode of the air conditioner, only the water level of the inner water collection tank 320 can be monitored. Based on this, in the condensed water treatment method provided in the embodiment of the present invention, the condensed water treatment in the cooling mode includes: monitoring the water level of the inner water collection tank 320 during the cooling operation of the refrigerant circulation system; if the water level alarm of the inner water collection tank 320 is detected, the second drainage device 340 is controlled to start and stop according to the preset first drainage time, so that the second drainage device 340 atomizes or vaporizes the condensed water in the inner water collection tank 320 within the first drainage time and then discharges it to the outdoor environment, thereby completing the drainage of the inner water collection tank 320 once through the second drainage device 340. Through the above control logic, once the condensed water accumulated in the inner water collection tank 320 reaches a certain amount, the condensed water in the inner water collection tank 320 will be consumed by the second drainage device 340, realizing the cyclic consumption of the condensed water in the inner water collection tank 320.

[0079] It should be noted that the second drainage device 340 can be controlled to work K times at a preset interval within the first drainage time, and the K value is preset (for example, K=20). For example, if the preset interval is 10 seconds, the second drainage device 340 pauses for 10 seconds after working for 50 seconds each time, and then works for 50 seconds again, until the second drainage device 340 works K times within the first drainage time, and the second drainage device 340 is controlled to stop. The second drainage device 340 can also work continuously after being started, and the second drainage device 340 is controlled to stop when the continuous working time reaches the first drainage time.

[0080] In order to improve the reliability of condensed water treatment in the cooling mode, the second drainage device 340 monitors the water level of the inner water collection tank 320 during the first drainage time period when the condensed water in the inner water collection tank 320 is atomized or vaporized and then discharged to the outdoor environment; if it is monitored that the inner water collection tank 320 is in a state of continuous or intermittent water level alarm, it indicates that the second drainage device 340 has a fault, and the second drainage device 340 is controlled to shut down and output the first fault information, and the remaining time of the first drainage time period will not be continued, and the next drainage cycle of the inner water collection tank 320 will not be entered until the fault of the second drainage device 340 is eliminated. Among them, the first fault information is used to prompt that the second drainage device 340 has a fault. In order to avoid the overflow of condensed water in the inner water collection tank 320, if the second drainage device 340 fails, it is also necessary to prohibit the operation of the first drainage device 330.

[0081] In order to facilitate understanding of the condensed water treatment process in the cooling mode, the following is an example of describing the process of treating the condensed water in the inner water collection tank 320 during the cooling operation:

[0082] Step B1: In response to the cooling start signal of the refrigerant circulation system, trigger the start of monitoring the water level of the inner water collecting tank 320. When the water level alarm of the inner water collecting tank 320 is detected, the second drainage device 340 is turned on and the process proceeds to step B2;

[0083] Step B2: monitoring whether the operation time of the second drainage device 340 after being turned on reaches the first drainage time, and if it does not reach the first drainage time, triggering step B3;

[0084] Step B3: triggering the second drainage device 340 to work once (50 seconds), atomizing or vaporizing the condensed water in the inner water collection tank 320 and then discharging it to the outdoor environment;

[0085] Step B4: Determine whether the working times of the second drainage device 340 after being turned on reaches the preset times threshold (20 times), and determine whether the inner water collection tank 320 is in a state of continuous or intermittent water level alarm within the first preset time (less than the first drainage time, such as 2 minutes or 3 minutes) after the second drainage device 340 is turned on. If the inner water collection tank 320 is in a state of continuous or intermittent water level alarm within the first preset time, it is determined that the second drainage device 340 is faulty, and jump to step B5; if the working times of the second drainage device 340 after being turned on does not reach 20 times, jump to step B6; if the working times of the second drainage device 340 after the current start-up reaches 20 times, jump to step B7:

[0086] Step B5: outputting first fault information indicating that the second drainage device 340 has a fault;

[0087] Step B6: Determine whether the duration of the current operation of the second drainage device 340 reaches 50 seconds. If it reaches 50 seconds, control the second drainage device 340 to pause for 10 seconds and then return to step B2;

[0088] Step B7: Determine whether the duration of the current operation of the second drainage device 340 reaches 50 seconds. If so, end the process and jump to step B8.

[0089] Step B8: Control the second drainage device 340 to stop.

[0090] Condensate treatment method 3: Condensate treatment in heating mode:

[0091] It is understandable that in the cooling mode of the air conditioner, condensed water is generated on the indoor side, and no condensed water is accumulated in the outer sump 310, and only the water level of the inner sump 320 needs to be monitored. In the heating mode of the air conditioner, condensed water is generated on the outdoor side. Therefore, during the heating operation of the refrigerant circulation system, it is necessary to monitor the water levels of the outer water collection tank 310 and the inner water collection tank 320 at the same time; if a water level alarm is detected in the inner water collection tank 320, the second drainage device 340 is controlled to start and stop according to the preset first drainage time, so that the second drainage device 340 can atomize or vaporize the condensed water in the inner water collection tank 320 within the first drainage time and then discharge it to the outdoor environment, thereby completing the drainage of the inner water collection tank 320 through the second drainage device 340; if a water level alarm is detected in the outer water collection tank 310, the first drainage device 330 is controlled to start and stop according to the preset first drainage time, so that the first drainage device 330 can perform the action of draining water from the outer water collection tank 310 to the inner water collection tank 320 within the second drainage time, thereby completing the drainage of the outer water collection tank 310 through the first drainage device 330.

[0092] In order to improve the reliability of condensed water treatment in the heating mode, the water level of the outer water collection tank 310 is monitored during the second drainage time. If it is monitored that the outer water collection tank 310 is in a state of continuous or intermittent water level alarm, it indicates that the first drainage device 330 has a fault, and the first drainage device 330 is controlled to stop and output the second fault information. The remaining time of the second drainage time will not be continued, and the next drainage cycle of the outer water collection tank 310 will not be entered until the fault of the first drainage device 330 is eliminated. The second fault information is used to prompt that the first drainage device 330 has a fault.

[0093] In order to facilitate the understanding of the condensate treatment process during the heating operation, the following example describes the condensate treatment process of the refrigerant circulation system during the heating operation:

[0094] Step B1: In response to the heating start signal of the refrigerant circulation system, trigger the start of monitoring the water level of the inner water collection tank 320 and the water level of the outer water collection tank 310; when the water level alarm of the inner water collection tank 320 is detected, the second drainage device 340 is turned on and then steps B2 to B8 are executed, which will not be repeated here for the sake of brevity of the specification; when the water level alarm of the outer water collection tank 320 is detected, the first drainage device 330 is turned on and then step B9 is executed;

[0095] Step B9: monitoring whether the operation time of the first drainage device 330 after being turned on reaches the second drainage time, if it does not reach the second drainage time, triggering step B10;

[0096] Step B10: triggering the first drainage device 330 to work once (60 seconds) to drain water into the inner water collection tank 320;

[0097] Step B11: Determine whether the working times of the first drainage device 330 after startup reaches the preset times threshold (30 times), and determine whether the outer water collection tank 310 is in a state of continuous or intermittent water level alarm within the second preset time (less than the second drainage time, such as 2 minutes or 3 minutes) after the first drainage device 330 is turned on. If the outer water collection tank 310 is in a state of continuous or intermittent water level alarm within the second preset time, it is determined that the first drainage device 330 is faulty, and jump to step B12; if the working times of the first drainage device 330 after startup does not reach 30 times, jump to step B13; if the working times of the first drainage device 330 after the current startup reaches 30 times, jump to step B14:

[0098] Step B12: outputting first fault information indicating that the first drainage device 330 has a fault;

[0099] Step B13: determining whether the duration of the current operation of the first drainage device 330 reaches 60 seconds. If so, controlling the first drainage device 330 to pause for 10 seconds and then returning to step B9;

[0100] Step B14: Determine whether the duration of the current operation of the first drainage device 330 reaches 60 seconds. If it reaches 60 seconds, jump to step B15;

[0101] Step B15: Control the first drainage device 330 to stop.

[0102] It is understandable that in the heating mode, if the refrigerant circulation system is in the defrosting process, due to the low outdoor temperature, the second water level switch 370 in the external water collection tank 310 is in danger of being frozen and failing; the second water level switch 370 being frozen may cause two failure situations: 1. There is a large amount of water in the defrosting process, but because the second water level switch 370 is frozen, the water has overflowed but the low water level state is detected, resulting in the condensed water in the external water collection tank 310 not being drained in time; 2. The first drainage device 330 has been started, so that the water level has dropped to the normal water level, but the second water level switch 370 is frozen and fails, causing the first drainage device 330 to be ineffective in drainage. To this end, the technical solution provided by the embodiment of the present invention may also include the following steps: when the refrigerant circulation system is in the defrosting operation process, the first drainage device 330 and the second drainage device 340 are controlled to operate alternately; wherein, the process of controlling the first drainage device 330 and the second drainage device 340 to operate alternately is: when the current operation of the first drainage device 330 causes a water level alarm in the inner water collection tank 320, the first drainage device 330 is triggered to stop and the second drainage device 340 is turned on, and when the current operation time of the second drainage device 340 reaches the preset third drainage time, the first drainage device 330 is triggered to be turned on again. It should be noted that the first drainage device 330 and the second drainage device 340 are operated alternately, and the first drainage device 330 is the first to start the operation.

[0103] In a specific implementation, the first drainage device 330 and the second drainage device 340 may be triggered to end the alternating operation in response to a defrosting end signal of the refrigerant circulation system. Specifically, the first drainage device 330 and the second drainage device 340 may be triggered to end the alternating operation after receiving a first preset delay time of the defrosting end signal.

[0104] It is understandable that the first drainage device 330 and the second drainage device 340 can be triggered to start alternating operation in response to the defrost start signal of the refrigerant circulation system. It is also possible to determine whether the current outdoor temperature is lower than the preset temperature threshold when receiving the defrost start signal of the refrigerant circulation system. If the current outdoor temperature is lower than the preset temperature threshold, the first drainage device 330 and the second drainage device 340 are triggered to start alternating operation. It should be noted that the preset temperature threshold can be 0°C or a temperature value close to it, or 1°C to 2°C higher than 0°C.

[0105] In response to the defrost start signal of the refrigerant circulation system, the coil temperature difference of the outdoor heat exchanger 10 at a preset time interval is obtained; if the coil temperature difference is greater than the preset temperature difference threshold, the first drainage device 330 and the second drainage device 340 are triggered to start alternating operation. Specifically, in response to the defrost start signal of the refrigerant circulation system, the coil temperature of the outdoor heat exchanger 10 is detected at intervals of time t1, and the difference ΔT of the two coil temperature changes is recorded. When the coil temperature rises, ΔT increases as a positive value (appears during the defrost process); when the coil temperature T decreases, ΔT increases as a negative value (a process before receiving the defrost start signal); when ΔT is greater than a certain temperature difference threshold A (A is a positive value), it means that the defrost function has melted liquid water, and water begins to accumulate in the external water collection tank 310. When ΔT is greater than the preset temperature difference threshold B (B is a positive value, and B>A), the first drainage device 330 and the second drainage device 340 are triggered to start alternating operation, so as to discharge the defrosted condensed water more punctually.

[0106] It is understandable that the first drainage device 330 and the second drainage device 340 may also be triggered to start alternating operation when the second preset delay time is reached after the defrost start signal of the refrigerant circulation system is received.

[0107] Based on the same inventive concept, the embodiment of the present invention provides a condensate treatment device for air conditioning equipment, referring to Figure 1 and Figure 4 As shown, the air conditioning equipment includes a refrigerant circulation system and a condensate treatment system. Figure 6 As shown, the condensate treatment device includes: a defrost response unit 601, which is used to respond to the current defrost of the refrigerant circulation system, start the condensate treatment system to treat the condensate accumulated in the current defrost process, and obtain the current outdoor temperature and the current interval time, the current interval time is the interval time between the current defrost and the last execution of the condensate defrosting program; a temperature determination unit 602, which is used to determine the target temperature range where the current outdoor temperature is located if the current outdoor temperature is within the preset temperature range and the current interval time is greater than the preset time threshold; a defrosting judgment unit 603, which is used to judge whether to execute the condensate defrosting program of the condensate treatment system after the current defrost is completed according to the preset defrosting conditions corresponding to the target temperature range.

[0108] It can be understood that the temperature determination unit 602 is specifically used to: match a temperature interval in which the current outdoor temperature is located from the pre-divided M temperature intervals as the target temperature interval, and M is an integer greater than 1; wherein the M temperature intervals are formed by dividing the preset temperature range based on M-1 boundary temperature values, and the preset defrosting conditions corresponding to the M temperature intervals are different from each other.

[0109] It can be understood that the condensed water treatment system includes an external water collection tank 310 corresponding to the external heat exchanger 10 of the refrigerant circulation system, an internal water collection tank 320 corresponding to the internal heat exchanger 20 of the refrigerant circulation system, a first drainage device 330 for draining water from the external water collection tank 310 to the internal water collection tank 320, and a second drainage device for gasifying or atomizing the condensed water in the internal water collection tank 320 and discharging it to the outdoor environment; the preset defrosting condition corresponding to the first temperature range is that the current defrosting is completed, and the current defrosting triggers a water level alarm in the internal water collection tank 320, and the current defrosting triggers a water level alarm in the internal water collection tank 320. The occurrence of a water level alarm in the inner water collection tank 320 indicates that the condensed water discharged into the inner water collection tank 320 through the first drainage device 330 cannot be discharged to the outdoor environment through the second drainage device 340; the preset defrosting condition corresponding to the second temperature interval is the end of the current defrost; the preset defrosting condition corresponding to the third temperature interval is the end of the current defrost, and the condensed water defrosting procedure of the condensed water treatment system has not been executed after the end of N consecutive historical defrosts before the current defrost, N is an integer greater than 1, and the first temperature interval, the second temperature interval and the third temperature interval satisfy that the temperature values ​​gradually decrease.

[0110] It can be understood that the condensate treatment device also includes a defrosting execution unit, which is used to: if the current outdoor temperature is within the first temperature range, and when the current defrost triggers a water level alarm in the internal water collection tank 320, in response to an end signal indicating the end of the current defrost, execute the condensate defrosting program for the condensate treatment system; if the current outdoor temperature is within the second temperature range, in response to an end signal indicating the end of the current defrost, execute the condensate defrosting program for the condensate treatment system; if the current outdoor temperature is within the third temperature range, and the condensate defrosting program for the condensate treatment system has not been executed after the end of N consecutive historical defrosts before the current defrost, in response to an end signal indicating the end of the current defrost, execute the condensate defrosting program for the condensate treatment system.

[0111] It can be understood that the condensate treatment system also includes a bypass heating pipe 380 arranged in the outer water collection tank 310 and connected to the outdoor heat exchanger 10, and the defrosting execution unit includes: a parameter adjustment subunit, which is used to increase the heat released from the bypass heating pipe 380 to the outer water collection tank 310 by adjusting the operating parameters of the refrigerant circulation system; a first opening control subunit, which is used to open the first drainage device 330 to pump water from the outer water collection tank 310 to the inner water collection tank 320; a second opening control subunit is used to open the second drainage device 340 during the process of draining water from the outer water collection tank 310 to the inner water collection tank 320 by the first drainage device 330, if a water level alarm is detected in the inner water collection tank 320, and the condensate in the inner water collection tank 320 is atomized or vaporized and then discharged to the outdoor environment until the condensate defrosting program is exited.

[0112] It can be understood that the condensate treatment system includes an internal water collection tank 320 arranged corresponding to the indoor heat exchanger 20 of the refrigerant circulation system, and a spraying device for spraying the condensate in the internal water collection tank 320 toward the indoor heat exchanger 20. The condensate treatment device also includes: a humidification control unit, which is used to turn on the spraying device if the preset humidification conditions are met at the current moment, so that the spraying device sprays the condensate in the internal water collection tank 320 toward the indoor heat exchanger 20; wherein the preset humidification conditions at least include that the current indoor humidity is less than the set humidity.

[0113] It can be understood that the condensate treatment system includes an external water collection tank 310 corresponding to the external heat exchanger 10 of the refrigerant circulation system, an internal water collection tank 320 corresponding to the internal heat exchanger 20 of the refrigerant circulation system, a first drainage device 330 for draining water from the external water collection tank 310 to the internal water collection tank 320, and a second drainage device 340 for vaporizing or atomizing the condensate in the internal water collection tank 320 and discharging it to the outdoor environment. The condensate treatment device also includes: a first water level monitoring unit, which is used to monitor the water level of the internal water collection tank 320 during the heating or cooling operation of the refrigerant circulation system; an internal drainage unit, which is used to control the start and stop of the second drainage device 340 according to a preset first drainage time if the first water level monitoring unit detects that a water level alarm occurs in the internal water collection tank 320, so that the second drainage device 340 can atomize or vaporize the condensate in the internal water collection tank 320 and discharge it to the outdoor environment during the first drainage time.

[0114] It can be understood that the condensate water treatment device also includes: a first fault monitoring unit, which is used to monitor the water level of the inner water collection tank 320 during the first drainage time; if the inner water collection tank 320 is monitored to be in a state of continuous or intermittent water level alarm during the first drainage time, the second drainage device 340 is controlled to shut down and the first fault information is output, and the first fault information is used to prompt that the second drainage device 340 has a fault; a prohibition control unit, which is used to prohibit the operation of the first drainage device 330.

[0115] It is understandable that the condensate treatment device also includes: a second water level monitoring unit, which is used to monitor the water level of the external water collection tank 310 during the heating operation of the refrigerant circulation system; an external drainage unit, which is used to control the start and stop of the first drainage device 330 according to the preset second drainage time if the second water level monitoring unit detects that a water level alarm occurs in the external water collection tank 310, so that the first drainage device 330 can perform the action of draining water from the external water collection tank 310 to the internal water collection tank 320 within the second drainage time.

[0116] It is understandable that the condensate water treatment device also includes: a second fault monitoring unit, which is used to monitor the water level of the external water collection tank 310 during the second drainage time period; if the external water collection tank 310 is monitored to be in a state of continuous or intermittent water level alarm during the second drainage time period, the first drainage device 330 is controlled to shut down and output a second fault information, and the second fault information is used to prompt that the first drainage device 330 has a fault.

[0117] It can be understood that the condensate treatment device also includes a trigger detection unit, which is used to: respond to the start signal characterizing the start of the current defrost, obtain the coil temperature difference of the outdoor heat exchanger of the refrigerant circulation system at a preset interval time; if the coil temperature difference is greater than the preset temperature difference threshold, trigger the condensate treatment system to process the condensate accumulated in the current defrost process.

[0118] It can be understood that the condensate treatment system includes an external water collection tank 310 corresponding to the external heat exchanger of the refrigerant circulation system, an internal water collection tank 320 corresponding to the internal heat exchanger 20 of the refrigerant circulation system, a first drainage device 330 for draining water from the external water collection tank 310 to the internal water collection tank 320, and a second drainage device 340 for gasifying or atomizing the condensate in the internal water collection tank 320 and discharging it to the outdoor environment. The condensate treatment device also includes a defrost drainage control unit, which is used to: control the first drainage device 330 and the second drainage device 340 to operate alternately during the current defrosting process of the refrigerant circulation system; wherein, when the current operation of the first drainage device 330 causes a water level alarm in the internal water collection tank 320, the first drainage device 330 is triggered to shut down and the second drainage device 340 is turned on, and when the current operating time of the second drainage device 340 reaches the preset third drainage time, the first drainage device 330 is triggered to be reopened until the current defrosting is completed.

[0119] It can be understood that the condensate water treatment device also includes a parameter judgment unit, which is used to: continuously monitor the current outdoor temperature in the heating mode of the air-conditioning equipment; if the current outdoor temperature is within the preset temperature range, in response to the start signal characterizing the start of the current defrost, obtain the current interval time; and determine whether the current interval time is greater than the preset time threshold.

[0120] The specific functions of each functional unit in the condensate treatment device in the embodiment of the present invention have been described in detail in the embodiment of the condensate treatment method for air-conditioning equipment provided in the embodiment of the present invention, and will not be elaborated here.

[0121] Based on the same inventive concept, an embodiment of the present invention provides an air conditioning device, referring to Figure 1 , air conditioning equipment includes refrigerant circulation system, condensate water treatment system and controller. Figure 7As shown, the controller includes a memory 704, a processor 702, and a computer program stored in the memory 704 and executable on the processor 702. The processor 702 executes the program to implement the steps of any implementation method in the aforementioned condensate treatment method for air-conditioning equipment.

[0122] Among them, Figure 7 In the embodiment of the present invention, a bus architecture (represented by bus 700) is shown, which may include any number of interconnected buses and bridges, and bus 700 links various circuits including one or more processors represented by processor 702 and memory represented by memory 704. Bus 700 may also link various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. Bus interface 705 provides an interface between bus 700 and receiver 701 and transmitter 703. Receiver 701 and transmitter 703 may be the same element, namely a transceiver, providing a unit for communicating with various other devices over a transmission medium. Processor 702 is responsible for managing bus 700 and general processing, while memory 704 may be used to store data used by processor 702 when performing operations.

[0123] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that has the functions specified in one or more boxes.

[0124] These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing device to work in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0125] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0126] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.

[0127] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

[0128] The above description is only an embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent substitution, improvement, etc. made within the spirit and principle of the present invention shall be included in the scope of the claims of the present invention.

Claims

1. A method for treating condensed water of an air conditioning device, characterized in that: The air conditioning equipment includes a refrigerant circulation system and a condensed water treatment system, and the method includes: In response to the current defrosting of the refrigerant circulation system, the condensate treatment system is turned on to treat the condensate accumulated in the current defrosting process, and the current outdoor temperature and the current interval time are obtained, where the current interval time is the interval time between the current defrosting and the last execution of the condensate defrosting program; If the current outdoor temperature is within a preset temperature range and the current interval time is greater than a preset time threshold, determining a target temperature interval in which the current outdoor temperature is located; According to the preset defrosting conditions corresponding to the target temperature range, it is determined whether to execute the condensed water defrosting procedure of the condensed water treatment system after the current defrosting is completed.

2. The method according to claim 1, characterized in that The determining the target temperature interval in which the current outdoor temperature lies includes: Matching a temperature interval where the current outdoor temperature is located from the pre-divided M temperature intervals as the target temperature interval, where M is an integer greater than 1; The M temperature intervals are formed by dividing the preset temperature range based on M-1 boundary temperature values, and the preset defrosting conditions corresponding to the M temperature intervals are different from each other.

3. The method according to claim 2, characterized in that The condensed water treatment system comprises an external water collection tank corresponding to the external heat exchanger of the refrigerant circulation system, an internal water collection tank corresponding to the internal heat exchanger of the refrigerant circulation system, a first drainage device for draining water from the external water collection tank to the internal water collection tank, and a second drainage device for gasifying or atomizing the condensed water in the internal water collection tank and discharging it to the outdoor environment; The preset defrosting condition corresponding to the first temperature range is that the current defrosting is completed and the current defrosting triggers the water level alarm of the inner water collection tank. The current defrosting triggers the water level alarm of the inner water collection tank, which indicates that the condensed water discharged to the inner water collection tank through the first drainage device cannot be discharged to the outdoor environment through the second drainage device. The preset defrosting condition corresponding to the second temperature range is that the current defrosting is finished; The preset defrosting condition corresponding to the third temperature interval is that the current defrost is completed, and the condensed water defrosting program of the condensed water treatment system has not been executed after the completion of N consecutive historical defrosts before the current defrost, N is an integer greater than 1, and the first temperature interval, the second temperature interval and the third temperature interval satisfy the gradually decreasing temperature values.

4. The method according to claim 3, characterized in that The determining whether to execute a condensed water defrosting procedure of the condensed water treatment system after the current defrosting is completed according to the preset defrosting condition corresponding to the target temperature range includes: If the current outdoor temperature is within the first temperature range and the water level alarm of the water collecting tank is triggered by the current defrosting, in response to an end signal indicating the end of the current defrosting, a condensed water defrosting procedure of the condensed water treatment system is executed; If the current outdoor temperature is within the second temperature range, in response to an end signal indicating the end of the current defrosting, executing a condensed water defrosting procedure of the condensed water treatment system; If the current outdoor temperature is within the third temperature range, and the condensate defrosting program of the condensate treatment system has not been executed after the end of N consecutive historical defrosts before the current defrost, the condensate defrosting program of the condensate treatment system is executed in response to an end signal indicating the end of the current defrost.

5. The method according to claim 3, characterized in that The condensate treatment system further includes a bypass heating pipeline disposed in the external water collection tank and connected to the external heat exchanger. The condensate defrosting procedure of the condensate treatment system includes: By adjusting the operating parameters of the refrigerant circulation system, the heat released by the bypass heating pipeline into the external water collecting tank is increased; Opening the first drainage device to pump water from the outer water collection tank to the inner water collection tank; During the process of the first drainage device draining water from the outer water collection tank to the inner water collection tank, if a water level alarm is detected in the inner water collection tank, the second drainage device is turned on to atomize or vaporize the condensed water in the inner water collection tank and discharge it to the outdoor environment until the condensed water defrosting program is exited.

6. The method according to claim 1, characterized in that The condensate treatment system includes an inner water collection tank corresponding to the internal heat exchanger of the refrigerant circulation system, and a spraying device for spraying the condensate in the inner water collection tank to the internal heat exchanger, and the method further includes: If the preset humidification condition is met at the current moment, the spray device is turned on so that the spray device sprays the condensed water in the inner water collection tank to the indoor heat exchanger; The preset humidification condition at least includes that the current indoor humidity is less than the set humidity.

7. The method according to claim 1, characterized in that The condensed water treatment system includes an outer water collection tank corresponding to the external heat exchanger of the refrigerant circulation system, an inner water collection tank corresponding to the internal heat exchanger of the refrigerant circulation system, a first drainage device for draining water from the outer water collection tank to the inner water collection tank, and a second drainage device for gasifying or atomizing the condensed water in the inner water collection tank and discharging it to the outdoor environment. The method also includes: During the heating or cooling operation of the refrigerant circulation system, monitoring the water level of the inner water collection tank; If a water level alarm is detected in the inner water collection tank, the second drainage device is controlled to start and stop according to the preset first drainage time, so that the second drainage device can atomize or vaporize the condensed water in the inner water collection tank within the first drainage time and then discharge it to the outdoor environment.

8. The method according to claim 7, characterized in that The method further comprises: Monitoring the water level of the inner sump during the first drainage time period; If it is monitored that the inner water collection tank is continuously or intermittently in a water level alarm state during the first drainage time, the second drainage device is controlled to stop and a first fault message is output, wherein the first fault message is used to indicate that a fault occurs in the second drainage device; The first drainage device is prohibited from operating.

9. The method according to any one of claims 7 to 8, characterized in that: The method further comprises: During the heating operation of the refrigerant circulation system, monitoring the water level of the external water collection tank; If a water level alarm is detected in the outer water collection tank, the first drainage device is controlled to start and stop according to the preset second drainage time, so that the first drainage device can drain water from the outer water collection tank to the inner water collection tank within the second drainage time.

10. The method according to claim 9, characterized in that The method further comprises: Monitoring the water level of the outer sump during the second drainage time period; If it is monitored that the external water collection tank is continuously or intermittently in a water level alarm state during the second drainage time, the first drainage device is controlled to shut down and a second fault message is output, wherein the second fault message is used to indicate that a fault has occurred in the first drainage device.

11. The method according to claim 1, characterized in that In response to the current defrosting of the refrigerant circulation system, starting the condensate treatment system to perform condensate treatment includes: In response to a start signal indicating the start of the current defrosting, obtaining a coil temperature difference of an external heat exchanger of the refrigerant circulation system at a preset time interval; If the coil temperature difference is greater than a preset temperature difference threshold, the condensate treatment system is triggered to start processing the condensate accumulated in the current defrosting process.

12. The method according to claim 1, characterized in that The condensed water treatment system includes an external water collection tank corresponding to the external heat exchanger of the refrigerant circulation system, an internal water collection tank corresponding to the internal heat exchanger of the refrigerant circulation system, a first drainage device for draining water from the external water collection tank to the internal water collection tank, and a second drainage device for gasifying or atomizing the condensed water in the internal water collection tank and discharging it to the outdoor environment. After the condensed water treatment system is turned on, the condensed water accumulated in the current defrosting process is processed, including: During the current defrosting process of the refrigerant circulation system, controlling the first drainage device and the second drainage device to operate alternately; Among them, when the current operation of the first drainage device causes a water level alarm in the internal water collection tank, the first drainage device is triggered to shut down and the second drainage device is turned on; when the current operation time of the second drainage device reaches the preset third drainage time, the first drainage device is triggered to be reopened until the current defrosting is completed.

13. The method according to claim 1, characterized in that The method further comprises: continuously monitoring the current outdoor temperature in a heating mode of the air conditioning device; If the current outdoor temperature is within the preset temperature range, in response to a start signal indicating the start of the current defrosting, obtaining the current interval time; Determine whether the current interval time is greater than a preset time threshold.

14. A condensate water treatment device for air conditioning equipment, characterized in that: The air conditioning equipment includes a refrigerant circulation system and a condensed water treatment system, and the condensed water treatment device includes: a defrost response unit, for responding to the current defrost of the refrigerant circulation system, starting the condensed water treatment system to treat the condensed water accumulated in the current defrost process, and obtaining the current outdoor temperature and the current interval time, wherein the current interval time is the interval time between the current defrost and the last execution of the condensed water defrosting program; a temperature determination unit, configured to determine a target temperature interval in which the current outdoor temperature is located if the current outdoor temperature is within a preset temperature range and the current interval time is greater than a preset time threshold; The defrosting judgment unit is used to judge whether to execute the condensed water defrosting procedure of the condensed water treatment system after the current defrosting is completed according to the preset defrosting conditions corresponding to the target temperature range.

15. An air conditioning device, characterized in that: It includes a refrigerant circulation system, a condensed water treatment system and a controller. The controller includes a memory, a processor and a computer program stored in the memory and executable on the processor. The processor executes the program to implement any of the methods described in claims 1-13.