Novel electron beam smelting furnace

By using mechanisms such as electric slide rails and hydraulic rods in the electron beam smelting furnace, the automatic removal and placement of the crucible is achieved, and the problem of work burden and low efficiency caused by excessive surface temperature of the crucible in the prior art is solved, and the work is improved Efficiency and ease of operation.

CN119063453AInactive Publication Date: 2024-12-03ANHUI POLYTECHNIC UNIV MECHANICAL & ELECTRICAL COLLEGE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411316663.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

After the metal is smelted, the surface temperature of the existing electron beam smelting furnace is too high and cannot be taken out manually. Tools are needed, which increases the workload and reduces the working efficiency, resulting in a long time for the next smelting.

Method used

A new type of electron beam smelting furnace was designed, using electric slide rails, sliders, hydraulic rods, push cylinders, clamping blocks and buffer plates to realize the automatic removal and placement of the crucible, and the combination of hydraulic rods and push cylinders The clamping block clamps and moves the crucible to the carrier table, and the buffer plate provides a cushioning force to prevent the crucible from being thrown out.

Benefits of technology

The automatic removal and placement of the crucible is realized, which reduces the work burden, improves work efficiency, simplifies the operation process, and reduces the time requirement for next smelting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119063453A_ABST
    Figure CN119063453A_ABST
Patent Text Reader

Abstract

The invention relates to the related technical field of electron beam smelting, in particular to a novel electron beam smelting furnace which comprises a furnace body, one side of the furnace body is connected with an electron gun, the furnace body is connected with a vacuum pump, a crucible is arranged in the furnace body, and a feeding mechanism is arranged on the inner side of the furnace body. When the crucible needs to be taken out, one end of a hydraulic rod is started to move downwards, a second connecting block is made to move downwards, a pushing air cylinder and a clamping block are started to clamp the crucible together, then the hydraulic rod is retracted, an electric sliding rail is started, a sliding block moves to move the crucible outwards, and metal needing to be smelted next time is put into the crucible. The crucible is placed on the bearing table by moving the sliding blocks, the situation that the sliding blocks move too fast and the crucible is thrown out can be prevented by making contact with the springs through the buffer plates, and the crucible can be taken out under the condition that other tools are not needed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field related to electron beam melting, and in particular to a novel electron beam melting furnace. Background Art

[0002] Electron beam furnace is referred to as EB furnace. It was developed in the mid-1950s. It is an electric furnace that uses the heat energy converted from the kinetic energy of a high-speed electron beam as a heat source for melting. However, after the material is melted, the temperature of the crucible surface will be too high, and it may fall over due to error when it is taken out. Therefore, a new type of electron beam melting furnace is particularly needed.

[0003] However, after the existing electron beam melting furnace melts the metal, the crucible needs to be taken out. Because the surface temperature of the crucible is too high, it cannot be taken out manually and needs to be taken out with the help of other tools, which increases the workload, reduces work efficiency, and causes the problem of long time required for the next melting. Summary of the invention

[0004] The object of the present invention is to provide a new electron beam melting furnace which can automatically take out the crucible after the metal is melted, thereby reducing the workload and improving the work efficiency; in order to solve the problem proposed in the above background technology that the existing electron beam melting furnace needs to take out the crucible after melting the metal, but because the surface temperature of the crucible is too high, it cannot be taken out manually and needs to be taken out with the help of other tools, and the time required for the next melting is long.

[0005] To achieve the above objectives, the present invention provides the following technical solutions: A new type of electron beam melting furnace, comprising a furnace body, one side of the furnace body is connected to an electron gun, the furnace body is connected to a vacuum pump, a crucible is arranged in the furnace body, and a feeding mechanism is arranged inside the furnace body.

[0006] The feeding mechanism includes an electric slide rail, a slider, a first connecting plate, a first connecting block, a hydraulic rod, a second connecting block, a pushing cylinder, a clamping block, a fixed block, a limiting hole, a spring, a buffer plate and a positioning arc surface. An electric slide rail is connected to the upper part of the furnace body, one end of the electric slide rail is connected to the slider, one end of the slider is connected to the first connecting plate, one end of the first connecting plate is connected to the first connecting block, one end of the first connecting block is connected to the hydraulic rod, one end of the hydraulic rod is connected to the second connecting block, one end of the second connecting block is connected to the pushing cylinder, one side of the pushing cylinder is connected to the clamping block, the surface of the clamping block is provided with a positioning arc surface adapted to the surface of the crucible, one end of the electric slide rail is connected to the fixed block, one side of the fixed block is provided with a limiting hole, a spring is installed in the limiting hole, and one side of the first connecting block is connected to the buffer plate.

[0007] The electric slide rail cooperates with the slider, and the material of the electric slide rail is iron-nickel alloy.

[0008] The feeding mechanism is symmetrically arranged with respect to the central axis of the first connecting plate.

[0009] There are at least two feeding mechanisms.

[0010] A cooling mechanism is provided on one side of the furnace body; the cooling mechanism includes a water reservoir, an isolation plate, a water pump, a water pipe, a water supply pipe, a slot, a connecting pipe, a connecting pipe, an injection pipe, a high-pressure nozzle and a drainage groove; one side of the furnace body is connected to the water reservoir, an isolation plate is connected to the water reservoir, one end of the isolation plate is installed with a water pump, one side of the water pump is connected to a water pipe, one end of the water pipe is connected to the water reservoir, one side of the water pump is connected to the water supply pipe, a slot is provided on one side of the furnace body, a connecting pipe is connected in the slot, one end of the connecting pipe is connected to the water pump, one side of the connecting pipe is connected to a connecting pipe, one side of the connecting pipe is connected to an injection pipe, one end of the injection pipe is connected to a high-pressure nozzle, and a drainage groove is provided on one side of the furnace body.

[0011] The connecting pipes are symmetrically arranged around the center of the furnace body; and the injection pipes are distributed at equal intervals on one side of the connecting pipe.

[0012] At least two connecting pipes are provided, and the water pumping pipes are symmetrically arranged with respect to the central axis of the isolation plate.

[0013] The clamping groove cooperates with the connecting pipe, and the drainage groove is symmetrically opened with respect to the central axis of the furnace body.

[0014] A supporting platform is arranged below the crucible, and a furnace door is connected to one side of the furnace body.

[0015] Compared with the prior art, the beneficial effects of the present invention are as follows: the new type of electron beam melting furnace is provided with an electric slide rail, a slider, a first connecting plate, a first connecting block, a hydraulic rod, a second connecting block, a pushing cylinder, a clamping block, a fixing block, a limiting hole, a spring and a buffer plate. After smelting, the crucible needs to be taken out, and the hydraulic rod starts to move one end downward, so that the second connecting block moves downward, the pushing cylinder is started, the clamping block clamps the crucible together, and then the hydraulic rod is retracted. The electric slide rail is started, the slider moves to move the crucible outward, and the crucible is automatically taken out; then the metal to be smelted next time is put into the crucible, the electric slide rail is started, and the crucible is placed on the supporting platform by moving the slider. The buffer plate contacts the spring, and the spring provides a buffering force to prevent the slider from moving too fast or the crucible from being thrown out due to collision. The crucible is automatically taken out, which greatly reduces the workload and improves work efficiency.

[0016] The invention solves the problem that the existing electron beam melting furnace needs to take out the crucible after melting the metal, because the surface temperature of the crucible is too high and it cannot be taken out manually, and it needs to be taken out with the help of other tools. This increases the workload, reduces the work efficiency, and causes the time required for the next melting to be long. The invention can automatically take out the crucible after melting the metal, reduces the workload, and improves the work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a schematic diagram of the overall appearance structure of a new type of electron beam melting furnace of the present invention;

[0018] Figure 2 This is a schematic diagram of the structure of a novel electron beam melting furnace feeding mechanism of the present invention;

[0019] Figure 3 This is a schematic diagram of the structure of the mutual cooperation between the connecting pipe and the connecting pipe of a novel electron beam melting furnace of the present invention;

[0020] Figure 4 This is a schematic diagram of the structure of the cooperation between a water reservoir and a water pump of a novel electron beam melting furnace of the present invention.

[0021] In the figure: 1. furnace body; 2. electron gun; 3. vacuum pump; 4. crucible; 5. furnace door; 6. feeding mechanism; 601. electric slide rail; 602. slider; 603. first connecting plate; 604. first connecting block; 605. hydraulic rod; 606. second connecting block; 607. pushing cylinder; 608. clamping block; 609. fixing block; 610. limiting hole; 611. spring; 612. buffer plate; 613. positioning arc surface; 7. cooling mechanism; 701. water reservoir; 702. isolation plate; 703. water pump; 704. water pump pipe; 705. water supply pipe; 706. slot; 707. connecting pipe; 708. connecting pipe; 709. injection pipe; 710. high-pressure nozzle; 711. drainage trough; 8. bearing platform. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0023] See also Figure 1-4The present invention provides a technical solution: a new electron beam melting furnace, comprising a furnace body 1, an electron gun 2 connected to one side of the furnace body 1, a vacuum pump 3 connected to the furnace body 1, a crucible 4 arranged in the furnace body 1, and a feeding mechanism 6 arranged inside the furnace body 1. The vacuum pump 3 can make the furnace body 1 in a vacuum environment. The electron gun 2 can provide the energy required for melting, and the crucible 4 provides a place for melting metal.

[0024] The feeding mechanism 6 includes an electric slide rail 601, a slider 602, a first connecting plate 603, a first connecting block 604, a hydraulic rod 605, a second connecting block 606, a pushing cylinder 607, a clamping block 608, a fixing block 609, a limiting hole 610, a spring 611, a buffer plate 612 and a positioning arc surface 613. The upper part of the furnace body 1 is connected to the electric slide rail 601, one end of the electric slide rail 601 is connected to the slider 602, one end of the slider 602 is connected to the first connecting plate 603, one end of the first connecting plate 603 is connected to the first connecting block 604, and the first One end of the connecting block 604 is connected to a hydraulic rod 605, one end of the hydraulic rod 605 is connected to a second connecting block 606, one end of the second connecting block 606 is connected to a push cylinder 607, one side of the push cylinder 607 is connected to a clamping block 608, the surface of the clamping block 608 is provided with a positioning arc surface 613 adapted to the surface of the crucible 4, the lower part of the electric slide 601 is connected to a fixed block 609, one side of the fixed block 609 is provided with a limiting hole 610, a spring 611 is installed in the limiting hole 610, and one side of the first connecting block 604 is connected to a buffer plate 612. Through the arrangement of the electric slide 601, the slider 602, the first connecting plate 603, the first connecting block 604, the hydraulic rod 605, the second connecting block 606, the push cylinder 607, the clamping block 608, the fixed block 609, the limiting hole 610, the spring 611, the buffer plate 612 and the positioning arc surface 613. After smelting, the crucible 4 needs to be taken out. The hydraulic rod 605 starts to move one end downward, so that the second connecting block 606 moves downward, and the push cylinder 607 is started. The clamping block 608 clamps the crucible 4 together through the positioning arc surface 613, and then the hydraulic rod 605 is retracted, and the electric slide rail 601 is started. The movement of the slider 602 will drive the crucible 4 to move outward, so that the crucible 4 can be automatically taken out, and then the metal to be smelted next time is placed in the crucible 4. Start the electric slide rail 601, and place the crucible 4 on the bearing platform 8 by moving the slider 602. The buffer plate 612 contacts the spring 611, and the buffer plate 612 compresses the spring 611. The spring 611 provides a buffering force, which can prevent the slider 602 from moving too fast or the clamping block 608 from being unstable due to collision, so that the crucible 4 can be thrown out. The crucible 4 can be automatically taken out, which greatly reduces the workload and improves the work efficiency.

[0025] Furthermore, the electric slide rail 601 cooperates with the slider 602. The feeding mechanism 6 is symmetrically arranged with respect to the central axis of the first connecting plate 604, and there are at least two feeding mechanisms 6. By setting the electric slide rail 601, the slider 602 can be controlled to move and the position of the slider 602 can be adjusted.

[0026] Furthermore, the hydraulic rod 605 is symmetrically arranged with respect to the central axis of the first connecting plate 603, and the push cylinder 607 is symmetrically arranged with respect to the central axis of the first connecting plate 603. By the arrangement of the hydraulic rod 605, the position of the clamping block 608 from the crucible 4 can be adjusted so that the crucible 4 can be clamped or released.

[0027] Furthermore, the clamping block 608 is symmetrically arranged with respect to the central axis of the first connecting plate 603 , and the electric slide rail 601 is made of an iron-nickel alloy. By setting the clamping block 608 , the crucible 4 can be taken out so that the required smelting metal can be replaced.

[0028] Furthermore, a cooling mechanism 7 is provided on one side of the furnace body 1; the cooling mechanism 7 includes a water reservoir 701, an isolation plate 702, a water pump 703, a water pump pipe 704, a water supply pipe 705, a slot 706, a connecting pipe 707, a connecting pipe 708, a spray pipe 709, a high-pressure nozzle 710 and a drain trough 711. A water reservoir 701 is connected to one side of the furnace body 1, an isolation plate 702 is connected to the water reservoir 701, a water pump 703 is installed at one end of the isolation plate 702, a water pump 704 is connected to one side of the water pump 703, one end of the water pump pipe 704 is connected to the water reservoir 701, and a water supply pipe 705 is connected to one side of the water pump 703. A slot 706 is provided on one side of the furnace body 1, a connecting pipe 707 is connected inside the slot 706, one end of the connecting pipe 707 is connected to a water pump 703, one side of the connecting pipe 707 is connected to a connecting pipe 708, one side of the connecting pipe 708 is connected to an injection pipe 709, one end of the injection pipe 709 is connected to a high-pressure nozzle 710, and a drainage groove 711 is provided on one side of the furnace body 1. By arranging the water reservoir 701, the isolation plate 702, the water pump 703, the water pump pipe 704, the water supply pipe 705, the slot 706, the connecting pipe 707, the connecting pipe 708, the injection pipe 709, the high-pressure nozzle 710 and the drainage groove 711, the water pump 703 extracts the water in the water reservoir 701 through the water pump pipe 704, transfers the water from the connecting pipe 707 to the connecting pipe 708, and then transfers the water to the high-pressure nozzle 710 through the injection pipe 709. The high-pressure nozzle 710 sprays water to reduce the temperature of the crucible 4, and then the water is discharged from the drainage groove 711. When the water in the water reservoir 701 is insufficient, water can be supplied through the water supply pipe 705.

[0029] The connecting pipe 708 is symmetrically arranged with respect to the center of the furnace body 1 ; the injection pipes 709 are evenly spaced on one side of the connecting pipe 708 , so that the crucible 4 can be cooled over a large area.

[0030] At least two connecting pipes 708 are provided, and the pumping pipes 704 are symmetrically arranged with respect to the central axis of the isolation plate 702. The connecting pipes can provide water to the injection pipes 709, and the symmetrical arrangement of the pumping pipes 704 can speed up water pumping.

[0031] The card slot 706 cooperates with the connecting pipe 707 , and the drainage groove 711 is symmetrically opened with the central axis of the furnace body 1 . Through the arrangement of the drainage groove 711 , water can be discharged to maintain the working environment in the furnace body 1 .

[0032] A supporting platform 8 is arranged below the crucible 4 , and a furnace door 5 is connected to one side of the furnace body 1 .

[0033] Working principle: First, when the machine starts to run, turn on the vacuum pump 3 to make the furnace body 1 in a vacuum environment, turn on the electron gun 2 to provide the energy required for smelting. After smelting, the crucible 4 needs to be taken out, and the hydraulic rod 605 starts to move one end downward to move the second connecting block 606 downward, and start the push cylinder 607. The clamping block 608 clamps the crucible 4 together through the positioning arc surface 613, and then the hydraulic rod 605 is retracted, the electric slide rail 601 is started, and the slider 602 moves to move the crucible 4 outward, so that the crucible 4 is automatically taken out. Then put the metal to be smelted next time into the crucible 4, and drive the moving slider 602 to place the crucible 4 on the supporting platform 8. The buffer plate 612 contacts the spring 611, and the buffer plate 612 compresses the spring 611. The spring 611 provides a buffer force to prevent the slider 602 from moving too fast or the clamping block 608 from being unstable due to collision and throwing the crucible 4 out. The water pump 703 draws the water out of the water reservoir 701 through the pumping pipe 704, transfers it from the connecting pipe 707 to the connecting pipe 708, and then transfers it to the high-pressure nozzle 710 through the injection pipe 709. The high-pressure nozzle 710 sprays water to lower the temperature of the crucible 4, and then the water is discharged from the drain trough 711.

[0034] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A novel electron beam melting furnace, comprising a furnace body (1), characterized in that: An electron gun (2) is connected to one side of the furnace body (1), a vacuum pump (3) is connected to the furnace body (1), a crucible (4) is arranged inside the furnace body (1), and a feeding mechanism (6) is arranged inside the furnace body (1).

2. A novel electron beam melting furnace according to claim 1, characterized in that: The feeding mechanism (6) comprises an electric slide rail (601), a slider (602), a first connecting plate (603), a first connecting block (604), a hydraulic rod (605), a second connecting block (606), a pushing cylinder (607), a clamping block (608), a fixing block (609), a limiting hole (610), a spring (611), a buffer plate (612) and a positioning arc surface (613); the upper part of the furnace body (1) is connected to an electric slide rail (601); one end of the electric slide rail (601) is connected to a slider (602); one end of the slider (602) is connected to a first connecting plate (603); one end of the first connecting plate (603) is connected to a first connecting block (604); One end of the connecting block (604) is connected to a hydraulic rod (605), one end of the hydraulic rod (605) is connected to a second connecting block (606), one end of the second connecting block (606) is connected to a pushing cylinder (607), one side of the pushing cylinder (607) is connected to a clamping block (608), the surface of the clamping block (608) is provided with a positioning arc surface (613) adapted to the surface of the crucible (4), a fixing block (609) is connected below the electric slide rail (601), a limiting hole (610) is provided on one side of the fixing block (609), a spring (611) is installed in the limiting hole (610), and one side of the first connecting block (604) is connected to a buffer plate (612).

3. A novel electron beam melting furnace according to claim 2, characterized in that: The electric slide rail (601) cooperates with the slider (602), and the material of the electric slide rail (601) is an iron-nickel alloy.

4. A novel electron beam melting furnace according to claim 2, characterized in that: The feeding mechanism (6) is symmetrically arranged about the central axis of the first connecting plate (604).

5. A novel electron beam melting furnace according to claim 1, characterized in that: There are at least two feeding mechanisms (6).

6. A novel electron beam melting furnace according to any one of claims 1 to 5, characterized in that: A cooling mechanism (7) is provided on one side of the furnace body (1); the cooling mechanism (7) comprises a water reservoir (701), an isolation plate (702), a water pump (703), a water pump pipe (704), a water supply pipe (705), a slot (706), a connecting pipe (707), a connecting pipe (708), a spray pipe (709), a high-pressure spray head (710) and a drainage groove (711); one side of the furnace body (1) is connected to a water reservoir (701); an isolation plate (702) is connected to the water reservoir (701); a water pump (703) is installed at one end of the isolation plate (702); one side of the water pump (703) is connected to the water pump pipe (711); (704), one end of the water pump (704) is connected to the water reservoir (701), one side of the water pump (703) is connected to a water supply pipe (705), one side of the furnace body (1) is provided with a slot (706), the slot (706) is connected to a connecting pipe (707), one end of the connecting pipe (707) is connected to the water pump (703), one side of the connecting pipe (707) is connected to a connecting pipe (708), one side of the connecting pipe (708) is connected to an injection pipe (709), one end of the injection pipe (709) is connected to a high-pressure nozzle (710), and one side of the furnace body (1) is provided with a drainage groove (711).

7. A novel electron beam melting furnace according to claim 6, characterized in that: The connecting pipe (708) is symmetrically arranged with respect to the center of the furnace body (1); and the injection pipes (709) are distributed at equal intervals on one side of the connecting pipe (708).

8. A novel electron beam melting furnace according to claim 6, characterized in that: At least two connecting pipes (708) are provided, and the water pumping pipes (704) are symmetrically arranged about the central axis of the isolation plate (702).

9. A novel electron beam melting furnace according to claim 6, characterized in that: The clamping groove (706) cooperates with the connecting pipe (707), and the drainage groove (711) is symmetrically opened with respect to the central axis of the furnace body (1).

10. A novel electron beam melting furnace according to claim 1, characterized in that: A supporting platform (8) is provided below the crucible (4), and a furnace door (5) is connected to one side of the furnace body (1).