Shield tunnel model test device for researching influence of ground loading on tunnel
By designing a shield tunnel model test device for studying the impact of ground load on tunnels, using I-shaped joints and grooves to simulate longitudinal joints, combined with distributed fiber monitoring, the shortcomings in the development law of longitudinal fractures in shield tunnels are solved. , realizes accurate simulation and monitoring of the mechanical behavior and deformation laws of shield tunnels, and improves the reliability of the test results.
Patent Information
- Application Number
- CN202411242376.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-12-03
AI Technical Summary
In the prior art, there are few researches on the development laws of longitudinal cracks in shield tunnels and the mechanism of lateral deformation of pipe sheets, and there is a lack of effective experimental devices for research.
Design a shield tunnel model test device for studying the impact of ground load on tunnels, including a model box, shield tunnel model, pressure application mechanism and deformation monitoring mechanism, connect the model pipe sheet through I-shaped joints, and Grooves are opened on the side wall of the pipe sheet to simulate longitudinal joints, and deformation monitoring is performed using polyethylene I-shaped joints and distributed optical fibers.
Effectively simulate the mechanical behavior and deformation laws of the shield tunnel prototype, improve the reliability of the model test results, and can conduct tests under different soil or rock formation conditions. It is suitable for the repair, reinforcement and overpressure unloading of shield tunnels.
Smart Images

Figure CN119064176A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of tunnel engineering in geotechnical and underground engineering, and in particular relates to a shield tunnel model test device for studying the influence of ground loading on the tunnel. Background Art
[0002] As a public transportation mode that combines the two advantages of low energy consumption and high carrying capacity, urban rail transit has efficiently solved the problem of traffic congestion while meeting environmental protection requirements. To a certain extent, it has alleviated the population and traffic pressures brought about by the advancement of urbanization and the sustained rapid economic and social development in my country.
[0003] Shield construction has become the most important form of tunnel construction structure due to its obvious advantages such as safe construction, high efficiency, environmental protection and no climate restrictions. After the subway shield tunnel was put into operation, with the accumulation of operating years, the frequent construction activities in the surrounding area, the geological environment and train vibration and other factors will cause different degrees of damage to its segment structure, such as segment cracking, concrete carbonization, joint damage, tunnel leakage, surface shedding, etc. According to statistics, segment cracking is one of the main structural manifestations of the disease. Among them, longitudinal cracks are perpendicular to the thickness direction of the segment and are mostly structural cracks caused by loads. The development of its depth and length has a significant impact on the transmission of internal forces of the structure and the integrity of the segment, so it has a greater impact on the overall mechanical properties of the tunnel structure.
[0004] The shield tunnel uses longitudinal bolts and circumferential bolts to assemble the rigid segment structure into a structural whole with a certain degree of flexibility. Therefore, most of the damage caused by load or deformation will appear in the form of joint opening and cracks. In order to explore the influence of existing longitudinal cracks in subway shield tunnels and their development on the mechanical properties of the segment structure, some scholars have conducted research on the influence of cracks on model segments or overall performance. At the same time, in the aspect of numerical research, some scholars have also studied the influence of existing cracks on the deformation and mechanical properties of the structure. However, most of the current research is based on the structural level to explore the influence of existing cracks on the ultimate bearing capacity of the structure and the overall instability and failure process, while there are few studies on the development law of longitudinal cracks in shield tunnels and their influence on the transverse deformation and failure mechanism of the segment. Therefore, it is urgent to design a test device for studying the development law of longitudinal cracks in shield tunnels and their influence on the transverse deformation and failure mechanism of the segment. Summary of the invention
[0005] In view of the problems existing in the above-mentioned prior art, the present invention provides a shield tunnel model test device for studying the influence of ground loading on the tunnel, and specifically discloses the following technical solutions:
[0006] A shield tunnel model test device for studying the influence of ground loading on a tunnel comprises a model box, wherein an underlying soil layer and a passing soil layer are sequentially laid in the model box from bottom to top, a shield tunnel model is buried in the passing soil layer, a pressure applying mechanism is arranged on the upper surface of the passing soil layer located above the shield tunnel model, a deformation monitoring mechanism is arranged on the side wall of the shield tunnel model, and the model box is a transparent panel perpendicular to the side wall of the shield tunnel.
[0007] Furthermore, the shield tunnel model includes a plurality of model segments, and adjacent model segments are connected by I-shaped joint pieces, and the I-shaped joint pieces are made of polyethylene.
[0008] Furthermore, a groove is provided on the side wall of each model segment along the length direction of the model segment.
[0009] Furthermore, the pressure applying mechanism includes a loading plate and a weight, the loading plate is placed flat on the upper surface of the penetrated soil layer, and the weight is located at the upper end of the loading plate.
[0010] Furthermore, the deformation monitoring mechanism includes a point strain gauge and / or a displacement meter and / or a distributed optical fiber, the point strain gauge is pasted on the outer wall of the shield tunnel model, the distributed optical fiber is pasted on the inner wall of the shield tunnel model, the displacement meter is set up inside the shield tunnel model, and the contact of the displacement meter is against the inner wall of the shield tunnel model.
[0011] Furthermore, the method for making the shield tunnel model comprises the following steps:
[0012] S1. Obtain the geometric parameters and mechanical parameters of the shield tunnel prototype to be used for research;
[0013] S2. Propose a geometric similarity ratio CL to obtain the geometric parameters of the shield tunnel model;
[0014] S3, propose elastic modulus similarity ratio CE to obtain the mechanical parameters of the shield tunnel model;
[0015] S4. Propose a water-paste ratio, and make a shield tunnel model according to the proposed geometric parameters and mechanical parameters of the shield tunnel model;
[0016] S5, measuring the mechanical parameters of the shield tunnel model, and determining whether the corresponding mechanical parameters of the shield tunnel model are equal to the set values;
[0017] S6. If the mechanical parameters of the shield tunnel model are not equal to the set values, the water-paste ratio is adjusted, and steps S4 and S5 are repeated until the difference between the mechanical parameters of the shield tunnel model and the set values is less than 5%, and the relationship between the water-paste ratio and the mechanical parameters obtained multiple times is fitted into a curve to determine the water-paste ratio corresponding to when the mechanical parameters of the shield tunnel model are equal to the set values;
[0018] S7, making materials according to the water-paste ratio, and casting a single model segment according to the calculated geometric parameters;
[0019] S8. The longitudinal joint of the model segment is simulated by opening grooves. The cross-sectional dimensions of the grooves are determined according to the stiffness equivalence principle of the joints. In the calculation of the cross-sectional dimensions of the grooves, the bending stiffness κ is taken as 5×107N·m / rad. The calculation is performed according to the similarity relationship of the longitudinal joint of the model segment. The groove patterns on both the inner and outer sides are selected. The model segment is grooved with a groove depth of 5.0mm and a width of 5.0mm.
[0020] S9. The shield tunnel model is obtained by gluing I-shaped joint pieces to the circumferential joints.
[0021] Furthermore, the geometric parameters of the shield tunnel prototype and the shield tunnel model are their corresponding segment splicing method, inner diameter, outer diameter, thickness, width, annular joint groove depth, and thickness and width of the longitudinal joint piece required to connect the segments, and the mechanical parameters of the shield tunnel prototype and the shield tunnel model are their corresponding elastic modulus E and uniaxial compressive strength fcu.
[0022] Furthermore, the position of the groove opened in step S8 is the position on the shield tunnel model corresponding to the shield tunnel prototype to be used for research.
[0023] Furthermore, the number and the location of the I-shaped connector pieces in step S9 correspond to the number and the location of the annular bolts on the shield tunnel prototype to be studied.
[0024] Compared with the prior art, the present invention has the following beneficial effects:
[0025] (1) By connecting adjacent model segments with I-shaped joint pieces, the mechanical influence effect and range of the annular bolt joints on the shield tunnel prototype to be studied can be effectively reflected; by opening grooves, the stress and deformation characteristics of different parts of the shield tunnel prototype under external loads can be effectively simulated, thereby better reflecting the mechanical behavior and deformation law of the shield tunnel prototype.
[0026] (2) By selecting polyethylene as the joint material for simulating the circumferential joints of the segments, the circumferential local effect of the shield tunnel prototype can be better simulated, ensuring that the stress pattern of the model segments and joints in the model test is consistent with the actual project, thereby improving the reliability of the model test results.
[0027] (3) The pressure applying mechanism is located above the shield tunnel model, which helps to apply pressure to the shield tunnel model, thereby more accurately simulating the temporary surface loading effect.
[0028] (4) The model test device in the present invention is multifunctional, easy to assemble and disassemble, and its size can be modified according to different test requirements. It is suitable for the study of different soil layers or rock layers, and then various geotechnical tests related to shield tunnel repair and reinforcement, overpressure unloading, and back-wall grouting under different working conditions can be carried out.
[0029] (5) Displacement meters, strain gauges, and distributed optical fibers are installed on the shield tunnel model to comprehensively monitor the longitudinal and lateral deformation evolution of the shield tunnel model after being subjected to stress in real time. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a schematic diagram of the overall structure of the present invention.
[0031] Figure 2 This is a structural diagram of the shield tunnel model.
[0032] 1-pressure applying mechanism, 2-model box, 3-shield tunnel model, 4-model segment, 5-traversing soil layer, 6-underlying soil layer, 7-point strain gauge, 8-displacement meter, 9-I-shaped joint piece, 10-groove. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] Reference Figure 1-2 A shield tunnel model test device for studying the influence of ground loading on tunnels comprises a model box 2, in which an underlying soil layer 6 and a passing soil layer 5 are laid in sequence from bottom to top, a shield tunnel model 3 is buried in the passing soil layer 5, a pressure applying mechanism 1 is arranged on the upper surface of the passing soil layer 5 above the shield tunnel model 3, a deformation monitoring mechanism is arranged on the side wall of the shield tunnel model 3, and the model box 2 is a transparent panel perpendicular to the side wall of the shield tunnel.
[0035] In this embodiment, the shield tunnel model 3 includes a plurality of model segments 4, and the adjacent model segments 4 are connected by I-shaped joint pieces 9, which can effectively reflect the mechanical influence effect and range of the annular bolt joints on the shield tunnel prototype to be studied. The I-shaped joint pieces 9 are made of polyethylene, which can better simulate the annular local effects of the shield tunnel prototype, ensure that the stress mode of the model segments 4 and the joints in the model test is consistent with the actual project, and thus improve the reliability of the model test results.
[0036] In this embodiment, a groove 10 is provided on the side wall of each of the model segments 4 along the length direction of the model segment 4, thereby weakening the stiffness of this part, and being able to effectively simulate the stress and deformation characteristics of different parts of the shield tunnel prototype under external loads, thereby being able to better reflect the mechanical behavior and deformation law of the shield tunnel prototype.
[0037] In this embodiment, by combining the similarity principle and based on the mechanical properties of the segment joint, a specific microconcrete formula material is used to simulate the segment concrete. The material is mainly cement as a cementitious material, and is mixed with quartz sand (0.3-0.5 mm), quartz sand (1.0-2.0 mm) and slag powder in a specific ratio, and is formed into a similar material after being fully stirred, compacted and hardened, ensuring that the physical and mechanical properties of the similar material are closer to those of concrete.
[0038] In this embodiment, in order to ensure that the shield tunnel model 3 can deform and form structural damage under reasonable overload conditions, soft soil is selected as the traversing soil layer 5; in addition, in order to avoid excessive settlement of the shield tunnel model 3 during the test and affect the monitoring efficiency of the instrument, medium-weathered mud siltstone is selected as the underlying soil layer 6. Through repeated tests and comparisons, a mixture of river sand and rubber particles is selected as a similar material to simulate soft soil, and a hot-melt mixture of barite powder, quartz sand and paraffin is selected as a similar material for medium-weathered mud siltstone. In addition, a hole with a radius of 0.12m is opened in the middle of the transparent panel of the model box 2 corresponding to the position of the shield tunnel model 3, so as to better measure the horizontal and vertical convergence of the shield tunnel model 3 and observe the development of structural cracks.
[0039] In this embodiment, the pressure applying mechanism 1 includes a loading plate and a weight, the loading plate is placed flat on the upper surface of the through soil layer 5, the weight is located at the upper end of the loading plate, the setting of the loading plate can ensure that the weight of the weight is evenly applied to the through soil layer, and different loads can be applied to the shield tunnel model 3 by increasing or decreasing the number of weights. In other embodiments, the pressure applying mechanism 1 can also be other heavy objects or devices that can apply pressure.
[0040] In this embodiment, the deformation monitoring mechanism includes a point strain gauge 7 and / or a displacement meter 8 and / or a distributed optical fiber. The point strain gauge 7 is pasted on the outer wall of the shield tunnel model 3, and the distributed optical fiber is pasted on the inner wall of the shield tunnel model 3. The displacement meter 8 is installed inside the shield tunnel model 3, and the contact of the displacement meter 8 is against the inner wall of the shield tunnel model 3.
[0041] In this embodiment, the method for making the shield tunnel model includes the following steps:
[0042] S1. Obtain the geometric parameters and mechanical parameters of the shield tunnel prototype to be used for research;
[0043] S2. Propose a geometric similarity ratio CL to obtain the geometric parameters of the shield tunnel model;
[0044] S3, propose elastic modulus similarity ratio CE to obtain the mechanical parameters of the shield tunnel model;
[0045] S4. Propose a water-paste ratio, and make a shield tunnel model according to the proposed geometric parameters and mechanical parameters of the shield tunnel model;
[0046] S5, measuring the mechanical parameters of the shield tunnel model, and determining whether the corresponding mechanical parameters of the shield tunnel model are equal to the set values;
[0047] S6. If the mechanical parameters of the shield tunnel model are not equal to the set values, the water-paste ratio is adjusted, and steps S4 and S5 are repeated until the difference between the mechanical parameters of the shield tunnel model and the set values is less than 5%, and the relationship between the water-paste ratio and the mechanical parameters obtained multiple times is fitted into a curve to determine the water-paste ratio corresponding to when the mechanical parameters of the shield tunnel model are equal to the set values;
[0048] S7, making materials according to the water-paste ratio, and casting a single model segment according to the calculated geometric parameters;
[0049] S8. The longitudinal joint of the model segment is simulated by opening grooves. The cross-sectional dimensions of the grooves are determined according to the stiffness equivalence principle of the joints. In the calculation of the cross-sectional dimensions of the grooves, the bending stiffness κ is taken as 5×107N·m / rad. The calculation is performed according to the similarity relationship of the longitudinal joint of the model segment. The groove patterns on both the inner and outer sides are selected. The model segment is grooved with a groove depth of 5.0mm and a width of 5.0mm.
[0050] S9. The shield tunnel model is obtained by gluing I-shaped joint pieces to the circumferential joints.
[0051] In this embodiment, the geometric parameters of the shield tunnel prototype and the shield tunnel model 3 are their corresponding segment splicing method, inner diameter, outer diameter, thickness, width, annular joint groove depth, and the thickness and width of the longitudinal joint piece required to connect the segments, and the mechanical parameters of the shield tunnel prototype and the shield tunnel model 3 are their corresponding elastic modulus E and uniaxial compressive strength fcu.
[0052] In this embodiment, the position where the groove 10 is opened in step S8 is the position on the shield tunnel model 3 corresponding to the shield tunnel prototype to be used for research.
[0053] In this embodiment, the number and the arrangement positions of the I-shaped connector pieces 9 in step S9 correspond to the number and the arrangement positions of the annular bolts on the shield tunnel prototype to be studied.
[0054] In this embodiment, the geometric similarity ratio, strength, stress, cohesion, and elastic modulus similarity ratio of the shield tunnel model 3 and the shield tunnel prototype are all 1:20, while the bulk density similarity ratio, Poisson's ratio, strain, and friction angle similarity ratio are all 1:1, which can better simulate the longitudinal deformation evolution of the shield tunnel model 3 after being subjected to temporary surface loading, and provide reliable data support for actual tunnel engineering.
[0055] The above description is only a preferred embodiment of the present invention and does not limit the technical scope of the present invention. Therefore, any slight modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention still fall within the scope of the technical solution of the present invention.
Claims
1. A shield tunnel model test device for studying the influence of ground load on tunnel, characterized in that: The invention comprises a model box, in which an underlying soil layer and a through soil layer are laid in sequence from bottom to top, a shield tunnel model is buried in the through soil layer, a pressure applying mechanism is arranged on the upper surface of the through soil layer located above the shield tunnel model, a deformation monitoring mechanism is arranged on the side wall of the shield tunnel model, and the model box is a transparent panel perpendicular to the side wall of the shield tunnel.
2. A shield tunnel model test device for studying the influence of ground load on tunnel according to claim 1, characterized in that: The shield tunnel model includes a plurality of model segments, and adjacent model segments are connected by I-shaped joint pieces, and the I-shaped joint pieces are made of polyethylene.
3. A shield tunnel model test device for studying the influence of ground load on tunnel according to claim 2, characterized in that: A groove is arranged on the side wall of each model tube segment along the length direction of the model tube segment.
4. A shield tunnel model test device for studying the influence of ground load on tunnel according to claim 1, characterized in that: The pressure applying mechanism comprises a loading plate and a weight, wherein the loading plate is placed flat on the upper surface of the through soil layer, and the weight is located at the upper end of the loading plate.
5. A shield tunnel model test device for studying the influence of ground load on tunnel according to claim 1, characterized in that: The deformation monitoring mechanism includes a point strain gauge and / or a displacement meter and / or a distributed optical fiber. The point strain gauge is pasted on the outer wall of the shield tunnel model, the distributed optical fiber is pasted on the inner wall of the shield tunnel model, and the displacement meter is set up inside the shield tunnel model, and the contact of the displacement meter is against the inner wall of the shield tunnel model.
6. A shield tunnel model test device for studying the influence of ground load on tunnel according to claim 1, characterized in that: The method for making the shield tunnel model comprises the following steps: S1. Obtain the geometric parameters and mechanical parameters of the shield tunnel prototype to be used for research; S2. Propose a geometric similarity ratio CL to obtain the geometric parameters of the shield tunnel model; S3, propose elastic modulus similarity ratio CE to obtain the mechanical parameters of the shield tunnel model; S4. Propose a water-paste ratio, and make a shield tunnel model according to the proposed geometric parameters and mechanical parameters of the shield tunnel model; S5, measuring the mechanical parameters of the shield tunnel model, and determining whether the corresponding mechanical parameters of the shield tunnel model are equal to the set values; S6. If the mechanical parameters of the shield tunnel model are not equal to the set values, the water-paste ratio is adjusted, and steps S4 and S5 are repeated until the difference between the mechanical parameters of the shield tunnel model and the set values is less than 5%, and the relationship between the water-paste ratio and the mechanical parameters obtained multiple times is fitted into a curve to determine the water-paste ratio corresponding to when the mechanical parameters of the shield tunnel model are equal to the set values; S7, making materials according to the water-paste ratio, and casting a single model segment according to the calculated geometric parameters; S8. The longitudinal joint of the model segment is simulated by opening grooves. The cross-sectional dimensions of the grooves are determined according to the stiffness equivalence principle of the joints. In the calculation of the cross-sectional dimensions of the grooves, the bending stiffness κ is taken as 5×107N·m / rad. The calculation is performed according to the similarity relationship of the longitudinal joint of the model segment. The groove patterns on both the inner and outer sides are selected. The model segment is grooved with a groove depth of 5.0mm and a width of 5.0mm. S9. The shield tunnel model is obtained by gluing I-shaped joint pieces to the circumferential joints.
7. A shield tunnel model test device for studying the influence of ground load on tunnel according to claim 6, characterized in that: The geometric parameters of the shield tunnel prototype and the shield tunnel model are respectively the corresponding segment splicing method, inner diameter, outer diameter, thickness, width, annular joint groove depth, and thickness and width of the longitudinal joint piece required to connect the segments; the mechanical parameters of the shield tunnel prototype and the shield tunnel model are respectively the corresponding elastic modulus E and uniaxial compressive strength fcu.
8. A shield tunnel model test device for studying the influence of ground load on tunnel according to claim 6, characterized in that: The position where the groove is opened in step S8 is the position on the shield tunnel model corresponding to the shield tunnel prototype to be used for research.
9. A shield tunnel model test device for studying the influence of ground load on tunnel according to claim 6, characterized in that: The number and location of the I-shaped connector pieces in step S9 correspond to the number and location of the annular bolts on the shield tunnel prototype to be studied.