Velocity field establishment method for step-by-step matching of well seismic horizon, medium and equipment
Through the method of step-by-step matching of well seismic strata and time-depth curve correction, the problem of insufficient matching of well geological stratification and seismic strata is solved, the velocity field accuracy of oil field reservoir prediction is improved, and the potential of residual oil is improved Effect.
Patent Information
- Application Number
- CN202310647654.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-02
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2043-06-02
AI Technical Summary
In the oil field reservoir prediction, the matching degree between the well point geological stratification and seismic strata is insufficient, resulting in low velocity field accuracy, and the strata matching and constraint at the deposition unit level cannot be achieved, affecting the potential tapping effect of the remaining oil.
The velocity field establishment method is adopted for step by step matching of well seismic strata. Through multi-well consistency analysis and time-depth curve correction, the accuracy of seismic structure interpretation is gradually improved, ensuring the matching of well geological stratification and seismic strata, and thus establishing a high Accurate velocity field.
The consistency matching and outlier processing of well seismic strata are achieved, the accuracy of seismic structure interpretation is improved, and the seismic attribute analysis and inversion model can be guided at the sedimentary unit-level level is established, which improves the potential tapping effect of residual oil.
Smart Images

Figure CN119065024A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a reservoir prediction research method, belongs to the field of oilfield reservoir prediction, and specifically relates to a velocity field establishment method, medium and equipment for step-by-step matching of well seismic layers. Background Art
[0002] In the later stage of oilfield development, the remaining oil is mainly concentrated in the imperfect injection and production areas, such as fault edges, local structural highs, etc. Fault edge well placement, horizontal wells and other potential tapping methods have become common potential tapping methods, which require higher and higher accuracy of seismic structure, and require a high-precision velocity field establishment method that is suitable for it.
[0003] At present, the commonly used method for establishing three-dimensional velocity field in seismic development is to establish velocity field by interpolating well point time-depth relationship under seismic horizon constraint. This method has the following two shortcomings: First, the seismic horizon used to constrain the trend and the corresponding well point geological stratification are not completely matched (only some well stratification can match the seismic horizon), because the quality of synthetic seismic records is determined by the degree of waveform matching between synthetic seismic records and seismic traces near the well, rather than relying on the matching between well stratification and seismic horizon; second, the seismic horizons constraining the trend are relatively few, generally at the oil layer level or individual geological interfaces with obvious reflection characteristics in the seismic profile. This method cannot obtain the sedimentary unit level seismic horizon, and it is also impossible to achieve sedimentary unit level stratum matching and constraint.
[0004] Therefore, how to improve the accuracy of the velocity field has become an urgent problem to be solved in this field. Summary of the invention
[0005] In view of the above problems, the present invention provides a velocity field establishment method, medium and equipment for step-by-step matching of well-seismic layers. This method, medium and equipment are based on multi-well consistency analysis, which can effectively improve the accuracy of seismic structural interpretation and ensure the effect of tapping the potential of remaining oil.
[0006] In order to achieve the above technical objectives, the technical solution adopted by the present invention is as follows:
[0007] According to one aspect of the present invention, a method for establishing a velocity field for level-by-level matching of well-seismic layers is provided, the method comprising the following steps:
[0008] Step 1: Prepare the target well location’s logging data, seismic data, and the top and bottom seismic layer data of the target layer. 顶 and h 底 ;
[0009] Step 2: Obtain the initial time-depth curve TD1 of each well by making seismic synthetic records;
[0010] Step 3: In the top and bottom seismic layer data h of the target layer 顶 and h底 Under the trend constraint, the first velocity field V1 is established by interpolating the initial time-depth curve TD1 of the well point;
[0011] Step 4: Use the first velocity field V1 to separate the top and bottom layers of the target layer. 深顶、 top 深底 Convert from depth domain to time domaintop 时顶、 top 时底 ;
[0012] Step 5: Under the constraints of the top and bottom seismic horizon trends of the target layer, the top and bottom layers in the time domain are 时顶、 top 时底 Interpolation obtains new top and bottom seismic horizons H 顶1 and H 底1 , for H 顶1 and H 底1 The consistency analysis and outlier processing are performed to obtain the final top and bottom seismic horizons H. 顶 and H 底 ;
[0013] Step 6: Layer the top and bottom surfaces using the depth domain 深顶、 top 深底 The final top and bottom seismic horizons H obtained in step 5 顶 and H 底 The time-depth pair TD is obtained by corresponding matching, and the time-depth pair TD is used to correct the initial time-depth curve TD1 to obtain the corrected time-depth curve TD2 of each well;
[0014] Step 7: At the final top and bottom seismic horizons H 顶 and H 底 Under the trend constraint, the second velocity field V2 is established by interpolating the corrected time-depth curve TD2;
[0015] Step 8: Use the second velocity field V2 to divide the sedimentary unit level in the depth domain target layer into top 深1 、top 深 2......top 深n Convert to time domain top 时1 、top 时2 ......top 时n ;
[0016] Step 9: At the final top and bottom seismic horizons H of the target layer 顶 and H 底 Under the trend constraint, the top of the sedimentary unit level in the target layer in the time domain 时1 、top 时2 ......top 时nInterpolation is used to obtain the top seismic horizons H1, H2, H2, H3, H4, H5, H6, H7, H8, H9, H10, H11, H12, H13, H14, H15, H16, H17, H18, H19, H20, H21, H22, H33, H34, H35, H36, H37, H38, H39, H40 n , for H1, H2...H n The consistency analysis and outlier processing were performed to obtain the final seismic horizon H of the top surface of each sedimentary unit in the target layer. d1 , H d2 ......H dn ;
[0017] Step 10: Use the depth domain to layer the top of the sedimentary unit level within the target layer 深1 、top 深2 ......top 深n , the bottom surface layer of the target layer and the top surface seismic horizon H of each sedimentary unit in the final target layer obtained in step 9 d1 , H d2 ......H dn , H 底 The final time-depth curve TD3 of each well is obtained by corresponding matching;
[0018] Step 11: Seismic horizon H at the top of each sedimentary unit in the final target layer d1 , H d2 ......H dn , H 底 Under the trend constraint, the third velocity field V3 is established by interpolating the final time-depth curve TD3.
[0019] According to one embodiment of the present invention, the data in step 1 is obtained through conventional well logging interpretation and seismic structural interpretation.
[0020] According to one embodiment of the present invention, step 2 includes: calculating the reflection coefficient from the acoustic wave and density logging curve, convolving the reflection coefficient with the extracted seismic wavelet to obtain an initial synthetic seismic record, matching and adjusting the initial synthetic seismic record with the seismic trace near the well to obtain a final synthetic seismic record, and each depth point on the final synthetic seismic record corresponds to a time value, thereby obtaining an initial time-depth curve TD1 for each well.
[0021] According to an embodiment of the present invention, step 3 includes: dividing the target layer into n small layers in equal proportion in the time domain, and the thickness of each small layer is d, then:
[0022] d=(h 底 -h 顶 ) / n
[0023] Among them, h 底 and h 顶 It is the top and bottom seismic horizon of the target layer obtained by seismic tectonic interpretation, and n represents the number of small layers into which the target layer is divided;
[0024] In h 顶 and h 底 n-1 seismic horizons are obtained, and the seismic horizon h of each small layer is obtained by calculation. i :
[0025] h i =h 顶 +i*d
[0026] Among them, i represents the number of small layers, 1≤i≤n-1;
[0027] Based on the initial time-depth curve TD1, each well in the time domain is connected to the seismic layer h i The time-depth pairs of the intersection points are extracted and interpolated between wells to obtain the small layer h i Plane velocity V i , when n is large enough, h i Plane velocity V i That is h i The velocity of the layer is calculated, thereby obtaining the first velocity field V1 of the target layer.
[0028] According to one embodiment of the present invention, step 4 includes: obtaining t=2h / v according to h=vt / 2, wherein t is the seismic double-layer travel time, h is the depth, and v is the velocity, and using the first velocity field V1 to convert the top and bottom layers of the target layer into the target layer. 深顶、 top 深底 Convert from depth domain to time domaintop 时顶、 top 时底 .
[0029] According to one embodiment of the present invention, step 5 includes: taking two wells separated by a predetermined distance as boundaries, obtaining new top and bottom seismic horizons H by interpolation. 顶1 and H 底1 .
[0030] According to one embodiment of the present invention, when the distance between two wells is greater than a predetermined distance, the inter-well stratified interpolation trend is based on the seismic layer trend; when the distance between two wells is less than the predetermined distance, the inter-well trend is based on the inter-well stratified interpolation trend in the time domain of the two wells.
[0031] According to one embodiment of the present invention, in step 5, H 顶1 and H 底1 The consistency analysis and outlier processing are respectively performed. When the time domain stratification of an individual well is greatly different from that of its neighboring wells, an abnormal bulge or depression appears on the inserted new seismic horizon. When the well position is inconsistent with the overall trend of the seismic horizon, the final top and bottom seismic horizons H are obtained by removing outliers or smoothing the well position. 顶 and H 底 .
[0032] According to one embodiment of the present invention, step 6 includes: using the top surface layer of the oil layer group at the depth domain well point and the final top surface seismic layer H 顶 Matching is performed by using the bottom stratification of the oil layer group and the final bottom seismic layer H 底 The time-depth pair TD of the top and bottom interfaces is obtained by matching, and the time-depth pair TD is used to correct the initial time-depth curve TD1 to obtain the corrected time-depth curve TD2 of each well.
[0033] According to an embodiment of the present invention, step 7 includes: dividing the target layer into n' small layers in equal proportion in the time domain, and the thickness of each small layer is d', then:
[0034] d'=(H 底 -H 顶 ) / n'
[0035] Among them, H 底 and H 顶 are the final top and bottom seismic horizons obtained in step 5, and n' represents the number of sub-layers;
[0036] In H 顶 and H 底 n'-1 seismic horizons are obtained, and the seismic horizon H of each small layer is obtained by calculation. i :
[0037] H i =H 顶 +i'*d'
[0038] Among them, i' represents the number of small layers, 1≤i'≤n'-1;
[0039] Based on the corrected time-depth curve TD2, each well in the time domain is compared with the seismic layer H i The time-depth pairs of the intersection points are extracted and interpolated between wells to obtain the small layer H i Plane velocity V i ', when n' is large enough, H i Plane velocity V i 'It's H i ' layer's velocity, thereby obtaining the second velocity field V2 of the target layer.
[0040] According to one embodiment of the present invention, step 8 includes: obtaining t=2h / v according to h=vt / 2, where t is the seismic double-layer travel time, h is the depth, and v is the velocity, and converting the top and bottom layers of each sedimentary unit layer from the depth domain to the time domain using the t=2h / v formula through the second velocity field V2.
[0041] According to one embodiment of the present invention, step 9 includes: taking two wells separated by a second predetermined distance as boundaries, by dividing the top of the sedimentary unit level in the target layer in the time domain 时1 、top 时2 ......top 时n Interpolation is used to obtain the top seismic horizons H1, H2, H2, H3, H4, H5, H6, H7, H8, H9, H10, H11, H12, H13, H14, H15, H16, H17, H18, H19, H20, H21, H22, H33, H34, H35, H36, H37, H38, H39, H40 n .
[0042] According to one embodiment of the present invention, when the distance between two wells is greater than a second predetermined distance, the inter-well stratified interpolation trend is based on the seismic layer trend; when the distance between two wells is less than the second predetermined distance, the inter-well trend is based on the inter-well stratified interpolation trend in the time domain of the two wells.
[0043] According to one embodiment of the present invention, in step 9, H1, H2, ..., H n The consistency analysis and outlier processing are respectively performed, including: when the time domain stratification of an individual well is greatly different from that of its neighboring wells, an abnormal bulge or depression appears on the inserted new seismic horizon. In the case that the well position is inconsistent with the overall trend of the seismic horizon, the outlier removal or smoothing of the well position is performed to obtain the final seismic horizon H of the top surface of each sedimentary unit in the target layer. d1 , H d2 ......H dn .
[0044] According to one embodiment of the present invention, step 10 includes: using the top layer of the sedimentary unit level in the target layer at the depth domain well point 深1 The seismic horizon H d1 Matching, layered top 深2 With seismic horizon H d2 Matching... Layered top 深n With seismic horizon H dn Matching, target layer bottom layer and H 底 Matching is performed to obtain n+1 groups of time-depth pairs, and these n+1 groups of time-depth pairs are used to correct the corrected time-depth curve TD2 to obtain the final time-depth curve TD3 of each well.
[0045] According to one embodiment of the present invention, step 11 includes: applying the final time-depth curve TD3 to obtain the velocity of each layer of each deposition unit-level segment according to the method of step 3. When the velocities of the layers of all deposition unit-level segments are obtained, the third velocity field V3 to be finally established is obtained.
[0046] According to one embodiment of the present invention, in step 10, the top of the oil layer group and the top of the first sedimentation unit are the same layer.
[0047] According to one embodiment of the present invention, in step 3 and step 5, the number of small layers is determined according to the target layer thickness and the accuracy requirement of the speed to be established.
[0048] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores a computer program, wherein the computer program performs the steps of the above method when executed by a processor.
[0049] According to another aspect of the present invention, there is provided a computer device, comprising:
[0050] at least one processor; and
[0051] A memory storing a computer program executable on the processor, wherein the processor executes the steps of the method described above when executing the program.
[0052] Due to the adoption of the above technical solution, the method, medium and device provided by the present invention have at least one of the following beneficial effects compared with the prior art:
[0053] (1) By performing step-by-step matching analysis and consistency correction on the well point geological stratification and seismic horizon, a time-depth curve with good consistency between the well point and seismic horizon is obtained, thereby obtaining a high-precision velocity field of the target layer in the study area;
[0054] (2) The seismic horizons at the sedimentary unit level obtained in the process of velocity field calculation can be used for seismic attribute analysis, grid model establishment for seismic inversion, etc.;
[0055] (3) The high-precision velocity field finally obtained realizes the time-depth conversion of seismic data volumes, seismic layers, etc., especially the time-depth conversion of seismic inversion data volumes, which can be used to guide the preparation of measures. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present invention but do not constitute a limitation of the present invention. In the accompanying drawings:
[0057] Figure 1 A flow chart of a method for establishing a velocity field for level-by-level matching of well-seismic layers according to the present invention is exemplarily shown;
[0058] Figure 2 The top and bottom seismic horizons H of the target layer matched with the well layer obtained according to one embodiment of the present invention are shown. 顶 and H 底 Schematic diagram of
[0059] Figure 3A schematic diagram showing the interface seismic horizon at the sedimentary unit level obtained according to one embodiment of the present invention is shown;
[0060] Figure 4 FIG. 4 is a schematic diagram showing a velocity field V3 established according to an embodiment of the present invention. DETAILED DESCRIPTION
[0061] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0062] Figure 1 The flowchart of the venturi tube self-cleaning method according to the present invention is exemplarily shown.
[0063] As shown in the figure, the method generally includes the following steps:
[0064] Step 1: Prepare the target well location’s logging data, seismic data, and target layer top and bottom seismic layer data h 顶 and h 底 ;
[0065] Step 2: Obtain the initial time-depth curve TD1 of each well by making seismic synthetic records;
[0066] Step 3: In the top and bottom seismic layer data h of the target layer 顶 and h 底 Under the trend constraint, the first velocity field V1 is established by interpolating the initial time-depth curve TD1 of the well point;
[0067] Step 4: Use the first velocity field V1 to separate the top and bottom layers of the target layer. 深顶、 top 深底 Convert from depth domain to time domaintop 时顶 、top 时底 ;
[0068] Step 5: Under the constraints of the top and bottom seismic horizon trends of the target layer, the top and bottom layers in the time domain are 时顶 、top 时底 Interpolation obtains new top and bottom seismic horizons H 顶1 and H 底1 , for H 顶1 and H 底1 The consistency analysis and outlier processing are performed to obtain the final top and bottom seismic horizons H. 顶 and H 底 ;
[0069] Step 6: Layer the top and bottom surfaces using the depth domain 深顶 、top深底 The top and bottom seismic horizons H obtained in step 5 顶 and H 底 The time-depth pair TD is obtained by corresponding matching, and the time-depth pair TD is used to correct the initial time-depth curve TD1 to obtain the corrected time-depth curve TD2 of each well;
[0070] Step 7: At the final top and bottom seismic horizons H 顶 and H 底 Under the trend constraint, the second velocity field V2 is established by interpolating the time-depth curve TD2 after the first correction;
[0071] Step 8: Use the second velocity field V2 to divide the sedimentary unit level in the depth domain target layer into top 深1 、top 深 2......top 深n Convert to time domain top 时1 、top 时2 ......top 时n ;
[0072] Step 9: At the final top and bottom seismic horizons H of the target layer 顶 and H 底 Under the trend constraint, the top of the sedimentary unit level in the target layer in the time domain 时1 、top 时2 ......top 时n Interpolation is used to obtain the top seismic horizons H1, H2, H2, H3, H4, H5, H6, H7, H8, H9, H10, H11, H12, H13, H14, H15, H16, H17, H18, H19, H20, H21, H22, H33, H34, H35, H36, H37, H38, H39, H40 n , for H1, H2...H n The consistency analysis and outlier processing were performed to obtain the final seismic horizon H of the top surface of each sedimentary unit in the target layer. d1 , H d2 ......H dn ;
[0073] Step 10: Use the depth domain to layer the top of the sedimentary unit level within the target layer 深1 、top 深2 ......top 深n , the bottom surface layer of the target layer and the top surface seismic horizon H of each sedimentary unit in the final target layer obtained in step 9 d1 , H d2 ......H dn , H 底 The final time-depth curve TD3 of each well is obtained by corresponding matching;
[0074] Step 11: Seismic horizon H at the top of each sedimentary unit in the final target layer d1 , H d2 ......Hdn , H 底 Under the trend constraint, the third velocity field V3 is established by interpolating the final time-depth curve TD3.
[0075] The following is an explanation of the specific operation examples for each step.
[0076] In some embodiments, the data in step 1 are obtained through conventional well logging interpretation and seismic structural interpretation. Well logging interpretation can be obtained based on respective well logging information, such as but not limited to well logging information such as resistivity, natural potential, acoustic wave velocity, and rock volume density. Seismic structural interpretation can be obtained based on respective seismic data, such as but not limited to using the reflection time, phase homogeneity, wave velocity and other kinematic information of seismic waves to study the distribution range and undulating morphology of stratum interfaces and the development of faults, and convert the travel time in the full screen of the seismic time section into the depth of the stratum interface to draw a structural map.
[0077] In some embodiments, the specific operation of step 2 may include calculating the reflection coefficient from the acoustic wave and density logging curve, convolving the reflection coefficient with the extracted seismic wavelet to obtain an initial synthetic seismic record, matching and adjusting the initial synthetic seismic record with the seismic trace near the well to obtain a final synthetic seismic record, and each depth point on the final synthetic seismic record corresponds to a time value, thereby obtaining an initial time-depth curve TD1 for each well.
[0078] In some embodiments, the specific operation of step 3 may include dividing the target layer into n small layers in equal proportion in the time domain, and the thickness of each small layer is d, then:
[0079] d=(h 底 -h 顶 ) / n
[0080] Among them, h 底 and h 顶 It is the top and bottom seismic horizon of the target layer obtained by seismic tectonic interpretation. n represents the number of small layers into which the target layer is divided. The value of n can be determined according to the thickness of the target layer and the accuracy requirement of the velocity to be established.
[0081] In h 顶 and h 底 n-1 seismic horizons are obtained, and the seismic horizon h of each small layer is obtained by calculation. i :
[0082] h i =h 顶 +i*d
[0083] Among them, i represents the number of small layers, 1≤i≤n-1;
[0084] Based on the initial time-depth curve TD1, each well in the time domain is connected to the seismic layer hi The time-depth pair (velocity) of the intersection point is extracted and interpolated between wells to obtain the small layer h i Plane velocity V i , when n is large enough, h i Plane velocity V i That is h i The velocity of the layer is calculated, thereby obtaining the first velocity field V1 of the target layer.
[0085] In some embodiments, the specific operation of step 4 may include: according to h = vt / 2 to obtain t = 2h / v, where t is the seismic double-layer travel time, h is the depth, and v is the velocity, through the first velocity field V1 using t = 2h / v to the top and bottom layers of the target layer 深顶、 top 深底 Convert from depth domain to time domaintop 时顶 、top 时底 .
[0086] In some embodiments, the specific operation of step 5 may include: taking two wells separated by a predetermined distance as boundaries, obtaining new top and bottom seismic horizons H by interpolation. 顶1 and H 底1 For example, when the distance between two wells is greater than the first predetermined distance, the inter-well interpolation trend is based on the seismic horizon trend; when the distance between two wells is less than the first predetermined distance, the inter-well trend is based on the inter-well time domain interpolation trend. The first predetermined distance can be 200-400 meters. 顶1 and H 底1 The consistency analysis and outlier processing can be performed separately, including: when the time domain stratification of an individual well is greatly different from that of its neighboring wells, an abnormal bulge or depression appears on the inserted new seismic horizon; when the well position is inconsistent with the overall trend of the seismic horizon, the final top and bottom seismic horizons H are obtained by removing outliers or smoothing the well position. 顶 and H 底 The overall trend of the new horizon is basically consistent with that of the original horizon, and the new horizon matches the well stratification better than the original horizon.
[0087] In some embodiments, the specific operation of step 6 may include: using the top layer of the oil layer group at the depth domain well point and the final top surface seismic layer H 顶 Matching is performed by using the bottom stratification of the oil layer group and the final bottom seismic layer H 底 The time-depth pair TD (velocity) of the top and bottom interfaces is obtained by matching, and the time-depth pair TD (velocity) is used to correct the initial time-depth curve TD1 to obtain the corrected time-depth curve TD2 for each well.
[0088] In some embodiments, the specific operation of step 7 may include: dividing the target layer into n' small layers in equal proportion in the time domain, and the thickness of each small layer is d', then:
[0089] d'=(H 底 -H 顶 ) / n'
[0090] Among them, H 底 and H 顶 are the final top and bottom seismic horizons obtained in step 5, and n' represents the number of sub-layers;
[0091] In H 顶 and H 底 n'-1 seismic horizons are obtained, and the seismic horizon H of each small layer is obtained by calculation. i :
[0092] H i =H 顶 +i'*d'
[0093] Among them, i' represents the number of small layers, 1≤i'≤n'-1;
[0094] Based on the corrected time-depth curve TD2, each well in the time domain is compared with the seismic layer H i The time-depth pairs of the intersection points are extracted and interpolated between wells to obtain the small layer H i Plane velocity V i ', when n' is large enough, H i Plane velocity V i 'It's H i ' layer's velocity, thereby obtaining the second velocity field V2 of the target layer.
[0095] In some embodiments, the specific operations of step 8 may include: obtaining t=2h / v according to h=vt / 2, where t is the seismic double-layer travel time, h is the depth, and v is the velocity, and converting the top and bottom layers of each sedimentary unit layer from the depth domain to the time domain using the t=2h / v formula through the second velocity field V2.
[0096] In some embodiments, the specific operation of step 9 may include: taking two wells separated by a second predetermined distance as boundaries, by dividing the top of the sedimentary unit level in the target layer in the time domain 时1 、top 时2 ......top 时n Interpolation is used to obtain the top seismic horizons H1, H2, H2, H3, H4, H5, H6, H7, H8, H9, H10, H11, H12, H13, H14, H15, H16, H17, H18, H19, H20, H21, H22, H33, H34, H35, H36, H37, H38, H39, H40 nWhen the distance between the two wells is greater than the second predetermined distance, the inter-well interpolation trend is based on the seismic horizon trend. When the distance between the two wells is less than the second predetermined distance, the inter-well trend is based on the inter-well time domain interpolation trend. The second predetermined distance can be 200-400 meters. For H1, H2...H n The consistency analysis and outlier processing can be performed separately: when the time domain stratification of an individual well is greatly different from that of its neighboring wells, an abnormal bulge or depression appears on the inserted new seismic horizon. In the case that the well position is inconsistent with the overall trend of the seismic horizon, the final seismic horizon H of the top surface of each sedimentary unit in the target layer can be obtained by removing the outliers or smoothing the well position. d1 , H d2 ......H dn The new horizons of each sedimentary unit are basically consistent with the overall trend of the original horizons, and match the well stratification better than the original horizons.
[0097] In some embodiments, the specific operation of step 10 may include: using the top layer of the sedimentary unit level in the target layer at the depth domain well point 深1 The seismic horizon H d1 Matching, layered top 深2 With seismic horizon H d2 Matching... Layered top 深n With seismic horizon H dn Matching, target layer bottom layer and H 底 Matching is performed to obtain n+1 groups of time-depth pairs, and these n+1 groups of time-depth pairs are used to correct the corrected time-depth curve TD2 to obtain the final time-depth curve TD3 of each well.
[0098] In some embodiments, the specific operation of step 11 may include: applying the final time-depth curve TD3 to each deposition unit-level segment to obtain the velocity of each layer according to the method of step 3. When the velocities of the layers of all deposition unit-level segments are obtained, the third velocity field V3 to be finally established is obtained.
[0099] In some embodiments, in step 10, the top of the oil layer group is the same layer as the top of the first sedimentary unit.
[0100] In some embodiments, in step 3 and step 5, the number of small layers is determined based on the target layer thickness and the accuracy requirement of the speed to be established.
[0101] The present invention also provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the steps of the above method are executed.
[0102] The present invention also provides a computer device, which includes at least one processor and a memory, wherein the memory stores a computer program that can be run on the processor. When the processor executes the program, the steps of the above method are performed.
[0103] The implementation process of the method of the present invention is described below by taking a block of Daqing Oilfield as an example.
[0104] Step 1 - Data Preparation:
[0105] Prepare the well data (logging curves, well inclination, layers), seismic data volume and top and bottom seismic horizon data (h 顶 and h 底 ).
[0106] Step 2- Obtain the time-depth curve TD1:
[0107] The reflection coefficient is calculated from the acoustic wave and density logging curve, and the reflection coefficient is convolved with the extracted seismic wavelet to obtain the initial synthetic seismic record. The initial synthetic seismic record is matched and adjusted with the seismic trace near the well to obtain the final synthetic seismic record. Each depth point on the synthetic record corresponds to a time value, thus obtaining the initial time-depth relationship curve DT1 of the well point.
[0108] Step 3-Build the preliminary velocity field V1:
[0109] In the time domain, the target layer is divided into n small layers in equal proportions, and the thickness of each small layer is d, then:
[0110] d=(h 底 -h 顶 ) / n
[0111] Where: h 底 and h 顶 It is the top and bottom seismic horizon of the target layer obtained by seismic tectonic interpretation. n represents the number of small layers into which the target layer is divided. n can be determined according to the thickness of the target layer and the accuracy requirement of the velocity to be established.
[0112] So in h 顶 and h 底 n-1 seismic horizons are obtained, and the seismic horizon h of each small layer is obtained by calculation. i :
[0113] h i =h 顶 +i*d
[0114] Among them, i represents the number of small layers, 1≤i≤n-1;
[0115] Based on the initial time-depth curve TD1, each well in the time domain is connected to the seismic layer h iThe time-depth pairs of the intersection points are extracted and interpolated between wells to obtain the small layer h i Plane velocity V i , when n is large enough, h i Plane velocity V i That is h i The velocity of the layer is calculated, thereby obtaining the first velocity field V1 of the target layer.
[0116] Step 4-Depth time conversion of top and bottom layers of the target layer:
[0117] According to h = vt / 2, we get t = 2h / v, where t is the seismic double-layer travel time, h is the depth, and v is the velocity. The top and bottom layers of the target layer are divided into top and bottom layers by the first velocity field V1 using the t = 2h / v formula. 深顶、 top 深底 Convert from depth domain to time domaintop 时顶、 top 时底 .
[0118] Step 5- Obtain the top and bottom seismic horizons H of the target layer that matches the well layer 顶 and H 底 :
[0119] Taking the interval between two wells as 300m, when the interval between two wells is greater than 300m, the inter-well interpolation trend is based on the seismic horizon trend. When the interval between two wells is less than 300m, the inter-well trend is based on the interpolation trend of the time domain between the two wells. The new top and bottom seismic horizons H are obtained by interpolation. 顶1 and H 底1 ;
[0120] When the time domain stratification of an individual well is significantly different from that of its neighboring wells, abnormal bulges or depressions appear on the inserted new seismic horizon, and when the well position is inconsistent with the overall trend of the seismic horizon, the final top and bottom seismic horizon H is obtained by removing outliers and smoothing the well position. 顶 and H 底 ( Figure 2 ), the overall trend of the new layer is basically consistent with the original layer, and it matches the well stratification better than the original layer.
[0121] Step 6 - Determine the corrected time-depth curve TD2 for each well:
[0122] Application of depth domain well point top layering and seismic horizon H 顶 Matching, oil layer bottom layer and seismic layer H 底 The initial time-depth curve TD1 is corrected by matching to obtain the corrected time-depth curve TD2 for each well.
[0123] Step 7-Use the time-depth curve TD2 to establish the velocity field V2;
[0124] The specific method is basically the same as step 3, except that the seismic horizon (h 顶 and h 底 ) is replaced by the seismic horizon (H 顶 and H 底 ), the initial time-depth curve TD1 is replaced by the corrected time-depth curve TD2 to obtain the second velocity field V2;
[0125] Step 8: Use the velocity field V2 to perform deep-time conversion on the unit-level layers in the target layer;
[0126] The specific method is basically the same as step 4, except that the top and bottom interface stratification of the target layer in step 4 is replaced by all sedimentary unit level stratification. Although the number of stratifications increases, the method is the same.
[0127] Step 9- Obtain the top seismic horizon H of each sedimentary unit in the target layer d1 , H d2 ......H dn :
[0128] The specific method is basically the same as step 5, except that step 5 obtains the seismic horizons of the top and bottom of the target layer, while this step obtains the seismic horizons of all sedimentary unit-level interfaces ( Figure 3 ).
[0129] Step 10- Obtain the final time-depth curve TD3 for each well:
[0130] Sedimentary unit level stratification within the target layer at the well point in the depth domain 深1 The top seismic horizon H d1 Matching, layered top 深2 With seismic horizon H d2 Matching... Layered top 深n With seismic horizon H dn Matching, target layer bottom layer and H 底 Matching is performed to obtain n+1 groups of time-depth pairs, and the corrected time-depth curve TD2 is corrected using the n+1 groups of time-depth pairs to obtain the final time-depth curve TD3 of each well match.
[0131] Step 11-Use the time-depth curve TD3 to establish the final velocity field V3.
[0132] The specific method is basically the same as step 3, except that it is more refined based on step 3, and each sedimentary unit-level layer segment is repeatedly subjected to the time-depth curve TD3 according to the method of step 3. i The velocity of the layer is obtained when the h of all sedimentary unit-level layers is iAfter all the velocities of the layers are obtained, the final velocity field V3 ( Figure 4 ).
[0133] The preferred embodiments of the present invention are described in detail above. However, the present invention is not limited to the specific details in the above embodiments. Within the technical concept of the present invention, a variety of simple modifications can be made to the technical solution of the present invention, and these simple modifications all belong to the protection scope of the present invention.
[0134] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present invention will not further describe various possible combinations.
[0135] In addition, various embodiments of the present invention may be arbitrarily combined, and as long as they do not violate the concept of the present invention, they should also be regarded as the contents disclosed by the present invention.
Claims
1. A velocity field establishment method for level-by-level matching of well-seismic layers. It is characterized in that The following steps are involved: Step 1: Prepare the target well location’s logging data, seismic data, and target layer top and bottom seismic layer data h 顶 and h 底 ; Step 2: Obtain the initial time-depth curve TD1 of each well by making seismic synthetic records; Step 3: In the top and bottom seismic layer data h of the target layer 顶 and h 底 Under the trend constraint, the first velocity field V1 is established by interpolating the initial time-depth curve TD1 of the well point; Step 4: Use the first velocity field V1 to separate the top and bottom layers of the target layer. 深顶 、top 深底 Convert from depth domain to time domaintop 时顶 、top 时底 ; Step 5: Under the constraints of the top and bottom seismic horizon trends of the target layer, the top and bottom layers in the time domain are 时顶 、top 时底 Interpolation obtains new top and bottom seismic horizons H 顶1 and H 底1 , for H 顶1 and H 底1 The final top and bottom seismic horizons H are obtained by performing consistency analysis and outlier processing respectively. 顶 and H 底 ; Step 6: Layer the top and bottom surfaces using the depth domain 深顶 、top 深底 The final top and bottom seismic horizons H obtained in step 5 顶 and H 底 The time-depth pair TD is obtained by corresponding matching, and the time-depth pair TD is used to correct the initial time-depth curve TD1 to obtain the corrected time-depth curve TD2 of each well; Step 7: At the final top and bottom seismic horizons H 顶 and H 底 Under the trend constraint, the second velocity field V2 is established by interpolating the corrected time-depth curve TD2; Step 8: Use the second velocity field V2 to divide the sedimentary unit level in the depth domain target layer into top 深1 、top 深2 ......top 深n Convert to time domain top 时1 、top 时2 ......top 时n ; Step 9: At the final top and bottom seismic horizons H of the target layer 顶 and H 底 Under the trend constraint, the top of the sedimentary unit level in the target layer in the time domain 时1 、top 时2 ......top 时n The top seismic horizon H of each sedimentary unit in the initial target layer is obtained by interpolation. 1 , H 2 ......H n , for H 1 , H 2 ......H n The consistency analysis and outlier processing were performed to obtain the final seismic horizon H of the top surface of each sedimentary unit in the target layer. d1 , H d2 ......H dn ; Step 10: Use the depth domain to layer the top of the sedimentary unit level within the target layer 深1 、top 深2 ......top 深n , the bottom surface layer of the target layer and the top surface seismic horizon H of each sedimentary unit in the final target layer obtained in step 9 d1 , H d2 ......H dn , H 底 The final time-depth curve TD3 of each well is obtained by corresponding matching; Step 11: Seismic horizon H at the top of each sedimentary unit in the final target layer d1 , H d2 ......H dn , H 底 Under the trend constraint, the third velocity field V3 is established by interpolating the final time-depth curve TD3.
2. The method according to claim 1, It is characterized in that The data in step 1 are obtained through conventional well logging interpretation and seismic structural interpretation.
3. The method according to claim 1, It is characterized in that Step 2 includes: calculating the reflection coefficient from the acoustic wave and density logging curve, convolving the reflection coefficient with the extracted seismic wavelet to obtain an initial synthetic seismic record, matching and adjusting the initial synthetic seismic record with the seismic trace near the well to obtain a final synthetic seismic record, and each depth point on the final synthetic seismic record corresponds to a time value, thereby obtaining the initial time-depth curve TD1 of each well.
4. The method according to claim 1, It is characterized in that Step 3 includes: dividing the target layer into n small layers in equal proportion in the time domain, and the thickness of each small layer is d, then: d=(h 底 -h 顶 ) / n Among them, h 底 and h 顶 It is the top and bottom seismic horizon of the target layer obtained by seismic tectonic interpretation, and n represents the number of small layers into which the target layer is divided; In h 顶 and h 底 n-1 seismic horizons are obtained, and the seismic horizon h of each small layer is obtained by calculation. i : h i =h 顶 +i*d Among them, i represents the number of small layers, 1≤i≤n-1; Based on the initial time-depth curve TD1, each well in the time domain is connected to the seismic layer h i The time-depth pairs of the intersection points are extracted and interpolated between wells to obtain the small layer h i Plane velocity V i , when n is large enough, h i Plane velocity V i That is h i The velocity of the layer is calculated, thereby obtaining the first velocity field V1 of the target layer.
5. The method according to claim 1, It is characterized in that Step 4 includes: according to h=vt / 2, t=2h / v is obtained, where t is the seismic double-layer travel time, h is the depth, and v is the velocity. The top and bottom layers of the target layer are divided into top and bottom layers of the target layer by the first velocity field V1 using the t=2h / v formula. 深顶、 top 深底 Convert from depth domain to time domaintop 时顶、 top 时底 .
6. The method according to claim 1, It is characterized in that Step 5 includes: taking the two wells separated by a predetermined distance as the boundary, obtaining new top and bottom seismic horizons H by interpolation 顶1 and H 底1 .
7. The method according to claim 6, It is characterized in that When the distance between two wells is greater than the preset distance, the inter-well stratified interpolation trend is based on the seismic stratum trend; when the distance between two wells is less than the preset distance, the inter-well trend is based on the inter-well stratified interpolation trend in the time domain of the two wells.
8. The method according to claim 6, It is characterized in that In step 5, H 顶1 and H 底1 The consistency analysis and outlier processing are respectively performed, including: when the time domain stratification of an individual well is greatly different from that of its neighboring wells, abnormal bulges and depressions appear on the inserted new seismic horizon. When the well position is inconsistent with the overall trend of the seismic horizon, the final top and bottom seismic horizons H are obtained by removing outliers or smoothing the well position. 顶 and H 底 .
9. The method according to claim 1, It is characterized in that Step 6 includes: using the top layer of the oil layer group at the depth domain well point and the final top surface seismic layer H 顶 Matching is performed by using the bottom stratification of the oil layer group and the final bottom seismic layer H 底 The time-depth pair TD of the top and bottom interfaces is obtained by matching, and the time-depth pair TD is used to correct the initial time-depth curve TD1 to obtain the corrected time-depth curve TD2 of each well.
10. The method according to claim 1, It is characterized in that Step 7 includes: dividing the target layer into n' small layers in equal proportion in the time domain, and the thickness of each small layer is d', then: d’=(H 底 -H 顶 ) / n’ Among them, H 底 and H 顶 are the final top and bottom seismic horizons obtained in step 5, and n' represents the number of sub-layers; In H 顶 and H 底 n'-1 seismic horizons are obtained, and the seismic horizon H of each small layer is obtained by calculation. i : H i =H 顶 +i’*d’ Among them, i' represents the number of small layers, 1≤i'≤n'-1; Based on the corrected time-depth curve TD2, each well in the time domain is compared with the seismic layer H i The time-depth pairs of the intersection points are extracted and interpolated between wells to obtain the small layer H i Plane velocity V i ', when n' is large enough, H i Plane velocity V i 'It's H i ' layer's velocity, thereby obtaining the second velocity field V2 of the target layer.
11. The method according to claim 1, It is characterized in that Step 8 includes: obtaining t=2h / v according to h=vt / 2, where t is the seismic double-layer travel time, h is the depth, and v is the velocity, and converting the top and bottom layers of each sedimentary unit layer from the depth domain to the time domain using the t=2h / v formula through the second velocity field V2.
12. The method according to claim 1, It is characterized in that Step 9 includes: taking two wells separated by a second predetermined distance as boundaries, by dividing the top of the sedimentary unit level in the target layer in the time domain 时1 、top 时 2......top 时n The top seismic horizon H of each sedimentary unit in the initial target layer is obtained by interpolation. 1 , H 2 ......H n .
13. The method according to claim 12, It is characterized in that When the distance between the two wells is greater than the second predetermined distance, the inter-well stratified interpolation trend is based on the seismic stratum trend; when the distance between the two wells is less than the second predetermined distance, the inter-well trend is based on the inter-well stratified interpolation trend in the time domain of the two wells.
14. The method according to claim 12, It is characterized in that In step 9, 1 , H 2 ......H n The consistency analysis and outlier processing are respectively performed, including: when the time domain stratification of an individual well is greatly different from that of its neighboring wells, an abnormal bulge or depression appears on the inserted new seismic horizon. In the case that the well position is inconsistent with the overall trend of the seismic horizon, the outlier removal or smoothing of the well position is performed to obtain the final seismic horizon H of the top surface of each sedimentary unit in the target layer. d1 , H d2 ......H dn .
15. The method according to claim 1, It is characterized in that Step 10 includes: using the top layer of the sedimentary unit level in the target layer at the depth domain well point 深1 The seismic horizon H d1 Matching, layered top 深2 With seismic horizon H d2 Matching... Layered top 深n With seismic horizon H dn Matching, target layer bottom layer and H 底 Matching is performed to obtain n+1 groups of time-depth pairs, and these n+1 groups of time-depth pairs are used to correct the corrected time-depth curve TD2 to obtain the final time-depth curve TD3 of each well.
16. The method according to claim 1, It is characterized in that Step 11 includes: applying the final time-depth curve TD3 to obtain the velocity of each layer of each deposition unit level segment according to the method of step 3. When the velocities of the layers of all deposition unit level segments are obtained, the third velocity field V3 to be finally established is obtained.
17. The method according to claim 1, It is characterized in that In step 10, the top of the oil layer group is the same layer as the top of the first sedimentary unit.
18. The method according to claim 1, It is characterized in that In step 3 and step 5, the number of small layers is determined according to the target layer thickness and the accuracy requirement of the velocity to be established.
19. A computer-readable storage medium storing a computer program. It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 18 are performed.
20. A computer device, include: at least one processor; as well as A memory storing a computer program executable on the processor, wherein the processor executes the steps of the method according to any one of claims 1 to 18 when executing the program.
Citation Information
Patent Citations
Precise prediction method for micro-amplitude structure
CN105717540A
A method for establishing a depth domain construction model
CN108663713A
Pre-stack and post-stack well-to-seismic joint time depth calibration method
CN112147717A
Shale gas horizontal well seismic while-drilling tracking method and device
CN113550734A
Reservoir prediction method for seismic constraint three-dimensional geologic modeling under straight-flat combined well pattern condition
CN115877447A