Advanced planning production scheduling method and system for microwave assembly digital production line

By adopting advanced planning and scheduling methods and systems on the digital production line of microwave components, using intelligent algorithms and real-time monitoring technology, the problem of difficult planning and variability impacts under manual management is solved, and higher production accuracy and production line are achieved Adaptability.

CN119067370APending Publication Date: 2024-12-03SOUTHWEST CHINA RES INST OF ELECTRONICS EQUIP
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411104765.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The digital production line of microwave components faces a high proportion of customized products, making it difficult to formulate plans. The planning and production scheduling management model based on manual experience is random and uncertain, and it is impossible to effectively deal with the impact of variability in the production process, reducing the accuracy of production scheduling.

Method used

Adopting an advanced planning and scheduling method and system for digital production lines of microwave components, including model construction and management, data acquisition and management, planning and scheduling module, result verification, visual interactive adjustment, real-time process monitoring and dynamic task adjustment, combined with super inspiration formula algorithm, local search algorithm and artificial intelligence algorithm to realize self-closed data loop and dynamic adjustment.

Benefits of technology

It significantly improves the accuracy of the production scheduling model, enhances the adaptability of the production line to internal and external changes, improves the accuracy and transparency of the plan, and reduces the workload of the plan managers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067370A_ABST
    Figure CN119067370A_ABST
Patent Text Reader

Abstract

The invention discloses an advanced planning and production scheduling method and system for a microwave assembly digital production line, and relates to the technical field of production planning and production scheduling. The system comprises a model construction and management module, a data acquisition and management module, a plan production scheduling module, a result verification module, a visual interaction adjustment module, a process real-time monitoring module, a task dynamic adjustment module and a data automatic updating module. The invention further provides an advanced planning production scheduling method. According to the method, the accuracy of the production scheduling model can be remarkably improved, the self-closed loop of production scheduling data is ensured, the adaptability of a production line to internal and external related change factors is enhanced, the plan accuracy and plan transparency of the production line are improved, and the workload of production scheduling and data maintenance of plan management personnel is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of production planning and scheduling, and in particular to an advanced planning and scheduling method and system for a digital production line of microwave components. Background Art

[0002] The statements in this section merely provide background information related to the present disclosure and may not constitute prior art.

[0003] Microwave components refer to microelectronic products that operate in the frequency range between hundreds of MHz and tens of GHz and have the functions of receiving, processing, and transmitting microwave signals. Microwave components are widely used in electronic information equipment in military / civilian fields such as radar, communications, navigation, automotive electronics, and 5G communications. The main processes of microwave component dispensing, patching, wire bonding, surface mounting, and testing basically require the use of automated equipment. The logistics of the production line basically adopts an automatic logistics system, and a digital operation control system of the production line needs to be configured. The above-mentioned automatic processing equipment, automatic logistics system, digital operation control system and other capability elements together constitute the digital production line of microwave components. In the operation and control of the digital production line of microwave components, planning and scheduling management is the core of production line operation management. How to optimize the planning management model and production scheduling method to achieve intelligent, efficient and on-time delivery has become the goal of the digital production line. For microwave components, their production tasks have the characteristics of multi-variety, variable batch, customization and flexible production, which makes the digital production line of microwave components face greater challenges. The main challenges are reflected in the difficulty of planning due to the high proportion of product customization. The planning and scheduling management mode based on manual experience leads to a large randomness in the control process. The external input plan changes and abnormal disturbances caused by the operation of the production line cause great uncertainty impact on the planning and scheduling management. At the same time, the collection of multi-source data in the whole process of microwave components is difficult and highly variable. The mode based on manual collection leads to low accuracy of the scheduling model generated based on data, which has a huge impact on the accuracy of the scheduling results. Therefore, there is an urgent need for an advanced planning and scheduling method and system for the digital production line of microwave components to optimize the planning and scheduling management activities of microwave components.

[0004] Chinese patent CN 109767114 A discloses an intelligent production scheduling system, which has the effect of predicting corresponding orders according to customer needs in previous years, and producing corresponding products in advance based on the orders, so as to improve the overall service efficiency for customers. Chinese patent CN 107767068A discloses a lean production advanced planning and scheduling system and method, which can achieve fine control of production and processing costs through the optimization application of product combination, brand name switching, balanced production, etc. The efficiency of production scheduling is achieved, the timeliness and accuracy of production planning are improved, and the timely supply of production materials and the safety of material delivery are effectively coordinated; the equipment load is effectively allocated, and the workload of planning personnel is greatly reduced. Chinese patent CN 112862308A discloses an automatic production scheduling system for molding and vulcanization based on the MES system, establishes an automatic production scheduling mode for molding and vulcanization links, optimizes the production scheduling process, establishes a monitoring mechanism, and makes timely adjustments to abnormal change information in production, forming a dynamic match of all links in the entire tire production chain. The above patents show that various scheduling methods and systems have significant advantages in improving the timeliness and accuracy of production plans. In addition, there are no patents related to advanced scheduling methods and systems for digital production lines in the microwave component industry. In order to solve the problem that the current digital production line planning and scheduling of microwave components relies on manual scheduling and collection of component production data, which cannot effectively cope with the impact of volatility in the production process and reduces the scheduling accuracy, the present invention proposes an advanced scheduling method and system for digital production lines of microwave components based on the technical characteristics of microwave components. Summary of the invention

[0005] The purpose of the present invention is to provide an advanced planning and scheduling method and system for a digital production line of microwave components in response to the problems existing in the prior art, which can significantly improve the accuracy of the scheduling model, ensure the self-closed loop of scheduling data, enhance the adaptability of the production line to internal and external related variable factors, improve the planning accuracy and planning transparency of the production line, and reduce the workload of planning management personnel in scheduling and data maintenance.

[0006] The technical solution of the present invention is as follows:

[0007] An advanced planning and scheduling system for a microwave component digital production line, comprising:

[0008] Model building and management module, used to build and manage the production scheduling model and its components included in the production line planning and scheduling activities;

[0009] Data acquisition and management module, used to acquire data generated by production line planning and scheduling activities and perform data management;

[0010] The production planning module is used to perform intelligent calculations on the medium- and long-term production planning model and the daily production scheduling model and generate medium- and long-term planning schemes and daily production scheduling schemes;

[0011] The result verification module is used to build a virtual scene of the production line, complete the simulation verification of the medium- and long-term plans and daily production scheduling plans, and obtain the simulation values ​​of the core planning indicators;

[0012] Visual interactive adjustment module, used to make visual interactive adjustments to medium- and long-term plans and daily production scheduling plans, so that the plans can enter the actual execution stage;

[0013] The real-time process monitoring module is used to monitor the actual scenes of the production line in real time;

[0014] The task dynamic adjustment module is used to respond to disturbances and anomalies generated by the real-life scenarios of the production line and dynamically adjust the daily production execution plan using algorithms;

[0015] The data automatic update module is used to parse the production data after the task is executed and iterate the original data, rules, and scheduling models.

[0016] Furthermore, data management methods include: data preprocessing, database storage, statistical analysis, visualization, and version management.

[0017] Furthermore, intelligent computing includes: hyper-heuristic algorithms, local search algorithms, and artificial intelligence algorithms.

[0018] Furthermore, the real-time monitoring includes: information system collection, camera acquisition, and device interface upload.

[0019] An advanced planning and scheduling method for a microwave component digital production line, based on the above-mentioned advanced planning and scheduling system for a microwave component digital production line, comprises:

[0020] Step S1: data preparation; determining the scope of data required for production planning and scheduling, the scope of data covering the entire process of the microwave component digital production line; and determining the calculation method of data required for advanced production planning and scheduling;

[0021] Step S2: Construction of production scheduling model: Constructing the production scheduling model required for production scheduling based on the business process, the components of the production scheduling model include: model assumptions, model variables, encoding methods, constraint rules, optimization goals, and data weights;

[0022] Step S3: data acquisition: establish a data acquisition mechanism, acquire data from the entire process, and perform data preprocessing; the data acquisition sources include: automatic collection on the device side, push from the front-end business system, feedback from the back-end execution system, and manual filling;

[0023] Step S4: production scheduling calculation; the production scheduling calculation is divided into two parts: medium- and long-term production planning and daily production scheduling planning;

[0024] Step S5: Result verification; the result verification is to simulate the virtual production process of the daily production scheduling plan, and verify the accuracy of the plan result by comparing the simulation value of the core plan index with the target value; when the difference between the simulation value and the target value exceeds the set critical value, manual adjustment can be made; the core plan index includes: on-time completion rate of work orders, equipment utilization rate, and number of work-in-progress; the result verification can realize the digital twin between the real scene plan result and the virtual scene execution result;

[0025] Step S6: manual adjustment; the manual adjustment is to adjust the parameters of the production scheduling plan, and then verify the plan again, and repeat this cycle until the simulation value of the core plan indicator meets the target value, and the plan can enter the actual execution stage; the adjusted parameters include: work calendar adjustment, equipment startup status adjustment and work order priority adjustment; the adjustment method is visual interactive adjustment, which includes providing a large number of visual modules to facilitate personnel to quickly obtain production line information. The adjustment only needs to use the mouse to drag and drop or enter a value to modify the module, and the adjustment result is displayed in the virtual scene;

[0026] Step S7: process monitoring; the process monitoring is to monitor the real scene of the production line after the task enters the actual execution stage; the monitoring method includes: camera monitoring and action recognition of equipment, equipment status extraction and log upload, control software log upload, and on-site personnel registration; the process monitoring can identify normal scenes and abnormal scenes, and present them in a visual way; the visual presentation method of the normal scene includes: real-time display and prediction of the progress of each process task, real-time display of equipment status, real-time display of equipment utilization, and real-time display of the process section in-process quantity; the visual presentation method of the abnormal scene includes: pop-up window reminder of the overdue situation of each process task, pop-up window reminder of the alarm status of each equipment, and pop-up window reminder of the need to replace equipment fixtures or instruments;

[0027] Step S8: Dynamic adjustment; the dynamic scheduling is to modify the daily production schedule in real time based on the dynamic scheduling model after the process monitoring detects disturbances and anomalies;

[0028] Step S9: automatic update; the automatic update is to obtain data after the task is completed, use intelligent algorithms to analyze the task execution process, update the data, rules, and scheduling models, and feed back to data preparation; the content of the automatic data update includes: working hours, transfer economic batches, production economic batches, switching time matrix, and post-time; the automatic update content of the rules includes: constraint rules for medium- and long-term plans, and dynamic scheduling rules; the automatic update content of the model includes: medium- and long-term production plan models, daily production scheduling models, and dynamic scheduling models. The automatic update method of the model includes: updating model construction rules and updating model parameters.

[0029] Furthermore, the data involved in step S1 include: equipment group, equipment processing capacity, production line work calendar and working hours, project number, latest project completion time, product number, order group, work order group, work order importance, work order start date, work order delivery date, process route, bill of materials, process processing time, economic batch size for production, economic batch size for transfer, switching time matrix, process post-time, type and quantity of tooling and fixtures, number of required tooling and fixtures, type and quantity of test instruments, number of required test instruments, equipment maintenance plan, real-time status of equipment, and logistics turnover speed; the calculation method includes: obtaining precise formulas, obtaining empirical formulas, and model construction and simulation.

[0030] Furthermore, the encoding method in step S2 is processing time matrix encoding, equipment processing sequence encoding and process processing sequence encoding; the constraint rules are processing capacity definition constraints, equipment capacity constraints and process configuration constraints; the optimization goals are capacity balance, shortest delay time and shortest order delay time; the data weights are work order priority weights, constraint weights and target weights; the types of scheduling models involved in the business process include: production line capacity model, work order consumption model, economic batch model, switching mode model, material set model, fixture and instrument occupancy model, medium and long-term production plan model, daily production scheduling model and dynamic scheduling model.

[0031] Furthermore, the data preprocessing workflow in step S3 is data cleaning, data integration, data reduction, and data transformation; the content of the data cleaning includes: removing or completing missing data, removing or modifying data with logical errors, removing or modifying data with format and content errors, and verifying the relevance of data; the data integration is the work of merging data from multiple data sources, and the content includes identification of data entities, data redundancy and correlation analysis, data value conflict detection and processing, and data outlier detection; the data reduction is dimensionality reduction, data reduction, and data compression on the basis of ensuring data integrity; the content of the data transformation includes: summarizing and aggregating data, and constructing attributes.

[0032] Furthermore, the process of formulating the medium- and long-term production plan in step S4 is as follows: ① Establish a work order consumption model based on the work order information pushed by the front-end business system; the output data of the work order consumption model is the workload accumulated in each process for all work orders in progress; ② Establish a production line capacity model based on the basic configuration data of the microwave component digital production line and the basic configuration data of the equipment; the output data of the production line capacity model should be the production volume of the production line in each process; ③ According to the above-mentioned work order consumption model and production line capacity model, add the constraint rules of the medium- and long-term plan, and establish a medium- and long-term production plan model based on the production line process; the constraint rules of the medium- and long-term plan include: capacity rules, material arrival rules, and priority rules; the priority rules include: rules according to importance, start date and delivery date information priority or priority combination; ④ According to the medium- and long-term production plan model, Based on all the work order information of prefabrication and in-progress, a medium- and long-term plan is generated; the plan is a production sequencing plan for a work order; the equipment dimension of the production sequencing plan is all equipment, and the work order dimension is all work orders within the time span; the output of the plan includes: the completion time of all work orders, the Gantt chart of equipment utilization, and the material supply warning table; the work order time span of the plan is more than three months; ⑤ According to the results of the original plan, the plan is adjusted on the interactive interface to generate a new plan; the plan adjustment method includes: work calendar adjustment, equipment startup status adjustment and work order priority adjustment; ⑥ According to different plan results, multiple plans can be saved and the output of the plans can be compared, and the best plan can be highlighted; ⑦ According to the results of the best plan, the work order can enter the daily production scheduling stage after the review is completed;

[0033] The formulation process of daily production scheduling includes: ① Based on the medium- and long-term production planning model, the constraint model is integrated to generate a daily production scheduling model; the constraint model includes: economic batch model, switching mode model, material set model, tooling fixture, mold and instrument occupancy model; the dimension of the constraint model is process level, and each process can independently set the weights of these constraints; the material set model can affect the start-up situation of the process; ② Based on the daily production scheduling model, the work orders entering the daily production scheduling stage are automatically scheduled to generate a daily production scheduling plan; the output of the plan includes: scheduling results and production Gantt chart; the task granularity of the scheduling result is at least second level, and the resource granularity is at least equipment; ③ The daily production scheduling plan enters the result verification stage after the review is completed.

[0034] Furthermore, the disturbance in step S8 includes: work order insertion, work order priority adjustment; the abnormalities include: equipment status abnormality, personnel status abnormality, instrument status abnormality, and fixture status abnormality; the dynamic scheduling model is a task based on real-time judgment of scheduling rules, and adjusts tasks under the constraints of scheduling constraints to meet the set scheduling goals; the scheduling rules include: line scheduling rules, inter-unit scheduling rules, exit rules, AGV transportation rules; the scheduling constraints include: post-time constraints, AGV capacity constraints, equipment capacity constraints, vehicle quantity constraints, cache location constraints; the scheduling goals include: highest output, shortest switching time; the way to adjust tasks includes: updating the order of task time, updating the task designated machine; the scheduling goals include: task execution according to arrival time, task execution according to start time, and task execution according to designated machine.

[0035] Compared with the prior art, the present invention has the following beneficial effects:

[0036] An advanced planning and scheduling method and system for a digital production line of microwave components can significantly improve the accuracy of the scheduling model, ensure the self-closed loop of scheduling data, enhance the adaptability of the production line to relevant internal and external changing factors, improve the planning accuracy and planning transparency of the production line, and reduce the workload of planning management personnel in scheduling and data maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 A flow chart showing the advanced planning and scheduling method for the digital production line of microwave components of the present invention is shown;

[0038] Figure 2 The schematic diagram of the structure of the advanced planning and scheduling system of the digital production line of microwave components of the present invention is shown. DETAILED DESCRIPTION

[0039] It should be noted that relational terms such as "first" and "second" are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0040] The features and performance of the present invention are further described in detail below in conjunction with the embodiments.

[0041] Embodiment 1

[0042] See also Figure 2 , an advanced planning and scheduling system for a microwave component digital production line, including:

[0043] The model building and management module is used to build and manage the production scheduling model and its components included in the production line planning and scheduling activities. This module is used to implement steps S1 and S2.

[0044] The data acquisition and management module is used to acquire the data generated by the production line planning and scheduling activities and perform data management. The data management methods include but are not limited to data preprocessing, database storage, statistical analysis, visualization, and version management. This module is used to implement step S3.

[0045] The production planning module is used to perform intelligent calculations on the medium- and long-term production planning model and the daily production scheduling model and generate medium- and long-term planning schemes and daily production scheduling schemes. The intelligent calculation methods include but are not limited to hyper-heuristic algorithms, local search algorithms, and artificial intelligence algorithms. This module is used to implement step S4.

[0046] The result verification module is used to build a virtual scene of the production line, complete the simulation verification of the medium- and long-term plan and the daily production scheduling plan, and obtain the simulation value of the core plan index. When the simulation value of the core plan index does not meet the target value, manual adjustment is performed through the visual interactive adjustment module. This module is used to implement step S5.

[0047] The visual interactive adjustment module is used to visually and interactively adjust the medium- and long-term plans and daily production scheduling plans so that the plans can enter the actual execution stage. After the manual adjustment is completed, the simulation verification is performed again through the result verification module. When the simulation value of the core plan indicator meets the target value, the plan can enter the actual execution stage. This module is used to implement step S6.

[0048] The process real-time monitoring module is used to monitor the real scene of the production line in real time. The real-time monitoring technology includes but is not limited to information system collection, camera acquisition, and device interface upload. This module is used to implement step S7.

[0049] The task dynamic adjustment module is used to respond to disturbances and anomalies generated by the real scene of the production line and dynamically adjust the daily production execution plan using an algorithm. This module is used to implement step S8.

[0050] The data automatic update module is used to analyze the production data after the task is executed, and iterate the original data, rules, and production scheduling model. This module is used to implement step S9.

[0051] Based on the advanced planning and scheduling system for a microwave component digital production line, this embodiment also proposes an advanced planning and scheduling method for a microwave component digital production line. Figure 1 , specifically including the following steps:

[0052] Step S1: Data preparation. Determine the scope of data required for production planning and scheduling. The scope of data should include the entire process of the digital production line of microwave components. The data involved include but are not limited to equipment groups, equipment processing capabilities, production line work calendar and working hours, project numbers, latest project completion times, product numbers, order groups, work order groups, work order importance, work order start dates, work order delivery dates, process routes, bills of materials, process processing time, production economic batches, transfer economic batches, switching time matrix, process post-time, types and quantities of tooling and fixtures, the number of tooling and fixtures required, types and quantities of test instruments, the number of test instruments required, equipment maintenance plans, real-time equipment status, and logistics turnover speed. Determine the calculation method for data required for advanced production planning and scheduling. The calculation method includes but is not limited to precise formula retrieval, empirical formula retrieval, and model construction simulation.

[0053] Step S2: Construction of production scheduling model. Construct the production scheduling model required for production planning and scheduling based on the business process. The components of the production scheduling model include but are not limited to model assumptions, model variables, coding methods, constraint rules, optimization goals, and data weights. The coding method is processing time matrix coding, equipment processing sequence coding, and process processing sequence coding; the constraint rules are processing capacity definition constraints, equipment capacity constraints, and process configuration constraints; the optimization goals are capacity balance, shortest delay time, and shortest order delay time; the data weights are work order priority weights, constraint weights, and target weights. The types of production scheduling models involved in the business process include but are not limited to production line capacity models, work order consumption models, economic batch models, switching mode models, material set models, fixture and instrument occupancy models, medium- and long-term production planning models, daily production scheduling models, and dynamic scheduling models.

[0054] Step S3: Data acquisition. Establish a data acquisition mechanism to acquire data from the entire process and perform data preprocessing. The data acquisition sources include but are not limited to automatic collection on the device side, push from the front-end business system, feedback from the back-end execution system, and manual filling. The data preprocessing workflow includes data cleaning, data integration, data reduction, and data transformation. For example, the process processing time, production economic batch, transfer economic batch, switching time matrix, and process post-time in the basic product information need to be stored in the front-end business system through data preprocessing. The content of the data cleaning is not limited to removing or completing missing data, removing or modifying data with logical errors, removing or modifying data with format and content errors, and verifying the relevance of data. The data integration is the work of merging the data from the above multiple data sources, including but not limited to the identification of data entities, data redundancy and correlation analysis, data value conflict detection and processing, and data outlier detection. The data reduction is the work of dimension reduction, data reduction, and data compression on the basis of ensuring data integrity. The content of the data transformation is not limited to summarizing and aggregating data and constructing attributes.

[0055] Step S4: production scheduling calculation. The production scheduling calculation is divided into two parts: medium- and long-term production planning and daily production scheduling planning.

[0056] The process of formulating the medium- and long-term production plan is as follows: ① Establish a work order consumption model based on the work order information pushed by the front-end business system. The output data of the work order consumption model should be the workload accumulated in each process of all work orders in process. ② Establish a production line capacity model based on the basic configuration data and equipment basic configuration data of the digital production line of microwave components. The output data of the production line capacity model should be the production volume of the production line in each process. ③ According to the above work order consumption model and production line capacity model, add the constraint rules of the medium- and long-term plan to establish a medium- and long-term production plan model based on the production line process. The constraint rules of the medium- and long-term plan include but are not limited to capacity rules, material arrival rules, and priority rules. The priority rules include but are not limited to rules based on information priority or priority combination such as importance, start date and delivery date. ④ According to the medium- and long-term production plan model, a medium- and long-term plan scheme is generated based on all prefabricated and in process work order information. The scheme is a production sequencing scheme for work orders. The equipment dimension of the production sequencing scheme is all equipment, and the work order dimension is all work orders within the time span. The output of the scheme includes but is not limited to the completion time of all work orders, the Gantt chart of equipment utilization, and the material supply warning table. The work order time span of the scheme is more than three months. ⑤ According to the results of the original scheme, the scheme is adjusted on the interactive interface to generate a new scheme. The scheme adjustment methods include but are not limited to work calendar adjustment, equipment startup status adjustment and work order priority adjustment. ⑥ According to different scheme results, multiple schemes can be saved and the output of the schemes can be compared, and the best scheme can be highlighted by color. ⑦ According to the results of the best scheme, the work order can enter the daily production scheduling stage after the review is completed.

[0057] The formulation process of the daily production scheduling plan includes ① based on the medium- and long-term production planning model, integrating the constraint model to generate the daily production scheduling model. The constraint model includes but is not limited to the economic batch model, the switching mode model, the material set model, the tooling fixture, mold and instrument occupancy model. The dimension of the constraint model is the process level, and each process can set the weight of these constraints independently. The material set model can affect the start-up of the process. ② Based on the daily production scheduling model, the work orders entering the daily production scheduling stage are automatically scheduled to generate a daily production scheduling plan. The output of the plan includes but is not limited to scheduling results and production Gantt charts. The minimum task granularity of the scheduling result is seconds, and the minimum resource granularity is equipment. ③ After the review is completed, the daily production scheduling plan enters the result verification stage.

[0058] Step S5: Result verification. The result verification is to simulate the daily production scheduling plan in a virtual production process, and verify the accuracy of the plan result by comparing the simulation value of the core plan indicator with the target value. When the difference between the simulation value and the target value exceeds the set critical value, manual adjustment can be made. The core plan indicators include but are not limited to the on-time completion rate of work orders, equipment utilization rate, and the number of work-in-progress. The result verification can realize the digital twin between the real scene plan results and the virtual scene execution results.

[0059] Step S6: Manual adjustment. The manual adjustment is made by adjusting the parameters of the production scheduling plan, and then verifying the plan with the results, and repeating this cycle until the simulation value of the core plan indicator meets the target value, and the plan can enter the actual execution stage. The adjusted parameters include but are not limited to work calendar adjustment, equipment startup status adjustment and work order priority adjustment. The adjustment method is a visual interactive adjustment, which includes providing a large number of visual modules to facilitate personnel to quickly obtain production line information. The adjustment only requires dragging and dropping the mouse or entering a value to modify the module, and the adjustment result is displayed in the virtual scene.

[0060] Step S7: process monitoring. The process monitoring is to monitor the real scene of the production line after the task enters the actual execution stage. The monitoring methods include but are not limited to camera monitoring and motion recognition of equipment, equipment status extraction and log upload, control software log upload, and on-site personnel registration. The process monitoring can identify normal scenes and abnormal scenes and present them in a visual manner. The visualization presentation method of the normal scene includes but is not limited to real-time display and prediction of the progress of each process task, real-time display of equipment status, real-time display of equipment utilization, and real-time display of the process section work-in-progress. The visualization presentation method of the abnormal scene includes but is not limited to pop-up windows to remind the overdue status of each process task, pop-up windows to remind the alarm status of each device, and pop-up windows to remind the need to replace equipment fixtures or instruments.

[0061] Step S8: Dynamic adjustment. The dynamic scheduling is to modify the daily production schedule in real time based on the dynamic scheduling model after the process monitoring detects disturbances and anomalies. The disturbances include but are not limited to work order insertion and work order priority adjustment, and the anomalies include but are not limited to abnormal equipment status, abnormal personnel status, abnormal instrument status, and abnormal fixture status. The dynamic scheduling model is a task based on the real-time judgment of the scheduling rules, and the task is adjusted under the constraints of the scheduling constraints to meet the set scheduling goals. The scheduling rules include but are not limited to scheduling rules within the line, scheduling rules between units, exit rules, and AGV transportation rules. The scheduling constraints include but are not limited to post-time constraints, AGV capacity constraints, equipment capacity constraints, vehicle quantity constraints, and cache location constraints. The scheduling goals include but are not limited to the highest output and the shortest switching time. The way to adjust the task includes but is not limited to updating the order of task time and updating the task designated machine. The scheduling goals include but are not limited to executing tasks according to arrival time, executing tasks according to start time, and executing tasks according to designated machines.

[0062] Step S9: Automatic update. The automatic update is to obtain data after the task is completed, use intelligent algorithms to analyze the task execution process, update the data, rules, and scheduling models, and feed back to data preparation. The content of the automatic data update includes but is not limited to working hours, transfer economic batches, production economic batches, switching time matrix, and lead time. The automatic update content of the rules includes but is not limited to the constraint rules of medium- and long-term plans and dynamic scheduling rules. The automatic update content of the model includes but is not limited to medium- and long-term production plan models, daily production scheduling models, and dynamic scheduling models. The automatic update method of the model includes but is not limited to updating model construction rules and updating model parameters.

[0063] Embodiment 2

[0064] Embodiment 2 is a specific application of an advanced planning and scheduling method for a digital production line of microwave components proposed in Embodiment 1, and specifically includes:

[0065] Step S1: Data preparation.

[0066] Determine the scope of data required for production planning and scheduling. The scope of the data should cover the entire process of the microwave component digital production line. The data involved include but are not limited to equipment group (e.g., there are 3 SMT machines in the SMT equipment function group, and the equipment numbers are M01, M02 and M03), equipment processing capacity (e.g., the capacity of processing SMT process), production line work calendar and working hours, project number (e.g., P001), latest completion time of the project (e.g., 2024 / 12 / 31), product number (e.g., B001), order group (e.g., O001), work order group (e.g., O001-01), work order importance (e.g., important), work order start date (e.g., 2024 / 04 / 01), work order delivery date (e.g., 2024 / 04 / 30), process route (e.g., 01 dispensing - 02 SMT - 03 curing - 04 bonding - 05 testing), bill of materials (e.g., B001 requires 10 pieces of material B002 and 5 pieces of material B003 in the 02 SMT process), process processing time (e.g., B00 1’s 02 patch process processing time is 10 minutes), economic batch for production (e.g. 8 pieces), economic batch for transfer (e.g. 16 pieces), switching time matrix (e.g. the preparation time required for B001 to switch to other products in M1 and the preparation time required for other products to switch to B001), process post-process time (e.g. B001 needs to complete 02 patch process within 2 hours after completing 01 dispensing process), types and quantity of tooling and fixtures (e.g. there are 10 nozzles A in the nozzle warehouse), the number of tooling and fixtures required (e.g. B001 needs 1 nozzle A in 02 patch process), types and quantity of test instruments (e.g. there are 2 spectrum analyzers in the instrument storage warehouse), the number of test instruments required (e.g. B001 needs 1 spectrum analyzer in 05 test process), equipment maintenance plan (e.g. M1 needs maintenance work from 2024 / 04 / 03 to 2024 / 04 / 04), real-time status of equipment (e.g. in process), and logistics turnover speed (e.g. the circulation speed of AGV and the circulation speed of guide rail). Determine the calculation method for the data required for advanced planning and scheduling, which includes but is not limited to obtaining precise formulas, obtaining empirical formulas, and model building simulation.

[0067] Step S2: Construction of production scheduling model.

[0068] The production scheduling model required for production planning and scheduling is constructed based on the business process. The components of the production scheduling model include but are not limited to model assumptions, model variables, coding methods, constraint rules, optimization goals, and data weights. The coding method is processing time matrix coding, equipment processing sequence coding, and process processing sequence coding; the constraint rules are processing capacity definition constraints, equipment capacity constraints, and process configuration constraints; the optimization goals are capacity balance, shortest delay time, and shortest order delay time; the data weights are work order priority weights, constraint weights, and target weights. The types of production scheduling models involved in the business process include but are not limited to production line capacity models, work order consumption models, economic batch models, switching mode models, material set models, fixture and instrument occupancy models, medium- and long-term production planning models, daily production scheduling models, and dynamic scheduling models. For example, in the digital production line of microwave components, the above-mentioned production scheduling model is constructed based on the data within the range described in step S1. For example, the daily production scheduling model is constructed as follows: ① According to the actual business process, summarize the assumptions of the planning and scheduling model and identify the data variables involved in the model; ② According to the actual business process, simplify and decouple the business process and determine the coding method of the variables; identify the key business points and extract the planning and scheduling constraint rules; ③ Determine the constraint weights according to the focus of the actual business process; ④ Determine the optimization goals of the model according to the goals that need to be achieved by the actual business; ⑤ Establish a scheduling model and determine the optimization mechanism of the model.

[0069] Step S3: data acquisition.

[0070] Establish a data acquisition mechanism to acquire data from the entire process and perform data preprocessing. The data acquisition sources include but are not limited to automatic acquisition from the equipment end, push from the front-end business system, feedback from the back-end execution system, and manual filling. For example, in the digital production line of microwave components, the equipment status is automatically collected from the equipment end, the basic information, order information, and basic material information of microwave component products are pushed from the front-end business system, and the reporting information is feedback from the back-end execution system and manual filling. The data preprocessing workflow includes data cleaning, data integration, data reduction, and data transformation. For example, in the digital production line of microwave components, the process processing time, production economic batch, transfer economic batch, switching time matrix, and process post-time in the basic product information need to be stored in the front-end business system through data preprocessing. The content of the data cleaning includes but is not limited to removing or completing missing data, removing or modifying data with logical errors, removing or modifying data with format and content errors, and verifying the relevance of data. The data integration includes the work of merging the data from the above multiple data sources, including but not limited to the identification of data entities, data redundancy and correlation analysis, data value conflict detection and processing, and data outlier detection. The data reduction is the work of dimension reduction, data reduction, and data compression on the basis of ensuring data integrity. The content of the data transformation includes but is not limited to data aggregation and attribute construction. For example, in the digital production line of microwave components, the basic information of the product comes from multiple front-end business systems, and there are missing values ​​and null values ​​in the data content, which requires data cleaning, data integration and other data preprocessing work.

[0071] Step S4: production scheduling calculation.

[0072] The production scheduling operation is divided into two parts: medium- and long-term production planning and daily production scheduling.

[0073] The process of formulating the medium- and long-term production plan is as follows: ① Establish a work order consumption model based on the work order information pushed by the front-end business system. The output data of the work order consumption model should be the workload accumulated in each process for all work orders in progress. For example, in the digital production line of microwave components, the work order information includes project number, latest completion time of the project, order group, work order group, work order importance, work order start date, work order delivery date, work order process route, work order bill of materials, and process processing time. The work order consumption model is established based on the above information. ② Establish a production line capacity model based on the basic configuration data and equipment basic configuration data of the digital production line of microwave components. The output data of the production line capacity model should be the production volume of the production line in each process. For example, in the digital production line of microwave components, the basic configuration data includes but is not limited to the production line work calendar, commuting time, and logistics turnover speed, and the basic configuration data of equipment includes but is not limited to equipment group and equipment processing capacity. The production line capacity model is established based on the above information. ③ According to the above work order consumption model and production line capacity model, add the constraint rules of the medium- and long-term plan to establish a medium- and long-term production plan model based on the production line process. The constraint rules of the medium- and long-term plan include but are not limited to capacity rules, material arrival rules, and priority rules. The priority rules include but are not limited to rules based on information priority or priority combination such as importance, start date and delivery date. For example, in the digital production line of microwave components, according to the work order model and the production line capacity model, the medium- and long-term production plan model is established with capacity rules, material arrival rules and priority rules. The priority rules are rules based on information priority or priority combination such as importance, start date and delivery date. ④ According to the medium- and long-term production plan model, based on all prefabricated and in-process work order information, a medium- and long-term plan scheme is generated. The scheme is a production sequencing scheme for a work order. The equipment dimension of the production sequencing scheme is all equipment, and the work order dimension is all work orders within the time span. The output of the scheme includes but is not limited to the completion time of all work orders, the Gantt chart of equipment utilization, and the material supply warning table. The work order time span of the scheme is more than three months. For example, in the digital production line of microwave components, according to the medium- and long-term production plan model and the production situation of the production line, an original medium- and long-term plan with a time span of three months is generated. ⑤ According to the results of the original solution, adjust the solution on the interactive interface to generate a new solution. The solution adjustment methods include but are not limited to work calendar adjustment, equipment startup status adjustment and work order priority adjustment. For example, in the digital production line of microwave components, according to the results of the original solution, adjust the work calendar to increase overtime shifts or increase equipment startup status, improve the production capacity of the production line, and provide conditions for meeting the optimization goals. ⑥ According to different solution results, multiple solutions can be saved and the outputs of the solutions can be compared, and the best solution can be highlighted by color. For example, in the digital production line of microwave components, the outputs of the solution without overtime shifts are compared with the solution with overtime shifts, and the best solution is selected according to the advantages and disadvantages of the optimization indicators.⑦ According to the results of the best solution, the work order can enter the daily production scheduling stage after the review is completed. For example, in the digital production line of microwave components, there are multiple new work orders pushed by the front-end business system. After the medium- and long-term production plan, the work orders are screened and reviewed according to the results of the best solution. These work orders can be scheduled for daily production.

[0074] The formulation process of daily production scheduling includes: ① Based on the medium- and long-term production planning model, the constraint model is integrated to generate a daily production scheduling model. The constraint model includes but is not limited to the economic batch model, the switching mode model, the material set model, the fixture, mold and instrument occupancy model. The dimension of the constraint model is the process level, and each process can set the weight of these constraints independently. The material set model can affect the start of the process. For example, in the digital production line of microwave components, there is a switching time when the chip placement machine switches products, and the chip placement machine needs fixtures such as nozzles to process components. Therefore, the constraint model of the chip placement process has a switching mode model and a fixture occupancy model. ② Based on the daily production scheduling model, the work order entering the daily production scheduling planning stage is automatically scheduled to generate a daily production scheduling plan. The output of the plan includes but is not limited to the scheduling results and the production Gantt chart. The minimum task granularity of the scheduling result is second level, and the minimum resource granularity is equipment. For example, in the digital production line of microwave components, the work orders entering the daily production scheduling stage are automatically scheduled to generate a daily production scheduling plan, which can output scheduling results with task granularity at the minute level and resource granularity at the equipment level. ③ After the review is completed, the daily production scheduling plan enters the result verification stage.

[0075] Step S5: Result verification.

[0076] The result verification is to simulate the virtual production process of the daily production scheduling plan, and verify the accuracy of the plan results by comparing the simulation value of the core plan indicator with the target value. When the gap between the simulation value and the target value exceeds the set critical value, step S6 can be manually adjusted. The core plan indicators include but are not limited to the on-time completion rate of work orders, equipment utilization rate, and the number of work-in-progress. The result verification can realize the digital twin between the real scene plan results and the virtual scene execution results. For example, in the digital production line of microwave components, a simulation of the virtual production process is established according to the resource distribution of the production line, and the daily production scheduling plan is input into the simulation model, and the accuracy of the plan results is verified by the on-time completion rate of the work order.

[0077] Step S6: Manual adjustment.

[0078] The manual adjustment is made by adjusting the parameters of the production scheduling plan, and then verifying the plan with the results of step S5, and repeating this cycle until the simulation value of the core plan indicator meets the target value, and the plan can enter the actual execution stage. The parameters of the adjustment include but are not limited to work calendar adjustment, equipment startup status adjustment and work order priority adjustment. The adjustment method is a visual interactive adjustment, and the content includes providing a large number of visual modules to facilitate personnel to quickly obtain production line information. The adjustment only requires dragging and dropping the mouse or entering a value to modify the module, and the adjustment result is displayed in the virtual scene. For example, in the digital production line of microwave components, when the simulation results of the daily production scheduling model do not meet the requirements of the on-time completion rate of the work order, the equipment processing time is extended through the work calendar adjustment to meet the requirements of the on-time completion rate of the work order.

[0079] Step S7: process monitoring.

[0080] The process monitoring is to monitor the real scene of the production line after the task enters the actual execution stage. The monitoring methods include but are not limited to camera monitoring and motion recognition of equipment, equipment status extraction and log upload, control software log upload, and on-site personnel registration. The process monitoring can identify normal scenes and abnormal scenes and present them in a visual way. The visual presentation method of the normal scene includes but is not limited to real-time display and prediction of the progress of each process task, real-time display of equipment status, real-time display of equipment utilization, and real-time display of process segment work-in-progress. The visual presentation method of the abnormal scene includes but is not limited to pop-up window reminders of the overdue situation of each process task, pop-up window reminders of the alarm status of each device, and pop-up window reminders of the need to replace equipment fixtures or instruments. For example, in the digital production line of microwave components, when the placement machine alarms due to an emergency fault, the equipment status will be automatically extracted, and a pop-up window will be displayed in the system to remind the alarm status of the placement machine. The fault will affect the processing progress of the process task, and a pop-up window will be displayed in the system to remind the overdue situation of the process task.

[0081] Step S8: Dynamic adjustment.

[0082] The dynamic scheduling is to modify the daily production schedule in real time based on the dynamic scheduling model after the process monitoring detects disturbances and anomalies. The disturbances include but are not limited to work order insertion and work order priority adjustment, and the anomalies include but are not limited to abnormal equipment status, abnormal personnel status, abnormal instrument status, and abnormal fixture status. The dynamic scheduling model is a task based on the real-time judgment of the scheduling rules, and the task is adjusted under the constraints of the scheduling constraints to meet the set scheduling goals. The scheduling rules include but are not limited to scheduling rules within the line, scheduling rules between units, exit rules, and AGV transportation rules. The scheduling constraints include but are not limited to post-time constraints, AGV capacity constraints, equipment capacity constraints, vehicle quantity constraints, and cache location constraints. The scheduling goals include but are not limited to the highest output and the shortest switching time. The way to adjust the task includes but is not limited to updating the order of task time and updating the task designated machine. The scheduling goals include but are not limited to executing tasks according to arrival time, executing tasks according to start time, and executing tasks according to designated machines. For example, in a digital production line for microwave components, when a task carrier is circulating within the line and process monitoring detects an abnormal equipment status, the task is judged in real time based on the scheduling rules within the line and between units, and the task's designated machine is updated to meet the requirement that the task be executed according to the arrival time.

[0083] Step S9: Automatic update.

[0084] The automatic update is to obtain data after the task is completed, use intelligent algorithms to analyze the task execution process, update the data, rules, and scheduling models, and feed back to step S1 data preparation. The content of the automatic data update is not limited to working hours, transfer economic batches, production economic batches, switching time matrix, and post-time. The automatic update content of the rules is not limited to the constraint rules and dynamic scheduling rules of medium- and long-term plans. The automatic update content of the model includes but is not limited to medium- and long-term production planning models, daily production scheduling models, and dynamic scheduling models. The automatic update method of the model includes but is not limited to updating model construction rules and updating model parameters. For example, in the digital production line of microwave components, the task start time and task end time are obtained after the task is completed, and the intelligent algorithm is used to calculate the working hours, and the working hour data is updated.

[0085] The above-mentioned embodiments only express the specific implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the protection scope of the present application. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the technical solution concept of the present application, and these all belong to the protection scope of the present application.

[0086] This background section is provided to generally present the context of the invention, and the work of the presently named inventors, the work to the extent described in this background section, and aspects of this section that did not constitute prior art at the time of application are neither explicitly nor implicitly admitted to be prior art to the present invention.

Claims

1. An advanced planning and scheduling system for a microwave component digital production line, characterized in that: include: Model building and management module, used to build and manage the production scheduling model and its components included in the production line planning and scheduling activities; Data acquisition and management module, used to acquire data generated by production line planning and scheduling activities and perform data management; The production planning module is used to perform intelligent calculations on the medium- and long-term production planning model and the daily production scheduling model and generate medium- and long-term planning schemes and daily production scheduling schemes; The result verification module is used to build a virtual scene of the production line, complete the simulation verification of the medium- and long-term plans and daily production scheduling plans, and obtain the simulation values ​​of the core planning indicators; Visual interactive adjustment module, used to make visual interactive adjustments to medium- and long-term plans and daily production scheduling plans, so that the plans can enter the actual execution stage; The real-time process monitoring module is used to monitor the actual scenes of the production line in real time; The task dynamic adjustment module is used to respond to disturbances and anomalies generated by the real-life scenarios of the production line and dynamically adjust the daily production execution plan using algorithms; The data automatic update module is used to parse the production data after the task is executed and iterate the original data, rules, and scheduling models.

2. The advanced planning and scheduling system for a microwave component digital production line according to claim 1 is characterized in that: Data management methods include: data preprocessing, database storage, statistical analysis, visualization, and version management.

3. The advanced planning and scheduling system for a microwave component digital production line according to claim 1 is characterized in that: Intelligent computing, including: hyper-heuristic algorithms, local search algorithms, and artificial intelligence algorithms.

4. The advanced planning and scheduling system for a microwave component digital production line according to claim 1 is characterized in that: The real-time monitoring includes: information system collection, camera acquisition, and device interface upload.

5. An advanced planning and scheduling method for a digital production line of microwave components, characterized in that: An advanced planning and scheduling system for a digital production line of microwave components according to any one of claims 1 to 4, comprising: Step S1: data preparation; determining the scope of data required for production planning and scheduling, the scope of data covering the entire process of the microwave component digital production line; and determining the calculation method of data required for advanced production planning and scheduling; Step S2: Construction of production scheduling model: Constructing the production scheduling model required for production scheduling based on the business process, the components of the production scheduling model include: model assumptions, model variables, encoding methods, constraint rules, optimization goals, and data weights; Step S3: data acquisition: establish a data acquisition mechanism, acquire data from the entire process, and perform data preprocessing; the data acquisition sources include: automatic collection on the device side, push from the front-end business system, feedback from the back-end execution system, and manual filling; Step S4: production scheduling calculation; the production scheduling calculation is divided into two parts: medium- and long-term production planning and daily production scheduling planning; Step S5: Result verification; the result verification is to simulate the virtual production process of the daily production scheduling plan, and verify the accuracy of the plan result by comparing the simulation value of the core plan index with the target value; when the difference between the simulation value and the target value exceeds the set critical value, manual adjustment can be made; the core plan index includes: on-time completion rate of work orders, equipment utilization rate, and number of work-in-progress; the result verification can realize the digital twin between the real scene plan result and the virtual scene execution result; Step S6: manual adjustment; the manual adjustment is to adjust the parameters of the production scheduling plan, and then verify the plan again, and repeat this cycle until the simulation value of the core plan indicator meets the target value, and the plan can enter the actual execution stage; the adjusted parameters include: work calendar adjustment, equipment startup status adjustment and work order priority adjustment; the adjustment method is visual interactive adjustment, which includes providing a large number of visual modules to facilitate personnel to quickly obtain production line information. The adjustment only needs to use the mouse to drag and drop or enter a value to modify the module, and the adjustment result is displayed in the virtual scene; Step S7: process monitoring; the process monitoring is to monitor the real scene of the production line after the task enters the actual execution stage; the monitoring method includes: camera monitoring and action recognition of equipment, equipment status extraction and log upload, control software log upload, and on-site personnel registration; the process monitoring can identify normal scenes and abnormal scenes, and present them in a visual way; the visual presentation method of the normal scene includes: real-time display and prediction of the progress of each process task, real-time display of equipment status, real-time display of equipment utilization, and real-time display of the process section in-process quantity; the visual presentation method of the abnormal scene includes: pop-up window reminder of the overdue situation of each process task, pop-up window reminder of the alarm status of each equipment, and pop-up window reminder of the need to replace equipment fixtures or instruments; Step S8: Dynamic adjustment; the dynamic scheduling is to modify the daily production schedule in real time based on the dynamic scheduling model after the process monitoring detects disturbances and anomalies; Step S9: automatic update; the automatic update is to obtain data after the task is completed, use intelligent algorithms to analyze the task execution process, update the data, rules, and scheduling models, and feed back to data preparation; the content of the automatic data update includes: working hours, transfer economic batches, production economic batches, switching time matrix, and post-time; the automatic update content of the rules includes: constraint rules for medium- and long-term plans, and dynamic scheduling rules; the automatic update content of the model includes: medium- and long-term production plan models, daily production scheduling models, and dynamic scheduling models. The automatic update method of the model includes: updating model construction rules and updating model parameters.

6. The advanced planning and scheduling method for a microwave component digital production line according to claim 5 is characterized in that: The data involved in the step S1 include: equipment group, equipment processing capacity, production line work calendar and working hours, project number, latest project completion time, product number, order group, work order group, work order importance, work order start date, work order delivery date, process route, bill of materials, process processing time, production economic batch, transfer economic batch, switching time matrix, process post-time, type and quantity of tooling and fixtures, number of required tooling and fixtures, type and quantity of test instruments, number of required test instruments, equipment maintenance plan, real-time status of equipment, and logistics turnover speed; the calculation method includes: precise formula calculation, empirical formula calculation, and model construction simulation.

7. The advanced planning and scheduling method for a microwave component digital production line according to claim 5 is characterized in that: The coding method in step S2 is processing time matrix coding, equipment processing sequence coding and process processing sequence coding; the constraint rules are processing capacity definition constraints, equipment capacity constraints and process configuration constraints; the optimization goals are capacity balance, shortest delay time and shortest order delay time; The data weights include work order priority weight, constraint weight, and target weight; The types of scheduling models involved in the business process include: production line capacity model, work order consumption model, economic batch model, switching mode model, material set model, fixture and instrument occupancy model, medium- and long-term production plan model, daily production scheduling model and dynamic scheduling model.

8. The advanced planning and scheduling method for a microwave component digital production line according to claim 5 is characterized in that: The data preprocessing workflow in step S3 is data cleaning, data integration, data reduction, and data transformation; the content of the data cleaning includes: removing or completing missing data, removing or modifying data with logical errors, removing or modifying data with format and content errors, and verifying the relevance of data; the data integration is the work of merging data from multiple data sources, and the content includes identification of data entities, data redundancy and correlation analysis, data value conflict detection and processing, and data outlier detection; the data reduction is dimensionality reduction, data reduction, and data compression on the basis of ensuring data integrity; the content of the data transformation includes: summarizing and aggregating data, and constructing attributes.

9. The advanced planning and scheduling method for a microwave component digital production line according to claim 5, characterized in that: The process of formulating the medium- and long-term production plan in step S4 is as follows: ① Establish a work order consumption model based on the work order information pushed by the front-end business system; the output data of the work order consumption model is the workload accumulated in each process for all work orders in process; ② Establish a production line capacity model based on the basic configuration data of the microwave component digital production line and the basic configuration data of the equipment; the output data of the production line capacity model should be the production volume of the production line in each process; ③ According to the above work order consumption model and production line capacity model, add the constraint rules of the medium- and long-term plan, and establish a medium- and long-term production plan model based on the production line process; The constraint rules of the medium- and long-term plan include: capacity rules, material arrival rules, and priority rules; the priority rules include: rules based on importance, start date and delivery date information priority or priority combination; ④ According to the medium- and long-term production plan model, a medium- and long-term plan scheme is generated based on all prefabricated and in-progress work order information; the scheme is a production sequencing scheme for work orders; the equipment dimension of the production sequencing scheme is all equipment, and the work order dimension is all work orders within the time span; the output of the scheme includes: the completion time of all work orders, the Gantt chart of equipment utilization, and the material supply warning table; the work order time span of the scheme is more than three months; ⑤ According to the results of the original scheme, the scheme is adjusted on the interactive interface to generate a new scheme; the scheme adjustment method includes: work calendar adjustment, equipment startup status adjustment and work order priority adjustment; ⑥ According to different scheme results, multiple schemes can be saved and the output of the schemes can be compared, and the best scheme can be highlighted; ⑦ According to the results of the best scheme, the work order can enter the daily production scheduling stage after the review is completed; The formulation process of daily production scheduling includes: ① Based on the medium- and long-term production planning model, the constraint model is integrated to generate a daily production scheduling model; the constraint model includes: economic batch model, switching mode model, material set model, tooling fixture, mold and instrument occupancy model; the dimension of the constraint model is process level, and each process can independently set the weights of these constraints; the material set model can affect the start-up situation of the process; ② Based on the daily production scheduling model, the work orders entering the daily production scheduling stage are automatically scheduled to generate a daily production scheduling plan; the output of the plan includes: scheduling results and production Gantt chart; the task granularity of the scheduling result is at least second level, and the resource granularity is at least equipment; ③ The daily production scheduling plan enters the result verification stage after the review is completed.

10. The advanced planning and scheduling method for a microwave component digital production line according to claim 5, characterized in that: The disturbance in step S8 includes: work order insertion, work order priority adjustment; the abnormalities include: equipment status abnormality, personnel status abnormality, instrument status abnormality, and fixture status abnormality; the dynamic scheduling model is a task based on real-time judgment of scheduling rules, and adjusts tasks under the constraints of scheduling constraints to meet the set scheduling goals; the scheduling rules include: line body scheduling rules, inter-unit scheduling rules, exit rules, and AGV transportation rules; the scheduling constraints include: post-time constraints, AGV capacity constraints, equipment capacity constraints, vehicle quantity constraints, and cache location constraints; the scheduling goals include: highest output and shortest switching time; the way to adjust tasks includes: updating the order of task time and updating the task designated machine; the scheduling goals include: task execution according to arrival time, task execution according to start time, and task execution according to designated machine.

Citation Information

Cited By

  • Automatic production scheduling planning management system and method for paper cutting production

    CN120235401A

  • Scheduling method and scheduling system for satellite manufacturing and computer storage medium

    CN121052619A