Modern rural power grid planning method and system
By establishing unit efficiency and status evaluation models, determining carbon emission data and agricultural power demand trends, and using multi-objective evolution algorithms to optimize rural power grid planning, the problems of insufficient data utilization and lack of environmental protection considerations in traditional methods are solved, and more scientific , environmentally friendly and power grid planning that meets agricultural needs.
Patent Information
- Application Number
- CN202411148927.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-08-21
AI Technical Summary
Traditional rural power grid planning methods fail to make full use of generator set data, ignore the changing trends of carbon emissions and agricultural power demand, resulting in insufficient scientific and environmentally friendly performance of the planning scheme and unable to effectively meet the power demand of agricultural production.
By obtaining the operation data and historical maintenance data of the generator set, establishing a unit efficiency prediction model and status evaluation model; determining carbon emission data of various power generation technologies; obtaining historical power demand data of the agricultural industry, and establishing a power grid plan using a multi-objective evolution algorithm Optimize the model and determine the optimal grid planning scheme.
It improves the scientificity and rationality of power grid planning, improves environmental protection performance, enhances the compatibility between power grid planning schemes and agricultural production, and improves the comprehensive benefits of power grid.
Smart Images

Figure CN119067382A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power grid planning, and in particular to a modern rural power grid planning method and system. Background Art
[0002] With the rapid development of modern agriculture, the planning and construction of rural power grids, as an important infrastructure supporting agricultural production and rural life, is particularly important. Traditional rural power grid planning methods often focus on meeting basic power needs, while ignoring factors such as generator efficiency, unit status, carbon emissions of power generation technology, and changing trends in agricultural industry power demand, resulting in low comprehensive benefits of power grid planning schemes. Specifically, traditional rural power grid planning methods have the following problems:
[0003] 1. Insufficient data utilization: Failure to fully explore and utilize the potential value of data from power generation units. Due to the lack of effective data analysis and application, it is impossible to accurately predict the efficiency and status of the units. This defect in turn affects the scientificity and rationality of power grid planning, and the planning scheme may deviate from the actual operating conditions.
[0004] 2. Lack of environmental considerations: In traditional rural power grid planning, the carbon emission data of various power generation technologies are often not fully considered, which greatly reduces the environmental performance of power grid planning schemes and cannot effectively respond to the current society’s urgent demand for green and low-carbon development.
[0005] 3. Insufficient demand analysis: Failure to deeply analyze and grasp the changing trend of electricity demand in the agricultural industry has led to a serious disconnect between the grid planning scheme and the actual needs of agricultural production. Agricultural production has seasonal and cyclical characteristics, and electricity demand fluctuates accordingly, but traditional planning methods often ignore this important factor. Summary of the invention
[0006] The object of the present invention is to provide a modern rural power grid planning method and system to solve at least one of the above-mentioned prior art problems.
[0007] In a first aspect, the present invention provides a method for modernizing rural power grid planning, the method specifically comprising:
[0008] Acquire the operating data and historical maintenance data of the generator sets in the power grid planning area, establish a unit efficiency prediction model based on the operating data, and establish a unit status assessment model based on the historical maintenance data;
[0009] Determine the carbon emission data of various power generation technologies in the power grid planning area, wherein the carbon emission data includes carbon emission data of various types of renewable energy power generation technologies and carbon emission data of traditional energy power generation technologies;
[0010] Obtain historical power demand data of different types of agricultural industries in the power grid planning area, and determine the power demand change trend of each type of agricultural industry based on the historical power demand data;
[0011] According to the prediction results of the unit efficiency prediction model, the evaluation results of the unit status evaluation model, the carbon emission data and the changing trends of electricity demand of various types of agricultural industries, a multi-objective evolutionary algorithm is used to establish a power grid planning optimization model, and the power grid planning optimization model is used to determine the optimal power grid planning scheme.
[0012] In a second aspect, the present invention provides a modern rural power grid planning system, the system specifically comprising:
[0013] The first planning module is used to obtain the operating data and historical maintenance data of the generator sets in the power grid planning area, establish a unit efficiency prediction model based on the operating data, and establish a unit status assessment model based on the historical maintenance data;
[0014] The second planning module is used to determine the carbon emission data of various power generation technologies in the power grid planning area, wherein the carbon emission data includes the carbon emission data of various types of renewable energy power generation technologies and the carbon emission data of traditional energy power generation technologies;
[0015] The third planning module is used to obtain historical power demand data of different types of agricultural industries in the power grid planning area, and determine the power demand change trend of each type of agricultural industry according to the historical power demand data;
[0016] The fourth planning module is used to establish a power grid planning optimization model using a multi-objective evolutionary algorithm based on the prediction results of the unit efficiency prediction model, the evaluation results of the unit status evaluation model, the carbon emission data and the changing trends in electricity demand of various types of agricultural industries. The power grid planning optimization model is used to determine the optimal power grid planning scheme.
[0017] In a third aspect, the present invention provides a computer device, comprising: a memory and a processor and a computer program stored in the memory, and when the computer program is executed on the processor, a modern rural power grid planning method as described in any one of the above methods is implemented.
[0018] In a fourth aspect, the present invention provides a computer-readable storage medium, characterized in that a computer program is stored thereon, and when the computer program is executed by a processor, a modern rural power grid planning method as described in any one of the above methods is implemented.
[0019] Compared with the prior art, the present invention has at least one of the following technical effects:
[0020] 1. Improve the scientificity and rationality of power grid planning. By establishing unit efficiency prediction model and unit status assessment model, accurate prediction and assessment of the efficiency and status of the generator set are achieved.
[0021] 2. The environmental performance of the power grid planning scheme has been improved. By comprehensively considering the carbon emission data of various power generation technologies, the environmental protection performance of the power grid planning scheme has been optimized.
[0022] 3. Enhanced the compatibility between the power grid planning scheme and the actual needs of agricultural production. By deeply analyzing the changing trend of electricity demand in the agricultural industry, the power grid planning scheme is more in line with the actual needs of agricultural production, thereby improving the comprehensive benefits of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 It is a flow chart of a method for modernizing rural power grid planning provided by one embodiment of the present invention;
[0025] Figure 2 It is a structural schematic diagram of a modern rural power grid planning system provided by an embodiment of the present invention;
[0026] Figure 3 It is a structural schematic diagram of a computer device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0027] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.
[0028] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.
[0029] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0030] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.
[0031] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.
[0032] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.
[0033] In the embodiment of the present application, the execution subject of the process includes a terminal device, which includes but is not limited to: a server, a computer, a smart phone, a tablet computer, and other devices capable of executing the method disclosed in the present application. Figure 1 A schematic diagram of a process flow of a modern rural power grid planning method disclosed in an embodiment of the present invention is shown, and the details are as follows:
[0034] S101, obtaining operation data and historical maintenance data of generator sets in a planned area of a power grid, establishing a generator set efficiency prediction model according to the operation data, and establishing a generator set status assessment model according to the historical maintenance data.
[0035] In this embodiment, in order to implement the power grid planning specifically, the operating data and historical maintenance data of all generator sets in the power grid planning area are first obtained, including the operating parameters such as the power output, operating time, load rate, fuel consumption, etc. of the generator sets, as well as the historical maintenance information such as the maintenance records, fault types, and maintenance time of the units.
[0036] Then, we used these data to establish the unit efficiency prediction model and the unit status assessment model. For the unit efficiency prediction model, we used the support vector regression (SVR) algorithm, with the operating time and load rate as independent variables and the unit efficiency as the dependent variable. By preprocessing and feature selection of the operating data, we extracted the characteristic variables that mainly affect the unit efficiency, and trained the SVR model to predict the efficiency of the unit under different operating conditions.
[0037] For the unit status assessment model, the decision tree algorithm is used to build the model. First, the historical maintenance data is mined to analyze the correlation between the fault symptoms and fault causes of the generator set. Then, the performance indicators of the generator set are selected as feature variables, and the unit status rating is used as the target variable. The decision tree model is trained to evaluate the unit status.
[0038] In this embodiment, by establishing a unit efficiency prediction model and a unit status assessment model, accurate prediction and assessment of the efficiency and status of the generator sets in the power grid planning area are achieved. Specifically, the unit efficiency prediction model can predict the efficiency value of the unit according to the input parameters under different operating conditions, providing an important reference for power grid planning. The unit status assessment model can assess the status level of the unit according to the performance indicators of the generator set, helping power grid planners understand the health status of the unit, so as to formulate a more scientific and reasonable power grid planning plan.
[0039] In some embodiments, in the above step S101, establishing a unit efficiency prediction model according to the operation data specifically includes:
[0040] The operating data is processed by principal component analysis to reduce the dimension and obtain the main characteristic variables;
[0041] According to the type of each unit, the main characteristic variables are divided into different subsets by using a K-means clustering algorithm;
[0042] With the operating time and load rate as the independent variable and the unit efficiency as the dependent variable, the support vector regression model is used to establish the corresponding unit efficiency prediction model for each subset.
[0043] In this embodiment, principal component analysis is used to perform dimensionality reduction processing on the operating data, and the main characteristic variables are extracted from the high-dimensional data to achieve data dimensionality reduction. The operating data is preprocessed to remove noise and outliers, improve data quality, and prepare for principal component analysis. According to the results of the principal component analysis, the first k principal components whose cumulative contribution rates reach a preset threshold are selected as the main characteristic variables to achieve data dimensionality reduction. The K-means clustering algorithm is used to perform cluster analysis on the screened main characteristic variables, and the optimal cluster number K is determined through iterative optimization; according to the clustering results, the characteristic variables of each unit type are divided into different subsets, and each subset reflects a different unit operation mode.
[0044] The historical operation data are obtained according to the operation time and load rate, and used as the training data set of the support vector regression model; for each subset, the corresponding historical operation data are divided into a training set and a test set, the training set is used for model training, and the test set is used for model evaluation; the grid search and cross-validation methods are used to optimize the hyperparameters of the support vector regression model to obtain the optimal model parameter configuration; each subset is trained using the optimized support vector regression model to establish a unit efficiency prediction model; the operation time and load rate are used as independent variables, and the unit efficiency is used as the dependent variable, which are input into the trained prediction model; the unit efficiency prediction value of each subset under a given operation time and load rate is calculated through the prediction model; the efficiency prediction results of each subset are summarized to obtain the efficiency prediction of the entire unit.
[0045] In some embodiments, in the above step S101, establishing a unit status assessment model according to the historical maintenance data specifically includes:
[0046] Using an association rule mining algorithm to analyze the historical maintenance data, and determine the association between the fault symptoms and the fault causes of the generator set;
[0047] Taking the performance indicators of the generator set as characteristic variables and the unit status rating of the generator set as the target variable, a unit status assessment model is established using the decision tree algorithm according to the correlation between the fault symptoms and the fault causes of the generator set.
[0048] In this embodiment, based on the historical maintenance data of the generator set, data preprocessing technology is used to clean, integrate, transform and reduce the data to improve data quality. Through feature engineering, relevant features such as fault symptoms and fault causes are extracted from the preprocessed historical maintenance data to construct a feature set. An association rule mining algorithm, such as the Apriori algorithm or the FP-Growth algorithm, is used to mine the association rules between fault symptoms and fault causes. According to the mined association rules, the fault diagnosis rules are determined to form a rule base. If a certain fault symptom occurs, the possible cause of the fault is determined according to the association rules. For the new generator set fault data, the fault symptom features are extracted, and the cause of the fault is determined by matching the fault diagnosis rule base. If the cause of the fault cannot be diagnosed according to the existing rules, the fault data is added to the historical maintenance data set, the association rules are re-mined, and the fault diagnosis rule base is updated.
[0049] The historical operation data of the generator set, including the performance index data and the corresponding unit status rating data, are obtained as the training data set. The historical operation data obtained are preprocessed, abnormal data are eliminated, missing data are filled, and the data are normalized. According to the correlation between the fault symptoms and fault causes of the generator set, the performance indicators related to the fault are selected from the preprocessed data as feature variables. The unit status rating of the generator set is used as the target variable, and the preprocessed data is divided into a training set and a test set. The training set data is trained using the decision tree algorithm, and the decision tree model is constructed by recursively dividing the feature variables until the preset stop condition is met. The constructed decision tree model is used to predict the test set data to obtain the predicted unit status rating results, which are compared with the actual unit status rating, and the accuracy of the model and other evaluation indicators are calculated. If the accuracy and other evaluation indicators of the model meet the preset thresholds, the decision tree model is used as the final unit status evaluation model; otherwise, the parameters of the decision tree algorithm are adjusted, and the training and testing are re-performed until an evaluation model that meets the requirements is obtained.
[0050] S102, determining carbon emission data of various power generation technologies in the power grid planning area, wherein the carbon emission data includes carbon emission data of various types of renewable energy power generation technologies and carbon emission data of traditional energy power generation technologies.
[0051] In this embodiment, in order to comprehensively consider environmental factors during the grid planning process, the carbon emission data of various power generation technologies in the grid planning area are determined. This process first involves the classification of all power generation facilities in the area, including renewable energy power generation facilities such as wind power, solar power, and hydropower, as well as traditional energy power generation facilities such as coal, oil, and natural gas.
[0052] Specifically, first, through energy statistics released by the government, annual reports of power generation companies, databases of authoritative organizations such as the International Energy Agency, and on-site surveys, detailed operating data and carbon emission-related information of various power generation technologies are collected.
[0053] Then, according to different types of power generation technologies, the corresponding carbon emission calculation methods are adopted. For renewable energy power generation technologies, such as wind power and photovoltaic power, since they do not produce direct carbon dioxide emissions during the power generation process, carbon emissions mainly come from life cycle links such as equipment manufacturing, transportation, installation and maintenance. We use the life cycle assessment (LCA) method to calculate their carbon emissions. For traditional energy power generation technologies, such as coal-fired power generation and gas-fired power generation, the emission factor method is used to calculate their carbon dioxide emissions based on fuel consumption and corresponding emission factors.
[0054] The collected carbon emission data of various power generation technologies are integrated to form a complete carbon emission database. Subsequently, we use data analysis tools to conduct in-depth mining of the database, analyze the carbon emission characteristics, changing trends and influencing factors of various power generation technologies, and provide a scientific basis for power grid planning.
[0055] In this embodiment, by determining the carbon emission data of various power generation technologies in the power grid planning area, the environmental performance of various power generation technologies can be more clearly understood, so that low-carbon and environmentally friendly power generation methods can be given priority in power grid planning to reduce the negative impact of power grid operation on the environment. Carbon emission data provides important decision-making support for power grid planning. Based on this data, the environmental costs of different power generation plans can be evaluated, and the best plan that meets both power demand and environmental protection requirements can be selected.
[0056] In some embodiments, in the above step S102, the determining of carbon emission data of various power generation technologies in the grid planning area specifically includes:
[0057] Obtain meteorological data and energy resource data of different types of renewable energy in the power grid planning area, establish a correlation between the energy resource data of each type of renewable energy and the meteorological data, and form a renewable energy capacity prediction model;
[0058] Establishing a power generation model for each type of renewable energy, and determining power generation data of each type of renewable energy according to the power generation model and the renewable energy capacity prediction model;
[0059] Acquire traditional energy consumption data in the power grid planning area, and establish an energy network diagram based on the traditional energy consumption data, wherein the energy network diagram includes the association relationship between electricity and other different traditional energy forms;
[0060] Determine the carbon emission factors of various power generation technologies at various energy supply chain links, and determine the carbon emission data of various power generation technologies based on the carbon emission factors, the power generation data and the energy network diagram.
[0061] In this embodiment, meteorological data in the power grid planning area, including temperature, humidity, wind speed, radiation intensity, etc., are obtained, and historical output data of renewable energy such as wind energy and solar energy in the area are obtained. The obtained meteorological data is preprocessed, outliers and missing values are removed, and data is standardized to unify data of different dimensions to the same scale. Correlation analysis methods such as Pearson correlation coefficient or mutual information are used to analyze the correlation between meteorological conditions and renewable energy output, and determine the key meteorological factors affecting renewable energy output. According to the results of the correlation analysis, an appropriate machine learning algorithm, such as support vector machine, random forest or neural network, is selected to construct a renewable energy capacity prediction model. The preprocessed meteorological data and renewable energy historical output data are divided into training sets and test sets, the prediction model is trained using the training set data, and the prediction performance of the model is evaluated using the test set data. The trained prediction model is optimized, and the prediction accuracy and stability of the model are improved by adjusting model parameters, feature selection, and other methods.
[0062] Obtain the historical power generation data and influencing factor data of various types of renewable energy, use data cleaning and feature engineering methods to pre-process the data, remove outliers and redundant information, and extract key feature parameters. According to the characteristics of different types of renewable energy, select suitable machine learning algorithms, such as support vector machines, random forests or neural networks, to build power generation prediction models for various types of renewable energy. In the training process of the power generation prediction model, use cross-validation and other methods to optimize the model, and improve the prediction accuracy and generalization ability of the model by adjusting model hyperparameters and feature selection. Integrate the power generation prediction model and the capacity prediction model, comprehensively consider factors such as power generation efficiency and energy loss, dynamically adjust the model weights, and generate more accurate and comprehensive renewable energy power generation estimation data. According to the power generation estimation data and actual power generation data, continuously evaluate and optimize the prediction model, and continuously improve the prediction performance and adaptability of the model through incremental learning and online learning.
[0063] By connecting with the power grid planning department, we can obtain the historical consumption data of various traditional energy sources in the region, including the consumption and consumption time series data of electricity, coal, oil, natural gas and other energy sources. We preprocess the traditional energy consumption data, clean up outliers and missing values, and normalize the data to a unified time granularity and numerical range for subsequent association analysis and network construction. We use correlation analysis algorithms, such as Pearson correlation coefficient or mutual information, to calculate the correlation between different energy consumption time series and explore the strength of association between electric energy and other traditional energy sources. According to the strength of association between energy sources, we construct a weighted undirected graph in which nodes represent different forms of energy and the weight of edges represents the strength of association between energy sources. We use network embedding algorithms such as DeepWalk to learn low-dimensional vector representations of nodes and capture high-order associations between energy sources. We perform community discovery on the energy network graph and use the modularity-optimized Louvain algorithm to divide closely related energy nodes into the same community to explore the inherent structure and laws of energy consumption. The energy network diagram is visualized, the size and color of the nodes are set according to their importance and community affiliation, and the thickness of the edges is set according to their weights, intuitively presenting the intricate relationship between electric energy and other energy sources.
[0064] According to the pre-established energy network diagram, the carbon emission factor data of various power generation technologies in different links of the energy supply chain are obtained; the power generation data of various power generation technologies over a period of time are obtained, and the supply chain links corresponding to various power generation technologies are determined according to the energy network diagram; for each type of power generation technology, its power generation data is multiplied by the carbon emission factor of the corresponding supply chain link to obtain the carbon emissions of the power generation technology in that link; the carbon emissions of each type of power generation technology in all supply chain links are added together to obtain the total carbon emission data of the power generation technology; according to the total carbon emission data of various power generation technologies, the power generation technologies are classified by using a clustering algorithm to obtain the power generation technology categories with high, medium and low carbon emissions; for the power generation technology categories with high carbon emissions, the relationship between their carbon emissions and power generation and energy supply chain links is determined through regression analysis to judge the main influencing factors of carbon emissions; according to the main influencing factors of carbon emissions, the optimization algorithm is used to determine the strategy of adjusting the power generation structure and optimizing the supply chain to obtain the power generation technology combination and energy supply mode that effectively reduce carbon emissions.
[0065] Furthermore, the energy resource data of each type of renewable energy is associated with the terrain data to form a renewable energy capacity prediction model, which specifically includes:
[0066] Using principal component analysis to perform feature processing on the meteorological data, and extracting key meteorological factors related to renewable energy production capacity;
[0067] The time series data of the meteorological factors are analyzed by an autoregressive integrated moving average model to obtain the dynamic change characteristics of the meteorological factors;
[0068] According to the dynamic change characteristics and the energy resource data of each type of renewable energy, a long short-term memory network model is used to predict the renewable energy capacity, and a renewable energy capacity prediction model for each type of renewable energy is obtained.
[0069] In this embodiment, original meteorological parameters related to renewable energy production capacity are obtained based on meteorological data, and data cleaning and preprocessing operations are performed on the original meteorological parameters to obtain a preprocessed meteorological parameter data set. The principal component analysis method is used to perform feature analysis on the preprocessed meteorological parameter data set, and the principal component eigenvector of the meteorological parameters is obtained by calculating the correlation coefficient matrix between the various meteorological parameters and performing eigenvalue decomposition on the correlation coefficient matrix. According to the variance contribution rate of each component in the principal component eigenvector, the first N principal components with larger variance contribution rates are selected as key meteorological factors, where N is a preset positive integer threshold. It is determined whether the correlation between the key meteorological factor and the renewable energy production capacity is greater than the preset correlation threshold. If so, the key meteorological factor is determined as a key meteorological factor related to renewable energy production capacity.
[0070] For the time series data of meteorological factors, the autoregressive model is used to capture the time correlation of the data, the integral model is used to eliminate the non-stationarity of the data, and the moving average model is combined to smooth the random fluctuations of the data, and a comprehensive time series model of meteorological factor changes is established. The established autoregressive integral moving average model is used to fit and predict the time series data of meteorological factors to obtain the dynamic change characteristics of meteorological factors.
[0071] According to the type of renewable energy, the historical capacity data of each type of energy and the data of key factors affecting the capacity are obtained; the historical data obtained are preprocessed to extract the dynamic change characteristics of energy capacity and form time series data; for the preprocessed time series data, the long short-term memory network model is used for training to establish a capacity prediction model; in the training process of the capacity prediction model, the prediction performance of the model is optimized by setting the model hyperparameters and evaluation indicators; the trained long short-term memory network model is used in combination with the real-time collected energy data to predict the renewable energy capacity in the future; the capacity prediction results of each type of renewable energy are summarized to form an overall renewable energy capacity prediction report; according to the capacity prediction results, the scheduling and energy storage strategies of renewable energy are optimized to improve the utilization efficiency of renewable energy.
[0072] For example, first, the meteorological data in the power grid planning area is analyzed by principal component analysis to extract 10 key meteorological factors closely related to renewable energy production capacity, such as temperature, humidity, wind speed, and sunshine hours. Then, the autoregressive integral moving average model is used to analyze the time series data of these meteorological factors in the past five years to obtain their dynamic change characteristics, such as the temperature shows an obvious seasonal change trend, and the wind speed changes are relatively random. Then, the dynamic change characteristic data of the meteorological factors are matched with the historical data of five renewable energy sources such as wind energy and solar energy in the region to construct a training data set. Finally, the long short-term memory network model is used to learn the training data, and the number of hidden layers is set to 3 layers, the number of neurons in each layer is 128, 256 and 128 respectively, the learning rate is 01, and the capacity prediction model of various renewable energy sources is obtained after training for 1000 epochs. After evaluation, the model can accurately predict the output of various renewable energy sources in the future, and the average error rate is controlled within 8%, which provides a reliable basis for the optimal dispatch of the power grid.
[0073] Furthermore, the energy network diagram is established according to the traditional energy consumption data, specifically including:
[0074] Determine a node set of an energy production unit, an energy conversion unit, and an energy consumption unit according to the traditional energy consumption data;
[0075] Constructing an initial energy network graph according to the node set, wherein the edges of the initial energy network graph represent energy flow paths;
[0076] By analyzing the energy flow path, the correlation strength between different nodes is obtained;
[0077] The initial energy network diagram is optimized using a minimum spanning tree algorithm to calculate the weight of each edge;
[0078] According to the association strength between different nodes and the weight of each edge, the initial energy network diagram is adjusted to a target energy network diagram.
[0079] In this embodiment, the energy consumption of each node in the energy system is obtained based on the traditional energy consumption data and stored in the energy consumption database. With respect to the data in the energy consumption database, a clustering algorithm is used to cluster each node to obtain an energy production unit node set, an energy conversion unit node set, and an energy consumption unit node set. According to the energy production unit node set, the actual energy production equipment corresponding to each production unit node is determined, and the energy production data of each production equipment is obtained. According to the energy conversion unit node set, the actual energy conversion equipment corresponding to each conversion unit node is determined, and the energy conversion efficiency data of each conversion equipment is obtained. According to the energy consumption unit node set, the actual energy consumption equipment corresponding to each consumption unit node is determined, and the energy demand data of each consumption equipment is obtained.
[0080] Get a given set of nodes and determine the attribute information of each node, including node type, node location coordinates, etc. Based on the node attribute information, use graph theory algorithms to construct the topological structure of the initial energy network diagram and generate edges between nodes. For each edge, associate the attributes of energy flow, including parameters such as energy type, flow direction, and flow size. By calculating the edge weights of the network diagram, determine the feasible paths for energy flow between nodes and screen out the optimized transmission paths. Based on the network flow algorithm, calculate the optimal energy scheduling scheme under different scenarios, balance load distribution, and improve energy utilization efficiency. Based on the topological structure and node information of the initial energy network diagram, establish a mathematical model of the network, and quantify the attributes of nodes and edges into weight parameters.
[0081] The Prim algorithm or Kruskal algorithm is used to construct the minimum spanning tree, and the minimum cost tree is gradually generated by selecting the edge with the smallest weight through a greedy strategy. During the construction of the minimum spanning tree, the connectivity status of the node is dynamically updated to determine whether the selected edge will form a loop to avoid the failure of the spanning tree. The constructed minimum spanning tree is obtained, and the topological structure and node connection relationship of the tree are extracted as the optimized energy network topology. According to the edge weight information of the minimum spanning tree, the total transmission cost of the network is calculated to evaluate the effect and benefit of network optimization. The structure and cost information of the minimum spanning tree are fed back to the dispatching and control system of the energy network to achieve efficient distribution and balance of energy according to the optimized topology. The load changes and node status of the energy network are continuously monitored. When the network topology changes, the minimum spanning tree algorithm is re-triggered to adaptively optimize the network to maintain the stable and efficient operation of the energy system.
[0082] According to the association strength between nodes in the initial energy network graph, the initial association weight matrix between nodes is obtained; according to the weight of the edge in the initial energy network graph, the initial weight matrix of the edge in the network is obtained; through the deep learning algorithm, the initial association weight matrix and the initial weight matrix are trained to obtain the adjusted node association weight matrix and edge weight matrix; according to the adjusted node association weight matrix, the association strength between nodes is updated; according to the adjusted edge weight matrix, the weight of the edge in the network is updated; according to the updated node association strength and edge weight, the energy network topology graph is reconstructed; it is determined whether the reconstructed energy network topology graph meets the requirements of the target energy network graph, if so, the topology graph is output as the target energy network graph, if not, the third step is returned to continue training and adjustment.
[0083] Exemplarily, first, based on traditional energy consumption data, energy production units, energy conversion units and energy consumption units are divided into different node sets through cluster analysis algorithms. Among them, energy production units include thermal power plants, hydropower plants, etc., energy conversion units include substations, distribution stations, etc., and energy consumption units include industrial parks, commercial areas, residential areas, etc. Then, an initial energy network diagram is constructed based on the node set, and the edges in the diagram represent the flow paths of energy between different nodes. By analyzing factors such as energy transmission volume and distance on the energy flow path, the association strength between different nodes is calculated. For example, the association strength between a thermal power plant and a nearby substation is 8, while the association strength between a distant distribution station is 4. Next, the minimum spanning tree algorithm is used to optimize the initial energy network diagram and calculate the weight of each edge. The algorithm constructs a minimum spanning tree by continuously selecting the edge with the smallest weight, and finally obtains the optimized energy network diagram. In the optimization process, it is necessary to comprehensively consider factors such as the distance between nodes and energy transmission efficiency, and reasonably set the weight of the edge. For example, the edge weight of a short distance and high transmission efficiency can be set to 9, while the edge weight of a long distance and low transmission efficiency can be set to 2. Finally, according to the association strength between different nodes and the optimized edge weights, the initial energy network diagram is adjusted to form a target energy network diagram. During the adjustment process, it is necessary to take into account the balance of energy supply and demand and network stability, appropriately delete edges with weak association strength or small weight, and retain or appropriately increase edges with strong association strength or large weight. For example, edges with association strength lower than 3 and weight lower than 4 can be deleted, and edges with association strength higher than 7 and weight higher than 8 can be retained or increased. Through the above analysis and optimization process, a target energy network diagram with reasonable structure and high efficiency is finally formed, which provides an important reference for the optimized operation of the energy system.
[0084] S103, obtaining historical power demand data of different types of agricultural industries in the power grid planning area, and determining the power demand change trend of each type of agricultural industry according to the historical power demand data.
[0085] In this embodiment, the historical power demand data of different types of agricultural industries (such as planting, animal husbandry, fishery, agricultural product processing, etc.) in the power grid planning area are obtained, which usually include monthly, quarterly or annual power consumption, covering multiple time periods, so as to perform trend analysis. Then, time series analysis methods such as trend line fitting and seasonal decomposition are used to perform trend analysis on the power demand data of various agricultural industries. By calculating indicators such as the growth rate and cyclical fluctuations of power demand, the long-term trend and seasonal characteristics of power demand of different agricultural industries are identified. In order to intuitively display the analysis results, the power demand change trend of various agricultural industries can be presented in the form of charts (such as line charts, bar charts, trend lines, etc.), which can not only show the absolute value changes of power demand, but also clearly show the growth rate and fluctuations.
[0086] In this embodiment, by determining the changing trends of power demand for different types of agricultural industries in the power grid planning area, it is possible to provide strong decision support for power grid planning, power facility construction, and agricultural industry development. According to the changing trends of power demand, future power demand can be reasonably predicted to ensure the supply capacity and stability of the power grid.
[0087] In some embodiments, in the above step S103, determining the power demand change trend of each type of agricultural industry according to the historical power demand data specifically includes:
[0088] Using an autoregressive integrated moving average model to perform data preprocessing and trend analysis on the historical energy demand data, to obtain the time variation characteristics of energy demand of various types of agricultural industries;
[0089] Obtain weather forecast data, crop growth cycle data, and livestock and poultry growth stage data to form multi-source heterogeneous data;
[0090] Using principal component analysis to perform dimensionality reduction processing on the multi-source heterogeneous data to obtain multi-source heterogeneous data after dimensionality reduction;
[0091] The multi-source heterogeneous data after dimensionality reduction are fused through the Kalman filter algorithm to obtain the target multi-source heterogeneous data;
[0092] Taking the time variation characteristics of energy demand of various types of agricultural industries and the target multi-source heterogeneous data as input variables, taking the energy demand of various types of agricultural industries as output variables, and using a support vector machine regression model to construct an energy demand characteristic data set;
[0093] Based on the energy demand characteristic data set, a long short-term memory neural network algorithm is used to model and predict the energy demand of various types of agricultural industries, and obtain the changing trends of electricity demand of various types of agricultural industries.
[0094] In this embodiment, the historical energy demand data of each agricultural industry is obtained, and the data is cleaned and corrected for missing values and outliers to obtain complete and accurate time series data. The processed historical energy demand data is modeled using an autoregressive integral sliding average model, and the autoregressive coefficient, integral order, and sliding average term coefficient of the energy demand of each agricultural industry are obtained through model parameter estimation. According to the estimated model parameters, the energy demand data of each agricultural industry is trend analyzed to determine whether it has an obvious growth trend, cyclical fluctuations, or random disturbances, and the corresponding time change characteristics are extracted.
[0095] Acquire weather forecast data, crop growth cycle data, and livestock and poultry growth stage data to form an initial multi-source heterogeneous data set; preprocess the initial multi-source heterogeneous data set, including data cleaning, missing value processing, and data standardization, to obtain a preprocessed multi-source heterogeneous data set; use principal component analysis to extract features and reduce the dimension of the preprocessed multi-source heterogeneous data set to obtain a reduced-dimensional multi-source heterogeneous data set; construct a state transfer matrix and an observation matrix based on the crop growth cycle data and livestock and poultry growth stage data, and set the initial state and covariance matrix; input the reduced-dimensional multi-source heterogeneous data set into the Kalman filter model, and obtain the fused multi-source heterogeneous data through recursive calculation and state update; post-process the fused multi-source heterogeneous data, including data de-standardization and result visualization, to obtain the final target multi-source heterogeneous data set.
[0096] Data fusion technology is used to fuse the time series characteristics of agricultural industry energy consumption with multi-source heterogeneous data to construct an energy demand characteristic data set. The energy demand characteristic data set is divided into a training set and a test set. The training set is used to train the support vector machine regression model, and the test set is used to evaluate the model performance. Grid search and cross-validation methods are used to optimize the hyperparameters of the support vector machine regression model to improve the prediction accuracy of the model. The trained support vector machine regression model is used to predict the test set, obtain the energy demand prediction results of various agricultural industries, and evaluate the generalization ability of the model.
[0097] According to the energy demand characteristic data set, the data is preprocessed, including data cleaning, missing value processing, outlier processing, etc., to ensure data quality. For the preprocessed data set, the key attributes reflecting the energy demand characteristics of the agricultural industry are extracted to construct the energy demand feature vector. The long short-term memory neural network algorithm is used to design a network structure including the input layer, LSTM layer and output layer, in which the LSTM layer can capture the long-term dependency of the energy demand time series data. The constructed energy demand feature vector is input into the long short-term memory neural network model, and the model is trained to fit the changing trend of energy demand in the agricultural industry by setting appropriate network parameters. During the model training process, strategies such as early stopping are used to avoid overfitting problems and improve the generalization ability of the model. At the same time, the model hyperparameters are optimized by grid search and other methods to improve the prediction accuracy. The trained long short-term memory neural network model is used to predict the electricity demand of different types of agricultural industries, and the changing trend of electricity demand of various types of agricultural industries in the future is obtained.
[0098] S104, based on the prediction results of the unit efficiency prediction model, the evaluation results of the unit status evaluation model, the carbon emission data and the changing trends of electricity demand of various types of agricultural industries, a multi-objective evolutionary algorithm is used to establish a power grid planning optimization model, and the power grid planning optimization model is used to determine the optimal power grid planning scheme.
[0099] In this embodiment, in order to comprehensively consider multiple factors such as unit efficiency, unit status, carbon emissions, and the changing trend of electricity demand in the agricultural industry, a multi-objective evolutionary algorithm is used to establish a power grid planning optimization model. Specifically, first, based on the aforementioned prediction results and evaluation data, the objective function of the power grid planning optimization model is defined, and these objective functions include but are not limited to: maximizing power grid efficiency: based on the prediction results of the unit efficiency prediction model, by optimizing the power grid structure and operation strategy, the overall operation efficiency of the power grid is maximized; minimizing carbon emissions: according to the carbon emission data of various power generation technologies, the power generation combination and power grid layout are optimized to reduce carbon emissions during the operation of the power grid; meeting the power demand of the agricultural industry: according to the changing trend of power demand of various types of agricultural industries, ensure that the power grid planning scheme can meet the power demand of future agricultural production; improving the stability and reliability of the power grid: combining the evaluation results of the unit status evaluation model, optimize the redundancy of the power grid and the emergency response capability to improve the stability and reliability of the power grid.
[0100] In order to ensure the feasibility and rationality of the power grid planning scheme, corresponding constraints are further set, such as power grid capacity constraints, capital budget constraints, technical feasibility constraints, etc. A multi-objective evolutionary algorithm (such as NSGA-II, SPEA2, etc.) is used to solve the power grid planning problem. The algorithm searches for the optimal solution set (Pareto optimal solution set) of multiple objective functions in the solution space by simulating the natural evolution process. During the operation of the algorithm, the solution set is evaluated and screened according to the objective function and constraints, and gradually approaches the optimal solution. After multiple rounds of iterations, the algorithm will output a set of Pareto optimal solution sets. These solution sets are comprehensively analyzed using decision analysis tools (such as decision matrices, radar charts, etc.), considering the trade-off relationship between various objectives, and selecting the optimal solution that best meets the power grid planning needs and objectives.
[0101] In this embodiment, by adopting a multi-objective evolutionary algorithm to establish a power grid planning optimization model, it is possible to comprehensively consider multiple factors such as unit efficiency, unit status, carbon emissions, and agricultural industry electricity demand, so as to maximize the comprehensive benefits of the power grid planning scheme, which not only helps to improve the economy and environmental protection of power grid operation, but also better meet the electricity demand of agricultural production.
[0102] In some embodiments, in the above step S104, the multi-objective evolutionary algorithm is used to establish a power grid planning optimization model according to the prediction results of the unit efficiency prediction model, the evaluation results of the unit status evaluation model, the carbon emission data and the power demand change trend of various types of agricultural industries, specifically including:
[0103] Taking minimizing total cost, maximizing energy utilization and minimizing carbon emissions as objective functions, and taking the prediction results of the unit efficiency prediction model, the evaluation results of the unit status evaluation model, the carbon emission data and the power demand change trends of various types of agricultural industries as input parameters, a power grid planning optimization model is established;
[0104] A multi-objective evolutionary algorithm based on Pareto sorting is used to solve the multi-objective optimization model to obtain a Pareto optimal solution group;
[0105] For each solution in the Pareto optimal solution group, conditional risk value is used as a risk measurement indicator to quantify the uncertainty of renewable energy and obtain the risk value of each solution;
[0106] According to the risk value, an optimal solution is determined from the Pareto optimal solution group, and the optimal solution is an optimal power grid planning scheme.
[0107] In this embodiment, the historical electricity demand data of various types of agricultural industries are obtained, and the changing trend of electricity demand of various types of agricultural industries in the future is predicted by time series analysis algorithm. The real-time operation data of the generator set, including power generation, fuel consumption, etc., are collected, and the power generation efficiency of each unit under different working conditions is predicted according to the unit efficiency prediction model. The state parameters of each generator set, such as the running time and failure rate of the unit, are obtained, and the health status and reliability of each unit are evaluated by the unit state evaluation model. The carbon emission data of each generator set is collected, and the carbon emission intensity per unit of electricity is calculated as one of the optimization goals. The power demand prediction results, unit efficiency prediction results, unit state evaluation results and carbon emission data of various types of agricultural industries are used as input to construct a multi-objective optimization model, and the objective function includes minimizing total cost, maximizing energy utilization and minimizing carbon emissions.
[0108] The model is solved using a multi-objective evolutionary algorithm based on Pareto sorting (such as NSGA-II). The algorithm searches for the optimal solution set of multiple objective functions in the solution space by simulating the natural evolution process. After multiple rounds of iterations, the algorithm outputs a set of Pareto optimal solutions that achieve the best trade-off between the objective functions. For each solution in the Pareto optimal solution set, the conditional value at risk (CVaR) is used as a risk metric to quantify the uncertainty of renewable energy (such as wind power and solar power) power generation. CVaR measures the potential losses caused by insufficient power generation from renewable energy at a certain confidence level.
[0109] Calculate the risk value of each solution to evaluate its robustness in the face of renewable energy uncertainty. According to the trade-off between the risk value and the original objective function, select the optimal solution from the Pareto optimal solution set. This optimal solution not only performs well on each objective function, but also can better cope with the uncertainty of renewable energy. Specifically, calculate the risk value of each solution in the Pareto optimal solution group; sort the Pareto optimal solution group from small to large according to the risk value; obtain the solution with the smallest risk value after sorting and determine it as the optimal solution; generate a detailed power grid planning scheme based on the power grid topology structure, equipment parameters, etc. contained in the optimal solution; use the Monte Carlo simulation algorithm to perform multi-scenario risk assessment on the power grid planning scheme and determine whether the risk value exceeds the threshold; if the risk value exceeds the threshold, return to select the solution with the second smallest risk value and regenerate the planning scheme; if the risk value does not exceed the threshold, determine the current power grid planning scheme as the final optimal planning scheme.
[0110] For example, in the optimization of power grid planning, the objective functions are to minimize total cost, maximize energy utilization and minimize carbon emissions. First, the unit efficiency prediction model is used to predict the efficiency of each generator set in the future period of time, for example, the average efficiency of a thermal power unit in the next year is predicted to be 35%. Then, the unit state assessment model is used to evaluate the operating status of each unit to obtain their health index, such as the health index of a hydropower unit is 85. At the same time, the carbon emission data of each unit is collected, and the wind0 model simulates and calculates that the average annual carbon emission reduction of a wind farm is 20,000 tons. In addition, according to the forecast results of agricultural industry electricity demand, the electricity consumption of fisheries will increase at an average annual rate of 4% in the next five years. The above data is input into the power grid planning optimization model, and the multi-objective evolutionary algorithm NSGA-III is used to solve it. When the population size is 100 and the evolutionary generation is 500, 100 Pareto optimal solutions are obtained. Next, the conditional risk value CVaR is selected as the risk measurement indicator. When the confidence level is 95%, the CVaR value of each optimal solution is calculated to represent the economic loss risk caused by the uncertainty of renewable energy power generation. Finally, the solution with the smallest CVaR value is selected from the Pareto optimal solution set as the optimal planning scheme. This scheme takes into account multiple objectives of power grid planning and quantifies the uncertainty risk of renewable energy, which can guide the optimal construction and operation of the power grid.
[0111] Reference Figure 2 An embodiment of the present invention provides a modern rural power grid planning system 2, wherein the system 2 specifically includes:
[0112] The first planning module 201 is used to obtain the operating data and historical maintenance data of the generator sets in the power grid planning area, establish a unit efficiency prediction model based on the operating data, and establish a unit status assessment model based on the historical maintenance data;
[0113] The second planning module 202 is used to determine the carbon emission data of various power generation technologies in the power grid planning area, wherein the carbon emission data includes the carbon emission data of various types of renewable energy power generation technologies and the carbon emission data of traditional energy power generation technologies;
[0114] The third planning module 203 is used to obtain historical power demand data of different types of agricultural industries in the power grid planning area, and determine the power demand change trend of each type of agricultural industry according to the historical power demand data;
[0115] The fourth planning module 204 is used to establish a power grid planning optimization model using a multi-objective evolutionary algorithm based on the prediction results of the unit efficiency prediction model, the evaluation results of the unit status evaluation model, the carbon emission data and the changing trends of electricity demand for various types of agricultural industries. The power grid planning optimization model is used to determine the optimal power grid planning scheme.
[0116] It is understandable that if Figure 1 The contents of the embodiment of the modern rural power grid planning method shown in the figure are applicable to the embodiment of the modern rural power grid planning system. The functions specifically implemented by the embodiment of the modern rural power grid planning system are similar to those in the embodiment of the modern rural power grid planning method shown in the figure. Figure 1 The modern rural power grid planning method embodiment shown in FIG. 1 is the same as that shown in FIG. 1 , and the beneficial effects achieved are the same as those achieved in FIG. Figure 1 The beneficial effects achieved by the embodiment of the modern rural power grid planning method shown are also the same.
[0117] It should be noted that the information interaction, execution process and other contents between the above-mentioned systems are based on the same concept as the embodiment of the method of the present invention. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.
[0118] Those skilled in the art can clearly understand that, for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the system can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0119] Reference Figure 3 The embodiment of the present invention further provides a computer device 3, comprising: a memory 302 and a processor 301 and a computer program 303 stored in the memory 302. When the computer program 303 is executed on the processor 301, a modern rural power grid planning method as described in any one of the above methods is implemented.
[0120] The computer device 3 may be a computing device such as a desktop computer, a notebook, a PDA, or a cloud server. The computer device 3 may include, but is not limited to, a processor 301 and a memory 302. Those skilled in the art will appreciate that Figure 3 It is only an example of computer device 3 and does not constitute a limitation on computer device 3. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components, for example, it may also include input and output devices, network access devices, etc.
[0121] The processor 301 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0122] In some embodiments, the memory 302 may be an internal storage unit of the computer device 3, such as a hard disk or memory of the computer device 3. In other embodiments, the memory 302 may also be an external storage device of the computer device 3, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the computer device 3. Further, the memory 302 may also include both an internal storage unit of the computer device 3 and an external storage device. The memory 302 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program, etc. The memory 302 may also be used to temporarily store data that has been output or is to be output.
[0123] An embodiment of the present invention further provides a computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the method for planning a modern rural power grid as described in any one of the above methods is implemented.
[0124] In this embodiment, if the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, the steps of the above-mentioned various method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium can at least include: any entity or device that can carry the computer program code to the camera / terminal device, recording medium, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. For example, a USB flash drive, a mobile hard disk, a disk or an optical disk. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electric carrier signals and telecommunication signals.
[0125] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0126] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0127] In the embodiments disclosed in the present application, it should be understood that the disclosed devices / terminal equipment and methods can be implemented in other ways. For example, the device / terminal equipment embodiments described above are only schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0128] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
Claims
1. A modern rural power grid planning method, characterized in that: The method specifically comprises: Acquire the operating data and historical maintenance data of the generator sets in the power grid planning area, establish a unit efficiency prediction model based on the operating data, and establish a unit status assessment model based on the historical maintenance data; Determine the carbon emission data of various power generation technologies in the power grid planning area, wherein the carbon emission data includes carbon emission data of various types of renewable energy power generation technologies and carbon emission data of traditional energy power generation technologies; Obtain historical power demand data of different types of agricultural industries in the power grid planning area, and determine the power demand change trend of each type of agricultural industry based on the historical power demand data; According to the prediction results of the unit efficiency prediction model, the evaluation results of the unit status evaluation model, the carbon emission data and the changing trends of electricity demand of various types of agricultural industries, a multi-objective evolutionary algorithm is used to establish a power grid planning optimization model, and the power grid planning optimization model is used to determine the optimal power grid planning scheme.
2. The method according to claim 1, characterized in that The step of establishing a unit efficiency prediction model according to the operation data specifically includes: The operating data is processed by principal component analysis to reduce the dimension and obtain the main characteristic variables; According to the type of each unit, the main characteristic variables are divided into different subsets by using a K-means clustering algorithm; With the operating time and load rate as the independent variable and the unit efficiency as the dependent variable, the support vector regression model is used to establish the corresponding unit efficiency prediction model for each subset.
3. The method according to claim 2, characterized in that The step of establishing a unit status assessment model based on the historical maintenance data specifically includes: Using an association rule mining algorithm to analyze the historical maintenance data, and determine the association between the fault symptoms and the fault causes of the generator set; Taking the performance indicators of the generator set as characteristic variables and the unit status rating of the generator set as the target variable, a unit status assessment model is established using the decision tree algorithm according to the correlation between the fault symptoms and the fault causes of the generator set.
4. The method according to claim 1, characterized in that: The carbon emission data of various power generation technologies in the grid planning area are specifically determined as follows: Obtain meteorological data and energy resource data of different types of renewable energy in the power grid planning area, establish a correlation between the energy resource data of each type of renewable energy and the meteorological data, and form a renewable energy capacity prediction model; Establishing a power generation model for each type of renewable energy, and determining power generation data of each type of renewable energy according to the power generation model and the renewable energy capacity prediction model; Acquire traditional energy consumption data in the power grid planning area, and establish an energy network diagram based on the traditional energy consumption data, wherein the energy network diagram includes the association relationship between electricity and other different traditional energy forms; Determine the carbon emission factors of various power generation technologies at various energy supply chain links, and determine the carbon emission data of various power generation technologies based on the carbon emission factors, the power generation data and the energy network diagram.
5. The method according to claim 4, characterized in that The step of establishing a correlation between the energy resource data of each type of renewable energy and the terrain data to form a renewable energy capacity prediction model specifically includes: Using principal component analysis to perform feature processing on the meteorological data, and extracting key meteorological factors related to renewable energy production capacity; The time series data of the meteorological factors are analyzed by an autoregressive integrated moving average model to obtain the dynamic change characteristics of the meteorological factors; According to the dynamic change characteristics and the energy resource data of each type of renewable energy, a long short-term memory network model is used to predict the renewable energy capacity, and a renewable energy capacity prediction model for each type of renewable energy is obtained.
6. The method according to claim 4, characterized in that The step of establishing an energy network diagram according to the traditional energy consumption data specifically includes: Determine a node set of an energy production unit, an energy conversion unit, and an energy consumption unit according to the traditional energy consumption data; Constructing an initial energy network graph according to the node set, wherein the edges of the initial energy network graph represent energy flow paths; By analyzing the energy flow path, the correlation strength between different nodes is obtained; The initial energy network diagram is optimized using a minimum spanning tree algorithm to calculate the weight of each edge; According to the association strength between different nodes and the weight of each edge, the initial energy network diagram is adjusted to a target energy network diagram.
7. The method according to claim 1, characterized in that Determining the power demand change trend of each type of agricultural industry according to the historical power demand data specifically includes: Using an autoregressive integrated moving average model to perform data preprocessing and trend analysis on the historical energy demand data, to obtain the time variation characteristics of energy demand of various types of agricultural industries; Obtain weather forecast data, crop growth cycle data, and livestock and poultry growth stage data to form multi-source heterogeneous data; Using principal component analysis to perform dimensionality reduction processing on the multi-source heterogeneous data to obtain multi-source heterogeneous data after dimensionality reduction; The multi-source heterogeneous data after dimensionality reduction are fused through the Kalman filter algorithm to obtain the target multi-source heterogeneous data; Taking the time variation characteristics of energy demand of each type of agricultural industry and the target multi-source heterogeneous data as input variables, taking the energy demand of each type of agricultural industry as output variables, and using a support vector machine regression model to construct an energy demand characteristic data set; Based on the energy demand characteristic data set, a long short-term memory neural network algorithm is used to model and predict the energy demand of various types of agricultural industries, and obtain the changing trends of electricity demand of various types of agricultural industries.
8. The method according to any one of claims 1 to 7, characterized in that The multi-objective evolutionary algorithm is used to establish a power grid planning optimization model based on the prediction results of the unit efficiency prediction model, the evaluation results of the unit status evaluation model, the carbon emission data and the power demand change trends of various types of agricultural industries, specifically including: Taking minimizing total cost, maximizing energy utilization and minimizing carbon emissions as objective functions, and taking the prediction results of the unit efficiency prediction model, the evaluation results of the unit status evaluation model, the carbon emission data and the power demand change trends of various types of agricultural industries as input parameters, a power grid planning optimization model is established; A multi-objective evolutionary algorithm based on Pareto sorting is used to solve the multi-objective optimization model to obtain a Pareto optimal solution group; For each solution in the Pareto optimal solution group, conditional risk value is used as a risk measurement indicator to quantify the uncertainty of renewable energy and obtain the risk value of each solution; According to the risk value, an optimal solution is determined from the Pareto optimal solution group, and the optimal solution is an optimal power grid planning scheme.
9. A modern rural power grid planning system, characterized in that: The system specifically comprises: The first planning module is used to obtain the operating data and historical maintenance data of the generator sets in the power grid planning area, establish a unit efficiency prediction model based on the operating data, and establish a unit status assessment model based on the historical maintenance data; The second planning module is used to determine the carbon emission data of various power generation technologies in the power grid planning area, wherein the carbon emission data includes the carbon emission data of various types of renewable energy power generation technologies and the carbon emission data of traditional energy power generation technologies; The third planning module is used to obtain historical power demand data of different types of agricultural industries in the power grid planning area, and determine the power demand change trend of each type of agricultural industry according to the historical power demand data; The fourth planning module is used to establish a power grid planning optimization model using a multi-objective evolutionary algorithm based on the prediction results of the unit efficiency prediction model, the evaluation results of the unit status evaluation model, the carbon emission data and the changing trends in electricity demand of various types of agricultural industries. The power grid planning optimization model is used to determine the optimal power grid planning scheme.
Citation Information
Patent Citations
Low-carbon optimized dispatching method for closed loop
CN104268668A
Multi-objective stochastic programming method for micro-energy network containing multiple clean energy
CN111737884A
Multi-objective planning method and device for integrated energy system and terminal equipment
CN113887973A
Virtual power plant multi-objective optimization scheduling method
CN116307178A
Comprehensive energy system optimization management method
CN118052312A
Cited By
Multi-energy coupled micro-energy network optimization scheduling method and system
CN119784118A
Information processing system, information processing device, information processing method, and program
JP7926206B1