User data management method and platform

Through drone image acquisition and data management technology, the problem of difficulty in quickly understanding the configuration of photovoltaic panels and carbon emission improvements in corporate parks is solved, efficient power configuration and environmental protection benefits are achieved, and the popularity of photovoltaic panels is promoted.

CN119067413AInactive Publication Date: 2024-12-03STATE GRID ZHEJIANG ELECTRIC POWER CO MARKETING SERVICE CENT +1

Patent Information

Application Number
CN202411564159.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-05
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In promoting the popularization of photovoltaic panels, there are problems in the enterprise parks that are difficult to quickly understand the configuration and carbon emission improvement, resulting in low popularity of photovoltaic panels.

Method used

Through drone image acquisition and preset distribution display diagram, distribution area marking and data management are carried out, and data management text is generated to display carbon emission index values.

Benefits of technology

It improves the efficiency and accuracy of power configuration, simplifies the distribution process, provides scientific environmental protection indicators, and promotes the popularization and sustainable development of photovoltaic panels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067413A_ABST
    Figure CN119067413A_ABST
Patent Text Reader

Abstract

The invention provides a user data management method and platform, and relates to a data processing technology. The method comprises the following steps: calling a preset power distribution display graph and sending the preset power distribution display graph to the enterprise park for regional configuration to obtain an initial power distribution display graph; carrying out image acquisition on the enterprise park, and carrying out image matching degree determination on an obtained park upper view; updating the initial power distribution display graph based on the image matching degree, performing interaction configuration based on power distribution marking on the updated initial power distribution display graph, and performing power distribution marking; power distribution processing corresponding to each power distribution area is carried out, a preset data management template is called, data extraction is carried out on the obtained current power distribution display graph, and each corresponding filling slot position is filled with the data, so that a current data management text is obtained; and determining a carbon emission index value, and sending a current data management text carrying the carbon emission index value to the enterprise park for display. According to the invention, the application universality of the photovoltaic panel is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to data processing technology, and in particular to a user data management method and platform. Background Art

[0002] As an important source of energy consumption and carbon emissions, the green transformation of enterprise parks has become the focus of current technical work. As a clean and renewable energy form, the application of photovoltaic energy in enterprise parks is gradually becoming an important means to promote green development.

[0003] Enterprise parks usually occupy a large area, with abundant rooftop and open space resources, which provides good conditions for the installation of photovoltaic panels. By properly configuring photovoltaic panels, enterprise parks can not only achieve self-sufficient power supply and reduce energy costs, but also sell excess electricity to the grid to create additional economic benefits.

[0004] Despite the growing demand for photovoltaic panel configuration in corporate parks, existing technologies still face significant challenges in promoting the popularization of photovoltaic panels. Many corporate parks are unable to quickly learn about the corresponding configuration status, and are unable to learn about the improvement in carbon emissions, thereby reducing the popularity of the corresponding photovoltaic panels. Summary of the invention

[0005] Based on the above problems, the present invention is proposed to provide a user data management method and platform that overcomes the above problems or at least partially solves the above problems.

[0006] According to one aspect of the present invention, there is provided a user data management method, comprising the following steps: In response to receiving a power planning request for any enterprise park, a preset power distribution display diagram is retrieved and sent to the enterprise park for regional configuration, so as to obtain an initial power distribution display diagram including multiple power distribution areas; Controlling the drone to go to the enterprise park to collect images based on the positioning information corresponding to the enterprise park, and determining the image matching degree between the obtained top view of the park and the initial power distribution display map; The initial power distribution display diagram is updated based on the image matching degree, each power distribution area in the updated initial power distribution display diagram is interactively configured based on the power distribution mark, and the initial power distribution display diagram is sent to the enterprise park for power distribution marking; Perform power distribution processing corresponding to each power distribution area based on the initial power distribution display diagram marked with power distribution, call the preset data management template, extract data from the obtained current power distribution display diagram based on each filling slot corresponding to different filling types in the preset data management template, and fill each obtained filling data into the corresponding filling slots respectively to obtain the current data management text; The carbon emission index value corresponding to the enterprise park is determined based on the current data management text, and the current data management text carrying the carbon emission index value is sent to the enterprise park for display.

[0007] Optionally, in the method according to the present invention, controlling the drone to go to the enterprise park to collect images based on the positioning information corresponding to the enterprise park, and determining the image matching degree between the obtained park top view and the initial power distribution display map, includes: Determine a park center point corresponding to the enterprise park based on the positioning information, and control the drone to fly to the park center point in a flight state maintaining a preset altitude; In response to the drone arriving at the center of the park, controlling the drone to collect images of the enterprise park to obtain a test image; Performing image recognition on the test image to determine whether the test image includes a park outline corresponding to the enterprise park, and determining whether to adjust the preset height based on the determination result; In response to the test image including a park outline corresponding to the enterprise park, the test image is determined as a reference image, and the reference image is intercepted based on the park outline in the reference image to obtain a top view of the park including a park area corresponding to the park outline; Binarizing the top view of the park to obtain a binary image, wherein the binary image includes each wall pixel point corresponding to the first pixel value and each noise pixel point corresponding to the second pixel value; Pixel connections are performed on each wall pixel point that is arranged adjacently to obtain each site area in the upper view of the park, and image matching is determined based on each site area in the upper view of the park and each distribution area in the initial distribution display diagram.

[0008] Optionally, in the method according to the present invention, determining the image matching degree based on each site area located in the park top view and each power distribution area located in the initial power distribution display map includes: Taking the center point of the first image of the top view of the park as the center of the circle, a first image coordinate system corresponding to the top view of the park is established, and based on the first image coordinate system, the site coordinate points constituting the same site area are determined as corresponding site coordinate groups to obtain the site coordinate groups corresponding to the site areas respectively; Taking the center point of the second image of the initial power distribution display diagram as the center of a circle, a second image coordinate system corresponding to the initial power distribution display diagram is established, and based on the first image coordinate system, each distribution coordinate point constituting the same power distribution area is determined as a corresponding distribution coordinate group, and each distribution coordinate group corresponding to each distribution area is obtained; Compare the coordinates of each site coordinate group with each power distribution coordinate group, determine the coordinate coincidence rate between each site coordinate group and each power distribution coordinate group, and determine the power distribution coordinate group with the largest coordinate coincidence rate as having a matching association relationship with the site coordinate group; The site coordinate groups and the distribution coordinate groups having matching association relationships are divided into the same matching association set, and the site coordinate groups and the distribution coordinate groups in the same matching association set are compared in terms of coordinate offset dimension and coordinate quantity dimension, and the offset matching coefficient and the quantity matching coefficient are determined based on the comparison results; The offset matching coefficient and the quantity matching coefficient corresponding to the same matching association set are fused to obtain the image matching degrees corresponding to each power distribution area.

[0009] Optionally, in the method according to the present invention, the initial power distribution display diagram is updated based on the image matching degree, each power distribution area in the updated initial power distribution display diagram is interactively configured based on the power distribution mark, and the initial power distribution display diagram is sent to the enterprise park for power distribution marking, including: Compare the matching degree of each image with a preset matching threshold, and determine the matching association set corresponding to the image whose matching degree is less than the preset matching threshold as the adjustment association set; Replacing the power distribution area in the initial power distribution display diagram based on the site coordinate group in the adjustment association set to update the initial power distribution display diagram; Based on each power distribution area in the updated initial power distribution display diagram, a corresponding data filling layer with a link relationship is established, and the initial power distribution display diagram is sent to the enterprise park, wherein the data filling layer includes a power distribution state slot and a power distribution value slot; In response to the enterprise park interacting with any power distribution area, the data filling layer with a link relationship to the power distribution area is retrieved, and the content filling of the power distribution status slot and the power distribution value slot of the enterprise park is obtained to complete the power distribution marking of the initial power distribution display diagram.

[0010] Optionally, in the method according to the present invention, performing power distribution processing corresponding to each power distribution area based on the initial power distribution display diagram marked with power distribution includes: Based on the content-filled power distribution state slots corresponding to the power distribution areas, respectively, determining the power distribution states corresponding to the power distribution areas, respectively, wherein the power distribution states include a use state and an idle state; Determine all the power distribution areas in the corresponding use status as a set to be distributed, and determine, based on the park upper view, each site area that has a matching association relationship with each power distribution area in the set to be distributed as a set to be replaced; Binarizing each site area in the to-be-replaced set to obtain each binary area, wherein each binary area includes each wall pixel point corresponding to the first pixel value and each noise pixel point corresponding to the second pixel value; Obtaining the pixel ratio between each wall pixel and each noise pixel corresponding to the same binary area, and removing the power distribution area whose corresponding pixel ratio is less than or equal to a preset ratio threshold from the set to be distributed, to obtain an updated set to be distributed; The power distribution process is performed based on each power distribution area in the updated set to be distributed.

[0011] Optionally, in the method according to the present invention, performing power distribution processing based on the updated set of power to be distributed includes: Based on the park top view, pixel filling is performed on each distribution area with each site area having a matching association relationship with each distribution area in the set to be distributed, so as to obtain each updated distribution area; Taking the initial power distribution display diagram as a horizontal plane, perform dimensional transformation on each power distribution area in the to-be-distributed power set along the vertical direction to obtain each power distribution area corresponding to a three-dimensional form; Based on the distribution value slots corresponding to the distribution areas filled with content, the distribution values ​​corresponding to the distribution areas are determined, and the photovoltaic power generation models corresponding to the power generation specifications are determined based on the distribution values; Assemble each photovoltaic power generation model with the corresponding power distribution area model to obtain the current power distribution display diagram.

[0012] Optionally, in the method according to the present invention, a preset data management template is retrieved, data is extracted from the obtained current power distribution display diagram based on each filling slot corresponding to different filling types in the preset data management template, and each obtained filling data is filled into each corresponding filling slot respectively, so as to obtain the current data management text, including: Retrieving a preset data management template, wherein the preset data management template includes an enterprise information management template, an image information management template, and a power distribution processing management template that are sequentially stacked; Acquiring enterprise information corresponding to the enterprise park based on the enterprise information management template, and filling the enterprise information into a filling slot corresponding to the enterprise type in the enterprise information management template; Filling the current power distribution display diagram into a filling slot of a corresponding image type in the image information management template based on the image information management template, and marking each photovoltaic power generation model in the current power distribution display diagram based on a different model number; Marking the filling slots of the corresponding power distribution types in the power distribution processing management template based on different model numbers, and filling each photovoltaic power generation model in the current power distribution display diagram into the model sub-slots respectively included in each filling slot in the power distribution processing management template based on the model number, and filling each power generation specification corresponding to each photovoltaic power generation model into the specification sub-slots respectively included in each filling slot in the power distribution processing management template; In response to completing the data filling of each filling slot in the preset data management template, a current data management text is obtained.

[0013] Optionally, in the method according to the present invention, the method further comprises: Determine each photovoltaic configuration amount corresponding to each photovoltaic power generation model based on each power generation specification filled into each specification sub-slot in the power distribution processing management template, and perform superposition calculation on each photovoltaic configuration amount to obtain a configuration total amount; The power distribution values ​​corresponding to each power distribution area are superimposed and calculated to obtain the total power distribution amount, and the total power distribution amount is multiplied by the rated power charge to obtain the total power charge; Calculate the ratio of the total configuration amount to the total electricity fee to obtain an equivalent period; A power distribution amount management template is established based on a preset quantity management template, and the power distribution amount management template is superimposed and set after the power distribution processing management template, wherein the power distribution amount management template includes a filling slot corresponding to a cycle type, a filling slot corresponding to a type of amount, and an equation symbol between the two; The configured total amount is filled into the filling slot of the corresponding amount type, and the equivalent period is filled into the filling slot of the corresponding period type.

[0014] Optionally, in the method according to the present invention, determining the carbon emission index value corresponding to the enterprise park based on the current data management text, and sending the current data management text carrying the carbon emission index value to the enterprise park for display, includes: Acquire the number of regions corresponding to each power distribution area, and perform normalization processing on the number of regions to obtain a first quantity coefficient; Normalizing the total power distribution amount to obtain a first power distribution coefficient; The first quantity coefficient and the first power distribution coefficient are respectively multiplied by the retrieved quantity weight and the power distribution weight, and a superposition calculation is performed based on the obtained second quantity coefficient and the second power distribution coefficient to obtain a carbon emission index value corresponding to the enterprise park; A carbon emission management template is established based on a preset quantity management template, and the carbon emission management template is superimposed and set after the power distribution amount management template, wherein the carbon emission management template includes a filling slot corresponding to the indicator type and a filling slot corresponding to the adjustment type; Retrieving an index comparison table, wherein the index comparison table includes different index intervals and adjusted electricity charges corresponding to the different index intervals; Traversing the index comparison table, and determining a corresponding adjusted electricity fee based on an index interval including the carbon emission index value; The carbon emission index value and the adjusted electricity fee are respectively filled into the filling slot of the corresponding index type and the filling slot of the corresponding adjustment type, and the current data management text is sent to the enterprise park for display.

[0015] According to another aspect of the present invention, there is provided a user data management platform, comprising: A regional configuration module is configured to, in response to receiving a power planning request for any enterprise park, retrieve a preset power distribution display diagram and send it to the enterprise park for regional configuration, thereby obtaining an initial power distribution display diagram including multiple power distribution areas; An image acquisition module is configured to control the drone to go to the enterprise park to acquire images based on the positioning information corresponding to the enterprise park, and determine the image matching degree between the obtained top view of the park and the initial power distribution display map; A power distribution marking module is configured to update the initial power distribution display diagram based on the image matching degree, interactively configure each power distribution area in the updated initial power distribution display diagram based on the power distribution marking, and send the initial power distribution display diagram to the enterprise park for power distribution marking; The power distribution processing module is configured to perform power distribution processing corresponding to each power distribution area based on the initial power distribution display diagram marked with power distribution, call a preset data management template, extract data from the obtained current power distribution display diagram based on each filling slot corresponding to different filling types in the preset data management template, and fill each filling data into the corresponding filling slots respectively to obtain the current data management text; The indicator determination module is configured to determine the carbon emission indicator value corresponding to the enterprise park based on the current data management text, and send the current data management text carrying the carbon emission indicator value to the enterprise park for display.

[0016] According to the solution of the present invention, the beneficial effects of the present invention are mainly reflected in the following aspects: 1. Efficient regional planning and configuration: By automatically receiving power planning requests from enterprise parks and instantly retrieving preset power distribution display diagrams for regional configuration to obtain the initial power distribution display diagram, the efficiency of power distribution planning is significantly improved. At the same time, drones are used to collect park images and match them with the initial power distribution display diagram to ensure accurate positioning and updating of the power distribution area, making the power configuration more in line with the actual needs of the enterprise park.

[0017] 2. Intelligent interactive configuration and data management: In the updated initial power distribution display diagram, each power distribution area has been interactively configured based on the power distribution mark, which not only simplifies the power distribution process and facilitates the enterprise park to carry out the corresponding power distribution mark, but also improves the accuracy of the configuration. In addition, by calling the preset data management template, the current power distribution display diagram is extracted and filled with data, and a complete current data management text is generated, realizing intelligent management and efficient use of data.

[0018] 3. Significant environmental benefits: Based on the current data management text, the carbon emission index value of the enterprise park can be accurately calculated, which provides a scientific environmental protection index for the enterprise park. By displaying the current data management text carrying the carbon emission index value, the enterprise park can clearly understand its own environmental protection status, so as to take more effective energy-saving and emission reduction measures to promote sustainable development. It also further improves the popularity of photovoltaic panel applications. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 A flowchart of a user data management method according to an embodiment of the present invention is shown; Figure 2 The top view content corresponding to the current power distribution display diagram in this embodiment is shown; Figure 3 A structural block diagram of a user data management platform according to another embodiment of the present invention is shown. DETAILED DESCRIPTION

[0020] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.

[0021] An embodiment of the present invention provides a user data management method, which can be executed in a computing device.

[0022] Figure 1 A flow chart of a user data management method according to an embodiment of the present invention is shown, and the method is suitable for being executed in a computing device, wherein the computing device can be understood as a terminal with a data processing function, such as a mobile phone or a computer.

[0023] like Figure 1 As shown, a user data management method provided in this embodiment starts at step S101, wherein step S101 includes the following contents: In response to receiving a power planning request for any enterprise park, a preset power distribution display diagram is retrieved and sent to the enterprise park for regional configuration, thereby obtaining an initial power distribution display diagram including multiple power distribution areas.

[0024] For example, in this embodiment, the enterprise park can be understood as a park used to produce different types of goods, such as an electrical appliance production park, a food production park, or a daily chemical production park; since any enterprise park needs corresponding power resources to maintain the use of production equipment located in the enterprise park during the corresponding production process, the power resources are often provided by power companies and are non-clean energy, so they will generate a corresponding higher carbon emission dose, thereby causing higher environmental pollution; in this case, the enterprise park can deploy clean energy to reduce the corresponding carbon emission measurement; and in this embodiment, when the enterprise park has corresponding needs, it can use the corresponding terminal device to send a corresponding power planning request to the server, and after receiving the power planning request, the server will carry out the deployment planning of the clean energy of the enterprise park, wherein, since the deployment planning of clean energy is based on the deployment of photovoltaic panels, and photovoltaic panels are mainly based on solar energy to generate electricity, therefore, it is necessary to install photovoltaic panels on the top of each building in the enterprise park to power the enterprise park, at this time, it is necessary to conduct corresponding surveys on the tops of each building in the enterprise park to determine whether the corresponding photovoltaic panels can be deployed.

[0025] Here, in order to meet the customized deployment requirements of users, preset power distribution display diagrams can be pre-stored in the server for use. The preset power distribution display diagram can be understood as a layer that requires users to set the position of the top of each building by themselves. The server can send the stored preset power distribution display diagram to the enterprise park after obtaining the power planning request of any enterprise park, so that the enterprise park can perform regional configuration based on the preset power distribution display layer, thereby obtaining the initial power distribution display diagram of multiple distribution areas, wherein multiple distribution areas can be understood as areas where photovoltaic panels need to be deployed, that is, the corresponding tops of different buildings.

[0026] It can be explained that the specific process of the enterprise park performing regional configuration on the preset power distribution display diagram may include: when the enterprise park uses the corresponding terminal to receive the preset power distribution display diagram, the enterprise park can perform regional configuration of the preset power distribution display diagram through the power distribution plug-in sent at the same time as the preset power distribution display diagram, and the power distribution plug-in can call various preset shapes of different shapes, so that the enterprise park can select the preset shape with the same shape as the different buildings located in the enterprise park from each preset shape for configuration, and each preset shape can also be customized according to the needs of the enterprise park, so that the configuration of the power distribution area can be completed based on the needs of the enterprise park. Here, from the perspective of image processing, the process of regional configuration of the preset power distribution display diagram can be implemented based on the existing technology. Therefore, this embodiment does not specifically limit the setting of the specific power distribution plug-in.

[0027] In step S102, the following contents are included: The drone is controlled to go to the enterprise park to collect images based on the positioning information corresponding to the enterprise park, and the image matching degree of the obtained park top view and the initial power distribution display map is determined.

[0028] For example, in this embodiment, after the enterprise park completes the corresponding area configuration of the preset power distribution display diagram to obtain the initial power distribution display diagram, in order to improve the accuracy of the subsequent pre-deployment of photovoltaic panels, it is necessary to determine the relative position of each distribution area in the initial power distribution display diagram to determine whether the enterprise park's configuration of the distribution area is accurate. Here, the judgment process can be implemented based on image comparison, that is, the drone can be controlled to fly to the enterprise park based on the positioning information corresponding to the enterprise park, so that the drone is located above the enterprise park to perform image acquisition of the enterprise park, and further determine the image matching degree with the initial power distribution display diagram through the obtained park top view. The higher the corresponding image matching degree, the smaller the image difference between the park top view and the initial power distribution display diagram.

[0029] Furthermore, in this embodiment, the above-mentioned "controlling the drone to go to the enterprise park to collect images based on the positioning information corresponding to the enterprise park, and determining the image matching degree between the obtained park top view and the initial power distribution display map" may also include the following steps: Determine a park center point corresponding to the enterprise park based on the positioning information, and control the drone to fly to the park center point in a flight state maintaining a preset altitude; In response to the drone arriving at the center of the park, controlling the drone to collect images of the enterprise park to obtain a test image; Performing image recognition on the test image to determine whether the test image includes a park outline corresponding to the enterprise park, and determining whether to adjust the preset height based on the determination result; In response to the test image including a park outline corresponding to the enterprise park, the test image is determined as a reference image, and the reference image is intercepted based on the park outline in the reference image to obtain a top view of the park including a park area corresponding to the park outline; Binarizing the top view of the park to obtain a binary image, wherein the binary image includes each wall pixel point corresponding to the first pixel value and each noise pixel point corresponding to the second pixel value; Pixel connections are performed on each wall pixel point that is arranged adjacently to obtain each site area in the upper view of the park, and image matching is determined based on each site area in the upper view of the park and each distribution area in the initial distribution display diagram.

[0030] For example, in this embodiment, the positioning information can be obtained based on the transmission of the enterprise park. The positioning information can specifically correspond to the GPS positioning information of the center point of the enterprise park. After obtaining the corresponding positioning information, the server can control the drone to fly to the center point of the park at a preset height. Here, the preset height can be set by the user, and is generally required to be higher than the urban construction height; When the drone flies to the center of the park, the server can further control the drone to collect images of the enterprise park to obtain the corresponding test image. It should be noted that since the preset height of the drone is pre-set, if in actual circumstances, when the heights of the buildings in the enterprise park are almost the same as the preset height, the drone may not be able to capture the entire enterprise park, that is, the acquired test image may only include a part of the enterprise park. Based on this, it is necessary to determine the content of the acquired test image. When the test image only includes a part of the park outline of the corresponding enterprise park, it indicates that the preset height needs to be adjusted, specifically, it is increased until the captured test image includes all the park outlines of the corresponding enterprise park. It should be noted that the park outline here refers to the outline that surrounds the enterprise park; when the obtained test image includes the complete park outline, the test image can be determined as the reference image; It should be noted that, after the drone completes the shooting of the reference image, the reference image may include other parts besides the image part corresponding to the park outline, such as roads and trees outside the enterprise park. In order to reduce the corresponding data processing amount in the subsequent image processing process, the reference image can be intercepted based on the park outline, that is, all other image parts except the park outline are deleted, so as to obtain the park top view corresponding to the park area located at the park outline. Finally, in this embodiment, since the deployment of photovoltaic panels only needs to rely on the building tops of each building located in the enterprise park, the image portion corresponding to the top of each building in the park top view can be obtained based on the park top view, and since each building located in the enterprise park corresponds to a different building outline composed of building walls, and the building walls generally correspond to the same material and color, the park top view can be binarized to obtain a corresponding binary image, wherein the binary image includes each wall pixel corresponding to the first pixel value and each noise pixel corresponding to the second pixel value, wherein the noise pixel can be understood as other pixel points located in the park top view except for the building outline; and after obtaining the corresponding wall pixel points, the wall pixel points in adjacent positions can be connected pixel by pixel, so that the site areas located in the park top view can be obtained, and then the image matching degree can be determined based on the site areas located in the park top view and the distribution areas located in the initial distribution display diagram.

[0031] Furthermore, in this embodiment, the above-mentioned “determining the image matching degree based on each site area located in the park top view and each power distribution area located in the initial power distribution display map” may also include the following steps: Taking the center point of the first image of the top view of the park as the center of the circle, a first image coordinate system corresponding to the top view of the park is established, and based on the first image coordinate system, the site coordinate points constituting the same site area are determined as corresponding site coordinate groups to obtain the site coordinate groups corresponding to the site areas respectively; Taking the center point of the second image of the initial power distribution display diagram as the center of a circle, a second image coordinate system corresponding to the initial power distribution display diagram is established, and based on the first image coordinate system, each distribution coordinate point constituting the same power distribution area is determined as a corresponding distribution coordinate group, and each distribution coordinate group corresponding to each distribution area is obtained; Compare the coordinates of each site coordinate group with each power distribution coordinate group, determine the coordinate coincidence rate between each site coordinate group and each power distribution coordinate group, and determine the power distribution coordinate group with the largest coordinate coincidence rate as having a matching association relationship with the site coordinate group; The site coordinate groups and the distribution coordinate groups having matching association relationships are divided into the same matching association set, and the site coordinate groups and the distribution coordinate groups in the same matching association set are compared in terms of coordinate offset dimension and coordinate quantity dimension, and the offset matching coefficient and the quantity matching coefficient are determined based on the comparison results; The offset matching coefficient and the quantity matching coefficient corresponding to the same matching association set are fused to obtain the image matching degrees corresponding to each power distribution area.

[0032] For example, in this embodiment, in order to determine the image matching degree of each site area in the park upper view and each distribution area in the initial distribution display map, it is necessary to obtain the relative position of each site area in the park upper view and each distribution area in the initial distribution display map, so as to perform corresponding position comparison, which specifically includes the following: First, the first image coordinate system and the second image coordinate system can be established based on the first image center point of the park top view and the second image center point of the initial power distribution display map, respectively, and further based on the first image coordinate system, the site coordinate points constituting the same site area are determined as the same site coordinate group, and based on the second image coordinate system, the distribution coordinate points constituting the same power distribution area are determined as the same power distribution coordinate group, and then the site coordinate groups corresponding to the site areas and the power distribution coordinate groups corresponding to the power distribution areas can be obtained respectively; Next, since each distribution area in the initial distribution display diagram is planned by the enterprise park itself, in order to judge the accuracy of the planning, the site coordinate group and the distribution coordinate group can be compared with each other, specifically to determine the coordinate coincidence rate between each site coordinate point included in each site coordinate group and each distribution coordinate point included in each distribution coordinate point; here, the enterprise park needs to plan the distribution area based on its understanding of the actual situation of the enterprise park, so there should be a high coordinate coincidence rate between the distribution coordinate group and the site coordinate group corresponding to the same building. Based on this, the positional relationship between the site coordinate group and the distribution coordinate group can be judged by the coordinate coincidence rate. For any site coordinate group, the one with the largest coordinate coincidence rate in each distribution coordinate group can be determined as having a corresponding matching association relationship with it, that is, it can be determined that the two should correspond to the same building; Then, after the matching association relationship between the site area and the power distribution area is determined, the site coordinate group and the power distribution coordinate group with the matching association relationship can be divided into the same matching association set, and the matching association sets corresponding to the buildings located in the enterprise park are obtained. The site coordinate group and the power distribution coordinate group in the same matching association set are further compared in the coordinate offset dimension and the coordinate quantity dimension, so as to obtain the corresponding offset matching coefficient and quantity matching coefficient; It can be explained that the regional comparison based on the coordinate offset dimension can be understood as determining the deviation in position between the two by comparing the corresponding coordinate groups of the two, and the regional comparison based on the coordinate quantity dimension can be understood as determining the deviation in quantity between the two by comparing the corresponding coordinate groups of the two; for example, for the coordinate offset dimension, the coordinate values ​​of the corresponding coordinate groups can be compared, and the corresponding offset matching coefficient can be obtained based on the degree of offset. The larger the degree of offset, the smaller the corresponding offset matching coefficient. Specifically, the coordinate profile composed of each coordinate group can be obtained, and the corresponding offset matching coefficient can be determined based on the degree of offset of the coordinate profile; similarly, for the coordinate quantity dimension, the coordinate quantities of the corresponding coordinate groups can be compared, and the corresponding quantity matching coefficient can be obtained based on the quantity difference. The larger the quantity difference, the smaller the corresponding quantity matching coefficient. Specifically, the number of coordinate points included in each coordinate group can be obtained, and the difference calculation can be performed based on the number of coordinate points to obtain the corresponding quantity difference, and the corresponding quantity matching coefficient can be further determined based on the quantity difference.

[0033] Finally, after obtaining the corresponding offset matching coefficient and quantity matching coefficient, the offset matching coefficient and quantity matching coefficient corresponding to the same matching association set can be fused to obtain the image matching degrees corresponding to each distribution area. Here, coefficient fusion can be understood as directly adding the two numerical values, or the corresponding coefficient weight can be set according to the different weights of the two, so as to further improve the accuracy of obtaining image matching degrees.

[0034] In step S103, the following contents are included: The initial power distribution display diagram is updated based on the image matching degree, each power distribution area in the updated initial power distribution display diagram is interactively configured based on the power distribution marking, and the initial power distribution display diagram is sent to the enterprise park for power distribution marking.

[0035] For example, in this embodiment, it can be seen from the above content that the image matching degree represents the matching degree between the distribution area self-planned by the enterprise park corresponding to the same building and the actual site area. Therefore, if the image matching degree is low, it indicates that the gap between the distribution area self-planned by the enterprise park and the actual site area is large. At this time, the distribution area needs to be updated to ensure that the updated initial distribution display map has high accuracy; and after completing the update of the initial distribution display map, each distribution area included therein can be interactively configured based on the distribution mark, so as to facilitate the corresponding distribution marking of the initial distribution display map after sending it to the enterprise park. Here, the distribution mark can be understood as marking the power resources required for each distribution area, so as to perform the deployment of photovoltaic panels according to the corresponding distribution mark in the subsequent process.

[0036] Further, in this embodiment, the above-mentioned "updating the initial power distribution display map based on the image matching degree, performing interactive configuration based on the power distribution mark on each power distribution area in the updated initial power distribution display map, and sending the initial power distribution display map to the enterprise park for power distribution marking" may also include the following steps: Compare the matching degree of each image with a preset matching threshold, and determine the matching association set corresponding to the image whose matching degree is less than the preset matching threshold as the adjustment association set; Replacing the power distribution area in the initial power distribution display diagram based on the site coordinate group in the adjustment association set to update the initial power distribution display diagram; Based on each power distribution area in the updated initial power distribution display diagram, a corresponding data filling layer with a link relationship is established, and the initial power distribution display diagram is sent to the enterprise park, wherein the data filling layer includes a power distribution state slot and a power distribution value slot; In response to the enterprise park interacting with any power distribution area, the data filling layer with a link relationship to the power distribution area is retrieved, and the content filling of the power distribution status slot and the power distribution value slot of the enterprise park is obtained to complete the power distribution marking of the initial power distribution display diagram.

[0037] For example, in this embodiment, it can be known from the above content that the image matching degree is used to characterize the matching degree between the distribution area planned by the enterprise park corresponding to the same building and the actual existing site area. Therefore, the image matching degree can be compared with the preset matching threshold to determine whether the distribution area needs to be updated based on the corresponding site area. Here, the preset matching threshold can be set based on user needs, and its specific value is not limited in this implementation; after completing the comparison between each image matching degree and the preset matching threshold, the matching association set whose corresponding image matching degree is less than the preset matching threshold can be determined as an adjustment association set, that is, the distribution area located in the adjustment association set needs to be updated, and the specific updating method is to replace the corresponding distribution area located in the initial distribution display diagram based on the site coordinate group located in the adjustment association set; and after completing the update of the initial distribution display diagram, the corresponding initial distribution display diagram can be sent to the enterprise park for distribution marking, and before sending, in order to facilitate the enterprise park to perform corresponding operations, the corresponding can be established based on each distribution area in the updated initial distribution display diagram. Each data filling layer, here, each data filling layer has a link relationship with the corresponding distribution area, that is, any terminal can call the corresponding data filling layer for display when interacting with any distribution area; in this embodiment, the data filling layer may include a corresponding distribution status slot and a distribution value slot, wherein the distribution status slot is used for the enterprise park to fill in whether the corresponding distribution area needs power distribution. It should be noted that since some buildings may have low power consumption, for example, the electrical equipment required for buildings such as sundries storage warehouses may only include corresponding lighting equipment, the distribution area may not need to deploy additional photovoltaic panels to increase the corresponding enterprise cost. Therefore, based on the distribution area where photovoltaic panels need to be deployed and the distribution area where photovoltaic panels do not need to be deployed, different corresponding filling entries can be created in advance, so that the enterprise park can make corresponding choices when filling based on the distribution status slot, for example, it can include usage status and idle status; and for filling in the corresponding distribution value slot, the enterprise park can fill in according to the actual power consumption of the corresponding building, thereby completing the distribution marking of the initial distribution display diagram.

[0038] In step S104, the following contents are included: Based on the initial distribution display diagram that has been marked with distribution marks, distribution processing is performed on the corresponding distribution areas, and the preset data management template is called up. Data is extracted from the current distribution display diagram based on the filling slots corresponding to different filling types in the preset data management template, and the corresponding filling slots are filled with the obtained filling data to obtain the current data management text.

[0039] For example, in this embodiment, after the enterprise park completes the power distribution marking of each distribution area in the initial power distribution display diagram, the server can obtain the initial power distribution display diagram and perform power distribution processing of the corresponding photovoltaic panels based on the power distribution marking. After completing the corresponding power distribution processing, in order to enable the enterprise park to have a more comprehensive understanding of the deployment of photovoltaic panels, a preset data management template can be pre-set and stored in the server, and data can be extracted according to the initial power distribution display diagram, so that the extracted key fill data are filled into each fill slot in the preset data management template to form a current data management text that can be viewed by the enterprise park.

[0040] It should be noted that the current data management text can exist in the form of PPT, and the current data management text can include multiple paragraphs of pre-filled text content. Corresponding filling slots can be interspersed in the text content to fill in the extracted key filling data. For example, a certain paragraph of text content includes "Photovoltaic panel deployment plan based on XXX", where the corresponding XXX is the filling slot that needs to be filled with the name of the corresponding enterprise park, thereby realizing customized automatic generation of deployment conditions and improving the convenience of obtaining information for enterprise parks.

[0041] Furthermore, in this embodiment, the above-mentioned “performing power distribution processing corresponding to each power distribution area based on the initial power distribution display diagram with power distribution marking” may also include the following steps: Based on the content-filled power distribution state slots corresponding to the power distribution areas, respectively, determining the power distribution states corresponding to the power distribution areas, respectively, wherein the power distribution states include a use state and an idle state; Determine all the power distribution areas in the corresponding use status as a set to be distributed, and determine, based on the park upper view, each site area that has a matching association relationship with each power distribution area in the set to be distributed as a set to be replaced; Binarizing each site area in the to-be-replaced set to obtain each binary area, wherein each binary area includes each wall pixel point corresponding to the first pixel value and each noise pixel point corresponding to the second pixel value; Obtaining the pixel ratio between each wall pixel and each noise pixel corresponding to the same binary area, and removing the power distribution area whose corresponding pixel ratio is less than or equal to a preset ratio threshold from the set to be distributed, to obtain an updated set to be distributed; The power distribution process is performed based on each power distribution area in the updated set to be distributed.

[0042] For example, in this embodiment, after obtaining the initial power distribution display diagram after the enterprise park is marked for power distribution, the server can perform power distribution processing on each power distribution area according to the power distribution mark, that is, deploy photovoltaic panels; here, since the enterprise park has filled the corresponding power distribution status slots according to the actual situation of each power distribution area, the server can determine the power distribution status corresponding to each power distribution area based on the filled power distribution status slots, and at the same time determine all the power distribution areas of the corresponding use status as the set to be distributed, which also indicates the power distribution areas that need to be processed; after completing the acquisition of the set to be distributed, since the power distribution area is set and planned based on the enterprise park, it is impossible to determine whether the corresponding building in the actual environment meets the deployment conditions of the photovoltaic panels based on the power distribution area. At this time, it is necessary to determine the site areas that have a matching association relationship with each distribution area in the set to be distributed as the set to be replaced based on the upper view of the park, so as to replace the power distribution area of ​​the set to be distributed based on the set to be replaced, so as to determine whether each distribution area meets the corresponding deployment conditions based on each site area; and in the specific determination process, Since it is necessary to consider whether the corresponding building top has a large deployment space when actually deploying photovoltaic panels, then the site areas in the to-be-replaced set can be processed again based on the binarization process to obtain the corresponding binarized areas, wherein each corresponding binarized area includes wall pixels corresponding to the first pixel value and noise pixels corresponding to the second pixel value. Here, when the binarized area includes wall pixels, it indicates that the area corresponding to the wall pixels is free of debris, that is, it can be used to deploy photovoltaic panels. At this time, it is necessary to further determine whether the size of the area meets the corresponding deployment size. The determination method can specifically include obtaining the pixel ratio between the wall pixels and the noise pixels corresponding to the same binarized area. When any pixel ratio is less than or equal to the preset ratio threshold stored in the server, it indicates that the area corresponding to the distribution area where the photovoltaic panels can be deployed may be small. At this time, it is necessary to remove the distribution area from the to-be-distributed set to obtain an updated to-be-distributed set, so as to further perform distribution processing based on the distribution areas in the updated to-be-distributed set.

[0043] Furthermore, in this embodiment, the above-mentioned “performing power distribution processing based on the updated set of power to be distributed” may also include the following steps: Based on the park top view, pixel filling is performed on each distribution area with each site area having a matching association relationship with each distribution area in the set to be distributed, so as to obtain each updated distribution area; Taking the initial power distribution display diagram as a horizontal plane, perform dimensional transformation on each power distribution area in the to-be-distributed power set along the vertical direction to obtain each power distribution area corresponding to a three-dimensional form; Based on the distribution value slots corresponding to the distribution areas filled with content, the distribution values ​​corresponding to the distribution areas are determined, and the photovoltaic power generation models corresponding to the power generation specifications are determined based on the distribution values; Assemble each photovoltaic power generation model with the corresponding power distribution area model to obtain the current power distribution display diagram.

[0044] For example, in this embodiment, after obtaining the updated set of power to be distributed, the power distribution area located therein can be processed based on photovoltaic panels. Since the power distribution area is set by the enterprise park itself, in order to improve the display authenticity of the power distribution park after the power distribution processing, the site areas that have matching associations with the power distribution areas in the set of power to be distributed can be used to fill pixels in each distribution area based on the upper view of the park, so as to obtain updated power distribution requirements. It can be understood that due to the different corresponding power distribution states and pixel ratios of the power distribution areas included in the initial power distribution display diagram, only a part of the power distribution areas may be filled with pixels in the end, and the other part cannot be filled with pixels accordingly because it does not meet the photovoltaic panel deployment conditions. Therefore, the amount of data processing can be further reduced through selective pixel filling. In order to improve the display effect of power distribution processing, the initial power distribution display diagram can be used as the horizontal plane, and the dimensions of each distribution area in the power distribution set to be distributed can be further converted along the vertical direction (that is, the direction perpendicular to the horizontal plane), so as to form corresponding three-dimensional forms of each distribution area. It should be noted that, in the above content, it is mentioned that there may be a part of the power distribution area in the initial power distribution display diagram that cannot be filled with corresponding pixels. Therefore, in the actual operation process, only a part of the power distribution area may be converted into a three-dimensional form. In this way, the corresponding data processing amount can be reduced without losing the display of key content. Furthermore, after completing the dimensional conversion of each distribution area, it can also be connected to each distribution area through the content filling in the enterprise park. The corresponding power distribution value slots are used to determine the corresponding power distribution values, so that the server can select the photovoltaic power generation model of the corresponding power generation specification according to the corresponding configuration value, and assemble the photovoltaic power generation model with the corresponding power distribution area to obtain the current power distribution display diagram, so as to realize the customized deployment of the photovoltaic power generation model; here, the photovoltaic power generation model can be understood as a three-dimensional model of the corresponding photovoltaic panel. Since photovoltaic panels generally have a variety of power generation specifications, the photovoltaic panel that meets the requirements can be determined based on the power distribution value, and the corresponding photovoltaic power generation model can be called to place it on the top of the three-dimensional distribution area, simulating the installation position of the photovoltaic panel in the real scene, improving the display effect of the corresponding power distribution processing, and helping the enterprise park to quickly obtain the corresponding content of the corresponding power distribution processing.

[0045] For example, Figure 2 As shown, Figure 2 The top view corresponding to the current power distribution display diagram is shown in FIG. Figure 2 It includes 6 distribution areas, 3 of which meet the deployment conditions and have deployed corresponding photovoltaic power generation models.

[0046] Further, in this embodiment, the above-mentioned “calling a preset data management template, extracting data from the obtained current power distribution display diagram based on each filling slot corresponding to different filling types in the preset data management template, and filling each filling data into the corresponding filling slots respectively, to obtain the current data management text” may also include the following steps: Retrieving a preset data management template, wherein the preset data management template includes an enterprise information management template, an image information management template, and a power distribution processing management template that are sequentially stacked; Acquiring enterprise information corresponding to the enterprise park based on the enterprise information management template, and filling the enterprise information into a filling slot corresponding to the enterprise type in the enterprise information management template; Filling the current power distribution display diagram into a filling slot of a corresponding image type in the image information management template based on the image information management template, and marking each photovoltaic power generation model in the current power distribution display diagram based on a different model number; Marking the filling slots of the corresponding power distribution types in the power distribution processing management template based on different model numbers, and filling each photovoltaic power generation model in the current power distribution display diagram into the model sub-slots respectively included in each filling slot in the power distribution processing management template based on the model number, and filling each power generation specification corresponding to each photovoltaic power generation model into the specification sub-slots respectively included in each filling slot in the power distribution processing management template; In response to completing the data filling of each filling slot in the preset data management template, a current data management text is obtained.

[0047] For example, from the above content, it can be seen that the preset data management template can exist in the form of PPT. Therefore, the enterprise information management template, image information management template and power distribution processing management template included in the preset data management template can be integrated in a layered manner, that is, the first page of the preset data association template is the enterprise information management template, the second page is the image information management template, and the third page is the power distribution processing management template.

[0048] Here, the enterprise information management template can be understood as a template for introducing enterprise information of an enterprise park, that is, each filling slot included in the enterprise information management template corresponds to an enterprise type, and can be filled into the filling slot corresponding to the enterprise type in the enterprise information management template by acquiring the enterprise information corresponding to the enterprise park. The enterprise information may include relevant information such as the enterprise name, enterprise address, and business scope; The image information management template can be understood as a template for introducing the appearance of the enterprise park, that is, the filling slots included in the image information management template correspond to the image types respectively, and the current power distribution display diagram can be filled into the filling slots of the corresponding image types in the image information management template, so that after the obtained current data management text is sent to the enterprise park, the enterprise park can click on the image information management template to view the current power distribution display diagram; in addition, since the power distribution processing management template located after the image information management template displays the appearance of the park, it can also display which areas have been planned for the deployment of photovoltaic panels. If the power generation specifications and information of the photovoltaic power generation model for power distribution processing in each distribution area are to be displayed, it is necessary to use the power distribution processing management module located after the image information management template to do so. Before that, each photovoltaic power generation model located in the current power distribution display diagram needs to be marked in advance based on different model numbers; The power distribution processing management template can be understood as a template for introducing the power distribution processing of the enterprise park, specifically including the introduction of the photovoltaic power generation model and the corresponding power generation specifications for different power distribution areas. Each filling slot of the power distribution processing management template includes a model sub-slot and a specification sub-slot, wherein each filling slot has a different model number, that is, the filling slot and each photovoltaic power generation model are based on the model number. The one-to-one correspondence between the filling slot and the photovoltaic power generation model can be established through different pages, which is convenient for the enterprise park to quickly find; here, the model sub-slot is used to fill the corresponding photovoltaic power generation model into it, and the specification sub-slot is used to fill the corresponding power generation specification into it; Finally, after completing the data filling of all the filling slots in the preset data management template, the current data management text can be obtained, so that it can be read after being sent to the enterprise park to view the corresponding photovoltaic panel deployment plan.

[0049] In addition, in the actual application process, since the deployment of photovoltaic panels requires corresponding funds for deployment, and the corresponding funds need to be paid by the enterprise park itself, after completing the deployment plan for photovoltaic panels, the corresponding photovoltaic configuration amount should also be notified to the enterprise park. Therefore, in this embodiment, the following steps can be further included: Determine each photovoltaic configuration amount corresponding to each photovoltaic power generation model based on each power generation specification filled into each specification sub-slot in the power distribution processing management template, and perform superposition calculation on each photovoltaic configuration amount to obtain a configuration total amount; The power distribution values ​​corresponding to each power distribution area are superimposed and calculated to obtain the total power distribution amount, and the total power distribution amount is multiplied by the rated power charge to obtain the total power charge; Calculate the ratio of the total configuration amount to the total electricity fee to obtain an equivalent period; A power distribution amount management template is established based on a preset quantity management template, and the power distribution amount management template is superimposed and set after the power distribution processing management template, wherein the power distribution amount management template includes a filling slot corresponding to a cycle type, a filling slot corresponding to a type of amount, and an equation symbol between the two; The configured total amount is filled into the filling slot of the corresponding amount type, and the equivalent period is filled into the filling slot of the corresponding period type.

[0050] For example, in this embodiment, since the purchase and installation of photovoltaic panels are generally completed at one time, including the corresponding equipment costs and installation costs, and photovoltaic panels with different power generation specifications may have different photovoltaic configuration amounts, different photovoltaic configuration amounts can be determined based on different power generation specifications, and the various photovoltaic configuration amounts are superimposed and calculated to obtain the total configuration amount, that is, the total cost required to complete the purchase and installation of all photovoltaic panels; After obtaining the corresponding total configuration amount, the distribution values ​​of each distribution area can be superimposed and calculated to obtain the corresponding total distribution amount, wherein the total distribution amount is understood as the total amount of electricity to be consumed, and the total electricity amount can be further multiplied by the rated electricity fee to obtain the corresponding total electricity fee. It should be noted that the total electricity here can be obtained by a corresponding period, such as by day, month, quarter or year, etc.; After completing the calculation of the total configuration amount and the total electricity fee, the corresponding equivalent period can be obtained by calculating the ratio of the two. The equivalent period can be understood as the electricity fee generated by the deployment of photovoltaic panels after each distribution area has been running for a period of time greater than or equal to the equivalent period without deploying photovoltaic panels. In order to establish a corresponding relationship between the total configuration amount and the total electricity fee based on the equivalent period, a power distribution amount management template can be further established based on the preset quantity management template, and each corresponding power distribution amount management template is superimposed and set after the power distribution processing management template, wherein the power distribution amount management template also includes a filling slot corresponding to the cycle type, a filling slot corresponding to the amount type, and an equation symbol between the two; Finally, the total configuration amount can be filled in the filling slot of the corresponding amount type, and the equivalent cycle can be filled in the filling slot of the corresponding cycle type, so that when it is sent to the enterprise park for viewing, the enterprise park can view the corresponding equivalent cycle through the power distribution amount management template.

[0051] In step S105, the following contents are included: The carbon emission index value corresponding to the enterprise park is determined based on the current data management text, and the current data management text carrying the carbon emission index value is sent to the enterprise park for display.

[0052] For example, in this embodiment, after completing the creation of the current data management text, the carbon emission index value corresponding to the enterprise park can be further determined based on the current data management text, so that the enterprise park can understand the carbon emission reduction benefits that can be achieved if it actually deploys photovoltaic panels, thereby increasing the enthusiasm of the enterprise park for the deployment of photovoltaic panels.

[0053] Further, in this embodiment, the above-mentioned “determining the carbon emission index value corresponding to the enterprise park based on the current data management text, and sending the current data management text carrying the carbon emission index value to the enterprise park for display” may also include the following steps: Acquire the number of regions corresponding to each power distribution area, and perform normalization processing on the number of regions to obtain a first quantity coefficient; Normalizing the total power distribution amount to obtain a first power distribution coefficient; The first quantity coefficient and the first power distribution coefficient are respectively multiplied by the retrieved quantity weight and the power distribution weight, and a superposition calculation is performed based on the obtained second quantity coefficient and the second power distribution coefficient to obtain a carbon emission index value corresponding to the enterprise park; A carbon emission management template is established based on a preset quantity management template, and the carbon emission management template is superimposed and set after the power distribution amount management template, wherein the carbon emission management template includes a filling slot corresponding to the indicator type and a filling slot corresponding to the adjustment type; Retrieving an index comparison table, wherein the index comparison table includes different index intervals and adjusted electricity charges corresponding to the different index intervals; Traversing the index comparison table, and determining a corresponding adjusted electricity fee based on an index interval including the carbon emission index value; The carbon emission index value and the adjusted electricity fee are respectively filled into the filling slot of the corresponding index type and the filling slot of the corresponding adjustment type, and the current data management text is sent to the enterprise park for display.

[0054] For example, in this embodiment, in order to obtain the corresponding carbon emission index, the carbon emission assessment of the enterprise park can be realized through two different dimensions, including the numerical assessment of the number of corresponding areas and the total power distribution amount, that is, the more the number of corresponding areas and the higher the total power distribution amount, the greater the corresponding carbon emission index should be, and the specific dimensions are as follows: First, the number of regions of each power distribution area can be obtained, and the number of regions can be normalized to obtain a first quantity coefficient. At the same time, the total power distribution amount also needs to be normalized to obtain a first power distribution coefficient. Next, by multiplying the first quantity coefficient and the first power distribution coefficient with the retrieved quantity weight and the power distribution weight respectively, and superimposing the obtained second quantity coefficient and the second power distribution coefficient, the carbon emission index value corresponding to the enterprise park can be obtained; Next, in order to further improve the enthusiasm of enterprise parks for the deployment of photovoltaic panels, corresponding electricity usage preferential strategies can also be formulated according to the carbon emission index value. For example, a carbon emission management template is established based on a preset quantity management template, and the carbon emission management template is superimposed and set after the power distribution amount management template. Here, the carbon emission management template can include a filling slot corresponding to the indicator type and a filling slot for the adjustment type; Then, the index comparison table stored in the server is retrieved, wherein the index comparison table includes different index intervals and the adjusted electricity charges corresponding to the different index intervals. The index interval containing the carbon emission index value is determined by performing corresponding data traversal on the index comparison table, and the corresponding adjusted electricity charge is further determined based on the index interval. Here, it can be explained that the adjusted electricity charge can be understood as an electricity charge discount for the deployment of photovoltaic panels in the enterprise park. The higher the corresponding carbon emission index value, the greater the contribution value of the enterprise park to carbon emissions, which will give it a greater electricity charge discount. Finally, after obtaining the adjusted electricity charge, the carbon emission index value and the adjusted electricity charge can be filled in the filling slot of the corresponding index type and the filling slot of the corresponding adjustment type respectively, and then the current management text can be sent to the corresponding enterprise park for display, so as to facilitate the enterprise park to visualize the deployment of photovoltaic panels, so as to further improve the popularity of photovoltaic panel applications.

[0055] Another embodiment of the present invention provides a user data management platform. Figure 3 The corresponding platform block diagram includes: A regional configuration module is configured to, in response to receiving a power planning request for any enterprise park, retrieve a preset power distribution display diagram and send it to the enterprise park for regional configuration, thereby obtaining an initial power distribution display diagram including multiple power distribution areas; An image acquisition module is configured to control the drone to go to the enterprise park to acquire images based on the positioning information corresponding to the enterprise park, and determine the image matching degree between the obtained top view of the park and the initial power distribution display map; A power distribution marking module is configured to update the initial power distribution display diagram based on the image matching degree, interactively configure each power distribution area in the updated initial power distribution display diagram based on the power distribution marking, and send the initial power distribution display diagram to the enterprise park for power distribution marking; The power distribution processing module is configured to perform power distribution processing corresponding to each power distribution area based on the initial power distribution display diagram marked with power distribution, call a preset data management template, extract data from the obtained current power distribution display diagram based on each filling slot corresponding to different filling types in the preset data management template, and fill each filling data into the corresponding filling slots respectively to obtain the current data management text; The indicator determination module is configured to determine the carbon emission indicator value corresponding to the enterprise park based on the current data management text, and send the current data management text carrying the carbon emission indicator value to the enterprise park for display.

[0056] In the description provided herein, algorithms and displays are not inherently related to any particular computer, virtual system or other device. Various general purpose systems can also be used together with the examples of the present invention. According to the above description, it is obvious that the structure required for constructing such systems. In addition, the present invention is not directed to any specific programming language either. It should be understood that various programming languages ​​can be utilized to implement the content of the present invention described herein, and the above description of specific languages ​​is for the purpose of disclosing the preferred embodiment of the present invention.

[0057] In the description provided herein, a large number of specific details are described. However, it is understood that embodiments of the present invention can be practiced without these specific details. In some instances, well-known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this description.

[0058] Similarly, it should be understood that in order to streamline the present disclosure and aid in understanding one or more of the various inventive aspects, in the above description of exemplary embodiments of the present invention, various features of the present invention are sometimes grouped together into a single embodiment, figure, or description thereof.

[0059] Those skilled in the art will appreciate that the modules or units or components of the devices in the examples disclosed herein may be arranged in the devices described in the embodiment, or alternatively may be located in one or more devices different from the devices in the examples. The modules in the foregoing examples may be combined into one module or may be divided into multiple submodules.

[0060] Those skilled in the art will appreciate that the modules in the devices in the embodiments may be adaptively changed and arranged in one or more devices different from the embodiments. The modules or units or components in the embodiments may be combined into one module or unit or component, and furthermore may be divided into a plurality of submodules or subunits or subcomponents.

[0061] Furthermore, those skilled in the art will appreciate that although some embodiments described herein include certain features included in other embodiments but not other features, the combination of features from different embodiments is meant to be within the scope of the present invention and to form different embodiments.

[0062] In addition, some of the embodiments are described herein as methods or combinations of method elements that can be implemented by a processor of a computer system or by other devices that perform the functions. Therefore, a processor with necessary instructions for implementing the method or method elements forms a device for implementing the method or method elements. In addition, the elements described herein of the device embodiments are examples of devices for implementing the functions performed by the elements for the purpose of implementing the invention.

[0063] As used herein, unless otherwise specified, the use of ordinal numbers "first," "second," "third," etc. to describe common objects merely indicates that different instances of similar objects are involved, and is not intended to imply that the objects so described must have a given order in time, space, order, or in any other manner.

[0064] Although the present invention has been described according to a limited number of embodiments, it will be apparent to those skilled in the art, with the benefit of the above description, that other embodiments may be envisioned within the scope of the invention thus described. In addition, it should be noted that the language used in this specification is primarily selected for readability and instructional purposes, rather than for explaining or limiting the subject matter of the present invention.

Claims

1. A user data management method, characterized in that: The following steps are involved: In response to receiving a power planning request for any enterprise park, a preset power distribution display diagram is retrieved and sent to the enterprise park for regional configuration, so as to obtain an initial power distribution display diagram including multiple power distribution areas; Controlling the drone to go to the enterprise park to collect images based on the positioning information corresponding to the enterprise park, and determining the image matching degree between the obtained top view of the park and the initial power distribution display map; The initial power distribution display diagram is updated based on the image matching degree, each power distribution area in the updated initial power distribution display diagram is interactively configured based on the power distribution mark, and the initial power distribution display diagram is sent to the enterprise park for power distribution marking; Perform power distribution processing corresponding to each power distribution area based on the initial power distribution display diagram marked with power distribution, call the preset data management template, extract data from the obtained current power distribution display diagram based on each filling slot corresponding to different filling types in the preset data management template, and fill each obtained filling data into the corresponding filling slots respectively to obtain the current data management text; The carbon emission index value corresponding to the enterprise park is determined based on the current data management text, and the current data management text carrying the carbon emission index value is sent to the enterprise park for display.

2. The user data management method according to claim 1, characterized in that: Controlling the drone to go to the enterprise park to collect images based on the positioning information corresponding to the enterprise park, and determining the image matching degree between the obtained park top view and the initial power distribution display map, including: Determine a park center point corresponding to the enterprise park based on the positioning information, and control the drone to fly to the park center point in a flight state maintaining a preset altitude; In response to the drone arriving at the center of the park, controlling the drone to collect images of the enterprise park to obtain a test image; Performing image recognition on the test image to determine whether the test image includes a park outline corresponding to the enterprise park, and determining whether to adjust the preset height based on the determination result; In response to the test image including a park outline corresponding to the enterprise park, the test image is determined as a reference image, and the reference image is intercepted based on the park outline in the reference image to obtain a top view of the park including a park area corresponding to the park outline; Binarizing the top view of the park to obtain a binary image, wherein the binary image includes each wall pixel point corresponding to the first pixel value and each noise pixel point corresponding to the second pixel value; Pixel connections are performed on each wall pixel point that is arranged adjacently to obtain each site area in the upper view of the park, and image matching is determined based on each site area in the upper view of the park and each distribution area in the initial distribution display diagram.

3. The user data management method according to claim 2, characterized in that: Determining the image matching degree based on each site area located in the park top view and each power distribution area located in the initial power distribution display map includes: Taking the center point of the first image of the top view of the park as the center of the circle, a first image coordinate system corresponding to the top view of the park is established, and based on the first image coordinate system, the site coordinate points constituting the same site area are determined as corresponding site coordinate groups to obtain the site coordinate groups corresponding to the site areas respectively; Taking the center point of the second image of the initial power distribution display diagram as the center of a circle, a second image coordinate system corresponding to the initial power distribution display diagram is established, and based on the first image coordinate system, each distribution coordinate point constituting the same power distribution area is determined as a corresponding distribution coordinate group, and each distribution coordinate group corresponding to each distribution area is obtained; Compare the coordinates of each site coordinate group with each power distribution coordinate group, determine the coordinate coincidence rate between each site coordinate group and each power distribution coordinate group, and determine the power distribution coordinate group with the largest coordinate coincidence rate as having a matching association relationship with the site coordinate group; The site coordinate groups and the distribution coordinate groups having matching association relationships are divided into the same matching association set, and the site coordinate groups and the distribution coordinate groups in the same matching association set are compared in terms of coordinate offset dimension and coordinate quantity dimension, and the offset matching coefficient and the quantity matching coefficient are determined based on the comparison results; The offset matching coefficient and the quantity matching coefficient corresponding to the same matching association set are fused to obtain the image matching degrees corresponding to each power distribution area.

4. The user data management method according to claim 3, characterized in that: The initial power distribution display diagram is updated based on the image matching degree, each power distribution area in the updated initial power distribution display diagram is interactively configured based on the power distribution mark, and the initial power distribution display diagram is sent to the enterprise park for power distribution marking, including: Compare the matching degree of each image with a preset matching threshold, and determine the matching association set corresponding to the image whose matching degree is less than the preset matching threshold as the adjustment association set; Replacing the power distribution area in the initial power distribution display diagram based on the site coordinate group in the adjustment association set to update the initial power distribution display diagram; Based on each power distribution area in the updated initial power distribution display diagram, a corresponding data filling layer with a link relationship is established, and the initial power distribution display diagram is sent to the enterprise park, wherein the data filling layer includes a power distribution state slot and a power distribution value slot; In response to the enterprise park interacting with any power distribution area, the data filling layer with a link relationship to the power distribution area is retrieved, and the content filling of the power distribution status slot and the power distribution value slot of the enterprise park is obtained to complete the power distribution marking of the initial power distribution display diagram.

5. The user data management method according to claim 4, characterized in that: Based on the initial power distribution display diagram with power distribution marks, power distribution processing corresponding to each power distribution area is performed, including: Based on the content-filled power distribution state slots corresponding to the power distribution areas, respectively, determining the power distribution states corresponding to the power distribution areas, respectively, wherein the power distribution states include a use state and an idle state; Determine all the power distribution areas in the corresponding use status as a set to be distributed, and determine, based on the park upper view, each site area that has a matching association relationship with each power distribution area in the set to be distributed as a set to be replaced; Binarizing each site area in the to-be-replaced set to obtain each binary area, wherein each binary area includes each wall pixel point corresponding to the first pixel value and each noise pixel point corresponding to the second pixel value; Obtaining the pixel ratio between each wall pixel and each noise pixel corresponding to the same binary area, and removing the power distribution area whose corresponding pixel ratio is less than or equal to a preset ratio threshold from the set to be distributed, to obtain an updated set to be distributed; The power distribution process is performed based on each power distribution area in the updated set to be distributed.

6. The user data management method according to claim 5, characterized in that: Power distribution processing is performed based on the updated set of power to be distributed, including: Based on the park top view, pixel filling is performed on each distribution area with each site area having a matching association relationship with each distribution area in the set to be distributed, so as to obtain each updated distribution area; Taking the initial power distribution display diagram as a horizontal plane, perform dimensional transformation on each power distribution area in the to-be-distributed power set along the vertical direction to obtain each power distribution area corresponding to a three-dimensional form; Based on the distribution value slots corresponding to the distribution areas filled with content, the distribution values ​​corresponding to the distribution areas are determined, and the photovoltaic power generation models corresponding to the power generation specifications are determined based on the distribution values; Assemble each photovoltaic power generation model with the corresponding power distribution area model to obtain the current power distribution display diagram.

7. The user data management method according to claim 6, characterized in that: Retrieve a preset data management template, extract data from the current power distribution display diagram based on each filling slot corresponding to different filling types in the preset data management template, and fill each filling data into the corresponding filling slots to obtain the current data management text, including: Retrieving a preset data management template, wherein the preset data management template includes an enterprise information management template, an image information management template, and a power distribution processing management template that are sequentially stacked; Acquiring enterprise information corresponding to the enterprise park based on the enterprise information management template, and filling the enterprise information into a filling slot corresponding to the enterprise type in the enterprise information management template; Filling the current power distribution display diagram into a filling slot of a corresponding image type in the image information management template based on the image information management template, and marking each photovoltaic power generation model in the current power distribution display diagram based on a different model number; Marking the filling slots of the corresponding power distribution types in the power distribution processing management template based on different model numbers, and filling each photovoltaic power generation model in the current power distribution display diagram into the model sub-slots respectively included in each filling slot in the power distribution processing management template based on the model number, and filling each power generation specification corresponding to each photovoltaic power generation model into the specification sub-slots respectively included in each filling slot in the power distribution processing management template; In response to completing the data filling of each filling slot in the preset data management template, a current data management text is obtained.

8. The user data management method according to claim 7, characterized in that: The method further comprises: Determine each photovoltaic configuration amount corresponding to each photovoltaic power generation model based on each power generation specification filled into each specification sub-slot in the power distribution processing management template, and perform superposition calculation on each photovoltaic configuration amount to obtain a configuration total amount; The power distribution values ​​corresponding to each power distribution area are superimposed and calculated to obtain the total power distribution amount, and the total power distribution amount is multiplied by the rated power charge to obtain the total power charge; Calculate the ratio of the total configuration amount to the total electricity fee to obtain an equivalent period; A power distribution amount management template is established based on a preset quantity management template, and the power distribution amount management template is superimposed and set after the power distribution processing management template, wherein the power distribution amount management template includes a filling slot corresponding to a cycle type, a filling slot corresponding to a type of amount, and an equation symbol between the two; The configured total amount is filled into the filling slot of the corresponding amount type, and the equivalent period is filled into the filling slot of the corresponding period type.

9. The user data management method according to claim 8, characterized in that: Determining a carbon emission index value corresponding to the enterprise park based on the current data management text, and sending the current data management text carrying the carbon emission index value to the enterprise park for display, including: Acquire the number of regions corresponding to each power distribution area, and perform normalization processing on the number of regions to obtain a first quantity coefficient; Normalizing the total power distribution amount to obtain a first power distribution coefficient; The first quantity coefficient and the first power distribution coefficient are respectively multiplied by the retrieved quantity weight and the power distribution weight, and a superposition calculation is performed based on the obtained second quantity coefficient and the second power distribution coefficient to obtain a carbon emission index value corresponding to the enterprise park; A carbon emission management template is established based on a preset quantity management template, and the carbon emission management template is superimposed and set after the power distribution amount management template, wherein the carbon emission management template includes a filling slot corresponding to the indicator type and a filling slot corresponding to the adjustment type; Retrieving an index comparison table, wherein the index comparison table includes different index intervals and adjusted electricity charges corresponding to the different index intervals; Traversing the index comparison table, and determining a corresponding adjusted electricity fee based on an index interval including the carbon emission index value; The carbon emission index value and the adjusted electricity fee are respectively filled into the filling slot of the corresponding index type and the filling slot of the corresponding adjustment type, and the current data management text is sent to the enterprise park for display.

10. A user data management platform, characterized in that: include: A regional configuration module is configured to, in response to receiving a power planning request for any enterprise park, retrieve a preset power distribution display diagram and send it to the enterprise park for regional configuration, thereby obtaining an initial power distribution display diagram including multiple power distribution areas; An image acquisition module is configured to control the drone to go to the enterprise park to acquire images based on the positioning information corresponding to the enterprise park, and determine the image matching degree between the obtained top view of the park and the initial power distribution display map; A power distribution marking module is configured to update the initial power distribution display diagram based on the image matching degree, interactively configure each power distribution area in the updated initial power distribution display diagram based on the power distribution marking, and send the initial power distribution display diagram to the enterprise park for power distribution marking; The power distribution processing module is configured to perform power distribution processing corresponding to each power distribution area based on the initial power distribution display diagram marked with power distribution, call a preset data management template, extract data from the obtained current power distribution display diagram based on each filling slot corresponding to different filling types in the preset data management template, and fill each filling data into the corresponding filling slots respectively to obtain the current data management text; The indicator determination module is configured to determine the carbon emission indicator value corresponding to the enterprise park based on the current data management text, and send the current data management text carrying the carbon emission indicator value to the enterprise park for display.

Citation Information

Patent Citations

  • Graphic file processing method and device, equipment and storage medium

    CN108563894A

  • Refined waypoint checking method applied to unmanned aerial vehicle inspection in photovoltaic industry

    CN111259097A

  • Global path trajectory planning method and device of unmanned aerial vehicle, unmanned aerial vehicle and equipment

    CN113741507A

  • Roof photovoltaic visual design method, system, equipment and medium

    CN117010071A

  • Photovoltaic capacity configuration method and device, storage medium and processor

    CN118520622A

Cited By

  • E-commerce platform data processing method and system based on big data

    CN120612148A