Downhole communication system of tunneling equipment
By using carrier communication equipment and sensors connected by power cables in the underground communication system, the problem of poor communication effect of underground excavation equipment is solved, timely notification and handling in emergencies is achieved, the risk of casualties is reduced, and the underground work is improved security.
Patent Information
- Application Number
- CN202411255007.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-12-03
AI Technical Summary
The existing underground communication methods have problems such as poor communication effect, unstable signal and difficult installation in the working environment of the excavation equipment, which makes it difficult to notify and deal with in an emergency situation, increasing the risk of casualties.
Using a downhole communication system, through the communication connection between the first carrier communication device and the second carrier communication device, a power cable is used as a communication medium to realize data transmission, and a gas sensor, a pressure sensor and an alarm device are provided on the excavation device, through The control unit and normally open/normal closed contacts control the power supply to ensure timely handling of communication interruptions and safety situations.
It achieves good communication effects of underground excavation equipment, ensures timely notification and handling in emergencies, reduces the risk of casualties, and improves the safety and reliability of underground work.
Smart Images

Figure CN119070855A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of communication equipment, and in particular to an underground communication system for tunneling equipment. Background Art
[0002] Currently, underground emergency systems primarily use wired and wireless communication methods. Both methods can provide underground personnel with communication, allowing them to be notified in an emergency in a timely manner, thereby reducing or avoiding casualties.
[0003] Wired communications refer to methods such as wired telephones and wired radio. This primarily involves laying a wired network from the surface to the underground, configured to cover a specific area based on the underground space. As underground tunneling equipment continues to advance, the need for network cables and communications equipment continues to increase, gradually filling gaps in newly added tunnels.
[0004] The main problem with wired communication is the inability to conduct timely follow-up installation underground. The communication cables must be laid and arranged promptly, requiring additional materials and a dedicated installation team. This work is difficult to perform while the underground excavation equipment is operating, resulting in a period of vacuum in the work area, creating an opportunity for major accidents. Currently, to prevent serious casualties, strict control and reduction of underground personnel are required, and simultaneous construction operations are prohibited.
[0005] Wireless communication refers to 4G / 5G network communication underground. This is achieved through collaboration with network operators to deploy backbone network base stations underground. Each base station covers a specific area. As the distance from the base station increases and obstacles increase, the signal gradually attenuates, ultimately rendering communication impossible.
[0006] Wireless communication suffers from the harsh working environment underground. Wireless signals cannot guarantee real-time communication, and communication quality is unstable. Underground equipment is numerous, tunnels are winding, and there is a large amount of dust. These factors severely impact the quality of wireless communication. Furthermore, wireless transmission requires the layout, laying, and installation of base stations, which also present the same challenges as wired communication.
[0007] Both of these communication methods have various drawbacks and problems. Due to the high speed of current tunneling equipment, the new space created by tunnel excavation is becoming larger and larger, and the unpredictable underground geological conditions are numerous, which also increases the probability of danger in the excavation area. Summary of the Invention
[0008] The present invention aims to solve the technical problem that the current communication method has poor communication effect on underground tunneling equipment.
[0009] To this end, the present invention provides an underground communication system for tunneling equipment.
[0010] The present invention provides an underground communication system for tunneling equipment, including a tunneling equipment body, and the underground communication system further includes:
[0011] The first carrier communication device is used to be placed in the underground space together with the tunneling equipment body;
[0012] The second carrier communication device is provided on the tunneling equipment body;
[0013] The first carrier communication device is communicatively connected to the second carrier communication device for data transmission.
[0014] The underground communication system for tunneling equipment provided by the present invention is connected through a first carrier communication device and a second carrier communication device, so that the second carrier communication device on the tunneling equipment body and the first carrier communication device can directly exchange information, and has good communication effect, solving the technical problem that the current communication method has poor communication effect on tunneling equipment underground.
[0015] In addition, the technical solution provided by the present invention may also have the following additional technical features:
[0016] In any of the above technical solutions, further, the downhole communication system further includes:
[0017] The power feeding device is electrically connected to the tunneling device body, and the first carrier communication device is electrically connected to the power feeding device.
[0018] In this technical solution, the power feeding device provides power for the operation of the tunneling equipment body, and the first carrier communication device is electrically connected to the power feeding device to control the power on and off of the tunneling equipment body by the power feeding device.
[0019] In any of the above technical solutions, further, the downhole communication system further includes:
[0020] A power cable, one end of which is connected to the tunneling equipment body, and the other end of which is connected to the feeding equipment, is used to realize the communication connection between the first carrier communication equipment and the second carrier communication equipment.
[0021] In this technical solution, the tunneling equipment uses carrier communication via a power cable as the communication medium, transmitting data between a first carrier communication device and a second carrier communication device. This allows data exchange between the first and second carrier communication devices. The first carrier communication device can communicate with the mine's surface control room via the mine's underground ring network near the tunnel entrance. The power cable, which transmits power to the tunneling equipment, connects one end to the underground power feeder and the other to the tunneling equipment's explosion-proof electrical control box. The power cable moves with the tunneling equipment.
[0022] In any of the above technical solutions, further, the first carrier communication device is provided with a normally open / normally closed contact, and the normally open / normally closed contact is electrically connected to the feeding device.
[0023] In this technical solution, the first carrier communication device controls the power supply device located at the tunnel entrance through its own normally open / normally closed contacts to cut off the power supply, thereby immediately causing the tunneling equipment body to lose power, preventing the tunneling equipment body from continuing to operate due to emergencies encountered in underground operations.
[0024] In any of the above technical solutions, further, the downhole communication system further includes:
[0025] The communication interruption detection unit is provided on the first carrier communication device and / or the second carrier communication device, and is used to detect the interruption of the communication signal between the first carrier communication device and the second carrier communication device.
[0026] In this technical solution, when the communication between the first carrier communication device and the second carrier communication device is interrupted for more than a certain period of time, the first carrier communication device will send an alarm code, and the mine's ground control room will receive the fault information through the mine's underground ring network, which is conducive to the subsequent inspection and maintenance of the underground communication system.
[0027] In any of the above technical solutions, further, a control unit is provided on the tunneling equipment body, and the control unit is electrically connected to the second carrier communication device.
[0028] In this technical solution, the control unit sends a power-off signal to the second carrier communication device, and the second carrier communication device transmits the power-off signal to the first carrier communication device via a power cable. After receiving the power-off signal, the first carrier communication device controls the feeding device to cut off the power.
[0029] In any of the above technical solutions, further, a gas sensor is provided on the tunneling equipment body, and the control unit is electrically connected to the gas sensor for detecting the gas concentration around the tunneling equipment body.
[0030] In this technical solution, a gas sensor is installed on the tunneling equipment body. When the gas concentration around the tunneling equipment body in the underground space exceeds the standard, the gas sensor converts the first detection signal of the excessive gas concentration into a first electrical signal and transmits it to the control unit. After the control unit receives the first electrical signal of the excessive gas concentration, it sends the relevant information of the excessive gas concentration to the second carrier communication device. The second carrier communication device transmits the relevant information of the excessive gas concentration to the first carrier communication device through the power cable, indicating that the working face is abnormal. The first carrier communication device controls the power supply equipment located at the tunnel entrance through its own normally open / normally closed contacts to cut off the power, so that the tunneling equipment body immediately loses power and shuts down, avoiding the extreme situation of explosion.
[0031] In any of the above technical solutions, further, a first pressure sensor and an alarm device are provided on the excavation equipment body;
[0032] The first pressure sensor is used to detect a first warning value of the pressure on the tunneling equipment body;
[0033] The alarm device is used to sound an alarm when the pressure on the excavation equipment body reaches a first warning value;
[0034] The control unit is electrically connected to the first pressure sensor and the alarm device.
[0035] In this technical solution, a first pressure sensor and an alarm device are installed on the tunneling equipment body, wherein the first pressure sensor is used to detect a first warning value of the pressure borne by the tunneling equipment body. When the pressure borne by the tunneling equipment body reaches the first warning value, the first pressure sensor converts a second detection signal reaching the first warning value into a second electrical signal and transmits it to the control unit. After receiving the second electrical signal transmitted by the first pressure sensor, the control unit sends a first alarm signal to the alarm device. The alarm device initiates an alarm after receiving the first alarm signal. The control unit sends the first alarm signal to the first carrier communication device through the power cable.
[0036] In any of the above technical solutions, further, a second pressure sensor is provided on the tunneling equipment body for detecting a second warning value of the pressure borne by the tunneling equipment body, the second warning value is greater than the first warning value, and the control unit is electrically connected to the second pressure sensor.
[0037] In this technical solution, a second pressure sensor is installed on the tunneling equipment body. The second pressure sensor is used to detect a second warning value of the pressure borne by the tunneling equipment body. If the second warning value is greater than the first warning value, the second pressure sensor converts a third detection signal reaching the second warning value into a third electrical signal and transmits it to the control unit. After the control unit receives the third electrical signal transmitted by the second pressure sensor, it controls the alarm device to stop issuing an alarm and sends a second alarm signal to the first carrier communication device through a power cable. After the first carrier communication device receives the second alarm signal, the first carrier communication device controls the power supply device located at the tunnel entrance to cut off power through its own normally open / normally closed contacts, thereby causing the tunneling equipment body to lose power and shut down immediately; and uses the alarm to prompt people around the tunneling equipment body to evacuate in time.
[0038] In any of the above technical solutions, further, an emergency stop button is provided on the tunneling equipment body, and the control unit is electrically connected to the emergency stop button.
[0039] In this technical solution, when the emergency stop button on the tunneling equipment body is pressed, or the onboard sensor reaches the alarm value, the alarm data is sent to the mine's ring network through the first carrier communication equipment and received by the mine's ground control room, reminding the ground monitoring personnel to pay close attention to the work and operation of the tunneling equipment.
[0040] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become obvious from the description below, or will be learned through practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0042] Figure 1 A functional block diagram of an underground communication system for tunneling equipment provided by one embodiment of the present application is shown;
[0043] Figure 2 A functional principle block diagram of the tunneling equipment body provided by an embodiment of the present application is shown.
[0044] Figure 1 and Figure 2 Figure numerals: 1. First carrier communication equipment; 2. Second carrier communication equipment; 3. Excavation equipment body; 4. Power cable; 5. Control unit; 6. Gas sensor; 7. First pressure sensor; 8. Alarm device; 9. Second pressure sensor; 10. Power feeding equipment; 11. Communication interruption detection unit; 12. Emergency stop button; 13. Airborne sensor; 14. Tunnel entrance. DETAILED DESCRIPTION
[0045] The embodiments of the present application will be described in detail below. Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application and are not to be construed as limiting the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of this application.
[0046] The terms "first" and "second" in the specification and claims of this application may explicitly or implicitly refer to one or more of the features. Throughout the description of this application, unless otherwise specified, "plurality" means two or more. Furthermore, "and / or" in the specification and claims refers to at least one of the connected entities, and the character " / " generally indicates an "or" relationship between the connected entities.
[0047] In the description of this application, it should be understood that the terms "upper" and "inner" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing this application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on this application.
[0048] In the description of this application, it should be noted that, unless otherwise expressly specified or limited, the terms "mounted," "connected," and "connected" should be understood in a broad sense. For example, they can refer to fixed connections, detachable connections, or integral connections; mechanical connections or electrical connections; direct connections or indirect connections through an intermediate medium; and internal connections between two components. Those skilled in the art will understand the specific meanings of the above terms in this application based on the specific circumstances.
[0049] The following combination Figure 1 and Figure 2 An underground communication system for tunneling equipment provided according to an embodiment of the present application is described.
[0050] like Figure 1 and Figure 2 As shown, an underground communication system for tunneling equipment is proposed, including a tunneling equipment body 3, a first carrier communication device 1 and a second carrier communication device 2. The first carrier communication device 1 is used to be placed in the underground space together with the tunneling equipment body 3; the second carrier communication device 2 is arranged on the tunneling equipment body 3; the first carrier communication device 1 is communicatively connected with the second carrier communication device 2 for data transmission.
[0051] This embodiment uses the first carrier communication device 1 and the second carrier communication device 2 to communicate with each other, so that the second carrier communication device 2 on the tunneling equipment body 3 and the first carrier communication device 1 can directly exchange information with each other, and has good communication effect, which solves the technical problem that the current communication method has poor communication effect on tunneling equipment underground.
[0052] In special circumstances, through the first carrier communication device 1 and the second carrier communication device 2 on the tunneling equipment body 3, timely notification is given to the personnel around the tunneling equipment, as well as the vicinity of the tunnel entrance 14 where the first carrier communication device 1 is located, and even the ground is contacted. When facing danger, quick disposal and evacuation are possible, and the ground is notified of the dangerous situation underground, thereby buying precious time for rescue personnel to arrive and rescue in time, and reducing and minimizing casualties.
[0053] Compared to the tunneling equipment's operating area, the area near tunnel entrance 14, where the first carrier communication device 1 is located, is relatively safe because it falls within the tunneling equipment's non-operating area. Tunnel entrance 14, where the first carrier communication device 1 is located, is approximately 1 km from the tunneling equipment. This allows the tunneling equipment to be shut down by powering off at this location, allowing for communication and information exchange with personnel near the tunneling equipment.
[0054] In some embodiments, the underground communication system is further provided with a power feeding device 10, which is electrically connected to the tunneling equipment body 3, and the first carrier communication device 1 is electrically connected to the power feeding device 10. The power feeding device provides power for the operation of the tunneling equipment body 3. The first carrier communication device 1 is electrically connected to the power feeding device 10 to control whether the power feeding device 10 powers on and off the tunneling equipment body 3.
[0055] In some embodiments, a power cable 4 is provided between the first carrier communication device 1 and the second carrier communication device 2. One end of the power cable 4 is connected to the tunneling equipment body 3, and the other end is connected to the feeding device 10, for realizing the communication connection between the first carrier communication device 1 and the second carrier communication device 2.
[0056] Specifically, the tunneling equipment's carrier communication method utilizes a power cable 4 as the communication medium, enabling data transmission between the first and second carrier communication devices 1 and 2. This allows for data exchange between the first and second carrier communication devices 1 and 2. The first carrier communication device 1 can communicate with the mine's surface control room via the mine's underground ring network near the tunnel entrance 14. The power cable 4 acts as the power transmission bridge for the tunneling equipment. One end of the power cable 4 is connected to the underground power feeder 10, and the other end is connected to the tunneling equipment's explosion-proof electrical control box. The power cable 4 moves with the tunneling equipment.
[0057] In some embodiments, the first carrier communication device 1 is provided with a normally open / normally closed contact electrically connected to the power feeding device 10. The first carrier communication device 1 controls the power feeding device 10 at the tunnel entrance 14 through its own normally open / normally closed contact, thereby immediately de-energizing the tunneling equipment 3, thereby preventing the tunneling equipment 3 from continuing to operate underground due to unexpected situations.
[0058] In some embodiments, the first carrier communication device 1 and / or the second carrier communication device 2 is provided with a communication interruption detection unit 11 having a communication interruption detection function for detecting the interruption of the communication signal between the first carrier communication device 1 and the second carrier communication device 2 .
[0059] When the communication between the first carrier communication device 1 and the second carrier communication device 2 is interrupted for more than a certain period of time, such as 10 seconds, the first carrier communication device 1 will send an alarm code, and the mine's ground control room will receive the fault information through the mine's underground ring network, which is conducive to the subsequent inspection and maintenance of the underground communication system.
[0060] It should be noted that, combined with Figure 1 and Figure 2 As shown, the airborne sensor 13 includes at least a gas sensor 6, a first pressure sensor 7, and a second pressure sensor 9. Of course, it should be understood that the airborne sensor 13 may also include sensors for detecting other indicators if practical needs are met, which is not limited in this embodiment.
[0061] In some embodiments, a control unit 5, a gas sensor 6, a first pressure sensor 7, an alarm device 8 and a second pressure sensor 9 are provided on the tunneling equipment body 3, wherein the control unit 5 is electrically connected to the second carrier communication equipment 2, the gas sensor 6, the first pressure sensor 7, the alarm device 8 and the second pressure sensor 9.
[0062] Specifically, the control unit 5 can be any controller in the prior art that meets actual needs, and is not limited in this embodiment.
[0063] The control unit 5 sends a power-off signal to the second carrier communication device 2 , and the second carrier communication device 2 transmits the power-off signal to the first carrier communication device 1 via the power cable 4 . After receiving the power-off signal, the first carrier communication device 1 controls the feeding device 10 to cut off the power.
[0064] Specifically, the gas sensor 6 is installed on the tunneling equipment body 3. When the gas concentration around the tunneling equipment body 3 exceeds the standard in the underground space, the gas sensor 6 converts the first detection signal of the excessive gas concentration into a first electrical signal and transmits it to the control unit 5. After the control unit 5 receives the first electrical signal of the excessive gas concentration, it sends the relevant information of the excessive gas concentration to the second carrier communication device 2. The second carrier communication device 2 transmits the relevant information of the excessive gas concentration to the first carrier communication device 1 through the power cable 4, indicating that the working face is abnormal. The first carrier communication device 1 controls the power supply device 10 located at the tunnel entrance 14 through its own normally open / normally closed contacts to cut off the power, so that the tunneling equipment body 3 immediately loses power and shuts down, avoiding the extreme situation of explosion.
[0065] It should be noted that the temporary support of the tunneling equipment body 3 is equipped with pressure sensors, specifically a first pressure sensor 7 and a second pressure sensor 9. It is necessary to distinguish whether the temporary support is in a lifting or stopping state. When the temporary support is in a lifting or stopping state, the alarm device 8 will not sound an alarm. When the temporary support is stationary, the first pressure sensor 7 and the second pressure sensor 9 normally detect the pressure exerted on the temporary support of the tunneling equipment body 3.
[0066] Specifically, the first pressure sensor 7 and the alarm device 8 are installed on the tunneling equipment body 3, wherein the first pressure sensor 7 is used to detect the first warning value of the pressure borne by the tunneling equipment body 3. When the pressure borne by the tunneling equipment body 3 reaches the first warning value, the first pressure sensor 7 converts the second detection signal reaching the first warning value into a second electrical signal and transmits it to the control unit 5. After the control unit 5 receives the second electrical signal transmitted by the first pressure sensor 7, it sends the first alarm signal to the alarm device 8. The alarm device 8 initiates an alarm after receiving the first alarm signal; the control unit 5 sends the first alarm signal to the first carrier communication device 1 through the power cable 4.
[0067] Specifically, the second pressure sensor 9 is installed on the temporary support of the tunneling equipment body 3. The second pressure sensor 9 is used to detect the second warning value of the pressure on the tunneling equipment body 3. The second warning value is greater than the first warning value. The second pressure sensor 9 converts the third detection signal that reaches the second warning value into a third electrical signal and transmits it to the control unit 5. After the control unit 5 receives the third electrical signal transmitted by the second pressure sensor 9, it controls the alarm device 8 to stop issuing the alarm and sends the second alarm signal to the first carrier communication device 1 through the power cable 4. After the first carrier communication device 1 receives the second alarm signal, the first carrier communication device 1 controls the power feeding device 10 located at the tunnel entrance 14 through its own normally open / normally closed contacts to cut off the power, thereby causing the tunneling equipment body 3 to lose power and shut down immediately; and uses the alarm to prompt people around the tunneling equipment body 3 to evacuate in time.
[0068] Utilizing onboard sensors 13 on the tunneling equipment 3 and using carrier communication, in the event of a danger, personnel nearby the tunneling equipment are promptly notified to evacuate, and alarm data is transmitted to the tunnel entrance 14 or to personnel in the ground control room. Alternatively, if a danger is detected on the ground, the tunneling equipment can be remotely controlled to halt operation and notify personnel nearby to evacuate.
[0069] In some embodiments, an emergency stop button 12 is further provided on the tunneling equipment body 3 , and the control unit 5 is electrically connected to the emergency stop button 12 .
[0070] Specifically, when the emergency stop button 12 on the tunneling equipment body 3 is pressed, or the onboard sensor 13 reaches the alarm value, the alarm data is sent to the mine ring network through the first carrier communication device 1 and received by the mine's ground control room, reminding the ground monitoring personnel to pay close attention to the work and operation of the tunneling equipment.
[0071] In some embodiments, when personnel in the ground monitoring room or near the tunnel entrance 14 detect an anomaly and need to shut down the tunneling equipment, they can send a shutdown command to the tunneling equipment via the start / stop button on the first carrier communication device 1 at the tunnel entrance 14 or via a remote command. After the tunneling equipment is shut down, the noise and dust generated by the equipment are significantly reduced. This helps personnel inside the tunneling equipment stay informed of external conditions. Furthermore, since the tunneling equipment is shut down rather than powered off, the onboard lighting system 3 on the tunneling equipment body 3 continues to function normally, facilitating the subsequent resumption of production.
[0072] Specifically, the underground communication system for tunneling equipment provided in this embodiment has at least the following beneficial effects:
[0073] (1) Through the communication connection between the first carrier communication device 1 and the second carrier communication device 2, information can be directly exchanged between the second carrier communication device 2 on the tunneling equipment body 3 and the first carrier communication device 1, and good communication effect is achieved, thus solving the technical problem that the current communication method has poor communication effect on the tunneling equipment underground;
[0074] (2) Through the first carrier communication device 1 and the second carrier communication device 2 on the tunneling equipment body 3, timely notification is given to the personnel around the tunneling equipment, as well as the vicinity of the tunnel entrance 14 where the first carrier communication device 1 is located, and even to the ground. When faced with danger, quick disposal and evacuation can be achieved, and the ground is notified of the dangerous situation underground, thereby buying precious time for rescue personnel to arrive and rescue in time, and reducing and minimizing casualties.
[0075] Throughout this specification, references to "one embodiment" or "a specific embodiment" mean that the specific features, structures, materials, or characteristics described in conjunction with that embodiment or example are included in at least one embodiment or example of the present application. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
[0076] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions, and variations may be made to the embodiments without departing from the principles and purpose of the present application, and that the scope of the present application is defined by the claims and their equivalents.
Claims
1. An underground communication system for a tunneling device, comprising a tunneling device body (3), characterized in that: The downhole communication system further comprises: A first carrier communication device (1) is used to be placed in an underground space together with the tunneling device body (3); A second carrier communication device (2) is arranged on the tunneling device body (3); The first carrier communication device (1) is communicatively connected to the second carrier communication device (2) for data transmission.
2. The underground communication system of tunneling equipment according to claim 1, characterized in that: The downhole communication system further comprises: A power feeding device (10), the power feeding device (10) is electrically connected to the excavation equipment body (3), and the first carrier communication device (1) is electrically connected to the power feeding device (10).
3. The underground communication system of tunneling equipment according to claim 2, characterized in that: The downhole communication system further comprises: A power cable (4), one end of which is connected to the excavation equipment body (3), and the other end of which is connected to the feeding equipment (10), for realizing a communication connection between the first carrier communication equipment (1) and the second carrier communication equipment (2).
4. The underground communication system of tunneling equipment according to claim 2, characterized in that: The first carrier communication device (1) is provided with a normally open / normally closed contact, and the normally open / normally closed contact is electrically connected to the feeding device (10).
5. The underground communication system of tunneling equipment according to claim 1, characterized in that: The downhole communication system further comprises: A communication interruption detection unit (11) is provided on the first carrier communication device (1) and / or the second carrier communication device (2) and is used to detect the interruption of the communication signal between the first carrier communication device (1) and the second carrier communication device (2).
6. The underground communication system of tunneling equipment according to claim 1, characterized in that: The tunneling equipment body (3) is provided with a control unit (5), and the control unit (5) is electrically connected to the second carrier communication device (2).
7. The underground communication system of tunneling equipment according to claim 6, characterized in that: The tunneling equipment body (3) is also provided with a gas sensor (6), and the control unit (5) is electrically connected to the gas sensor (6) for detecting the gas concentration around the tunneling equipment body (3).
8. The underground communication system of tunneling equipment according to claim 6, characterized in that: The excavation equipment body (3) is also provided with a first pressure sensor (7) and an alarm device (8); The first pressure sensor (7) is used to detect a first warning value of the pressure borne by the tunneling equipment body (3); The alarm device (8) is used to issue an alarm when the pressure on the tunneling equipment body (3) reaches the first warning value; The control unit (5) is electrically connected to the first pressure sensor (7) and the alarm device (8).
9. The underground communication system of tunneling equipment according to claim 8, characterized in that: The tunneling equipment body (3) is also provided with a second pressure sensor (9) for detecting a second warning value of the pressure on the tunneling equipment body (3), the second warning value being greater than the first warning value, and the control unit (5) is electrically connected to the second pressure sensor (9).
10. The underground communication system of tunneling equipment according to claim 6, characterized in that: The excavation equipment body (3) is also provided with an emergency stop button (12), and the control unit (5) is electrically connected to the emergency stop button (12).