Automatic flanging equipment and process

By designing automatic flange equipment, the automatic arrangement and flange of pipe fittings is achieved using rotating tables, electric slide rails and feeding components, solving the operating risks caused by manual material discharge and improving safety and production efficiency.

CN119076809AInactive Publication Date: 2024-12-06YANCHENG CITY PRICE TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411321438.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing stamping equipment used for metal pipe fittings mostly uses manual material discharge when discharging materials, which leads to close contact between workers and equipment, which poses operating risks, and the sharp ports generated during cutting of pipes are likely to cut operators.

Method used

An automatic flange device is designed, including equipment base, rotating table, electric slide rail, flange push rod, molding mold and feeding components. By automatically arranging and feeding pipe fittings, the automatic flange of the pipe fittings is achieved to avoid manual direct contact. and automatic fixation and loosening of pipe fittings by fastening electric push rods and contact switches.

Benefits of technology

Automatic flange and feeding of pipe fittings is realized, which reduces close contact between workers and equipment, reduces operating risks, and prevents pipe fittings from shaking during molding by automatically fastening the arc plate, thereby improving production efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119076809A_ABST
    Figure CN119076809A_ABST
Patent Text Reader

Abstract

The invention discloses automatic flanging equipment and a process, and relates to the technical field of flanging equipment. The device comprises a device base, a rotating table, an electric sliding rail and a flanging electric push rod are fixedly installed at the top of the device base, the rotating table is located between the electric sliding rail and the flanging electric push rod, a flanging bearing seat is fixedly installed at the top of the rotating table, and an electric sliding block is installed at the top of the electric sliding rail in a driving mode; and a forming mold is fixedly mounted at the top of the electric sliding block. By arranging the feeding assembly, a large number of pipe fittings are firstly put into the storage box, the pipe fittings can be automatically arranged, the rotating table drives the flanging bearing base to turn to the extending base, the feeding electric push rod pushes the pipe fittings out of the feeding base till the pipe fittings move to the flanging bearing base, and automatic arrangement and feeding of the pipe fittings are achieved; the pipe fittings do not need to be manually placed on the flanging bearing seat, materials are fed into the material storage box, workers are prevented from making close contact with equipment, and the operation risk of the workers is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of flanging equipment, and in particular to automatic flanging equipment and technology. Background Art

[0002] Flanging of pipe parts is a kind of stamping process. On the flat or curved part of the blank, the mold is used to form a straight wall or flange with a certain angle along the edge of a closed or unclosed curve. Generally, flanging of pipe parts is to prevent the two ends of the pipe from being easily flattened. Another situation is that it is required by the structure during use.

[0003] Existing stamping equipment for metal pipe fittings still mostly adopts manual feeding when discharging materials. The pipe parts are manually held by hand and extended into the clamp. The clamp clamps the pipe parts, and the forming mold is inserted into the pipe parts for flanging. After the flanging work is completed, the clamp is opened and the flanging pipe parts are manually taken out. On the one hand, manual placement of pipe fittings will cause workers to have close contact with the equipment for a long time, which poses certain operational risks. On the other hand, since the ports produced when the pipes are cut are relatively sharp, the operator's skin is easily cut during manual placement. Therefore, an automatic flanging device and process are proposed. Summary of the invention

[0004] The purpose of the present invention is to solve the problem that the existing stamping equipment for metal pipe fittings still adopts the manual material discharge method when discharging materials, that is, the pipe parts are manually held by hand and extended into the clamp, the clamp clamps the pipe parts, the forming mold is inserted into the pipe parts to perform flanging work, and after the flanging work is completed, the clamp is opened, and the flanging completed pipe parts are manually taken out. On the one hand, the manual placement of pipe fittings will cause the workers to be in close contact with the equipment for a long time, and there are certain operational risks. On the other hand, since the ports generated when the pipes are cut are relatively sharp, the operator's skin is easily cut during manual placement. The present invention provides an automatic flanging device and process.

[0005] In order to achieve the above-mentioned purpose, the present invention specifically adopts the following technical solutions:

[0006] An automatic flanging device and process comprises an equipment base, a rotating table, an electric slide rail and a flanging electric push rod are fixedly installed on the top of the equipment base, the rotating table is located between the electric slide rail and the flanging electric push rod, a flanging support seat is fixedly installed on the top of the rotating table, an electric slider is driven and installed on the top of the electric slide rail, a forming mold is fixedly installed on the top of the electric slider, the telescopic end of the flanging electric push rod faces the flanging support seat and is fixedly installed with an inner lining rod, a top ring is provided on the inner lining rod, the positions of the flanging support seat, the forming mold and the inner lining rod correspond to each other, and a feeding assembly is provided on the top of the equipment base for arranging multiple pipes neatly and feeding them to the top of the flanging support seat in sequence for flanging.

[0007] Furthermore, the feeding assembly includes a plurality of box tube brackets fixedly mounted on the top of the equipment base, a material storage box is fixedly mounted between the plurality of box tube brackets, the material storage box, the flanging support seat and the flanging electric push rod are respectively distributed on three side surfaces of the rotating table, an arrangement tube is provided at the bottom of the material storage box, a feeding base is fixedly mounted at the bottom of the arrangement tube, semicircular through holes matching the feeding base are provided on both sides of the bottom of the arrangement tube, an extension base is fixedly mounted on the side of the feeding base facing the flanging support seat, a feeding electric push rod is fixedly mounted on the top of the equipment base, the telescopic end of the feeding electric push rod faces the arrangement tube and is fixedly mounted with a sleeve, the sleeve and the extension base are respectively distributed on both sides of the arrangement tube, the sleeve is matched with the semicircular through hole and the feeding base and the extension base, and the sleeve is slidably sleeved on the fixed end of the feeding electric push rod.

[0008] Furthermore, an inclined conduit is fixedly installed at the bottom of the material storage box, and the feeding base is fixedly installed at the bottom of the inclined conduit.

[0009] Furthermore, the tops of the multiple box pipe brackets located on the same side are fixedly installed with the same unclogging electric push rod, the telescopic end of the unclogging electric push rod faces the material storage box and is fixedly installed with an unclogging frame, one side of the unclogging frame is fixedly installed with multiple evenly distributed unclogging rods, multiple clearance holes are opened on both sides of the material storage box, unclogging push plates are arranged inside the clearance holes, and one end of the multiple unclogging rods located at the same height are fixedly installed on the side wall of the unclogging push plate.

[0010] Furthermore, an adjusting electric push rod is fixedly mounted on the side wall of the telescopic end of the flanging electric push rod, the telescopic end of the adjusting electric push rod is fixedly mounted on the side wall of the top ring, and the top ring is slidably sleeved on the lining rod.

[0011] Furthermore, fastening electric push rods are fixedly installed on both sides of the flange support seat, and fastening arc plates are fixedly installed on the telescopic ends of the fastening electric push rods, and the two fastening arc plates are respectively distributed on both sides of the top of the flange support seat.

[0012] Furthermore, a contact switch is provided on one side of the flange support seat facing the flange electric push rod, the contact switch is electrically connected to the two fastening electric push rods, and the position of the contact switch corresponds to the position of the top ring.

[0013] An automatic flanging process comprises the following steps:

[0014] S1. Place a large number of pipe fittings into the storage box in a direction parallel to the feeding electric push rod;

[0015] S2. The pipes at the bottom will fall into the arrangement tube along the inclined guide tube and be automatically arranged, and the pipes at the bottom will fall on the feeding base;

[0016] S3, the rotating table drives the flanging support seat to turn to the extension base, and the feeding electric push rod drives the sleeve to insert into the feeding base to push the pipe fitting out until the pipe fitting is completely moved to the flanging support seat;

[0017] S4, the flanging support seat carries the pipe fitting and rotates to a position flush with the forming mold and the flanging electric push rod. The flanging electric push rod drives the lining rod to insert the pipe fitting, so that the top ring pushes the pipe fitting to move until the top ring triggers the contact switch, which controls the fastening electric push rods on both sides to drive the fastening arc plates to press the pipe fitting;

[0018] S5. The electric slide rail drives the electric slider to carry the forming mold to move toward the pipe fitting, so that the other end of the pipe fitting is inserted into the forming mold for flanging. Then the forming mold and the lining rod are reset, the top ring leaves the contact switch, the arc plate is tightened to loosen the pipe fitting, and the flanging-completed pipe fitting is removed.

[0019] The beneficial effects of the present invention are as follows:

[0020] 1. The present invention sets a feeding assembly so that a large number of pipe fittings are first placed in the storage box, and the pipe fittings are automatically arranged. The pipe fittings at the bottom fall on the feeding base, and the rotating table drives the flange support seat to turn to the extension base. Then the feeding electric push rod pushes the pipe fittings out of the feeding base until the pipe fittings are completely moved to the flange support seat, thereby realizing automatic arrangement and feeding of the pipe fittings. There is no need to manually place the pipe fittings on the flange support seat. In addition to feeding the material into the storage box, it avoids close contact between personnel and the equipment, thereby reducing the operating risks of the staff.

[0021] 2. The present invention provides a dredging push plate, so that after the pipe fittings are put in, the dredging electric push rods on both sides will drive the two dredging frames respectively, so that the dredging frames drive the dredging rods to move toward the material storage box, so that the dredging push plates on both sides are close to each other in the clearance holes, and the pipe fittings inside the material storage box are pushed, so that the pipe fittings inside the material storage box are squeezed and pushed each other, and the crooked pipe fittings are corrected, and the pipe fittings can be prevented from accumulating and blocking the top of the arrangement pipe;

[0022] 3. The present invention provides a fastening electric push rod and a fastening arc plate, so that when the pipe is flanging, the top ring will press against one end of the pipe and push the pipe toward the forming mold until the top ring moves to one side of the flanging support seat, and the top ring stops moving. The fastening electric push rods on both sides of the top of the flanging support seat will respectively drive the two fastening arc plates to approach each other and press against the top of the pipe, so that the pipe is completely fixed to prevent the pipe from shaking during forming;

[0023] 4. The present invention sets a contact switch so that when the top ring moves to one side of the flanging support seat, it will contact the contact switch, thereby triggering the contact switch to control the tightening electric push rods on both sides to drive the tightening arc plate to press the pipe fitting. When the flanging is completed, the top ring resets and leaves the contact switch. The tightening electric push rod will control the tightening arc plate to loosen the pipe fitting, thereby facilitating the staff to unload the material and realizing automatic control of the tightening and loosening of the tightening arc plate. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention;

[0025] Figure 2 It is a schematic diagram of the three-dimensional structure of the rotating table of the present invention;

[0026] Figure 3 It is a schematic diagram of the three-dimensional structure of the electric slide rail of the present invention;

[0027] Figure 4 This is a schematic diagram of the three-dimensional structure of the flanging electric push rod of the present invention;

[0028] Figure 5 It is a schematic diagram of the three-dimensional structure of the material storage box and the feeding electric push rod of the present invention;

[0029] Figure 6 It is a schematic diagram of the three-dimensional structure of the material storage box and the arrangement tube of the present invention;

[0030] Figure 7 It is a schematic diagram of the internal three-dimensional structure of the material storage box and the arrangement tube of the present invention;

[0031] Figure 8 It is a schematic diagram of the automatic flanging process of the present invention;

[0032] Figure numerals: 1. Equipment base; 2. Rotating table; 3. Flanging support seat; 4. Electric slide rail; 5. Electric slider; 6. Molding mold; 7. Flanging electric push rod; 8. Lining rod; 9. Top ring; 10. Adjusting electric push rod; 11. Box tube bracket; 12. Storage box; 13. Arrangement tube; 14. Feeding base; 15. Extension base; 16. Feeding electric push rod; 17. Sleeve; 18. Oblique guide tube; 19. Unblocking electric push rod; 20. Unblocking rack; 21. Unblocking rod; 22. Unblocking push plate; 23. Fastening electric push rod; 24. Fastening arc plate; 25. Contact switch. DETAILED DESCRIPTION

[0033] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0034] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. In addition, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0036] In the description of the embodiments of the present invention, it should be noted that the terms "inside", "outside", "upper", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, or are the orientations or positional relationships in which the inventive product is usually placed when used. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0037] like Figures 1 to 8As shown, an automatic flanging equipment and process include an equipment base 1, a rotating table 2, an electric slide rail 4 and a flanging electric push rod 7 are fixedly installed on the top of the equipment base 1, the rotating table 2 is located between the electric slide rail 4 and the flanging electric push rod 7, a flanging support seat 3 is fixedly installed on the top of the rotating table 2, an electric slider 5 is driven and installed on the top of the electric slide rail 4, a forming mold 6 is fixedly installed on the top of the electric slider 5, the telescopic end of the flanging electric push rod 7 faces the flanging support seat 3 and is fixedly installed with an inner lining rod 8, a top ring 9 is arranged on the inner lining rod 8, the positions of the flanging support seat 3, the forming mold 6 and the inner lining rod 8 correspond to each other, and a device for arranging a plurality of pipes neatly and in sequence is arranged on the top of the equipment base 1. A feeding component that feeds materials to the top of the flanging support seat 3 for flanging; specifically, when the automatic flanging equipment is in use, the feeding component will sequentially feed the arranged pipe fittings to the flanging support seat 3, and then the flanging support seat 3 will carry the pipe fittings and rotate to a position flush with the forming mold 6 and the flanging electric push rod 7, and the flanging electric push rod 7 will drive the lining rod 8 to move toward the flanging support seat 3 and insert it into the pipe fitting, so that the top ring 9 rests against one end of the pipe fitting, and at this time the electric slide rail 4 will drive the electric slider 5 to carry the forming mold 6 to move toward the pipe fitting, and insert the other end of the pipe fitting into the forming mold 6 for flanging, and then the forming mold 6 and the lining rod 8 will be reset, and the flanging-completed pipe fitting will be removed, thereby realizing automatic flanging of the pipe fitting.

[0038] like Figure 5 , Figure 6As shown, the feeding assembly includes a plurality of box tube brackets 11 fixedly mounted on the top of the equipment base 1, a storage box 12 is fixedly mounted between the plurality of box tube brackets 11, the storage box 12 and the flanging support seat 3 and the flanging electric push rod 7 are respectively distributed on three sides of the rotating table 2, and an arrangement tube 13 is arranged at the bottom of the storage box 12. In the present embodiment, the width of the arrangement tube 13 is set to be slightly larger than the outer diameter of the pipe fitting, a feeding base 14 is fixedly mounted at the bottom of the arrangement tube 13, semicircular through holes matching the feeding base 14 are opened on both sides of the bottom of the arrangement tube 13, an extension base 15 is fixedly mounted on the side of the feeding base 14 facing the flanging support seat 3, a feeding electric push rod 16 is fixedly mounted on the top of the equipment base 1, the telescopic end of the feeding electric push rod 16 faces the arrangement tube 13 and is fixedly mounted with a sleeve 17, the sleeve 17 and the extension base 15 are respectively distributed on both sides of the arrangement tube 13, the sleeve 17 and the semicircular through hole and the feeding The material base 14 and the extension base 15 are adapted to each other, and the sleeve 17 is slidably sleeved on the fixed end of the feeding electric push rod 16; specifically, by setting the feeding assembly, before starting the flanging, a large number of pipe fittings are first placed in the storage box 12 in a direction parallel to the feeding electric push rod 16, and then the pipe fittings will fall into the arrangement tube 13 in turn and be automatically arranged from top to bottom, and the bottom pipe fitting will fall on the feeding base 14. At this time, the rotating table 2 drives the flanging support seat 3 to turn to the extension base 15, and then the feeding electric push rod 16 will drive the sleeve 17 to be inserted between the feeding base 14 and the semicircular tube, pushing the pipe fitting out of the feeding base 14 and sliding along the extension base 15 until the pipe fitting is completely moved onto the flanging support seat 3, thereby realizing automatic arrangement and feeding of the pipe fittings, without the need to manually place the pipe fittings on the flanging support seat 3, and except for feeding into the storage box 12, close contact with the equipment by personnel is avoided, thereby reducing the operating risk of the staff.

[0039] like Figure 7 As shown, an inclined conduit 18 is fixedly installed at the bottom of the storage box 12, and the feeding base 14 is fixedly installed at the bottom of the inclined conduit 18; specifically, by setting the inclined conduit 18, the inclined conduit 18 can play a role in guiding and arranging, so that the pipes put into the storage box 12 in batches will gather toward the middle along the inclined conduit 18 and fall into the arrangement tube 13 in sequence.

[0040] like Figure 7As shown, the tops of multiple box tube supports 11 located on the same side are fixedly installed with the same dredging electric push rod 19, the telescopic end of the dredging electric push rod 19 faces the material storage box 12 and is fixedly installed with a dredging frame 20, and one side of the dredging frame 20 is fixedly installed with multiple evenly distributed dredging rods 21, and multiple clearance holes are opened on both sides of the material storage box 12, and dredging push plates 22 are arranged inside the clearance holes, and one end of multiple dredging rods 21 located at the same height is fixedly installed on the side wall of the dredging push plate 22 Specifically, by setting the dredging push plate 22, after the pipes are put in, the dredging electric push rods 19 on both sides will respectively drive the two dredging frames 20, so that the dredging frames 20 drive the dredging rods 21 to move toward the storage box 12, so that the dredging push plates 22 on both sides are close to each other in the make way holes, and the pipes inside the storage box 12 are pushed, so that the pipes inside the storage box 12 are squeezed and pushed by each other, and then the crooked pipes are straightened, and the pipes can be prevented from accumulating and clogging on the top of the arrangement tube 13.

[0041] like Figure 4 As shown, an adjusting electric push rod 10 is fixedly installed on the side wall of the telescopic end of the flanging electric push rod 7, and the telescopic end of the adjusting electric push rod 10 is fixedly installed on the side wall of the top ring 9, and the top ring 9 is slidably sleeved on the lining rod 8; specifically, by setting the adjusting electric push rod 10, the adjusting electric push rod 10 can drive the top ring 9 to slide on the lining rod 8, thereby fine-tuning the position of the top ring 9 to cope with pipes of different lengths.

[0042] like Figure 2 As shown, fastening electric push rods 23 are fixedly installed on both sides of the flanging support seat 3, and fastening arc plates 24 are fixedly installed on the telescopic ends of the fastening electric push rods 23, and the two fastening arc plates 24 are respectively distributed on both sides of the top of the flanging support seat 3; specifically, by arranging the fastening electric push rods 23 and the fastening arc plates 24, when the pipe fitting is flanging, the top ring 9 will press against one end of the pipe fitting and push the pipe fitting toward the forming mold 6 until the top ring 9 moves to one side of the flanging support seat 3, the top ring 9 stops moving, and the fastening electric push rods 23 on both sides of the top of the flanging support seat 3 will respectively drive the two fastening arc plates 24 to approach each other and press them against the top of the pipe fitting, so that the pipe fitting is completely fixed to prevent the pipe fitting from shaking during forming.

[0043] like Figure 2As shown, a contact switch 25 is provided on the side of the flanging support seat 3 facing the flanging electric push rod 7, and the contact switch 25 is electrically connected to the two fastening electric push rods 23, and the position of the contact switch 25 corresponds to the position of the top ring 9; specifically, by setting the contact switch 25, when the top ring 9 moves to one side of the flanging support seat 3, it will contact the contact switch 25, thereby triggering the contact switch 25, controlling the fastening electric push rods 23 on both sides to drive the fastening arc plate 24 to press the pipe fittings. When the flanging is completed, the top ring 9 resets and leaves the contact switch 25, and the fastening electric push rod 23 controls the fastening arc plate 24 to loosen the pipe fittings, thereby facilitating the staff to unload materials and realizing automatic control of the tightening and loosening of the fastening arc plate 24.

[0044] An automatic flanging process comprises the following steps:

[0045] S1, put a large number of pipe fittings into the storage box 12 in a direction parallel to the feeding electric push rod 16;

[0046] S2, the pipes at the bottom will fall into the arrangement tube 13 along the inclined guide tube 18 and be automatically arranged, and the pipes at the bottom will fall on the feeding base 14;

[0047] S3, the rotating table 2 drives the flanging support seat 3 to turn to the extension base 15, and the feeding electric push rod 16 drives the sleeve 17 to insert into the feeding base 14 to push the pipe out until the pipe is completely moved to the flanging support seat 3;

[0048] S4, the flanging support seat 3 carries the pipe fitting and rotates to a position flush with the forming mold 6 and the flanging electric push rod 7, the flanging electric push rod 7 drives the lining rod 8 to insert into the pipe fitting, so that the top ring 9 pushes the pipe fitting to move until the top ring 9 triggers the contact switch 25, which controls the fastening electric push rods 23 on both sides to drive the fastening arc plates 24 to press the pipe fitting;

[0049] S5, the electric slide rail 4 drives the electric slider 5 to carry the forming mold 6 to move toward the pipe fitting, so that the other end of the pipe fitting is inserted into the forming mold 6 for flanging, and then the forming mold 6 and the lining rod 8 are reset, the top ring 9 leaves the contact switch 25, the arc plate 24 is tightened to release the pipe fitting, and the flanging-completed pipe fitting is removed.

[0050] In summary: when the automatic flanging equipment is in use, the feeding assembly will sequentially feed the pipe fittings to the flanging support seat 3, and then the flanging support seat 3 will carry the pipe fittings and rotate to a position flush with the forming mold 6 and the flanging electric push rod 7, and the flanging electric push rod 7 will drive the lining rod 8 to move toward the flanging support seat 3 and insert it into the pipe fitting, so that the top ring 9 is against one end of the pipe fitting, and then the electric slide rail 4 will drive the electric slide block 5 to carry the forming mold 6 to move toward the pipe fitting, and insert the other end of the pipe fitting into the forming mold 6 for flanging, and then the forming mold 6 and the lining rod 8 will be reset, and the flanging-completed pipe fittings will be removed to realize automatic flanging of the pipe fittings. By setting the feeding assembly, a large number of pipe fittings are first placed in the storage box 12 in a direction parallel to the feeding electric push rod 16 before starting to flanging. The pipes will then fall into the arrangement tube 13 in sequence and be automatically arranged from top to bottom, and the pipes at the bottom will fall onto the feeding base 14. At this time, the rotating table 2 drives the flange support seat 3 to turn to the extension base 15, and then the feeding electric push rod 16 drives the sleeve 17 to be inserted between the feeding base 14 and the semicircular tube, pushing the pipes out of the feeding base 14 and sliding along the extension base 15 until the pipes are completely moved onto the flange support seat 3, thereby realizing automatic arrangement and feeding of the pipes. There is no need to manually place the pipes on the flange support seat 3, except for feeding into the storage box 12, which avoids close contact between personnel and the equipment, reduces the operating risks of the staff, and by providing the inclined guide tube 18, the inclined guide tube 18 can play a role in guiding the arrangement, so that the pipes can be put into the storage box 1 in batches. The pipes in 2 will be gathered toward the middle along the inclined guide tube 18 and fall into the arrangement tube 13 in sequence. By setting the dredging push plate 22, after the pipes are put in, the dredging electric push rods 19 on both sides will respectively drive the two dredging frames 20, so that the dredging frames 20 drive the dredging rods 21 to move toward the storage box 12, so that the dredging push plates 22 on both sides are close to each other in the clearance holes, and the pipes inside the storage box 12 are pushed, so that the pipes inside the storage box 12 are squeezed and pushed each other, so that the crooked pipes are put in the right position, and the pipes can be prevented from accumulating and clogging at the top of the arrangement tube 13. By setting the adjusting electric push rod 10, the adjusting electric push rod 10 can drive the top ring 9 to slide on the lining rod 8, so as to fine-tune the position of the top ring 9 to cope with pipes of different lengths. A fastening electric push rod 23 and a fastening arc plate 24 are provided so that when the pipe is being flanging, the top ring 9 will press against one end of the pipe and push the pipe toward the forming mold 6 until the top ring 9 moves to one side of the flanging support seat 3, and the top ring 9 stops moving. The fastening electric push rods 23 on both sides of the top of the flanging support seat 3 will respectively drive the two fastening arc plates 24 to approach each other and press against the top of the pipe, so that the pipe is completely fixed to prevent the pipe from shaking during forming. By providing a contact switch 25, when the top ring 9 moves to one side of the flanging support seat 3, it will contact the contact switch 25, thereby triggering the contact switch 25, controlling the fastening electric push rods 23 on both sides to drive the fastening arc plates 24 to press the pipe. When the flanging is completed, the top ring 9 resets and leaves the contact switch 25.The tightening electric push rod 23 will control the tightening arc plate 24 to loosen the pipe fitting, thereby facilitating the unloading of materials by the staff and realizing automatic control of the tightening and loosening of the tightening arc plate 24.

[0051] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.

Claims

1. An automatic flanging device, characterized in that: The invention comprises an equipment base (1), wherein a rotating table (2), an electric slide rail (4) and a flanging electric push rod (7) are fixedly installed on the top of the equipment base (1), wherein the rotating table (2) is located between the electric slide rail (4) and the flanging electric push rod (7), wherein a flanging support seat (3) is fixedly installed on the top of the rotating table (2), an electric slider (5) is driven and installed on the top of the electric slide rail (4), a forming die (6) is fixedly installed on the top of the electric slider (5), the telescopic end of the flanging electric push rod (7) faces the flanging support seat (3) and is fixedly installed with an inner lining rod (8), wherein a top ring (9) is arranged on the inner lining rod (8), the positions of the flanging support seat (3), the forming die (6) and the inner lining rod (8) correspond to each other, and a feeding assembly for arranging a plurality of pipes in an orderly manner and feeding them sequentially to the top of the flanging support seat (3) for flanging is arranged on the top of the equipment base (1).

2. The automatic flanging equipment according to claim 1, characterized in that: The feeding assembly comprises a plurality of box tube brackets (11) fixedly mounted on the top of the equipment base (1), a material storage box (12) being fixedly mounted between the plurality of box tube brackets (11), the material storage box (12) and the flanging support seat (3) and the flanging electric push rod (7) being respectively distributed on three side surfaces of the rotating table (2), an arrangement tube (13) being arranged at the bottom of the material storage box (12), a feeding base (14) being fixedly mounted at the bottom of the arrangement tube (13), semicircular through holes matching the feeding base (14) being provided on both sides of the bottom of the arrangement tube (13), and the feeding base (14) being arranged on the bottom of the arrangement tube (13). An extension base (15) is fixedly installed on the side of the seat (14) facing the flange support seat (3), and a feeding electric push rod (16) is fixedly installed on the top of the equipment base (1). The telescopic end of the feeding electric push rod (16) faces the arrangement tube (13) and is fixedly installed with a sleeve (17). The sleeve (17) and the extension base (15) are respectively distributed on both sides of the arrangement tube (13). The sleeve (17) is adapted to the semicircular through hole and the feeding base (14) and the extension base (15), and the sleeve (17) is slidably sleeved on the fixed end of the feeding electric push rod (16).

3. The automatic flanging equipment according to claim 2, characterized in that: An inclined conduit (18) is fixedly mounted on the bottom of the material storage box (12), and the feeding base (14) is fixedly mounted on the bottom of the inclined conduit (18).

4. The automatic flanging equipment according to claim 2, characterized in that: The tops of the plurality of box pipe supports (11) located on the same side are fixedly mounted with a same dredging electric push rod (19), the telescopic end of the dredging electric push rod (19) faces the material storage box (12) and is fixedly mounted with a dredging frame (20), one side of the dredging frame (20) is fixedly mounted with a plurality of evenly distributed dredging rods (21), both sides of the material storage box (12) are provided with a plurality of clearance holes, the interiors of the clearance holes are provided with dredging push plates (22), and one end of the plurality of dredging rods (21) located at the same height is fixedly mounted on the side wall of the dredging push plate (22).

5. The automatic flanging equipment according to claim 1, characterized in that: An adjusting electric push rod (10) is fixedly mounted on the side wall of the telescopic end of the flanging electric push rod (7), and the telescopic end of the adjusting electric push rod (10) is fixedly mounted on the side wall of the top ring (9), and the top ring (9) is slidably sleeved on the lining rod (8).

6. The automatic flanging equipment according to claim 1, characterized in that: A fastening electric push rod (23) is fixedly mounted on both sides of the flange support seat (3), and a fastening arc plate (24) is fixedly mounted on the telescopic end of the fastening electric push rod (23), and the two fastening arc plates (24) are respectively distributed on both sides of the top of the flange support seat (3).

7. The automatic flanging device according to claim 6, characterized in that: A contact switch (25) is provided on the side of the flange support seat (3) facing the flange electric push rod (7), and the contact switch (25) is electrically connected to the two fastening electric push rods (23). The position of the contact switch (25) corresponds to the position of the top ring (9).

8. An automatic flanging process according to any one of claims 1 to 7, characterized in that: The following steps are involved: S1, placing a large number of pipe fittings into the storage box (12) in a direction parallel to the feeding electric push rod (16); S2, the pipes at the bottom will fall along the inclined guide tube (18) into the arrangement tube (13) and be automatically arranged, and the pipes at the bottom will fall on the feeding base (14); S3, the rotating table (2) drives the flange support seat (3) to turn to the extension base (15), and the feeding electric push rod (16) drives the sleeve (17) to insert into the feeding base (14) to push the pipe out until the pipe is completely moved onto the flange support seat (3); S4, the flanging support seat (3) carries the pipe fitting and rotates to a position flush with the forming mold (6) and the flanging electric push rod (7), the flanging electric push rod (7) drives the lining rod (8) to insert the pipe fitting, so that the top ring (9) pushes the pipe fitting to move until the top ring (9) triggers the contact switch (25), which controls the fastening electric push rods (23) on both sides to drive the fastening arc plates (24) to press the pipe fitting; S5, the electric slide rail (4) drives the electric slider (5) to carry the forming mold (6) to move toward the pipe fitting, so that the other end of the pipe fitting is inserted into the forming mold (6) for flanging, and then the forming mold (6) and the lining rod (8) are reset, the top ring (9) leaves the contact switch (25), the arc plate (24) is tightened to release the pipe fitting, and the flanging-completed pipe fitting is removed.