On-site eccentric reaming method for connecting screw hole of in-service equipment
By combining drilling, scraping and cyclone milling on the rocker universal drilling machine, the problem of connecting screw holes in the in-service equipment is solved, and efficient hole expansion is achieved on-site, reducing the cost and cycle of return to the factory. Improve the sealing performance of the high-pressure outer cylinder of the turbine.
Patent Information
- Application Number
- CN202411132261.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-12-06
AI Technical Summary
In-service equipment, especially in the high-pressure external cylinders of steam turbines, the connecting screw holes are damaged due to environmental vibration and erosion, resulting in a degradation of sealing performance. It is difficult for the existing technology to effectively perform eccentric amplification on site, which increases the cost and cycle of return to the factory maintenance. .
Using a movable rocker arm universal drilling machine tool, the combined process of drilling, scraping and cyclone milling can realize eccentric expansion of the connecting screw holes, forming new connecting screw holes, avoiding the dependence on large boring machines or gantry milling. .
In service conditions, effective hole expansion of high-pressure external cylinder connection screw holes is achieved, saving return transportation costs, shortening the return repair cycle, and improving economic and practicality.
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hole enlargement in mechanical processing, and specifically to a method for eccentrically enlarging connecting screw holes on in-service equipment on site, and is particularly suitable for eccentrically enlarging connecting screw holes at the joint surface of the high-pressure outer cylinder of an in-service steam turbine. Background Art
[0002] During the service period of the equipment after leaving the factory, due to the adverse effects of many factors such as environmental vibration and environmental erosion, the connecting screw holes may be damaged or the locking force of the installed bolts may be difficult to meet the technical requirements. More intuitively, when the in-service equipment is a container-type equipment, the sealing performance will be affected by damage and decay of the connecting screw holes. For example, the high-pressure outer cylinder of the steam turbine is particularly prominent in harsh service conditions.
[0003] After the high-pressure outer cylinder of the steam turbine has been in operation, it is easy to have the technical problem of steam leakage on the center surface of the front shaft seal, which has a great adverse effect on the economy of the unit. In order to deal with the problem of steam leakage on the center surface of the high-pressure outer cylinder, the center surface of the high-pressure outer cylinder has always been repaired by welding. However, this method is relatively a temporary measure, and the problem of steam leakage on the center surface will still occur during operation after the repair. After repeated studies on the problem of steam leakage on the center surface of the high-pressure outer cylinder, it was found that the steam leakage on the center surface is mainly due to the loosening of the bolts caused by changes in boundary conditions such as unit operation, that is, the locking force of the bolts installed in the center surface connection screw hole is difficult to meet the technical requirements under harsh working conditions. Therefore, it is proposed to increase the bolt specifications at the center surface connection screw hole of the high-pressure outer cylinder to increase the sealing stress at the joint of the center surface of the high-pressure outer cylinder to solve the problem of steam leakage on the center surface.
[0004] For the high-pressure outer cylinder in service, the increase in the bolt specifications at the center dividing surface connecting screw hole will inevitably involve the problem of hole expansion. Due to the existence of position interference and other reasons, eccentric hole expansion can only be performed on the basis of the original connecting screw hole.
[0005] The best solution for eccentric hole expansion at the center plane of the in-service high-pressure outer cylinder is to return the high-pressure outer cylinder to the factory and use the existing large boring machine or gantry milling machine and other mechanical processing equipment that can directly process large-sized holes to expand the bottom hole and mill the thread. However, this return to the factory processing method will increase the transportation cost and extend the repair cycle, and the economic efficiency is poor. In order to save transportation costs and shorten the repair cycle, it is necessary to perform eccentric hole expansion on the high-pressure outer cylinder on-site in the service working environment of the turbine, which requires the development of an on-site eccentric hole expansion method that does not rely on large boring machines or gantry milling machines and other mechanical processing equipment in the factory. Summary of the invention
[0006] The technical purpose of the present invention is to independently develop a method for on-site eccentric expansion of connecting screw holes of in-service equipment without relying on large-scale boring machines or gantry milling machines and other mechanical processing equipment in the factory, in view of the technical necessity of on-site eccentric expansion of the high-pressure outer cylinder of the above-mentioned in-service equipment, especially the steam turbine.
[0007] The technical purpose of the present invention is achieved by the following technical solution: a method for on-site eccentric hole enlarging of a connecting screw hole of an in-service equipment, the on-site eccentric hole enlarging method comprising the following process steps: Step 1. Use process bolts to seal the current screw holes to be expanded on the in-service equipment; Step 2. Determine the center position of the eccentric hole at the currently blocked screw hole to be expanded; Step 3. Use a radial arm universal drilling machine to drill a hole at the determined eccentric expansion hole with a drill bit to obtain a foundation bottom hole; Step 4. According to the target bottom hole required by the design, a radial arm universal drilling machine is used to perform scraping processing in the base bottom hole with a scraper to obtain the target bottom hole required by the design; Step 5. Use a radial arm universal drilling machine to process a connecting thread in the target bottom hole by whirlwind milling to form a new connecting screw hole.
[0008] As one of the preferred technical solutions, in step 4, a scraper is used to perform scraping processing in the basic bottom hole. According to the structural size difference between the basic bottom hole and the target bottom hole required by the design, the scraper is adjusted on the rocker universal drilling machine in a tool changing sequence from small to large, and the basic bottom hole is scraped one by one until the target bottom hole required by the design is obtained.
[0009] Furthermore, the order of changing blades from small to large is to adjust the blades on the same scraper to different radial sizes, or to replace a separate scraper; When the blades on the same scraper are adjusted to different radial sizes, when the diameter of the bottom hole to be scraped is less than 110mm, the maximum external adjustment diameter difference of the blade on the corresponding tool rod is 20mm; when the diameter of the bottom hole to be scraped is ≥110mm, the maximum external adjustment diameter difference of the blade on the corresponding tool rod is 10mm.
[0010] As one of the preferred technical solutions, the in-service equipment is a high-pressure outer cylinder of a steam turbine; The screw hole to be expanded is the connecting screw hole at the center joint surface where steam leakage occurs.
[0011] Furthermore, when the high-pressure outer cylinder is drilled by the drill bit of the rocker universal drilling machine, the cutting parameters are S=85r / min and f=12.5mm / r.
[0012] Furthermore, when the basic bottom hole on the high-pressure outer cylinder is scraped by the scraper of the rocker universal drilling machine, when the diameter of the bottom hole to be scraped is less than 110 mm, the cutting parameters are S=16r / min, f=12.5mm / r; when the diameter of the bottom hole to be scraped is ≥110 mm, the cutting parameters are S=16r / min, f=8mm / r.
[0013] Furthermore, the current screw hole to be expanded on the high-pressure outer cylinder is 5 1 / 2-8UN, and the target screw hole required by the design is 6-8UN.
[0014] As one of the preferred technical solutions, the radial arm universal drilling machine is a movable VOM50 radial arm universal drilling machine with a maximum drilling diameter of φ50 mm.
[0015] The beneficial technical effect of the present invention is: the above-mentioned technical measures are aimed at the technical necessity of eccentric hole expansion on site for the above-mentioned in-service equipment, especially the high-pressure outer cylinder of the steam turbine, and an eccentric hole expansion method based on a movable rocker universal drilling machine tool is designed, which does not rely on large-scale boring machines or gantry milling machines and other mechanical processing equipment in the factory. This method combines the reasonable processes of basic drilling + multiple scraping + whirlwind milling, so that the movable machine tool that was originally not able to be used for large-size hole processing becomes feasible for processing large-size holes, thereby enabling in-service equipment such as the high-pressure outer cylinder of the steam turbine to be eccentrically expanded on site in the service working environment, eliminating the technical disadvantages of returning the high-pressure outer cylinder to the factory for eccentric hole expansion, that is, while meeting the technical requirements, it saves the transportation cost of returning to the factory, greatly shortens the repair cycle, and is economical and practical. DETAILED DESCRIPTION
[0016] The present invention relates to the technical field of hole enlargement in mechanical processing, specifically a method for eccentrically enlarging the connection screw holes of in-service equipment on site, which is particularly suitable for eccentrically enlarging the connection screw holes at the joint surface of the high-pressure outer cylinder of the in-service steam turbine. The main technical solution of the present invention is specifically described below. In addition, the expressions "approximately" and "basically" about the quantity or matching relationship in the following text mean that reasonable assembly errors, processing errors, etc. in the industry are allowed to exist, and are not literal expressions of absolute quantities or matching relationships.
[0017] The present invention is a method for performing on-site eccentric hole enlargement on the connecting screw holes on the equipment in service without returning to the factory for repair. The equipment in service is the high-pressure outer cylinder of the steam turbine, and the connecting screw hole to be enlarged is the connecting screw hole at the middle joint surface of the high-pressure outer cylinder where steam leakage occurs. The nominal diameter of the connecting screw hole to be enlarged is 5 1 / 2-8UN (i.e. 136.52mm), and the design requirement after hole enlargement is that the target screw hole nominal diameter is 6-8UN (i.e. 149.22mm). The method of performing on-site eccentric hole enlargement on the connecting screw hole at the middle joint of the aforementioned high-pressure outer cylinder of the present invention comprises the following process steps: Step 1. The fitter uses a process bolt (or a screw plug) to seal the current screw hole to be expanded on the high-pressure outer cylinder to prevent the drill bit or scraper from being unable to position stably and vibrating more when drilling / scraping at the current thread to be expanded, which will affect the drilling / scraping efficiency and quality; Step 2. At the blocked screw hole to be expanded, determine the center position of the eccentric expansion hole and mark the mark line according to the technical requirement of not interfering with other structures; Step 3. Use a movable VOM50 rocker universal drilling machine with a maximum drilling diameter of φ50mm, and drill a hole at the determined eccentric hole with a drill bit of φ50mm in diameter. The cutting parameters of the drilling are S=85r / min, f=12.5mm / r, and finally obtain a φ50mm basic bottom hole; Measure the diameter and roughness of the foundation bottom hole to ensure that it meets the design requirements; Step 4. Since the target screw hole φ149.22mm required by the design has a large difference in structural dimensions from the φ50mm basic bottom hole, it is necessary to replace the scraper on the basis of the basic bottom hole and scrape it in multiple sequences to meet the design requirements. After each sequence of scraping is completed, the diameter and roughness of the current bottom hole need to be measured to ensure whether it meets the design requirements; The above-mentioned scraper replacement is to adjust the scraper on the rocker universal drilling machine in the order of changing the tool from small to large. This includes two situations. One is to adjust the blade on the same scraper to different radial sizes. In this case, in order to ensure the processing quality and smooth progress, when the current bottom hole to be scraped has a diameter of less than 110mm, the maximum allowable external adjustment diameter difference of the blade on the corresponding tool rod is 20mm. When the current bottom hole to be scraped has a diameter of ≥110mm, the maximum allowable external adjustment diameter difference of the blade on the corresponding tool rod is 10mm; the second is to directly replace a separate scraper with a larger radial size. Of course, the replacement is also achieved step by step; The scraping process after each scraper replacement follows the following technical requirements: when the diameter of the bottom hole to be scraped is less than 110mm, the cutting parameters are required to be S=16r / min, f=12.5mm / r; when the diameter of the bottom hole to be scraped is ≥110mm, the cutting parameters are required to be S=16r / min, f=8mm / r; and so on until the target bottom hole required by the design is obtained; Step 5. Use a radial arm universal drilling machine to machine a connecting thread in the target bottom hole by whirlwind milling to form a new connecting screw hole; Check the thread quality to ensure it meets the design specifications.
[0018] The tool change process in step 4 above is as follows: A. Based on the basic bottom hole φ50mm obtained in step 3, to ensure that the scraper can be inserted into the operation, the scraper shank diameter is 50mm (basic bottom hole) - 0.5mm (minimum assembly clearance) = 49.5mm. The processing diameter of the scraper blade on the shank is radially adjustable within the range of 20mm, that is, the current allowable processing diameter range of the scraper is 70mm, and the cutting parameters are: S=16r / min, f=12.5mm / r; B. The bottom hole diameter obtained in step A is far from the target bottom hole required by the design. Therefore, after the scraper used in step A achieves the maximum scraping process, it is necessary to replace the scraper with a larger one. At this time, the scraper shank diameter is 70mm (bottom hole in step A) - 0.5mm (minimum assembly clearance) = 69.5mm. The processing diameter of the scraper blade on the shank is radially adjustable within the range of 20mm, that is, the allowable processing diameter range of the current scraper is 90mm, and the cutting parameters are: S = 16r / min, f = 12.5mm / r; C. The bottom hole diameter obtained in step B is far from the target bottom hole required by the design. Therefore, after the scraper used in step B achieves the maximum scraping process, it is necessary to replace the scraper with a larger one. At this time, the scraper shank diameter is 90mm (bottom hole in step B) - 0.5mm (minimum assembly clearance) = 89.5mm. The processing diameter of the scraper blade on the shank is radially adjustable within the range of 20mm, that is, the allowable processing diameter range of the current scraper is 110mm, and the cutting parameters are: S = 16r / min, f = 12.5mm / r; D. The bottom hole diameter obtained in step C is far from the target bottom hole required by the design. Therefore, after the scraper used in step C achieves the maximum scraping process, it is necessary to replace the scraper with a larger one. At this time, the scraper shank diameter is 110mm (step C bottom hole) - 0.5mm (minimum assembly clearance) = 109.5mm. The processing diameter of the scraper blade on the shank is radially adjustable within the range of 10mm, that is, the allowable processing diameter range of the current scraper is 120mm, and the cutting parameters are: S = 16r / min, f = 8mm / r; E. The bottom hole diameter obtained in step D is far from the target bottom hole required by the design. Therefore, after the scraper used in step D achieves the maximum scraping process, it is necessary to replace the scraper with a larger one. At this time, the scraper shank diameter is 120mm (step D bottom hole) - 0.5mm (minimum assembly clearance) = 119.5mm. The processing diameter of the scraper blade on the shank is radially adjustable within the range of 10mm, that is, the allowable processing diameter range of the current scraper is 130mm, and the cutting parameters are: S = 16r / min, f = 8mm / r; F. The bottom hole diameter obtained in step E is far from the target bottom hole required by the design. Therefore, after the scraper used in step E achieves the maximum scraping process, it is necessary to replace the scraper with a larger one. At this time, the scraper shank diameter is 130mm (bottom hole in step E) - 0.5mm (minimum assembly clearance) = 129.5mm. The processing diameter of the scraper blade on the shank is radially adjustable within the range of 10mm, that is, the allowable processing diameter range of the current scraper is 140mm, and the cutting parameters are: S = 16r / min, f = 8mm / r; H. The bottom hole diameter obtained in step F is far from the target bottom hole required by the design. Therefore, after the scraper used in step F achieves the maximum scraping process, it is necessary to replace the scraper with a larger one. At this time, the scraper shank diameter is 130mm (bottom hole in step F) - 0.5mm (minimum assembly clearance) = 139.5mm. The processing diameter of the scraper blade on the shank is radially adjustable within the range of 10mm, that is, the allowable processing diameter range of the current scraper is 150mm, and the cutting parameters are: S = 16r / min, f = 8mm / r; It is sufficient to process the screw hole to the technical requirement of φ149.22mm.
[0019] According to the above tool change processing process, it is also possible to achieve scraping processing of larger bottom holes (such as φ160mm bottom holes, etc.) to meet the technical requirements of on-site eccentric hole expansion of connecting screw holes of in-service equipment.
[0020] The above specific technical solutions are only used to illustrate the present invention rather than to limit it.
[0021] Although the present invention has been described in detail with reference to the above-mentioned specific technical solutions, those skilled in the art should understand that they can still modify the above-mentioned specific technical solutions, or make equivalent substitutions for some of the technical features therein; and these modifications or substitutions do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the present invention.
Claims
1. A method for on-site eccentric hole expansion of connecting screw holes of in-service equipment, characterized in that: The on-site eccentric hole expansion method comprises the following process steps: Step 1. Use process bolts to seal the current screw holes to be expanded on the in-service equipment; Step 2. Determine the center position of the eccentric hole at the blocked screw hole to be expanded; Step 3. Use a radial arm universal drilling machine to drill a hole at the determined eccentric expansion hole with a drill bit to obtain a foundation bottom hole; Step 4. According to the target bottom hole required by the design, a radial arm universal drilling machine is used to perform scraping processing in the base bottom hole with a scraper to obtain the target bottom hole required by the design; Step 5. Use a radial arm universal drilling machine to process a connecting thread in the target bottom hole by whirlwind milling to form a new connecting screw hole.
2. According to claim 1, the method for on-site eccentric hole expansion of the connecting screw hole of the in-service equipment is characterized in that: In step 4, a scraper is used to perform a scraping process in the base bottom hole. According to the difference in structural dimensions between the base bottom hole and the target bottom hole required by the design, the scraper is adjusted on the rocker universal drilling machine in a tool changing sequence from small to large, and the base bottom hole is scraped one by one until the target bottom hole required by the design is obtained.
3. The method for on-site eccentric hole expansion of connecting screw holes of in-service equipment according to claim 2, characterized in that: The order of changing blades from small to large is to adjust the blades on the same scraper to different radial sizes, or to replace a separate scraper; When the blades on the same scraper are adjusted to different radial sizes, when the diameter of the bottom hole to be scraped is less than 110mm, the maximum external adjustment diameter difference of the blade on the corresponding tool rod is 20mm; when the diameter of the bottom hole to be scraped is ≥110mm, the maximum external adjustment diameter difference of the blade on the corresponding tool rod is 10mm.
4. The method for on-site eccentric hole expansion of connecting screw holes of in-service equipment according to claim 1, characterized in that: The in-service equipment is a high-pressure outer cylinder of a steam turbine; The screw hole to be expanded is the connecting screw hole at the center joint surface where steam leakage occurs.
5. The method for on-site eccentric hole expansion of connecting screw holes of in-service equipment according to claim 4, characterized in that: When the high-pressure outer cylinder is drilled by the drill bit of the rocker universal drilling machine, the cutting parameters are S=85r / min and f=12.5mm / r.
6. The method for on-site eccentric hole expansion of connecting screw holes of in-service equipment according to claim 4, characterized in that: When the basic bottom hole on the high-pressure outer cylinder is scraped by the scraper of the rocker universal drilling machine, when the diameter of the bottom hole to be scraped is less than 110mm, the cutting parameters are S=16r / min, f=12.5mm / r; when the diameter of the bottom hole to be scraped is ≥110mm, the cutting parameters are S=16r / min, f=8mm / r.
7. The method for on-site eccentric hole expansion of connecting screw holes of in-service equipment according to claim 4, characterized in that: The current screw hole to be expanded on the high-pressure outer cylinder is 5 1 / 2-8UN, and the target screw hole required by the design is 6-8UN.
8. The method for on-site eccentric hole expansion of connecting screw holes of in-service equipment according to claim 1, characterized in that: The radial arm universal drilling machine is a movable VOM50 radial arm universal drilling machine with a maximum drilling diameter of φ50 mm.
Citation Information
Patent Citations
Method for repairing cylinder screw holes and special scraper and screw tap for implementing method
CN101941131A
Method for repairing main screw hole of reactor pressure vessel
CN103357928A
Machining process of piston for aircraft engine
CN108637612A
Main screw hole damage repairing method for nuclear power plant reactor pressure vessel
CN110253206A
Reaming and counterboring cutting tool
US4440531A