Battery replacement method and device
Parallel processing of battery removal and installation using mobile devices and cache racks at swap stations addresses the inefficiency of serial battery swapping, enhancing efficiency and user experience.
Patent Information
- Application Number
- CN202310664628.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-06
- Publication Date
- 2024-12-06
AI Technical Summary
The long replacement time at battery swap stations for electric vehicles affects operating efficiency and user experience due to serial processes of battery removal and installation.
Implementing a method and device that allows parallel processing of removing depleted batteries from and installing fully charged batteries into vehicles using multiple components such as mobile battery exchange devices, stackers, and cache racks, reducing the time required for battery swapping.
This approach significantly reduces battery swapping time, improves the efficiency and utilization of battery swap stations, and enhances user experience by enabling simultaneous removal and installation of batteries.
Smart Images

Figure CN119078591A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of battery replacement technology, and more specifically, to a method and device for battery replacement. Background Art
[0002] Developing new energy and replacing traditional energy with new energy is the main way to solve the current energy supply and demand bottleneck and reduce environmental pressure, and is also the basic guarantee for sustainable development. As an important part of sustainable development, new energy vehicles will become the mainstream direction of the vehicle industry.
[0003] At present, battery swap stations can be used to replace batteries in electric vehicles and replenish energy for electric vehicles with insufficient energy. Generally, it takes 5 to 6 minutes to replace the battery of an electric vehicle. The relatively long replacement time affects the operating efficiency and battery utilization rate of the battery swap station, and also reduces the user experience. Summary of the invention
[0004] The embodiments of the present application provide a method and device for battery replacement, which can reduce the time for battery replacement, improve the operating efficiency and battery utilization of battery replacement stations, and enhance user experience.
[0005] In a first aspect, a battery replacement method is provided, the method comprising: obtaining battery replacement demand information of a battery replacement vehicle; controlling a first battery replacement component to move a depleted battery in the battery replacement vehicle to a battery compartment according to the battery replacement demand information; and, in the process of controlling the first battery replacement component to move the depleted battery to the battery compartment, controlling the second battery replacement component to install a fully charged battery in the battery compartment into the battery replacement vehicle.
[0006] In an embodiment of the present application, the process of removing a depleted battery from a battery swapping vehicle to a battery compartment and the process of installing a fully charged battery from a battery compartment to a battery swapping vehicle can be carried out in parallel, thereby reducing the battery swapping time of the battery swapping vehicle, improving the efficiency of the battery swapping station and battery utilization, and improving user experience.
[0007] In one possible implementation, the first battery exchange component includes: a first mobile battery exchange device and a first stacker, the second battery exchange component includes: a second mobile battery exchange device and a second stacker, and a first cache rack and a second cache rack are arranged between the battery compartment and the battery exchange vehicle; the first mobile battery exchange device is used to move low-charged batteries between the first cache rack and the battery exchange vehicle, and the first stacker is used to move low-charged batteries between the first cache rack and the battery compartment; the second mobile battery exchange device is used to move fully charged batteries between the second cache rack and the battery exchange vehicle, and the second stacker is used to move fully charged batteries between the second cache rack and the battery compartment.
[0008] In the embodiment of the present application, by providing two sets of stackers, mobile battery exchange devices and cache racks, it is possible to flexibly achieve the parallel removal of depleted batteries from the battery exchange vehicle to the battery compartment and the removal of fully charged batteries from the battery compartment and installation in the battery exchange vehicle, thereby reducing the battery exchange time of the battery exchange vehicle, improving the utilization efficiency and battery utilization rate of the battery exchange station, and improving the user experience.
[0009] In one possible implementation, while controlling the first battery exchange component to move a depleted battery to the battery compartment, controlling the second battery exchange component to install a fully charged battery in the battery compartment into the battery exchange vehicle, including: while controlling the first mobile battery exchange device to move a depleted battery from the battery exchange vehicle to the first cache rack, controlling the second mobile battery exchange device to install a fully charged battery from the second cache rack into the battery exchange vehicle.
[0010] In an embodiment of the present application, the removal of a depleted battery from a battery swapping vehicle to a first cache rack and the installation of a fully charged battery from a second cache rack to a battery swapping vehicle can be carried out in parallel, which can reduce the battery swapping time of the battery swapping vehicle, improve the efficiency of the battery swapping station and the battery utilization rate, and enhance the user experience.
[0011] In one possible implementation, while controlling the first mobile battery exchange device to move a depleted battery from a battery exchange vehicle to a first cache rack, controlling the second mobile battery exchange device to install a fully charged battery from a second cache rack to the battery exchange vehicle, including: while controlling the first mobile battery exchange device to remove the depleted battery from the battery exchange vehicle, controlling the second mobile battery exchange device to move the fully charged battery from the second cache rack to the vicinity of the battery exchange vehicle.
[0012] During the removal of the deflated battery, the second mobile battery exchange device is controlled to move the fully charged battery from the second battery exchange rack to the vicinity of the battery exchange vehicle, so that after the deflated battery of the battery exchange vehicle is removed, the fully charged battery can be installed in the battery exchange vehicle in time, thereby reducing the waiting time of the battery exchange vehicle.
[0013] In one possible implementation, the first palletizer and the second palletizer are the same palletizer, and the method further includes: before controlling the second mobile battery exchange device to install the fully charged battery from the second cache rack to the battery exchange vehicle, controlling the first palletizer to move the fully charged battery from the battery compartment to the second cache rack; and after controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, controlling the first palletizer to move the depleted battery from the first cache rack to the battery compartment.
[0014] In an embodiment of the present application, through a palletizer, two cache racks and two mobile battery exchange devices, parallel processing of at least part of the actions of removing the depleted battery into the battery compartment and installing the fully charged battery from the battery compartment into the battery exchange vehicle can be achieved, which can not only reduce the modification of the battery exchange station and reduce the investment cost of the battery exchange station, but also reduce the battery exchange time, improve the battery utilization rate of the battery exchange station, and enhance the user experience.
[0015] In one possible implementation, the first palletizer and the second palletizer are the same palletizer, the first cache rack and the second cache rack are the same cache rack, and the method further includes: before controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, controlling the first palletizer to place the fully charged battery on the first cache rack; in the process of controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, controlling the second mobile battery exchange device to install the fully charged battery from the second cache rack to the battery exchange vehicle, including: in the process of controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, controlling the second mobile battery exchange device to install the fully charged battery from the first cache rack to the battery exchange vehicle; the method further includes: after controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, controlling the first palletizer to move the depleted battery from the first cache rack to the battery compartment.
[0016] In an embodiment of the present application, by providing a palletizer, a cache rack and two mobile battery exchange devices, it is possible to achieve parallel processing of at least part of the actions of removing a low-charged battery into a battery compartment and installing a fully-charged battery from the battery compartment into a battery exchange vehicle. This can not only reduce the modification of the battery exchange station and reduce the investment cost of the battery exchange station, but also reduce the battery exchange time, improve the battery utilization rate of the battery exchange station, and enhance the user experience.
[0017] In one possible implementation, while controlling the first battery exchange component to move the depleted battery to the battery compartment, controlling the second battery exchange component to install the fully charged battery in the battery compartment to the battery exchange vehicle, including: while controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, controlling the second palletizer to move the fully charged battery from the battery compartment to the second cache rack.
[0018] In an embodiment of the present application, the movement of a low-charged battery from the battery swapping vehicle to the first cache rack and the movement of a fully-charged battery from the battery compartment to the second cache rack can be carried out in parallel, which can reduce the battery swapping time of the battery swapping vehicle, improve the efficiency of the battery swapping station and the battery utilization rate, and enhance the user experience.
[0019] In one possible implementation, while controlling the first battery exchange component to move the depleted battery to the battery compartment, the second battery exchange component is controlled to install the fully charged battery in the battery compartment to the battery exchange vehicle, including: while controlling the first stacker to move the depleted battery from the first cache rack to the battery compartment, the second mobile battery exchange device is controlled to install the fully charged battery from the second cache rack to the battery exchange vehicle.
[0020] In an embodiment of the present application, the movement of the depleted battery from the first cache rack to the battery compartment and the installation of the fully charged battery from the second cache rack to the battery swap vehicle can be carried out in parallel, which can reduce the battery swap time of the battery swap vehicle, improve the efficiency of the battery swap station and the battery utilization rate, and improve the user experience.
[0021] In a possible implementation, the first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device.
[0022] In the embodiment of the present application, through a mobile battery exchange device, it is still possible to achieve the parallel removal of the depleted battery into the battery compartment and the installation of the fully charged battery into the battery exchange vehicle, which can not only reduce the transformation of the battery exchange station and reduce the investment cost of the battery exchange station, but also reduce the battery exchange time, improve the operating efficiency of the battery exchange station, and improve the user experience.
[0023] In a possible implementation manner, the first palletizer and the second palletizer are the same palletizer.
[0024] In the embodiment of the present application, through a palletizer, it is still possible to achieve the parallel removal of low-charged batteries into the battery compartment and the installation of fully charged batteries into the battery swap vehicle, which can not only reduce the transformation of the battery swap station and reduce the investment cost of the battery swap station, but also reduce the battery swap time, improve the operating efficiency of the battery swap station, and improve the user experience.
[0025] In one possible implementation, while controlling the first battery exchange component to move the depleted battery to the battery compartment, controlling the second battery exchange component to install the fully charged battery in the battery compartment to the battery exchange vehicle, including: while controlling the first palletizer to move the depleted battery from the first cache rack to the battery compartment, controlling the second palletizer to move the fully charged battery from the battery compartment to the second cache rack.
[0026] In an embodiment of the present application, the movement of a low-charge battery from the first cache rack to the battery compartment and the movement of a fully-charged battery from the battery compartment to the second cache rack can be carried out in parallel, which can reduce the battery replacement time of the battery replacement vehicle, improve the efficiency of the battery replacement station and the battery utilization rate, and improve the user experience.
[0027] In one possible implementation, the first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device, and the method includes: before controlling the first palletizer to move the depleted battery from the first cache rack to the battery compartment, controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack; and, after controlling the second palletizer to move the fully charged battery from the battery compartment to the second cache rack, controlling the first mobile battery exchange device to install the fully charged battery from the second cache rack to the battery exchange vehicle.
[0028] Through a mobile battery-swapping device, at least part of the actions of removing a depleted battery from a battery-swapping vehicle to a battery compartment and installing a fully charged battery from a battery compartment to a battery-swapping vehicle can be performed simultaneously, thereby reducing the investment cost of battery-swapping stations and shortening the battery-swapping time.
[0029] In one possible implementation, the first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device, the first cache rack and the second cache rack are the same cache rack, and the method includes: before controlling the first palletizer to move the depleted battery from the first cache rack to the battery compartment, controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack; in the process of controlling the first palletizer to move the depleted battery from the first cache rack to the battery compartment, controlling the second palletizer to move the fully charged battery from the battery compartment to the second cache rack, including: in the process of controlling the first palletizer to move the depleted battery from the first cache rack to the battery compartment, controlling the first palletizer to move the fully charged battery from the battery compartment to the first cache rack; the method includes: after controlling the first palletizer to move the fully charged battery from the battery compartment to the first cache rack, controlling the first mobile battery exchange device to install the fully charged battery from the first cache rack to the battery exchange vehicle.
[0030] Through a mobile battery exchange device, a cache rack and two palletizers, it is possible to move low-charged batteries from the cache rack to the battery compartment and fully-charged batteries from the battery compartment to the cache rack in parallel, thereby reducing the investment cost of the battery exchange station and shortening the battery exchange time.
[0031] In one possible implementation, based on the battery swap demand information, the first battery swap component is controlled to move the deflated battery in the battery swap vehicle to the battery compartment, including: determining information of a first time based on the battery swap demand information, the battery swap demand information including information of a second time, the second time information being the time information at which the battery swap vehicle is expected to arrive at the battery swap platform in the battery swap station, the first time being earlier than the second time; and controlling the first mobile battery swap device to move toward the battery swap platform at the first time to move the deflated battery to the battery compartment.
[0032] In an embodiment of the present application, the first mobile battery swap device can be controlled to move toward the battery swap platform in advance, which can reduce the waiting time between the battery swap vehicle arriving at the battery swap platform and starting to disassemble the battery, thereby reducing the overall battery swap time, improving the operating efficiency and battery utilization of the battery swap station, and improving user experience.
[0033] In one possible implementation, information about the first time is determined based on the battery exchange demand information, including: determining information about the first time based on the battery exchange demand information and information about the first duration, wherein the information about the first duration is the duration required for the first mobile battery exchange device to move from an initial position to the battery exchange platform, and the first time is earlier than or equal to the second time minus the first duration.
[0034] In the embodiment of the present application, the first mobile battery swapping device has already arrived at the battery swapping platform before the battery swapping vehicle arrives at the battery swapping platform. When the battery swapping vehicle arrives at the battery swapping platform, the first mobile battery swapping device can also promptly remove the depleted battery of the battery swapping vehicle, thereby reducing the battery swapping time of the battery swapping vehicle, improving the operational efficiency of the battery swapping station, and enhancing the user experience.
[0035] In a possible implementation, the method also includes: obtaining scheduled battery replacement information of the battery replacement vehicle, the scheduled battery replacement information including scheduled battery replacement time information of the battery replacement vehicle; and determining information of the second time based on the scheduled battery replacement time information.
[0036] The embodiment of the present application can determine the estimated time for the battery swap vehicle to reach the battery swap platform based on the information of the scheduled battery swap time, so that the first mobile battery swap device can be moved to the battery swap platform in advance, reducing the battery swap time of the battery swap vehicle, improving the operating efficiency of the battery swap station, and enhancing the user experience.
[0037] In a possible implementation, the method also includes: obtaining information about vehicles to be replaced that are queued in front of the battery swapping vehicle in the battery swapping station, the information about the vehicles to be replaced including the number of vehicles to be replaced; and determining information about the second time based on the information about the vehicles to be replaced.
[0038] The battery swapping solution provided in the embodiment of the present application can accurately determine the time when the battery swapping vehicle reaches the battery swapping platform according to the number of vehicles waiting to be swapped queued in front of the battery swapping vehicle, so as to control the first mobile battery swapping device to move toward the battery swapping platform in advance and reasonably, thereby reducing the battery swapping time of the battery swapping vehicle, improving the operating efficiency of the battery swapping station, and improving the user experience.
[0039] In a second aspect, a battery replacement device is provided, which includes: an acquisition unit for acquiring battery replacement demand information of a battery replacement vehicle; a processing unit for controlling a first battery replacement component to move a deflated battery in the battery replacement vehicle to a battery compartment according to the battery replacement demand information; and, while controlling the first battery replacement component to move the deflated battery to the battery compartment, controlling the second battery replacement component to install a fully charged battery in the battery compartment into the battery replacement vehicle.
[0040] In one possible implementation, the first battery exchange component includes: a first mobile battery exchange device and a first stacker, the second battery exchange component includes: a second mobile battery exchange device and a second stacker, and a first cache rack and a second cache rack are arranged between the battery compartment and the battery exchange vehicle; the first mobile battery exchange device is used to move low-charged batteries between the first cache rack and the battery exchange vehicle, and the first stacker is used to move low-charged batteries between the first cache rack and the battery compartment; the second mobile battery exchange device is used to move fully charged batteries between the second cache rack and the battery exchange vehicle, and the second stacker is used to move fully charged batteries between the second cache rack and the battery compartment.
[0041] In one possible implementation, the processing unit is used to: while controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, control the second mobile battery exchange device to install the fully charged battery from the second cache rack into the battery exchange vehicle.
[0042] In one possible implementation, the processing unit is used to: while controlling the first mobile battery exchange device to remove the depleted battery of the battery exchange vehicle, control the second mobile battery exchange device to move the fully charged battery from the second cache rack to the vicinity of the battery exchange vehicle.
[0043] In one possible implementation, the first palletizer and the second palletizer are the same palletizer, and the processing unit is also used to: before controlling the second mobile battery exchange device to install the fully charged battery from the second cache rack to the battery exchange vehicle, control the first palletizer to move the fully charged battery from the battery compartment to the second cache rack; and after controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, control the first palletizer to move the depleted battery from the first cache rack to the battery compartment.
[0044] In one possible implementation, the first palletizer and the second palletizer are the same palletizer, the first cache rack and the second cache rack are the same cache rack, and the processing unit is also used to: before controlling the first mobile battery exchange device to move from the battery exchange vehicle to the first cache rack, control the first palletizer to move the fully charged battery from the battery compartment to the first cache rack and place the fully charged battery on the first cache rack; in the process of controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, control the second mobile battery exchange device to install the fully charged battery from the first cache rack into the battery exchange vehicle; after controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, control the first palletizer to move the depleted battery from the first cache rack to the battery compartment.
[0045] In one possible implementation, the processing unit is used to: while controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, control the second palletizer to move the fully charged battery from the battery compartment to the second cache rack.
[0046] In one possible implementation, the processing unit is used to: while controlling the first palletizer to move the depleted battery from the first cache rack to the battery compartment, control the second mobile battery exchange device to install the fully charged battery from the second cache rack to the battery exchange vehicle.
[0047] In a possible implementation, the first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device.
[0048] In a possible implementation, the first palletizer and the second palletizer are the same palletizer.
[0049] In a possible implementation, the processing unit is used to: during the process of controlling the first palletizer to move the low-charged battery from the first buffer rack to the battery bin, control the second palletizer to move the fully-charged battery from the battery bin to the second buffer rack.
[0050] In one possible implementation, the first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device, and the processing unit is also used to: before controlling the first palletizer to move the depleted battery from the first cache rack to the battery compartment, control the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack; and after controlling the second palletizer to move the fully charged battery from the battery compartment to the second cache rack, control the first mobile battery exchange device to install the fully charged battery from the second cache rack to the battery exchange vehicle.
[0051] In one possible implementation, the first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device, the first cache rack and the second cache rack are the same cache rack, and the processing unit is used to: before controlling the first palletizer to move the deflated battery from the first cache rack to the battery compartment, control the first mobile battery exchange device to move the deflated battery from the battery exchange vehicle to the first cache rack; in the process of controlling the first palletizer to move the deflated battery from the first cache rack to the battery compartment, control the first palletizer to move the fully charged battery from the battery compartment to the first cache rack; after controlling the first palletizer to move the fully charged battery from the battery compartment to the first cache rack, control the first mobile battery exchange device to install the fully charged battery from the first cache rack to the battery exchange vehicle.
[0052] In one possible implementation, the processing unit is used to: determine information of the first time based on battery swapping demand information, the battery swapping demand information includes information of the second time, the second time information is the time information when the battery swapping vehicle is expected to arrive at the battery swapping platform in the battery swapping station, and the first time is earlier than the second time; control the first mobile battery swapping device to move to the battery swapping platform at the first time.
[0053] In one possible implementation, the processing unit is used to determine the first time information based on the battery exchange demand information and the first duration information, wherein the first duration information is the time required for the first mobile battery exchange device to move from an initial position to the battery exchange platform, and the first time is earlier than or equal to the second time minus the first duration.
[0054] In one possible implementation, an acquisition unit is used to acquire scheduled battery replacement information of a battery replacement vehicle, the scheduled battery replacement information including scheduled battery replacement time information of the battery replacement vehicle; and a processing unit is used to determine information of a second time based on the scheduled battery replacement time information.
[0055] In one possible implementation, the acquisition unit is used to obtain information about vehicles waiting to be replaced that are queued in front of the battery swapping vehicle in the battery swapping station, the information about the vehicles waiting to be replaced includes the number of vehicles waiting to be replaced; the processing unit is used to determine the information of the second time based on the information about the vehicles waiting to be replaced.
[0056] In a third aspect, a battery replacement device is provided, the device comprising a memory and a processor, the memory being used to store instructions, the processor being used to read the instructions and execute the method described in the first aspect or any one of the first aspects according to the instructions.
[0057] In a fourth aspect, a battery swap station is provided, the battery swap station comprising the device described in the second aspect or any one of the second aspects.
[0058] In a fifth aspect, a chip is provided, comprising: a processor, configured to call and run a computer program from a memory, so that a device equipped with the chip executes the method described in the first aspect or any one of the first aspects.
[0059] In a sixth aspect, a computer-readable storage medium is provided, wherein the computer-readable storage medium is used to store a computer program. When the computer program is executed by a computer, the computer implements the method described in the first aspect or any one of the first aspects. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] Figure 1 It is a schematic architecture diagram of an application scenario of an energy storage system to which the embodiments of the present application are applicable.
[0061] Figure 2 It is a structural schematic diagram of the battery swap platform provided in an embodiment of the present application.
[0062] Figure 3 It is a flow chart of the battery replacement method provided in an embodiment of the present application.
[0063] Figure 4 It is a flow chart of the battery replacement method provided in an embodiment of the present application.
[0064] Figure 5 It is a flow chart of the battery replacement method provided in an embodiment of the present application.
[0065] Figure 6 It is a flow chart of the battery replacement method provided in an embodiment of the present application.
[0066] Figure 7 It is a flow chart of the battery replacement method provided in an embodiment of the present application.
[0067] Figure 8 It is a schematic block diagram of the battery replacement device provided in an embodiment of the present application.
[0068] Fig. 9 It is a schematic block diagram of the battery replacement device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0069] The following detailed description and drawings of the embodiments of the present application are used to illustrate the principles of the present application, but cannot be used to limit the scope of the present application, that is, the present application is not limited to the described embodiments.
[0070] In the description of the present application, it should be noted that, unless otherwise specified, "multiple" means more than two; the terms "upper", "lower", "left", "right", "inside", "outside", etc., indicating the orientation or positional relationship, are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. "Vertical" is not strictly vertical, but is within the allowable error range. "Parallel" is not strictly parallel, but is within the allowable error range.
[0071] The directional words appearing in the following description are all directions shown in the figures, and do not limit the specific structure of this application. In the description of this application, it should also be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to the specific circumstances.
[0072] In the embodiment of the present application, during the process of executing A, executing B can be understood as the actions of A and B being performed at least partially synchronously.
[0073] With the development of new energy technologies, batteries are being used in more and more fields, such as being used as a power source to provide power for vehicles and reduce the use of non-renewable resources. When the battery power in a vehicle is insufficient to support the vehicle to continue driving, charging equipment such as charging piles can be used to charge the vehicle, that is, to charge the battery in the vehicle to achieve the battery charge and discharge cycle. However, battery charging takes a long time, which limits the vehicle's endurance.
[0074] Developing new energy and replacing traditional energy with new energy is the main way to solve the current energy supply and demand bottleneck and reduce environmental pressure, and is also the basic guarantee for sustainable development. As an important part of sustainable development, new energy vehicles will become the mainstream direction of the vehicle industry.
[0075] At present, battery swap stations can be used to replace batteries in electric vehicles and replenish energy for electric vehicles with insufficient energy. At present, usually after the power-consuming equipment is parked on the power swap platform, the low-power batteries of the power-consuming equipment are first disassembled and transported to the battery compartment for charging, and then the fully charged batteries are taken out of the battery compartment and installed in the power-consuming equipment. That is, the disassembly and installation processes work in series. This battery swap method takes a long time, which affects the operating efficiency and battery utilization of the power swap station, and also reduces the user experience.
[0076] Based on this, the present application provides a battery replacement method and device, the method including: obtaining battery replacement demand information of a battery replacement vehicle; according to the battery replacement demand information, controlling a first battery replacement component to move a depleted battery in the battery replacement vehicle to a battery compartment; and, in the process of controlling the first battery replacement component to move the depleted battery to the battery compartment, controlling the second battery replacement component to install a fully charged battery in the battery compartment into the battery replacement vehicle.
[0077] In an embodiment of the present application, the process of removing a depleted battery from a battery swapping vehicle to a battery compartment and the process of removing a fully charged battery from the battery compartment and installing it to a battery swapping vehicle can be carried out in parallel, thereby reducing the battery swapping time of the battery swapping vehicle, improving the efficiency of the battery swapping station and battery utilization, and improving user experience.
[0078] In the present application, battery cells may include lithium-ion secondary batteries, lithium-ion primary batteries, lithium-sulfur batteries, sodium-lithium-ion batteries, sodium-ion batteries or magnesium-ion batteries, etc., and the embodiments of the present application do not limit this. Battery cells may be cylindrical, flat, rectangular or other shapes, etc., and the embodiments of the present application do not limit this. Battery cells are generally divided into three types according to the packaging method: cylindrical battery cells, square battery cells and soft-pack battery cells, and the embodiments of the present application do not limit this.
[0079] The battery mentioned in the embodiments of the present application refers to a single physical module including one or more battery cells to provide higher voltage and capacity. For example, the battery mentioned in the present application may include a battery pack, etc. The battery generally includes a box for encapsulating one or more battery cells. The box can reduce the impact of liquid or other foreign matter on the charging or discharging of the battery cells.
[0080] In order to meet different power requirements, the battery may include multiple battery cells, wherein the multiple battery cells may be connected in series, in parallel, or in a hybrid connection, wherein the hybrid connection refers to a mixture of series and parallel connections. Optionally, multiple battery cells may be connected in series, in parallel, or in a hybrid connection to form a battery module, and multiple battery modules may be connected in series, in parallel, or in a hybrid connection to form a battery. In other words, multiple battery cells may be directly formed into a battery, or may be first formed into a battery module, and the battery module may then be formed into a battery. The battery is further disposed in an electrical device to provide electrical energy to the electrical device.
[0081] The electric equipment mentioned in the embodiments of the present application may refer to vehicles, such as battery vehicles, electric vehicles, etc. The electric equipment mentioned in the embodiments of the present application may also refer to other devices that use batteries, such as mobile phones, portable devices, laptops, electric toys, electric tools, ships and spacecraft, etc. Spacecraft include, for example, airplanes, rockets, space shuttles and spacecraft, etc.
[0082] It should be understood that the technical solutions described in the embodiments of the present application are not limited to the devices described above, but can also be applied to all devices using batteries. However, for the sake of simplicity, the following embodiments are described using vehicles as examples.
[0083] Figure 1 A schematic diagram of the structure of a battery swap station according to an embodiment of the present application is shown, wherein the battery swap method provided in the embodiment of the present application can be applied to the battery swap station.
[0084] like Figure 1 As shown, the battery swap station 100 may include a battery rack 110. The battery rack 110 may be configured with a plurality of batteries. The battery rack 110 may include a battery compartment 111 and a battery cache rack 112. The batteries may be stored in the battery compartment so that the batteries may be charged. The battery cache rack 112 may be used to temporarily store depleted batteries removed from the battery swap vehicle 1. The battery swap cache rack 112 may also be used to temporarily store fully charged batteries removed from the battery compartment 111 and to be installed in the battery swap vehicle 1.
[0085] The battery swap station 100 may also include a palletizer 120 and a mobile battery swap device 130, such as a rail-guided vehicle (RGV). The mobile battery swap device 130 may remove the batteries from the battery swap vehicle 1 and transport them to the battery cache rack 112. The palletizer 120 may be used to transport the depleted batteries removed from the battery swap vehicle 1 by the mobile battery swap device 130 to the battery cache rack 112. The palletizer 120 may also be used to transport fully charged batteries from the battery compartment 111 to the battery cache rack 112. The mobile battery swap device 130 is also used to install fully charged batteries from the battery cache rack 112 onto the battery swap vehicle 1.
[0086] In some embodiments of the present application, the battery swap station 100 may include at least one battery cache rack 112 .
[0087] In some embodiments of the present application, the battery swap station 100 may include at least one palletizer 120 .
[0088] In some embodiments of the present application, the battery swap station 100 may include at least one mobile battery swap device 130 .
[0089] Exemplarily, the battery swap station may include two battery cache racks 112 , two palletizers 120 , and two mobile battery swap devices 130 .
[0090] The battery swap station 100 may further include a battery swap platform 140 . Figure 2 A schematic diagram of a battery swap vehicle 1 traveling on a battery swap platform 140 is shown. On the battery swap platform 140, a mobile battery swap device can replace the battery on the battery swap vehicle 1. Figure 1 and Figure 2 The X direction in the figure may be the driving direction of the battery swap vehicle 1 on the battery swap platform 140, and the Y direction may be the driving direction of the mobile battery swap device on the battery swap platform 140. For example, the mobile battery swap device may move along the Y direction to the vicinity of the battery swap vehicle 1 via the guide rails on the battery swap platform 140.
[0091] As an example, the battery swap platform 140 may include a front ramp 144, a front wheel positioning roller 146, a rear ramp 143, and a rear wheel positioning roller 145. The battery swap vehicle 1 may travel from the rear ramp 143 toward the front ramp 144. Figure 2 As shown. Along the driving direction of the battery swapping vehicle 1, the front wheel positioning roller 146 and the rear wheel positioning roller 145 can be located between the front ramp 144 and the rear ramp 143. The front wheel positioning roller 146 can be set close to the front ramp 144, and the rear wheel positioning roller 145 can be set close to the rear ramp 143. The front wheel positioning roller 146 can be used to position the front wheel of the battery swapping vehicle 1. The rear wheel positioning roller 145 can be used to position the rear wheel of the battery swapping vehicle 1. The battery swapping platform 200 can position the battery swapping vehicle 1 in the X direction and the Y direction through the front wheel positioning roller 106 and the rear wheel positioning roller 145, so that the battery swapping vehicle 1 can be fixed relative to the battery swapping platform 140. For example, when the battery swapping platform 140 completes the positioning of the battery swapping vehicle 1, the mobile battery swapping device can be moved to the battery swapping platform 140 to remove the depleted battery in the battery swapping vehicle 1.
[0092] In the embodiment of the present application, a low-power battery may refer to a battery removed from the battery swap vehicle 1, and a fully-charged battery may refer to a battery installed in the battery swap vehicle 1. Generally speaking, the power of a fully-charged battery is greater than the power of a low-power battery, and the power level can be determined based on the power level or power percentage.
[0093] Figure 3 A flow chart of the battery replacement method provided in an embodiment of the present application.
[0094] 310, obtaining the battery replacement demand information of the battery replacement vehicle.
[0095] The battery swap demand information can be used to determine whether the battery swap vehicle needs to have its battery swapped.
[0096] 320. According to the battery replacement demand information, control the first battery replacement component to move the low-power battery in the battery replacement vehicle to the battery compartment.
[0097] When it is known that the battery swap vehicle needs to be replaced, the first battery swap component can be controlled to remove the battery of the battery swap vehicle to the battery compartment. That is, the first battery swap component is controlled to remove the low-power battery of the battery swap vehicle and move it to the battery compartment to charge the low-power battery.
[0098] 330. While controlling the first battery exchange component to move the depleted battery to the battery compartment, control the second battery exchange component to install the fully charged battery in the battery compartment into the battery exchange vehicle.
[0099] While controlling the first component to remove the depleted battery and move it to the battery compartment, the second battery replacement component is controlled to move the fully charged battery from the battery compartment to the vicinity of the battery replacement vehicle and install the fully charged battery into the battery replacement vehicle.
[0100] That is to say, the process of removing the low-power battery from the battery swap vehicle to the battery compartment and the process of installing the fully charged battery from the battery compartment to the battery swap vehicle can be carried out in parallel. For example, before the first battery swap assembly places the low-power battery in the battery compartment, the second battery swap assembly moves the fully charged battery from the battery compartment to the battery swap vehicle.
[0101] In an embodiment of the present application, the process of removing a depleted battery from a battery swapping vehicle to a battery compartment and the process of installing a fully charged battery from a battery compartment to a battery swapping vehicle can be carried out in parallel, thereby reducing the battery swapping time of the battery swapping vehicle, improving the efficiency of the battery swapping station and battery utilization, and improving user experience.
[0102] In some embodiments of the present application, the first battery exchange component includes: a first mobile battery exchange device and a first stacker, the second battery exchange component includes: a second mobile battery exchange device and a second stacker, and a first cache rack and a second cache rack are arranged between the battery compartment and the battery exchange vehicle.
[0103] Among them, the first mobile battery exchange device is used to move depleted batteries between the first cache rack and the battery exchange vehicle, and the first palletizer is used to move depleted batteries between the first cache rack and the battery compartment; the second mobile battery exchange device is used to move fully charged batteries between the second cache rack and the battery exchange vehicle, and the second palletizer is used to move fully charged batteries between the second cache rack and the battery compartment.
[0104] In this embodiment, a mobile battery swapping device can be used to remove and transport the depleted batteries of the battery swapping vehicle to the first cache rack, and a palletizer can be used to transport the depleted batteries of the first cache rack to the battery compartment. Another palletizer can be used to transport the fully charged batteries in the battery compartment to the second cache rack, and another mobile battery swapping device can be used to install the fully charged batteries of the second cache rack to the battery swapping vehicle.
[0105] By setting up two sets of stackers, mobile battery swapping devices and cache racks, it is possible to flexibly achieve the parallel removal of depleted batteries from the battery swapping vehicle to the battery compartment and the removal of fully charged batteries from the battery compartment and installation into the battery swapping vehicle, thereby reducing the battery swapping time of the battery swapping vehicle, improving the efficiency of the battery swapping station and battery utilization, and enhancing user experience.
[0106] Figure 4 A flow chart of the battery replacement method provided in an embodiment of the present application.
[0107] 410, obtaining the battery swapping demand information of the battery swapping vehicle.
[0108] 420. According to the battery replacement demand information, control the first battery replacement component to move the low-power battery of the battery replacement vehicle to the battery compartment.
[0109] When a battery-swapping vehicle needs to have its battery replaced, for the side of the deflated battery to be removed, the first mobile battery-swapping device can be controlled to remove the deflated battery of the battery-swapping vehicle to the first cache rack, and then the first palletizer can be controlled to move the deflated battery of the first cache rack to the battery compartment.
[0110] 430. During the process of controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, the second mobile battery exchange device is controlled to install the fully charged battery from the second cache rack to the battery exchange vehicle.
[0111] The process of the first mobile battery swap device removing and moving the low-power battery to the first cache rack and the process of the second mobile battery swap device installing the fully-charged battery from the second cache rack to the battery swap vehicle can be carried out in parallel. For example, while the first mobile battery swap device is removing the low-power battery, the second mobile battery swap device can move the fully-charged battery from the second cache rack to the vicinity of the battery swap vehicle; while the first mobile battery swap device is moving the removed low-power battery to the first cache rack, the second mobile battery swap device can install the fully-charged battery of the second cache rack into the battery swap vehicle.
[0112] In an embodiment of the present application, the removal of a depleted battery from a battery swapping vehicle to a first cache rack and the installation of a fully charged battery from a second cache rack to a battery swapping vehicle can be carried out in parallel, which can reduce the battery swapping time of the battery swapping vehicle, improve the efficiency of the battery swapping station and the battery utilization rate, and enhance the user experience.
[0113] Optionally, while controlling the first mobile battery-swapping device to remove the depleted battery of the battery-swapping vehicle, the second mobile battery-swapping device can be controlled to move the fully-charged battery from the second cache rack to the vicinity of the battery-swapping vehicle.
[0114] During the removal of the deflated battery, the second mobile battery exchange device is controlled to move the fully charged battery from the second battery exchange rack to the vicinity of the battery exchange vehicle, so that after the deflated battery of the battery exchange vehicle is removed, the fully charged battery can be installed in the battery exchange vehicle in time, thereby reducing the waiting time of the battery exchange vehicle.
[0115] In some embodiments of the present application, the first palletizer and the second palletizer are the same palletizer.
[0116] In some embodiments of the present application, the first cache rack and the second cache rack may be the same cache rack.
[0117] Exemplarily, when the first cache rack and the second cache rack are the same cache rack, before controlling the second mobile battery exchange device to install the fully charged battery from the second cache rack to the battery exchange vehicle, the first palletizer can be controlled to move the fully charged battery from the battery compartment to the second cache rack; and after controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, the first palletizer can be controlled to move the depleted battery from the first cache rack to the battery compartment.
[0118] That is to say, the stacker can be controlled to move the fully charged battery from the battery compartment to the second cache rack first, and then the first mobile battery swap device can be controlled to move the depleted battery from the battery swap vehicle to the first cache rack, and the second mobile battery swap device can be controlled to install the fully charged battery from the second cache rack to the battery swap vehicle. After the first mobile battery swap device removes the depleted battery from the battery swap vehicle to the first cache rack, the stacker can be controlled to move the depleted battery from the first cache rack to the battery compartment.
[0119] In an embodiment of the present application, through a palletizer, two cache racks and two mobile battery exchange devices, parallel processing of at least part of the actions of removing the depleted battery into the battery compartment and installing the fully charged battery from the battery compartment into the battery exchange vehicle can be achieved, which can not only reduce the modification of the battery exchange station and reduce the investment cost of the battery exchange station, but also reduce the battery exchange time, improve the battery utilization rate of the battery exchange station, and enhance the user experience.
[0120] Exemplarily, when the first palletizer and the second palletizer are the same palletizer, and the first cache rack and the second cache rack are the same cache rack, before controlling the first mobile battery exchange device to place the depleted battery on the first cache rack, the first palletizer can be controlled to place the fully charged battery on the first cache rack; in the process of controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, the second mobile battery exchange device can be controlled to install the fully charged battery from the first cache rack to the battery exchange vehicle; after controlling the first mobile battery exchange device to place the depleted battery on the first cache rack, the first palletizer can be controlled to move the depleted battery from the first cache rack to the battery compartment.
[0121] That is, the palletizer can be controlled to place the fully charged batteries in the battery compartment into the cache rack, and then the first mobile battery swap device can be controlled to move the depleted batteries from the battery swap vehicle to the cache rack and the second mobile battery swap device can be controlled to install the fully charged batteries from the cache rack into the battery swap vehicle. After the first mobile battery swap device places the depleted batteries into the cache rack, the palletizer is controlled to move the depleted batteries from the cache rack to the battery compartment.
[0122] In an embodiment of the present application, by providing a palletizer, a cache rack and two mobile battery exchange devices, it is possible to achieve parallel processing of at least part of the actions of removing a low-charged battery into a battery compartment and installing a fully-charged battery from the battery compartment into a battery exchange vehicle. This can not only reduce the modification of the battery exchange station and reduce the investment cost of the battery exchange station, but also reduce the battery exchange time, improve the battery utilization rate of the battery exchange station, and enhance the user experience.
[0123] Figure 5 A flow chart of the battery replacement method provided in an embodiment of the present application.
[0124] 510, obtaining the battery swapping demand information of the battery swapping vehicle.
[0125] 520. According to the battery replacement demand information, control the first battery replacement component to move the low-power battery in the battery replacement vehicle to the battery compartment.
[0126] Step 510 and step 520 may refer to the relevant descriptions above, and this application will not elaborate on them here.
[0127] 530. In the process of controlling the first mobile battery exchange device to move the low-charged battery from the battery exchange vehicle to the first cache rack, the second palletizer is controlled to move the fully-charged battery from the battery compartment to the second cache rack.
[0128] The process of the first mobile battery swap device moving the depleted battery from the battery swap vehicle to the first cache rack and the process of the second palletizer moving the fully charged battery from the battery compartment to the second cache rack can be performed in parallel. For example, the first mobile battery swap device can be synchronously controlled to start moving the depleted battery from the battery swap vehicle to the first cache rack and the second palletizer can be synchronously controlled to start moving the fully charged battery from the battery compartment to the second cache rack, that is, the start execution time of the two actions is the same.
[0129] In an embodiment of the present application, the movement of a low-charged battery from the battery swapping vehicle to the first cache rack and the movement of a fully-charged battery from the battery compartment to the second cache rack can be carried out in parallel, which can reduce the battery swapping time of the battery swapping vehicle, improve the efficiency of the battery swapping station and the battery utilization rate, and enhance the user experience.
[0130] 540. While controlling the first palletizer to move the low-charged battery from the first cache rack to the battery compartment, controlling the second mobile battery exchange device to install the fully-charged battery from the second cache rack to the battery exchange vehicle.
[0131] The process of the first palletizer moving the low-charged battery from the first cache rack to the battery compartment and the process of the second mobile battery swapping device installing the fully-charged battery from the second cache rack to the battery swapping vehicle can be performed in parallel. For example, the first palletizer can be controlled to start moving the low-charged battery from the first cache rack to the battery compartment and the second mobile battery swapping device can be controlled to start installing the fully-charged battery from the second cache rack to the battery swapping vehicle synchronously, that is, the start execution time of the two actions is the same.
[0132] In an embodiment of the present application, the movement of the depleted battery from the first cache rack to the battery compartment and the installation of the fully charged battery from the second cache rack to the battery swap vehicle can be carried out in parallel, which can reduce the battery swap time of the battery swap vehicle, improve the efficiency of the battery swap station and the battery utilization rate, and improve the user experience.
[0133] In some embodiments of the present application, the first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device.
[0134] When the low-power battery is removed to the battery compartment, the action of the first mobile battery swap device can generally be performed first; when the fully-charged battery is installed to the battery swap vehicle, the action of the second mobile battery swap device can generally be performed later. The working hours of the first mobile battery swap device and the second mobile battery swap device can be staggered. Therefore, one mobile battery swap device can realize the parallel operation of at least part of the actions of removing the low-power battery from the battery compartment and installing the fully-charged battery to the battery swap vehicle.
[0135] In the embodiment of the present application, through a mobile battery exchange device, it is still possible to achieve the parallel removal of the depleted battery into the battery compartment and the installation of the fully charged battery into the battery exchange vehicle, which can not only reduce the transformation of the battery exchange station and reduce the investment cost of the battery exchange station, but also reduce the battery exchange time, improve the operating efficiency of the battery exchange station, and improve the user experience.
[0136] In some embodiments of the present application, the first palletizer and the second palletizer are the same palletizer.
[0137] When the low-power battery is removed to the battery compartment, the first palletizer can generally be used later; when the fully-charged battery is installed to the battery swap vehicle, the second palletizer can generally be used later. The action times of the first palletizer and the second palletizer can be staggered, so that at least part of the actions of removing the low-power battery from the battery compartment and installing the fully-charged battery on the battery swap vehicle can be performed in parallel by one palletizer.
[0138] In the embodiment of the present application, through a palletizer, it is still possible to achieve the parallel removal of low-charged batteries into the battery compartment and the installation of fully charged batteries into the battery swap vehicle, which can not only reduce the transformation of the battery swap station and reduce the investment cost of the battery swap station, but also reduce the battery swap time, improve the operating efficiency of the battery swap station, and improve the user experience.
[0139] Exemplarily, when the first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device, and the first palletizer and the second palletizer are the same palletizer, while controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, the first palletizer can be controlled to move the fully charged battery from the battery compartment to the second cache rack; while controlling the first palletizer to move the depleted battery from the first cache rack to the battery compartment, the first mobile battery exchange device can be controlled to install the fully charged battery from the first cache rack to the battery compartment.
[0140] In this way, we can not only reduce the transformation of battery swap stations and the investment cost of battery swap stations, but also reduce the battery swap time, improve the battery utilization rate of battery swap stations, and enhance the user experience.
[0141] Figure 6 A flow chart of the battery replacement method provided in an embodiment of the present application.
[0142] 610, obtaining the battery swapping demand information of the battery swapping vehicle.
[0143] 620. According to the battery replacement demand information, control the first battery replacement component to move the low-power battery of the battery replacement vehicle to the battery compartment.
[0144] The description of steps 610 and 620 can refer to the relevant content in the above text, and this application will not go into details here.
[0145] 630. In the process of controlling the first palletizer to move the low-charged battery from the first buffer rack to the battery compartment, control the second palletizer to move the fully-charged battery from the battery compartment to the second buffer rack.
[0146] The process of the first palletizer moving the low-power battery from the first cache rack to the battery bin and the process of the second palletizer moving the fully-charged battery from the battery bin to the second cache rack can be performed in parallel. For example, the first palletizer can be controlled to start moving the low-power battery from the first cache rack to the battery bin and the second palletizer can be controlled to start moving the fully-charged battery from the battery bin to the second cache rack synchronously, that is, the start execution time of the two actions is the same.
[0147] In an embodiment of the present application, the movement of a low-charge battery from the first cache rack to the battery compartment and the movement of a fully-charged battery from the battery compartment to the second cache rack can be carried out in parallel, which can reduce the battery replacement time of the battery replacement vehicle, improve the efficiency of the battery replacement station and the battery utilization rate, and improve the user experience.
[0148] In some embodiments of the present application, the first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device.
[0149] In some embodiments of the present application, the first cache rack and the second cache rack may be the same cache rack.
[0150] In some embodiments of the present application, the first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device.
[0151] Exemplarily, when the first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device, before controlling the first palletizer to move the depleted battery from the first cache rack to the battery compartment, the first mobile battery exchange device is controlled to move the depleted battery from the battery exchange vehicle to the first cache rack; and, after controlling the second palletizer to move the fully charged battery from the battery compartment to the second cache rack, the first mobile battery exchange device is controlled to install the fully charged battery from the second cache rack to the battery exchange vehicle.
[0152] That is, the mobile battery swap device can first remove the depleted battery from the battery swap vehicle to the first cache rack, and then control the first palletizer to move the depleted battery from the first cache rack to the battery compartment and control the second palletizer to move the fully charged battery from the battery compartment to the second cache rack. After the fully charged battery is placed on the second cache rack, the mobile battery swap device can install the fully charged battery of the second cache rack to the battery swap vehicle.
[0153] Through a mobile battery-swapping device, at least part of the actions of removing a depleted battery from a battery-swapping vehicle to a battery compartment and installing a fully charged battery from a battery compartment to a battery-swapping vehicle can be performed simultaneously, thereby reducing the investment cost of battery-swapping stations and shortening the battery-swapping time.
[0154] Exemplarily, the first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device, and the first cache rack and the second cache rack are the same cache rack. Before controlling the first palletizer to move the deflated battery from the first cache rack to the battery compartment, the first mobile battery exchange device is controlled to move the deflated battery from the battery exchange vehicle to the first cache rack; while controlling the first palletizer to move the deflated battery from the first cache rack to the battery compartment, the first palletizer is controlled to move the fully charged battery from the battery compartment to the first cache rack; after controlling the first palletizer to move the fully charged battery from the battery compartment to the first cache rack, the first mobile battery exchange device is controlled to install the fully charged battery from the first cache rack to the battery exchange vehicle.
[0155] That is, the mobile battery exchange device can be controlled to remove the low-charged battery from the battery exchange vehicle to the cache rack first, and then the first palletizer can be controlled to move the low-charged battery from the cache rack to the battery compartment and the second palletizer can be controlled to move the fully-charged battery from the battery compartment to the cache rack. After the fully-charged battery is placed on the cache rack, the mobile battery exchange device is controlled to install the fully-charged battery from the cache rack to the battery exchange vehicle.
[0156] Through a mobile battery exchange device, a cache rack and two palletizers, it is possible to move low-charged batteries from the cache rack to the battery compartment and fully-charged batteries from the battery compartment to the cache rack in parallel, thereby reducing the investment cost of the battery exchange station and shortening the battery exchange time.
[0157] Figure 7 A flow chart of the battery replacement method provided in an embodiment of the present application.
[0158] 710, obtaining the battery swapping demand information of the battery swapping vehicle.
[0159] 720. Determine the first-time information based on the battery replacement demand information.
[0160] The battery swap demand information includes information on the second time, and the second time information is the time information when the battery swap vehicle is expected to arrive at the battery swap platform in the battery swap station. The first time is earlier than the second time.
[0161] 730, control the first mobile battery exchange device to move to the battery exchange platform at the first time to move the depleted battery of the battery exchange vehicle to the battery compartment.
[0162] Usually, after the vehicle is positioned on the battery swap platform, the mobile battery swap device starts to move toward the battery swap vehicle. In the embodiment of the present application, before the vehicle reaches the battery swap platform, the first mobile battery swap device can move toward the battery swap platform.
[0163] Therefore, in this embodiment, the first mobile battery swap device can be controlled to move toward the battery swap platform in advance, which can reduce the waiting time between the battery swap vehicle arriving at the battery swap platform and starting to disassemble the battery, thereby reducing the overall battery swap time, improving the operating efficiency and battery utilization of the battery swap station, and improving user experience.
[0164] Optionally, in this embodiment, the information of the first time can be determined based on the battery exchange demand information and the information of the first duration, wherein the information of the first duration is the time required for the first mobile battery exchange device to move from an initial position to the battery exchange platform, and the first time is earlier than or equal to the second time minus the first duration.
[0165] That is, before the battery swap vehicle arrives at the battery swap platform, the first mobile battery swap device has already arrived at the battery swap platform. When the battery swap vehicle arrives at the battery swap platform, the first mobile battery swap device can also promptly remove the depleted battery of the battery swap vehicle, reduce the battery swap time of the battery swap vehicle, improve the operating efficiency of the battery swap station, and enhance the user experience.
[0166] 740. While controlling the first battery exchange component to move the depleted battery to the battery compartment, controlling the second battery exchange component to install the fully charged battery in the battery compartment into the battery exchange vehicle.
[0167] The content of step 740 can refer to the relevant description above, and this application will not elaborate on it here.
[0168] In some embodiments of the present application, scheduled battery replacement information of a battery replacement vehicle can be obtained, and the scheduled battery replacement information includes scheduled battery replacement time information of the battery replacement vehicle; based on the scheduled battery replacement time information, information of the second time is determined.
[0169] The estimated time for the battery swap vehicle to arrive at the battery swap platform can be determined based on the information of the scheduled battery swap time of the battery swap vehicle. For example, the estimated time for the battery swap vehicle to arrive at the battery swap platform can be determined based on the information of the scheduled battery swap time, road condition information (such as distance information, time required for the journey), etc.
[0170] The embodiment of the present application can determine the estimated time for the battery swap vehicle to reach the battery swap platform based on the information of the scheduled battery swap time, so that the first mobile battery swap device can be moved to the battery swap platform in advance, reducing the battery swap time of the battery swap vehicle, improving the operating efficiency of the battery swap station, and enhancing the user experience.
[0171] In some embodiments of the present application, information about vehicles waiting to be replaced that are queued in front of a battery swapping vehicle in a battery swapping station may be obtained, the information about the vehicles waiting to be replaced including the number of vehicles waiting to be replaced; based on the information about the vehicles waiting to be replaced, information about the second time may be determined.
[0172] For example, the number of vehicles waiting to be replaced in the battery replacement channel can be determined by the number of vehicles entering the battery replacement channel of the battery replacement station. The time when a certain vehicle arrives at the battery replacement platform can be determined based on the number of vehicles waiting to be replaced before the vehicle.
[0173] The battery swapping solution provided in the embodiment of the present application can accurately determine the time when the battery swapping vehicle reaches the battery swapping platform according to the number of vehicles waiting to be swapped queued in front of the battery swapping vehicle, so as to control the first mobile battery swapping device to move toward the battery swapping platform in advance and reasonably, thereby reducing the battery swapping time of the battery swapping vehicle and improving the operating efficiency of the battery swapping station.
[0174] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0175] The above describes in detail the battery replacement method of the embodiment of the present application. Figure 8 and Fig. 9 The battery replacement device of the embodiment of the present application is described in detail, and the technical features described in the method embodiment are applicable to the following device embodiments. It should be understood that the description of the method side embodiment corresponds to the description of the device embodiment, so the parts not described in detail can refer to the description above.
[0176] Figure 8 is a schematic block diagram of a battery replacement device provided in an embodiment of the present application. Figure 8 As shown, the device 3000 includes an acquisition unit 3010 and a processing unit 3020. The acquisition unit 3010 can acquire data, and the processing unit 3020 is used to process the data.
[0177] An acquisition unit 3010 is used to acquire battery swap demand information of a battery swap vehicle;
[0178] The processing unit 3020 is used to control the first battery exchange component to move the depleted battery in the battery exchange vehicle to the battery compartment according to the battery exchange demand information; and, in the process of controlling the first battery exchange component to move the depleted battery to the battery compartment, control the second battery exchange component to install the fully charged battery in the battery compartment into the battery exchange vehicle.
[0179] In some embodiments of the present application, the first battery exchange component includes: a first mobile battery exchange device and a first stacker, the second battery exchange component includes: a second mobile battery exchange device and a second stacker, and a first cache rack and a second cache rack are arranged between the battery compartment and the battery exchange vehicle; the first mobile battery exchange device is used to move depleted batteries between the first cache rack and the battery exchange vehicle, and the first stacker is used to move depleted batteries between the first cache rack and the battery compartment; the second mobile battery exchange device is used to move fully charged batteries between the second cache rack and the battery exchange vehicle, and the second stacker is used to move fully charged batteries between the second cache rack and the battery compartment.
[0180] In some embodiments of the present application, the processing unit 3020 is used to: while controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, control the second mobile battery exchange device to install the fully charged battery from the second cache rack into the battery exchange vehicle.
[0181] In some embodiments of the present application, the processing unit 3020 is used to: while controlling the first mobile battery exchange device to remove the depleted battery of the battery exchange vehicle, control the second mobile battery exchange device to move the fully charged battery from the second cache rack to the vicinity of the battery exchange vehicle.
[0182] In some embodiments of the present application, the first palletizer and the second palletizer are the same palletizer, and the processing unit 3020 is also used to: before controlling the second mobile battery exchange device to install the fully charged battery from the second cache rack to the battery exchange vehicle, control the first palletizer to move the fully charged battery from the battery compartment to the second cache rack; and after controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, control the first palletizer to move the depleted battery from the first cache rack to the battery compartment.
[0183] In some embodiments of the present application, the first palletizer and the second palletizer are the same palletizer, the first cache rack and the second cache rack are the same cache rack, and the processing unit 3020 is also used to: before controlling the first mobile battery exchange device to move from the battery exchange vehicle to the first cache rack, control the first palletizer to move the fully charged battery from the battery compartment to the first cache rack and place the fully charged battery on the first cache rack; in the process of controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, control the second mobile battery exchange device to install the fully charged battery from the first cache rack into the battery exchange vehicle; after controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, control the first palletizer to move the depleted battery from the first cache rack to the battery compartment.
[0184] In some embodiments of the present application, the processing unit 3020 is used to: while controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, control the second palletizer to move the fully charged battery from the battery compartment to the second cache rack.
[0185] In some embodiments of the present application, the processing unit 3020 is used to: while controlling the first palletizer to move the depleted battery from the first cache rack to the battery compartment, control the second mobile battery exchange device to install the fully charged battery from the second cache rack to the battery exchange vehicle.
[0186] In some embodiments of the present application, the first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device.
[0187] In some embodiments of the present application, the first palletizer and the second palletizer are the same palletizer.
[0188] In some embodiments of the present application, the processing unit 3020 is used to: control the second palletizer to move fully charged batteries from the battery compartment to the second cache rack while controlling the first palletizer to move depleted batteries from the first cache rack to the battery compartment.
[0189] In some embodiments of the present application, the first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device, and the processing unit 3020 is also used to: before controlling the first palletizer to move the depleted battery from the first cache rack to the battery compartment, control the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack; and after controlling the second palletizer to move the fully charged battery from the battery compartment to the second cache rack, control the first mobile battery exchange device to install the fully charged battery from the second cache rack to the battery exchange vehicle.
[0190] In some embodiments of the present application, the first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device, the first cache rack and the second cache rack are the same cache rack, and the processing unit 3020 is used to: before controlling the first palletizer to move the deflated battery from the first cache rack to the battery compartment, control the first mobile battery exchange device to move the deflated battery from the battery exchange vehicle to the first cache rack; in the process of controlling the first palletizer to move the deflated battery from the first cache rack to the battery compartment, control the first palletizer to move the fully charged battery from the battery compartment to the first cache rack; after controlling the first palletizer to move the fully charged battery from the battery compartment to the first cache rack, control the first mobile battery exchange device to install the fully charged battery from the first cache rack to the battery exchange vehicle.
[0191] In some embodiments of the present application, the processing unit 3020 is used to: determine information of the first time based on the battery swapping demand information, the battery swapping demand information includes information of the second time, the second time information is the time information when the battery swapping vehicle is expected to arrive at the battery swapping platform in the battery swapping station, and the first time is earlier than the second time; control the first mobile battery swapping device to move to the battery swapping platform at the first time.
[0192] In some embodiments of the present application, the processing unit 3020 is used to: determine the information of the first time based on the battery exchange demand information and the information of the first duration, wherein the information of the first duration is the time required for the first mobile battery exchange device to move from an initial position to the battery exchange platform, and the first time is earlier than or equal to the second time minus the first duration.
[0193] In some embodiments of the present application, the acquisition unit 3010 is used to obtain the scheduled battery replacement information of the battery replacement vehicle, and the scheduled battery replacement information includes the scheduled battery replacement time information of the battery replacement vehicle; the processing unit 3020 is used to determine the information of the second time based on the scheduled battery replacement time information.
[0194] In some embodiments of the present application, the acquisition unit 3010 is used to obtain information about vehicles to be replaced that are queued in front of the battery swapping vehicle in the battery swapping station, and the information about the vehicles to be replaced includes the number of vehicles to be replaced; the processing unit 3020 is used to determine the information of the second time based on the information of the vehicles to be replaced.
[0195] It should be understood that the above and other operations and / or functions of each module in the battery replacement device 3000 are to achieve Figures 3 to 7 For the sake of brevity, the corresponding processes in each method are not repeated here.
[0196] Fig. 9 FIG. 4 is a schematic block diagram of a battery replacement device 4000 according to an embodiment of the present application. Fig. 9As shown, the control device 4000 includes a processor 4010 and a memory 4020, wherein the memory 4020 is used to store instructions, and the processor 4010 is used to read the instructions and execute the methods of the various embodiments of the present application based on the instructions.
[0197] The memory 4020 may be a separate device independent of the processor 4010 , or may be integrated into the processor 4010 .
[0198] Alternatively, if Fig. 9 As shown, the control device 4000 of the energy storage system may further include a transceiver 4030, and the processor 4010 may control the transceiver 4030 to communicate with other devices. Specifically, information or data may be sent to other devices, or information or data sent by other devices may be received.
[0199] It should be understood that the processor of the embodiment of the present application may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method embodiment can be completed by the hardware integrated logic circuit or software instructions in the processor. The above processor can be a general processor, a digital signal processor (digital signal processor, DSP), an application specific integrated circuit (application specific integrated circuit, ASIC), a field programmable gate array (field programmable gate array, FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The methods, steps and logic block diagrams disclosed in the embodiments of the present application can be implemented or executed. The general processor can be a microprocessor or the processor can also be any conventional processor. The steps of the method disclosed in the embodiment of the present application can be directly embodied as a hardware decoding processor to perform, or the hardware and software modules in the decoding processor can be combined to perform. The software module can be located in a mature storage medium in the field such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory, and the processor reads the information in the memory and completes the steps of the above method in combination with its hardware.
[0200] It can be understood that the memory in the embodiments of the present application can be a volatile memory or a non-volatile memory, or can include both volatile and non-volatile memories. Among them, the non-volatile memory can be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory can be a random access memory (RAM), which is used as an external cache. By way of example and not limitation, many forms of RAM are available, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDR SDRAM), enhanced SDRAM (ESDRAM), synchronous link DRAM (SLDRAM), and direct RAM (DR RAM). It should be noted that the memory of the systems and methods described herein is intended to include, but is not limited to, these and any other suitable types of memory.
[0201] Optionally, an embodiment of the present application further provides a battery swap station, which includes the device provided in the embodiment of the present application.
[0202] An embodiment of the present application also provides a computer-readable storage medium for storing a computer program.
[0203] Optionally, the computer-readable storage medium can be applied to the battery replacement device in the embodiments of the present application, and when the computer program runs on the computer, it enables the computer to execute the corresponding processes implemented by the device in the various methods of the embodiments of the present application. For the sake of brevity, they will not be repeated here.
[0204] An embodiment of the present application also provides a computer program product, including computer program instructions.
[0205] Optionally, the computer program product can be applied to the battery replacement device in the embodiments of the present application, and when the computer program instructions are run on a computer, the computer executes the corresponding processes implemented by the battery replacement device in the various methods of the embodiments of the present application. For the sake of brevity, they will not be repeated here.
[0206] The embodiment of the present application also provides a computer program.
[0207] Optionally, the computer program can be applied to the battery replacement device in the embodiments of the present application. When the computer program runs on a computer, the computer executes the corresponding processes implemented by the battery replacement device in the various methods of the embodiments of the present application. For the sake of brevity, they will not be repeated here.
[0208] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0209] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0210] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are merely schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. In addition, the mutual coupling or direct coupling or communication connection involved in the embodiments of the present application can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0211] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0212] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0213] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as USB flash drives, mobile hard drives, ROM, RAM, magnetic disks, or optical disks.
[0214] Although the present application has been described with reference to preferred embodiments, various modifications may be made thereto and parts thereof may be replaced with equivalents without departing from the scope of the present application. In particular, the various technical features mentioned in the various embodiments may be combined in any manner as long as there are no structural conflicts. The present application is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
Claims
1. A method for replacing a battery, characterized in that: The method comprises: Obtaining battery swap demand information of battery swap vehicles; According to the battery replacement demand information, control the first battery replacement component to move the low-power battery in the battery replacement vehicle to the battery compartment; and While controlling the first battery exchange component to move the depleted battery to the battery compartment, controlling the second battery exchange component to install the fully charged battery in the battery compartment into the battery exchange vehicle.
2. The method according to claim 1, characterized in that The first battery exchange assembly includes: a first mobile battery exchange device and a first palletizer, the second battery exchange assembly includes: a second mobile battery exchange device and a second palletizer, and a first cache rack and a second cache rack are provided between the battery compartment and the battery exchange vehicle; The first mobile battery exchange device is used to move the low-power battery between the first cache rack and the battery exchange vehicle, and the first palletizer is used to move the low-power battery between the first cache rack and the battery compartment; The second mobile battery exchange device is used to move the fully charged battery between the second cache rack and the battery exchange vehicle, and the second palletizer is used to move the fully charged battery between the second cache rack and the battery compartment.
3. The method according to claim 2, characterized in that In the process of controlling the first battery exchange component to move the low-power battery to the battery compartment, controlling the second battery exchange component to install the fully-charged battery in the battery compartment to the battery exchange vehicle includes: During the process of controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, the second mobile battery exchange device is controlled to install the fully charged battery from the second cache rack to the battery exchange vehicle.
4. The method according to claim 3, characterized in that In the process of controlling the first mobile battery swapping device to move the low-charge battery from the battery swapping vehicle to the first cache rack, controlling the second mobile battery swapping device to install the fully-charged battery from the second cache rack to the battery swapping vehicle comprises: During the process of controlling the first mobile battery-exchange device to remove the depleted battery of the battery-exchange vehicle, the second mobile battery-exchange device is controlled to move the fully-charged battery from the second cache rack to the vicinity of the battery-exchange vehicle.
5. The method according to claim 3 or 4, characterized in that: The first palletizer and the second palletizer are the same palletizer, and the method further comprises: Before controlling the second mobile battery exchange device to install the fully charged battery from the second cache rack to the battery exchange vehicle, controlling the first palletizer to move the fully charged battery from the battery compartment to the second cache rack; and, After controlling the first mobile battery exchange device to move the deficient battery from the battery exchange vehicle to the first cache rack, controlling the first palletizer to move the deficient battery from the first cache rack to the battery compartment.
6. The method according to claim 3 or 4, characterized in that: The first palletizer and the second palletizer are the same palletizer, the first cache rack and the second cache rack are the same cache rack, and the method further comprises: Before controlling the first mobile battery exchange device to move the low-charge battery from the battery exchange vehicle to the first cache rack, controlling the first palletizer to place the fully-charged battery on the first cache rack; In the process of controlling the first mobile battery swapping device to move the low-charge battery from the battery swapping vehicle to the first cache rack, controlling the second mobile battery swapping device to install the fully-charged battery from the second cache rack to the battery swapping vehicle includes: In the process of controlling the first mobile battery exchange device to move the low-charge battery from the battery exchange vehicle to the first cache rack, controlling the second mobile battery exchange device to install the fully-charged battery from the first cache rack to the battery exchange vehicle; The method further comprises: After controlling the first mobile battery exchange device to move the deficient battery from the battery exchange vehicle to the first cache rack, controlling the first palletizer to move the deficient battery from the first cache rack to the battery compartment.
7. The method according to claim 2, characterized in that In the process of controlling the first battery exchange component to move the low-power battery to the battery compartment, controlling the second battery exchange component to install the fully-charged battery in the battery compartment to the battery exchange vehicle includes: During the process of controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, the second palletizer is controlled to move the fully charged battery from the battery compartment to the second cache rack.
8. The method according to claim 7, characterized in that In the process of controlling the first battery exchange component to move the low-power battery to the battery compartment, controlling the second battery exchange component to install the fully-charged battery in the battery compartment to the battery exchange vehicle includes: While controlling the first palletizer to move the low-charged battery from the first cache rack to the battery compartment, controlling the second mobile battery exchange device to install the fully-charged battery from the second cache rack to the battery exchange vehicle.
9. The method according to claim 7 or 8, characterized in that: The first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device.
10. The method according to claim 8 or 9, characterized in that: The first palletizer and the second palletizer are the same palletizer.
11. The method according to claim 2, characterized in that In the process of controlling the first battery exchange component to move the low-power battery to the battery compartment, controlling the second battery exchange component to install the fully-charged battery in the battery compartment to the battery exchange vehicle includes: In the process of controlling the first palletizer to move the low-charged battery from the first cache rack to the battery compartment, the second palletizer is controlled to move the fully-charged battery from the battery compartment to the second cache rack.
12. The method according to claim 11, characterized in that The first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device, The method comprises: Before controlling the first palletizer to move the low-power battery from the first cache rack to the battery compartment, controlling the first mobile battery exchange device to move the low-power battery from the battery exchange vehicle to the first cache rack; and, After controlling the second palletizer to move the fully-charged battery from the battery compartment to the second cache rack, controlling the first mobile battery exchange device to install the fully-charged battery from the second cache rack to the battery exchange vehicle.
13. The method according to claim 11, characterized in that The first mobile battery swap device and the second mobile battery swap device are the same mobile battery swap device, the first cache rack and the second cache rack are the same cache rack, The method comprises: Before controlling the first palletizer to move the low-power battery from the first cache rack to the battery compartment, controlling the first mobile battery exchange device to move the low-power battery from the battery exchange vehicle to the first cache rack; In the process of controlling the first palletizer to move the low-charged battery from the first cache rack to the battery compartment, controlling the second palletizer to move the fully-charged battery from the battery compartment to the second cache rack includes: In the process of controlling the first palletizer to move the low-charged battery from the first cache rack to the battery compartment, controlling the first palletizer to move the fully-charged battery from the battery compartment to the first cache rack; The method comprises: After controlling the first palletizer to move the fully-charged battery from the battery compartment to the first cache rack, controlling the first mobile battery exchange device to install the fully-charged battery from the first cache rack to the battery exchange vehicle.
14. The method according to any one of claims 2 to 13, characterized in that According to the battery replacement demand information, controlling the first battery replacement component to move the low-power battery in the battery replacement vehicle to the battery compartment includes: Determine information of a first time according to the battery swap demand information, wherein the battery swap demand information includes information of a second time, wherein the second time information is time information of when the battery swap vehicle is expected to arrive at the battery swap platform in the battery swap station, and the first time is earlier than the second time; Control the first mobile battery exchange device to move toward the battery exchange platform at the first time to move the depleted battery to the battery compartment.
15. The method according to claim 14, characterized in that The determining of the first time information according to the battery replacement demand information includes: Based on the battery exchange demand information and the first duration information, determine the first time information, wherein the first duration information is the time required for the first mobile battery exchange device to move from an initial position to the battery exchange platform, and the first time is earlier than or equal to the second time minus the first duration.
16. The method according to claim 14 or 15, characterized in that The method further comprises: Acquire the scheduled battery replacement information of the battery replacement vehicle, wherein the scheduled battery replacement information includes the scheduled battery replacement time information of the battery replacement vehicle; The information of the second time is determined according to the scheduled battery replacement time information.
17. The method according to claim 14 or 15, characterized in that The method further comprises: Acquire information of vehicles to be replaced that are queued in front of the battery replacement vehicle in the battery replacement station, wherein the information of the vehicles to be replaced includes the number of the vehicles to be replaced; The information of the second time is determined based on the information of the vehicle to be replaced.
18. A battery replacement device, characterized in that: The device comprises: An acquisition unit, used to acquire battery replacement demand information of a battery replacement vehicle; a processing unit, configured to control the first battery swap component to move the depleted battery in the battery swap vehicle to the battery compartment according to the battery swap demand information; and While controlling the first battery exchange component to move the depleted battery to the battery compartment, controlling the second battery exchange component to install the fully charged battery in the battery compartment into the battery exchange vehicle.
19. The device according to claim 18, characterized in that The first battery exchange assembly includes: a first mobile battery exchange device and a first palletizer, the second battery exchange assembly includes: a second mobile battery exchange device and a second palletizer, and a first cache rack and a second cache rack are provided between the battery compartment and the battery exchange vehicle; The first mobile battery exchange device is used to move the low-power battery between the first cache rack and the battery exchange vehicle, and the first palletizer is used to move the low-power battery between the first cache rack and the battery compartment; The second mobile battery exchange device is used to move the fully charged battery between the second cache rack and the battery exchange vehicle, and the second palletizer is used to move the fully charged battery between the second cache rack and the battery compartment.
20. The device according to claim 19, characterized in that The processing unit is used for: During the process of controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, the second mobile battery exchange device is controlled to install the fully charged battery from the second cache rack into the battery exchange vehicle.
21. The device according to claim 20, characterized in that The processing unit is used for: During the process of controlling the first mobile battery-exchange device to remove the depleted battery of the battery-exchange vehicle, the second mobile battery-exchange device is controlled to move the fully-charged battery from the second cache rack to the vicinity of the battery-exchange vehicle.
22. The device according to claim 20 or 21, characterized in that The first palletizer and the second palletizer are the same palletizer, The processing unit is also used for: Before controlling the second mobile battery exchange device to install the fully charged battery from the second cache rack to the battery exchange vehicle, controlling the first palletizer to move the fully charged battery from the battery compartment to the second cache rack; and, After controlling the first mobile battery exchange device to move the deficient battery from the battery exchange vehicle to the first cache rack, controlling the first palletizer to move the deficient battery from the first cache rack to the battery compartment.
23. The device according to claim 20 or 21, characterized in that The first palletizer and the second palletizer are the same palletizer, the first cache rack and the second cache rack are the same cache rack, The processing unit is also used for: Before controlling the first mobile battery exchange device to move from the battery exchange vehicle to the first cache rack, controlling the first palletizer to move the fully charged battery from the battery compartment to the first cache rack and placing the fully charged battery on the first cache rack; In the process of controlling the first mobile battery exchange device to move the low-charge battery from the battery exchange vehicle to the first cache rack, controlling the second mobile battery exchange device to install the fully-charged battery from the first cache rack into the battery exchange vehicle; After controlling the first mobile battery exchange device to move the deficient battery from the battery exchange vehicle to the first cache rack, controlling the first palletizer to move the deficient battery from the first cache rack to the battery compartment.
24. The device according to claim 18, characterized in that The processing unit is used for: During the process of controlling the first mobile battery exchange device to move the depleted battery from the battery exchange vehicle to the first cache rack, the second palletizer is controlled to move the fully charged battery from the battery compartment to the second cache rack.
25. The device according to claim 24, characterized in that The processing unit is used for: While controlling the first palletizer to move the low-charge battery from the first cache rack to the battery compartment, controlling the second mobile battery exchange device to install the fully-charged battery from the second cache rack to the battery exchange vehicle.
26. The device according to claim 24 or 25, characterized in that The first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device.
27. The device according to claim 25 or 26, characterized in that The first palletizer and the second palletizer are the same palletizer.
28. The device according to claim 19, characterized in that The processing unit is used for: In the process of controlling the first palletizer to move the low-charged battery from the first cache rack to the battery compartment, controlling the second palletizer to move the fully-charged battery from the battery compartment to the second cache rack.
29. The device according to claim 28, characterized in that The first mobile battery exchange device and the second mobile battery exchange device are the same mobile battery exchange device, The processing unit is also used for: Before controlling the first palletizer to move the low-power battery from the first cache rack to the battery compartment, controlling the first mobile battery exchange device to move the low-power battery from the battery exchange vehicle to the first cache rack; as well as, After controlling the second palletizer to move the fully-charged battery from the battery compartment to the second cache rack, controlling the first mobile battery exchange device to install the fully-charged battery from the second cache rack to the battery exchange vehicle.
30. The device according to claim 28, characterized in that The first mobile battery swap device and the second mobile battery swap device are the same mobile battery swap device, the first cache rack and the second cache rack are the same cache rack, and the processing unit is used for: Before controlling the first palletizer to move the low-power battery from the first cache rack to the battery compartment, controlling the first mobile battery exchange device to move the low-power battery from the battery exchange vehicle to the first cache rack; In the process of controlling the first palletizer to move the low-charged battery from the first cache rack to the battery compartment, controlling the first palletizer to move the fully-charged battery from the battery compartment to the first cache rack; After controlling the first palletizer to move the fully-charged battery from the battery compartment to the first cache rack, controlling the first mobile battery exchange device to install the fully-charged battery from the first cache rack to the battery exchange vehicle.
31. The device according to any one of claims 19 to 30, characterized in that The processing unit is used for: Determine information of a first time according to the battery swap demand information, wherein the battery swap demand information includes information of a second time, wherein the second time information is time information of when the battery swap vehicle is expected to arrive at the battery swap platform in the battery swap station, and the first time is earlier than the second time; Control the first mobile battery exchange device to move toward the battery exchange platform at the first time.
32. The device according to claim 31, characterized in that The processing unit is used for: Based on the battery exchange demand information and the first duration information, determine the first time information, wherein the first duration information is the time required for the first mobile battery exchange device to move from an initial position to the battery exchange platform, and the first time is earlier than or equal to the second time minus the first duration.
33. The device according to claim 31 or 32, characterized in that The acquisition unit is used to acquire the scheduled battery replacement information of the battery replacement vehicle, wherein the scheduled battery replacement information includes the scheduled battery replacement time information of the battery replacement vehicle; The processing unit is used to determine the information of the second time based on the scheduled battery replacement time information.
34. The device according to claim 31 or 32, characterized in that The acquisition unit is used to acquire information of vehicles to be replaced that are queued in front of the battery replacement vehicle in the battery replacement station, and the information of the vehicles to be replaced includes the number information of the vehicles to be replaced; The processing unit is used to determine the information of the second time based on the information of the vehicle to be replaced.
35. A battery replacement device, characterized in that: The device comprises a memory and a processor, wherein the memory is used to store instructions, and the processor is used to read the instructions and execute the method according to any one of claims 1 to 17 according to the instructions.
36. A battery swap station, characterized in that: The battery swap station comprises the device according to any one of claims 18 to 35.
37. A chip, characterized in that: It comprises: a processor, configured to call and run a computer program from a memory, so that a device equipped with the chip executes the method according to any one of claims 1 to 17.
38. A computer-readable storage medium, characterized in that: The computer-readable storage medium is used to store a computer program, and when the computer program is executed by a computer, the computer implements the method according to any one of claims 1 to 17.
Citation Information
Patent Citations
Battery replacing system, battery replacing method and battery replacing station
CN111301357A
Battery replacing station control method
CN113547951A
Battery swap station service management system and method
CN113570094A
Battery temporary storage device for battery swap station and battery swap station
CN114590165A
Battery swap station drainage method and device, storage medium and electronic equipment
CN115320451A
Cited By
Battery replacing method and device based on battery appearance identification and battery replacing authorization
CN121224511A
