Garbage truck capable of feeding through turning barrel and swing arm
By designing a hanging barrel and swing arm device on the garbage truck coexist, and using the side arm and swing arm cylinder to flip the garbage bucket, the problems of poor adaptability and garbage leakage in the existing technology are solved, and the optimal Placeholder layout and stability.
Patent Information
- Application Number
- CN202411331859.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2024-12-06
AI Technical Summary
When the existing rear-mounted compression garbage truck is equipped with hanging buckets and swing arm collection devices, the limitations between the devices make it impossible to achieve the optimal placeholding design, poor adaptability, and the position of the garbage bucket support of the swing arm device leads to garbage dispersion. Leaked problem.
A garbage truck for turning the bucket and swing arm feeding is designed. The hanging bucket collection device coexists with the swing arm device. The swing arm device includes a side arm, swing arm cylinder and a bucket lifting chain. The garbage bucket support is arranged inside the side arm, and through The swing arm cylinder drives the side arm to lift and complete the trash bucket flip, and complete the trash can flip through the hanging bucket collection device, which helps the support feet increase vehicle stability.
The optimal layout of each device is achieved, which avoids garbage leakage, improves the stability and adaptability of the garbage truck, and meets the collection needs of different garbage containers.
Smart Images

Figure CN119079343A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of sanitation machinery and equipment, and in particular to a garbage truck with a bucket-turning and swing-arm loading function. Background Art
[0002] With the continuous development of society, the demand for rear-loading compression vehicles is also increasing. At present, there are three main types of rear-loading compression garbage trucks on the market: hanging bucket, hopper and swing arm. Different types of garbage trucks correspond to different garbage collection methods. Since the collecting devices are fixed at the rear of the vehicle, and two collecting devices are arranged at the rear of a vehicle at the same time, it is difficult to achieve the optimal space design for the two devices. There are inevitable defects in each collecting device. For example, the swing arm requires a larger space for movement, thereby reducing the space occupied by the hanging bucket collecting device, so that the hanging bucket collecting device has poor adaptability and can only be used for smaller hanging buckets. For another example, the garbage bucket installed on the swing arm is too large and needs support to ensure normal unloading. The reserved support position also greatly reduces the space occupied by the hanging bucket collecting device. The support of the hopper is at the lower position of the rear end of the vehicle. Due to the size limitation of the support and its external position, when collecting garbage in the garbage hopper and collecting garbage in barrels by the turning barrel device, there will be garbage leakage from the support position.
[0003] The existing rear-loading compression garbage trucks are restricted in their structures, unable to achieve maximum utilization of each device, and have relatively poor adaptability. Summary of the invention
[0004] The purpose of the present application is to provide a garbage truck with a tipping bucket and swing arm loading function, wherein the garbage truck is provided with a hanging bucket collection device and a swing arm device for different garbage collection methods, and a garbage bucket support is arranged on the inner side of the side arm, which will not limit the arrangement of the hanging bucket collection device and will not reduce the loader hopper volume.
[0005] In order to solve the above technical problems, the following technical solutions are adopted: The present application provides a garbage truck with a bucket-turning and swing-arm loading function, comprising a front part and a box body, a loading mechanism being provided at the rear end of the box body, a bucket-hanging collection device and a swing-arm device being provided on the loading mechanism, the bucket-hanging collection device being used to install and turn over a garbage bucket, and the swing-arm device being used to install and turn over a garbage bucket; The swing arm device comprises a side arm, a swing arm oil cylinder and a bucket lifting chain. The side arm is provided with the bucket lifting chain, the bucket lifting chain is used to connect with the garbage bucket, and the swing arm oil cylinder is used to drive the side arm to rise and fall, so as to realize the swing arm action of the side arm to complete the flipping of the garbage bucket; A garbage bucket support docking with the garbage bucket is provided on the inner side of the side arm, and the garbage bucket support is used to support the bottom of the garbage bucket when the garbage bucket is unloading.
[0006] Optionally, the bucket hanging collection device includes a bucket hanging cylinder, a bucket hanging arm and a bucket hanging platform. The bucket hanging cylinders are installed in pairs on both side surfaces of the filling mechanism close to the bottom. The bucket hanging arms are connected to the bucket hanging cylinders. A bucket hanging platform is installed between the bucket hanging arms on both side surfaces. The bucket hanging platform is used to install a trash can.
[0007] Optionally, the side arms and swing arm cylinders are installed in pairs on both sides of the loading mechanism, and two bucket chains are installed at the end of each side arm.
[0008] Optionally, a connecting rod is provided between the side arms on both sides of the loading mechanism, and the connecting rod is installed on one end of the side arm where the bucket chain is provided.
[0009] Optionally, a swing arm base is provided at the lower end of the loading mechanism, one end of the side arm is mounted on the swing arm base, the other end is mounted with the bucket lifting chain, and the hanging bucket collecting device is mounted below the swing arm base.
[0010] Optionally, the fixed end of the swing arm cylinder is installed on the loading mechanism, and the telescopic end is installed on the side arm.
[0011] Optionally, an auxiliary support foot is provided between the loading mechanism and the rear wheel of the box body, and the auxiliary support foot is used to support the ground when the swing arm device is in operation.
[0012] Optionally, a detachable locking ring is provided on the bucket lifting chain, and the locking ring is used for installing the garbage bucket.
[0013] Compared with the prior art, the present invention has the following beneficial effects: 1. The rear part of the garbage truck body of the present invention is provided with a hanging bucket collection device and a swing arm device. The swing arm device includes a side arm, a swing arm cylinder and a bucket lifting chain. The side arm is driven to rise and fall by the swing arm cylinder to complete the flipping of the garbage bucket on the bucket lifting chain. The garbage bucket is flipped by the hanging bucket collection device to achieve the collection of different garbage containers. By arranging the garbage bucket support on the inner side of the side arm, it will not affect the installation of the hanging bucket collection device, nor will it reduce the bucket volume of the filling mechanism. When the garbage bucket is unloaded, garbage will not leak outside the car body. The overall structural layout of the present invention is reasonable, and the optimal layout of each device is achieved.
[0014] 2. The garbage truck of the present invention is also provided with auxiliary legs. When the swing arm device is in operation, the auxiliary legs are used for support, thereby increasing the stability of the garbage truck. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall structure of a garbage truck with a bucket tipping and swing arm loading in one embodiment of the present application; Figure 2It is a schematic diagram of the rear view structure of a garbage truck with a bucket tipping and swing arm loading in one embodiment of the present application; Figure 3 This is a schematic diagram of garbage bin loading of a garbage truck with a bucket tipping and swing arm loading in one embodiment of the present application; Figure 4 It is a schematic diagram of the garbage bucket loading of a garbage truck with a tipping bucket and swing arm loading in one embodiment of the present application.
[0016] Description of reference numerals: 1. Bucket collection device; 2. Swing arm base; 3. Side arm; 4. Swing arm cylinder; 5. Bucket lifting chain; 6. Loading mechanism; 7. Auxiliary support legs; 8. Box body; 9. Garbage bucket support; 10. Locking ring; 11. Connecting rod; 12. Bucket cylinder; 13. Bucket arm; 14. Bucket platform; 15. Garbage bucket; 16. Garbage bucket. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present application and its application or use. Example 1
[0018] like Figure 1-Figure 4 As shown, this embodiment provides a garbage truck with bucket flipping and swing arm loading, including a front end and a box body 8, a loading mechanism 6 is provided at the rear end of the box body 8, a bucket hanging collection device 1 and a swing arm device are provided on the loading mechanism 6, the bucket hanging collection device 1 is used to install and flip the garbage can 13, and the swing arm device is used to install and flip the garbage bucket 16; the bucket hanging collection device 1 is installed at the lower end of the loading mechanism 6.
[0019] The swing arm device includes a side arm 3, a swing arm oil cylinder 4 and a bucket chain 5. The side arm 3 is provided with the bucket chain 5, and the bucket chain 5 is used to connect with the garbage bucket 16. The swing arm oil cylinder 4 is used to drive the side arm 3 to rise and fall, so as to realize the swing arm action of the side arm 3 to flip the garbage bucket 16. The side arm 3 rotates around the connection point fixed on the filling mechanism 6, thereby driving the other end to rise and fall, and the bucket chain at the other end is connected with the garbage bucket 16.
[0020] A garbage bucket support 9 connected to the garbage bucket 16 is provided on the inner side of the side arm 3, and the garbage bucket support 9 is used to support the bottom of the garbage bucket 16 when the garbage bucket 16 is unloading.
[0021] When the hanging bucket collecting device 1 is in use, the side arm 3 of the swing arm device is raised to the highest point and completely retracted, and the side arm 3 is close to the side of the filling mechanism 6. The hanging bucket collecting device 1 will not interfere with the side arm 3 during the process of turning over the garbage bin 13. When the swing arm device is working, the hanging bucket collecting device is at the lowest point. When the side arm 3 is at the lowest point, the lifting and turning of the garbage bucket 16 will not contact the hanging bucket collecting device. The garbage bucket 16 is fixedly connected by the bucket lifting chain 5, and then the swing arm cylinder 4 drives the side arm 3 to rise. When the garbage bucket 16 rises to a certain height, the garbage bucket 16 is close to both sides of one end of the filling mechanism The corners are in contact with the garbage bucket support 9 on the inner side of the side arm 3. Since the garbage bucket support 9 is arranged on the inner side of the side arm 3, during the flipping of the side arm 3, the garbage bucket 16 will move forward together with the side arm 3, and the garbage will not leak out of the area outside the garbage truck. The two side edges of the garbage bucket 16 stop rising due to the restriction of the garbage bucket support 9, and after the side arm 3 continues to rise, the other end of the garbage bucket 16 continues to rise, and the end limited by the garbage bucket support 9 is in a lower position, thereby realizing the flipping of the garbage bucket 16 at an angle, and the garbage in the garbage bucket 16 falls into the filling mechanism 6, completing the unloading of the garbage in the garbage bucket 16. Example 2
[0022] This embodiment provides a technical solution based on Embodiment 1, and is different from Embodiment 1 in that: the hanging bucket collection device includes a hanging bucket cylinder 12, a hanging bucket arm 13 and a hanging bucket platform 14, the hanging bucket cylinder 12 is installed in pairs on the lower two side surfaces of the filling mechanism 6, the fixed end of the hanging bucket cylinder 12 is installed on the side surface of the filling mechanism 6, the telescopic end is connected to the hanging bucket arm 13, a hanging bucket platform 14 is installed between the two hanging bucket arms 13, the two side edges of the hanging bucket platform 12 are respectively connected to the hanging bucket arms 13, the hanging bucket platform 14 is used to install a trash can 15, the area of the hanging bucket platform 14 where the trash can 15 can be installed is basically the same as the width of the filling mechanism 6, and a 660L or 1100L trash can can be installed, or two 120L or 240L trash cans can be installed at a time to accommodate trash cans of different sizes.
[0023] The side arms 3 and the swing arm oil cylinders 4 are installed in pairs on both sides of the loading mechanism 6, and two bucket chains 5 are installed at the end of each side arm 3. A connecting rod 11 is installed between the two side arms 3, and the connecting rod 11 is installed at one end of the side arm 3 where the bucket chain 5 is installed. When the swing arm oil cylinder 4 drives the side arm 3, the connecting rod 11 can prevent shaking and increase the stability of the side arm 3.
[0024] A detachable locking ring 10 is provided on one end of the bucket chain 5 away from the side arm 3. One end of the locking ring 10 is installed on the bucket chain 5, and the other end is installed on the side ear of the garbage bucket 16. The locking ring 10 can be removed from the bucket chain 5 to adjust the position on the bucket chain and change the length of the bucket chain 5 used to adapt to garbage buckets of different sizes. The two bucket chains 5 are located at both ends of the side of the garbage bucket 16 to ensure the stable installation of the garbage bucket 16.
[0025] A swing arm base 2 is provided at the lower end of the filling mechanism, one end of the side arm 3 is installed on the swing arm base 2, and the other end is installed with the bucket lifting chain 5, and the bucket hanging collection device 1 is installed below the swing arm base 2.
[0026] The side arm 3 is mounted on the inner swing arm base of the filling mechanism 6, and the bucket hanging arm 13 is mounted on the outer side surface of the filling mechanism 6. When the side arm 3 swings, the bucket hanging arm 13 is at the lowest point, and the bucket hanging platform 14 on the bucket hanging arm 13 is at the lowest point. The garbage bucket 16 will not contact the bucket hanging platform 14 during the lifting process. When the bucket hanging arm 13 swings, the side arm 3 is at the highest point, and the connecting rod 11 between the side arms 3 is at the highest point. When the largest garbage bin is completely turned over, it will not contact the connecting rod 11, ensuring the collection of different garbage devices.
[0027] An auxiliary support leg 7 is provided between the loading mechanism 6 and the rear wheel of the box body 8. The auxiliary support leg 7 is supported to the ground when the swing arm device is in operation to ensure the stability of the rear of the vehicle. The garbage bucket support of the existing swing arm type garbage truck is usually arranged near the swing arm base, that is, at the lower position of the rear end of the vehicle. When the garbage bucket is raised, one end of the garbage bucket is restricted by the garbage bucket support. However, since the garbage bucket support is arranged at the lower end of the rear end of the vehicle, the garbage in the garbage bucket will leak from the garbage bucket support, requiring manual processing, which is time-consuming and labor-intensive.
[0028] The present application ensures the stability of the vehicle when the side arm 3 is raised or lowered by installing the auxiliary support leg 7 between the loading mechanism 6 and the rear wheel of the box body 8, and does not occupy the position of the hanging bucket collection device 1. The garbage bucket support 9 is arranged on the inner side of the side arm 3. When the garbage bucket 16 is raised to a certain height, it begins to limit the position of one side of the garbage bucket, and then the garbage bucket 16 is flipped over to realize unloading, and the garbage in the garbage bucket 16 will not leak into the garbage truck.
[0029] The present application reasonably designs the layout of the auxiliary support legs 7, the swing arm device and the garbage collection device, so that the layout of each structure is optimized without affecting the use of each structure.
[0030] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.
Claims
1. A garbage truck with a bucket tipping and swing arm loading, comprising a front and a box body (8), characterized in that: A loading mechanism (6) is provided at the rear end of the box body (8), and a hanging bucket collection device (1) and a swing arm device are provided on the loading mechanism (6), wherein the hanging bucket collection device (1) is used to install and flip the trash can (15), and the swing arm device is used to install and flip the trash bucket (16); The swing arm device comprises a side arm (3), a swing arm oil cylinder (4) and a bucket lifting chain (5); the side arm (3) is provided with the bucket lifting chain (5); the bucket lifting chain (5) is used to connect with the garbage bucket (16); the swing arm oil cylinder (4) is used to drive the side arm (3) to rise and fall, thereby realizing the swing arm action of the side arm (3) to complete the turning over of the garbage bucket (16); A garbage bucket support (9) that is connected to the garbage bucket (16) is provided on the inner side of the side arm (3), and the garbage bucket support (9) is used to support the bottom of the garbage bucket (16) when the garbage bucket (16) is unloading.
2. The garbage truck with bucket tipping and swing arm loading according to claim 1 is characterized in that: The bucket hanging collection device (1) comprises a bucket hanging cylinder (12), a bucket hanging arm (13) and a bucket hanging platform (14), wherein the bucket hanging cylinder (12) is installed in pairs on two side surfaces close to the bottom of the filling mechanism (6), the bucket hanging arm (13) is connected to the bucket hanging cylinder (12), and a bucket hanging platform (12) is installed between the bucket hanging arms (13) on the two side surfaces, and the bucket hanging platform (12) is used to install a garbage can (15).
3. The garbage truck with bucket tipping and swing arm loading according to claim 1 is characterized in that: The side arms (3) and the swing arm cylinders (4) are installed in pairs on both sides of the loading mechanism (6), and two bucket chains (5) are installed at the end of each side arm (3).
4. The garbage truck with bucket tipping and swing arm loading according to claim 3 is characterized in that: A connecting rod (11) is provided between the side arms (3) on both sides of the filling mechanism (6), and the connecting rod (11) is mounted on one end of the side arm (3) where the bucket chain (5) is provided.
5. The garbage truck with bucket tipping and swing arm loading according to claim 1 is characterized in that: A swing arm base (2) is provided at the lower end of the loading mechanism (6); one end of the side arm (3) is mounted on the swing arm base (2); the other end of the side arm (3) is mounted on the bucket lifting chain (5); and the bucket hanging collection device (1) is mounted below the swing arm base (2).
6. The garbage truck with bucket tipping and swing arm loading according to claim 1, characterized in that: The fixed end of the swing arm oil cylinder (4) is mounted on the loading mechanism (6), and the telescopic end is mounted on the side arm (3).
7. The garbage truck with bucket tipping and swing arm loading according to claim 1, characterized in that: An auxiliary support foot (7) is provided between the loading mechanism (6) and the rear wheel of the box body (8), and the auxiliary support foot (7) is used to support the ground when the swing arm device is in operation.
8. The garbage truck with bucket tipping and swing arm loading according to claim 1, characterized in that: The bucket lifting chain (5) is provided with a detachable locking ring (10), and the locking ring (10) is used to install the garbage bucket (16).
Citation Information
Patent Citations
Compression type garbage truck combined feeding device
CN107963376A
Garbage truck
CN110127249A
Novel swing arm mechanism of back-loading compression refuse collector
CN203229114U
Multifunctional turnover mechanism for rear-mounted garbage compression truck
CN212023721U
Container tilting apparatus for refuse collection vehicle
JP2012171718A