Pile machine omnibearing management and control system and drilling management and control method
Through the positioning, verticality and pile diameter monitoring of the pile machine's comprehensive management and control system, the inaccurate positioning and wear problems during the drilling process of the pile machine are solved, the pile body quality and construction safety are improved, and the rectification costs are reduced.
Patent Information
- Application Number
- CN202411007774.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-12-06
AI Technical Summary
Reliable control cannot be achieved during the drilling process of existing pile rigs, resulting in unstable foundation reinforcement quality, safety hazards and additional rectification costs.
Design a pile machine all-round management and control system, including positioning module, verticality monitoring module and pile diameter monitoring module, and real-time monitoring of pile machine position, verticality and piles through positioning instruments, laser emitters and multi-chamber pressure probes Provides the control center for data analysis and adjustment to ensure accurate positioning and drilling quality of the pile machine.
Reliable positioning and real-time monitoring of the pile machine is realized, reducing pile body tilt and wear problems, improving pile body quality, and reducing construction risks and rectification costs.
Smart Images

Figure CN119083428A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of pile drivers, and in particular to an all-round pile driver control system and a drilling control method. Background Art
[0002] Commonly used foundation reinforcement methods in the engineering field include three-axis mixing piles, MJS piles, SMW method piles, high-pressure rotary jet piles, long spiral piles, sleeve valve pipe grouting, etc., with a wide range of application scenarios. For example, in the foundation pit retaining structure, a process combining three-axis mixing piles, MJS piles, high-pressure rotary jet piles and underground continuous walls (bored piles) is often used to form a foundation pit retaining structure system, which jointly plays the role of retaining soil and stopping water to ensure the normal construction of foundation pit excavation. For example, in shield reinforcement operations, three-axis mixing piles and high-pressure rotary jet piles are often used for full-hall reinforcement as the shield starting end reinforcement, shield tool change point reinforcement, and cross channel reinforcement to ensure the safety of shield starting arrival, tool change operations, and cross channel construction processes.
[0003] However, during actual construction, affected by the personal qualities of construction workers and unknown geological conditions, there are defects that affect the quality of the pile body, such as pile body inclination, split pile tip, insufficient pile diameter, and pile position offset. It is impossible to reliably control the drilling of the pile driver, resulting in problems such as deviation of the ground-anchored wall, water leakage in the foundation pit, mud and water gushing in the foundation pit, mud and water gushing or collapse of the cross tunnel heading, and failure of shield opening operations. These problems leave great safety risks and hidden dangers for the remaining processes, resulting in additional defect remediation costs.
[0004] The information disclosed in this background technology section is only used to deepen the understanding of the background technology of the present disclosure, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art known to those skilled in the art. Summary of the invention
[0005] In view of at least one of the above technical problems, the present disclosure provides a pile driver all-round control system and a drilling control method, which aims to solve the problem that the existing pile driver drilling has potential safety hazards due to the inability to achieve reliable control.
[0006] According to one aspect of the present disclosure, a pile driver all-round control system is provided, which includes a positioning module, a verticality monitoring module, a pile diameter monitoring module and a control center; the positioning module includes a positioning instrument fixed at the top position of the pile driver by a fixed bracket and used to measure the elevation and coordinates of the installation point; the verticality monitoring module includes a laser transmitter correspondingly hung at the top position of the pile driver frame, and a centering disk fixed at the pile driver frame directly below the laser transmitter for receiving the laser beam emitted by the laser transmitter; the pile diameter monitoring module includes a multi-chamber pressure probe arranged at the corresponding stirring blade along the radial direction of the drill bit, a hydraulic pump source respectively connected to the corresponding oil pipes of each chamber of the multi-chamber pressure probe, and a pressure sensor for detecting the pressure in the corresponding oil pipe of each chamber.
[0007] In some embodiments of the present disclosure, a single-drill-shaft pile driver is provided with one positioning device, and a multi-drill-shaft pile driver is provided with two positioning devices.
[0008] In some embodiments of the present disclosure, the positioning module further includes a reference station with known position information, and the reference station and the locator synchronously receive the same positioning signal to correct the measurement information of the locator.
[0009] In some embodiments of the present disclosure, a line connecting a fixing point of the laser transmitter and a center of the centering disk is parallel to an axis of the rack.
[0010] In some embodiments of the present disclosure, the centering disk is provided with a plurality of concentric scale ring lines at equal intervals.
[0011] In some embodiments of the present disclosure, the chambers of the multi-chamber pressure probe are distributed radially along the drill bit, and the position of each chamber corresponds to a critical point of different degrees of wear of the drill bit.
[0012] According to another aspect of the present disclosure, a pile driver drilling control method is provided, which is implemented based on the above-mentioned pile driver omnidirectional control system and includes the following steps: (1) Importing pile position design data information into the control center, selecting the pile position currently under construction, and the positioning device obtaining drilling rig position information, and outputting the position deviation between the current position of the drilling rig and the designed drilling position; (2) After the pile driver moves to the designed drilling point, the laser transmitter emits a laser beam to obtain the alignment deviation between the laser shooting point on the centering disk and the center of the centering disk, and adjusts the pile driver leg cylinder accordingly until the laser shooting point coincides with the center of the centering disk, and then drilling begins; (3) The multi-chamber pressure probe is fixedly installed at the radial position of the drill bit corresponding to the stirring blade at the front edge of drilling, so that each chamber corresponds to each critical wear point of the drill bit; during the drilling process, the pressure value of each chamber corresponding to the corresponding output of the pressure sensor is monitored in real time, and after determining that the pressure value changes, the control center issues an early warning to remind the drilling bit stirring blade to be inspected and repaired.
[0013] In some embodiments of the present disclosure, the positioning module also includes a base station with known position information. In step (1), the base station and the positioning instrument synchronously receive the same positioning signal, and correct the measurement data of the positioning instrument according to the deviation between the measurement information of the base station and the known position information.
[0014] In some embodiments of the present disclosure, during the drilling process, the verticality of the frame is monitored in real time by a verticality monitoring module.
[0015] One or more technical solutions provided in the embodiments of the present application have at least any of the following technical effects or advantages: 1. The positioning module can determine the deviation between the actual position of the pile driver and the designed position in real time according to the designed pile position, and through the setting of the reference station with known position information, it can effectively correct the measurement data of the locator, thereby ensuring the accuracy of the measurement data of the locator and ensuring the reliable positioning of the pile driver.
[0016] 2. The verticality of the pile driver frame can be quickly determined by the position of the laser beam emitted by the laser transmitter at the centering plate, and the concentric and evenly spaced scale rings at the centering plate can provide an adjustment range for the verticality of the pile driver frame.
[0017] 3. The multi-chamber pressure probe can detect different degrees of drill bit wear, so that the control center can issue different warnings according to different wear, thereby monitoring the pile diameter and promptly detecting drill bit wear so that the drill bit can be repaired in time. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a schematic diagram of the measurement principle of the positioning module in one embodiment of the present application.
[0019] Figure 2 It is a structural schematic diagram of a positioning module in one embodiment of the present application.
[0020] Figure 3 It is a structural schematic diagram of the centering plate in one embodiment of the present application.
[0021] Figure 4 This is a schematic diagram of the use status of a multi-chamber pressure probe in one embodiment of the present application.
[0022] In the above figures, 1 is a locator, 2 is a fixed bracket, 3 is a reference station, 4 is a pile driver, 5 is a satellite, 6 is an antenna, 61 is a radio station, 7 is a centering plate, 8 is a drill bit stirring blade, and 9 is a multi-chamber pressure probe. DETAILED DESCRIPTION
[0023] In the description of the present application, it should be understood that the terms "up", "down", "front", "back", "left", "right", "top", "bottom", "inside", "outside", "vertical", "horizontal", "clockwise", "counterclockwise", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0024] The programs involved or relied upon in the following embodiments are all conventional programs or simple programs in the technical field, and those skilled in the art can make conventional selections or adaptive adjustments according to specific application scenarios. The devices involved in the following embodiments, unless otherwise specified, are all conventional commercially available products.
[0025] In order to better understand the technical solution of the present application, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0026] In order to solve the technical problem that the existing pile driver system control is mainly affected by the operator's experience and the control reliability is poor, this example discloses a pile driver all-round control system, which includes a positioning module, a verticality monitoring module, a pile diameter monitoring module and a control center.
[0027] The control center is located in the pile driver operation room as a control terminal, which is used to obtain the monitoring data information corresponding to each module, and then output the corresponding control instructions according to the monitoring data to control the pile driver operation.
[0028] Before the pile driver starts drilling, it must first be moved to the designed point so that the drill rod coincides with the axis of the designed pile body. However, in order to ensure that the pile driver can be accurately moved to the designed point, the control system includes a positioning module. Specifically, in this embodiment, the positioning module includes a Beidou satellite positioning device, which has a satellite coordinate positioning function, a positioning error of ±10mm, and can also realize elevation measurement. At the same time, considering that different types of pile driver equipment contain different numbers of drilling devices, that is, there are differences in the number of rotating shafts; for pile driver equipment with only one drilling device, such as rotary drilling rigs, screw pile drivers, single-axis pile drivers, high-pressure rotary jet pile drivers, and compaction machines, a positioning device is used to measure the position coordinates and elevation data. The positioning device is fixedly installed at the top of the pile driver through a fixed bracket, and in this example, the positioning device is installed concentrically and colinearly with the pile driver drill shaft, thereby ensuring that the coordinate information measured by the positioning device can be accurately reflected to the pile driver drill shaft, so as to facilitate the judgment of whether the pile driver has moved to the corresponding position of the designed point. For pile drivers with multiple drilling devices, such as three-axis pile mixers and five-axis pile mixers, it is necessary to accurately control the deflection angle because they have multiple drilling axes. For this purpose, two positioning instruments are used to measure the position coordinates, elevation and angle. Figure 2 Two locators 1 are arranged at the top of the pile driver through a fixed bracket 2. The two locators 1 can independently perform elevation and coordinate point positioning measurements, and fit a straight line segment between the two measuring points according to the measured two coordinates and elevation information, so as to judge the deflection angle according to the fitted straight line segment, and then adjust the pile driver according to the deflection angle until the two locators are positioned at the designed position.
[0029] In this embodiment, the measurement data communication and power supply of the locator are led out from the pile driver operating room through the data line laid along the pile driver frame, and data communication is carried out with the control center in the pile driver operating room. The reliability and stability of data transmission can be improved through wired transmission. However, in order to improve the positioning measurement accuracy of the positioning module, in this embodiment, see Figure 1 The positioning module also includes a reference station 3, the position information of which is known. Therefore, the reference station 3 and the positioning device 1 synchronously receive the signal of the same satellite 5, obtain the measurement data of the reference station and compare it with its known position information, so as to obtain the correction data, and correct the measurement data of the positioning device 1 accordingly. Specifically, in this embodiment, the positioning module also includes a radio station 61, and the correction data is wirelessly transmitted to the positioning device 1 through the radio station 61 and the antenna 6. The positioning device 1 obtains its accurate real-time position after differential correction based on the correction data, thereby ensuring that the positioning device can complete the positioning operation in real time and with high precision.
[0030] After the drill shaft of the pile driver is accurately positioned, considering that the pile body is long, it has verticality requirements during drilling, otherwise the designed effect may not be achieved due to the skewness of the pile body. For this reason, the management and control system also includes a verticality monitoring module, which includes a laser transmitter and a centering disk. Among them, the laser transmitter is suspended upside down at the top of the pile driver frame through a rope soft connection, so that it can swing freely under the action of gravity, and the laser emission port of the laser transmitter is facing the lower part of the pile driver frame; correspondingly, a centering disk is fixed at the lower position of the pile driver frame. In this example, the centering disk is located 10 to 20 meters below the laser transmitter to reflect the irradiation position of the laser beam emitted by the laser transmitter. Among them, refer to Figure 3 In this example, the diameter of the centering disk is 40 cm, and with the center of the centering disk 7 as the reference, a number of concentric scale rings are set at equal intervals, and the spacing between adjacent scale rings is 50 mm. When the verticality monitoring module is installed, it is ensured that the line between the fixed point of the laser transmitter and the center of the centering disk is parallel to the pile driver frame. Therefore, when the frame meets the verticality requirement, the laser beam is just aimed at the center of the centering disk. When the frame is tilted, the laser transmitter swings under the action of gravity, and the laser beam point deviates from the center of the centering disk. Therefore, it is determined that the verticality of the pile driver frame does not meet the requirements. According to the deviation of the laser beam point at the centering disk, the pile driver is controlled to adjust accordingly, so that the laser beam point coincides with the center of the centering disk again, thereby ensuring the verticality of the pile driver frame. Among them, since in this embodiment, a number of scale rings are set at equal intervals and concentrically at the centering disk, the adjustment range of the pile driver frame can be controlled according to the distance between the laser beam point and the corresponding scale ring, thereby improving the adjustment efficiency.
[0031] In addition, in the actual drilling process, considering that the drill bit will have a certain degree of wear after long-term use, the drill bit diameter will be smaller than the factory diameter, which will lead to a certain deviation between the pile hole diameter corresponding to the drill bit and the design diameter, and the pile diameter cannot be well controlled. For this reason, in the present embodiment, the pile driver all-round control system also includes a pile diameter monitoring module. The pile diameter monitoring module includes a multi-chamber pressure probe, which includes a plurality of independent chambers. The overall shape is a long strip, and hydraulic oil is independently supplied to each chamber by independent hydraulic oil pipes. Each hydraulic oil pipe is connected to a hydraulic pump source. Therefore, under the action of the hydraulic pump source, each chamber of the multi-chamber pressure probe is filled with hydraulic oil of a certain pressure; in addition, each hydraulic oil pipe is provided with a pressure sensor to measure the hydraulic oil pressure of each corresponding chamber. In actual use, refer to Figure 4, the multi-chamber pressure probe 9 is arranged along the radial direction of the drill bit and fixed at the edge of the stirring blade 8, so that each chamber is distributed along the radial direction of the drill bit. Therefore, when the drill bit is worn, the chamber at the corresponding position is also worn, which causes the corresponding chamber to leak and lose pressure. After the corresponding pressure sensor detects the pressure change of the corresponding hydraulic oil pipe, it transmits the information to the control center to alarm, and warns the wear degree of the drill bit according to the position of the worn chamber, so that the drill bit can be repaired or replaced according to the precision control requirements of the actual project. Furthermore, by one-to-one correspondence between the arrangement position of each chamber of the multi-chamber pressure probe and the critical point of different degrees of wear, an alarm reminder can be realized when the drill bit is worn to different degrees.
[0032] In addition, this example also discloses a pile driver drilling control method, which is implemented based on the above-mentioned pile driver omnidirectional control system and specifically includes the following steps: (1) Import the pile position design data information into the control center, select the pile position currently under construction, and use the locator to obtain the drilling rig position information and output the position deviation between the current drilling rig position and the designed drilling position.
[0033] Before the pile driver starts working, first import all the design data information of the pile position into the control center located in the pile driver operation room, that is, the control terminal. Specifically, the pile position map or pile position information table is imported in CAD format or table format, and the control terminal automatically reads the information of each pile position. The control center includes a display screen, which displays the imported design pile position information on the display screen, and selects the planned construction pile position accordingly, and starts the construction work of the pile position. The positioning instrument starts to obtain the elevation and position coordinate information, and displays the real-time information of the proposed construction pile position and the pile driver on the display screen of the control center communication in real time, and prompts the deviation distance information between the pile driver and the design position, using arrows to reflect the deviation direction and numbers to reflect the deviation distance. The operator controls the pile driver to move according to the deviation shown until the pile driver coincides with the designed pile position.
[0034] Among them, during the operation of the locator, the base station and the locator synchronously receive the same positioning signal from the same satellite at the same time, and correct the measurement data of the locator according to the deviation data between the measurement information of the base station and its known position information to ensure the accuracy and reliability of the locator's measurement and positioning.
[0035] (2) After the pile driver moves to the designed drilling point, the laser transmitter emits a laser beam to obtain the alignment deviation between the laser shooting point on the centering disk and the center of the centering disk. The pile driver's outrigger cylinder is adjusted accordingly until the laser shooting point coincides with the center of the centering disk, and drilling begins.
[0036] Since the laser transmitter is suspended upside down on the top of the frame by a flexible connection, it can swing under its own gravity, so that the laser beam of the laser transmitter is always in a vertical state, and since the line between the fixed point of the laser transmitter and the center of the centering disk is parallel to the frame, when the frame tilts, the laser transmitter deviates due to gravity, so that the laser beam emitted by the laser transmitter deviates from the line between its fixed point and the center of the centering disk, so that the shooting point of the laser beam at the centering disk deviates from the center of the centering disk, and thus the operator can observe whether the shooting point of the laser beam at the centering disk coincides with the center of the centering disk, so as to judge the verticality of the pile driver frame. In addition, since in this embodiment, the surface of the centering disk is concentric with its center and is provided with a number of scale rings at equal intervals, the offset distance can be estimated through the scale ring closest to the laser beam shooting point, so that the adjustment amplitude can be controlled accordingly, and the extension length of each leg oil cylinder of the frame can be controlled accordingly to achieve the leveling of the pile driver.
[0037] In addition, in this embodiment, during the drilling process of the pile driver, the verticality of the frame is monitored in real time through the verticality monitoring module, and the working parameters of the pile driver are adjusted in time accordingly to ensure the quality of pile formation.
[0038] (3) A multi-chamber pressure probe is fixedly installed at the radial position of the drill bit corresponding to the stirring blade at the front edge of drilling, so that each chamber corresponds to each critical wear point of the drill bit; during the drilling process, the pressure value of each chamber corresponding to the corresponding output of the pressure sensor is monitored in real time. When the pressure value changes, the control center issues an early warning to remind the maintenance of the drill bit stirring blade.
[0039] The multi-chamber pressure probe is arranged and fixed before the drill bit of the drilling rig is drilled. In this embodiment, the multi-chamber pressure probe is a hollow metal structure, which is connected to the hydraulic pump station through a steel hydraulic oil pipe, wherein the hydraulic oil pipe enters the inside of the drill rod from the drill bit position, extends along the inside of the drill rod, and is connected to the hydraulic oil pipe connected to the hydraulic pump station through the rotary joint at the top of the pile driver, thereby preventing the hydraulic oil pipe from being twisted as the drill bit rotates. For details, see Figure 4In this example, the multi-chamber pressure probe is arranged behind the rotation direction of the mixing blade and is welded and fixed along the edge of the mixing blade. Correspondingly, the multi-chamber pressure probe has three chambers, corresponding to the early warning pressure chamber, the alarm pressure chamber and the limit pressure chamber. In this example, a mixing pile with a diameter of 880mm is constructed. The fixed position of the multi-chamber pressure probe makes the early warning pressure chamber, the alarm pressure chamber and the limit pressure chamber correspond to the positions of φ880mm, φ850mm and φ830mm respectively, where φ830mm is the maximum deviation value allowed by the specification. When the mixing blade is worn, the multi-chamber pressure probe welded and fixed with the mixing blade is worn synchronously, resulting in leakage and decompression of the pressure chamber. The pressure sensor connected in the hydraulic oil pipe monitors the hydraulic oil pressure in real time, so that after the corresponding chamber loses pressure, the communication is transmitted to the control center for alarm display, indicating the pile diameter range, so that it is convenient for construction personnel to carry out maintenance according to the degree of wear.
[0040] In addition, in this embodiment, the pile driver's all-round control system also collects and analyzes the pile information in real time. The control center automatically collects and records the actual pile position information of each pile, displays the deviation comparison between the actual pile position and the designed pile position, and the plane position comparison between the current pile position and the previous pile position. The relevant information is reflected in graphics and length annotations, and supports data export. In addition, the control center also automatically collects and records the verticality and actual pile diameter information of each pile, and reflects the verticality of the pile body and the overall pile diameter in the form of a three-dimensional column. After the control center summarizes the above information, it forms an overall three-dimensional pile diagram to reflect the bite between piles, pile morphology, pile deviation and other information.
[0041] Although some preferred embodiments of the present application have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present application.
[0042] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the inventive concept. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. A comprehensive pile driver control system. It is characterized in that Including positioning module, verticality monitoring module, pile diameter monitoring module and control center; The positioning module includes a positioning instrument fixed at the top of the pile driver through a fixed bracket and used to measure the elevation and coordinates of the installation point; The verticality monitoring module includes a laser transmitter correspondingly mounted at the top of the pile driver frame, and a centering disc fixed at the pile driver frame just below the laser transmitter for receiving the laser beam emitted by the laser transmitter; The pile diameter monitoring module includes a multi-chamber pressure probe arranged along the radial direction of the drill bit at the corresponding stirring blade, a hydraulic pump source connected to the oil pipe corresponding to each chamber of the multi-chamber pressure probe, and a pressure sensor for detecting the pressure in the oil pipe corresponding to each chamber.
2. The all-round pile driver control system according to claim 1, It is characterized in that A single-drilling-shaft pile driver is provided with one positioning device, and a multi-drilling-shaft pile driver is provided with two positioning devices.
3. The all-round pile driver control system according to claim 1, It is characterized in that The positioning module also includes a reference station with known position information, and the reference station and the positioning instrument synchronously receive the same positioning signal to correct the measurement information of the positioning instrument.
4. The all-round pile driver control system according to claim 1, It is characterized in that The line connecting the fixing point of the laser transmitter and the center of the centering disk is parallel to the axis of the frame.
5. The all-round pile driver control system according to claim 1, It is characterized in that The centering disk is provided with a plurality of concentric scale ring lines at equal intervals.
6. The all-round pile driver control system according to claim 1, It is characterized in that The chambers of the multi-chamber pressure probe are distributed along the radial direction of the drill bit, and the position of each chamber corresponds to and matches the critical point of different degrees of wear of the drill bit.
7. A pile driver drilling control method, It is characterized in that The method is implemented based on the all-round pile driver control system according to claim 1, and comprises the following steps: (1) Importing pile position design data information into the control center, selecting the pile position currently under construction, and the positioning device obtaining drilling rig position information, and outputting the position deviation between the current position of the drilling rig and the designed drilling position; (2) After the pile driver moves to the designed drilling point, the laser transmitter emits a laser beam to obtain the alignment deviation between the laser shooting point on the centering disk and the center of the centering disk, and adjusts the pile driver leg cylinder accordingly until the laser shooting point coincides with the center of the centering disk, and then drilling begins; (3) The multi-chamber pressure probe is fixedly installed at the radial position of the drill bit corresponding to the stirring blade at the front edge of drilling, so that each chamber corresponds to each critical wear point of the drill bit; during the drilling process, the pressure value of each chamber corresponding to the corresponding output of the pressure sensor is monitored in real time, and after determining that the pressure value changes, the control center issues an early warning to remind the drilling bit stirring blade to be inspected and repaired.
8. The pile driver drilling control method according to claim 7, It is characterized in that The positioning module also includes a reference station with known position information. In step (1), the reference station and the positioning instrument synchronously receive the same positioning signal, and correct the measurement data of the positioning instrument according to the deviation between the measurement information of the reference station and the known position information.
9. The pile driver drilling control method according to claim 7, It is characterized in that During the drilling process, the verticality of the frame is monitored in real time through the verticality monitoring module.