Construction method for removing cast-in-place piles in shield crossing area under viaduct

Through the combination of a crawler full-casing full-rotating drilling rig and a micro wedge-shaped drill hammer, the problem of difficulty in removing old piles under the viaduct is solved, and efficient construction and safe reinforcement of the bridge foundation is achieved in low clearance environment.

CN119083432AActive Publication Date: 2024-12-06HANGZHOU NANKUN CONSTRUCTION CO LTD +3

Patent Information

Application Number
CN202411222534.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-12-06
Estimated Expiration
2044-09-02

AI Technical Summary

Technical Problem

In the construction of cast-injected pile removal in the shield crossing area under the viaduct, the existing technology is difficult to effectively solve the difficulty of removing old piles, especially in low clearance environments, which are prone to vibration and collapse of holes, which have adverse effects on the upper bridge foundation.

Method used

The crawler-type full-casing full-rotating drilling rig is used to combine the micro wedge-shaped drill hammer and the micro impulse grab, and the old pile is surrounded by the casing, and the micro wedge-shaped drill hammer is snapped into the bearing interval and pile interval. The crawler-type full-casing full-rotating drilling rig is rotated together to rotate the old pile The pile bearing platform and insertion section are twisted, and the broken pile is pulled out using a low-lying short-arm track crane to achieve barrier-free construction under low clearance conditions.

Benefits of technology

The efficient removal of old piles under the viaduct was achieved, ensuring normal construction was carried out, reducing disturbances to the bridge foundation, improving overall barrier cleaning efficiency, and strengthening the bridge foundation through subsequent filling of cement mortar, ensuring safety and stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083432A_ABST
    Figure CN119083432A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of cast-in-place pile removal, and discloses a construction method for removing cast-in-place piles in a shield crossing area under a viaduct, which comprises the following steps of: placing a crawler-type full-casing full-slewing drilling machine in place, hoisting a casing by using a low-lying short-arm crawler crane, and rotating the casing to downwards cut until the casing surrounds the periphery of an old pile bearing platform; hoisting a micro wedge-shaped drill hammer, embedding the micro wedge-shaped drill hammer between the old pile bearing platform and the inner side wall of the sleeve, driving the sleeve to rotate until the old pile bearing platform is twisted off, and taking out the old pile bearing platform; the sleeve is driven to continuously press and cut the soil layer until the lower portion of the sleeve surrounds the upper portion of the old pile; the micro wedge-shaped drill hammer is embedded between the old pile and the inner side wall of the sleeve, the sleeve is driven to rotate till the insertion section is twisted off, and the insertion section is taken out; the steps are repeated until the length of the residual pile section is smaller than the set length, and the residual pile section is crushed and the hole is cleaned through a miniature cross-shaped punch hammer; and backfilling the cement mortar, and pulling the sleeve.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention patent relates to the technical field of cast-in-place pile removal, specifically, to a construction method for removing cast-in-place piles in a shield tunneling area under an elevated bridge. Background Art

[0002] To meet the needs of urban traffic, subway lines in major cities are constantly expanding, and underground tunnel construction is becoming more and more common. During the tunnel shield construction process, conflicts between the shield line and the old pile foundations of existing buildings often occur. In order to ensure the smooth excavation of the project shield tunnel, the old piles must be removed before the shield construction without affecting the safety of the surrounding infrastructure.

[0003] Taking the newly built southern extension of Guangzhou Metro Line 18 as an example, the tunnel of the project is designed to have a diameter of 8m and a top buried depth of about 24m from the ground. According to the plan, its shield line will pass under the elevated bridge section of Nansha Port Expressway located in the Shiliuyong area. Nansha Port Expressway (bridge) is located in Nansha District, Guangzhou. It was completed and opened to traffic in 2004. The bridge carries a large number of freight vehicles from Nansha Port, with a daily traffic volume of up to 140,000 vehicles. Lingxin Avenue was built 7m below the elevated bridge. The factory buildings on this section of the road were demolished when Lingxin Avenue was built. The shield route conflicts with the old cast-in-place pile foundation of the original factory building of Lingxin Avenue. The number of conflicts between the new shield crossing area and the old piles is 83, of which 55 old piles are distributed in the low clearance area under the bridge. The old piles are concrete cast-in-place piles with a designed pile diameter of 800mm and an average pile length of 34m. The concrete strength of the old pile foundation is C35, which makes it extremely difficult for the shield machine to excavate and pass through.

[0004] In current technology, the removal of old underground piles is usually done by impact crushing, rotary drilling, and full-casing and full-rotation pile extraction. Given that the Nansha site is backfilled with a fish pond, if an impact hammer is used to crush the old piles, the impact process is likely to cause a collapsed hole. In addition, the original old piles are embedded in the rock and are located under the viaduct. The vibration and collapsed hole caused by the impact will have an adverse effect on the upper bridge foundation. If a rotary drilling rig is used for construction, the low-headroom rotary drilling rig has a small torque and the old piles are deep. The low-headroom rotary drilling rig has a slow speed in removing the old piles and consumes a lot of materials. If a full-casing and full-rotation drilling rig is used to remove the old piles, it is also limited by the low-headroom environment, and conventional pile extraction operations cannot be carried out normally on site. Summary of the invention

[0005] The purpose of the present invention is to provide a construction method for removing cast-in-place piles in a shield tunneling area under a viaduct, aiming to solve the problem of difficulty in removing old underground piles under the viaduct in the prior art.

[0006] The present invention is achieved in that a construction method for removing cast-in-place piles in a shield tunneling area under a viaduct comprises the following construction steps:

[0007] 1) According to the shield route, measure and lay out the shield crossing area under the viaduct to determine the position of the old piles;

[0008] 2) The crawler-type full-casing full-rotation drilling rig is in place. The crawler-type full-casing full-rotation drilling rig has a center hole in the middle. The casing is hoisted by a low-lying short-arm crawler crane. The casing passes through the center hole, and the bottom of the casing is pressed against the position of the old pile. The crawler-type full-casing full-rotation drilling rig drives the casing to rotate and cut downward until the casing embraces the outer periphery of the old pile cap, and there is a cap gap between the outer periphery of the old pile cap and the inner side wall of the casing;

[0009] 3) Use a low-lying short-arm crawler crane to hoist a micro wedge-shaped drill hammer, which is embedded in the cap gap from top to bottom, and is clamped and fixed between the old pile cap and the casing; use a crawler-type full-casing full-rotation drilling rig to drive the casing to rotate until the old pile cap is twisted off, and then remove the old pile cap from the casing;

[0010] 4) Using a crawler-type full-casing full-rotation drilling rig to drive the casing to continue pressing down to cut the soil layer until the bottom of the casing is pressed down to a set distance, and then stop driving the casing to rotate, and the lower part of the casing embraces the upper part of the old pile; the old pile has an insertion section inserted into the casing and a residual pile section located below the casing, and a pile interval is formed between the outer periphery of the insertion section and the inner side wall of the casing;

[0011] 5) Use a micro wedge-shaped drill hammer to embed into the pile interval from top to bottom. The micro wedge-shaped drill hammer is clamped and fixed between the old pile and the casing. Use a crawler-type full-casing full-rotation drill rig to drive the casing to rotate until the inserted section is twisted off, and then remove the inserted section from the casing;

[0012] 6) Repeat the above construction steps 4) to 5) until the length of the residual pile segment is less than the set length, use a micro cross hammer to break the residual pile segment into debris, and then use a micro grab bucket to take the debris out of the casing, and form a hole to be filled at the old pile position;

[0013] 7) Install a grouting frame and a grouting conduit, and backfill cement mortar into the hole to be filled through the grouting conduit;

[0014] 8) Pull out the casing.

[0015] Optionally, in the construction step 2), a positioning base plate is suspended on the old pile position, and then the crawler-type full-casing full-rotation drilling rig is moved, and a positioning hole penetrating up and down is formed in the middle of the positioning base plate, and the positioning hole is aligned with the center hole up and down.

[0016] Optionally, a plurality of positioning grooves are formed on the top of the positioning base plate, and the crawler-type full-casing full-rotation drilling rig has a plurality of legs that can telescope up and down;

[0017] In the construction step 2), after the crawler-type full-casing full-rotation drilling rig is moved to a set position, the plurality of legs are extended and moved downward until the bottom of the legs is pressed against the positioning groove.

[0018] Optionally, the sleeve includes a plurality of vertically connected section tubes, and adjacent section tubes are connected to each other via a connecting structure;

[0019] In the construction step 4), during the process of using a crawler-type full-casing and full-rotation drilling rig to drive the casing to continue to press down and cut the soil layer, the casing has an upper extension section extending above the center hole. When the length of the upper extension section is less than 50 cm, the casing rotation is stopped, and a waterproof membrane is rolled on the outer periphery of the upper extension section to form a waterproof layer, and then butter is applied on the waterproof layer to form a lubricating layer; a low-lying short-arm crawler crane is used to hoist the joint pipe, and the hoisted joint pipe is connected to the top of the upper extension section through a connecting structure, and the waterproof layer is clamped and fixed between the upper extension section and the hoisted joint pipe.

[0020] Optionally, the bottom of the sleeve is provided with a plurality of cutting shoes, and the plurality of cutting shoes are arranged at intervals along the circumference of the sleeve; the inner side wall of the bottom of the sleeve is provided with a plurality of inner cutter heads, the inner ends of the inner cutter heads are connected to the inner side wall of the sleeve, and the outer ends of the inner cutter heads are extended toward the center of the sleeve; the outer periphery of the bottom of the sleeve is welded with protruding strips, and the plurality of protruding strips form a protruding grid on the outer periphery of the sleeve;

[0021] In the construction step 2), during the process of the crawler-type full-casing full-rotation drilling rig driving the casing to rotate and cut downward, an annular cap spacing is formed on the old pile position under the action of the inner cutter head;

[0022] In the construction step 4), during the process of the crawler-type full-casing and full-rotation drilling rig driving the casing to rotate and cut downward, an annular pile interval is formed on the old pile position under the action of the inner cutter head.

[0023] Optionally, in the construction steps 3) and 6), during the downward cutting and drilling of the casing, the soil in the casing is taken out by using a micro-grab bucket;

[0024] In the construction step 3), after the old pile cap is twisted off, the old pile cap is taken out by using a micro-grab bucket.

[0025] Optionally, in the construction step 3), after the old pile cap is twisted off, the cap steel bars in the old pile cap are exposed under the impact of the micro wedge-shaped drill hammer, and the old pile cap is hoisted out of the casing by bundling the cap steel bars;

[0026] In the construction step 5), after the insertion section is twisted off, the old pile reinforcement in the insertion section is exposed under the impact of the micro wedge-shaped drill hammer, and the insertion section is lifted out of the casing by bundling the old pile reinforcement.

[0027] Optionally, the outer side of the micro wedge-shaped drill hammer is formed with an arc-shaped outer side surface, and the inner side of the micro wedge-shaped drill hammer is formed with a concave-convex inner side surface, and the two sides of the outer side surface are respectively connected to the two sides of the inner side surface, and along the direction from top to bottom, the outer side surface is arranged to extend obliquely toward the inner side surface;

[0028] In the construction step 3), after the miniature wedge-shaped drill hammer is embedded in the cap gap, the outer side surface abuts against the inner side wall of the casing, and the inner side surface abuts against the outer periphery of the old pile cap;

[0029] In the construction step 6), after the miniature wedge-shaped drill hammer is embedded in the pile interval, the outer side surface abuts against the inner side wall of the casing, and the inner side surface abuts against the outer periphery of the insertion section;

[0030] The top of the micro wedge-shaped drill hammer is provided with a hanging ear for connecting with a wire rope. In the construction step 3), the micro wedge-shaped drill hammer is hoisted to the top of the cap gap by the wire rope, and after the outer side surface is closely fitted with the inner side wall of the casing, the wire rope is released, and under the action of gravity, the micro wedge-shaped drill hammer is embedded in the cap gap from top to bottom;

[0031] In the construction step 6), the micro wedge-shaped drill hammer is hoisted to the top of the pile interval by a wire rope, and after the outer side surface is tightly fitted with the inner wall of the casing, the wire rope is released, and under the action of gravity, the micro wedge-shaped drill hammer is embedded in the pile interval from top to bottom.

[0032] Optionally, the micro wedge-shaped drill hammer comprises a plurality of steel plates, the plurality of steel plates are welded to each other, the outer end surface of the steel plate is formed with an abutment surface for abutting against the inner wall of the casing, the abutment surfaces of the plurality of steel plates are combined to form the outer side surface, and the abutment surface is provided with an elastic counter-pressure convex strip;

[0033] In the construction step 3), when the micro wedge-shaped drill hammer is embedded into the cap gap under the action of gravity, the micro wedge-shaped drill hammer is pressed by the old pile cap, the counter-pressure convex strip is compressed, and under the action of elastic force, the inner side surface of the micro wedge-shaped drill hammer is pressed against the outer periphery of the old pile cap;

[0034] In the construction step 6), when the micro wedge-shaped drill hammer is embedded into the pile interval under the action of gravity, the micro wedge-shaped drill hammer is pressed by the old pile, the counter-pressure convex strip is compressed, and under the action of elastic force, the inner surface of the micro wedge-shaped drill hammer is pressed against the outer periphery of the old pile.

[0035] Optionally, the inner end surface of the steel plate is formed with an inclined surface, and along the direction from top to bottom, the inclined surface is arranged to extend obliquely toward the abutting surface, and a plurality of the inclined surfaces of the steel plates are combined to form the inner side surface; a through hole is provided in the middle of the steel plate, which penetrates the steel plate front and back, and the outer end of the through hole penetrates the abutting surface, and the inner end of the steel plate penetrates the inclined surface;

[0036] The counter-pressure convex strip has a telescopic section embedded in the through hole; a moving block is provided in the through hole, the inner end of the moving block is connected to the outer end of the telescopic section, the outer end of the moving block is provided with a pressing cutter head arranged toward the inclined surface, and the upper and lower ends of the moving block are provided with outwardly protruding convex blocks; two guide rails are provided in the through hole, and a spring for driving the moving block to reset is provided in the guide rail, the inner end of the spring is fixedly arranged, and the outer end of the spring presses on the convex block;

[0037] In the construction step 3), after the micro wedge-shaped drill hammer is embedded into the cap gap under the action of gravity, the counter-pressure convex strip is squeezed by the inner wall of the casing, the counter-pressure convex strip is compressed, the telescopic section is deformed and extended toward the inclined surface, driving the moving block to move toward the inclined surface, and the convex block squeezes the spring to deform until the pressing cutter head is pressed against the old pile cap;

[0038] In the construction step 6), after the miniature wedge-shaped drill hammer is embedded into the pile interval under the action of gravity, the counter-pressure convex strip is squeezed by the inner wall of the casing, the counter-pressure convex strip is compressed, the telescopic section is deformed and extended toward the inclined surface, driving the moving block to move toward the inclined surface, and the convex block squeezes the spring to deform until the pressing cutter head presses against the old pile;

[0039] When the miniature wedge-shaped drill hammer is taken out from the platform interval or the pile interval, under the action of elastic force, the spring pressing protrusion moves toward the abutting surface, the moving block squeezes the telescopic section to deform and shorten, and the counter-pressure protrusion expands and deforms outward.

[0040] Compared with the prior art, the present invention provides a method for removing cast-in-place piles in the shield crossing area under the viaduct. The crawler-type full-casing full-rotation drilling rig adopts a crawler self-propelled mechanism, which can move freely and accurately into position without the cooperation of a large crane. The old pile removal process adopts a low-lying crawler crane and a modified micro-grab bucket, a micro-cross hammer, and a micro-wedge-shaped chisel hammer to achieve barrier-free construction under low clearance conditions and ensure the normal construction. In addition, the crawler-type full-casing full-rotation drilling rig is quickly and efficiently put into place; the full-casing full-rotation drilling rig is used to sink the casing to cover the old pile, and the micro-wedge-shaped chisel hammer is inserted into the gap between the pedestal and the pile. The crawler-type full-casing full-rotation drilling rig rotates in coordination and twists off the old pile pedestal and the insertion section, and then the broken pile is pulled out with the help of a micro-grab bucket or a low-lying short-arm crawler crane, and the overall obstacle removal efficiency is high.

[0041] Then, the old piles were removed with casing follow-up throughout the process. The length of the pulled-out and inserted section was measured to determine the condition of the residual pile section in the casing. When the length of the residual pile section was short, the micro cross hammer and micro grab bucket repeatedly grabbed and removed the slag in the casing to ensure that the obstacle was completely cleared and cleared for subsequent shield crossing. In addition, during the construction process, the casing was driven by a full-casing and full-rotation drilling rig to advance the drilling and trap the old piles, isolating the hole operations from causing excessive disturbance to the bridge foundation. After the old piles were removed, the hole was immediately filled with super-slow-setting cement mortar to reinforce the site again, ensuring the safety and stability of the bridge foundation. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 It is a schematic flow chart of a construction method for removing cast-in-place piles in a shield tunneling area under a viaduct provided by the present invention;

[0043] Figure 2 It is a schematic diagram of the structure of cast-in-place piles and bridge foundation in the shield tunneling area under the viaduct provided by the present invention;

[0044] Figure 3 It is a structural schematic diagram of a low-lying short-arm crawler crane provided by the present invention;

[0045] Figure 4 It is a structural schematic diagram of a positioning substrate provided by the present invention;

[0046] Figure 5 It is a schematic structural diagram of the miniature wedge-shaped drill hammer provided by the present invention;

[0047] Figure 6 is a front view schematic diagram of the bottom of the casing provided by the present invention;

[0048] Figure 7 It is a cross-sectional schematic diagram of the steel plate provided by the present invention. DETAILED DESCRIPTION

[0049] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0050] The implementation of the present invention is described in detail below in conjunction with specific embodiments.

[0051] The same or similar numbers in the drawings of this embodiment correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the drawings, it is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as limitations on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0052] Reference Figure 1-7 The figure shows a preferred embodiment of the present invention.

[0053] The invention provides a method for removing cast-in-place piles in a shield tunneling area under a viaduct, comprising the following construction steps:

[0054] 1) According to the shield route 30, measure and lay out the shield crossing area under the viaduct to determine the position of the old pile 20;

[0055] 2) The crawler-type casing full-rotation drilling rig is in place. The crawler-type casing full-rotation drilling rig has a center hole in the middle. The casing 400 is hoisted by a low-lying short-arm crawler crane 100. The casing 400 passes through the center hole, and the bottom of the casing 400 is pressed against the position of the old pile 20; the crawler-type casing full-rotation drilling rig drives the casing 400 to rotate and cut downward until the casing 400 embraces the outer periphery of the old pile cap, and there is a cap gap between the outer periphery of the old pile cap and the inner side wall of the casing 400;

[0056] 3) Using a low-lying short-arm crawler crane 100 to hoist the micro wedge-shaped drill hammer 300, the micro wedge-shaped drill hammer 300 is embedded into the gap between the pile cap from top to bottom, and the micro wedge-shaped drill hammer 300 is clamped and fixed between the old pile cap and the casing 400; using a crawler-type casing full-rotation drilling rig to drive the casing 400 to rotate until the old pile cap is twisted off, and then the old pile cap is taken out from the casing 400;

[0057] 4) Using the crawler-type casing full-rotation drilling rig to drive the casing 400 to continue to press down and cut the soil layer until the bottom of the casing 400 is pressed down to a set distance, and then stop driving the casing 400 to rotate, so that the lower part of the casing 400 embraces the upper part of the old pile 20; the old pile 20 has an insertion section inserted into the casing 400 and a residual pile section located below the casing 400, and a pile interval is formed between the outer periphery of the insertion section and the inner side wall of the casing 400;

[0058] 5) Use the micro wedge-shaped drill hammer 300 to embed into the pile interval from top to bottom. The micro wedge-shaped drill hammer 300 is clamped and fixed between the old pile 20 and the casing 400. Use the crawler-type casing full-rotation drill rig to drive the casing 400 to rotate until the inserted section is twisted off, and then remove the inserted section from the casing 400;

[0059] 6) Repeat the above construction steps 4) to 5) until the length of the residual pile segment is less than the set length, use a micro cross hammer to break the residual pile segment into debris, and then use a micro grab to remove the debris from the casing 400, forming a hole to be filled at the position of the old pile 20;

[0060] 7) Install the grouting frame and grouting conduit, and backfill cement mortar into the hole to be filled through the grouting conduit;

[0061] 8) Pull out casing 400.

[0062] The above-mentioned construction method for removing cast-in-place piles in the shield tunneling area under the viaduct adopts a crawler-type casing full-rotation drilling rig, which can move freely and accurately into position through a crawler self-propelled mechanism without the cooperation of a large crane. The old pile 20 is removed by a low-lying crawler crane 100 and a modified micro-grab bucket, a micro-cross hammer, and a micro-wedge-shaped chisel hammer 300 to achieve barrier-free construction under low clearance conditions and ensure the normal progress of construction. In addition, the crawler-type casing full-rotation drilling rig is put into position quickly and efficiently; the casing full-rotation drilling rig is used to sink the casing 400 to cover the old pile 20, and the micro-wedge-shaped chisel hammer 300 is inserted into the gap between the pedestal and the pile interval, and the crawler-type casing full-rotation drilling rig rotates and twists off the old pile pedestal and the insertion section, and then the broken pile is pulled out with the help of a micro-grab bucket or a low-lying short-arm crawler crane 100, and the overall obstacle removal efficiency is high.

[0063] Next, the old pile 20 is removed with casing 400. The length of the inserted section is measured to determine the condition of the residual pile section in the casing 400. When the length of the residual pile section is short, the micro cross hammer and micro grab bucket are used to repeatedly grab and remove the slag in the casing 400 to ensure that the obstacle is completely cleared and clear the obstacles for the subsequent shield crossing. In addition, during the construction process, the casing 400 is driven by the casing full-rotation drilling rig to advance and drill into the old pile 20, isolating the hole operation from causing excessive disturbance to the bridge foundation 10. After the old pile 20 is removed, the hole is immediately filled with super slow-setting cement mortar to reinforce the site again, ensuring the safety and stability of the bridge foundation 10.

[0064] Specifically, the JAR-210H casing full-rotation drilling rig was modified and a crawler walking mechanism was installed on its base to form a casing full-rotation drilling rig. The whole machine is 4m high and can move to the pile hole without the assistance of a large crane, meeting the low-headroom construction requirements.

[0065] Specifically, the arm 110 of the YTQU100HD crawler crane 100 is dismantled and adjusted to a low-lying state, forming a low-lying short-arm crawler crane 100 with a maximum lifting load of 100t and a total height of only 3.5m, which can meet the lifting operations in low-clearance environments.

[0066] Specifically, the bucket body of the conventional impact grab bucket is 5m long, which cannot meet the construction requirements in low clearance environments. Therefore, this method specially develops a micro impact grab bucket for low clearance environments, with a bucket body length of 2m.

[0067] Specifically, the miniature wedge-shaped drill hammer 300 has a total hammer body length of only 2 m and is composed of a plurality of trapezoidal steel plates 310 , the curvature of which fits the inner wall of the casing 400 .

[0068] Specifically, the conventional hammer is 5m long, which cannot meet the construction requirements in low clearance environments. Therefore, this method reduces the length of the cross hammer. The miniature cross hammer has a diameter of 1.2m and a length of 2m. The hammer body is designed with multiple steel plates 310 to compensate for the effect of being too light due to the reduced length.

[0069] Specifically, blocking piles are driven in rows with a pile diameter of 1.5m, a pile spacing of 1.3m and a pile length of 34m to enclose and reinforce the bridge piers to reduce the adverse effects of pile pulling on the existing bridge.

[0070] In construction step 1), an infrared displacement monitoring device is installed to monitor the displacement of the bridge deck. In this way, the deformation is automatically monitored 24 hours a day.

[0071] In construction step 2), a positioning base plate 200 is suspended on the position of the old pile 20, and then the crawler-type casing full-rotation drilling rig is moved. A positioning hole 201 that passes through the middle of the positioning base plate 200 is formed, and the positioning hole 201 is aligned with the center hole. In this way, the positioning base plate 200 can ensure that the axis of the casing 400 is in the same straight line with the axis of the old pile 20, and the crawler-type casing full-rotation drilling rig can be positioned, which is convenient for operating and moving the crawler-type casing full-rotation drilling rig to a set position.

[0072] A plurality of positioning grooves 202 are formed on the top of the positioning base plate 200, and the crawler-type casing full-rotation drilling rig has a plurality of legs that can telescope up and down;

[0073] In construction step 2), after the crawler casing full-rotation drilling rig is moved to the set position, the multiple legs are extended and moved downward until the bottom of the legs are pressed against the positioning groove 202. In this way, the crawler casing full-rotation drilling rig is prevented from being displaced.

[0074] The casing 400 includes a plurality of vertically connected section pipes, and adjacent section pipes are connected to each other via a connecting structure;

[0075] In construction step 4), the casing 400 is driven by a crawler-type casing full-rotation drill to continue to press down and cut the soil layer. The casing 400 has an upper extension section extending above the center hole. When the length of the upper extension section is less than 50 cm, the casing 400 is stopped from rotating. A waterproof film is rolled on the outer periphery of the upper extension section to form a waterproof layer, and then butter is applied on the waterproof layer to form a lubricating layer. The low-lying short-arm crawler crane 100 is used to hoist the section pipe, and the hoisted section pipe is connected to the top of the upper extension section through a connecting structure. The waterproof layer is clamped and fixed between the upper extension section and the hoisted section pipe. In this way, the sealing is ensured by the design of the waterproof layer, and the design of the lubricating layer allows the section pipes of the upper section to be smoothly embedded in the process of extension and insertion.

[0076] The bottom of the sleeve 400 is provided with a plurality of cutting shoes 410, which are arranged at intervals along the circumference of the sleeve 400; the inner side wall of the bottom of the sleeve 400 is provided with a plurality of inner cutter heads 420, the inner ends of the inner cutter heads 420 are connected to the inner side wall of the sleeve 400, and the outer ends of the inner cutter heads 420 are extended toward the center of the sleeve 400; the outer periphery of the bottom of the sleeve 400 is welded with protruding strips, and the plurality of protruding strips form a protruding grid on the outer periphery of the sleeve 400;

[0077] In construction step 2), when the crawler-type casing full-rotation drilling rig drives the casing 400 to rotate and cut downward, an annular cap spacing is formed on the pile position of the old pile 20 under the action of the inner cutter head 420;

[0078] In construction step 4), when the crawler-type casing full-rotation drill drives the casing 400 to rotate and cut downward, an annular pile interval is formed on the pile position of the old pile 20 under the action of the inner cutter head 420. In this way, a gap is broken in the casing 400 by the action of the inner cutter head 420, which is convenient for the micro-wedge drill hammer 300 to be embedded, and the cutting body to be grabbed and lifted out. And the design of the protruding grid facilitates the lowering of the casing 400.

[0079] The width of the inner blade head 420 is greater than 12 cm.

[0080] In this embodiment, in the construction steps 3) and 6), during the downward cutting and drilling process of the casing 400, the soil in the casing 400 is taken out by using a micro-grab bucket;

[0081] In construction step 3), after the old pile cap is twisted off, the old pile cap is taken out by using a micro-grab bucket. In this way, when the old pile cap is relatively regular, it can be quickly taken out by using a micro-grab bucket.

[0082] In construction step 3), after the old pile cap is twisted off, the cap steel bars in the old pile cap are exposed under the impact of the micro wedge-shaped drill hammer 300, and the old pile cap is hoisted out of the casing 400 by tying the cap steel bars;

[0083] In construction step 5), after the insertion section is twisted off, under the impact of the micro wedge-shaped drill hammer 300, the old pile 20 steel bars in the insertion section are exposed, and the insertion section is lifted out of the casing 400 by tying the old pile 20 steel bars. In this way, the construction personnel enter the casing 400, tie it up, and the crawler crane 100 lifts it out to realize the removal of the cutting body.

[0084] The outer side of the micro wedge-shaped drill hammer 300 is formed with an arc-shaped outer side surface 301, and the inner side of the micro wedge-shaped drill hammer 300 is formed with a concave-convex inner side surface 302. The two sides of the outer side surface 301 are respectively connected to the two sides of the inner side surface 302. From top to bottom, the outer side surface 301 is arranged to extend obliquely toward the inner side surface 302.

[0085] In construction step 3), after the miniature wedge-shaped drill hammer 300 is embedded in the cap gap, the outer side surface 301 abuts against the inner wall of the casing 400, and the inner side surface 302 abuts against the outer periphery of the old pile cap;

[0086] In construction step 6), after the miniature wedge-shaped drill hammer 300 is embedded in the pile interval, the outer side surface 301 abuts against the inner side wall of the casing 400, and the inner side surface 302 abuts against the outer periphery of the insertion section;

[0087] The top of the micro wedge-shaped drill hammer 300 is provided with a hanging ear for connecting with a wire rope. In the construction step 3), the micro wedge-shaped drill hammer 300 is lifted to the top of the cap gap by the wire rope, and after the outer side surface 301 is closely fitted with the inner wall of the casing 400, the wire rope is released. Under the action of gravity, the micro wedge-shaped drill hammer 300 is embedded in the cap gap from top to bottom;

[0088] In construction step 6), the miniature wedge drill hammer 300 is hoisted to the top of the pile interval by a steel wire rope, and after the outer side surface 301 is closely fitted with the inner side wall of the casing 400, the steel wire rope is released, and under the action of gravity, the miniature wedge drill hammer 300 is embedded in the pile interval from top to bottom. In this way, the design of the outer side surface 301 facilitates the determination of the final position of the miniature wedge drill hammer 300 before it is lowered, which facilitates its accurate placement. The miniature wedge drill hammer 300 is embedded in advance by utilizing its own gravity, so that it is stably engaged in the base interval or the pile interval, and when the casing 400 rotates, the torque can be better transmitted to the cut body.

[0089] When the miniature wedge-shaped drill hammer 300 fails to achieve the desired effect after one insertion, the operation may be repeated for multiple times until the miniature wedge-shaped drill hammer 300 is stuck.

[0090] When the insertion section is too long, after the insertion section is taken out to a certain distance above the casing 400, an excavator is used to fold the insertion section, and then the insertion section is completely taken out to meet the low clearance construction requirements.

[0091] The micro wedge-shaped drill hammer 300 includes a plurality of steel plates 310, which are welded to each other. The outer end surface of the steel plate 310 is formed with an abutting surface 311 for abutting against the inner wall of the casing 400. The abutting surfaces 311 of the plurality of steel plates 310 are combined to form an outer side surface 301, and an elastic reaction convex strip 320 is provided on the abutting surface 311.

[0092] In construction step 3), when the micro wedge-shaped drill hammer 300 is embedded into the gap between the pile caps under the action of gravity, the micro wedge-shaped drill hammer 300 is pressed by the old pile cap, the reaction convex strip 320 is compressed, and under the action of elastic force, the inner side surface 302 of the micro wedge-shaped drill hammer 300 is pressed against the outer periphery of the old pile cap;

[0093] In construction step 6), when the micro wedge drill hammer 300 is embedded into the pile interval under the action of gravity, the micro wedge drill hammer 300 is pressed by the old pile 20, and the reaction convex strip 320 is compressed. Under the action of elastic force, the inner side surface 302 of the micro wedge drill hammer 300 is pressed against the outer periphery of the old pile 20. In this way, through the action of gravity acceleration, the reaction convex strip 320 is squeezed to a compressed state after falling, absorbing the force squeezed on the micro wedge drill hammer 300, and under the action of elastic force, the micro wedge drill hammer 300 is pressed back on the cut body, thereby improving the insertion effect of the micro wedge drill hammer 300 and increasing the probability of getting stuck.

[0094] As a preferred embodiment, the inner end surface of the steel plate 310 is formed with an inclined surface 312, and along the top-down direction, the inclined surface 312 is arranged to extend obliquely toward the abutting surface 311, and a plurality of inclined surfaces 312 of the steel plates 310 are combined to form the inner side surface 302; a through hole is provided in the middle of the steel plate 310, which penetrates the steel plate 310 front and back, and the outer end of the through hole penetrates the abutting surface 311, and the inner end of the steel plate 310 penetrates the inclined surface 312;

[0095] The reaction convex strip 320 has a telescopic section 321 embedded in the through hole; a moving block 330 is provided in the through hole, the inner end of the moving block 330 is connected to the outer end of the telescopic section 321, the outer end of the moving block 330 is provided with a pressing cutter head 331 arranged toward the inclined surface 312, and the upper and lower ends of the moving block 330 are provided with outwardly protruding convex blocks 332; two guide rails are provided in the through hole, and a spring 333 for driving the moving block 330 to return is provided in the guide rail, the inner end of the spring 333 is fixedly arranged, and the outer end of the spring 333 presses on the convex block 332;

[0096] In construction step 3), after the miniature wedge-shaped drill hammer 300 is embedded into the gap between the caps under the action of gravity, the reaction convex strip 320 is squeezed by the inner wall of the casing 400, the reaction convex strip 320 is compressed, and the telescopic section 321 is deformed and extended toward the inclined surface 312, driving the moving block 330 to move toward the inclined surface 312, and the convex block 332 squeezes the spring 333 to deform, until the pressing cutter head 331 is pressed against the old pile cap;

[0097] In construction step 6), after the miniature wedge-shaped drill hammer 300 is embedded into the pile interval under the action of gravity, the reaction convex strip 320 is squeezed by the inner wall of the casing 400, the reaction convex strip 320 is compressed, and the telescopic section 321 is deformed and extended toward the inclined surface 312, driving the moving block 330 to move toward the inclined surface 312, and the convex block 332 squeezes the spring 333 to deform, until the pressing cutter head 331 is pressed against the old pile 20;

[0098] When the miniature wedge-shaped chisel hammer 300 is taken out from the gap between the caps or the piles, under the action of the elastic force, the spring 333 presses the protrusion 332 to move toward the abutting surface 311, and the moving block 330 squeezes the telescopic section 321 to deform and shorten, and the reaction protrusion 320 expands and deforms outward. In this way, the movement of the pressing blade 331 is controlled by the design of the telescopic section 321, so that it is hidden in the through hole in the natural state, and in the embedded state, the pressing blade 331 abuts against the cut body, ensuring that its surface is partially broken, so that the steel bars inside are exposed, which is convenient for lifting. In addition, the connection between the miniature wedge-shaped chisel hammer 300 and the cut body is increased to ensure the transmission of torque.

[0099] The pressing blade head 331 may be a diamond bead or the like.

[0100] As a preferred embodiment, during the backfilling of cement mortar, the catheter is pulled out according to the injection surface formed by the cement mortar in the hole to be filled. The bottom of the injection catheter in the hole is always kept at a height of more than 2m above the cement mortar backfilling surface. To ensure the smooth extraction of the catheter and the casing 400, when the cement mortar is backfilled to half of the volume in the hole, the injection hopper is unloaded and the casing 400 is started to be pulled out.

[0101] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A construction method for removing cast-in-place piles in the shield tunneling area under a viaduct, characterized in that: The construction steps include: 1) According to the shield route, measure and lay out the shield crossing area under the viaduct to determine the position of the old piles; 2) The crawler-type full-casing full-rotation drilling rig is in place. The crawler-type full-casing full-rotation drilling rig has a center hole in the middle. The casing is hoisted by a low-lying short-arm crawler crane. The casing passes through the center hole, and the bottom of the casing is pressed against the position of the old pile. The crawler-type full-casing full-rotation drilling rig drives the casing to rotate and cut downward until the casing embraces the outer periphery of the old pile cap, and there is a cap gap between the outer periphery of the old pile cap and the inner side wall of the casing; 3) Use a low-lying short-arm crawler crane to hoist a micro wedge-shaped drill hammer, which is embedded in the cap gap from top to bottom, and is clamped and fixed between the old pile cap and the casing; use a crawler-type full-casing full-rotation drilling rig to drive the casing to rotate until the old pile cap is twisted off, and then remove the old pile cap from the casing; 4) Using a crawler-type full-casing full-rotation drilling rig to drive the casing to continue pressing down to cut the soil layer until the bottom of the casing is pressed down to a set distance, and then stop driving the casing to rotate, and the lower part of the casing embraces the upper part of the old pile; the old pile has an insertion section inserted into the casing and a residual pile section located below the casing, and a pile interval is formed between the outer periphery of the insertion section and the inner side wall of the casing; 5) Use a micro wedge-shaped drill hammer to embed into the pile interval from top to bottom. The micro wedge-shaped drill hammer is clamped and fixed between the old pile and the casing. Use a crawler-type full-casing full-rotation drill rig to drive the casing to rotate until the inserted section is twisted off, and then remove the inserted section from the casing; 6) Repeat the above construction steps 4) to 5) until the length of the residual pile segment is less than the set length, use a micro cross hammer to break the residual pile segment into debris, and then use a micro grab bucket to take the debris out of the casing, and form a hole to be filled at the old pile position; 7) Install a grouting frame and a grouting conduit, and backfill cement mortar into the hole to be filled through the grouting conduit; 8) Pull out the casing.

2. The method for removing bored piles in the shield tunneling area under the viaduct as claimed in claim 1 is characterized in that: In the construction step 2), a positioning base plate is suspended on the old pile position, and then the crawler-type full-casing full-rotation drilling rig is moved. A positioning hole penetrating vertically is formed in the middle of the positioning base plate, and the positioning hole is aligned with the center hole vertically.

3. The method for removing cast-in-place piles in the shield tunneling area under the viaduct as claimed in claim 2 is characterized in that: A plurality of positioning grooves are formed on the top of the positioning base plate, and the crawler-type full-casing full-rotation drilling rig has a plurality of legs that can telescope up and down; In the construction step 2), after the crawler-type full-casing full-rotation drilling rig is moved to a set position, the plurality of legs are extended and moved downward until the bottom of the legs is pressed against the positioning groove.

4. The method for removing cast-in-place piles in the shield tunneling area under the viaduct as claimed in claim 1 is characterized in that: The sleeve comprises a plurality of vertically connected section pipes, and adjacent section pipes are connected to each other via a connecting structure; In the construction step 4), during the process of using a crawler-type full-casing and full-rotation drilling rig to drive the casing to continue to press down and cut the soil layer, the casing has an upper extension section extending above the center hole. When the length of the upper extension section is less than 50 cm, the casing rotation is stopped, and a waterproof membrane is rolled on the outer periphery of the upper extension section to form a waterproof layer, and then butter is applied on the waterproof layer to form a lubricating layer; a low-lying short-arm crawler crane is used to hoist the joint pipe, and the hoisted joint pipe is connected to the top of the upper extension section through a connecting structure, and the waterproof layer is clamped and fixed between the upper extension section and the hoisted joint pipe.

5. The method for removing bored piles in the shield tunneling area under the viaduct as claimed in claim 1 is characterized in that: The bottom of the sleeve is provided with a plurality of cutting shoes, and the plurality of cutting shoes are arranged at intervals along the circumference of the sleeve; the inner side wall of the bottom of the sleeve is provided with a plurality of inner cutter heads, the inner ends of the inner cutter heads are connected to the inner side wall of the sleeve, and the outer ends of the inner cutter heads are extended toward the center of the sleeve; the outer periphery of the bottom of the sleeve is welded with protruding strips, and the plurality of protruding strips form a protruding grid on the outer periphery of the sleeve; In the construction step 2), during the process of the crawler-type full-casing full-rotation drilling rig driving the casing to rotate and cut downward, an annular cap spacing is formed on the old pile position under the action of the inner cutter head; In the construction step 4), during the process of the crawler-type full-casing and full-rotation drilling rig driving the casing to rotate and cut downward, an annular pile interval is formed on the old pile position under the action of the inner cutter head.

6. The method for removing bored piles in the shield tunneling area under the viaduct as described in claim 1, characterized in that: In the construction steps 3) and 6), during the downward cutting and drilling of the casing, the soil in the casing is taken out by using a micro-grab bucket; In the construction step 3), after the old pile cap is twisted off, the old pile cap is taken out by using a micro-grab bucket.

7. The method for removing bored piles in the shield tunneling area under the viaduct as claimed in claim 1, characterized in that: In the construction step 3), after the old pile cap is twisted off, the cap steel bars in the old pile cap are exposed under the impact of the micro wedge-shaped drill hammer, and the old pile cap is hoisted out of the casing by bundling the cap steel bars; In the construction step 5), after the insertion section is twisted off, the old pile reinforcement in the insertion section is exposed under the impact of the micro wedge-shaped drill hammer, and the insertion section is lifted out of the casing by bundling the old pile reinforcement.

8. The method for removing bored piles in the shield tunneling area under a viaduct according to any one of claims 1 to 7, characterized in that: The outer side of the micro wedge-shaped drill hammer is formed with an arc-shaped outer side surface, and the inner side of the micro wedge-shaped drill hammer is formed with a concave-convex inner side surface, and the two sides of the outer side surface are respectively connected to the two sides of the inner side surface, and the outer side surface is arranged to extend obliquely toward the inner side surface along the direction from top to bottom; In the construction step 3), after the miniature wedge-shaped drill hammer is embedded in the cap gap, the outer side surface abuts against the inner side wall of the casing, and the inner side surface abuts against the outer periphery of the old pile cap; In the construction step 6), after the miniature wedge-shaped drill hammer is embedded in the pile interval, the outer side surface abuts against the inner side wall of the casing, and the inner side surface abuts against the outer periphery of the insertion section; The top of the micro wedge-shaped drill hammer is provided with a hanging ear for connecting with a wire rope. In the construction step 3), the micro wedge-shaped drill hammer is hoisted to the top of the cap gap by the wire rope, and after the outer side surface is closely fitted with the inner side wall of the casing, the wire rope is released, and under the action of gravity, the micro wedge-shaped drill hammer is embedded in the cap gap from top to bottom; In the construction step 6), the micro wedge-shaped drill hammer is hoisted to the top of the pile interval by a wire rope, and after the outer side surface is tightly fitted with the inner wall of the casing, the wire rope is released, and under the action of gravity, the micro wedge-shaped drill hammer is embedded in the pile interval from top to bottom.

9. The method for removing bored piles in the shield tunneling area under the viaduct as claimed in claim 8, characterized in that: The miniature wedge-shaped drill hammer comprises a plurality of steel plates, the plurality of steel plates are welded to each other, the outer end surface of the steel plate is formed with an abutment surface for abutting against the inner wall of the casing, the abutment surfaces of the plurality of steel plates are combined to form the outer side surface, and the abutment surface is provided with an elastic counter-pressure convex strip; In the construction step 3), when the micro wedge-shaped drill hammer is embedded into the cap gap under the action of gravity, the micro wedge-shaped drill hammer is pressed by the old pile cap, the counter-pressure convex strip is compressed, and under the action of elastic force, the inner side surface of the micro wedge-shaped drill hammer is pressed against the outer periphery of the old pile cap; In the construction step 6), when the micro wedge-shaped drill hammer is embedded into the pile interval under the action of gravity, the micro wedge-shaped drill hammer is pressed by the old pile, the counter-pressure convex strip is compressed, and under the action of elastic force, the inner surface of the micro wedge-shaped drill hammer is pressed against the outer periphery of the old pile.

10. The method for removing bored piles in the shield tunneling area under the viaduct as claimed in claim 9, characterized in that: The inner end surface of the steel plate is formed with an inclined surface, and along the direction from top to bottom, the inclined surface is arranged to extend obliquely toward the abutting surface, and a plurality of the inclined surfaces of the steel plates are combined to form the inner side surface; a through hole is provided in the middle of the steel plate, which penetrates the steel plate front and back, and the outer end of the through hole penetrates the abutting surface, and the inner end of the steel plate penetrates the inclined surface; The counter-pressure convex strip has a telescopic section embedded in the through hole; a moving block is provided in the through hole, the inner end of the moving block is connected to the outer end of the telescopic section, the outer end of the moving block is provided with a pressing cutter head arranged toward the inclined surface, and the upper and lower ends of the moving block are provided with outwardly protruding convex blocks; two guide rails are provided in the through hole, and a spring for driving the moving block to reset is provided in the guide rail, the inner end of the spring is fixedly arranged, and the outer end of the spring presses on the convex block; In the construction step 3), after the micro wedge-shaped drill hammer is embedded into the cap gap under the action of gravity, the counter-pressure convex strip is squeezed by the inner wall of the casing, the counter-pressure convex strip is compressed, the telescopic section is deformed and extended toward the inclined surface, driving the moving block to move toward the inclined surface, and the convex block squeezes the spring to deform until the pressing cutter head is pressed against the old pile cap; In the construction step 6), after the miniature wedge-shaped drill hammer is embedded into the pile interval under the action of gravity, the counter-pressure convex strip is squeezed by the inner wall of the casing, the counter-pressure convex strip is compressed, the telescopic section is deformed and extended toward the inclined surface, driving the moving block to move toward the inclined surface, and the convex block squeezes the spring to deform until the pressing cutter head presses against the old pile; When the miniature wedge-shaped drill hammer is taken out from the platform interval or the pile interval, under the action of elastic force, the spring pressing protrusion moves toward the abutting surface, the moving block squeezes the telescopic section to deform and shorten, and the counter-pressure protrusion expands and deforms outward.

Citation Information

Patent Citations

  • Old pile pulling-out method

    CN114703848A

  • Extraction implementation method for ultra-deep PHC pile under ultra-low clearance condition

    CN117552420A

  • Pile pulling construction technology of full-rotation casing pipe drilling machine

    CN118187066A

  • Existing bridge pile pulling device is passed through in weak soil shield driving district

    CN206570811U

  • Hinge type double-splicing type steel boot old pile pulling-out system

    CN220927846U

Cited By

  • Old pile lossless pulling-out construction method of all-casing full-slewing drilling machine

    CN121161821A