Tight reservoir energizing fracturing volume transformation technical method

Through the oil-shelve mixed injection fracturing process, the penetration capacity of CO2 is used to quickly enter the reservoir in CO2 energy-enhancing fracturing, which solves the problems of high construction risks and high costs in the existing technology, and realizes the depth energy increase of low-pressure reservoirs and large-scale transformation.

CN119083968APending Publication Date: 2024-12-06SOUTHWEST PETROLEUM UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411563027.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-05
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing CO2 energy-enhancing fracturing technology is difficult to achieve large-scale construction under the limitation of equipment and liquid systems, resulting in high construction risks and high costs.

Method used

The oil-shelves mixed injection fracturing process is adopted, and the oil pipe pump is filled with frozen glue, sand liquid and casing pump is filled with CO2. The pump injection sequence and quantity are adjusted according to the temperature field of the bottom of the well and artificial cracks, so as to avoid mixing CO2 with frozen glue liquid, and use CO2. The penetration capacity quickly enters the reservoir, reducing construction risks and costs.

Benefits of technology

It significantly reduces the construction risk of CO2 energy-enhancing and sand fracturing, reduces the cost of fracturing fluid, realizes the depth energy-enhancing and large-scale transformation of low-pressure reservoirs, and improves the efficiency of reservoir transformation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083968A_ABST
    Figure CN119083968A_ABST
Patent Text Reader

Abstract

The invention discloses a tight reservoir energizing fracturing volume transformation technical method, and relates to the technical field of low-pressure oil and gas reservoir development reservoir transformation. The method comprises the following steps that 1, according to the requirements of reservoir transformation and fracturing construction, an acid-resistant fracturing pipe column is optimized, and an oil sleeve mixed injection fracturing technology is adopted; and 2, gel sand-carrying fluid is pumped into an oil pipe, a supported artificial fracture is formed, a sleeve is filled with mixed liquid of CO2 and fracturing fluid, according to the design that fracturing pressure is limited and displacement is not limited, the temperature of the well bottom and the temperature in the artificial fracture during construction of the sleeve with the highest displacement are simulated, and the phase state characteristics of CO2 before the CO2 enters the stratum are determined. According to the technological method, the problem that large-scale construction is difficult due to the fact that fracturing equipment and a transformation liquid system are limited in existing CO2 energized fracturing is solved. By using existing conventional fracturing equipment and a common transformation liquid system, CO2 large-scale energy increasing and fracturing transformation composite construction can be achieved, and the CO2 plays a greater role in reservoir transformation and low-quality oil reservoir development.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a technical method for volume transformation of dense reservoirs by energy-enhanced fracturing, belonging to the technical field of reservoir transformation for low-pressure oil and gas reservoir development. Background Art

[0002] As an energy-enhancing gas, CO2 has been used to improve gas well recovery since the 1950s and has been widely used in production-enhancing operations since the 1960s. At present, pure CO2 fracturing, CO2 foam fracturing and CO2 energy-enhancing fracturing have been formed at home and abroad. Pure CO2 fracturing (i.e., CO2 dry fracturing) has high requirements for fracturing equipment and supporting sand-carrying fluid thickeners. Liquid tanks, sand tanks, etc. must be fully sealed, and sand-carrying fluid thickeners must be specially developed. Conventional fracturing equipment and fracturing fluid systems are difficult to meet the needs of this process. The cost of transforming equipment is high and the economic benefits are low, resulting in a small application range of pure CO2 fracturing. Only individual well field tests have been carried out in certain blocks at home and abroad. At present, the commonly used CO2 energy-enhancing fracturing is mainly CO2 foam fracturing. On the basis of conventional fracturing equipment, casing or full tubing pumping fracturing is used. It only needs to develop a water-based fracturing fluid thickener that matches CO2, and has a wide range of applications. However, CO2 quasi-dry fracturing has high requirements for the matching fracturing fluid system, and a special thickener still needs to be developed. It is required that the fracturing fluid prepared by the thickener does not affect the sand-carrying property of the fracturing fluid after mixing with liquid CO2 in different proportions. The conventional fracturing fluid system does not meet the requirements of the process technology, which is an important aspect of the high cost of CO2 fracturing fluid. The present invention provides a technical method for volume transformation of energy-enhanced fracturing of tight reservoirs. The method mainly adopts tubing pumping of gel sand-carrying fluid (i.e., fracturing fluid) and casing pumping of pure CO2. According to the scale of gel fracturing fluid and CO2 liquid designed for energy enhancement and transformation, the casing string is optimized to meet the needs of pumping gel sand-carrying fluid and CO2 liquid separately in casing oil. At the same time, according to the simulation of the temperature field at the bottom of the well and in the artificial fracture during the fracturing process, the different pumping sequences and pumping displacements of gel sand-carrying fluid and CO2 are adjusted. The core of this technology is to force the separation of the gel sand-carrying fluid and CO2 during the CO2 energy-enhanced fracturing wellbore pumping process to prevent the two from mixing in the wellbore and affecting their respective performances, especially to prevent the influence of CO2 on the gel sand-carrying fluid, which may cause the sand-carrying fluid to be desanded and cause sand blockage, thereby leading to construction failure. The technical method provided by the present invention promotes the mixing of the gel sand-carrying fluid and CO2 before entering the formation at the bottom of the well. Since CO2 has extremely strong penetrating ability, it can quickly penetrate into the interior of the reservoir after entering the oil and gas reservoir, thereby reducing the impact on the sand-carrying fluid. This part is the biggest difference between the present invention and the existing CO2 dry fracturing, CO2 quasi-dry fracturing, CO2 energy-enhanced fracturing and other processes. Compared with the existing process technology, it can significantly reduce the construction risk of CO2 energy-enhanced sand fracturing, and at the same time greatly reduce the cost of fracturing fluid, and the technical and economic advantages are relatively significant.

[0003] Chinese patent CN109138959B discloses a supercritical CO2 energy-concentrated fracturing method. After the oil and gas well is perforated and completed, the supercritical CO2 energy-concentrated fracturing string is lowered into the target layer section and fixed by using an oil pipe, CO2 is injected into the supercritical CO2 energy-concentrated fracturing string through the oil pipe and continuously pressurized, the target reservoir is impacted and fractured by using CO2, and CO2 is continuously injected into the supercritical CO2 energy-concentrated fracturing string until the designed amount is reached and the injection is stopped. The above steps are repeated to fracture different target layers.

[0004] Chinese patent CN111520110A describes a method and system for supercritical CO2 fracturing of horizontal wells to develop enhanced geothermal energy. The main features are as follows: after fully mixing liquid CO2 and abrasive, the resulting mixture is lowered into the position to be perforated, and the resulting mixture of supercritical CO2 and abrasive passes through a hydraulic jet nozzle to form a high-pressure jet, which destroys the casing, cement ring, and hot dry rock to form perforations; pure liquid CO2 is pumped to the perforation position to form artificial fractures; proppant and supercritical CO2 are fully mixed in a sand mixing truck, and the mixed fracturing fluid is pumped into the well by a fracturing truck, and the proppant is carried to the fracture by supercritical CO2 underground to complete the first stage of fracturing; the hydraulic jet nozzle is moved to the next position to be transformed, and isolation fluid is pumped in to protect the fractured well section, and the above operations are repeated in sequence until all fracturing transformations of the horizontal well are completed.

[0005] Chinese patent CN108071378A describes a CO2 foam fracturing method suitable for tight oil and gas reservoirs. The main steps include: (1) selecting input parameters according to reservoir parameters and block well spacing, and then predicting the production capacity changes under different fracture lengths and different conductivity parameters to obtain the optimal fracture length and fracture conductivity, thereby optimizing the fracturing construction scale; (2) determining the fracturing construction string according to process requirements, post-fracturing return and production requirements, and combining the conditions of neighboring wells that have been constructed to predict the construction pressure, thereby optimizing the construction displacement; then optimizing the relevant construction parameters to complete the single well optimization design; (3) injecting the CO2 clean foam fracturing fluid system into the wellbore to carry out CO2 foam fracturing construction.

[0006] Chinese patent CN108825194A describes a carbon dioxide anhydrous sand fracturing method, the main steps of which include: 1) selecting gas wells and reservoirs for carbon dioxide anhydrous sand fracturing; 2) fracturing and fracture creation: injecting carbon dioxide into the annulus of the oil pipe and the oil casing at the same time, wherein the injection displacement of the carbon dioxide pre-fluid is greater than the injection displacement of the carbon dioxide in the oil pipe; 3) filling the fracture gaps: injecting carbon dioxide sand-carrying fluid and viscosity-enhancing agent into the annulus of the oil casing; 4) stopping sand displacement.

[0007] Chinese patent CN109736767A describes a supercritical carbon dioxide fracturing production enhancement process, which includes: S1: construction preparation, including preparation of carbon dioxide fracturing fluid and preparation of fracturing equipment; S2: connection of ground pipelines; S3: ground circulation detection; S4: wellhead and ground pipeline pressure testing; S5: filling the wellbore to prepare for fracturing construction; S6: preliminary fracturing test; S7: fracturing construction, so that carbon dioxide reaches a supercritical state, at which time the fracture degree of the fractured formation is increased, the fracture is further extended and the carbon dioxide fracturing fluid extends the fracture, and then the sand mixing equipment is started to inject proppant until the proppant is completely entered into the formation; S8: after shutting in the well for at least 120 minutes, step S9 is performed; S9: depressurization, controlling the release of carbon dioxide until the fracture is closed.

[0008] The document "CO2 Energy-Enhanced Fracturing Technology for Upper Paleozoic Gas Strata in Changqing" (Petroleum Drilling and Production Technology, Issue 4, 2002), based on the geological research on reservoir transformation, conducted indoor research on CO2 foam fracturing technology, introduced and developed CO2 foam fracturing acid cross-linking technology, optimized CO2 foam scheme design and on-site construction technology, and matched CO2 energy-enhanced fracturing technology.

[0009] The literature "Research and Application of CO2 Energy-Enhanced Fracturing Technology" (Drilling and Production Technology, Issue 4, 2005) used CO2 front-stage plug energy-enhancing technology to carry out 6 well fracturing operations on site. The average shut-in reaction time was about 2 hours, the drainage cycle was 10.8 days, and the drainage time was shortened by nearly 10 days; the drainage efficiency was 90.5%, an increase of 39%; the average daily increase in crude oil production after fracturing was 38.608m 3 , natural gas 18335m 3 .

[0010] The document "Application of CO2 Energy-Enhanced Fracturing in Coalbed Methane Vertical Wells" (Coal Engineering, 2011, No. 2) systematically analyzes the production increase mechanism of CO2 energy-enhanced fracturing based on the characteristics of CO2 energy-enhanced fracturing, and designs the CO2 energy-enhanced fracturing coal reservoir technology in the study area in combination with the actual situation of Luling Mine. The gas production comparison between CO2 energy-enhanced fracturing and conventional activated water fracturing in Luling Mine shows that CO2 energy-enhanced fracturing can increase the gas production of coalbed methane vertical wells to a certain extent, and has a good application prospect.

[0011] The document "Discussion on the Application of CO2 Fracturing Technology in Continental Shale Gas Layers" (Natural Gas Industry, 2014, No. 1) analyzes the characteristics of CO2 foam fracturing technology, CO2 energy-enhanced fracturing technology and liquid CO2 fracturing technology in view of the reservoir characteristics and fracturing difficulties of continental shale gas layers, and conducts liquid CO2 fracturing and CO2 energy-enhanced fracturing application tests in the Chang 7 shale gas layer of the Mesozoic Yanchang Formation in the Ordos Basin. The results show that pure liquid CO2 at 2.0m 3 / min displacement can open 7 sections of shale gas layer, the fluid is discharged quickly after fracturing, and it can be ignited and combustible after 24 hours; at the same time, CO2 energy fracturing can significantly increase the return speed and return rate of fracturing fluid, shorten the discharge cycle, and is conducive to the exploration and development of continental shale gas. In addition, based on the current status of domestic fracturing equipment and technology and environmental protection issues, the future application and development ideas of CO2 fracturing technology for continental shale gas layers are proposed.

[0012] The literature "Application of CO2 Energy-Enhanced Fracturing in Low-Permeability Reservoirs" (Petrochemical Applications, 2021, No. 4) In order to increase the effect of reservoir fracturing transformation, the CO2 pre-energized fracturing construction process is adopted. The CO2 pre-segment plug can effectively supplement the formation energy, reduce reservoir damage and increase the flowback efficiency. It can be seen from the field test that the flowback rate is more than 88%, the maximum increase in crude oil production is 68t, and the input-output ratio is more than 1:2.5, which can effectively improve the efficiency of reservoir transformation and achieve good economic benefits.

[0013] The document "Important Achievements in CO2 Energy-Enhanced Fracturing Technology in Changqing Oilfield" (Unconventional Oil and Gas, 2022, No. 3) demonstrated the liquid CO2 pre-enhanced fracturing and carbon storage test in the side-drilling horizontal well of the old well in Changqing Oilfield, which was first successfully achieved in the central area of ​​Sulige Gas Field. Various technical data show that the cumulative amount of liquid CO2 entering the well reached 100m 3 After the one-time release and ignition, the flame is as high as 6-7m, and the monitored CO2 storage rate exceeds 80%, achieving the dual goals of fracturing production increase and environmental protection and emission reduction. According to experts who study fracturing technology at the Changqing Oilfield Oil and Gas Technology Research Institute, CO2 pre-energization technology is applied to gas field tight gas reservoirs and old area transformation with its unique process advantages, and has clear technical pertinence for low-pressure, tight, and strong water-locked sandstone reservoirs.

[0014] The above patents and literature studies show that the commonly used CO2 energy-enhanced fracturing technologies currently include CO2 dry fracturing, CO2 foam fracturing, and special tools to pump CO2 into the target reservoir to perform fracturing operations. CO2 dry fracturing, also known as waterless fracturing, implements fully enclosed operations, pumps CO2 into the casing at the same time as special sand-carrying fluid viscosity-enhancing agents, and conventional fracturing fluids cannot be used to perform dry fracturing. CO2 foam fracturing is widely implemented, which has the dual functions of energy enhancement and fracturing. It is mainly based on pre-placement of CO2. A certain amount of pure CO2 is designed as the energy enhancement liquid pumping before fracturing construction. Generally, casing pumping is adopted. Conventional fracturing fluid is mainly used to carry sand in the second half, and a small amount of CO2 is mixed to achieve the effect of foaming. After injection into the formation, it has the effect of energy enhancement. In the high sand ratio stage, in order to reduce the risk of adding sand, the pumping of CO2 is generally reduced and stopped. A large amount of CO2 is mainly pumped in the pre-liquid stage. Due to the poor fracture-making ability of liquid pure CO2, it is difficult to enter the deep reservoir. The energy enhancement effect of this method is general, mainly used to increase the return energy, and cannot significantly increase the reservoir energy in the far wellbore area. The literature and patents also discuss the use of special downhole tools to pump CO2 directly to the target reservoir to achieve the purpose of energy enhancement fracturing. This method mainly relies on special downhole pipe string combination tools. The core of the process technology is the tool itself, and the combination work is relatively complex, which is difficult to meet the purpose of large-scale CO2 fracturing energy enhancement and reservoir transformation. Therefore, based on the above analysis, it is urgently necessary to develop a method that utilizes existing fracturing pumping equipment and existing conventional fracturing fluid systems to implement large-scale CO2 energy-enhanced fracturing operations to achieve the purpose of deep energy enhancement and large-scale transformation of low-pressure reservoirs. Summary of the invention

[0015] The purpose of this application is to solve the problems raised in the above background technology, and to provide a technical method for volume transformation of tight reservoirs by energy-enhanced fracturing.

[0016] In order to achieve the above-mentioned purpose, this application specifically adopts the following technical solutions: A technical method for volume transformation of a tight reservoir by energy-enhanced fracturing comprises the following steps: Step 1: According to the requirements of reservoir transformation and fracturing construction, the acid-resistant fracturing string is optimized and the oil-casing mixed injection fracturing process is adopted; Step 2: The tubing is pumped with gel-carrying sand to form supported artificial fractures. The casing is filled with a mixture of CO2 and fracturing fluid. According to the design of fracturing with limited pressure but unlimited displacement, the temperature at the bottom of the well and in the artificial fracture during the construction of the casing with the highest displacement is simulated to determine the phase characteristics of CO2 before entering the formation. Step 3: Reduce the displacement of the frozen sand-carrying fluid in the tubing to ensure that the temperature in the artificial fracture is within 50% of the reservoir temperature (50m range), and the casing is pumped with CO2 at the maximum displacement to reach 60% of the designed amount; Step 4: gradually increase the displacement of the gel-carrying sand liquid in the tubing to the maximum displacement within the pressure limit range, and gradually reduce the displacement of CO2 in the casing to the minimum displacement and the pumping volume reaches the CO2 reaching the designed volume; Step 5: Stop the CO2 pumping operation, replace the casing with low-viscosity slippery water to start displacement, and when the designed amount of sand-carrying fluid is reached, replace the tubing with slippery water until the displacement operation is completed.

[0017] Furthermore, step 1 includes: for a low-pressure and low-permeability oil reservoir, using reservoir numerical simulation software to optimize the CO2 fracturing scale required for energy-enhanced fracturing, and then designing the casing size according to the ratio of the CO2 scale and the fracturing fluid sand-carrying scale, preferably acid-resistant oil pipes, to meet the requirements of casing-oil mixed injection, gel sand-carrying fluid and CO2 displacement.

[0018] Furthermore, step 2 comprises: according to the length of artificial fractures required for fully transforming the reservoir in step 1, using the oil pipe to pump the gel sand-carrying fluid at the maximum displacement within the pressure limit, designing the viscosity of the gel sand-carrying fluid to be about 200 mpa.s, preferably using medium-sized proppant, adding sand at a medium sand ratio, and the scale of the sand-carrying fluid is about 30% of the total sand-carrying fluid scale. During this period, a small amount of a mixture of slick water and CO2 is pumped into the casing, and no sand is added to the mixture. After the mixture fills the wellbore, the oil pipe wellbore is closed.

[0019] Furthermore, step 3 includes: after completing step 2, gradually reducing the displacement of the sand-carrying fluid in the tubing from the highest displacement to a temperature that meets the requirement of maintaining a relatively low temperature (about 50% of the reservoir temperature (50m range)) from the wellhead to the bottom of the well and in the artificial fractures, and no proppant is added to the sand-carrying fluid at this time. At the same time, the pumping displacement of CO2 in the casing is increased. In this stage, pure CO2 is pumped into the casing, and the displacement is gradually increased to the highest displacement under the pressure-limiting condition. If the casing pressure reaches the minimum value for maintaining the casing-oil pressure balance, the displacement of the gel sand-carrying fluid in the tubing will no longer be reduced. The total amount of pure CO2 pumped in this stage is about 50% of the total design amount.

[0020] Furthermore, step 4 includes: gradually increasing the displacement of the tubing sand-carrying fluid to the maximum displacement under the pressure limit condition, adding proppant during pumping, and gradually reducing the CO2 displacement in the casing until the minimum displacement for maintaining the casing-oil pressure balance is reached. This step needs to complete the pumping of the remaining gel sand-carrying fluid and the required proppant and remaining CO2 required by the design.

[0021] Furthermore, step 5 includes: after completing the pumping of the designed sand-carrying fluid, proppant and CO2 in step 4, starting the displacement construction step, pumping 50% of the tubing volume of the gel sand-carrying fluid without proppant into the tubing, pumping 50% of the tubing volume of slippery water, and all the slippery water pumped into the casing, and the pumping volume is 100% of the casing volume.

[0022] The beneficial effects of the present application are as follows: The process method provided by the present invention overcomes the difficulty of large-scale construction of existing CO2 energy-enhanced fracturing due to the limitations of fracturing equipment and transformation fluid systems. Using existing conventional fracturing equipment and ordinary transformation fluid systems, CO2 large-scale energy enhancement and fracturing transformation composite construction can be achieved, which provides a technical reference for CO2 to play a greater role in reservoir transformation and low-quality oil reservoir development. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the design of the fracturing string and the casing oil mixed injection wellbore and the fracturing string and casing oil distribution pumping CO2 and gel sand carrying fluid of the present invention; Figure 2 This is a schematic diagram of the gel in the artificial fracture replacing CO2 and entering the deep reservoir. DETAILED DESCRIPTION

[0024] In order to make the purpose, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application.

[0025] like Figure 1-Figure 2 As shown, a technical method for volume transformation of energy-enhanced fracturing of tight reservoirs proposed in one embodiment of the present application is to solve the problem that conventional fracturing equipment and fracturing fluid systems are difficult to meet the needs of large-scale energy-enhanced fracturing transformation of CO2. The present invention provides a method for energy-enhanced volume transformation by mixed injection of casing and oil to achieve large-scale energy enhancement of CO2 and composite transformation of fracturing with sand. Especially for low-pressure reservoirs, combined with the deployment of well network and well spacing, reservoir numerical simulation software combined with fracturing simulation software is used to optimize the CO2 pumping scale and fracturing transformation scale required when the energy enhancement increases the formation pressure by 15%. Then, the target reservoir is treated by mixed injection of casing and oil. First, the tubing is pumped with a large displacement of gel sand-carrying fluid, and ceramsite proppants with medium or larger particle sizes are added to the sand-carrying fluid. The casing is injected with a volume of slick water and CO2 mixed liquid to maintain the casing-oil pressure balance. The gel-carrying fluid pumped by the tubing forms a long artificial fracture after entering the formation. At the same time, the ceramsite proppant can support the artificial fracture after the displacement of the gel-carrying fluid is reduced in the later stage, avoiding the complete closure of the artificial fracture formed by the gel, which is conducive to the smooth entry of the CO2 pumped in the later stage into the deep reservoir. The large displacement of the gel-carrying fluid pumped in the tubing can also reduce the wellbore temperature, which can ensure that the CO2 pumped in the later stage is in the environmental conditions of maintaining a liquid state.

[0026] When the gel sand-carrying fluid and ceramsite proppant pumped into the tubing reaches about 30% of the designed volume of the well, the displacement begins to be reduced, and the casing begins to pump CO2, raising the displacement to the maximum displacement under the maximum pressure limit, and maintaining the maximum displacement of CO2 pumped into the casing until 60% of the designed total volume is pumped. During this period, the lowest displacement in the tubing is maintained to pump the gel sand-carrying fluid. Then the displacement of CO2 pumped begins to be gradually reduced, and the displacement of the gel sand-carrying fluid in the tubing is gradually increased until all the designed gel sand-carrying fluid, proppant ceramsite, and CO2 are pumped. Then, the tubing is replaced with 50% gel sand-carrying fluid (without proppant) + 50% slick water, and the total pumping volume is the casing volume; the casing is replaced with slick water, and the total displacement volume is the total casing volume.

[0027] The core of the present invention is to use only conventional fracturing equipment and reforming fluid system, and adopt a mixed injection method to avoid mixing of CO2 and conventional reforming fluid system in the wellbore, prevent the influence of CO2 on the performance of sand-carrying fluid, and reduce construction risks such as sand plugging.

[0028] The purpose of the present invention is achieved through the following technical solution: A technical method for volume transformation of a tight reservoir by energy-enhanced fracturing, comprising the following steps: Step 1: According to the requirements of reservoir transformation and fracturing construction, the acid-resistant fracturing string is optimized and the oil-casing mixed injection fracturing process is adopted; Step 2: The tubing is pumped with gel-carrying sand to form supported artificial fractures. The casing is filled with a mixture of CO2 and fracturing fluid. According to the design of fracturing with limited pressure but unlimited displacement, the temperature at the bottom of the well and in the artificial fracture during the construction of the casing with the highest displacement is simulated to determine the phase characteristics of CO2 before entering the formation. Step 3: Reduce the displacement of the frozen sand-carrying fluid in the tubing to ensure that the temperature in the artificial fracture is within 50% of the reservoir temperature (50m range), and the casing is pumped with CO2 at the maximum displacement to reach 60% of the designed amount; Step 4: gradually increase the displacement of the gel-carrying sand liquid in the tubing to the maximum displacement within the pressure limit range, and gradually reduce the displacement of CO2 in the casing to the minimum displacement and the pumping volume reaches the CO2 reaching the designed volume; Step 5: Stop the CO2 pumping operation, replace the casing with low-viscosity slippery water to start displacement, and when the designed amount of sand-carrying fluid is reached, replace the tubing with slippery water until the displacement operation is completed.

[0029] In some embodiments, step 2 includes: according to the length of artificial fractures required to fully transform the reservoir in step 1, the maximum displacement of the oil pipe within the pressure limit is used to pump the gel sand-carrying liquid, the viscosity of the gel sand-carrying liquid is designed to be about 200mpa.s, medium-sized proppant is preferred, sand is added at a medium sand ratio, and the scale of the sand-carrying liquid is about 30% of the total sand-carrying liquid scale. During this period, a small amount of a mixture of slick water and CO2 is pumped into the casing, and no sand is added to the mixture. After the mixture fills the wellbore, the oil pipe wellbore is closed.

[0030] In some embodiments, step 3 includes: after completing step 2, gradually reducing the displacement of the sand-carrying fluid in the tubing from the highest displacement to a temperature that meets the requirement of maintaining a relatively low temperature (about 50% of the reservoir temperature (50m range)) from the wellhead to the bottom of the well and in the artificial fractures, and no proppant is added to the sand-carrying fluid at this time. At the same time, the pumping displacement of CO2 in the casing is increased. In this stage, pure CO2 is pumped into the casing, and the displacement is gradually increased to the highest displacement under the pressure-limiting conditions. If the casing pressure reaches the minimum value for maintaining the casing-oil pressure balance, the displacement of the gel sand-carrying fluid in the tubing will no longer be reduced. The total amount of pure CO2 pumped in this stage is about 50% of the total design amount.

[0031] In some embodiments, step 4 includes: gradually increasing the displacement of the sand-carrying fluid in the tubing to the maximum displacement under the pressure limit condition, adding proppant during pumping, and gradually reducing the CO2 displacement in the casing until the minimum displacement for maintaining the casing-oil pressure balance is reached. This step must be completed to achieve the design requirements, and the pumping of the remaining gel sand-carrying fluid and the required proppant and remaining CO2.

[0032] In some embodiments, step 5 includes: after completing the pumping of the designed sand-carrying fluid, proppant and CO2 in step 4, starting the displacement construction step, pumping 50% of the tubing volume of the gel sand-carrying fluid without proppant into the tubing, pumping 50% of the tubing volume of slippery water, and all the water pumped into the casing is slippery water, and the pumping volume is 100% of the casing volume.

[0033] The present invention relates to a composite transformation process method for implementing large-scale energy enhancement and fracturing transformation simultaneously by using CO2. The method mainly implements large-scale CO2 energy enhancement fracturing for low-pressure oil reservoirs, which can increase the formation energy and improve the reservoir pressure. At the same time, large-scale fracturing transformation is implemented to achieve high and stable production of low-pressure oil reservoirs. Taking a low-pressure oil reservoir as an example, the content of the present invention is specifically described. The main characteristics of reservoir A are that the reservoir is buried at a depth of 4000m, the pressure coefficient is 0.9, the reservoir temperature is 85℃, the permeability is 0.9mD, the porosity is 13%, and the reservoir thickness is 12m. It is a typical low-permeability and low-pressure oil reservoir. Natural fractures are locally developed in the reservoir. Downhole rock sampling coring shows that the density of natural fractures is 0.6 / m, the comprehensive filling degree is 85%, and a small part is not filled. The well pattern is 500m×300m, and the well spacing in the direction of the maximum principal stress of the formation is 500m. Through reservoir numerical simulation analysis, a single well controls a 250m×200m reservoir range, and achieves the goal of increasing reservoir pressure by 17%. The total amount of CO2 pumped into a single well is about 2,600 cubic meters. According to the fracturing simulation software analysis, a single well controls oil and gas in a range of 250m×200m, and the length of the artificial support half-fracture should reach about 250m. Considering the opening of natural fractures to form some complex fractures, the analysis shows that the total amount of liquid for the single well transformation scale is about 2,600 cubic meters, and 350 cubic meters of sand are added. The artificial fracture morphology formed according to the well network and well spacing simulation and its relationship with the well network and well spacing. Based on the above analysis, the acid-resistant completion and fracturing string are optimized, the casing size is 8-1 / 8 inches, and the tubing is a combination of 4 inches and 3-1 / 2 inches. The oil casing mixed injection method is used to implement the energy enhancement transformation construction. The schematic diagram of the wellbore, fracturing string, perforation layer, casing and tubing pumping is as shown in the attachment. Figure 1 The internal pressure of the tubing is 90MPa. With a 100 wellhead, the maximum pressure limit of the tubing construction is 90MPa, the casing pressure limit is 100MPa, and the maximum displacement of the simulated tubing gel can reach 9m 3 / min, casing pump CO2 displacement can reach 12 m 3 / min. Gel-carrying sand liquid in the oil pipe 9m 3 / min displacement, the temperature of the casing annulus at the bottom of the well can be reduced by about 50% to about 40°C, and the displacement of CO2 injected by casing pump in the later stage can reach 12 m 3 / min, the temperature inside the casing can be reduced by about 50%, ensuring that the CO2 is still in a liquid state (<31℃, >11MPa for liquid) in the wellbore, which is more conducive to pumping.

[0034] According to the above optimization results, the second step of the present invention is implemented, the oil pipe is pumped with gel sand-carrying liquid, and the viscosity of the gel sand-carrying liquid is selected to be 200mPa.s, which can meet the needs of seam making and high-strength sand addition. The construction displacement is quickly increased to 9m 3 / min, and at the same time, the sand mixer adds 30 / 50 mesh ceramsite proppant, the sand ratio is 15%, and the casing is filled with 1 m 3 / min pumping a mixture of slick water (fracturing fluid with a viscosity of about 5mpa.s) and a small amount of CO2. The main purpose is to test whether the CO2 pumping in the casing can be implemented smoothly, and the pumping displacement can be increased at any time. The gel-carrying sand fluid is pumped in 450 cubic meters, and 70 cubic meters of sand is added. The length of the artificial support fracture can reach about 120m. The artificial fracture can provide a flow channel for the subsequent pumping of CO2, so that CO2 can quickly reach a position about 120m deep in the reservoir.

[0035] Furthermore, the displacement of the sand-carrying fluid in the tubing gel is gradually reduced, and the adjustment sequence is: 9m 3 / min-8m 3 / min-7m 3 / min-6m 3 / min-5m 3 / min-4m 3 / min-3m 3 / min, each stage is maintained for 10 minutes, and in the stage of reducing the displacement, the sand-carrying fluid and sand-sand ratio is reduced to 10%. At the same time, the displacement of CO2 pumped into the casing is gradually increased in this stage, with each 1 cubic meter as a stage, and gradually increased to 10m 3 / min, each stage is maintained for 10 minutes, and the pumping equipment and wellbore are observed and evaluated for any abnormalities. CO2 is pumped into the casing and maintained for 10m 3 / min displacement, the displacement of the gel-carrying fluid pumped into the tubing is maintained at 3m 3 / min, pumping for 120 minutes, at this stage, the total pumping of CO2 is 1700 cubic meters, the gel sand-carrying fluid is 1200 cubic meters, and the proppant is 150 cubic meters. The CO2 pumped in this step mainly enters the deep reservoir along the artificial fractures formed by the gel sand-carrying fluid in the previous step. At the same time, the CO2 pumped by the casing and the gel sand-carrying fluid pumped by the tubing still have a certain viscosity in the reservoir after mixing, which plays a role in continuing to create fractures and is also conducive to CO2 entering deeper reservoirs. According to the temperature field simulation in the artificial fracture, the reservoir temperature within 50m of the wellbore is still relatively low (<31℃). In this range, CO2 is mainly in liquid state, and some CO2 penetrates into the reservoir along the high-permeability natural fractures. In the range beyond 50m, as the temperature rises, CO2 gradually becomes supercritical and has extremely strong permeability, which can penetrate into the denser oil and gas reservoirs. Therefore, CO2 enters more reservoirs beyond 50m from the wellbore to supplement the deep energy of the reservoir.

[0036] Furthermore, the displacement of the frozen sand-carrying fluid in the oil pipe was quickly increased to 9m 3 / min, the sand ratio was increased to 20%, and the CO2 emission in the casing was quickly reduced to 3m 3 / min, using the high-viscosity gel-carrying fluid pumped into the oil pipe to replace the 1700 cubic meters of CO2 pumped into the formation in the previous step and enter the deep reservoir, as shown in the attached Figure 2 As shown in the figure, after the high-displacement casing displacement is adjusted to the right position, the pumping continues for 100 minutes. After completing this stage, a total of about 2,000 cubic meters of CO2, about 2,000 cubic meters of gel-carrying fluid, and about 300 cubic meters of formation proppant are pumped into the reservoir. In this stage, the high-displacement gel-carrying fluid in the tubing enters the formation to create fractures, so that the half-fracture length of the artificial propped fracture can reach 180-200m, displacing the large amount of CO2 pumped in the previous step into the deep reservoir, and also carrying a small amount of CO2 pumped by the casing into the reservoir at the bottom of the well. This part of CO2 can diffuse along the artificial fractures near the wellbore to supplement the formation energy near the wellbore.

[0037] Further, the displacement operation is completed and the oil pipe is kept at 9m 3 / min displacement, pumping 50% of the tubing volume of frozen sand-carrying fluid and 50% of the tubing volume of slippery water; lifting the displacement in the casing to 5-8m 3 / min, pumping slick water equivalent to the entire casing volume. So far, a large-scale CO2 energy-enhancing fracturing reconstruction operation has been completed for a well in reservoir A, and the total amount of CO2, gel sand-carrying fluid and proppant designed to achieve the dual purposes of energy enhancement and reconstruction has been completed.

[0038] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A technical method for volume transformation of tight reservoir by energy-enhanced fracturing, characterized in that: The following steps are involved: Step 1: According to the requirements of reservoir transformation and fracturing construction, the acid-resistant fracturing string is optimized and the oil-casing mixed injection fracturing process is adopted; Step 2: The tubing is pumped with gel-carrying sand to form supported artificial fractures. The casing is filled with a mixture of CO2 and fracturing fluid. According to the design of fracturing with limited pressure but unlimited displacement, the temperature at the bottom of the well and in the artificial fracture during the construction of the casing with the highest displacement is simulated to determine the phase characteristics of CO2 before entering the formation. Step 3: Reduce the displacement of the frozen sand-carrying fluid in the tubing to ensure that the temperature in the artificial fracture is within 50% of the reservoir temperature (50m range), and the casing is pumped with CO2 at the maximum displacement to reach 60% of the designed amount; Step 4: gradually increase the displacement of the gel-carrying sand liquid in the tubing to the maximum displacement within the pressure limit range, and gradually reduce the displacement of CO2 in the casing to the minimum displacement and the pumping volume reaches the CO2 reaching the designed volume; Step 5: Stop the CO2 pumping operation, replace the casing with low-viscosity slippery water to start displacement, and when the designed amount of sand-carrying fluid is reached, replace the tubing with slippery water until the displacement operation is completed.

2. A technical method for volume transformation of a tight reservoir by energy-enhanced fracturing according to claim 1, characterized in that: The step 1 comprises: for a low-pressure and low-permeability oil reservoir, using reservoir numerical simulation software to optimize the CO2 fracturing scale required for energy-enhanced fracturing, and then designing the casing size according to the ratio of the CO2 scale and the fracturing fluid sand-carrying scale, preferably acid-resistant oil pipes, to meet the requirements of casing-oil mixed injection, gel sand-carrying fluid and CO2 displacement.

3. A technical method for volume transformation of a tight reservoir by energy-enhanced fracturing according to claim 2, characterized in that: The step 2 comprises: according to the length of the artificial fracture required for fully transforming the reservoir in step 1, using the oil pipe to pump the gel sand-carrying fluid at the maximum displacement within the pressure limit, designing the viscosity of the gel sand-carrying fluid to be about 200 mpa.s, preferably using a medium-sized proppant, adding sand at a medium sand ratio, and the scale of the sand-carrying fluid is about 30% of the total sand-carrying fluid scale. During this period, a small amount of a mixture of slick water and CO2 is pumped into the casing, and no sand is added to the mixture. After the mixture fills the wellbore, the oil pipe wellbore is closed.

4. A technical method for volume transformation of a tight reservoir by energy-enhanced fracturing according to claim 3, characterized in that: The step 3 includes: after completing step 2, gradually reducing the displacement of the sand-carrying fluid in the tubing from the highest displacement to a temperature that meets the requirement of maintaining a relatively low temperature (about 50% of the reservoir temperature (50m range)) from the wellhead to the bottom of the well and in the artificial fractures, and no proppant is added to the sand-carrying fluid at this time. At the same time, the pumping displacement of CO2 in the casing is increased. In this stage, pure CO2 is pumped into the casing, and the displacement is gradually increased to the highest displacement under the pressure-limiting condition. If the casing pressure reaches the minimum value to maintain the casing-oil pressure balance, the displacement of the gel sand-carrying fluid in the tubing will no longer be reduced. The total amount of pure CO2 pumped in this stage is about 50% of the total design amount.

5. A technical method for volume transformation of tight reservoirs by energy-enhanced fracturing according to claim 4, characterized in that: The step 4 includes: gradually increasing the displacement of the sand-carrying fluid in the tubing to the maximum displacement under the pressure limit condition, adding proppant during pumping, and gradually reducing the CO2 displacement in the casing until the minimum displacement for maintaining the casing oil pressure balance is reached. This step needs to complete the pumping of the remaining gel sand-carrying fluid and the required proppant and remaining CO2 required by the design.

6. A technical method for volume transformation of tight reservoirs by energy-enhanced fracturing according to claim 5, characterized in that: The step 5 comprises: after completing the pumping of the designed sand-carrying fluid, proppant and CO2 in step 4, starting the displacement construction step, pumping 50% of the tubing volume of the gel sand-carrying fluid without proppant into the tubing, pumping 50% of the tubing volume of slippery water, and all the slippery water is pumped into the casing, and the pumping volume is 100% of the casing volume.