Large mining electric shovel excavated material weight monitoring system and method

By using axial force and radial force measurement bridges, encoders and calculation processing modules on large mining shovels, the material weight is directly calculated, which solves the problem of large number of sensors and inaccurate weight monitoring, and improves the problem of improved Monitoring accuracy and application convenience.

CN119085809APending Publication Date: 2024-12-06CHINA MINING PROD SAFETY APPROVAL & CERTIFICATION CENT
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411125962.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing large-scale mining electric shovel excavation material weight monitoring system requires arranging of more sensors to measure and increase the tension and torque of the wire rope, etc., and the weight monitoring results are not accurate enough, and the actual application of the project is complicated.

Method used

Using the axial and radial forces of the push rod to measure the bridge, the push displacement encoder and the lift displacement encoder, the calculation processing module determines the shovel geometric triangle, combines the bridge voltage and encoder data to calculate the material weight, reduces the Number of sensors to improve accuracy.

Benefits of technology

It realizes the weight monitoring of large-scale mining electric shovel materials with simple structure and convenient operation, improves the accuracy of weight estimation, reduces the number of sensors used, and simplifies engineering applications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119085809A_ABST
    Figure CN119085809A_ABST
Patent Text Reader

Abstract

The invention provides a large mining electric shovel excavated material weight monitoring system and method.The system comprises a collecting device and a processing device, and a pushing and pressing bucket rod axial force measuring bridge and a pushing and pressing bucket rod radial force measuring bridge in the collecting device are composed of strain gauge sets arranged on the upper surface and the lower surface of a pushing and pressing bucket rod in the length and width direction of the pushing and pressing bucket rod; a calculation processing module in the processing device determines an interior angle of a geometric triangle of the electric shovel based on a pushing stroke and a lifting stroke monitored by a pushing displacement encoder and a lifting displacement encoder; a first bridge voltage and a second bridge voltage which are output by a push-press bucket rod axial force measuring bridge and a push-press bucket rod radial force measuring bridge and an inner angle of a geometric triangle of the electric shovel are combined to obtain a push-press bucket rod axial force, a push-press bucket rod radial force and a tension force of a lifting steel wire rope so as to obtain a material weight; the vertexes of the geometric triangle of the electric shovel are the meshing point of the pushing pinion and the pushing bucket rod, the connecting point of the lifting steel wire rope and the bucket and the tangent point of the head sheave and the side, close to the bucket, of the lifting steel wire rope respectively.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of mining electric shovels, and in particular to a system and method for monitoring the weight of excavated materials by a large mining electric shovel. Background Art

[0002] Large mining electric shovels are key equipment for open-pit coal mining. Mining electric shovels are usually used in conjunction with mining trucks. The materials in the electric shovel bucket are unloaded into the mining truck, which then transports the coal. Since the loading capacity of the mining truck is limited, the electric shovel operator needs to load as much coal as possible within the loading capacity of the mining truck to improve transportation efficiency. Therefore, accurately monitoring the weight of the materials unloaded by the electric shovel into the mining truck each time plays a vital role in improving the transportation efficiency of the mining truck.

[0003] At present, domestic institutions have carried out some research work on the weight monitoring of excavated materials by large mining electric shovels, but the relevant research still has the following shortcomings and deficiencies: 1) The existing excavated material monitoring schemes often require the arrangement of sensors to measure various status information such as lifting wire rope tension, pushing motor torque, pushing stroke, lifting stroke, etc., which requires a lot of sensor data; 2) The relatively simple excavated material weight monitoring method often ignores the influence of the weight of the pushing bucket arm and other components attached to the shovel arm, resulting in large errors in the calculated material weight; 3) The more accurate excavated material weight monitoring method often requires accurate acquisition of parameters such as the weight and center of mass position of each component of the system. The analysis and calculation process is complicated, and the actual engineering application is difficult.

[0004] Therefore, in view of the above shortcomings and deficiencies, it is urgent to propose a large-scale mining electric shovel excavation material weight monitoring system and method with simple structure, convenient operation and convenient engineering application. Summary of the invention

[0005] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.

[0006] To this end, the first purpose of the present invention is to propose a large-scale mining electric shovel excavation material weight monitoring system to solve the problem that the existing system needs to arrange more sensors to measure the lifting wire rope tension, torque, etc., and the weight monitoring results are not accurate enough.

[0007] The second object of the present invention is to provide a method for monitoring the weight of materials excavated by a large mining electric shovel.

[0008] To achieve the above-mentioned purpose, the first aspect of the present invention proposes a large-scale mining electric shovel excavation material weight monitoring system, including a collection device and a processing device, the collection device includes a push bucket arm axial force measurement bridge, a push bucket arm radial force measurement bridge, a push displacement encoder and a lifting displacement encoder, the processing device includes a calculation processing module;

[0009] The pushing bucket arm axial force measuring bridge and the pushing bucket arm radial force measuring bridge are composed of a strain gauge group arranged on the pushing bucket arm, and the strain gauge group includes a first strain gauge and a second strain gauge arranged on the upper surface of the pushing bucket arm along the length direction of the pushing bucket arm, a third strain gauge and a fourth strain gauge arranged on the lower surface of the pushing bucket arm along the length direction of the pushing bucket arm, a fifth strain gauge and a sixth strain gauge arranged on the upper surface of the pushing bucket arm along the width direction of the pushing bucket arm, and a seventh strain gauge and an eighth strain gauge arranged on the lower surface of the pushing bucket arm along the width direction of the pushing bucket arm; the pushing bucket arm axial force measuring bridge is composed of a first strain gauge, a third strain gauge, a fifth strain gauge and a seventh strain gauge, the first strain gauge and the third strain gauge are placed on the opposite arm, the fifth strain gauge and the seventh strain gauge are placed on the opposite arm, and the first strain gauge and the seventh strain gauge are connected to a common The end is connected to the negative pole of the bridge power supply, the common end of the third strain gauge and the fifth strain gauge is connected to the positive pole of the bridge power supply, the common end of the first strain gauge and the fifth strain gauge is the first output positive pole, and the common end of the third strain gauge and the seventh strain gauge is the first output negative pole; the push bucket rod radial force measurement bridge is composed of the second strain gauge, the fourth strain gauge, the sixth strain gauge and the eighth strain gauge, the fourth strain gauge and the sixth strain gauge are placed on the opposite arm, the second strain gauge and the eighth strain gauge are placed on the opposite arm, the common end of the fourth strain gauge and the eighth strain gauge is connected to the negative pole of the bridge power supply, the common end of the second strain gauge and the sixth strain gauge is connected to the positive pole of the bridge power supply, the common end of the second strain gauge and the fourth strain gauge is the second output positive pole, and the common end of the sixth strain gauge and the eighth strain gauge is the second output negative pole;

[0010] The pushing arm axial force measuring bridge is used to output a first bridge voltage corresponding to the axial force of the pushing arm through a first output positive electrode and a first output negative electrode, the pushing arm radial force measuring bridge is used to output a second bridge voltage corresponding to the radial force of the pushing arm through a second output positive electrode and a second output negative electrode, the pushing displacement encoder is used to monitor the pushing stroke of the pushing arm, and the lifting displacement encoder is used to monitor the lifting stroke of the lifting drum;

[0011] The calculation and processing module is used to determine the inner angle of the electric shovel geometric triangle based on the pushing stroke and the lifting stroke, and is also used to obtain the axial force of the pushing bucket arm, the radial force of the pushing bucket arm and the tension of the lifting wire rope based on the first bridge voltage, the second bridge voltage and the inner angle of the electric shovel geometric triangle, and then calculate the material weight, wherein the three vertices of the electric shovel geometric triangle are respectively the meshing point of the pushing pinion and the pushing bucket arm, the connection point of the lifting wire rope and the bucket, and the tangent point of the crown wheel and the lifting wire rope close to the bucket side.

[0012] In the large mining electric shovel excavation material weight monitoring system provided in the first aspect of the present invention, the distance between the position of the strain gauge group and the connection between the push bucket arm and the bucket is a set multiple of the push bucket arm length, and the set multiple is less than 0.5.

[0013] In the large-scale mining electric shovel excavation material weight monitoring system provided by the first aspect of the present invention, the push displacement encoder is installed on the rotating shaft of the push pinion.

[0014] In the large-scale mining electric shovel excavation material weight monitoring system provided by the first aspect of the present invention, the lifting displacement encoder is installed on the rotating shaft of the lifting drum.

[0015] In the large-scale mining electric shovel excavation material weight monitoring system provided in the first aspect of the present invention, the collection device also includes a modulation module and a wireless transmission module, and the processing device also includes a wireless receiving module and a signal demodulation module. The modulation module is used to modulate the first bridge voltage and the second bridge voltage from the push bucket arm axial force measurement bridge and the push bucket arm radial force measurement bridge and send them to the wireless transmission module, the wireless transmission module is used to send the modulated first bridge voltage and the second bridge voltage to the wireless receiving module in a wireless manner, the wireless receiving module is used to receive the modulated first bridge voltage and the second bridge voltage and send them to the signal demodulation module, and the signal demodulation module is used to demodulate the modulated first bridge voltage and the second bridge voltage and send them to the calculation and processing module for processing.

[0016] In the large-scale mining electric shovel excavation material weight monitoring system provided in the first aspect of the present invention, the material weight acquisition process in the calculation and processing module includes: obtaining the real-time total weight of the bucket and the material based on the axial force of the pushing bucket arm, the radial force of the pushing bucket arm, the tension of the lifting wire rope and the inner angle of the geometric triangle of the electric shovel; in each operation process, obtaining the first real-time total weight of the bucket and the material when the mining electric shovel issues a unloading command, and obtaining the second real-time total weight of the bucket and the material when the mining electric shovel completes unloading in this operation process; based on the first real-time total weight and the second real-time total weight, calculating the weight of the material excavated by the mining electric shovel in this operation process.

[0017] In the large-scale mining electric shovel excavation material weight monitoring system provided by the first aspect of the present invention, the meshing point between the push pinion and the push bucket arm is B, the connection point between the lifting wire rope and the bucket is C, and the tangent point between the crown wheel and the lifting wire rope close to the bucket side is A. Then, the three sides of the electric shovel geometric triangle are side AB, side AC and side BC, and the real-time total weight of the bucket and the material satisfies:

[0018] M=F pa sin(θ-α)+F prcos(θ-α)+F H sin(π-β-θ)

[0019] Where M is the total weight of the bucket and material, F is pa F is the axial force of pushing the bucket arm, pr F is the radial force of pushing the bucket arm, H To increase the tension of the wire rope, θ represents the angle between side AB and the horizontal plane, α represents the angle between side AB and side BC, and β represents the angle between side AB and side AC.

[0020] In the large-scale mining electric shovel excavation material weight monitoring system provided by the first aspect of the present invention, the pushing bucket arm axial force, the pushing bucket arm radial force and the tension of the lifting wire rope meet the following conditions:

[0021]

[0022] In the formula, A p Indicates the cross-sectional area of ​​the push rod at the location of the strain gauge group, u pa is the first bridge voltage, K is the strain gauge sensitivity coefficient, u s is the supply voltage of the push-arm axial force measuring bridge and the push-arm radial force measuring bridge, μ is the Poisson's ratio, W p Indicates the bending section coefficient of the push arm at the location of the strain gauge group, u pr is the second bridge voltage, and l represents the distance between the location of the strain gauge group and the connection between the push rod and the bucket.

[0023] To achieve the above-mentioned purpose, the second aspect of the present invention proposes a weight monitoring method of the large-scale mining electric shovel excavation material weight monitoring system based on the first aspect, comprising:

[0024] Determine the geometric triangle of the electric shovel, wherein the three vertices of the geometric triangle of the electric shovel are respectively the meshing point of the pushing pinion and the pushing bucket rod, the connection point of the lifting wire rope and the bucket, and the tangent point of the crown wheel and the lifting wire rope close to the bucket side;

[0025] A first bridge voltage corresponding to the axial force of the pushing bucket arm is obtained by using a push bucket arm axial force measuring bridge, and a second bridge voltage corresponding to the radial force of the pushing bucket arm is obtained by using a push bucket arm radial force measuring bridge;

[0026] The pushing stroke of the pushing bucket arm is monitored by a pushing displacement encoder, and the lifting stroke of the lifting drum is monitored by a lifting displacement encoder;

[0027] The calculation and processing module is used to determine the inner angle of the electric shovel geometric triangle based on the pushing stroke and the lifting stroke, and the pushing bucket arm axial force, the pushing bucket arm radial force and the lifting wire rope tension are obtained based on the first bridge voltage, the second bridge voltage and the inner angle of the electric shovel geometric triangle, and then the material weight is calculated.

[0028] In the method for monitoring the weight of materials excavated by a large mining electric shovel provided in the second aspect of the present invention, the material weight is further calculated, including: obtaining the real-time total weight of the bucket and the material based on the axial force of the pushing bucket arm, the radial force of the pushing bucket arm, the tension of the lifting wire rope and the inner angle of the geometric triangle of the electric shovel; in each operation process, obtaining the first real-time total weight of the bucket and the material when the mining electric shovel issues a unloading command, and obtaining the second real-time total weight of the bucket and the material when the mining electric shovel completes unloading in this operation process; based on the first real-time total weight and the second real-time total weight, calculate the weight of the material excavated by the mining electric shovel in this operation process.

[0029] The present invention provides a large-scale mining electric shovel excavation material weight monitoring system and method, the weight monitoring system includes a collection device and a processing device, the collection device includes a push bucket arm axial force measurement bridge, a push bucket arm radial force measurement bridge, a push displacement encoder and a lifting displacement encoder, the processing device includes a calculation processing module; the push bucket arm axial force measurement bridge and the push bucket arm radial force measurement bridge are composed of a strain gauge group arranged on the push bucket arm, the strain gauge group includes a first strain gauge and a second strain gauge arranged on the upper surface of the push bucket arm along the length direction of the push bucket arm, a third strain gauge and a fourth strain gauge arranged on the lower surface of the push bucket arm along the length direction of the push bucket arm, and a third strain gauge and a fourth strain gauge arranged on the upper surface of the push bucket arm along the width direction of the push bucket arm. The fifth strain gauge and the sixth strain gauge are arranged on the upper surface of the pushing bucket rod, and the seventh strain gauge and the eighth strain gauge are arranged on the lower surface of the pushing bucket rod along the width direction of the pushing bucket rod; the pushing bucket rod axial force measurement bridge is composed of the first strain gauge, the third strain gauge, the fifth strain gauge and the seventh strain gauge, the first strain gauge and the third strain gauge are placed on the opposite arm, the fifth strain gauge and the seventh strain gauge are placed on the opposite arm, the connection common end of the first strain gauge and the seventh strain gauge is connected to the negative pole of the bridge power supply, the connection common end of the third strain gauge and the fifth strain gauge is connected to the positive pole of the bridge power supply, the connection common end of the first strain gauge and the fifth strain gauge is the first output positive pole, and the connection common end of the third strain gauge and the seventh strain gauge is the first output negative pole; the pushing bucket rod radial force measurement bridge is composed of the first strain gauge, the third strain gauge, the fifth strain gauge and the seventh strain gauge, the first strain gauge and the third strain gauge are placed on the opposite arm, the first strain gauge and the seventh strain gauge are connected to the negative pole of the bridge power supply, the third strain gauge and the fifth strain gauge are connected to the positive pole of the bridge power supply, the first strain gauge and the fifth strain gauge are connected to the positive pole of the bridge power supply, the first strain gauge and the fifth strain gauge are connected to the positive pole of the first output, and the third strain gauge and the seventh strain gauge are connected to the negative pole of the first output; The measuring bridge is composed of a second strain gauge, a fourth strain gauge, a sixth strain gauge and an eighth strain gauge. The fourth strain gauge and the sixth strain gauge are placed on the opposite arm, the second strain gauge and the eighth strain gauge are placed on the opposite arm, the common connection end of the fourth strain gauge and the eighth strain gauge is connected to the negative pole of the bridge power supply, the common connection end of the second strain gauge and the sixth strain gauge is connected to the positive pole of the bridge power supply, the common connection end of the second strain gauge and the fourth strain gauge is the second output positive pole, and the common connection end of the sixth strain gauge and the eighth strain gauge is the second output negative pole; the pushing bucket rod axial force measuring bridge is used to output the first bridge voltage corresponding to the pushing bucket rod axial force through the first output positive pole and the first output negative pole, and the pushing bucket rod radial force measuring bridge is used to output the first bridge voltage corresponding to the pushing bucket rod axial force through the first output positive pole and the first output negative pole. The second output positive electrode and the second output negative electrode output the second bridge voltage corresponding to the radial force of the pushing bucket arm. The pushing displacement encoder is used to monitor the pushing stroke of the pushing bucket arm, and the lifting displacement encoder is used to monitor the lifting stroke of the lifting drum. The calculation and processing module is used to determine the inner angle of the electric shovel geometric triangle based on the pushing stroke and the lifting stroke, and is also used to obtain the pushing bucket arm axial force, the pushing bucket arm radial force and the tension of the lifting wire rope based on the first bridge voltage, the second bridge voltage and the inner angle of the electric shovel geometric triangle, and then calculate the material weight, wherein the three vertices of the electric shovel geometric triangle are the meshing point of the pushing pinion and the pushing bucket arm, the connection point of the lifting wire rope and the bucket, and the tangent point of the crown wheel and the lifting wire rope close to the bucket side.In this case, the pushing arm axial force measuring bridge and the pushing arm radial force measuring bridge are used, and the pushing displacement encoder and the lifting displacement encoder are combined to obtain the pushing arm axial force, the pushing arm radial force and the tension of the lifting wire rope acting on the bucket. By arranging a strain gauge group on the pushing arm, the information of the strain gauge can be directly converted to obtain the force acting on the bucket. Compared with the traditional method of converting the pushing force using the pushing gear torque, the obtained force acting on the bucket is more direct and more accurate, thereby improving the estimation accuracy of the excavated material weight. In addition, the present invention does not need to arrange an additional torque sensor on the lifting drum to estimate the lifting wire rope tension, thereby reducing the number of sensors used. Therefore, the present invention solves the problem that the existing system needs to arrange more sensors to measure the lifting wire rope tension, torque, etc., and the weight monitoring results are not accurate enough.

[0030] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0032] Figure 1 A block diagram of a large-scale mining electric shovel excavation material weight monitoring system provided by an embodiment of the present invention;

[0033] Figure 2 This is a diagram showing the structure of a large-scale mining electric shovel excavation material weight monitoring system provided by an embodiment of the present invention;

[0034] Figure 3 An enlarged schematic diagram of a push arm strain gauge assembly patch provided in an embodiment of the present invention;

[0035] Figure 4 Schematic diagram of a push arm axial force measuring bridge and a push arm radial force measuring bridge provided in an embodiment of the present invention;

[0036] Figure 5 A geometric triangle relationship diagram of an electric shovel provided in an embodiment of the present invention;

[0037] Figure 6 A force analysis diagram for calculating the weight of excavated materials by a large mining electric shovel provided in an embodiment of the present invention;

[0038] Figure 7 This is a flow chart of a method for monitoring the weight of materials excavated by a large mining electric shovel provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0039] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the embodiments of the present invention. Instead, they are merely examples of devices and methods consistent with some aspects of the embodiments of the present invention as detailed in the appended claims.

[0040] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0041] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "multiple" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined. It should also be understood that the term "and / or" used in the present invention refers to and includes any or all possible combinations of one or more associated listed items.

[0042] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0043] The present invention provides a system and method for monitoring the weight of excavated materials by a large mining electric shovel, so as to solve the problems that the existing system needs to arrange more sensors to measure the tension and torque of the lifting wire rope, and the weight monitoring result is not accurate enough.

[0044] In an embodiment of the present invention, Figure 1 A block diagram of a system for monitoring the weight of excavated materials by a large mining electric shovel provided in an embodiment of the present invention. Figure 2The diagram of the structure of the large-scale mining electric shovel excavation material weight monitoring system provided by the embodiment of the present invention. The large-scale mining electric shovel excavation material weight monitoring system of the present invention can be referred to as a weight monitoring system. Figure 1 As shown, the large mining electric shovel excavation material weight monitoring system includes a collection device and a processing device. The collection device includes a push bucket arm axial force measurement bridge, a push bucket arm radial force measurement bridge, a push displacement encoder and a lifting displacement encoder, and the processing device includes a calculation processing module.

[0045] In the embodiment of the present invention, the push displacement encoder is used to monitor the push stroke of the push bucket arm, and the lifting displacement encoder is used to monitor the lifting stroke of the lifting drum. Specifically, the push displacement encoder is installed on the rotating shaft of the push pinion, and the lifting displacement encoder is installed on the rotating shaft of the lifting drum (see Figure 2 ). Since the number of pulses output by the push displacement encoder is linearly related to the pushing stroke of the push bucket arm, and the number of pulses output by the lifting displacement encoder is linearly related to the lifting stroke of the lifting drum, during the operation of the electric shovel, the calculation and processing module obtains the number of pulses of the push displacement encoder and the lifting displacement encoder in real time to calculate the pushing stroke of the push bucket arm and the lifting stroke of the lifting drum respectively.

[0046] In the embodiment of the present invention, the push arm axial force measuring bridge and the push arm radial force measuring bridge are composed of strain gauge groups. The strain gauge groups are arranged on the push arm (see Figure 2 ). The distance between the position of the strain gauge group and the connection between the push bucket arm and the bucket is a set multiple of the push bucket arm length. The set multiple is less than 0.5. The setting multiple range is, for example, 0.2 to 0.3 times. In this case, since the position of the strain gauge group is closer to the connection between the push bucket arm and the bucket on the entire push bucket arm, it is not necessary to consider the influence of the weight of other components on the push bucket arm and the weight of other components attached to the shovel arm on the bucket force, so that the calculated push bucket arm axial force and push bucket arm radial force are more accurate.

[0047] For example, the strain gauge group is composed of eight identical strain gauges, and each strain gauge can be a metal foil strain gauge.

[0048] Figure 3 This is an enlarged schematic diagram of the push arm strain gauge group patch provided by an embodiment of the present invention. Figure 3 (a) is the side view of the push arm. Figure 3 (b) is a top view of the upper surface of the push arm.

[0049] Specifically, Figure 3As shown, the strain gauge group includes a first strain gauge R1 and a second strain gauge R2 arranged on the upper surface of the pushing bucket arm along the length direction of the pushing bucket arm, a third strain gauge R3 and a fourth strain gauge R4 arranged on the lower surface of the pushing bucket arm along the length direction of the pushing bucket arm, a fifth strain gauge R5 and a sixth strain gauge R6 arranged on the upper surface of the pushing bucket arm along the width direction of the pushing bucket arm, and a seventh strain gauge R7 and an eighth strain gauge R8 arranged on the lower surface of the pushing bucket arm along the width direction of the pushing bucket arm.

[0050] Figure 4 Schematic diagram of the push arm axial force measurement bridge and push arm radial force measurement bridge provided by the embodiment of the present invention. Figure 4 (a) is a schematic diagram of the push-arm axial force measurement bridge. Figure 4 (b) is a schematic diagram of the radial force measurement bridge of the push arm.

[0051] like Figure 4 As shown in (a), the push bucket arm axial force measurement bridge consists of the first strain gauge R1, the third strain gauge R3, the fifth strain gauge R5 and the seventh strain gauge R7. The first strain gauge R1 and the third strain gauge R3 are placed on the opposite arm, the fifth strain gauge R5 and the seventh strain gauge R7 are placed on the opposite arm, the common connection end of the first strain gauge R1 and the seventh strain gauge R7 is connected to the negative pole of the bridge power supply, the common connection end of the third strain gauge R3 and the fifth strain gauge R5 is connected to the positive pole of the bridge power supply, u s is the power supply voltage, the common end of the first strain gauge R1 and the fifth strain gauge R5 is used as the output positive electrode (i.e., the first output positive electrode) of the push-arm axial force measuring bridge, and the common end of the third strain gauge R3 and the seventh strain gauge R7 is used as the output negative electrode (i.e., the first output negative electrode) of the push-arm axial force measuring bridge; u' pa It is used to measure the first bridge voltage output by the bridge for pushing the axial force of the bucket arm.

[0052] like Figure 4 As shown in (b), the radial force measurement bridge of the push bucket rod is composed of the second strain gauge R2, the fourth strain gauge R4, the sixth strain gauge R6 and the eighth strain gauge R8. The fourth strain gauge R4 and the sixth strain gauge R6 are placed on the opposite arm, the second strain gauge R2 and the eighth strain gauge R8 are placed on the opposite arm, the common connection end of the fourth strain gauge R4 and the eighth strain gauge R8 is connected to the negative pole of the bridge power supply, the common connection end of the second strain gauge R2 and the sixth strain gauge R6 is connected to the positive pole of the bridge power supply, u s is the power supply voltage, the common end of the second strain gauge R2 and the fourth strain gauge R4 is used as the output positive pole (i.e., the second output positive pole) of the push bucket arm radial force measuring bridge, and the common end of the sixth strain gauge R6 and the eighth strain gauge R8 is used as the output negative pole (i.e., the second output negative pole) of the push bucket arm radial force measuring bridge; u' prThe second bridge voltage output by the bridge is measured to push the bucket arm radial force.

[0053] In the embodiment of the present invention, the push arm axial force measuring bridge is used to output a first bridge voltage corresponding to the push arm axial force through the first output positive electrode and the first output negative electrode, and the push arm radial force measuring bridge is used to output a second bridge voltage corresponding to the push arm radial force through the second output positive electrode and the second output negative electrode. Specifically, the push arm axial force measuring bridge and the push arm radial force measuring bridge output the first bridge voltage and the second bridge voltage respectively, so that the subsequent calculation processing module calculates the corresponding push arm axial force and push arm radial force based on the first bridge voltage and the second bridge voltage.

[0054] In the embodiment of the present invention, Figure 1 As shown, the acquisition device also includes a modulation module and a wireless transmission module. The processing device also includes a wireless receiving module and a signal demodulation module. The modulation module is used to modulate the first bridge voltage and the second bridge voltage from the push arm axial force measurement bridge and the push arm radial force measurement bridge and send them to the wireless transmission module. The wireless transmission module is used to send the modulated first bridge voltage and the second bridge voltage to the wireless receiving module in a wireless manner. The modulation module and the wireless transmission module are also arranged on the push arm. Data is exchanged between the wireless transmission processing module and the wireless reception processing module via 5G.

[0055] In the embodiment of the present invention, the wireless receiving module is used to receive the modulated first bridge voltage and the second bridge voltage sent by the wireless sending module and transfer them to the signal demodulation module, and the signal demodulation module is used to demodulate the modulated first bridge voltage and the second bridge voltage and send them to the calculation processing module for processing. The demodulated first bridge voltage can be expressed as u pa It means that the demodulated second bridge voltage can be expressed as u pr express.

[0056] In the embodiment of the present invention, the geometric triangle of the electric shovel needs to be determined before calculating the material weight. The three vertices of the geometric triangle of the electric shovel are the meshing point between the push pinion and the push bucket rod, the connection point between the lifting wire rope and the bucket, and the tangent point between the sheave and the lifting wire rope near the bucket. Figure 2 As shown, the meshing point between the pushing pinion and the pushing bucket arm is B, the connection point between the lifting wire rope and the bucket is C, and the tangent point between the crown wheel and the lifting wire rope close to the bucket side is A.

[0057] Figure 5 This is a geometric triangle relationship diagram of the electric shovel provided in the embodiment of the present invention. Figure 5 As shown, the three sides of the shovel geometric triangle ABC are side AB, side AC and side BC. The length of side AB is L F , the length of side AC is LH , the length of side BC is L P The angle between side AB and the horizontal plane is θ. The internal angle α of the shovel geometric triangle ABC is the angle between side AB and side BC, and the internal angle β is the angle between side AB and side AC.

[0058] In the embodiment of the present invention, the calculation processing module is used to determine the inner angle of the geometric triangle of the electric shovel based on the pushing stroke and the lifting stroke. Specifically, the calculation processing module obtains the number of pulses of the pushing displacement encoder and the lifting displacement encoder in real time to calculate the pushing stroke of the pushing bucket arm and the lifting stroke of the lifting drum, and then determines the inner angle of the geometric triangle of the electric shovel based on the pushing stroke and the lifting stroke. The length L of the side BC is P That is, the pushing stroke of the pushing bucket arm, the length of side AC is L H It is the lifting stroke of the lifting drum. The length L of side AB F is a fixed value.

[0059] The pushing stroke of the pushing bucket arm and the lifting stroke of the lifting drum meet the following requirements:

[0060]

[0061] Where, L P0 is the length of BC in the initial state, L H0 is the length of AC in the initial state, N 推-额 and N 提-额 N 提-额 N is the rated pulse number corresponding to one revolution of the push displacement encoder and the lift displacement encoder respectively. 推-实 and N 提-实 are the actual output pulse numbers of the push displacement encoder and the lift displacement encoder, N 推-实 The positive and negative values ​​correspond to the positive and negative rotations of the displacement encoder. 提-实 The positive and negative values ​​correspond to the forward and reverse rotation of the lifting displacement encoder. During installation, ensure that the forward rotation of the pushing displacement encoder corresponds to the extension movement of the pushing bucket arm, and the reverse rotation of the lifting displacement encoder corresponds to the lifting movement of the lifting wire rope. a represents the movement length of the pushing bucket arm corresponding to one rotation of the pushing displacement encoder, and b represents the movement length of the lifting wire rope corresponding to one rotation of the lifting displacement encoder.

[0062] The internal angles of the shovel geometric triangle ABC satisfy:

[0063]

[0064] In an embodiment of the present invention, the calculation and processing module is also used to obtain the axial force of the pushing bucket arm, the radial force of the pushing bucket arm and the tension of the lifting wire rope based on the first bridge voltage, the second bridge voltage and the inner angle of the electric shovel geometric triangle, and then calculate the material weight, wherein the material weight acquisition process in the calculation and processing module includes: obtaining the real-time total weight of the bucket and the material based on the axial force of the pushing bucket arm, the radial force of the pushing bucket arm, the tension of the lifting wire rope and the inner angle of the electric shovel geometric triangle; in each operation process, obtaining the first real-time total weight of the bucket and the material when the mining electric shovel issues a unloading command, and obtaining the second real-time total weight of the bucket and the material when the mining electric shovel completes unloading in this operation process; based on the first real-time total weight and the second real-time total weight, calculate the weight of the material excavated by the mining electric shovel in this operation process.

[0065] Specifically, Figure 6 This is a force analysis diagram for calculating the weight of excavated materials by a large mining electric shovel provided in an embodiment of the present invention. The connection point C between the lifting wire rope and the bucket is subject to four forces, namely, the tension F of the lifting wire rope H , Pushing arm axial force F pa , radial force F of pushing bucket arm pr The real-time total weight of the bucket and the material (i.e. the gravity of the bucket and the material) M. The real-time total weight M is directed vertically downward, pushing the axial force F of the bucket arm. pa The angle between the direction and the horizontal plane is θ-α, and the radial force F pr The angle between the direction of the real-time total weight M and the reverse extension line is θ-α, and the tension F of the lifting wire rope is H The angle between the direction of and the horizontal plane is π-β-θ.

[0066] The force at the connection point C is balanced, so the tension of the lifting wire rope can be calculated based on the axial force and radial force of the push bucket arm. The axial force, radial force and tension of the lifting wire rope satisfy:

[0067]

[0068] In the formula, A p Indicates the cross-sectional area of ​​the push rod at the location of the strain gauge group, u pa is the first bridge voltage, K is the strain gauge sensitivity coefficient, u s is the supply voltage of the push-arm axial force measuring bridge and the push-arm radial force measuring bridge, μ is the Poisson's ratio, W p Indicates the bending section coefficient of the push arm at the location of the strain gauge group, u pr is the second bridge voltage, and l represents the distance between the location of the strain gauge group and the connection between the push rod and the bucket.

[0069] The real-time total weight of the bucket and material meets:

[0070] M=F pa sin(θ-α)+F pr cos(θ-α)+F H sin(π-β-θ)

[0071] Where M is the total weight of the bucket and material, F is pa F is the axial force of pushing the bucket arm, pr F is the radial force of pushing the bucket arm, H To increase the tension of the wire rope, θ represents the angle between side AB and the horizontal plane, α represents the angle between side AB and side BC, and β represents the angle between side AB and side AC. In each operation process, the first real-time total weight of the bucket and the material when the mining shovel issues a discharge command is obtained, and the second real-time total weight of the bucket and the material when the mining shovel completes the discharge in this operation process is obtained; the difference between the first real-time total weight and the second real-time total weight is calculated to obtain the weight of the material excavated by the mining shovel in this operation process.

[0072] Specifically, the specific weight monitoring process of the large-scale mining electric shovel excavation material weight monitoring system is as follows:

[0073] 1) The meshing point between the push pinion and the push bucket arm of a large mining electric shovel is B, the connection point between the lifting wire rope and the bucket is C, and the tangent point between the crown wheel and the lifting wire rope close to the bucket is A, thereby obtaining the geometric triangle ABC of the electric shovel. The length between point A and point B (i.e., side AB) in the initial state is L. F , the length between point B and point C (i.e. side BC) in the initial state is L P0 , the length between point A and point C (i.e. side AC) in the initial state is L H0 .

[0074] 2) During the operation of the electric shovel, the actual output pulse number of the push displacement encoder and the lifting displacement encoder is obtained in real time to calculate the length L between point B and point C during the operation of the electric shovel in real time P , the length between point A and point C is L H .

[0075] 3) Let ∠ABC be α and ∠BAC be β in the geometric triangle ABC of the electric shovel, and calculate the values ​​of α and β in real time during the operation of the electric shovel.

[0076] 4) Calculate and store in real time the real-time total weight M of the bucket and materials calculated at different times during the operation of the electric shovel in each excavation and loading operation process.

[0077] 5) In the stored data of the total weight of the bucket and materials at different times of the electric shovel operation in each excavation and loading operation process, the real-time total weight of the bucket and materials corresponding to the time when the mining electric shovel issues a discharge command in the operation process is selected and recorded as the full load data M 满 (i.e., the first real-time total weight), select the real-time total weight of the bucket and the material corresponding to the completion of the unloading of the mining electric shovel in this operation process and record it as the no-load data M 空 (i.e., the second real-time total weight), and calculate the weight of the material excavated by the mining shovel in this operation process as M 满 -M 空 .

[0078] The following is an embodiment of the method of the present invention. For details not disclosed in the embodiment of the method of the present invention, please refer to the embodiment of the system of the present invention. The embodiment of the method of the present invention proposes a method for monitoring the weight of excavated materials by a large-scale mining electric shovel. The method for monitoring the weight of excavated materials by a large-scale mining electric shovel utilizes the weight monitoring system for excavated materials by a large-scale mining electric shovel of the above-mentioned system embodiment to perform weight monitoring. The method for monitoring the weight of excavated materials by a large-scale mining electric shovel of the present invention can be referred to as a weight monitoring method.

[0079] Figure 7 This is a flow chart of a method for monitoring the weight of materials excavated by a large mining electric shovel provided in an embodiment of the present invention.

[0080] like Figure 7 As shown, the method for monitoring the weight of excavated materials by a large mining electric shovel comprises:

[0081] Step S101, determining the geometric triangle of the electric shovel, the three vertices of which are the meshing point between the pushing pinion and the pushing bucket arm, the connection point between the lifting wire rope and the bucket, and the tangent point between the sheave and the lifting wire rope close to the bucket side;

[0082] Step S102, using a push arm axial force measuring bridge to obtain a first bridge voltage corresponding to the push arm axial force, and using a push arm radial force measuring bridge to obtain a second bridge voltage corresponding to the push arm radial force;

[0083] Step S103, using a pushing displacement encoder to monitor the pushing stroke of the pushing bucket arm, and using a lifting displacement encoder to monitor the lifting stroke of the lifting drum;

[0084] Step S104, using the calculation and processing module to determine the inner angle of the electric shovel geometric triangle based on the pushing stroke and the lifting stroke, and also based on the first bridge voltage, the second bridge voltage and the inner angle of the electric shovel geometric triangle to obtain the pushing bucket axial force, the pushing bucket radial force and the tension of the lifting wire rope, and then calculate the material weight.

[0085] In some embodiments, the material weight is further calculated in step S104, including: obtaining the real-time total weight of the bucket and the material based on the axial force of the pushing arm, the radial force of the pushing arm, the tension of the lifting wire rope and the inner angle of the geometric triangle of the electric shovel; in each operation process, obtaining the first real-time total weight of the bucket and the material when the mining electric shovel issues a unloading command, and obtaining the second real-time total weight of the bucket and the material when the mining electric shovel completes unloading in this operation process; calculating the weight of the material excavated by the mining electric shovel in this operation process based on the first real-time total weight and the second real-time total weight.

[0086] It should be noted that the above explanation of the embodiment of the system for monitoring the weight of excavated materials by a large mining electric shovel is also applicable to the method for monitoring the weight of excavated materials by a large mining electric shovel of this embodiment, which will not be repeated here.

[0087] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0088] In the large-scale mining electric shovel excavation material weight monitoring system and method of the embodiment of the present invention, the weight monitoring system includes a collection device and a processing device, the collection device includes a pushing bucket arm axial force measurement bridge, a pushing bucket arm radial force measurement bridge, a pushing displacement encoder and a lifting displacement encoder, the processing device includes a calculation processing module; the pushing bucket arm axial force measurement bridge and the pushing bucket arm radial force measurement bridge are composed of a strain gauge group arranged on the pushing bucket arm, and the strain gauge group includes a first strain gauge and a second strain gauge arranged on the upper surface of the pushing bucket arm along the length direction of the pushing bucket arm, a third strain gauge and a fourth strain gauge arranged on the lower surface of the pushing bucket arm along the length direction of the pushing bucket arm, and a third strain gauge and a fourth strain gauge arranged on the lower surface of the pushing bucket arm along the width direction of the pushing bucket arm. The fifth strain gauge and the sixth strain gauge on the upper surface, and the seventh strain gauge and the eighth strain gauge arranged on the lower surface of the pushing bucket rod along the width direction of the pushing bucket rod; the pushing bucket rod axial force measurement bridge consists of the first strain gauge, the third strain gauge, the fifth strain gauge and the seventh strain gauge, the first strain gauge and the third strain gauge are placed on the opposite arm, the fifth strain gauge and the seventh strain gauge are placed on the opposite arm, the connection common end of the first strain gauge and the seventh strain gauge is connected to the negative pole of the bridge power supply, the connection common end of the third strain gauge and the fifth strain gauge is connected to the positive pole of the bridge power supply, the connection common end of the first strain gauge and the fifth strain gauge is the first output positive pole, and the connection common end of the third strain gauge and the seventh strain gauge is the first output negative pole; the pushing bucket rod radial force The measuring bridge is composed of a second strain gauge, a fourth strain gauge, a sixth strain gauge and an eighth strain gauge. The fourth strain gauge and the sixth strain gauge are placed on the opposite arm. The second strain gauge and the eighth strain gauge are placed on the opposite arm. The common connection end of the fourth strain gauge and the eighth strain gauge is connected to the negative pole of the bridge power supply. The common connection end of the second strain gauge and the sixth strain gauge is connected to the positive pole of the bridge power supply. The common connection end of the second strain gauge and the fourth strain gauge is the second output positive pole, and the common connection end of the sixth strain gauge and the eighth strain gauge is the second output negative pole. The push arm axial force measuring bridge is used to output the first bridge voltage corresponding to the axial force of the push arm through the first output positive pole and the first output negative pole. The push arm radial force measuring bridge is used to output the first bridge voltage corresponding to the axial force of the push arm through the first output positive pole and the first output negative pole. The second output positive electrode and the second output negative electrode output the second bridge voltage corresponding to the radial force of the pushing bucket arm. The pushing displacement encoder is used to monitor the pushing stroke of the pushing bucket arm, and the lifting displacement encoder is used to monitor the lifting stroke of the lifting drum. The calculation and processing module is used to determine the inner angle of the electric shovel geometric triangle based on the pushing stroke and the lifting stroke, and is also used to obtain the pushing bucket arm axial force, the pushing bucket arm radial force and the tension of the lifting wire rope based on the first bridge voltage, the second bridge voltage and the inner angle of the electric shovel geometric triangle, and then calculate the material weight, wherein the three vertices of the electric shovel geometric triangle are the meshing point of the pushing pinion and the pushing bucket arm, the connection point of the lifting wire rope and the bucket, and the tangent point of the crown wheel and the lifting wire rope close to the bucket side.In this case, the pushing arm axial force measuring bridge and the pushing arm radial force measuring bridge are used, and the pushing displacement encoder and the lifting displacement encoder are combined to obtain the pushing arm axial force, the pushing arm radial force and the tension of the lifting wire rope acting on the bucket. By arranging a strain gauge group on the pushing arm, the information of the strain gauge can be directly converted to obtain the force acting on the bucket. Compared with the traditional method of converting the pushing force using the pushing gear torque, the obtained force acting on the bucket is more direct and more accurate, thereby improving the estimation accuracy of the excavated material weight. In addition, the present invention does not need to arrange an additional torque sensor on the lifting drum to estimate the lifting wire rope tension, thereby reducing the number of sensors used. Therefore, the present invention solves the problem that the existing system needs to arrange more sensors to measure the lifting wire rope tension, torque, etc., and the weight monitoring results are not accurate enough.

[0089] The beneficial effects of the system and method of the present invention include:

[0090] 1) The present invention arranges a strain gauge group on the pushing bucket rod, and uses the information of the strain gauge to directly convert the force acting on the bucket. Compared with the traditional method of converting the pushing force using the torque of the pushing gear, this method does not need to consider the influence of the weight of the pushing bucket rod and other parts attached to the shovel rod on the bucket force. The obtained force acting on the bucket is more direct and more accurate, thereby improving the estimation accuracy of the excavated material weight;

[0091] 2) The present invention can directly calculate the tension of the lifting wire rope and use the tension of the lifting wire rope to calculate the weight of the excavated material. There is no need to arrange a torque sensor on the lifting drum to estimate the tension of the lifting wire rope, thereby reducing the number of sensors used;

[0092] 3) The present invention uses the push arm force calculated by the strain gauge group and combines it with the force analysis of the bucket to simply and conveniently calculate the total weight of the bucket and the material. The entire process does not require accurate acquisition of the weight, center of mass position and other parameters of each component of the system, which is more convenient for practical engineering applications.

[0093] 4) The present invention uses the difference between the full-load data and the no-load data obtained by monitoring to calculate the actual weight of the excavated material by the mining electric shovel, which eliminates the influence of factors such as sensor measurement fluctuation on the calculation of the excavated material weight to a certain extent, and improves the monitoring accuracy of the excavated material;

[0094] 5) The present invention has a simple structure, low cost, convenient use, strong practicability, and is convenient for practical application in engineering projects.

[0095] The accompanying drawings show schematic diagrams of structures according to embodiments disclosed in the present invention. These figures are not drawn to scale, and some details are magnified and some details may be omitted for the purpose of clear expression. The shapes of various regions and layers shown in the figures and the relative sizes and positional relationships therebetween are only exemplary, and may deviate in practice due to manufacturing tolerances or technical limitations, and those skilled in the art may additionally design regions / layers with different shapes, sizes, and relative positions according to actual needs.

[0096] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution disclosed in the present invention can be achieved, and the present invention is not limited here.

[0097] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A large-scale mining electric shovel excavation material weight monitoring system, characterized in that: It includes a collection device and a processing device, wherein the collection device includes a push bucket arm axial force measurement bridge, a push bucket arm radial force measurement bridge, a push displacement encoder and a lifting displacement encoder, and the processing device includes a calculation processing module; The pushing bucket arm axial force measuring bridge and the pushing bucket arm radial force measuring bridge are composed of a strain gauge group arranged on the pushing bucket arm, and the strain gauge group includes a first strain gauge and a second strain gauge arranged on the upper surface of the pushing bucket arm along the length direction of the pushing bucket arm, a third strain gauge and a fourth strain gauge arranged on the lower surface of the pushing bucket arm along the length direction of the pushing bucket arm, a fifth strain gauge and a sixth strain gauge arranged on the upper surface of the pushing bucket arm along the width direction of the pushing bucket arm, and a seventh strain gauge and an eighth strain gauge arranged on the lower surface of the pushing bucket arm along the width direction of the pushing bucket arm; the pushing bucket arm axial force measuring bridge is composed of a first strain gauge, a third strain gauge, a fifth strain gauge and a seventh strain gauge, the first strain gauge and the third strain gauge are placed on the opposite arm, the fifth strain gauge and the seventh strain gauge are placed on the opposite arm, and the first strain gauge and the seventh strain gauge are connected in a common The end is connected to the negative pole of the bridge power supply, the common connection end of the third strain gauge and the fifth strain gauge is connected to the positive pole of the bridge power supply, the common connection end of the first strain gauge and the fifth strain gauge is the first output positive pole, and the common connection end of the third strain gauge and the seventh strain gauge is the first output negative pole; the pushing bucket arm radial force measurement bridge is composed of a second strain gauge, a fourth strain gauge, a sixth strain gauge and an eighth strain gauge, the fourth strain gauge and the sixth strain gauge are placed on the opposite arm, the second strain gauge and the eighth strain gauge are placed on the opposite arm, the common connection end of the fourth strain gauge and the eighth strain gauge is connected to the negative pole of the bridge power supply, the common connection end of the second strain gauge and the sixth strain gauge is connected to the positive pole of the bridge power supply, the common connection end of the second strain gauge and the fourth strain gauge is the second output positive pole, and the common connection end of the sixth strain gauge and the eighth strain gauge is the second output negative pole; The pushing bucket arm axial force measuring bridge is used to output a first bridge voltage corresponding to the pushing bucket arm axial force through a first output positive electrode and a first output negative electrode, and the pushing bucket arm radial force measuring bridge is used to output a second bridge voltage corresponding to the pushing bucket arm radial force through a second output positive electrode and a second output negative electrode, the pushing displacement encoder is used to monitor the pushing stroke of the pushing bucket arm, and the lifting displacement encoder is used to monitor the lifting stroke of the lifting drum; The calculation and processing module is used to determine the inner angle of the electric shovel geometric triangle based on the pushing stroke and the lifting stroke, and is also used to obtain the pushing bucket arm axial force, the pushing bucket arm radial force and the lifting wire rope tension based on the first bridge voltage, the second bridge voltage and the inner angle of the electric shovel geometric triangle, and then calculate the material weight, wherein the three vertices of the electric shovel geometric triangle are the meshing point of the pushing pinion and the pushing bucket arm, the connection point of the lifting wire rope and the bucket, and the tangent point of the crown wheel and the lifting wire rope close to the bucket side.

2. The large-scale mining electric shovel excavation material weight monitoring system according to claim 1 is characterized in that: The distance between the position of the strain gauge group and the connection between the pushing bucket arm and the bucket is a set multiple of the length of the pushing bucket arm, and the set multiple is less than 0.

5.

3. The large-scale mining electric shovel excavation material weight monitoring system according to claim 1 is characterized in that: The pushing displacement encoder is mounted on the rotating shaft of the pushing pinion.

4. The large-scale mining electric shovel excavation material weight monitoring system according to claim 1 is characterized in that: The lifting displacement encoder is installed on the rotating shaft of the lifting drum.

5. The large-scale mining electric shovel excavation material weight monitoring system according to claim 1 is characterized in that: The acquisition device also includes a modulation module and a wireless transmission module, and the processing device also includes a wireless receiving module and a signal demodulation module. The modulation module is used to modulate the first bridge voltage and the second bridge voltage from the pushing bucket arm axial force measuring bridge and the pushing bucket arm radial force measuring bridge and send them to the wireless transmission module. The wireless transmission module is used to send the modulated first bridge voltage and the second bridge voltage to the wireless receiving module in a wireless manner. The wireless receiving module is used to receive the modulated first bridge voltage and the second bridge voltage and send them to the signal demodulation module. The signal demodulation module is used to demodulate the modulated first bridge voltage and the second bridge voltage and send them to the calculation and processing module for processing.

6. The large-scale mining electric shovel excavation material weight monitoring system according to claim 1 is characterized in that: The process of obtaining the material weight in the calculation processing module includes: Obtaining the real-time total weight of the bucket and the material based on the axial force of the pushing bucket arm, the radial force of the pushing bucket arm, the tension of the lifting wire rope, and the inner angle of the geometric triangle of the electric shovel; In each operation process, a first real-time total weight of the bucket and the material is obtained when the mining shovel issues a discharge command, and a second real-time total weight of the bucket and the material is obtained when the mining shovel completes discharge in the operation process; The weight of the material excavated by the mining electric shovel in the current operation process is calculated based on the first real-time total weight and the second real-time total weight.

7. The large-scale mining electric shovel excavation material weight monitoring system according to claim 6 is characterized in that: Let B be the meshing point between the push pinion and the push bucket arm, C be the connection point between the lifting wire rope and the bucket, and A be the tangent point between the crown sheave and the lifting wire rope on the side close to the bucket. Then the three sides of the geometric triangle of the electric shovel are AB, AC, and BC. The real-time total weight of the bucket and material satisfies: M=F pa sin(θ-α)+F pr cos(θ-α)+F H sin(π-β-θ) Where M is the total weight of bucket and material, F pa is the axial force pushing the bucket arm, F pr F is the radial force pushing the bucket arm, H To increase the tension of the wire rope, θ represents the angle between side AB and the horizontal plane, α represents the angle between side AB and side BC, and β represents the angle between side AB and side AC.

8. The large-scale mining electric shovel excavation material weight monitoring system according to claim 7 is characterized in that: The axial force of the pushing bucket arm, the radial force of the pushing bucket arm and the tension of the lifting wire rope meet the following requirements: Where A p Indicates the cross-sectional area of ​​the push rod at the location of the strain gauge group, u pa is the first bridge voltage, K is the strain gauge sensitivity coefficient, u s is the supply voltage of the push-arm axial force measurement bridge and the push-arm radial force measurement bridge, μ is the Poisson's ratio, W p Indicates the bending section coefficient of the push arm at the location of the strain gauge group, u pr is the second bridge voltage, and l represents the distance between the location of the strain gauge group and the connection between the push bucket arm and the bucket.

9. A weight monitoring method based on the large-scale mining electric shovel excavation material weight monitoring system according to any one of claims 1 to 8, characterized in that: include: Determine the geometric triangle of the electric shovel, wherein the three vertices of the geometric triangle are the meshing point of the pushing pinion and the pushing bucket arm, the connection point of the lifting wire rope and the bucket, and the tangent point of the crown sheave and the lifting wire rope on the side close to the bucket; A first bridge voltage corresponding to the axial force of the pushing bucket arm is obtained by using a push-bucket arm axial force measuring bridge, and a second bridge voltage corresponding to the radial force of the pushing bucket arm is obtained by using a push-bucket arm radial force measuring bridge; The pushing stroke of the pushing bucket arm is monitored by a pushing displacement encoder, and the lifting stroke of the lifting drum is monitored by a lifting displacement encoder; A calculation and processing module is used to determine the inner angle of the electric shovel geometric triangle based on the pushing stroke and the lifting stroke, and also to obtain the pushing bucket arm axial force, the pushing bucket arm radial force and the tension of the lifting wire rope based on the first bridge voltage, the second bridge voltage and the inner angle of the electric shovel geometric triangle, and then calculate the material weight.

10. The method for monitoring the weight of excavated materials by a large mining electric shovel according to claim 9, characterized in that: The material weight is then calculated, including: Obtaining the real-time total weight of the bucket and the material based on the axial force of the pushing bucket arm, the radial force of the pushing bucket arm, the tension of the lifting wire rope, and the inner angle of the geometric triangle of the electric shovel; In each operation process, a first real-time total weight of the bucket and the material is obtained when the mining shovel issues a discharge command, and a second real-time total weight of the bucket and the material is obtained when the mining shovel completes discharge in the operation process; The weight of the material excavated by the mining electric shovel in the current operation process is calculated based on the first real-time total weight and the second real-time total weight.