Hydropower station drainage monitoring analysis display method

Through automated data collection and analysis, monitoring and predicting the status of drainage equipment, data visualization and fault location of drainage equipment are realized, and the problem of manual monitoring consumes a lot of manpower and lacks unified analysis in traditional systems is solved, providing efficient drainage monitoring and faults Early warning function.

CN119089019AInactive Publication Date: 2024-12-06CHINA YANGTZE POWER
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411024802.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional power station drainage detection and analysis systems require manual pump, underground monitoring and data analysis, which consumes a lot of manpower and lacks analysis from the dimension of equipment, which cannot meet the needs of modern monitoring and analysis.

Method used

By automatically obtaining drainage equipment operation data and water level data from the big data center, monitoring the unit's drainage status, establishing a drainage database, predicting drainage time, performing intelligent alarms, and locate faults and accidents, providing visual data display and fault warning.

Benefits of technology

It realizes data visualization of the operating status and water level changes of drainage equipment, discovers equipment failures and abnormalities, provides fault warning and rapid location of fault sources, and solves the problem of manual monitoring and data analysis that consumes a lot of manpower and lacks unified analysis.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119089019A_ABST
    Figure CN119089019A_ABST
Patent Text Reader

Abstract

The invention discloses a hydropower station drainage monitoring analysis display method, which comprises the following steps of: performing data visualization display on the operation state and equipment information of drainage equipment through real-time data acquisition and analysis, and performing analysis on the operation state and water level change of the drainage equipment. Meanwhile, equipment faults, abnormities and potential problems are found through a data processing and analysis technology, an alarm is given, abnormal conditions and potential faults in the drainage process are recognized and analyzed, fault early warning is provided, and a fault source is rapidly positioned; the problems that in the prior art, pump and underground monitoring and data analysis are not conducted manually, a large amount of manpower is consumed, a system lacks analysis according to the dimension of equipment, unified data analysis is lacked, and a pure report cannot meet the current monitoring and analysis requirement are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of drainage monitoring, and in particular to a method for analyzing and displaying drainage monitoring of a hydropower station. Background Art

[0002] The holographic monitoring and advanced application system integrates the existing data resources of the power plant by adopting advanced sensors, electronics, information, communications, control, intelligent analysis software and other technical means, forming a data sharing center for holographic data collection, transmission, processing, storage and analysis of the units in the production domain of the hydropower plant and a unified platform for decision support applications, realizing advanced application functions such as real-time monitoring of equipment, operating condition analysis, test analysis, equipment fault diagnosis, equipment health assessment, economic operation analysis, equipment trend analysis, etc., creating conditions for realizing intelligent analysis of unit status, smart operation and maintenance of equipment, and economic operation guidance, thereby further improving the intelligent application and management level of the Gezhouba Hydropower Plant and providing a scientific basis for management decision-making.

[0003] However, in the prior art, when testing the safety of drainage in a hydropower station, it is necessary to monitor the safety of each pump. For example, a Chinese patent discloses a real-time monitoring system and method for rainfall drainage in a hydropower station area, CN113962831B, which includes a reservoir water level real-time acquisition module, a ditch water flow real-time acquisition module, a rainfall real-time acquisition module, a central control module, and a data storage module. Based on the existing hydropower station area safety monitoring scheme, this scheme does not only stop at regular inspection and maintenance of drainage ditches; during the vacuum period of regular inspection and maintenance, the rainfall drainage in the hydropower station area can also be monitored in real time through the cooperation between the reservoir water level real-time acquisition module, the ditch water flow real-time acquisition module, the rainfall real-time acquisition module, the central control module, and the data storage module; and it can also realize the abnormal and accurate judgment of drainage ditch damage or drainage ditch blockage, effectively avoid geological disasters, and is suitable for promotion and application in most hydropower stations across the country, effectively protecting the safety of life and property in the hydropower station area.

[0004] Although the above scheme has the above advantages, the traditional power station drainage detection and analysis system often requires manual pump and underground monitoring and data analysis, which consumes a lot of manpower, especially for large hydropower stations. At the same time, it is impossible to visualize the overall data in the key data of equipment such as pumps and switch air chambers. The system lacks analysis based on the equipment dimension and unified data analysis. The maintenance management lacks visualized maintenance plans, maintenance histories and real-time maintenance status. Simple reports cannot meet the current monitoring and analysis needs. Therefore, a hydropower station drainage monitoring and analysis display method is urgently needed to solve such problems. Summary of the invention

[0005] The purpose of the present invention is to overcome the above-mentioned shortcomings and provide a method for monitoring, analyzing and presenting drainage of a hydropower station to solve the problems raised in the background technology.

[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for monitoring and analyzing the drainage of a hydropower station, comprising the following steps: Data collection: Automatically obtain drainage equipment operation data, water level data and drainage work order data from the big data center; Unit drainage monitoring: monitor the drainage status of the unit, calculate the drainage status, and establish a drainage database; the specific monitoring of the unit drainage status is as follows: turn on more than 3 maintenance pumps, where each maintenance pump corresponds to a switch measurement point, and the water level in the maintenance well, i.e. the analog measurement point, starts to rise. Combined with the drainage work order, i.e. the work ticket for opening the tailwater disc valve, determine the drainage status of the specific unit. After all maintenance pumps stop running, the unit drainage is completed; Predict drainage status: predict the drainage time of a single unit based on historical data, the water level change curve of the maintenance well, and the start and stop status of the maintenance pump to predict the start and end of drainage; Calculate drainage time: Calculate drainage time based on historical data to predict the start and end time of drainage for a single unit; Intelligent alarm: Analyze the collected drainage equipment operation data and water level data to issue intelligent alarms; Fault and accident location: Establish a fault sample library, monitoring program and main program. When a fault or accident occurs, the timing diagram and startup sequence of the fault or accident are displayed according to the logical relationship of the fault or accident, and the source of the fault or accident is given and provided to the operating personnel.

[0007] Preferably, in the data collection step, the method of automatically acquiring data is specifically: The data service interface provided by the big data center is called in the collection program to obtain the operation data, water level data and drainage work order data of the drainage equipment.

[0008] Preferably, in the step of predicting the drainage state, the drainage state is calculated specifically as follows: Combined with the start and end time of the unit drainage, the unit drainage time is calculated, the number of pump starts during a complete drainage period of the unit is counted, the water level curve of the maintenance well, the corresponding relationship between the start and stop status of the maintenance pump and the drainage state of the unit are displayed, and the historical data are combined. The historical data includes the change of the water level of the maintenance well, the start and stop status of the maintenance pump and the historical drainage time; Set the water level change curve of the maintenance well for: ; Check the start and stop status of the pump The switch quantity data is: ; Set the threshold to 10 units of water level rise and 10 units of water level drop, that is, the water level rise threshold is 10 and the water level drop threshold is -10; Check the water level change curve. When the water level continues to rise and exceeds the water level rise threshold, it is determined that the unit starts to drain water, that is, from the second time point At the beginning, if it exceeds 10 units continuously, the water level rise condition is met, and the predicted time point for the drainage state to begin is the second time point; Check the water level change curve. When the water level drops continuously and is lower than the water level drop threshold, it is determined that the unit has finished draining water, that is, from the 8th time point At the beginning, it is continuously below 10 units, meeting the water level drop condition. At this time, the predicted time point to end the drainage state is the 8th time point.

[0009] Preferably, in the step of calculating the drainage time, the specific calculation steps are: The specific steps for calculating drainage time are as follows: ; Among them, T is the drainage time, M is the end time, and N is the start time, that is, 8 time points minus the second time point to get 6 time points. When there are multiple historical drainage time records, the average value is used for calculation. The specific formula is: Assume that there are currently n historical drainage time data points , in minutes, average drainage time for: .

[0010] Preferably, in the unit drainage monitoring step, establishing a unit drainage database is specifically as follows: Record the relevant data of each drainage of the unit, including the drainage unit number, drainage start and end time, drainage time, pump start and stop details, and the water at the beginning and end of the drainage state. Preferably, in the intelligent alarm step, the specific process of analyzing the collected drainage equipment operation data and water level data and performing intelligent alarm is as follows: When the water level does not drop for a long time after the pump is started, and when the water level rises to the critical value and the pump does not start, an intelligent alarm is issued and the alarm information is output for display.

[0011] Preferably, in the fault and accident location step, the fault sample library is used to define the orderly actions of the protection device under various fault types.

[0012] Preferably, in the fault and accident location step, the monitoring program is used to determine whether to start the main program to locate the fault and accident. The monitoring program runs every second, and when it is detected that the protection signal measuring point trips and the circuit breaker closes, the main program is triggered.

[0013] Preferably, in the fault and accident location step, after the main program is started, the interval equipment information related to the protection tripping signal measuring point is retrieved to check whether a series of orderly measuring point actions similar to the fault sample library occur within the 7-second time window, and the closest result after comparison with the characteristic value of the fault sample library is used as the fault location analysis result output information.

[0014] Beneficial effects of the present invention: The present invention uses real-time data collection and analysis to visualize the operating status and equipment information of the drainage equipment. For the operating status and water level changes of the drainage equipment, the present invention uses data processing and analysis technology to discover equipment failures, abnormalities and potential problems and issue alarms, identify and analyze abnormal conditions and potential failures in the drainage process, provide fault warnings and quickly locate the source of the fault, and solve the problems existing in the prior art of no manual pumping, downhole monitoring and data analysis, which consumes a lot of manpower, the system lacks analysis in the dimension of equipment, lacks unified data analysis, and simple reports cannot meet the current monitoring and analysis needs. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a flow chart of a method for monitoring and analyzing the drainage of a hydropower station; Figure 2 This is a schematic diagram of the unit drainage process data; Figure 3 This is a schematic diagram of the operation of the drainage pump during the drainage process; Figure 4 This is a schematic diagram of the changing trend of the water level in the maintenance well during the drainage process and the operating conditions of each maintenance drainage pump. DETAILED DESCRIPTION

[0016] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0017] Example 1: Figure 1 As shown, an overhead LNG pipeline support structure with settlement compensation adjustment, A method for monitoring and analyzing drainage of a hydropower station, comprising the following steps: Data collection: Call the data service interface provided by the big data center in the data collection program to automatically obtain drainage equipment operation data, water level data and drainage work order data; Unit drainage monitoring: monitor the drainage status of the unit, calculate the drainage status, establish a drainage database, and monitor the drainage status of the unit as follows: start more than 3 maintenance pumps, where each maintenance pump corresponds to a switch measurement point, the water level in the maintenance well, i.e. the analog measurement point, starts to rise, and the drainage status of the specific unit is determined in combination with the drainage work order, i.e. the work ticket for opening the tailwater disc valve. After all maintenance pumps stop running, the unit drainage is completed; Predict the drainage status. Predict the drainage time of a single unit based on historical data, the water level change curve of the maintenance well, and the start and stop status of the maintenance pump to predict the start and end of drainage. Calculate the drainage time based on the historical data to predict the start and end time of drainage of a single unit; Intelligent alarm, set alarm rules, associate corresponding time series measurement points, and after the acquisition program obtains the data of the corresponding time series measurement points, it outputs alarm information according to the configured alarm rules; Fault and accident location, establishment of fault sample library, monitoring program and main program. When a fault or accident occurs, the timing diagram and startup sequence of the fault or accident are displayed according to the logical relationship of the fault or accident, and the source of the fault or accident is given and provided to the operating personnel.

[0018] The further configuration is as follows: in the data collection step, the data service interface provided by the big data center is called in the data collection program to automatically obtain the drainage equipment operation data, water level data and drainage work order data; The further setting is: in the step of predicting the drainage state, the drainage state is calculated specifically as follows: Combined with the start and end time of the unit drainage, the unit drainage time is calculated, the number of pump starts during a complete drainage period of the unit is counted, the water level curve of the maintenance well, the corresponding relationship between the start and stop status of the maintenance pump and the drainage state of the unit are displayed, and the historical data are combined. The historical data includes the change of the water level of the maintenance well, the start and stop status of the maintenance pump and the historical drainage time; Set the water level change curve of the maintenance well for: ; Check the start and stop status of the pump The switch quantity data is:

[0019] Set the threshold to 10 units of water level rise and 10 units of water level drop, that is, the water level rise threshold is 10 and the water level drop threshold is -10; Check the water level change curve. When the water level continues to rise and exceeds the water level rise threshold, it is determined that the unit starts to drain water, that is, from the second time point At the beginning, if it exceeds 10 units continuously, the water level rise condition is met, and the predicted time point for the drainage state to begin is the second time point; Check the water level change curve. When the water level drops continuously and is lower than the water level drop threshold, it is determined that the unit has finished draining water, that is, from the 8th time point At the beginning, it is continuously lower than 10 units, meeting the water level drop condition. At this time, the predicted time point for ending the drainage state is the 8th time point; The further setting is: In the step of calculating the drainage time, the specific calculation steps are: The specific steps for calculating drainage time are as follows: ; Among them, T is the drainage time, M is the end time, and N is the start time, that is, 8 time points minus the second time point to get 6 time points. When there are multiple historical drainage time records, the average value is used for calculation. The specific formula is: Assume that there are currently n historical drainage time data points , in minutes, average drainage time for: ; Further setting is: in the unit drainage monitoring step, the unit drainage database is established as follows: Record the relevant data of each drainage of the unit, including the drainage unit number, drainage start and end time, drainage time, pump start and stop details, and water at the beginning and end of the drainage state; Further settings are: In the intelligent alarm step, the alarm rules are as follows: After the pump is started, the water level does not drop for a long time; after the water level rises to the critical value, the pump does not start; The further setting is: in the fault and accident location step, the fault sample library is used to define the orderly actions of the protection devices under various fault types; Further settings are as follows: in the fault and accident location step, the monitoring program is used to determine whether to start the main program to locate the fault and accident. The monitoring program runs every second. When it is detected that the protection signal measurement point trips and the circuit breaker is closed, the main program is triggered; Further settings are as follows: in the fault and accident location step, after the main program is started, the interval equipment information related to the protection tripping signal measuring point is retrieved to check whether a series of orderly measuring point actions similar to the fault sample library appear within the 7-second time window, and the result closest to the characteristic value of the fault sample library is used as the fault location analysis result output information.

[0020] Working principle: Based on a power plant side of a certain industrial Internet platform, we first monitor the opening status of 3 or more maintenance pumps, and each maintenance pump corresponds to a switch measurement point. At the same time, we monitor the rising situation of the water level in the maintenance well (analog measurement point), and combine it with the latest drainage work order (work ticket for opening the tailwater disc valve) to determine that the unit is in a drainage state. When all maintenance pumps stop running, it is determined that the unit drainage has ended.

[0021] As for the calculation related to the drainage status: it is necessary to combine the start and end time points of the unit drainage, calculate the unit drainage time, and at the same time count the number of pump starts during a complete drainage of the unit, and display the corresponding relationship between the maintenance well water level curve, the start and stop status of the maintenance pump and the unit drainage status.

[0022] For the prediction of the drainage time of a single unit, based on the drainage data of each unit in previous years, a machine learning algorithm is used, combined with the real-time operation data of the drainage equipment, the water level change data and the drainage work order data, to predict the start and end time of drainage, and then calculate the predicted drainage time.

[0023] Secondly, for the intelligent alarm of the drainage equipment, the alarm rules of the drainage equipment are set through a flexible configuration table. The alarm program outputs the alarm information of the drainage equipment in real time by matching the alarm configuration.

[0024] Combined with the operation rules of drainage equipment and the trend of water level changes, the fault samples of drainage equipment are defined. According to the logical relationship between faults and accidents, the timing diagram and startup sequence of faults and accidents are displayed, and the information on the source of faults and accidents is provided for reference by the operating personnel to quickly locate faults and accidents. The monitoring program is used to determine whether to start the main program for fault and accident location. The monitoring program runs every second. When it is detected that the protection signal measurement point has tripped and the circuit breaker has closed, the main program is triggered. The main program retrieves the interval equipment information related to the protection trip signal measurement point, checks whether a series of ordered actions similar to the fault sample library appear within the 7-second time window, and outputs the closest result after comparing the characteristic value of the fault sample library as the fault location analysis result.

[0025] Through real-time data collection and analysis, the operating status and equipment information of the drainage equipment can be visualized, and equipment failures, abnormalities and potential problems can be discovered and alarmed in a timely manner for the operating status and water level changes of the drainage equipment. At the same time, through data processing and analysis technology, abnormal conditions and potential failures in the drainage process can be identified and analyzed, fault warnings can be provided, and the source of the fault can be quickly located.

[0026] Embodiment 2: A method for monitoring and analyzing drainage of a hydropower station, comprising the following steps: Data collection and monitoring: collect and monitor the operating status of each maintenance drainage pump, the time series data of the maintenance well water level, and the work order data of the tailwater disc valve opening of the unit; When the water level in the maintenance well reaches the preset threshold and has a continuous upward trend, and at the same time it is monitored that 3 or more maintenance drainage pumps are running and there is a work ticket with the tailwater disc valve of the unit open, at this time, the equipment code in the work ticket data is used to determine which unit is currently draining water.

[0027] Record the drainage process of the unit. When the unit is determined to be in the drainage state through the above steps, start recording the drainage process of the unit: Drainage start time: The time point when the first maintenance drainage pump is started during this drainage process; Drainage end time: The time point when the last pump stopped during this drainage process; Actual drainage time: Drainage end time - drainage start time; Predicted drainage time: Based on the historical drainage data and parameters of the same unit, machine learning is used to predict the duration of this drainage; Displacement: The drainage operation time of each drainage pump*rated drainage parameters; Drainage start water level: The water level in the inspection well corresponding to the drainage start time; Drainage end water level: The water level of the inspection well corresponding to the end time of drainage Number of pump starts: The total number of service drainage pumps started during the drainage process.

[0028] By recording the above drainage process, the following application is performed in the unit drainage monitoring module. Figure 2 Display the unit drainage process data, Figure 3 Record the operation of the drainage pump during the drainage process. Figure 4 It reflects the changing trend of the water level in the maintenance well during the drainage process and the operating conditions of each maintenance drainage pump.

[0029] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A method for monitoring, analyzing and displaying drainage in a hydropower station, characterized in that: The following steps are involved: Data collection: Automatically obtain drainage equipment operation data, water level data and drainage work order data from the big data center; Unit drainage monitoring: monitor the drainage status of the unit, calculate the drainage status, and establish a drainage database; the specific monitoring of the unit drainage status is as follows: turn on more than 3 maintenance pumps, where each maintenance pump corresponds to a switch measurement point, and the water level in the maintenance well, i.e. the analog measurement point, starts to rise. Combined with the drainage work order, i.e. the work ticket for opening the tailwater disc valve, determine the drainage status of the specific unit. After all maintenance pumps stop running, the unit drainage is completed; Predict drainage status: predict the drainage time of a single unit based on historical data, the water level change curve of the maintenance well, and the start and stop status of the maintenance pump to predict the start and end of drainage; Calculate drainage time: Calculate drainage time based on historical data to predict the start and end time of drainage for a single unit; Intelligent alarm: Analyze the collected drainage equipment operation data and water level data to issue intelligent alarms; Fault and accident location: Establish a fault sample library, monitoring program and main program. When a fault or accident occurs, the timing diagram and startup sequence of the fault or accident are displayed according to the logical relationship of the fault or accident, and the source of the fault or accident is given and provided to the operating personnel.

2. A method for monitoring, analyzing and displaying drainage of a hydropower station according to claim 1, characterized in that: In the data collection step, the method of automatically acquiring data is specifically as follows: The data service interface provided by the big data center is called in the collection program to obtain the operation data, water level data and drainage work order data of the drainage equipment.

3. A method for monitoring, analyzing and displaying drainage of a hydropower station according to claim 1, characterized in that: In the step of predicting the drainage state, the drainage state is calculated specifically as follows: Combined with the start and end time of the unit drainage, the unit drainage time is calculated, the number of pump starts during a complete drainage period of the unit is counted, the water level curve of the maintenance well, the corresponding relationship between the start and stop status of the maintenance pump and the drainage state of the unit are displayed, and the historical data are combined. The historical data includes the change of the water level of the maintenance well, the start and stop status of the maintenance pump and the historical drainage time; Set the water level change curve of the maintenance well for: ; Check the start and stop status of the pump The switch quantity data is: ; Set the threshold to 10 units of water level rise and 10 units of water level drop, that is, the water level rise threshold is 10 and the water level drop threshold is -10; Check the water level change curve. When the water level continues to rise and exceeds the water level rise threshold, it is determined that the unit starts to drain water, that is, from the second time point At the beginning, if it exceeds 10 units continuously, the water level rise condition is met, and the predicted time point for the drainage state to begin is the second time point; Check the water level change curve. When the water level drops continuously and is lower than the water level drop threshold, it is determined that the unit has finished draining water, that is, from the 8th time point At the beginning, it is continuously below 10 units, meeting the water level drop condition. At this time, the predicted time point to end the drainage state is the 8th time point.

4. A method for monitoring, analyzing and displaying drainage of a hydropower station according to claim 1, characterized in that: In the step of calculating the drainage time, the specific calculation steps are: The specific steps for calculating drainage time are as follows: ; Among them, T is the drainage time, M is the end time, and N is the start time, that is, 8 time points minus the second time point to get 6 time points. When there are multiple historical drainage time records, the average value is used for calculation. The specific formula is: Assume that there are currently n historical drainage time data points , in minutes, average drainage time for: 。 5. A method for monitoring, analyzing and displaying drainage of a hydropower station according to claim 1, characterized in that: In the unit drainage monitoring step, the establishment of the unit drainage database is specifically as follows: Record the relevant data of each drainage of the unit, including the drainage unit number, drainage start and end time, drainage time, pump start and stop details, and the water at the beginning and end of the drainage state.

6. A method for monitoring, analyzing and displaying drainage of a hydropower station according to claim 1, characterized in that: In the intelligent alarm step, the specific process of analyzing the collected drainage equipment operation data and water level data and performing intelligent alarm is as follows: When the water level does not drop for a long time after the pump is started, and when the water level rises to the critical value and the pump does not start, an intelligent alarm is issued and the alarm information is output for display.

7. A method for monitoring, analyzing and displaying drainage of a hydropower station according to claim 1, characterized in that: In the fault and accident location step, the fault sample library is used to define the orderly actions of the protection devices under various fault types.

8. A method for monitoring, analyzing and displaying drainage of a hydropower station according to claim 1, characterized in that: In the fault and accident location step, the monitoring program is used to determine whether to start the main program to locate the fault and accident. The monitoring program runs every second. When it is detected that the protection signal measuring point trips and the circuit breaker closes, the main program is triggered.

9. A method for monitoring, analyzing and displaying drainage of a hydropower station according to claim 1, characterized in that: In the fault and accident location step, after the main program is started, the interval equipment information related to the protection tripping signal measuring point is retrieved to check whether a series of orderly actions of the measuring points similar to the fault sample library appear within the 7-second time window, and the closest result after comparison with the characteristic value of the fault sample library is used as the fault location analysis result output information.

Citation Information

Patent Citations

  • A real-time monitoring system and method for rainfall drainage in hydropower station areas

    CN113962831B

  • Transmission line malfunction early-warning method and system based on big data driving

    CN106779505A

  • An intelligent drainage pump station based on SWMM model for pump group optimal dispatching and early warning disposal

    CN109284873A

  • Drainage system operation state prediction method and system based on Transform model

    CN115222165A

  • Intelligent operation system and method based on large hydropower station equipment analysis

    CN118261562A