Simulation method, device, processor and system for secondary arc of high-voltage cable
By constructing short-circuit arc and latent supply arc models, simulating and controlling high-voltage cable arc faults, the problem of lack of latent supply current simulation in the existing technology is solved, the fire risk in high-voltage cable design is reduced, and the reliability of simulation results is improved.
Patent Information
- Application Number
- CN202411127840.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-12-06
AI Technical Summary
The existing high-voltage cable arc fault simulation methods lack the simulation of latent supply current, resulting in a fire risk in the design.
By constructing a short-circuit arc model and a latent supply arc model, the changing trends of short-circuit current and latent supply current are simulated, the current source output in the experimental circuit is controlled, and the arc is generated and cut off to achieve the simulation of the latent supply arc.
Effectively simulate the behavior of the latent power supply arc, reduces the fire risk in high-voltage cable design and improves the reliability of simulation results.
Smart Images

Figure CN119089840A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of high-voltage cable fault simulation, and in particular to a simulation method, a simulation device, a computer-readable storage medium, a processor and a simulation system for a high-voltage cable latent power arc. Background Art
[0002] With the acceleration of urbanization, the overhead line transmission method has gradually had an impact on urban planning and development, given the high demand for transmission space. High-voltage cables have become key equipment in the transmission and distribution network and have been increasingly widely used, due to their advantages such as small footprint, strong power supply reliability, and the ability to optimize the appearance of the city. For this reason, overhead line transmission is still used outside urban areas, while high-voltage cable transmission is used within the city. This change has caused the original overhead line to evolve into a hybrid "overhead line-cable" line, bringing more severe challenges to the existing relay protection methods.
[0003] Since the insulation system of the cable does not have the ability to self-recover, the automatic reclosing device cannot be used on the cable. However, for such hybrid lines, the current standards, such as GB / T 34122-2017, DL / T 559-2018, DL / T5506-2015, etc., do not prohibit the use of automatic reclosing, but propose that it should be specifically considered based on the actual conditions of the cable section. In order to improve the power supply reliability of the system, in the existing technology, the operating unit will enable the automatic reclosing device in the hybrid line. As a result, the latent power arc that originally only appeared on the overhead line during the single-phase reclosing process also has a certain probability of appearing on the cable, and the longer arcing time of the latent power arc will greatly increase the risk of the cable insulation material being ignited by the arc, thereby causing a cable fire.
[0004] However, the current arc fault experiments conducted on cables do not take the impact of the latent power arc into consideration, so the previous cable arc fault experimental schemes cannot study the latent power arc that occurs on the cable. In addition, the principle of the generation of the latent power arc comes from the capacitive current and inductive current generated by the transmission line of the other two phases that are not cut off during the single-phase reclosing process. If the experimental environment is constructed according to the actual working conditions during the experiment, simulation cannot be performed. That is, the arc fault simulation experiment in the prior art lacks the measurement of the latent power current, and the high-voltage cables designed on this basis have a fire risk. Summary of the invention
[0005] The main purpose of the present application is to provide a simulation method, simulation device, computer-readable storage medium, processor and simulation system for a high-voltage cable submerged power supply arc, so as to at least solve the problem that the fault simulation method in the prior art lacks simulation of the submerged power supply current, so that the high-voltage cable designed according to the simulation results has a fire risk.
[0006] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a simulation method for a submerged power supply arc of a high-voltage cable is provided, the simulation method is used to control an experimental circuit, the experimental circuit includes a first branch, a second branch and a third branch, the first branch includes a high-voltage cable, the arc burning channel of the target position of the high-voltage cable is exposed, the second branch is used to supply power to the first branch to simulate a short-circuit arc, the third branch is used to supply power to the first branch to simulate a submerged power supply arc, the second branch is connected in parallel with the third branch and the second branch and the third branch are both connected in series with the first branch, the method includes: constructing a short-circuit arc model and a submerged power supply arc model, the short-circuit arc model is used to simulate the short-circuit current of the short-circuit arc with the steady-state arc voltage and the short-circuit arc steady-state conductivity change trend, the submerged power supply arc model is used to simulate the submerged power supply current of the submerged power supply arc with the submerged power supply arc length, the The invention relates to a method for determining a first target curve for simulating the changing trend of the short-circuit current through the short-circuit arc model according to the target laying parameters, and a second target curve for simulating the changing trend of the submerged supply current through the submerged supply arc model according to the target laying parameters, and a submerged supply current peak value according to the second target curve; the third branch is controlled to supply power to the first branch according to the submerged supply current peak value, and the second branch is controlled to supply power to the first branch according to the short-circuit current peak value, and the second branch is disconnected when the second branch is connected for a preset time, and the voltage, current and resistance of the target arc in the arcing channel are recorded until the arc in the arcing channel is extinguished, and the changing relationship between the voltage, current and resistance of the target arc and time is obtained respectively.
[0007] Optionally, constructing a short-circuit arc model includes: obtaining the short-circuit arc steady-state conductance, the short-circuit current and the steady-state arc voltage, and performing simulation based on the physical characteristics of the short-circuit arc burning process to obtain a first target formula, wherein the first target formula is used to simulate the change trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the short-circuit arc steady-state conductance: Among them, G p is the short-circuit arc steady-state conductance of the short-circuit arc, i arc is the short-circuit current, V p is the steady-state arc voltage, τ p is the short-circuit arc time constant, used to characterize the short-circuit arc duration, α p is the short-circuit arc time constant coefficient, I p is the peak value of the short-circuit current, l p is the short-circuit arc length.
[0008] Optionally, constructing a submersible power arc model includes: obtaining the submersible power current, the submersible power arc length, the arc potential difference, and the submersible power arc steady-state conductance, and performing simulation based on the physical characteristics of the submersible power arc burning process to obtain a second target formula, wherein the second target formula is used to simulate the change trend of the submersible power current of the submersible power arc with the submersible power arc length, the arc potential difference, and the submersible power arc steady-state conductance: Among them, G s is the steady-state conductance of the submersible arc, i s_arc is the potential supply current, l arc is the length of the submerged arc, u st is the arc potential difference per unit length, τ 0 is the initial time constant, l p is the short-circuit arc length, l arc is the length of the submerged arc, α s is the time constant coefficient of the submersible arc, τ s is the submersible power arc time constant, used to characterize the duration of the submersible power arc.
[0009] Optionally, a first target curve is obtained by simulating the changing trend of the short-circuit current through the short-circuit arc model according to the target laying parameters, including: according to the short-circuit arc model, converting the short-circuit arc into an equivalent resistor through PSCAD, and the resistance of the equivalent resistor is variable; based on the target laying parameters and the equivalent resistor, simulating the changing trend of the short-circuit current to obtain the first target curve.
[0010] Optionally, the third branch includes an AC current source, an isolation transformer and a first switch, and the third branch is controlled to supply power to the first branch according to the peak value of the latent supply current, including: closing the first switch and adjusting the AC current source so that the output current of the third branch is the peak value of the latent supply current.
[0011] Optionally, the second branch includes a circuit breaker, a second switch, an isolation transformer and an impulse generator, and the second branch is controlled to supply power to the first branch according to the short-circuit current peak value, including: closing the circuit breaker and the second switch, and adjusting the impulse generator so that the output current of the second branch is the short-circuit current peak value.
[0012] Optionally, when the second branch is connected for a preset time, disconnecting the second branch includes: disconnecting the circuit breaker when the circuit breaker is in a closed state and the arcing channel melts.
[0013] According to another aspect of the present application, a simulation device for a submerged power supply arc of a high-voltage cable is provided, the simulation device is used to control an experimental circuit, the experimental circuit includes a first branch, a second branch and a third branch, the first branch includes a high-voltage cable, the arc burning channel of the target position of the high-voltage cable is exposed, the second branch is used to supply power to the first branch to simulate a short-circuit arc, the third branch is used to supply power to the first branch to simulate a submerged power supply arc, the second branch is connected in parallel with the third branch and the second branch and the third branch are both connected in series with the first branch, the device includes: a construction unit, used to construct a short-circuit arc model and a submerged power supply arc model, the short-circuit arc model is used to simulate the short-circuit current of the short-circuit arc with the steady-state arc voltage and the short-circuit arc steady-state conductivity change trend, the submerged power supply arc model is used to simulate the submerged power supply current of the submerged power supply arc with the submerged power supply arc length, arc potential difference and submerged power supply a change trend of the steady-state conductance of the arc; an acquisition unit, used to acquire target laying parameters, simulate the change trend of the short-circuit current through the short-circuit arc model according to the target laying parameters to obtain a first target curve, determine the short-circuit current peak value according to the first target curve, simulate the change trend of the submerged supply current through the submerged supply arc model according to the target laying parameters to obtain a second target curve, and determine the submerged supply current peak value according to the second target curve; a control unit, used to control the third branch to supply power to the first branch according to the submerged supply current peak value, control the second branch to supply power to the first branch according to the short-circuit current peak value, disconnect the second branch when the second branch is connected for a preset time, record the voltage, current and resistance of the target arc in the arcing channel until the arc in the arcing channel is extinguished, and obtain the change relationship between the voltage, current and resistance of the target arc with time.
[0014] According to another aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute any one of the methods described.
[0015] According to another aspect of the present application, an arc simulation system is provided, comprising: one or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include methods for executing any one of the described methods.
[0016] Applying the technical solution of the present application, in the simulation method of the high-voltage cable submerged power supply arc, the simulation method is used to control an experimental circuit, the experimental circuit includes a first branch, a second branch and a third branch, the first branch includes a high-voltage cable, the arc burning channel of the target position of the high-voltage cable is exposed, the second branch is used to supply power to the first branch to simulate a short-circuit arc, the third branch is used to supply power to the first branch to simulate a submerged power supply arc, the second branch is connected in parallel with the third branch and the second branch and the third branch are both connected in series with the first branch, the method includes: first, constructing a short-circuit arc model and a submerged power supply arc model, the short-circuit arc model is used to simulate the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, the submerged power supply arc model is used to simulate the submerged power supply current of the submerged power supply arc with the submerged power supply arc length, arc potential difference and submerged power supply The changing trend of the steady-state conductance of the arc; then, the target laying parameters are obtained, and the changing trend of the short-circuit current is simulated by the short-circuit arc model according to the target laying parameters to obtain the first target curve, and the short-circuit current peak is determined according to the first target curve, and the changing trend of the submerged supply current is simulated by the submerged supply arc model according to the target laying parameters to obtain the second target curve, and the submerged supply current peak is determined according to the second target curve; finally, according to the submerged supply current peak, the third branch is controlled to supply power to the first branch, and according to the short-circuit current peak, the second branch is controlled to supply power to the first branch, and when the second branch is connected for a preset time, the second branch is disconnected, and the voltage, current and resistance of the target arc in the arcing channel are recorded until the arc in the arcing channel is extinguished, and the changing relationship between the voltage, current and resistance of the target arc and time is obtained respectively. The present application constructs an arc fault simulation model of a hybrid line cable segment, calculates the short-circuit current and the latent supply current of the arc fault state respectively, controls the corresponding current source output according to the circuit current and the latent supply current respectively, generates an arc in the experimental circuit, cuts off the short-circuit arc and records the changes of the latent supply arc to realize the simulation of the latent supply arc. This method solves the problem that the fault simulation method in the prior art lacks simulation of the latent supply current, and the high-voltage cable designed according to the corresponding simulation results has a fire risk. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 A hardware structure block diagram of a mobile terminal according to a method for simulating a high-voltage cable submerged arc provided in an embodiment of the present application is shown;
[0018] Figure 2 A schematic flow chart of a method for simulating a high-voltage cable submerged arc according to an embodiment of the present application is shown;
[0019] Figure 3A schematic structural diagram of an experimental circuit for a high-voltage cable submerged arc power supply provided according to an embodiment of the present application is shown.
[0020] Figure 4 A structural block diagram of a simulation device for a high-voltage cable submerged arc is shown according to an embodiment of the present application.
[0021] The above drawings include the following reference numerals:
[0022] 102, processor; 104, memory; 106, transmission device; 108, input and output devices. DETAILED DESCRIPTION
[0023] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0024] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0025] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0026] As introduced in the background technology, the arc fault simulation experiment in the prior art lacks the measurement of the latent supply current, and the high-voltage cables designed on this basis have a fire risk. In order to solve the problem that the fault simulation method lacks the simulation of the latent supply current, and the high-voltage cables designed according to the simulation results have a fire risk, the embodiments of the present application provide a simulation method, simulation device, computer-readable storage medium, processor and simulation system for the latent supply arc of a high-voltage cable.
[0027] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0028] The method embodiments provided in the embodiments of the present application can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 1 is a hardware structure block diagram of a mobile terminal of a method for simulating a high-voltage cable arc according to an embodiment of the present invention. Figure 1 As shown, the mobile terminal may include one or more ( Figure 1 Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the mobile terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations are shown.
[0029] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the display method of device information in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, the above method is implemented. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories can be connected to the mobile terminal via a network. Examples of the above-mentioned network include but are not limited to the Internet, an intranet, a local area network, a mobile communication network, and a combination thereof. The transmission device 106 is used to receive or send data via a network. The above-mentioned specific examples of the network may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.
[0030] In this embodiment, a simulation method for a high-voltage cable submerged power arc running on a mobile terminal, a computer terminal or a similar computing device is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in an order different from that shown here.
[0031] Figure 2 FIG. 1 is a flow chart of a method for simulating a high voltage cable arc according to an embodiment of the present application. Figure 2 As shown, the simulation method is used to control an experimental circuit, the experimental circuit includes a first branch, a second branch and a third branch, the first branch includes a high-voltage cable, the arcing channel of the target position of the high-voltage cable is exposed, the second branch is used to supply power to the first branch to simulate a short-circuit arc, and the third branch is used to supply power to the first branch to simulate a latent power arc. The method includes the following steps:
[0032] Step S201, constructing a short-circuit arc model and a submersible power arc model, wherein the short-circuit arc model is used to simulate the variation trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, and the submersible power arc model is used to simulate the variation trend of the submersible power current of the submersible power arc with the submersible power arc length, arc potential difference and the steady-state conductance of the submersible power arc;
[0033] Specifically, according to the laying parameters of the "overhead line-cable" hybrid line, an arc fault simulation calculation model of the cable section in the hybrid line is constructed in the PSCAD (Power Systems Computer Aided Design) software, the cable and overhead line are modeled using the preset model in the software, and the relevant models are customized according to the arcing characteristics of the above-mentioned short-circuit arc and the above-mentioned submerged power arc, and the above-mentioned short-circuit arc model and the above-mentioned submerged power arc model are constructed.
[0034] Step S202, obtaining target laying parameters, simulating the change trend of the short-circuit current through the short-circuit arc model according to the target laying parameters to obtain a first target curve, determining the short-circuit current peak value according to the first target curve, simulating the change trend of the submersible supply current through the submersible supply arc model according to the target laying parameters to obtain a second target curve, and determining the submersible supply current peak value according to the second target curve;
[0035] Specifically, according to the pure resistance characteristics of the arc, a variable resistor is used to replace the arc equivalently to achieve the effect of simulating an arc fault. According to the changing trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, the resistance value of the variable resistor in the short-circuit arc model is changed to achieve the effect of simulating the changing trend of the short-circuit current, and a first target curve is obtained, and then the short-circuit current peak value is determined according to the first target curve. According to the changing trend of the submerged current of the submerged arc with the submerged arc length, arc potential difference and the steady-state conductance of the submerged arc, the resistance value of the variable resistor in the submerged arc model is changed to achieve the effect of simulating the changing trend of the submerged current, and a second target curve is obtained, and then the submerged current peak value is determined according to the second target curve.
[0036] Step S203, according to the peak value of the latent supply current, the third branch is controlled to supply power to the first branch, according to the peak value of the short-circuit current, the second branch is controlled to supply power to the first branch, when the second branch is connected for a preset time, the second branch is disconnected, and the voltage, current and resistance of the target arc in the arc burning channel are recorded until the arc in the arc burning channel is extinguished, and the change relationship between the voltage, current and resistance of the target arc and time is obtained respectively.
[0037] Specifically, an AC current source is used to pass an AC current equal to the peak value of the latent supply current into the third branch, and power is supplied to the first branch through the third branch. Since the latent supply current is small, no arc will be generated when it forms a loop with the earth through the thin copper wire. The second switch and circuit breaker in the second branch are closed, and a short-circuit current is introduced into the first branch to artificially strike an arc. After a preset time has passed since the arc was generated, the circuit breaker is disconnected. At this time, the short-circuit current is disconnected from the loop, but the latent supply current still exists. The latent supply current will take over the short-circuit current and maintain the existence of the arc at the arcing position. The arc at this time is the latent supply arc. The air temperature at the arc position will gradually drop, the degree of ionization will decrease, the arc resistance will increase, and finally the short-circuit arc will extinguish itself. The voltage, current and resistance of the target arc in the arcing channel are recorded, and the relationship between the voltage, current and resistance of the target arc and time is obtained respectively.
[0038] Through this embodiment, first, a short-circuit arc model and a submerged arc model are constructed, the short-circuit arc model is used to simulate the variation trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, and the submerged arc model is used to simulate the variation trend of the submerged current of the submerged arc with the submerged arc length, arc potential difference and the steady-state conductance of the submerged arc; then, the target laying parameters are obtained, and the variation trend of the short-circuit current is simulated by the short-circuit arc model according to the target laying parameters to obtain a first target curve, the short-circuit current peak value is determined according to the first target curve, and the submerged arc model is used to simulate the variation trend of the submerged current of the submerged arc with the submerged arc length, arc potential difference and the steady-state conductance of the submerged arc; then, the target laying parameters are obtained, and the variation trend of the short-circuit current is obtained by simulating the short-circuit current model according to the target laying parameters, and the short-circuit current peak value is determined according to the first target curve. The second target curve is obtained by simulating the change trend of the above-mentioned submerged supply current through the above-mentioned submerged supply arc model, and the submerged supply current peak value is determined according to the above-mentioned second target curve; finally, the above-mentioned third branch is controlled to supply power to the above-mentioned first branch according to the above-mentioned submerged supply current peak value, and the above-mentioned second branch is controlled to supply power to the above-mentioned first branch according to the above-mentioned short-circuit current peak value. When the above-mentioned second branch is connected for a preset time, the above-mentioned second branch is disconnected, and the voltage, current and resistance of the target arc in the above-mentioned arc burning channel are recorded until the arc in the above-mentioned arc burning channel is extinguished, and the change relationship of the voltage, current and resistance of the target arc with time is obtained respectively. The present application constructs an arc fault simulation model of a hybrid line cable segment, calculates the short-circuit current and submerged supply current of the arc fault state respectively, controls the corresponding current source output according to the circuit current and the submerged supply current respectively, generates an arc in the experimental circuit, and cuts off the short-circuit arc to record the change of the submerged supply arc, so as to realize the simulation of the submerged supply arc. This method solves the problem that the fault simulation method in the prior art lacks simulation of the submerged supply current, and the high-voltage cable designed according to the corresponding simulation results has a fire risk.
[0039] In order to construct a short-circuit arc model, in an optional implementation manner, the above step S201 includes:
[0040] Step S2011, obtaining the above-mentioned short-circuit arc steady-state conductance, the above-mentioned short-circuit current and the above-mentioned steady-state arc voltage, and performing simulation based on the physical characteristics of the above-mentioned short-circuit arc burning process to obtain a first target formula, and the above-mentioned first target formula is used to simulate the change trend of the short-circuit current of the above-mentioned short-circuit arc with the steady-state arc voltage and the short-circuit arc steady-state conductance:
[0041]
[0042] Among them, G p is the short-circuit arc steady-state conductance of the short-circuit arc, i arc is the above short-circuit current, V p is the above steady-state arc voltage, τ p is the short-circuit arc time constant, which is used to characterize the above short-circuit arc duration, α p is the short-circuit arc time constant coefficient, I pis the peak value of the short-circuit current, l p is the short-circuit arc length.
[0043] Specifically, according to the arc burning characteristics of the short-circuit arc, the existence time of the short-circuit arc is extremely short. Therefore, it can be approximately considered that the length of the short-circuit arc always remains constant during the arc burning process, which is equal to the distance from the cable core to the metal sheath. Then, the mathematical equation of the above short-circuit arc is constructed to obtain the above first target model.
[0044] In order to construct a submerged arc model, in an optional implementation, the above step S201 further includes:
[0045] Step S2012, obtaining the above-mentioned submersible power supply current, the above-mentioned submersible power supply arc length, the above-mentioned arc potential difference and the above-mentioned submersible power supply arc steady-state conductance, and performing simulation based on the physical characteristics of the above-mentioned submersible power supply arc burning process to obtain a second target formula, and the above-mentioned second target formula is used to simulate the change trend of the submersible power supply current of the above-mentioned submersible power supply arc with the submersible power supply arc length, arc potential difference and submersible power supply arc steady-state conductance:
[0046]
[0047]
[0048] Among them, G s is the steady-state conductance of the above-mentioned submersible arc, i s_arc is the above-mentioned potential supply current, l arc is the length of the above-mentioned submerged arc, u st is the arc potential difference per unit length, τ 0 is the initial time constant, l p is the short-circuit arc length, l arc is the length of the above-mentioned secondary arc, α s is the time constant coefficient of the submersible arc, τ s is the submersible power arc time constant, which is used to characterize the duration of the above submersible power arc.
[0049] Specifically, during the short-circuit arc burning process, the original short-circuit arc burning channel on the cable will be pushed open by the air that heats up sharply during the burning process, so that the channel originally existing inside the cable insulation layer is exposed to the air. At this time, the arc burning process of the latent arc will be affected by factors such as air thermal convection, and then the above-mentioned second target model is constructed according to the influence of the short-circuit arc on the latent arc.
[0050] In order to obtain the first target curve, in an optional real-time manner, the above step S202 includes:
[0051] Step S2021, according to the short-circuit arc model, convert the short-circuit arc into an equivalent resistor through PSCAD, and the resistance value of the equivalent resistor is variable;
[0052] Specifically, the arc has a pure resistance characteristic, and a variable resistor can be used to equivalently replace the arc to achieve the effect of simulating an arc fault.
[0053] Step S2022, simulating the change trend of the short-circuit current based on the target installation parameters and the equivalent resistance to obtain the first target curve.
[0054] Specifically, the resistance value of the variable resistor in the above-mentioned short-circuit arc model is changed according to the changing trend equation of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, so as to achieve the effect of simulating the changing trend of the short-circuit current of the above-mentioned short-circuit arc, obtain the first target curve, and then determine the short-circuit current peak based on the curve.
[0055] In order to generate the latent current, in an optional embodiment, as Figure 3 As shown, the third branch includes an AC current source, an isolation transformer and a first switch, and the step S203 includes:
[0056] Step S2031, closing the first switch, and adjusting the AC current source so that the output current of the third branch is the peak value of the latent supply current.
[0057] Specifically, the first switch in the third branch is closed, and an alternating current equal to the peak value of the latent current is passed into the third branch. Since the latent current is small, it will not damage the thin copper wire at the location of the artificially created cable arc fault. The latent current will form a loop with the ground through the thin copper wire and will not generate an arc.
[0058] In order to perform artificial arc ignition, in an optional embodiment, as Figure 3 As shown, the above step S203 also includes:
[0059] Step S2032, closing the circuit breaker and the second switch, and adjusting the impulse generator so that the output current of the second branch is the short-circuit current peak value.
[0060] Specifically, the second switch and the circuit breaker in the second branch are closed, and the impulse generator supplies a current equal to the peak value of the short-circuit current to the second branch to artificially strike an arc.
[0061] In order to generate a submerged arc, in an optional embodiment, as Figure 3 As shown, step S203 also includes:
[0062] Step S2033, when the circuit breaker is in a closed state and the arcing channel is melted, opening the circuit breaker.
[0063] Specifically, when the above-mentioned circuit breaker is in a closed state, an impulse generator supplies current to the circuit to artificially strike an arc. After tens to one hundred milliseconds, the above-mentioned circuit breaker is disconnected. At this time, the short-circuit current peak is disconnected from the circuit, but the latent current still exists. Since the short-circuit arc has an extremely high temperature, the degree of air ionization at the arc burning position is still very high, and deionization does not occur. Therefore, the latent current will take over the short-circuit current to maintain the existence of the arc at the arc burning position. The arc at this time is a latent current arc.
[0064] Furthermore, the peak value of the above-mentioned latent current is much smaller than the peak value of the above-mentioned short-circuit current, and the temperature during the arcing process will also be lower than that of the short-circuit arc. The air temperature at the arc position will gradually drop, the degree of ionization will decrease, and the arc resistance will increase. Eventually, the short-circuit arc will extinguish itself. The voltage, current and resistance of the target arc in the above-mentioned arcing channel are recorded, and the changing relationships of the voltage, current and resistance of the target arc with time are obtained respectively.
[0065] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0066] The embodiment of the present application also provides a simulation device for a high-voltage cable submerged power arc. It should be noted that the simulation device for a high-voltage cable submerged power arc in the embodiment of the present application can be used to execute the simulation method for a high-voltage cable submerged power arc provided in the embodiment of the present application. The device is used to implement the above-mentioned embodiments and preferred implementation modes, and those that have been described will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware for a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.
[0067] The following introduces the simulation device for the high-voltage cable submerged power arc provided in an embodiment of the present application.
[0068] Figure 4 1 is a structural block diagram of a simulation device for a high-voltage cable arc according to an embodiment of the present application. Figure 4As shown, the simulation device is used to control the experimental circuit, the experimental circuit includes a first branch, a second branch and a third branch, the first branch includes a high-voltage cable, the arcing channel of the target position of the high-voltage cable is exposed, the second branch is used to supply power to the first branch to simulate a short-circuit arc, and the third branch is used to supply power to the first branch to simulate a latent power arc. The device includes:
[0069] A construction unit 10 is used to construct a short-circuit arc model and a submersible power supply arc model. The short-circuit arc model is used to simulate the variation trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc. The submersible power supply arc model is used to simulate the variation trend of the submersible power supply current of the submersible power supply arc with the submersible power supply arc length, arc potential difference and the steady-state conductance of the submersible power supply arc.
[0070] Specifically, according to the laying parameters of the "overhead line-cable" hybrid line, an arc fault simulation calculation model of the cable section in the hybrid line is constructed in the PSCAD (Power Systems Computer Aided Design) software, the cable and overhead line are modeled using the preset model in the software, and the relevant models are customized according to the arcing characteristics of the above-mentioned short-circuit arc and the above-mentioned submerged power arc, and the above-mentioned short-circuit arc model and the above-mentioned submerged power arc model are constructed.
[0071] The acquisition unit 20 is used to acquire target laying parameters, simulate the change trend of the short-circuit current through the short-circuit arc model according to the target laying parameters to obtain a first target curve, determine the short-circuit current peak value according to the first target curve, simulate the change trend of the submersible supply current through the submersible supply arc model according to the target laying parameters to obtain a second target curve, and determine the submersible supply current peak value according to the second target curve;
[0072] Specifically, according to the pure resistance characteristics of the arc, a variable resistor is used to replace the arc equivalently to achieve the effect of simulating an arc fault. According to the changing trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, the resistance value of the variable resistor in the short-circuit arc model is changed to achieve the effect of simulating the changing trend of the short-circuit current, and a first target curve is obtained, and then the short-circuit current peak value is determined according to the first target curve. According to the changing trend of the submerged current of the submerged arc with the submerged arc length, arc potential difference and the steady-state conductance of the submerged arc, the resistance value of the variable resistor in the submerged arc model is changed to achieve the effect of simulating the changing trend of the submerged current, and a second target curve is obtained, and then the submerged current peak value is determined according to the second target curve.
[0073] The control unit 30 is used to control the third branch to supply power to the first branch according to the peak value of the latent supply current, and control the second branch to supply power to the first branch according to the peak value of the short-circuit current, disconnect the second branch when the second branch is connected for a preset time, record the voltage, current and resistance of the target arc in the arc burning channel until the arc in the arc burning channel is extinguished, and obtain the change relationship between the voltage, current and resistance of the target arc with time.
[0074] Specifically, an AC current source is used to pass an AC current equal to the peak value of the latent supply current into the third branch, and power is supplied to the first branch through the third branch. Since the latent supply current is small, no arc will be generated when it forms a loop with the earth through the thin copper wire. The second switch and circuit breaker in the second branch are closed, and a short-circuit current is introduced into the first branch to artificially strike an arc. After a preset time has passed since the arc was generated, the circuit breaker is disconnected. At this time, the short-circuit current is disconnected from the loop, but the latent supply current still exists. The latent supply current will take over the short-circuit current and maintain the existence of the arc at the arcing position. The arc at this time is the latent supply arc. The air temperature at the arc position will gradually drop, the degree of ionization will decrease, the arc resistance will increase, and finally the short-circuit arc will extinguish itself. The voltage, current and resistance of the target arc in the arcing channel are recorded, and the relationship between the voltage, current and resistance of the target arc and time is obtained respectively.
[0075] Through this embodiment, the simulation device is used to control the experimental circuit, the experimental circuit includes a first branch, a second branch and a third branch, the first branch includes a high-voltage cable, the arc burning channel of the target position of the high-voltage cable is exposed, the second branch is used to supply power to the first branch to simulate a short-circuit arc, the third branch is used to supply power to the first branch to simulate a submerged power arc, the construction unit constructs a short-circuit arc model and a submerged power arc model, the short-circuit arc model is used to simulate the short-circuit current of the short-circuit arc with the steady-state arc voltage and the short-circuit arc steady-state conductivity change trend, the submerged power arc model is used to simulate the submerged power current of the submerged power arc with the submerged power arc length, arc potential difference and submerged power arc steady-state conductivity change trend; the acquisition unit acquires the target laying parameters, according to the target laying parameters The short-circuit arc model is used to simulate the changing trend of the short-circuit current to obtain a first target curve, and the short-circuit current peak is determined according to the first target curve. The submerged supply current model is used to simulate the changing trend of the submerged supply current according to the target laying parameters to obtain a second target curve, and the submerged supply current peak is determined according to the second target curve; the control unit controls the third branch to supply power to the first branch according to the submerged supply current peak, and controls the second branch to supply power to the first branch according to the short-circuit current peak, disconnects the second branch when the second branch is connected for a preset time, and records the voltage, current and resistance of the target arc in the arc burning channel until the arc in the arc burning channel is extinguished, and obtains the changing relationships of the voltage, current and resistance of the target arc with time respectively. The present application constructs an arc fault simulation model of a hybrid line cable segment, calculates the short-circuit current and the latent supply current of the arc fault state respectively, controls the corresponding current source output according to the circuit current and the latent supply current respectively, generates an arc in the experimental circuit, cuts off the short-circuit arc and records the changes of the latent supply arc to realize the simulation of the latent supply arc. This method solves the problem that the fault simulation method in the prior art lacks simulation of the latent supply current, and the high-voltage cable designed according to the corresponding simulation results has a fire risk.
[0076] In order to construct the short-circuit arc model, in an optional implementation, the construction unit includes:
[0077] The first construction subunit obtains the short-circuit arc steady-state conductance, the short-circuit current and the steady-state arc voltage, performs simulation based on the physical characteristics of the short-circuit arc burning process, and obtains a first target formula, which is used to simulate the change trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the short-circuit arc steady-state conductance:
[0078]
[0079] Among them, G p is the short-circuit arc steady-state conductance of the short-circuit arc, iarc is the above short-circuit current, V p is the above steady-state arc voltage, τ p is the short-circuit arc time constant, which is used to characterize the above short-circuit arc duration, α p is the short-circuit arc time constant coefficient, I p is the peak value of the short-circuit current, l p is the short-circuit arc length.
[0080] Specifically, according to the arc burning characteristics of the short-circuit arc, the existence time of the short-circuit arc is extremely short. Therefore, it can be approximately considered that the length of the short-circuit arc always remains constant during the arc burning process, which is equal to the distance from the cable core to the metal sheath. Then, the mathematical equation of the above short-circuit arc is constructed to obtain the above first target model.
[0081] In order to construct a submerged arc model, in an optional implementation, the construction unit includes:
[0082] The second construction subunit obtains the above-mentioned submersible power supply current, the above-mentioned submersible power supply arc length, the above-mentioned arc potential difference and the above-mentioned submersible power supply arc steady-state conductance, performs simulation based on the physical characteristics of the above-mentioned submersible power supply arc burning process, and obtains the second target formula. The above-mentioned second target formula is used to simulate the change trend of the submersible power supply current of the above-mentioned submersible power supply arc with the submersible power supply arc length, arc potential difference and submersible power supply arc steady-state conductance:
[0083]
[0084] Among them, G s is the steady-state conductance of the above-mentioned submersible arc, i s_arc is the above-mentioned potential supply current, l arc is the length of the above-mentioned submerged arc, u st is the arc potential difference per unit length, τ 0 is the initial time constant, l p is the short-circuit arc length, l arc is the length of the above-mentioned secondary arc, α s is the time constant coefficient of the submersible arc, τ s is the submersible power arc time constant, which is used to characterize the duration of the above submersible power arc.
[0085] Specifically, during the short-circuit arc burning process, the original short-circuit arc burning channel on the cable will be pushed open by the air that heats up sharply during the burning process, so that the channel originally existing inside the cable insulation layer is exposed to the air. At this time, the arc burning process of the latent arc will be affected by factors such as air thermal convection, and then the above-mentioned second target model is constructed according to the influence of the short-circuit arc on the latent arc.
[0086] In order to obtain the first target curve, in an optional real-time manner, the acquisition unit includes:
[0087] The calculation subunit converts the short-circuit arc into an equivalent resistor through PSCAD according to the short-circuit arc model, and the resistance value of the equivalent resistor is variable;
[0088] Specifically, the arc has a pure resistance characteristic, and a variable resistor can be used to equivalently replace the arc to achieve the effect of simulating an arc fault.
[0089] The simulation subunit simulates the change trend of the short-circuit current based on the target installation parameters and the equivalent resistance to obtain the first target curve.
[0090] Specifically, the resistance value of the variable resistor in the above-mentioned short-circuit arc model is changed according to the changing trend equation of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, so as to achieve the effect of simulating the changing trend of the short-circuit current of the above-mentioned short-circuit arc, obtain the first target curve, and then determine the short-circuit current peak based on the curve.
[0091] In order to generate the latent current, in an optional implementation, the control unit includes:
[0092] The first control subunit closes the first switch and adjusts the AC current source so that the output current of the third branch is the peak value of the latent supply current.
[0093] Specifically, the first switch in the third branch is closed, and an alternating current equal to the peak value of the latent current is passed into the third branch. Since the latent current is small, it will not damage the thin copper wire at the location of the artificially created cable arc fault. The latent current will form a loop with the ground through the thin copper wire and will not generate an arc.
[0094] In order to perform artificial arc ignition, in an optional embodiment, the control unit further includes:
[0095] The second control subunit closes the circuit breaker and the second switch, and adjusts the impulse generator so that the output current of the second branch is the short-circuit current peak value.
[0096] Specifically, the second switch and the circuit breaker in the second branch are closed, and the impulse generator supplies a current equal to the peak value of the short-circuit current to the second branch to artificially strike an arc.
[0097] In order to generate a submerged arc, in an optional implementation, the control unit further includes:
[0098] The third control subunit opens the circuit breaker when the circuit breaker is in a closed state and the arcing channel melts.
[0099] Specifically, when the above-mentioned circuit breaker is in a closed state, an impulse generator supplies current to the circuit to artificially strike an arc. After tens to one hundred milliseconds, the above-mentioned circuit breaker is disconnected. At this time, the short-circuit current peak is disconnected from the circuit, but the latent current still exists. Since the short-circuit arc has an extremely high temperature, the degree of air ionization at the arc burning position is still very high, and deionization does not occur. Therefore, the latent current will take over the short-circuit current to maintain the existence of the arc at the arc burning position. The arc at this time is a latent current arc.
[0100] Furthermore, the peak value of the above-mentioned latent current is much smaller than the peak value of the above-mentioned short-circuit current, and the temperature during the arcing process will also be lower than that of the short-circuit arc. The air temperature at the arc position will gradually drop, the degree of ionization will decrease, and the arc resistance will increase. Eventually, the short-circuit arc will extinguish itself. The voltage, current and resistance of the target arc in the above-mentioned arcing channel are recorded, and the changing relationships of the voltage, current and resistance of the target arc with time are obtained respectively.
[0101] The simulation device for the high-voltage cable submerged arc includes a processor and a memory. The construction unit, acquisition unit, control unit, etc. are stored in the memory as program units, and the processor executes the program units stored in the memory to implement corresponding functions. The modules are all located in the same processor; or, the modules are located in different processors in any combination.
[0102] The processor contains a kernel, which calls the corresponding program unit from the memory. One or more kernels can be set, and the accuracy of the experimental results can be improved by adjusting the kernel parameters.
[0103] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.
[0104] An embodiment of the present invention provides a computer-readable storage medium, which includes a stored program, wherein when the program is running, the device where the computer-readable storage medium is located is controlled to execute the simulation method of the high-voltage cable submerged power arc.
[0105] Specifically, the simulation method of the high-voltage cable submerged arc includes:
[0106] Step S201, constructing a short-circuit arc model and a submersible power arc model, wherein the short-circuit arc model is used to simulate the variation trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, and the submersible power arc model is used to simulate the variation trend of the submersible power current of the submersible power arc with the submersible power arc length, arc potential difference and the steady-state conductance of the submersible power arc;
[0107] Specifically, according to the laying parameters of the "overhead line-cable" hybrid line, an arc fault simulation calculation model of the cable section in the hybrid line is constructed in the PSCAD (Power Systems Computer Aided Design) software, the cable and overhead line are modeled using the preset model in the software, and the relevant models are customized according to the arcing characteristics of the above-mentioned short-circuit arc and the above-mentioned submerged power arc, and the above-mentioned short-circuit arc model and the above-mentioned submerged power arc model are constructed.
[0108] Step S202, obtaining target laying parameters, simulating the change trend of the short-circuit current through the short-circuit arc model according to the target laying parameters to obtain a first target curve, determining the short-circuit current peak value according to the first target curve, simulating the change trend of the submersible supply current through the submersible supply arc model according to the target laying parameters to obtain a second target curve, and determining the submersible supply current peak value according to the second target curve;
[0109] Specifically, according to the pure resistance characteristics of the arc, a variable resistor is used to replace the arc equivalently to achieve the effect of simulating an arc fault. According to the changing trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, the resistance value of the variable resistor in the short-circuit arc model is changed to achieve the effect of simulating the changing trend of the short-circuit current, and a first target curve is obtained, and then the short-circuit current peak value is determined according to the first target curve. According to the changing trend of the submerged current of the submerged arc with the submerged arc length, arc potential difference and the steady-state conductance of the submerged arc, the resistance value of the variable resistor in the submerged arc model is changed to achieve the effect of simulating the changing trend of the submerged current, and a second target curve is obtained, and then the submerged current peak value is determined according to the second target curve.
[0110] Step S203, according to the peak value of the latent supply current, the third branch is controlled to supply power to the first branch, according to the peak value of the short-circuit current, the second branch is controlled to supply power to the first branch, when the second branch is connected for a preset time, the second branch is disconnected, and the voltage, current and resistance of the target arc in the arc burning channel are recorded until the arc in the arc burning channel is extinguished, and the change relationship between the voltage, current and resistance of the target arc and time is obtained respectively.
[0111] Specifically, an AC current source is used to pass an AC current equal to the peak value of the latent supply current into the third branch, and power is supplied to the first branch through the third branch. Since the latent supply current is small, no arc will be generated when it forms a loop with the earth through the thin copper wire. The second switch and circuit breaker in the second branch are closed, and a short-circuit current is introduced into the first branch to artificially strike an arc. After a preset time has passed since the arc was generated, the circuit breaker is disconnected. At this time, the short-circuit current is disconnected from the loop, but the latent supply current still exists. The latent supply current will take over the short-circuit current and maintain the existence of the arc at the arcing position. The arc at this time is the latent supply arc. The air temperature at the arc position will gradually drop, the degree of ionization will decrease, the arc resistance will increase, and finally the short-circuit arc will extinguish itself. The voltage, current and resistance of the target arc in the arcing channel are recorded, and the relationship between the voltage, current and resistance of the target arc and time is obtained respectively.
[0112] An embodiment of the present invention provides a processor, and the processor is used to run a program, wherein the simulation method of the high-voltage cable submerged power arc is executed when the program is run.
[0113] Specifically, the simulation method of the high-voltage cable submerged arc includes:
[0114] Step S201, constructing a short-circuit arc model and a submersible power arc model, wherein the short-circuit arc model is used to simulate the variation trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, and the submersible power arc model is used to simulate the variation trend of the submersible power current of the submersible power arc with the submersible power arc length, arc potential difference and the steady-state conductance of the submersible power arc;
[0115] Specifically, according to the laying parameters of the "overhead line-cable" hybrid line, an arc fault simulation calculation model of the cable section in the hybrid line is constructed in the PSCAD (Power Systems Computer Aided Design) software, the cable and overhead line are modeled using the preset model in the software, and the relevant models are customized according to the arcing characteristics of the above-mentioned short-circuit arc and the above-mentioned submerged power arc, and the above-mentioned short-circuit arc model and the above-mentioned submerged power arc model are constructed.
[0116] Step S202, obtaining target laying parameters, simulating the change trend of the short-circuit current through the short-circuit arc model according to the target laying parameters to obtain a first target curve, determining the short-circuit current peak value according to the first target curve, simulating the change trend of the submersible supply current through the submersible supply arc model according to the target laying parameters to obtain a second target curve, and determining the submersible supply current peak value according to the second target curve;
[0117] Specifically, according to the pure resistance characteristics of the arc, a variable resistor is used to replace the arc equivalently to achieve the effect of simulating an arc fault. According to the changing trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, the resistance value of the variable resistor in the short-circuit arc model is changed to achieve the effect of simulating the changing trend of the short-circuit current, and a first target curve is obtained, and then the short-circuit current peak value is determined according to the first target curve. According to the changing trend of the submerged current of the submerged arc with the submerged arc length, arc potential difference and the steady-state conductance of the submerged arc, the resistance value of the variable resistor in the submerged arc model is changed to achieve the effect of simulating the changing trend of the submerged current, and a second target curve is obtained, and then the submerged current peak value is determined according to the second target curve.
[0118] Step S203, according to the peak value of the latent supply current, the third branch is controlled to supply power to the first branch, according to the peak value of the short-circuit current, the second branch is controlled to supply power to the first branch, when the second branch is connected for a preset time, the second branch is disconnected, and the voltage, current and resistance of the target arc in the arc burning channel are recorded until the arc in the arc burning channel is extinguished, and the change relationship between the voltage, current and resistance of the target arc and time is obtained respectively.
[0119] Specifically, an AC current source is used to pass an AC current equal to the peak value of the latent supply current into the third branch, and power is supplied to the first branch through the third branch. Since the latent supply current is small, no arc will be generated when it forms a loop with the earth through the thin copper wire. The second switch and circuit breaker in the second branch are closed, and a short-circuit current is introduced into the first branch to artificially strike an arc. After a preset time has passed since the arc was generated, the circuit breaker is disconnected. At this time, the short-circuit current is disconnected from the loop, but the latent supply current still exists. The latent supply current will take over the short-circuit current and maintain the existence of the arc at the arcing position. The arc at this time is the latent supply arc. The air temperature at the arc position will gradually drop, the degree of ionization will decrease, the arc resistance will increase, and finally the short-circuit arc will extinguish itself. The voltage, current and resistance of the target arc in the arcing channel are recorded, and the relationship between the voltage, current and resistance of the target arc and time is obtained respectively.
[0120] An embodiment of the present invention provides a simulation system, the simulation system comprising a processor, a memory, and a program stored in the memory and executable on the processor, and when the processor executes the program, at least the following steps are implemented:
[0121] Step S201, constructing a short-circuit arc model and a submersible power arc model, wherein the short-circuit arc model is used to simulate the variation trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, and the submersible power arc model is used to simulate the variation trend of the submersible power current of the submersible power arc with the submersible power arc length, arc potential difference and the steady-state conductance of the submersible power arc;
[0122] Specifically, according to the laying parameters of the "overhead line-cable" hybrid line, an arc fault simulation calculation model of the cable section in the hybrid line is constructed in the PSCAD (Power Systems Computer Aided Design) software, the cable and overhead line are modeled using the preset model in the software, and the relevant models are customized according to the arcing characteristics of the above-mentioned short-circuit arc and the above-mentioned submerged power arc, and the above-mentioned short-circuit arc model and the above-mentioned submerged power arc model are constructed.
[0123] Step S202, obtaining target laying parameters, simulating the change trend of the short-circuit current through the short-circuit arc model according to the target laying parameters to obtain a first target curve, determining the short-circuit current peak value according to the first target curve, simulating the change trend of the submersible supply current through the submersible supply arc model according to the target laying parameters to obtain a second target curve, and determining the submersible supply current peak value according to the second target curve;
[0124] Specifically, according to the pure resistance characteristics of the arc, a variable resistor is used to replace the arc equivalently to achieve the effect of simulating an arc fault. According to the changing trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, the resistance value of the variable resistor in the short-circuit arc model is changed to achieve the effect of simulating the changing trend of the short-circuit current, and a first target curve is obtained, and then the short-circuit current peak value is determined according to the first target curve. According to the changing trend of the submerged current of the submerged arc with the submerged arc length, arc potential difference and the steady-state conductance of the submerged arc, the resistance value of the variable resistor in the submerged arc model is changed to achieve the effect of simulating the changing trend of the submerged current, and a second target curve is obtained, and then the submerged current peak value is determined according to the second target curve.
[0125] Step S203, according to the peak value of the latent supply current, the third branch is controlled to supply power to the first branch, according to the peak value of the short-circuit current, the second branch is controlled to supply power to the first branch, when the second branch is connected for a preset time, the second branch is disconnected, and the voltage, current and resistance of the target arc in the arc burning channel are recorded until the arc in the arc burning channel is extinguished, and the change relationship between the voltage, current and resistance of the target arc and time is obtained respectively.
[0126] Specifically, an AC current source is used to pass an AC current equal to the peak value of the latent supply current into the third branch, and power is supplied to the first branch through the third branch. Since the latent supply current is small, no arc will be generated when it forms a loop with the earth through the thin copper wire. The second switch and circuit breaker in the second branch are closed, and a short-circuit current is introduced into the first branch to artificially strike an arc. After a preset time has passed since the arc was generated, the circuit breaker is disconnected. At this time, the short-circuit current is disconnected from the loop, but the latent supply current still exists. The latent supply current will take over the short-circuit current and maintain the existence of the arc at the arcing position. The arc at this time is the latent supply arc. The air temperature at the arc position will gradually drop, the degree of ionization will decrease, the arc resistance will increase, and finally the short-circuit arc will extinguish itself. The voltage, current and resistance of the target arc in the arcing channel are recorded, and the relationship between the voltage, current and resistance of the target arc and time is obtained respectively.
[0127] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing a program for initializing at least the following method steps:
[0128] Step S201, constructing a short-circuit arc model and a submersible power arc model, wherein the short-circuit arc model is used to simulate the variation trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, and the submersible power arc model is used to simulate the variation trend of the submersible power current of the submersible power arc with the submersible power arc length, arc potential difference and the steady-state conductance of the submersible power arc;
[0129] Specifically, according to the laying parameters of the "overhead line-cable" hybrid line, an arc fault simulation calculation model of the cable section in the hybrid line is constructed in the PSCAD (Power Systems Computer Aided Design) software, the cable and overhead line are modeled using the preset model in the software, and the relevant models are customized according to the arcing characteristics of the above-mentioned short-circuit arc and the above-mentioned submerged power arc, and the above-mentioned short-circuit arc model and the above-mentioned submerged power arc model are constructed.
[0130] Step S202, obtaining target laying parameters, simulating the change trend of the short-circuit current through the short-circuit arc model according to the target laying parameters to obtain a first target curve, determining the short-circuit current peak value according to the first target curve, simulating the change trend of the submersible supply current through the submersible supply arc model according to the target laying parameters to obtain a second target curve, and determining the submersible supply current peak value according to the second target curve;
[0131] Specifically, according to the pure resistance characteristics of the arc, a variable resistor is used to replace the arc equivalently to achieve the effect of simulating an arc fault. According to the changing trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, the resistance value of the variable resistor in the short-circuit arc model is changed to achieve the effect of simulating the changing trend of the short-circuit current, and a first target curve is obtained, and then the short-circuit current peak value is determined according to the first target curve. According to the changing trend of the submerged current of the submerged arc with the submerged arc length, arc potential difference and the steady-state conductance of the submerged arc, the resistance value of the variable resistor in the submerged arc model is changed to achieve the effect of simulating the changing trend of the submerged current, and a second target curve is obtained, and then the submerged current peak value is determined according to the second target curve.
[0132] Step S203, according to the peak value of the latent supply current, the third branch is controlled to supply power to the first branch, according to the peak value of the short-circuit current, the second branch is controlled to supply power to the first branch, when the second branch is connected for a preset time, the second branch is disconnected, and the voltage, current and resistance of the target arc in the arc burning channel are recorded until the arc in the arc burning channel is extinguished, and the change relationship between the voltage, current and resistance of the target arc and time is obtained respectively.
[0133] Specifically, an AC current source is used to pass an AC current equal to the peak value of the latent supply current into the third branch, and power is supplied to the first branch through the third branch. Since the latent supply current is small, no arc will be generated when it forms a loop with the earth through the thin copper wire. The second switch and circuit breaker in the second branch are closed, and a short-circuit current is introduced into the first branch to artificially strike an arc. After a preset time has passed since the arc was generated, the circuit breaker is disconnected. At this time, the short-circuit current is disconnected from the loop, but the latent supply current still exists. The latent supply current will take over the short-circuit current and maintain the existence of the arc at the arcing position. The arc at this time is the latent supply arc. The air temperature at the arc position will gradually drop, the degree of ionization will decrease, the arc resistance will increase, and finally the short-circuit arc will extinguish itself. The voltage, current and resistance of the target arc in the arcing channel are recorded, and the relationship between the voltage, current and resistance of the target arc and time is obtained respectively.
[0134] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order than here, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.
[0135] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0136] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0137] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0138] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0139] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0140] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0141] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tapes, disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0142] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0143] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:
[0144] 1) A simulation method for a submerged power supply arc of a high-voltage cable of the present application, the simulation method is used to control an experimental circuit, the experimental circuit includes a first branch, a second branch and a third branch, the first branch includes a high-voltage cable, the arc burning channel of the target position of the high-voltage cable is exposed, the second branch is used to supply power to the first branch to simulate a short-circuit arc, the third branch is used to supply power to the first branch to simulate a submerged power supply arc, the second branch is connected in parallel with the third branch and the second branch and the third branch are both connected in series with the first branch, the method includes: first, constructing a short-circuit arc model and a submerged power supply arc model, the short-circuit arc model is used to simulate the short-circuit current of the short-circuit arc with the steady-state arc voltage and the short-circuit arc steady-state conductivity change trend, the submerged power supply arc model is used to simulate the submerged power supply current of the submerged power supply arc with the submerged power supply arc length, arc potential difference and submerged power supply arc steady-state then, obtaining target laying parameters, simulating the changing trend of the short-circuit current through the short-circuit arc model according to the target laying parameters to obtain a first target curve, determining the short-circuit current peak value according to the first target curve, simulating the changing trend of the submerged supply current through the submerged supply arc model according to the target laying parameters to obtain a second target curve, and determining the submerged supply current peak value according to the second target curve; finally, controlling the third branch to supply power to the first branch according to the submerged supply current peak value, controlling the second branch to supply power to the first branch according to the short-circuit current peak value, disconnecting the second branch when the second branch is connected for a preset time, recording the voltage, current and resistance of the target arc in the arcing channel until the arc in the arcing channel is extinguished, and obtaining the changing relationships of the voltage, current and resistance of the target arc with time respectively. The present application constructs an arc fault simulation model of a hybrid line cable segment, calculates the short-circuit current and the latent supply current of the arc fault state respectively, controls the corresponding current source output according to the circuit current and the latent supply current respectively, generates an arc in the experimental circuit, cuts off the short-circuit arc and records the changes of the latent supply arc to realize the simulation of the latent supply arc. This method solves the problem that the fault simulation method in the prior art lacks simulation of the latent supply current, and the high-voltage cable designed according to the corresponding simulation results has a fire risk.
[0145] 2) A simulation device for a submerged power supply arc of a high-voltage cable of the present application, the simulation device is used to control an experimental circuit, the experimental circuit includes a first branch, a second branch and a third branch, the first branch includes a high-voltage cable, the arc burning channel of the target position of the high-voltage cable is exposed, the second branch is used to supply power to the first branch to simulate a short-circuit arc, the third branch is used to supply power to the first branch to simulate a submerged power supply arc, the device includes: a construction unit constructs a short-circuit arc model and a submerged power supply arc model, the short-circuit arc model is used to simulate the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductivity of the short-circuit arc, the submerged power supply arc model is used to simulate the submerged power supply current of the submerged power supply arc with the length of the submerged power supply arc, the arc potential difference and the steady-state conductivity of the submerged power supply arc; an acquisition unit acquires target laying parameters, According to the above target laying parameters, the short-circuit current changing trend is simulated by the short-circuit arc model to obtain a first target curve, the short-circuit current peak is determined according to the first target curve, and the submerged supply current peak is determined according to the second target curve by simulating the submerged supply current changing trend according to the target laying parameters. The control unit controls the third branch to supply power to the first branch according to the submerged supply current peak, and controls the second branch to supply power to the first branch according to the short-circuit current peak. When the second branch is connected for a preset time, the second branch is disconnected, and the voltage, current and resistance of the target arc in the arc burning channel are recorded until the arc in the arc burning channel is extinguished, and the changing relationships of the voltage, current and resistance of the target arc with time are respectively obtained. The present application constructs an arc fault simulation model of a hybrid line cable segment, calculates the short-circuit current and the latent supply current of the arc fault state respectively, controls the corresponding current source output according to the circuit current and the latent supply current respectively, generates an arc in the experimental circuit, cuts off the short-circuit arc and records the changes of the latent supply arc to realize the simulation of the latent supply arc. This method solves the problem that the fault simulation method in the prior art lacks simulation of the latent supply current, and the high-voltage cable designed according to the corresponding simulation results has a fire risk.
[0146] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A method for simulating a high voltage cable submerged arc, characterized in that: The simulation method is used to control an experimental circuit, the experimental circuit includes a first branch, a second branch and a third branch, the first branch includes a high-voltage cable, the arcing channel of the target position of the high-voltage cable is exposed, the second branch is used to supply power to the first branch to simulate a short-circuit arc, the third branch is used to supply power to the first branch to simulate a latent power arc, the second branch is connected in parallel with the third branch, and the second branch and the third branch are both connected in series with the first branch, the method includes: Constructing a short-circuit arc model and a submersible power arc model, wherein the short-circuit arc model is used to simulate the changing trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, and the submersible power arc model is used to simulate the changing trend of the submersible power current of the submersible power arc with the submersible power arc length, arc potential difference and the steady-state conductance of the submersible power arc; Obtain target laying parameters, simulate the change trend of the short-circuit current through the short-circuit arc model according to the target laying parameters to obtain a first target curve, determine the short-circuit current peak value according to the first target curve, simulate the change trend of the submersible power supply current through the submersible power supply arc model according to the target laying parameters to obtain a second target curve, and determine the submersible power supply current peak value according to the second target curve; The third branch is controlled to supply power to the first branch according to the peak value of the latent supply current, and the second branch is controlled to supply power to the first branch according to the peak value of the short-circuit current. When the second branch is connected for a preset time, the second branch is disconnected, and the voltage, current and resistance of the target arc in the arc burning channel are recorded until the arc in the arc burning channel is extinguished, and the change relationship between the voltage, current and resistance of the target arc and time is obtained respectively.
2. The method according to claim 1, characterized in that Construct a short-circuit arc model, including: The short-circuit arc steady-state conductance, the short-circuit current and the steady-state arc voltage are obtained. The short-circuit arc steady-state conductance is simulated based on the physical characteristics of the short-circuit arc burning process to obtain a first target formula, which is used to simulate the change trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the short-circuit arc steady-state conductance: Among them, G p is the short-circuit arc steady-state conductance of the short-circuit arc, i arc is the short-circuit current, V p is the steady-state arc voltage, τ p is the short-circuit arc time constant, used to characterize the short-circuit arc duration, α p is the short-circuit arc time constant coefficient, I p is the peak value of the short-circuit current, l p is the short-circuit arc length.
3. The method according to claim 1, characterized in that Construct a submerged arc model, including: The submersible power supply current, the submersible power supply arc length, the arc potential difference and the submersible power supply arc steady-state conductance are obtained, and simulation is performed based on the physical characteristics of the submersible power supply arc burning process to obtain a second target formula, which is used to simulate the change trend of the submersible power supply current of the submersible power supply arc with the submersible power supply arc length, arc potential difference and submersible power supply arc steady-state conductance: Among them, G s is the steady-state conductance of the submersible arc, i s_arc is the potential supply current, l arc is the length of the submerged arc, u st is the arc potential difference corresponding to unit length, τ0 is the initial time constant, l p is the short-circuit arc length, l arc is the length of the submerged arc, α s is the time constant coefficient of the submersible arc, τ s is the submersible power arc time constant, used to characterize the duration of the submersible power arc.
4. The method according to claim 1, characterized in that: According to the target laying parameters, simulating the change trend of the short-circuit current by the short-circuit arc model to obtain a first target curve includes: According to the short-circuit arc model, the short-circuit arc is converted into an equivalent resistor through PSCAD, and the resistance value of the equivalent resistor is variable; The first target curve is obtained by simulating the change trend of the short-circuit current based on the target installation parameters and the equivalent resistance.
5. The method according to claim 1, characterized in that The third branch includes an AC current source, an isolation transformer and a first switch, and the third branch is controlled to supply power to the first branch according to the peak value of the latent current, including: The first switch is closed, and the AC current source is adjusted so that the output current of the third branch is the peak value of the latent supply current.
6. The method according to claim 5, characterized in that The second branch includes a circuit breaker, a second switch, an isolation transformer and an impulse generator, and the second branch is controlled to supply power to the first branch according to the short-circuit current peak value, including: The circuit breaker and the second switch are closed, and the impulse generator is adjusted so that the output current of the second branch is the short-circuit current peak value.
7. The method according to claim 6, characterized in that When the second branch is connected for a preset time, disconnecting the second branch includes: When the circuit breaker is in a closed state and the arcing channel melts, the circuit breaker is opened.
8. A simulation device for a high-voltage cable submerged arc, characterized in that: The simulation device is used to control an experimental circuit, the experimental circuit includes a first branch, a second branch and a third branch, the first branch includes a high-voltage cable, the arcing channel of the target position of the high-voltage cable is exposed, the second branch is used to supply power to the first branch to simulate a short-circuit arc, the third branch is used to supply power to the first branch to simulate a latent power arc, the second branch is connected in parallel with the third branch, and the second branch and the third branch are both connected in series with the first branch, the device includes: A construction unit, used to construct a short-circuit arc model and a submersible power arc model, wherein the short-circuit arc model is used to simulate the variation trend of the short-circuit current of the short-circuit arc with the steady-state arc voltage and the steady-state conductance of the short-circuit arc, and the submersible power arc model is used to simulate the variation trend of the submersible power current of the submersible power arc with the submersible power arc length, arc potential difference and the steady-state conductance of the submersible power arc; an acquisition unit, configured to acquire target laying parameters, simulate the change trend of the short-circuit current through the short-circuit arc model according to the target laying parameters to obtain a first target curve, determine the short-circuit current peak value according to the first target curve, simulate the change trend of the submersible supply current through the submersible supply arc model according to the target laying parameters to obtain a second target curve, and determine the submersible supply current peak value according to the second target curve; A control unit is used to control the third branch to supply power to the first branch according to the peak value of the latent supply current, control the second branch to supply power to the first branch according to the peak value of the short-circuit current, disconnect the second branch when the second branch is connected for a preset time, record the voltage, current and resistance of the target arc in the arcing channel until the arc in the arcing channel is extinguished, and obtain the change relationship between the voltage, current and resistance of the target arc and time.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the method according to any one of claims 1 to 7.
10. An arc simulation system, characterized in that: include: One or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include methods for executing any one of claims 1 to 7.