Power plant equipment defect number dynamic management method and system
By collecting and processing power plant defect information in real time, and formulating a defect removal plan using dynamic management model and priority sorting function, the problem of defect urgency and priority evaluation in power plant equipment defect management is solved, and efficient defect handling and resource allocation is achieved. Improves the operation efficiency and safety of the power plant.
Patent Information
- Application Number
- CN202410991118.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-12-06
AI Technical Summary
How to formulate a defect removal plan based on the urgency and priority of defects, dynamically adjust defect control indicators to adapt to the actual operation of the power plant, evaluate the defect removal effect and optimize it to improve the overall operation efficiency of the power plant.
Collect and process defect information in the power plant in real time, use the dynamic management model of defect quantity to calculate the defect control indicators of each major, formulate daily defect removal plans based on the priority sorting function, execute defect removal tasks, and optimize defect removal effects through the effect evaluation model. .
Improve the efficiency and accuracy of power plant equipment defect management, ensure early identification and classification of defects, achieve rapid response and preventive maintenance, reduce equipment downtime and maintenance costs caused by defects, and enhance the operating efficiency and economic benefits of power plants. .
Smart Images

Figure CN119090116A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of electric power safety, and in particular relates to a method and system for dynamically managing the number of defects in power plant equipment. Background Art
[0002] The number of defects in the structures, systems, and equipment of an operating power plant represents the health status of the power plant. When the number of accumulated defects in the structures, systems, and equipment is large, it means that the operating status of the power plant is degraded, and a chain reaction may occur at any time due to the deterioration of certain defects, thereby affecting the safe and stable operation of the unit. Due to objective factors such as system status, construction period, and preparation of maintenance plans, as the number of unit operation events increases, the unit will form a certain number of accumulated defects. Therefore, the management of operating power plants needs to take the number of accumulated defects of the unit as an important control content, thereby ensuring the safe and stable operation of the unit. Summary of the invention
[0003] In view of the above-mentioned problems, the present invention is proposed.
[0004] Therefore, the technical problems solved by the present invention are: how to formulate a defect elimination plan according to the urgency and priority of the defects; how to dynamically adjust the defect control indicators to adapt to the actual operation of the power plant; how to evaluate the defect elimination effect and optimize it to improve the overall operation efficiency of the power plant.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: real-time collection and acquisition of defect information of each specialty in the operation management system of the power plant, and data processing;
[0006] Using the dynamic management model of power plant equipment defects, the defect control index of each specialty in the new week is calculated based on the cumulative number of defects in each specialty; the planned number of defects eliminated and completed each day in the new week is calculated based on the number of new defects added daily in the past week;
[0007] According to the number of completed defects in the daily plan, a daily defect elimination plan for each discipline is formulated based on the defect priority sorting function;
[0008] According to the daily defect elimination plan table and daily defect elimination plan table for each profession, perform daily defect elimination tasks for each profession;
[0009] Defect elimination is evaluated and optimized based on the dynamic management effect evaluation model of defect quantity.
[0010] As a preferred solution of the method for dynamically managing the number of defects in power plant equipment described in the present invention, the professions include instrumentation maintenance, electrical maintenance, static machine maintenance, machine maintenance, maintenance support, weak current maintenance, technical support for corrosion prevention, radiation protection, engineering and civil engineering, operation technology and equipment management;
[0011] The defect information includes defect number, defect description, defect discovery time, defect status, and defect level.
[0012] As a preferred solution of the method for dynamically managing the number of defects of power plant equipment described in the present invention, the data processing includes screening the defect information of each specialty, retaining only the defects found in the past week and not eliminated, that is, the defects whose defect status is pending or being processed; summarizing the screened defect information of each specialty, and calculating the cumulative number of defects of each specialty; filling the cumulative number of defects of each specialty into a table according to the specialty number and name, and generating a statistical table of cumulative defects by specialty;
[0013] The calculation of the defect control index of each specialty in the new week includes filling the defect control index of each specialty and the overall defect control index of the power plant into a table to generate a defect control index table for each specialty;
[0014] The defect control index for each discipline is expressed as,
[0015]
[0016] Among them, C i represents the defect control index of the i-th profession, M i represents the minimum value of the cumulative number of defects in the i-th specialty, represents the floor function, that is, the largest integer not greater than x;
[0017] The overall defect control index of the power plant is expressed as,
[0018]
[0019] Where C represents the overall defect control index of the power plant, n represents the number of specialties, and C i represents the defect control index of the i-th profession;
[0020] The average number of new defects per day over the past week is expressed as,
[0021]
[0022] Where A represents the average number of new defects per day in the past week, N j Represents the number of new defects on day j.
[0023] As a preferred solution of the method for dynamically managing the number of defects of power plant equipment described in the present invention, the formulating of a daily defect elimination plan for each specialty includes sorting the defect information of each specialty using a defect priority sorting function, arranging the defect information in order from high to low defect levels and from early to late defect discovery times, and obtaining a defect priority list for each specialty;
[0024] According to the number of defects eliminated in each specialty's daily plan, select a corresponding number of defects from each specialty's defect priority list as each specialty's daily defect elimination plan, that is, a list of defects that should be eliminated every day for each specialty;
[0025] According to the daily defect elimination plan of each specialty, determine the method for eliminating each defect, including the specific steps for elimination, the required personnel, equipment, materials, and time, and generate a daily defect elimination plan for each specialty;
[0026] Fill in the daily defect elimination plan and daily defect elimination scheme of each profession into the table to generate a daily defect elimination plan table and a daily defect elimination scheme table for each profession;
[0027] The defect priority sorting function takes the defect information of each profession as input and outputs the defect priority list of each profession, which is expressed as:
[0028] DPSF(I1,I2,...,I m )=(P1,P2,...,P m )
[0029] P k =L k ×10+T k
[0030] Among them, I k The information of the k-th defect includes defect number, defect description, defect discovery time, defect status, and defect level. k represents the priority of the kth defect, m represents the number of defects, L k represents the level of the kth defect, T k represents the time of discovery of the kth defect, P k The larger the value of is, the higher the priority of the kth defect is. k The values of are the same, indicating that the priorities of the k-th defects are the same;
[0031] The input of the defect elimination plan selection function is the defect priority list of each specialty and the daily planned defect elimination completion quantity of each specialty. The output is the daily defect elimination plan of each specialty. The expression of the function is:
[0032]
[0033] Among them, P k represents the priority of the kth defect, Q i represents the daily planned defect elimination completion quantity of the i-th specialty, E k represents the kth defect elimination plan, that is, the information of the kth defect to be eliminated, m represents the number of defects, E k The selection rules are as follows:
[0034] From the defect priority list, select Q in descending order of priority. i defects as a plan to eliminate them;
[0035] If the number of defects in the defect priority list is less than Q i , then select all defects as the defect elimination plan and set Q i Adjusted to the number of defects, i.e. Q i =m;
[0036] If the number of defects in the defect priority list is equal to Q i , then select all defects as the defect elimination plan;
[0037] If the number of defects in the defect priority list is greater than Q i , then select the first Q i A defect is identified as a plan to eliminate it.
[0038] As a preferred solution of the method for dynamically managing the number of defects in power plant equipment described in the present invention, the execution of the daily defect elimination task for each specialty includes allocating defect elimination personnel for each specialty according to the daily defect elimination plan for each specialty, and notifying each specialty of the defect elimination task, including the defect number, defect description, defect level, and defect location of the defect to be eliminated;
[0039] According to the daily defect elimination plan table for each profession, prepare the defect elimination equipment and materials for each profession, and eliminate the defects that should be eliminated every day in each profession according to the specific steps of defect elimination;
[0040] According to the results of defect elimination, update the defect information of each discipline, including defect number, defect description, defect discovery time, defect status, and defect level. Feedback the results of defect elimination to the power plant's operation management system and update the defect statistics of the power plant.
[0041] Fill in the defect elimination results and feedback into the table to generate a daily defect elimination result table by profession and a daily defect elimination feedback table by profession.
[0042] As a preferred solution of the method for dynamically managing the number of defects in power plant equipment described in the present invention, the evaluation and optimization of defect elimination includes a defect elimination plan determination function, the input is the daily defect elimination plan for each specialty, and the output is the daily defect elimination plan for each specialty. The expression of the function is:
[0043]
[0044] Among them, E k represents the k-th defect elimination plan, that is, the information of the k-th defect that should be eliminated, S k represents the kth defect elimination scheme, i.e., the method for eliminating the kth defect, Q i It represents the daily planned defect elimination completion quantity of the i-th specialty;
[0045] S k The determination rules include analyzing the nature, cause, impact, and harm of each defect based on the information of each defect, including defect number, defect description, defect level, and defect location, and determining the defect elimination target of each defect, that is, the expected effect of defect elimination;
[0046] According to the defect elimination target of each defect, refer to the power plant's operating procedures, maintenance manuals, and technical standards, select the defect elimination method for each defect, that is, the specific steps for defect elimination, including the personnel, equipment, materials, and time for defect elimination, and generate a defect elimination plan for each defect, that is, S k ;
[0047] The defect elimination result update function takes as input the daily defect elimination result of each specialty and outputs the update of defect information of each specialty and defect statistics of the power plant, which is expressed as:
[0048]
[0049] Among them, R k represents the k-th defect elimination result, that is, the elimination status of the k-th defect, including the elimination time, result, and feedback. k ′ represents the update of the information of the kth defect, including defect number, defect description, defect discovery time, defect status, and defect level. i ′ represents the update of the cumulative number of defects of the i-th specialty, Q i represents the daily planned defect elimination completion quantity of the i-th specialty, m represents the number of defects, n represents the number of specialties, and I k ′ and D i The update rule of ′ is as follows:
[0050] According to the defect elimination results of each defect, modify the information of each defect, including defect number, defect description, defect discovery time, defect status, defect level, and generate an update of the information of each defect, that is, I k ′;
[0051] If the defect elimination result is successful, the defect status is changed to handled and the defect level is changed to 0;
[0052] If the defect elimination result is failure, the defect status is changed to pending, and the defect level is increased to 1 according to the feedback from the defect elimination;
[0053] If the defect elimination result is suspended, the defect status is changed to being processed, and the defect level is increased to 2 based on the feedback from the defect elimination.
[0054] As a preferred solution of the method for dynamically managing the number of defects in power plant equipment described in the present invention, the evaluation and optimization of defect elimination also includes the defect elimination feedback function input is the daily defect elimination feedback of each specialty, and the output is the adjustment of the defect control index of each specialty and the overall defect control index of the power plant, which is expressed as,
[0055]
[0056] Among them, F k represents the k-th defect elimination feedback, that is, the feedback on the elimination of the k-th defect, including the difficulty, problems, suggestions, etc. of the defect elimination. i ″ represents the adjustment of the defect control index of the i-th specialty, C″ represents the adjustment of the overall defect control index of the power plant, Q i represents the daily planned defect elimination completion quantity of the i-th specialty, and n represents the number of specialties;
[0057] C i The adjustment rules of "and C" include analyzing the difficulty, problems and suggestions of each defect elimination according to the defect elimination feedback, and determining the improvement measures for each defect elimination, that is, the optimization plan for defect elimination, including the adjustment of personnel, equipment, materials and time for defect elimination;
[0058] According to the defect elimination improvement measures for each defect, the defect elimination efficiency of each defect is evaluated, that is, the ratio of defect elimination time and quality, and the defect elimination efficiency score of each defect is generated, that is, E k ′;
[0059] According to the defect elimination efficiency score of each defect, the defect elimination efficiency score of each profession is calculated, that is, the average of the defect elimination efficiency scores of each profession, and the defect elimination efficiency score of each profession is generated, that is, E i ′;
[0060] According to the defect elimination efficiency score of each specialty, the defect control index of each specialty is adjusted, that is, the number of defects that each specialty should reduce to, and the adjustment of the defect control index of each specialty is generated, that is, C i ″;
[0061] If the defect elimination efficiency score of each specialty is greater than or equal to the preset threshold, it means that the defect elimination efficiency of each specialty is high, and the number of defects that should be reduced in each specialty is reduced, the defect elimination tasks of each specialty are increased, and the health status of the power plant is improved;
[0062] If the fault elimination efficiency score of each specialty is less than the preset threshold, it means that the fault elimination efficiency of each specialty is low. The number of defects that should be reduced in each specialty should be increased, and the fault elimination tasks of each specialty should be reduced to ensure the safe operation of the power plant.
[0063] According to the adjustment of the defect control index of each specialty, the overall defect control index of the power plant is recalculated, that is, the number of defects that the power plant should reduce to, and the adjustment of the overall defect control index of the power plant, that is, C″, is generated.
[0064] Another object of the present invention is to provide a system for dynamically managing the number of defects in power plant equipment, which can enable the power plant to respond to and resolve defects in a timely manner through real-time monitoring and dynamic adjustment. Through priority sorting and planning, key defects are ensured to be handled first. Through effect evaluation and optimization, the quality of power plant equipment defect management is continuously improved.
[0065] In order to solve the above technical problems, the present invention provides the following technical solutions: a power station security intelligent monitoring system, including a defect information real-time monitoring module, a defect control index calculation module, a defect elimination plan formulation module, a defect elimination execution tracking module, a dynamic adjustment and feedback module, and an effect evaluation and optimization module;
[0066] The defect information real-time monitoring module is responsible for real-time collection and processing of defect information of each profession to ensure the real-time and accuracy of the data;
[0067] The defect control index calculation module uses the defect control index model to calculate the defect control index C of each profession i and the overall defect control index C of the power plant;
[0068] The defect elimination plan formulation module uses the defect elimination priority ranking function to formulate a daily defect elimination plan for each profession and adjusts it according to the actual situation;
[0069] The defect elimination execution tracking module is responsible for executing defect elimination tasks and tracking and recording defect elimination results and feedback;
[0070] The dynamic adjustment and feedback module uses the defect elimination result update function and the defect elimination feedback function to dynamically adjust the defect control index according to the defect elimination result and feedback;
[0071] The effect evaluation and optimization module uses a defect quantity dynamic management effect evaluation model and a defect elimination effect scoring calculation function to evaluate the defect elimination effect and determine the evaluation level of the defect elimination effect.
[0072] A computer device comprises a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of a method for dynamically managing the number of defects of power plant equipment when executing the computer program.
[0073] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of a method for dynamically managing the number of defects in power plant equipment.
[0074] Beneficial effects of the present invention: The present invention provides a method for dynamically managing the number of defects in power plant equipment, which improves the efficiency and accuracy of defect management of power plant equipment by collecting and processing defect information in real time, dynamically calculating the defect control index of each profession, and formulating and executing a daily defect elimination plan based on priority sorting.
[0075] By accumulating and analyzing defect data, we ensure that defects can be identified and classified at an early stage, thereby achieving rapid response and preventive maintenance, and reducing the potential risks of defects to power plant operations. According to the number of new defects each day, we can dynamically adjust the defect elimination tasks to ensure that important and urgent defects are handled first, which not only improves the timeliness of processing, but also optimizes the allocation of resources. By evaluating and optimizing the effects of defect elimination plans, we continuously improve the effectiveness of defect elimination measures, effectively reduce equipment downtime and maintenance costs caused by defects, and enhance the operating efficiency and economic benefits of power plants. BRIEF DESCRIPTION OF THE DRAWINGS
[0076] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:
[0077] Figure 1 A flowchart of a method for dynamically managing the number of defects in power plant equipment provided by one embodiment of the present invention.
[0078] Figure 2 A structural diagram of a system for dynamically managing the number of defects in power plant equipment provided by one embodiment of the present invention. DETAILED DESCRIPTION
[0079] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.
[0080] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0081] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0082] The present invention is described in detail with reference to schematic diagrams. When describing the embodiments of the present invention, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.
[0083] At the same time, in the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "upper, lower, inner and outer" are based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first, second or third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0084] In the present invention, unless otherwise clearly specified and limited, the terms "install, connect, connect" should be understood in a broad sense, for example: it can be a fixed connection, a detachable connection or an integral connection; it can also be a mechanical connection, an electrical connection or a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0085] Example 1, reference Figure 1 , as an embodiment of the present invention, provides a method for dynamically managing the number of defects in power plant equipment, comprising:
[0086] S1: Collect and obtain defect information of each discipline in the power plant's operation management system in real time and process the data;
[0087] Furthermore, the said specialties include maintenance of instrumentation and control, maintenance of electrical equipment, maintenance of static equipment, maintenance of turnaround equipment, maintenance support, maintenance of weak current, technical support for anti-corrosion, radiation protection, engineering and civil engineering, operation technology and equipment management;
[0088] The defect information includes defect number, defect description, defect discovery time, defect status, and defect level.
[0089] Furthermore, the data processing includes screening the defect information of each profession, and only retaining the defects found in the past week and not eliminated, that is, the defects with the defect status of pending or being processed;
[0090] Summarize the screened defect information for each specialty and calculate the cumulative number of defects for each specialty;
[0091] Fill the cumulative defect quantity of each specialty into the table according to the specialty number and name to generate a statistical table of cumulative defects by specialty;
[0092] The defect control indicators calculated for each profession in the new week include:
[0093] Fill in the defect control index of each discipline and the overall defect control index of the power plant into the table to generate a discipline-specific defect control index table;
[0094] The defect control index for each discipline is expressed as:
[0095]
[0096] Among them, C i represents the defect control index of the i-th profession, M i represents the minimum value of the cumulative number of defects in the i-th specialty, represents the floor function, that is, the largest integer not greater than x;
[0097] The overall defect control index of the power plant is expressed as:
[0098]
[0099] Where C represents the overall defect control index of the power plant, n represents the number of specialties, and C i represents the defect control index of the i-th profession;
[0100] The average number of new defects per day over the past week is expressed as:
[0101]
[0102] Where A represents the average number of new defects per day in the past week, N j Represents the number of new defects on day j.
[0103] S2: Use the dynamic management model of the number of defects in power plant equipment to calculate the defect control index of each specialty in the new week based on the cumulative number of defects in each specialty; calculate the number of planned defect elimination completions for each day in the new week based on the number of new defects in the past week, that is, the number of defects that should be eliminated every day to achieve the defect control index;
[0104] It should be noted that the dynamic management model of power plant equipment defect quantity includes the following parts:
[0105] Input: The power plant's operation management system provides defect information for each discipline, including defect number, defect description, defect discovery time, defect status, defect level, etc.
[0106] Output: Daily defect elimination plan table by profession, daily defect elimination plan table by profession, daily defect elimination result table by profession, daily defect elimination feedback table by profession, which record the plan, plan, results and feedback of daily defect elimination tasks of each profession.
[0107] Parameters: cumulative number of defects for each specialty, defect control index for each specialty, overall defect control index of the power plant, number of new defects per day in the past week, average number of new defects per day in the past week, and daily planned defect elimination completion number for each specialty are used to calculate and control changes in the number of defects.
[0108] Variables: defect priority list for each discipline, daily defect elimination plan for each discipline, daily defect elimination scheme for each discipline, daily defect elimination results for each discipline, daily defect elimination feedback for each discipline, etc., are used to describe and execute the defect handling process.
[0109] Functions: calculation function of defect control indicators, calculation function of the average daily number of new defects, sorting function of defect priorities, selection function of defect elimination plan, determination function of defect elimination plan, update function of defect elimination results, feedback function of defect elimination feedback, which are used to implement the logic of dynamic management of defect quantity.
[0110] In order to describe the calculation process of defect control index, the defect control index calculation function is used for description. The input of this function is the cumulative number of defects in each specialty, and the output is the defect control index of each specialty and the overall defect control index of the power plant. The expression of the function is:
[0111] DCIC9D1,D2,...,D n )=(C1,C2,...,C n ,C)
[0112] Among them, D i represents the cumulative number of defects in the i-th specialty, C irepresents the defect control index of the i-th specialty, C represents the overall defect control index of the power plant, n represents the number of specialties, C i The calculation formulas for C are as follows:
[0113]
[0114] Among them, M i represents the minimum value of the cumulative number of defects in the i-th specialty, Represents the floor function, that is, the largest integer not greater than x.
[0115] The function for calculating the average number of new defects per day is used as the input of the function, and the output is the average number of new defects per day in the past week. The function expression is:
[0116] ADNDC(N1,N2,...,N7)=A
[0117] S3: According to the number of defects eliminated in the daily plan, a daily defect elimination plan is formulated for each discipline based on the defect priority ranking function, that is, which defects should be eliminated every day for each discipline, as well as the priority and method of defect elimination;
[0118] Furthermore, the formulation of a daily defect elimination plan for each specialty includes using a defect priority sorting function to sort the defect information of each specialty, arranging the defect information in order from high to low defect levels and from early to late defect discovery times, to obtain a defect priority list for each specialty;
[0119] According to the number of defects eliminated in each specialty's daily plan, select a corresponding number of defects from each specialty's defect priority list as each specialty's daily defect elimination plan, that is, a list of defects that should be eliminated every day for each specialty;
[0120] According to the daily defect elimination plan of each specialty, determine the method for eliminating each defect, including the specific steps for elimination, the required personnel, equipment, materials, and time, and generate a daily defect elimination plan for each specialty;
[0121] Fill in the daily defect elimination plan and daily defect elimination scheme of each profession into the table to generate a daily defect elimination plan table and a daily defect elimination scheme table for each profession;
[0122] The defect priority sorting function takes the defect information of each profession as input and outputs the defect priority list of each profession, which is expressed as:
[0123] DPSF(I1,I2,...,I m )=(P1,P2,...,P m )
[0124] Among them, Ik The information of the k-th defect includes defect number, defect description, defect discovery time, defect status, and defect level. k represents the priority of the kth defect, m represents the number of defects, P k The calculation formula is as follows:
[0125] P k =L k ×10+T k
[0126] Among them, L k represents the level of the kth defect, T k represents the time of discovery of the kth defect, P k The larger the value of is, the higher the priority of the kth defect is. k The values of are the same, indicating that the priorities of the k-th defects are the same.
[0127] The defect elimination plan selection function takes as input the defect priority list of each specialty and the daily defect elimination completion quantity of each specialty, and outputs the daily defect elimination plan of each specialty. The function expression is:
[0128]
[0129] Among them, P k represents the priority of the kth defect, Q i represents the daily planned defect elimination completion quantity of the i-th specialty, E k represents the kth defect elimination plan, that is, the information of the kth defect to be eliminated, m represents the number of defects, E k The selection rules are as follows:
[0130] From the defect priority list, select Q in descending order of priority. i defects as a plan to eliminate them;
[0131] If the number of defects in the defect priority list is less than Q i , then select all defects as the defect elimination plan and set Q i Adjusted to the number of defects, i.e. Q i =m;
[0132] If the number of defects in the defect priority list is equal to Q i , then select all defects as the defect elimination plan;
[0133] If the number of defects in the defect priority list is greater than Q i , then select the first Q i A defect is identified as a plan to eliminate it.
[0134] It should be noted that by using the defect level and defect discovery time, the priority of each defect can be reasonably determined to ensure that important and urgent defects are eliminated first, avoiding the deterioration and spread of defects. According to the daily planned defect elimination completion quantity of each specialty, the defect elimination tasks of each specialty can be balanced to avoid too many or too few defect elimination tasks, thereby improving the efficiency and quality of defect elimination. According to the defect elimination method of each defect, the defect elimination requirements of each defect can be clarified to avoid omissions and errors in defect elimination, and ensure the safety and accuracy of defect elimination.
[0135] S4: According to the daily defect elimination plan table and daily defect elimination plan table for each profession, perform the daily defect elimination task for each profession, that is, eliminate the defects that should be eliminated every day for each profession according to the defect elimination plan, and record the results and feedback of defect elimination;
[0136] Furthermore, the execution of daily defect elimination tasks for each profession includes allocating defect elimination personnel for each profession according to the daily defect elimination plan for each profession, and notifying each profession of the defect elimination tasks, including the defect number, defect description, defect level, and defect location to be eliminated.
[0137] According to the daily defect elimination plan table for each profession, prepare the defect elimination equipment and materials for each profession, and eliminate the defects that should be eliminated every day in each profession according to the specific steps of defect elimination;
[0138] According to the results of defect elimination, update the defect information of each discipline, including defect number, defect description, defect discovery time, defect status, and defect level. Feedback the results of defect elimination to the power plant's operation management system and update the defect statistics of the power plant.
[0139] Fill in the defect elimination results and feedback into the table to generate a daily defect elimination result table by profession and a daily defect elimination feedback table by profession.
[0140] S5: Evaluate and optimize defect elimination based on the dynamic management effect evaluation model of defect quantity.
[0141] Furthermore, the evaluation and optimization of defect elimination includes a defect elimination plan determination function, the input of which is the daily defect elimination plan for each profession, and the output of which is the daily defect elimination plan for each profession. The expression of the function is:
[0142]
[0143] Among them, E k represents the k-th defect elimination plan, that is, the information of the k-th defect that should be eliminated, S k represents the kth defect elimination scheme, i.e., the method for eliminating the kth defect, Q i represents the daily planned defect elimination completion quantity of the i-th specialty, S k The determination rules are as follows:
[0144] According to the information of each defect, including defect number, defect description, defect level, defect location, etc., analyze the nature, cause, impact, harm, etc. of each defect, and determine the defect elimination target of each defect, that is, the expected effect of defect elimination;
[0145] According to the elimination target of each defect, refer to the power plant's operating procedures, maintenance manuals, technical standards, etc., select the method of eliminating each defect, that is, the specific steps of eliminating the defect, including the personnel, equipment, materials, time, etc. of the defect elimination, and generate the elimination plan for each defect, that is, S k .
[0146] The defect elimination result update function takes as input the daily defect elimination result of each specialty and outputs the updated defect information of each specialty and the defect statistics of the power plant. The function expression is:
[0147]
[0148] Among them, R k represents the k-th defect elimination result, that is, the elimination status of the k-th defect, including the elimination time, result, feedback, etc. k ′ represents the update of the information of the kth defect, including defect number, defect description, defect discovery time, defect status, and defect level. i ′ represents the update of the cumulative number of defects of the i-th specialty, Q i represents the daily planned defect elimination completion quantity of the i-th specialty, m represents the number of defects, n represents the number of specialties, and I k ′ and D i The update rule of ′ is as follows:
[0149] According to the defect elimination results of each defect, modify the information of each defect, including defect number, defect description, defect discovery time, defect status, defect level, and generate an update of the information of each defect, that is, I k ′;
[0150] If the defect elimination result is successful, the defect status is changed to handled and the defect level is changed to 0;
[0151] If the defect elimination result is failure, the defect status will be changed to pending, and the defect level will be increased according to the feedback from the defect elimination;
[0152] If the defect elimination result is suspended, the defect status will be changed to in progress, and the defect level will be increased based on the feedback from the defect elimination.
[0153] Furthermore, the evaluation and optimization of defect elimination also includes a defect elimination feedback function whose input is the daily defect elimination feedback of each specialty and whose output is the adjustment of the defect control index of each specialty and the overall defect control index of the power plant. The expression of the function is:
[0154]
[0155] Among them, F k represents the k-th defect elimination feedback, that is, the feedback on the elimination of the k-th defect, including the difficulty, problems, suggestions, etc. of the defect elimination. i ″ represents the adjustment of the defect control index of the i-th specialty, C″ represents the adjustment of the overall defect control index of the power plant, Q i represents the daily planned defect elimination completion quantity of the i-th specialty, n represents the number of specialties, C i The adjustment rules for " and C" are as follows:
[0156] Based on the feedback from defect elimination of each defect, analyze the difficulty, problems, suggestions, etc. of defect elimination for each defect, and determine the improvement measures for defect elimination for each defect, that is, the optimization plan for defect elimination, including adjustments to the personnel, equipment, materials, time, etc. for defect elimination.
[0157] According to the defect elimination improvement measures for each defect, the defect elimination efficiency of each defect is evaluated, that is, the ratio of defect elimination time and quality, and the defect elimination efficiency score of each defect is generated, that is, E k ′.
[0158] According to the defect elimination efficiency score of each defect, the defect elimination efficiency score of each profession is calculated, that is, the average of the defect elimination efficiency scores of each profession, and the defect elimination efficiency score of each profession is generated, that is, E i ′.
[0159] According to the defect elimination efficiency score of each specialty, the defect control index of each specialty is adjusted, that is, the number of defects that each specialty should reduce to, and the adjustment of the defect control index of each specialty is generated, that is, C i ″.
[0160] If the defect elimination efficiency score of each specialty is greater than or equal to a preset threshold, it means that the defect elimination efficiency of each specialty is high, and the defect control index of each specialty can be appropriately improved, that is, the number of defects that should be reduced in each specialty can be reduced, the defect elimination tasks of each specialty can be increased, and the health status of the power plant can be improved;
[0161] If the defect elimination efficiency score of each profession is less than a preset threshold, it means that the defect elimination efficiency of each profession is low, and it is necessary to appropriately reduce the defect control index of each profession, that is, increase the number of defects that each profession should reduce, reduce the defect elimination tasks of each profession, and ensure the safe operation of the power plant.
[0162] According to the adjustment of the defect control index of each specialty, the overall defect control index of the power plant is recalculated, that is, the number of defects that the power plant should reduce to, and the adjustment of the overall defect control index of the power plant, that is, C″, is generated.
[0163] It should be noted that the defect quantity dynamic management effect evaluation model includes the following parts:
[0164] Input: Daily defect elimination result table by profession, daily defect elimination feedback table by profession, recording the results and feedback of daily defect elimination tasks for each profession.
[0165] Output: Daily defect elimination effectiveness evaluation form by profession, daily defect elimination effectiveness evaluation form by profession, recording the effectiveness evaluation and assessment of daily defect elimination tasks for each profession.
[0166] Parameters: daily planned defect elimination completion quantity for each specialty, defect control index for each specialty, overall defect control index of the power plant, etc., are used to evaluate and assess changes in the number of defects.
[0167] Variables: daily defect elimination completion number of each specialty, daily defect elimination efficiency score of each specialty, daily defect elimination effect score of each specialty, daily defect elimination effect evaluation of each specialty, etc., are used to describe and evaluate the effectiveness of defect handling.
[0168] Functions: calculation function for the number of completed defects, calculation function for defect elimination efficiency score, calculation function for defect elimination effect score, determination function for defect elimination effect evaluation, etc., which are used to implement the logic of effect evaluation of dynamic management of defect quantity.
[0169] The input of the function for calculating the number of completed defects is the daily defect elimination result of each major, and the output is the daily defect elimination number of each major. The function expression is:
[0170]
[0171] Among them, R k represents the k-th defect elimination result, that is, the elimination status of the k-th defect, including the elimination time, result, feedback, etc. i ′ represents the number of defects eliminated daily by the ith profession, that is, the number of defects actually eliminated by each profession every day, Q i represents the daily planned defect elimination completion quantity of the i-th specialty, Q i The calculation formula of ′ is as follows:
[0172]
[0173] Among them, I(R k ) represents the indicator function of the kth defect elimination result, that is, if the kth defect elimination result is "successful", then I(R k )=1, otherwise I(Rk )=0.
[0174] The input of the defect elimination effect score calculation function is the daily defect elimination completion quantity of each specialty and the defect control index of each specialty. The output is the daily defect elimination effect score of each specialty. The function expression is:
[0175] DEESF(Q i ′,C i )=E i ″
[0176] Among them, Q i ′ represents the number of defects eliminated daily by the ith profession, that is, the number of defects actually eliminated by each profession every day, C i represents the defect control index of the i-th profession, that is, the number of defects that each profession should reduce to, E i ″ represents the daily defect elimination effect score of the ith major, that is, the evaluation of the daily defect elimination effect of each major, E i The calculation formula of ″ is as follows:
[0177]
[0178] In order to describe the determination process of defect elimination effect evaluation, the defect elimination effect evaluation determination function is used for verification. The input of this function is the daily defect elimination effect score of each major, and the output is the daily defect elimination effect evaluation of each major. The expression of the function is:
[0179] DEEED(E i ″)=V i
[0180] Among them, E i ″ represents the daily defect elimination effect score of the ith profession, that is, the evaluation of the daily defect elimination effect of each profession, V i represents the daily defect elimination effect evaluation of the i-th profession, that is, the level of defect elimination effect of each profession every day, V i The determination rules are as follows:
[0181] If E i ″ is greater than or equal to 1, indicating that the daily defect elimination completion quantity of the i-th specialty has reached or exceeded the defect control index, and the defect elimination effect is good, then V i for “excellent”;
[0182] If E i ″ is less than 1, but greater than or equal to 0.8, indicating that the daily defect elimination completion quantity of the i-th specialty is close to the defect control index, and the defect elimination effect is average, then V i is "good";
[0183] If E i″ is less than 0.8, but greater than or equal to 0.6, indicating that the daily defect elimination completion quantity of the i-th specialty is lower than the defect control index, and the defect elimination effect is poor, then V i is "qualified";
[0184] If E i ″ is less than 0.6, indicating that the daily defect elimination completion quantity of the i-th specialty is far lower than the defect control index, and the defect elimination effect is very poor, then V i is "unqualified".
[0185] Embodiment 2, the second embodiment of the present invention, is different from the previous embodiment in that:
[0186] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program codes.
[0187] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.
[0188] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.
[0189] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0190] Example 3, reference Figure 2 , which is the third embodiment of the present invention, and which provides a dynamic management system for the number of defects in power plant equipment, including a defect information real-time monitoring module, a defect control index calculation module, a defect elimination plan formulation module, a defect elimination execution tracking module, a dynamic adjustment and feedback module, and an effect evaluation and optimization module;
[0191] The defect information real-time monitoring module is responsible for real-time collection and processing of defect information of each profession to ensure the real-time and accuracy of the data;
[0192] The defect control index calculation module uses the defect control index model to calculate the defect control index C of each profession i and the overall defect control index C of the power plant;
[0193] The defect elimination plan formulation module uses the defect elimination priority ranking function to formulate a daily defect elimination plan for each profession and adjusts it according to the actual situation;
[0194] The defect elimination execution tracking module is responsible for executing defect elimination tasks and tracking and recording defect elimination results and feedback;
[0195] The dynamic adjustment and feedback module uses the defect elimination result update function and the defect elimination feedback function to dynamically adjust the defect control index according to the defect elimination result and feedback;
[0196] The effect evaluation and optimization module uses a defect quantity dynamic management effect evaluation model and a defect elimination effect scoring calculation function to evaluate the defect elimination effect and determine the evaluation level of the defect elimination effect.
[0197] Example 4 is an embodiment of the present invention, which provides a method for dynamically managing the number of defects in power plant equipment. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through simulation experiments, with the goal of verifying how the new method for dynamically managing the number of defects can improve the equipment maintenance efficiency and safety of nuclear power plants.
[0198] A data acquisition system is set up to collect real-time information on equipment defects in power plant operation, including defect number, description, discovery time, current status and level.
[0199] First, all existing defect data is imported into the new dynamic management system to ensure that we start from an accurate baseline. Second, the system automatically updates defect data every day to ensure that management decisions are based on the latest information. Next, the defect prioritization algorithm is applied to execute defect elimination tasks according to the set defect elimination plan, giving priority to defects with high risk or high impact. Finally, the completed task data and defect status updates are collected daily for subsequent analysis.
[0200] Data analysis involves both quantitative and qualitative aspects. Quantitative analysis uses statistical software to process the changes in defect processing time, completion rate, and defect level before and after the experiment, and presents the effect of the new method in numerical form. Qualitative analysis evaluates the user-friendliness and practical application effect of the system by collecting feedback from maintenance personnel and management. The experimental results are shown in Table 1.
[0201] Table 1 Index data table
[0202]
[0203]
[0204] Through the analysis of data tables, we have invented that through priority sorting and reasonable fault elimination plans, maintenance personnel can complete fault elimination tasks more efficiently. The actual number of fault eliminations is highly consistent with the number of completed fault eliminations in the daily plan, indicating that there is a good match between the formulation and execution of the plan, and the planning of maintenance work has been enhanced. Through the timely handling of defects, the overall defect level has shown a downward trend, which means that the safety risks of the power plant have been effectively controlled. Over time, the number of cumulative defects has shown a downward trend, which reflects the effectiveness of dynamic management methods in long-term operation. Through the continuous collection and analysis of fault elimination data, managers can formulate future fault elimination plans and resource allocations more scientifically, realizing the transition from experience-driven to data-driven.
[0205] The experimental results show that the method of the present invention improves the maintenance efficiency and safety of nuclear power plants. The completion rate of defect elimination tasks has increased, and the processing speed of high-risk defects has been accelerated, thereby reducing the downtime of equipment and improving production stability. In addition, the overall downward trend of defect levels shows that the effectiveness of risk control has been improved. In the long run, the continuous decline in the number of cumulative defects reflects the effectiveness of the system in continuous operation. Through this dynamic management method, the power plant management can formulate defect elimination plans and resource allocation more scientifically, realize the transition from experience-driven to data-driven decision-making, and provide strong support for the long-term and stable operation of the power plant. This not only improves the maintenance cycle and cost efficiency of equipment, but also greatly improves the safety standards in the workplace.
[0206] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be covered by the scope of the claims of the present invention.
Claims
1. A method for dynamic management of the number of defects in power plant equipment, characterized in that: include: Collect and obtain defect information of each discipline in the power plant's operation management system in real time and process the data; Using the dynamic management model of power plant equipment defects, the defect control index of each specialty in the new week is calculated based on the cumulative number of defects in each specialty; the planned number of defects eliminated and completed each day in the new week is calculated based on the number of new defects added daily in the past week; According to the number of completed defects in the daily plan, a daily defect elimination plan for each discipline is formulated based on the defect priority sorting function; According to the daily defect elimination plan table and daily defect elimination plan table for each profession, perform daily defect elimination tasks for each profession; Defect elimination is evaluated and optimized based on the dynamic management effect evaluation model of defect quantity.
2. A method for dynamic management of the number of defects in power plant equipment according to claim 1, characterized in that: The professions include instrumentation maintenance, electrical maintenance, static maintenance, turnaround maintenance, maintenance support, weak current maintenance, technical support anti-corrosion, radiation protection, engineering and civil engineering, operation technology and equipment management; The defect information includes defect number, defect description, defect discovery time, defect status, and defect level.
3. A method for dynamic management of the number of defects in power plant equipment according to claim 2, characterized in that: The data processing includes screening the defect information of each profession, and only retaining the defects found in the past week and not eliminated, that is, the defects with the status of pending or being processed; Summarize the screened defect information of each major and calculate the cumulative number of defects for each major; fill the cumulative number of defects for each major into the table according to the major number and name, and generate a statistical table of cumulative defects by major; The calculation of the defect control index of each specialty in the new week includes filling the defect control index of each specialty and the overall defect control index of the power plant into a table to generate a defect control index table for each specialty; The defect control index for each discipline is expressed as, Among them, C i represents the defect control index of the i-th profession, M i represents the minimum value of the cumulative number of defects in the i-th specialty, represents the floor function, that is, the largest integer not greater than x; The overall defect control index of the power plant is expressed as, Where C represents the overall defect control index of the power plant, n represents the number of specialties, and C i represents the defect control index of the i-th profession; The average number of new defects per day over the past week is expressed as, Where A represents the average number of new defects per day in the past week, N j Represents the number of new defects on day j.
4. A method for dynamic management of the number of defects in power plant equipment according to claim 3, characterized in that: The formulation of a daily defect elimination plan for each specialty includes using a defect priority sorting function to sort the defect information of each specialty, arranging the defect information in order from high to low defect levels and from early to late defect discovery times, to obtain a defect priority list for each specialty; According to the number of defects eliminated in each specialty's daily plan, select a corresponding number of defects from each specialty's defect priority list as each specialty's daily defect elimination plan, that is, a list of defects that should be eliminated every day for each specialty; According to the daily defect elimination plan of each specialty, determine the method for eliminating each defect, including the specific steps for elimination, the required personnel, equipment, materials, and time, and generate a daily defect elimination plan for each specialty; Fill in the daily defect elimination plan and daily defect elimination scheme of each profession into the table to generate a daily defect elimination plan table and a daily defect elimination scheme table for each profession; The defect priority sorting function takes the defect information of each profession as input and outputs the defect priority list of each profession, which is expressed as: DPSF(I1,I2,...,I m )=(P1,P2,...,P m ) P k =L k ×10+T k Among them, I k The information of the k-th defect includes defect number, defect description, defect discovery time, defect status, and defect level. k represents the priority of the kth defect, m represents the number of defects, L k represents the level of the kth defect, T k represents the time of discovery of the kth defect, P k The larger the value of is, the higher the priority of the kth defect is. k The values of are the same, indicating that the priorities of the k-th defects are the same; The input of the defect elimination plan selection function is the defect priority list of each specialty and the daily planned defect elimination completion quantity of each specialty. The output is the daily defect elimination plan of each specialty, expressed as, Among them, P k represents the priority of the kth defect, Q i represents the daily planned defect elimination completion quantity of the i-th specialty, E k represents the kth defect elimination plan, that is, the information of the kth defect to be eliminated, m represents the number of defects, E k The selection rule includes selecting Q from the defect priority list in descending order of priority. i defects as a plan to eliminate them; If the number of defects in the defect priority list is less than m, all defects are selected as the defect elimination plan and Q i Adjusted to the number of defects, i.e. Q i =m; If the number of defects in the defect priority list is equal to Q i , then select all defects as the defect elimination plan; If the number of defects in the defect priority list is greater than Q i , then select the first Q i A defect is identified as a defect elimination plan.
5. A method for dynamic management of the number of defects in power plant equipment according to claim 4, characterized in that: The execution of the daily defect elimination task for each profession includes allocating defect elimination personnel for each profession according to the daily defect elimination plan for each profession, and notifying each profession of the defect elimination task, including the defect number, defect description, defect level, and defect location to be eliminated; According to the daily defect elimination plan table for each profession, prepare the defect elimination equipment and materials for each profession, and eliminate the defects that should be eliminated every day in each profession according to the specific steps of defect elimination; According to the results of defect elimination, update the defect information of each discipline, including defect number, defect description, defect discovery time, defect status, and defect level. Feedback the results of defect elimination to the power plant's operation management system and update the defect statistics of the power plant. Fill in the defect elimination results and feedback into the table to generate a daily defect elimination result table by profession and a daily defect elimination feedback table by profession.
6. A method for dynamic management of the number of defects in power plant equipment according to claim 5, characterized in that: The evaluation and optimization of defect elimination includes a defect elimination plan determination function, the input is the daily defect elimination plan of each profession, and the output is the daily defect elimination plan of each profession, which is expressed as: Among them, E k represents the kth defect elimination plan, that is, the information of the kth defect to be eliminated, S k represents the kth defect elimination scheme, i.e., the method for eliminating the kth defect, Q i It represents the daily planned defect elimination completion quantity of the i-th specialty; S k The determination rules include analyzing the nature, cause, impact, and harm of each defect based on the information of each defect, including defect number, defect description, defect level, and defect location, and determining the defect elimination target of each defect, that is, the expected effect of defect elimination; According to the defect elimination target of each defect, refer to the power plant's operating procedures, maintenance manuals, and technical standards, select the defect elimination method for each defect, that is, the specific steps for defect elimination, including the personnel, equipment, materials, and time for defect elimination, and generate a defect elimination plan for each defect, that is, S k ; The defect elimination result update function takes as input the daily defect elimination result of each specialty and outputs the update of defect information of each specialty and defect statistics of the power plant, which is expressed as: Among them, R k represents the k-th defect elimination result, that is, the elimination status of the k-th defect, including the elimination time, result, and feedback. k ′ represents the update of the information of the kth defect, including defect number, defect description, defect discovery time, defect status, and defect level. i ′ represents the update of the cumulative number of defects of the i-th specialty, Q i represents the daily planned defect elimination completion quantity of the i-th specialty, m represents the number of defects, n represents the number of specialties, and I k ′ and D i The update rule of ′ is as follows: According to the defect elimination results of each defect, modify the information of each defect, including defect number, defect description, defect discovery time, defect status, defect level, and generate an update of the information of each defect, that is, I k ′; If the defect elimination result is successful, the defect status is changed to handled and the defect level is changed to 0; If the defect elimination result is failure, the defect status is changed to pending, and the defect level is increased to 1 according to the feedback from the defect elimination; If the defect elimination result is suspended, the defect status is changed to being processed, and the defect level is increased to 2 based on the feedback from the defect elimination.
7. A method for dynamic management of the number of defects in power plant equipment according to claim 6, characterized in that: The evaluation and optimization of defect elimination also includes a defect elimination feedback function whose input is the daily defect elimination feedback of each specialty, and whose output is the adjustment of the defect control index of each specialty and the overall defect control index of the power plant, expressed as: Among them, F k represents the k-th defect elimination feedback, that is, the feedback on the elimination of the k-th defect, including the difficulty, problems, suggestions, etc. of the defect elimination. i ″ represents the adjustment of the defect control index of the i-th specialty, C″ represents the adjustment of the overall defect control index of the power plant, Q i represents the daily planned defect elimination completion quantity of the i-th specialty, and n represents the number of specialties; C i The adjustment rules of "and C" include analyzing the difficulty, problems and suggestions of each defect elimination according to the defect elimination feedback, and determining the improvement measures for each defect elimination, that is, the optimization plan for defect elimination, including the adjustment of personnel, equipment, materials and time for defect elimination; According to the defect elimination improvement measures for each defect, the defect elimination efficiency of each defect is evaluated, that is, the ratio of defect elimination time and quality, and the defect elimination efficiency score of each defect is generated, that is, E k ′; According to the defect elimination efficiency score of each defect, the defect elimination efficiency score of each profession is calculated, that is, the average of the defect elimination efficiency scores of each profession, and the defect elimination efficiency score of each profession is generated, that is, E i ′; According to the defect elimination efficiency score of each specialty, the defect control index of each specialty is adjusted, that is, the number of defects that each specialty should reduce to, and the adjustment of the defect control index of each specialty is generated, that is, C i ″; If the defect elimination efficiency score of each specialty is greater than or equal to the preset threshold, it means that the defect elimination efficiency of each specialty is high, and the number of defects that should be reduced in each specialty is reduced, the defect elimination tasks of each specialty are increased, and the health status of the power plant is improved; If the fault elimination efficiency score of each specialty is less than the preset threshold, it means that the fault elimination efficiency of each specialty is low. The number of defects that should be reduced in each specialty should be increased, and the fault elimination tasks of each specialty should be reduced to ensure the safe operation of the power plant. According to the adjustment of the defect control index of each specialty, the overall defect control index of the power plant is recalculated, that is, the number of defects that the power plant should reduce to, and the adjustment of the overall defect control index of the power plant, that is, C″, is generated.
8. A system using a method for dynamically managing the number of defects in power plant equipment according to any one of claims 1 to 7, characterized in that: It includes defect information real-time monitoring module, defect control index calculation module, defect elimination plan formulation module, defect elimination execution tracking module, dynamic adjustment and feedback module, and effect evaluation and optimization module; The defect information real-time monitoring module is responsible for real-time collection and processing of defect information of each profession to ensure the real-time and accuracy of the data; The defect control index calculation module uses the defect control index model to calculate the defect control index C of each profession i and the overall defect control index C of the power plant; The defect elimination plan formulation module uses the defect elimination priority ranking function to formulate a daily defect elimination plan for each profession and adjusts it according to the actual situation; The defect elimination execution tracking module is responsible for executing defect elimination tasks and tracking and recording defect elimination results and feedback; The dynamic adjustment and feedback module uses the defect elimination result update function and the defect elimination feedback function to dynamically adjust the defect control index according to the defect elimination result and feedback; The effect evaluation and optimization module uses a defect quantity dynamic management effect evaluation model and a defect elimination effect scoring calculation function to evaluate the defect elimination effect and determine the evaluation level of the defect elimination effect.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.