Multi-factor intelligent site selection method and system
Through multi-factor intelligent site selection method and improved hierarchical analysis method, the problems of insufficient factors and low site selection accuracy in the existing technology are solved, the accuracy and evaluation accuracy of marine intelligent site selection are improved, and the site selection decision is ensured. Scientific.
Patent Information
- Application Number
- CN202411578208.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-07
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing marine intelligent site selection technology has few considerations and insufficient accuracy of site selection models, resulting in low accuracy of intelligent site selection.
Using multi-factor intelligent site selection method, including data collection, processing and importing into geographic information database, using GIS geospatial processing algorithm library PostGIS for automatic calculation, and using improved hierarchical analysis method to evaluate the site selection scheme adaptive value to determine evaluation indicators Weight, use the entropy method to update the weight to improve the accuracy of the evaluation.
By considering a variety of marine spatial data and improved hierarchical analysis methods, the accuracy of intelligent site selection and evaluation accuracy of site selection schemes are improved, ensuring the scientificity and reliability of site selection decisions.
Smart Images

Figure CN119090317A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of marine space planning, and in particular to a multi-factor intelligent site selection method and system. Background Art
[0002] Marine intelligent site selection is a series of analysis and decision-making processes carried out before determining the most suitable construction area. This process requires comprehensive consideration of the purpose of the proposed project and the physical environment, ecological environment and other relevant conditions of the planned sea area. The quality of site selection will directly affect the success or failure of project construction. Therefore, in the study of intelligent site selection, it is necessary to consider multiple factors such as on-site fishery structure, resource status, environmental conditions, management background, existing foundation and shipping traffic.
[0003] There are technical solutions for intelligent site selection in the prior art. For example, the Chinese invention patent (CN111291520A) discloses an intelligent site selection method for marine anchored buoy stations that optimizes spatial efficiency, including S1. Establishing a buoy station site selection model, S2. Preprocessing spatial data, S3. Building a spatial computing middleware, performing spatial computing, S4. The iterator uses a particle swarm algorithm to establish a heuristic computing mode, runs the spatial computing middleware once for each particle, and selects the particle with the largest spatial efficiency index as the global optimal solution, S5. Determine whether the maximum number of iterations has been reached. When the maximum number of iterations has been reached, the calculation is terminated and the global optimal solution is output; when the maximum number of iterations has not been reached, S3 to S5 are repeated. Its advantage is that it effectively realizes the comprehensive site selection of multiple marine anchored buoy stations; however, the above scheme considers fewer factors when intelligently selecting sites, and on the other hand, the accuracy of the site selection model is not high, resulting in low accuracy of intelligent site selection. Summary of the invention
[0004] In view of this, the present invention proposes a multi-factor intelligent site selection method and system for improving the accuracy of intelligent site selection.
[0005] In order to achieve the above object, a multi-factor intelligent site selection method is provided, the method comprising the following steps: S1: Collect multi-factor data for intelligent site selection; S2: performing data processing operations on the multi-factor data; S3: importing the processed multi-factor data into a geographic information database to form a site selection analysis database; S4: input the site selection conditions into the intelligent site selection system, the intelligent site selection system automatically calculates the site selection data using the GIS geospatial processing algorithm library PostGIS according to the site selection logic and site selection analysis database to obtain a candidate site set; S5: conducting adaptability value assessment on the site selection schemes in the site selection candidate set; The use of the improved analytic hierarchy process to evaluate the adaptability of the site selection schemes in the site selection candidate set is specifically as follows: S5.1: Determine the evaluation indicators for the adaptive value assessment of the site selection options; S5.2: Calculate the final weight of the evaluation index using the improved analytic hierarchy process; S5.3: Perform an adaptability value assessment on the site selection options in the site selection candidate set according to the final weights.
[0006] Preferably, the S5.2 is specifically: S5.2.1: Create a judgment matrix A; S5.2.2: Calculate the initial weights a of the m indicators m ; S5.2.3: Obtain the subjective weights b of the m indicators m ; S5.2.4: Set the initial weight a of the mth indicator m and subjective weight b m Compare, if the relative error is less than the preset threshold, then keep it, otherwise go to the next step; S5.2.5: Update indicator weights; S5.2.6: Update the initial weight with the updated indicator weight to obtain the final weight.
[0007] Preferably, in S1, the multiple factors include: administrative district data, sea areas on the sea side of the coastline, sea areas on the land side of the coastline, marine functional zoning, continental coastline, isobaths, marine ecological red lines, marine ownership data, and marine classification data.
[0008] Preferably, in S2, the data processing includes: administrative district data processing, coastline data processing, marine ecological red line data processing, and marine classification data processing.
[0009] Preferably, the administrative district processing is specifically as follows: exporting the province and city fields in the boundary line data of each city in the target province, then converting the boundary line data of each city into city surface data, and finally merging the city surface data of each city into a layer to form administrative district data; The processing of the coastline data is specifically as follows: the coastline data is exported to the sea side, retaining only the first-level coastline class, and then adding the "continental coastline" field; the coastline data is exported to the land side, retaining only the first-level coastline class, and then adding the "island coastline" field; and then merging the exported first-level classes to obtain the processed coastline data; The processing of the marine ecological red line data is specifically as follows: removing the prohibited spots in the marine ecological red line data, then selecting the required fields to export and rename, and merging with the administrative district data to form the processed marine ecological red line data; The processing of the marine classification data is specifically as follows: exporting the county, grade and level fields of the marine classification data, and then merging them with the administrative district data to form processed marine classification data.
[0010] Preferably, in S3, the geographic information database is PostgreSQL.
[0011] Preferably, in S4, the site selection conditions include: city / county, sea use type, distance from shore, water depth, sea area use grade, site selection area, etc.
[0012] Preferably, in S5.1, the evaluation indicators include sea area function, sea area accessibility, flow rate, water depth, water quality, investment and construction cost, and transportation cost.
[0013] Preferably, S5.2.3 is specifically as follows: selecting a preset number of experts to assign weights to the evaluation indicators of sea area function, sea area accessibility, flow rate, water depth, water quality, investment and construction cost, and transportation cost respectively, and taking the average of the weights assigned by multiple experts for each indicator to obtain the subjective weights b of the m indicators. m .
[0014] According to another aspect of the present invention, a multi-factor intelligent site selection system is provided, wherein the system adopts the multi-factor intelligent site selection method described above, and the system comprises: A data collection module, used to collect multi-factor data for intelligent site selection; A data processing module, used for performing data processing operations on the multi-factor data; A site selection analysis database establishment module is used to import the processed multi-factor data into a geographic information database to form a site selection analysis database; A site selection candidate set acquisition module, used to input site selection conditions into the site selection analysis database to obtain a site selection candidate set; The adaptability value evaluation module is used to perform adaptability value evaluation on the site selection schemes in the site selection candidate set.
[0015] The advantages and beneficial effects of the present invention are: The present invention takes into account administrative district data, sea areas on the sea side of the coastline, sea areas on the land side of the coastline, marine functional zoning, continental coastline, isobaths, marine ecological red lines, marine ownership data, marine classification data and other data when intelligently selecting sites. Comprehensive factors are considered to improve the accuracy of intelligent site selection. When the analytic hierarchy process is used to evaluate the adaptability of a site selection scheme, the present invention improves the analytic hierarchy process, uses a judgment matrix and a subjective scoring method to determine weights, and then screens out weights with large errors. For weights with large errors, the entropy method is used to update the weights, thereby improving the accuracy of weight determination and further improving the accuracy of site selection scheme evaluation. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the drawings required for use in the description of the present invention or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 A flowchart of a multi-factor intelligent site selection method provided by an embodiment of the present invention; Figure 2 A flowchart of administrative district data processing for Zhejiang Province provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0018] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0019] Embodiment 1, as attached Figure 1 As shown, a multi-factor intelligent site selection method comprises the following steps: S1: Collect multi-factor data for intelligent site selection; Among them, the various factors include: administrative district data, sea areas on the sea side of the coastline, sea areas on the land side of the coastline, marine functional zoning, continental coastline, isobaths, marine ecological red lines, marine ownership data, marine classification data, etc.; The city-county boundary line refers to the geographical boundary line drawn between cities and counties, which is used to clarify the boundaries between different administrative regions. These boundary lines are usually determined based on a variety of factors such as history, geography, politics, and economy, and are intended to reasonably divide the scope of administrative jurisdiction and facilitate administrative management and social services; the coastline is the area where land and water meet, and it is the boundary between the ocean and land. It is generally a zone where land and ocean interact with each other. Among them, the sea area on the land side of the coastline is the sea area on the land side of the coastline, and the sea area on the sea side of the coastline is the sea area on the sea side of the coastline; marine functional zoning is to divide the sea area into different functional areas based on the geographical location, natural resource conditions, natural environmental conditions, and social needs of the sea area, so as to guide and constrain the practical activities of marine development and utilization, and ensure the economic, environmental and social benefits of the sea area; depth contour refers to the curve formed by connecting points of the same depth in the ocean or lake into a closed curve, which is scaled down and vertically projected onto a plane. The depths of all points on the same isobath are equal; the marine ecological red line refers to the line where important marine ecological functional areas, ecologically sensitive areas and ecologically fragile areas are designated as key control areas and strictly classified and controlled in order to maintain the health and safety of marine ecology; In this embodiment, when performing intelligent site selection, the scientific nature of the intelligent site selection can be effectively improved by considering and analyzing the above-mentioned multiple factors.
[0020] S2: performing data processing operations on the multi-factor data; The data processing includes: administrative district data processing, coastline data processing, marine ecological red line data processing, and marine classification data processing; The administrative district processing is specifically as follows: exporting the province and city fields in the boundary line data of each city in the target province, then converting the boundary line data of each city into city surface data, and finally merging the city surface data of each city into a layer to form administrative district data; For example, Figure 2 The data processing flow of administrative regions in Zhejiang Province is shown in the attached Figure 2 The process can realize the processing of administrative district data and obtain 5 administrative district data after processing; The processing of the coastline data is specifically as follows: the coastline data is exported to the sea side, retaining only the first-level coastline class, and then adding the "continental coastline" field; the coastline data is exported to the land side, retaining only the first-level coastline class, and then adding the "island coastline" field; and then merging the exported first-level classes to obtain the processed coastline data; The processing of the marine ecological red line data is specifically as follows: removing the prohibited spots in the marine ecological red line data, then selecting the required fields to export and rename, and merging with the administrative district data to form the processed marine ecological red line data; The processing of the marine classification data is specifically as follows: exporting the county, grade and level fields of the marine classification data, and then merging them with the administrative district data to form processed marine classification data; S3: importing the processed multi-factor data into a geographic information database to form a site selection analysis database; Wherein, the geographic information database is PostgreSQL; S4: inputting the site selection conditions into the intelligent site selection system, and the intelligent site selection system automatically calculates the site selection data using the GIS geospatial processing algorithm library PostGIS according to the site selection logic and the site selection analysis database to obtain a site selection candidate set; In this step, the site selection conditions include: city / county, sea use type, distance from shore, water depth, sea area use level, site selection area, etc.; The site selection logic includes the site selection logic of the sea-side functional area and the site selection logic of the land-side functional area. The site selection logic of the sea-side functional area is based on the city and county where it is located and the composite type of the marine functional area. Whether it is a prohibited marine ecological red line area, whether it is an authorized area, offshore distance, depth contours, sea area use fee registration, and area matching are selected in turn; the site selection logic of the land-side functional area is specifically based on the city and county where it is located, whether it is an authorized area, the conformity of the project layout of the single-report plan, and the homogeneity requirements of concentrated and contiguous blocks. S5: conducting adaptability value assessment on the site selection schemes in the site selection candidate set; By limiting the site selection conditions, multiple site selection schemes are generally obtained, thereby forming a site selection candidate set. In this embodiment, in order to further improve the intelligence of the site selection scheme, the adaptability of multiple site selection schemes is evaluated by scoring, so as to provide reference for decision makers; In this embodiment, an improved hierarchical analysis method is used to evaluate the adaptability of the site selection schemes in the site selection candidate set; Specifically, the improved analytic hierarchy process is used to evaluate the adaptability of the site selection schemes in the site selection candidate set as follows: S5.1: Determine the evaluation indicators for the adaptive value assessment of the site selection options; The evaluation indicators include sea area function, sea area accessibility, flow rate, water depth, water quality, investment and construction cost, transportation cost, etc. S5.2: Calculate the final weight of the evaluation index using the improved analytic hierarchy process; Wherein, the S5.2 is specifically: S5.2.1: Create a judgment matrix A; Wherein, the judgment matrix is: ; where a ij is the relative importance of evaluation index i and evaluation index j; In the formula, ; S5.2.2: Calculate the initial weights a of the m indicators m ; In this step, the maximum eigenvalue method is used to calculate the initial weights of the m indicators; S5.2.3: Obtain the subjective weights b of the m indicators m ; Specifically, S5.2.3 is as follows: a preset number of experts are selected to assign weights to the evaluation indicators of sea area function, sea area accessibility, flow rate, water depth, water quality, investment and construction cost, and transportation cost, respectively, and the weights assigned by multiple experts to each indicator are averaged to obtain the subjective weights b of the m indicators. m ; S5.2.4: Set the initial weight a of the mth indicator m and subjective weight b m Compare, if the relative error is less than the preset threshold, then keep it, otherwise go to the next step; The calculation formula of relative error e is: ; In this step, the preset threshold is 0.2; S5.2.5: Update indicator weights; In this step, the index weights are updated using the entropy method; The basic principle of the entropy method is to determine the indicator weight according to the information provided by the observed values of each indicator. In information theory, entropy is a measure of uncertainty. The greater the amount of information, the smaller the uncertainty and the smaller the entropy; the smaller the amount of information, the greater the uncertainty and the greater the entropy. The entropy method uses this characteristic to determine the degree of dispersion of each indicator by calculating the entropy value of each indicator. The greater the degree of dispersion, the greater the impact of the indicator on the comprehensive evaluation.
[0021] S5.2.6: Update the initial weight with the updated indicator weight to obtain the final weight; S5.3: Perform an adaptability value assessment on the site selection options in the site selection candidate set according to the final weights.
[0022] In this embodiment, when the analytic hierarchy process is used to evaluate the adaptability of the site selection plan, the analytic hierarchy process is improved, and the weights are determined by using a judgment matrix and a subjective scoring method respectively, and then the weights with large errors are screened out. For the weights with large errors, the entropy method is used to update the weights, which improves the accuracy of weight determination and thus improves the accuracy of site selection plan evaluation. Embodiment 2: This embodiment includes a multi-factor intelligent site selection system, the system adopts a multi-factor intelligent site selection method of embodiment 1, and the system includes: A data collection module, used to collect multi-factor data for intelligent site selection; A data processing module, used for performing data processing operations on the multi-factor data; A site selection analysis database establishment module is used to import the processed multi-factor data into a geographic information database to form a site selection analysis database; A site selection candidate set acquisition module, used to input site selection conditions into the site selection analysis database to obtain a site selection candidate set; The adaptability value evaluation module is used to perform adaptability value evaluation on the site selection schemes in the site selection candidate set.
[0023] Embodiment 3: This embodiment includes a computer-readable storage medium, on which a data processing program is stored, and the data processing program is executed by a processor to implement a multi-factor intelligent site selection method of embodiment 1.
[0024] It should be understood by those skilled in the art that the embodiments of this article can be provided as methods, devices (equipment), or computer program products. Therefore, this article can adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware aspects. Including but not limited to RAM, ROM, EEPROM, flash memory or other memory technology, CD-ROM, digital versatile disk (DVD) or other optical disk storage, magnetic cassette, tape, disk storage or other magnetic storage device, or any other medium that can be used to store desired information and can be accessed by a computer. In addition, it is well known to those of ordinary skill in the art that communication media generally contain computer-readable instructions, data structures, program modules, or other data in modulated data signals such as carrier waves or other transmission mechanisms, and may include any information delivery medium.
[0025] This document is described with reference to flowcharts and / or block diagrams of methods, apparatuses (devices), and computer program products according to the embodiments of this document. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0026] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0027] The embodiments and / or implementation methods described above are only used to illustrate the preferred embodiments and / or implementation methods of the technology of the present invention, and are not intended to impose any formal restrictions on the implementation methods of the technology of the present invention. Any person skilled in the art may make some changes or modifications to other equivalent embodiments without departing from the scope of the technical means disclosed in the content of the present invention, but they should still be regarded as the technology or embodiments that are essentially the same as the present invention. Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described here, and that various obvious changes, readjustments and substitutions can be made to those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention is described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may also include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.
Claims
1. A multi-factor intelligent site selection method, It is characterized in that The method comprises the following steps: S1: Collect multi-factor data for intelligent site selection; S2: performing data processing operations on the multi-factor data; S3: importing the processed multi-factor data into a geographic information database to form a site selection analysis database; S4: input the site selection conditions into the intelligent site selection system, the intelligent site selection system automatically calculates the site selection data using the GIS geospatial processing algorithm library PostGIS according to the site selection logic and site selection analysis database to obtain a candidate site set; S5: conducting adaptability value assessment on the site selection schemes in the site selection candidate set; Wherein, the improved hierarchical analysis method is used to evaluate the adaptability of the site selection schemes in the site selection candidate set; the improved hierarchical analysis method is used to evaluate the adaptability of the site selection schemes in the site selection candidate set as follows: S5.1: Determine the evaluation indicators for the adaptive value assessment of the site selection options; S5.2: Calculate the final weight of the evaluation index using the improved analytic hierarchy process; S5.3: Perform an adaptability value assessment on the site selection options in the site selection candidate set according to the final weights.
2. A multi-factor intelligent site selection method according to claim 1, It is characterized in that The S5.2 is specifically: S5.2.1: Create a judgment matrix A; S5.2.2: Calculate the initial weights a of the m indicators m ; S5.2.3: Obtain the subjective weights b of the m indicators m ; S5.2.4: Set the initial weight a of the mth indicator m and subjective weight b m Compare, if the relative error is less than the preset threshold, retain the initial weight, otherwise proceed to the next step; S5.2.5: Update indicator weights; S5.2.6: Update the initial weight with the updated indicator weight to obtain the final weight.
3. A multi-factor intelligent site selection method according to claim 1, It is characterized in that In S1, the multiple factors include: administrative district data, sea areas on the sea side of the coastline, sea areas on the land side of the coastline, marine functional zoning, continental coastline, isobaths, marine ecological red lines, marine ownership data, and marine classification data.
4. A multi-factor intelligent site selection method according to claim 1, It is characterized in that In S2, the data processing includes: administrative district data processing, coastline data processing, marine ecological red line data processing, and marine classification data processing.
5. A multi-factor intelligent site selection method according to claim 4, It is characterized in that The administrative district processing is specifically as follows: exporting the province and city fields in the boundary line data of each city in the target province, then converting the boundary line data of each city into city surface data, and finally merging the city surface data of each city into a layer to form administrative district data; The processing of the coastline data is specifically as follows: the coastline data is exported to the sea side, retaining only the first-level coastline class, and then adding the "continental coastline" field; the coastline is exported to the land side, retaining only the first-level coastline class, and then adding the "island coastline" field; and then merging the exported first-level classes to obtain the processed coastline data; The processing of the marine ecological red line data is specifically as follows: removing the prohibited spots in the marine ecological red line data, then selecting the required fields to export and rename, and merging with the administrative district data to form the processed marine ecological red line data; The processing of the marine classification data is specifically as follows: exporting the county, grade and level fields of the marine classification data, and then merging them with the administrative district data to form processed marine classification data.
6. A multi-factor intelligent site selection method according to claim 3, It is characterized in that In the S3, the geographic information database is PostgreSQL.
7. A multi-factor intelligent site selection method according to claim 1, It is characterized in that In S4, the site selection conditions include: city / county, sea use type, distance from shore, water depth, sea area use grade, and site selection area.
8. A multi-factor intelligent site selection method according to claim 2, It is characterized in that In S5.1, the evaluation indicators include sea area function, sea area accessibility, flow rate, water depth, water quality, investment and construction cost, and transportation cost.
9. A multi-factor intelligent site selection method according to claim 8, It is characterized in that S5.2.3 is specifically as follows: select a preset number of experts to assign weights to the evaluation indicators of sea area function, sea area accessibility, flow rate, water depth, water quality, investment and construction cost, and transportation cost respectively, and take the average of the weights assigned by multiple experts for each indicator to obtain the subjective weights b of the m indicators. m .
10. A multi-factor intelligent site selection system, It is characterized in that The system adopts a multi-factor intelligent site selection method according to any one of claims 1 to 9, and the system comprises: A data collection module, used to collect multi-factor data for intelligent site selection; A data processing module, used for performing data processing operations on the multi-factor data; A site selection analysis database establishment module is used to import the processed multi-factor data into a geographic information database to form a site selection analysis database; A site selection candidate set acquisition module, used to input site selection conditions into the site selection analysis database to obtain a site selection candidate set; The adaptability value evaluation module is used to perform adaptability value evaluation on the site selection schemes in the site selection candidate set.
Citation Information
Patent Citations
Reverse osmosis seawater desalination plant site selection method
CN112950084A
Multi-attribute decision-making urban CBD site selection method
CN115168521A
Technical improvement project optimization decision-making method and device considering multi-target contribution
CN117408433A
Three-dimensional hierarchical site selection method for universal marine-related project
CN117634808A
Comprehensive evaluation method for environmental protection capability of power grid enterprise based on combined empowerment
CN118898418A
Cited By
Multi-factor intelligent site selection method and system