Factory production scheduling method and system for radix fici simplicissimae chickens

By obtaining the target production volume and adjusting the production process parameters, the problem of quality inspection and scheduling of Wuzhifeng peach chicken in factory production is solved, and scientific scheduling and reasonable adjustment of the production process of Wuzhifeng peach chicken is achieved.

CN119090340AInactive Publication Date: 2024-12-06HEYUAN GENGYENTIANXIA AGRI DEV CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411138492.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing factory-based production of Wuwei Hairy Peach Chicken cannot dynamically detect and schedule production quality, resulting in timely adjustments when production quality is reduced.

Method used

By obtaining the target production volume, determining the sampling process and sampling quantity, adjusting the production process parameters according to the sampling results, and dynamically scheduling is used to ensure the production quality of Wuwei Hai Tao Chicken.

Benefits of technology

It realizes dynamic detection and scheduling of the production quality of Wuwei Hairy Peach Chicken, can timely adjust the production process parameters, and improves the scientificity and efficiency of the production process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119090340A_ABST
    Figure CN119090340A_ABST
Patent Text Reader

Abstract

The invention relates to the field of food factory production management, and discloses a factory production scheduling method for radix fici simplicissimae chickens, and the method comprises the steps: obtaining a target production amount of a target batch of radix fici simplicissimae chickens; according to the target production capacity, determining a sampling inspection process corresponding to the target batch of the radix fici simplicissimae chickens and a sampling inspection number corresponding to the sampling inspection process, and obtaining a sampling inspection result corresponding to the sampling inspection process after sampling inspection; and adjusting the production process parameters corresponding to the sampling inspection process according to the sampling inspection result corresponding to the sampling inspection process through the production process adjustment model. And when the target production capacity is smaller than the first production capacity, determining a third sampling inspection quantity according to the first production capacity, performing sampling inspection of the third sampling inspection quantity on the product baked for the third time, and obtaining a third baking sampling inspection result after sampling inspection. According to the invention, the production quality of the radix fici simplicissimae chicken can be dynamically detected and scheduled, and the production quality of the radix fici simplicissimae chicken can be timely adjusted when being reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of food factory production management, and more specifically, to a factory production scheduling method and system for five-fingered ginseng chicken. Background Art

[0002] Five-fingered ginseng chicken is a chicken product or dish that incorporates the ingredient of five-fingered ginseng. Five-fingered ginseng chicken originated in Guangdong Province and is one of the specialties of Guangdong. Five-fingered ginseng is a plant that grows in the Lingnan region. The roots of the five-fingered ginseng have a unique aroma and multiple medicinal values, so the five-fingered ginseng is often used in Chinese cooking, especially as a medicinal ingredient when making soup. Five-fingered ginseng has the effects of strengthening the spleen and eliminating dampness, promoting qi and eliminating phlegm, and relaxing muscles and activating collaterals. The combination of five-fingered ginseng and chicken can not only remove the fishy smell and enhance the fragrance, but also make the chicken more tender and juicy. The processing method of five-fingered ginseng chicken is to cook the chicken and the roots of the five-fingered ginseng together, so that the chicken not only absorbs the fragrance of the five-fingered ginseng, but also increases the medicinal effect of the dish.

[0003] The production process of five-fingered peach chicken usually uses local three-yellow chickens or other chickens with delicious meat that have not laid eggs. The roots of five-fingered peach are cleaned, and the processed chicken and five-fingered peach roots are put into the pot together, and an appropriate amount of water and other seasonings are added, and then slowly boiled to allow the chicken to fully absorb the fragrance and medicinal effects of five-fingered peach. Five-fingered peach chicken is not only a frequent guest on the family table due to its unique flavor and health-preserving characteristics, but also suitable as a tourist souvenir. At present, there is also an application of factory-based production of five-fingered peach chicken. In the process of factory-based production of five-fingered peach chicken, it is necessary to first prepare the concentrated soup of five-fingered peach according to the formula, and then soak and bake the hanging fresh chicken for multiple times to obtain the processed five-fingered peach chicken. In the existing factory-based production of five-fingered peach chicken, the production quality of five-fingered peach chicken cannot be dynamically detected and scheduled, and it cannot be adjusted in time when the production quality of five-fingered peach chicken is reduced. Summary of the invention

[0004] The purpose of this application is to provide a factory production scheduling method and system for five-fingered ginseng chicken, which solves the technical problem that the production quality of five-fingered ginseng chicken cannot be dynamically detected and scheduled, and timely adjustments cannot be made when the production quality of five-fingered ginseng chicken is reduced, and achieves the technical effect of being able to dynamically detect and schedule the production quality of five-fingered ginseng chicken and make timely adjustments when the production quality of five-fingered ginseng chicken is reduced.

[0005] An embodiment of the present application provides a factory production scheduling method for five-fingered ginseng chicken, the method comprising: obtaining a target production volume of a target batch of five-fingered ginseng chicken; determining, based on the target production volume, a sampling inspection process and a sampling quantity corresponding to the sampling inspection process corresponding to the target batch of five-fingered ginseng chicken, and obtaining the sampling inspection result corresponding to the sampling inspection process after the sampling inspection; and adjusting the production process parameters corresponding to the sampling inspection process according to the sampling inspection result corresponding to the sampling inspection process through a production process adjustment model.

[0006] In one possible implementation, the production process of five-fingered ginseng chicken includes: soaking the fresh chicken in concentrated soup for a first soaking time, then baking for a first baking time and cooling; soaking the fresh chicken in concentrated soup for a second soaking time, then baking for a second baking time and cooling; soaking the fresh chicken in concentrated soup for a third soaking time, then baking for a third baking time and cooling; determining the sampling process and the sampling quantity corresponding to the sampling process for the target batch of five-fingered ginseng chicken according to the target production volume, and obtaining the sampling results corresponding to the sampling process after the sampling, including: when the target production volume is less than the first production volume, determining the third sampling quantity according to the first production volume, and sampling the third sampling quantity on the product baked for the third time, and obtaining the sampling results of the third baking after the sampling; wherein the sampling results of the third baking include the skin hardness index, the skin color index of the third baking and the third baking index. Whole chicken weight loss index; when the target production volume is greater than the first production volume and less than or equal to the second production volume, the second sampling quantity is determined according to the second production volume, and the third sampling quantity is sampled on the products baked for the third time, and the second sampling quantity is sampled on the products baked for the second time, and the third baking sampling result and the second baking sampling result are obtained after the sampling; wherein, the second baking sampling result includes the second baking skin color index and the second baking whole chicken weight loss index; when the target production volume is greater than the second production volume and less than or equal to the third production volume, the third sampling quantity is determined according to the third production volume, and the third sampling quantity is sampled on the products baked for the third time, and the second sampling quantity is sampled on the products baked for the second time, and the first sampling quantity is sampled on the products baked for the first time, and the third baking sampling result, the second baking sampling result and the first baking sampling result are obtained after the sampling; wherein, the first baking sampling result includes the whole chicken doneness index.

[0007] In another possible implementation, the production process parameters corresponding to the sampling process are adjusted according to the sampling results corresponding to the sampling process through the production process adjustment model, including: determining the third baking adjustment parameters according to the third baking sampling results through the production process adjustment model; or, determining the second baking adjustment parameters according to the third baking sampling results and the second baking sampling results through the production process adjustment model, and determining the third baking adjustment parameters according to the second baking adjustment parameters and the third baking sampling results; or, determining the first baking adjustment parameters according to the third baking sampling results, the second baking sampling results and the first baking sampling results through the production process adjustment model, and determining the second baking adjustment parameters according to the first baking adjustment parameters and the second baking sampling results; determining the third baking adjustment parameters according to the first baking adjustment parameters, the second baking adjustment parameters and the third baking sampling results; wherein the first baking adjustment parameters, the second baking adjustment parameters and the third baking adjustment parameters include baking time and baking temperature, respectively.

[0008] In another possible implementation, the production process adjustment model is used to determine the first baking adjustment parameters according to the third baking inspection result, the second baking inspection result and the first baking inspection result, including: determining the first baking adjustment parameters and the whole chicken adjustment weight according to the third baking inspection result, the second baking inspection result and the first baking inspection result through the production process adjustment model.

[0009] In another possible implementation, the method also includes: when the third baking inspection result meets the preset third inspection condition, determining the second inspection quantity according to the third baking inspection result, performing the second inspection quantity on the second baked products, and obtaining the second baking inspection result after the inspection.

[0010] In another possible implementation, the method also includes: when the second baking inspection result meets the preset second inspection condition, determining the first inspection quantity according to the second baking inspection result, performing the first inspection quantity on the first baking products, and obtaining the first baking inspection result after the inspection.

[0011] In another possible implementation, the method also includes: obtaining the increase in production volume in the next production cycle; when the increase in production volume is greater than the preset increase in production volume, adjusting the target production volume in the current production cycle according to the increase in production volume, determining the sampling process and the sampling quantity corresponding to the sampling process for the target batch of five-fingered ginseng chicken according to the adjusted target production volume, and obtaining the sampling results corresponding to the sampling process after the sampling inspection.

[0012] In another possible implementation, the method also includes: when the third baking inspection result meets the preset third inspection condition, the second baking inspection result meets the preset second inspection condition, and the increase in production volume is greater than the preset increase in production volume, the second inspection quantity is determined according to the third baking inspection result, the first inspection quantity is determined according to the second baking inspection result, and the second inspection quantity and the first inspection quantity are adjusted according to the increase in production volume to obtain the second adjusted inspection quantity and the first adjusted inspection quantity; the second inspection quantity is inspected on the products baked for the second time, and the second inspection result is obtained after the inspection, and the first inspection result is obtained after the inspection; the first inspection quantity is inspected on the products baked for the first time, and the first inspection result is obtained after the inspection.

[0013] An embodiment of the present application also provides a factory production scheduling system for five-fingered ginseng chicken, and the factory production scheduling system for five-fingered ginseng chicken includes a unit for executing any of the methods described above.

[0014] An embodiment of the present application also provides a factory production scheduling system for five-fingered ginseng chicken, including a memory, a processor, and a computer program stored in the memory and executable on the processor, and the processor implements the method described above when executing the computer program.

[0015] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method described in any one of the above items is implemented.

[0016] An embodiment of the present application also provides a computer program product, including a computer program, which implements the steps of the method described above when executed by a processor.

[0017] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:

[0018] The embodiment of the present application provides a factory production scheduling method for five-fingered peach chicken, and the method includes: obtaining the target production volume of the target batch of five-fingered peach chicken; according to the target production volume, determining the sampling process and the sampling quantity corresponding to the sampling process of the target batch of five-fingered peach chicken, and obtaining the sampling results corresponding to the sampling process after sampling; adjusting the production process parameters corresponding to the sampling process according to the sampling results corresponding to the sampling process through the production process adjustment model. The method in the embodiment of the present application can dynamically schedule the quality inspection plan according to the target production volume of five-fingered peach chicken, and can scientifically schedule and adjust the quality inspection process of five-fingered peach chicken according to the production volume of five-fingered peach chicken, thereby realizing the reasonable scheduling of the production process of five-fingered peach chicken. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0020] Figure 1 A schematic diagram of a process flow of a factory production scheduling method for five-fingered ginseng chicken provided in an embodiment of the present application;

[0021] Figure 2 This is a schematic diagram of the process for determining the number of random inspections in an embodiment of the present application;

[0022] Figure 3 This is a schematic diagram of the process of determining the third baking adjustment parameters in the embodiment of the present application;

[0023] Figure 4 This is a schematic diagram of the process of determining the adjustment parameters for the second baking in an embodiment of the present application;

[0024] Figure 5 This is a schematic diagram of the process of determining the first baking adjustment parameters in an embodiment of the present application;

[0025] Figure 6 A schematic diagram of the logical structure of a factory production scheduling system for five-fingered ginseng chicken provided in an embodiment of the present application;

[0026] Figure 7 A schematic diagram of the physical structure of a factory production scheduling system for five-fingered ginseng chicken provided in an embodiment of the present application. DETAILED DESCRIPTION

[0027] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.

[0028] It should also be understood that the term “and / or” used in the specification and appended claims refers to and includes any and all possible combinations of one or more of the associated listed items.

[0029] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.

[0030] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.

[0031] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.

[0032] In the existing factory production process of five-fingered ginseng chicken, the production quality of five-fingered ginseng chicken cannot be dynamically detected and scheduled, and timely adjustments cannot be made when the production quality of five-fingered ginseng chicken decreases.

[0033] Based on the above reasons, the embodiment of the present application provides a factory production scheduling method for five-fingered peach chicken, and the method includes: obtaining the target production volume of the target batch of five-fingered peach chicken; according to the target production volume, determining the sampling process and the sampling quantity corresponding to the sampling process of the target batch of five-fingered peach chicken, and obtaining the sampling results corresponding to the sampling process after sampling; through the production process adjustment model, according to the sampling results corresponding to the sampling process, adjusting the production process parameters corresponding to the sampling process. The method in the embodiment of the present application can dynamically schedule the quality inspection plan according to the target production volume of five-fingered peach chicken, and can scientifically schedule and adjust the quality inspection process of five-fingered peach chicken according to the production volume of five-fingered peach chicken, thereby realizing the reasonable scheduling of the production process of five-fingered peach chicken.

[0034] In some scenarios, a factory production scheduling method for five-fingered ginseng chicken according to an embodiment of the present application can be applied to multi-batch production of five-fingered ginseng chicken. According to different predetermined production volumes, the quality inspection process in the production of five-fingered ginseng chicken can be scientifically scheduled, thereby improving the scheduling effect of the production process of five-fingered ginseng chicken.

[0035] The following is a specific example of a factory production scheduling method for five-fingered ginseng chicken provided in an embodiment of the present application.

[0036] Figure 1 A schematic diagram of a process flow for a factory production scheduling method for five-fingered ginseng chicken provided in an embodiment of the present application, such as Figure 1 As shown, the method includes S110 to S130, and S110 to S130 are described in detail below.

[0037] S110, obtaining the target production volume of the target batch of five-fingered ginseng chicken.

[0038] When scheduling the quality inspection process, the target production volume of the target batch of five-fingered ginseng chicken can be obtained, and then the quality inspection process can be scheduled and adjusted according to the target production volume of the target batch of five-fingered ginseng chicken.

[0039] S120. Determine the sampling process and the sampling quantity corresponding to the sampling process for the target batch of five-fingered ginseng chicken according to the target production volume, and obtain the sampling results corresponding to the sampling process after the sampling.

[0040] After obtaining the target production volume, the sampling process and the number of samplings corresponding to the target batch of five-fingered peach chicken can be determined according to the target production volume, and then the sampling process that needs quality inspection and the number of samplings for sampling the sampling process can be obtained, so as to accurately determine the sampling process.

[0041] After obtaining the sampling process and the sampling quantity corresponding to the sampling process, the sampling result corresponding to the sampling process can be obtained after the sampling is carried out.

[0042] S130. Adjust the production process parameters corresponding to the sampling process according to the sampling results corresponding to the sampling process through the production process adjustment model.

[0043] After obtaining the sampling results corresponding to the sampling process, the model can be adjusted through the production process. According to the sampling results corresponding to the sampling process, the production process parameters corresponding to the sampling process can be adjusted to achieve parameter adjustment of the production process and improve production effects.

[0044] Exemplarily, the production process adjustment model can be obtained by training the production process parameters corresponding to the sampling process and the corresponding adjustment measures, so as to realize automatic adjustment of the production process parameters corresponding to the sampling process.

[0045] The beneficial effect brought about by the above-mentioned implementation method is that the quality inspection process of the five-fingered ginseng chicken can be scientifically scheduled and adjusted according to the production volume of the five-fingered ginseng chicken, thereby realizing the reasonable scheduling of the production process of the five-fingered ginseng chicken.

[0046] In some implementations, the production process of the above-mentioned five-fingered ginseng chicken includes S210 to S230, and S210 to S230 are specifically described below.

[0047] S210, soaking the fresh chicken in the concentrated soup for a first soaking time, then baking the chicken for a first baking time and cooling the chicken.

[0048] Before roasting, you can make a concentrated soup of ginseng, and then soak and roast the fresh chicken in the concentrated soup of ginseng.

[0049] Exemplarily, the first soaking time may be 2 minutes.

[0050] Exemplarily, the first baking time may be 20 minutes.

[0051] S220, soaking the mixture a second time in the concentrated soup for a second soaking time, and then baking the mixture a second time for a second baking time and cooling the mixture.

[0052] Exemplarily, the second soaking time may be 1 minute.

[0053] Exemplarily, the second baking time may be 20 minutes.

[0054] S230, soaking the mixture for a third time in the concentrated soup for a third soaking time, and then baking the mixture for a third time for a third baking time and cooling the mixture.

[0055] Exemplarily, the third soaking time may be 1 minute.

[0056] Exemplarily, the third baking time may be 10 minutes.

[0057] In the embodiment of the present application, in order to ensure the stability of the baking quality, the above-mentioned three baking processes can be randomly inspected to improve the stability of the baking quality of the five-fingered ginseng chicken.

[0058] In some implementations, in the above S120, according to the target production volume, the sampling process and the sampling quantity corresponding to the sampling process of the target batch of five-fingered hairy peach chicken are determined, and the sampling results corresponding to the sampling process are obtained after the sampling inspection, including: when the target production volume is less than the first production volume, the third sampling quantity is determined according to the first production volume, and the third sampling quantity is sampled for the third baking product, and the third baking sampling result is obtained after the sampling inspection. Among them, the third baking sampling result includes the skin hardness index, the third baking skin color index, and the third baking whole chicken weight loss index.

[0059] Figure 2 This is a flow chart of determining the number of random inspections in the embodiment of the present application. Figure 2 As shown, when the target production volume is less than the first production volume, it means that the production volume of the five-fingered ginseng chicken is small. At this time, the last baking process can be sampled, that is, the third baked product can be sampled, which can ensure efficient quality inspection in small batch production.

[0060] Before the quality inspection, the third sampling quantity can be determined according to the first production volume, and the third sampling quantity can be sampled on the products baked for the third time, and the third baking sampling result can be obtained after the sampling.

[0061] Exemplarily, since the third roasting is the last roasting, the sampling result of the third roasting may include a skin hardness index, a skin color index of the third roasting, and a whole chicken weight loss index of the third roasting.

[0062] Illustratively, the first production volume may be 100 to 300 pieces.

[0063] In some implementations, in the above S120, according to the target production volume, the sampling process and the sampling quantity corresponding to the sampling process of the target batch of five-fingered peach chicken are determined, and the sampling results corresponding to the sampling process are obtained after the sampling inspection, including: when the target production volume is greater than the first production volume and less than or equal to the second production volume, the second sampling quantity is determined according to the second production volume, the third sampling quantity is sampled for the third baked product, and the second sampling quantity is sampled for the second baked product, and the third baking sampling result and the second baking sampling result are obtained after the sampling inspection. Among them, the second baking sampling result includes the second baking skin color index and the second baking whole chicken weight loss index.

[0064] like Figure 2 As shown, when the target production volume is greater than the first production volume and less than or equal to the second production volume, it indicates that the production volume of the five-fingered ginseng chicken is at a medium level. At this time, the last two baking processes can be sampled, that is, the products baked for the third time and the products baked for the second time can be sampled, which can ensure efficient quality inspection in medium batch production.

[0065] Before quality inspection, the second sampling quantity can be determined according to the second production volume, and the third sampling quantity can be inspected on the products baked for the third time, and the third sampling result can be obtained after the inspection; and the third sampling quantity can be inspected on the products baked for the third time, and the second sampling quantity can be inspected on the products baked for the second time, and the third sampling result and the second sampling result can be obtained after the inspection, which reflect the baking quality of the last two bakings.

[0066] Exemplarily, the second roasting random inspection result may include a second roasting skin color index and a second roasting whole chicken weight loss index.

[0067] Illustratively, the first production volume may be 300 to 1000 pieces.

[0068] In some implementations, in the above S120, according to the target production volume, the sampling process and the sampling quantity corresponding to the sampling process of the target batch of five-fingered peach chicken are determined, and the sampling results corresponding to the sampling process are obtained after the sampling inspection, including: when the target production volume is greater than the second production volume and less than or equal to the third production volume, the third sampling quantity is determined according to the third production volume, the third sampling quantity is sampled for the third baked product, the second sampling quantity is sampled for the second baked product, and the first sampling quantity is sampled for the first baked product, and the third baking sampling result, the second baking sampling result and the first baking sampling result are obtained after the sampling inspection. Among them, the first baking sampling result includes the whole chicken doneness index.

[0069] like Figure 2 As shown, when the target production volume is greater than the second production volume and less than or equal to the third production volume, it indicates that the production volume of the five-fingered ginseng chicken is at a relatively high level. At this time, quality inspection can be carried out on all baking processes to ensure quality inspection of the entire baking process and realize comprehensive quality inspection under mass production conditions.

[0070] Before quality inspection, the third random inspection quantity can be determined according to the third production volume, and the third random inspection quantity can be inspected on the products baked for the third time, the second random inspection quantity can be inspected on the products baked for the second time, and the first random inspection quantity can be inspected on the products baked for the first time. After the random inspection, the random inspection results of the third baking, the second baking and the first baking can be obtained, which comprehensively reflect the baking quality of the three baking processes.

[0071] Exemplarily, since the purpose of the first roasting is to cook the steamed chicken, the first roasting sampling result may include a whole chicken doneness index.

[0072] Illustratively, the third production volume may be 1000 to 3000 pieces.

[0073] The beneficial effect brought about by the above implementation method is that it can judge the baking process that needs quality inspection according to the size of the production volume, realize scientific judgment of the quality inspection process, and improve the flexibility and efficiency of quality inspection.

[0074] The beneficial effect brought about by the above-mentioned implementation method is that, since different production volumes correspond to different production times, different quality inspection strategies can be determined for different production times. When the production volume is small and the production time is short, the last baking process is quality inspected, and the last baking process can be adjusted in time; when the production volume is at a medium level and the production time is at a medium level, the last two baking processes are quality inspected, the baking process parameters can be adjusted in time, and enough time can be left to improve the baking quality by adjusting the baking process parameters; when the production volume is large and the production time is long, all baking processes can be quality inspected, the baking process parameters can be adjusted comprehensively, and the baking quality can be improved by combining the adjustment of the baking process parameters for a longer period of time.

[0075] In some implementations, the production process adjustment model is used to adjust the production process parameters corresponding to the sampling process according to the sampling results corresponding to the sampling process, including: determining the third baking adjustment parameters according to the third baking sampling results through the production process adjustment model.

[0076] Figure 3 FIG. 1 is a flow chart of determining the third baking adjustment parameters in the embodiment of the present application. Figure 3 As shown, after obtaining the third baking inspection result, the production process adjustment model can be used to determine the third baking adjustment parameters according to the third baking inspection result, and the third baking adjustment parameters are used to adjust the parameters of the third baking process.

[0077] In some implementations, adjusting the production process parameters corresponding to the sampling process according to the sampling results corresponding to the sampling process through the production process adjustment model includes: determining the second baking adjustment parameters according to the third baking sampling results and the second baking sampling results through the production process adjustment model, and determining the third baking adjustment parameters according to the second baking adjustment parameters and the third baking sampling results. Or,

[0078] Figure 4 FIG. 1 is a flow chart of determining the adjustment parameters for the second baking in an embodiment of the present application. Figure 4As shown, after obtaining the second baking inspection results, the production process adjustment model can be used to determine the second baking adjustment parameters according to the third baking inspection results and the second baking inspection results. The second baking adjustment parameters can adjust the parameters of the second baking process.

[0079] After obtaining the second baking adjustment parameters, since the parameters of the second baking process have been adjusted, the third baking adjustment parameters can be determined based on the second baking adjustment parameters and the third baking sampling results, and the third baking adjustment parameters are used to adjust the parameters of the third baking process.

[0080] In some implementations, adjusting the production process parameters corresponding to the sampling process according to the sampling results corresponding to the sampling process through the production process adjustment model includes: determining the first baking adjustment parameters according to the third baking sampling results, the second baking sampling results, and the first baking sampling results through the production process adjustment model, and determining the second baking adjustment parameters according to the first baking adjustment parameters and the second baking sampling results. Determining the third baking adjustment parameters according to the first baking adjustment parameters, the second baking adjustment parameters, and the third baking sampling results.

[0081] Figure 5 FIG. 1 is a flow chart of determining the first baking adjustment parameters in the embodiment of the present application. Figure 5 As shown, after obtaining the first baking inspection result, the model can be adjusted through the production process. According to the third baking inspection result, the second baking inspection result and the first baking inspection result, the first baking adjustment parameters can be determined to adjust the parameters of the first baking process and ensure the stability of the baking quality.

[0082] After obtaining the first baking adjustment parameters, since the first baking adjustment parameters have been adjusted to obtain the first baking adjustment parameters, the second baking adjustment parameters can be determined based on the first baking adjustment parameters and the second baking sampling results to achieve adjustment of the parameters of the second baking process and ensure the stability of the baking quality.

[0083] After obtaining the first baking adjustment parameters and the second baking adjustment parameters, since the first baking adjustment parameters and the second baking adjustment parameters have been adjusted, the third baking adjustment parameters can be determined based on the first baking adjustment parameters, the second baking adjustment parameters and the third baking random inspection results.

[0084] Exemplarily, the first toasting adjustment parameter, the second toasting adjustment parameter and the third toasting adjustment parameter include a toasting time and a toasting temperature, respectively.

[0085] The beneficial effect brought about by the above-mentioned implementation method is that when the production volume is at a medium level, the second baking adjustment parameters can be determined based on the third baking inspection results and the second baking inspection results, and the second baking adjustment parameters can adjust the parameters of the second baking process.

[0086] The beneficial effect brought about by the above implementation method is that after obtaining the changed second baking adjustment parameters, the third baking adjustment parameters can be determined by combining the second baking adjustment parameters and the third baking sampling results.

[0087] The beneficial effect brought about by the above-mentioned implementation method is that, when the production volume is large, the adjustment parameters of the first baking process can be determined based on the third baking inspection results, the second baking inspection results and the first baking inspection results, so as to adjust the parameters of the first baking process and ensure the stability of the baking quality.

[0088] The beneficial effect brought about by the above-mentioned implementation method is that after obtaining the changed first baking adjustment parameters and second baking adjustment parameters, the third baking adjustment parameters are determined by combining the first baking adjustment parameters, the second baking adjustment parameters and the third baking random inspection results, thereby realizing the full-process adjustment of parameter control of the baking process and improving the scientific nature of the baking process adjustment.

[0089] In some implementations, the above-mentioned method of adjusting the model through the production process to determine the first baking adjustment parameters according to the third baking inspection result, the second baking inspection result and the first baking inspection result includes: adjusting the model through the production process to determine the first baking adjustment parameters and the adjusted weight of the whole chicken according to the third baking inspection result, the second baking inspection result and the first baking inspection result.

[0090] When adjusting the production process, the production process adjustment model can be used to determine the first baking adjustment parameters and the adjusted weight of the whole chicken according to the third baking inspection results, the second baking inspection results, and the first baking inspection results. The weight of the whole chicken can be adjusted according to the inspection results of the baking process combined with the third baking inspection results, the second baking inspection results, and the first baking inspection results, thereby ensuring the quality of baking from the source and ensuring the stability of the baking effect from the source.

[0091] The beneficial effect brought about by the above-mentioned implementation method is that after obtaining the third baking inspection results, the second baking inspection results and the first baking inspection results, when adjusting the parameters of the first baking, the weight of the whole chicken can be adjusted at the same time, thereby ensuring the stability of the baking effect from the source.

[0092] In some implementations, the above method also includes: when the third baking inspection result meets the preset third inspection condition, determining the second inspection quantity according to the third baking inspection result, and inspecting the second inspection quantity of the products baked for the second time, and obtaining the second baking inspection result after the inspection.

[0093] After the random inspection, when the third baking random inspection result meets the preset third random inspection condition, it can be indicated that the third baking random inspection result needs to be further inspected under the preset third random inspection condition to improve the random inspection effect.

[0094] During the random inspection, the second random inspection quantity can be determined according to the third baking random inspection result, and the second random inspection quantity can be inspected on the second baking products, and the second baking random inspection result can be obtained after the random inspection.

[0095] Exemplarily, the preset third sampling inspection condition may be that a first ratio of a first indicator in the third baking sampling inspection result to a first indicator of the preset third sampling inspection condition exceeds a preset ratio.

[0096] Exemplarily, when the third baking inspection result meets the preset third inspection condition, when determining the second inspection quantity based on the third baking inspection result, the first ratio of the first indicator in the third baking inspection result and the first indicator of the preset third inspection condition can be determined, and finally the first ratio and the second inspection quantity can be multiplied to obtain the second inspection quantity.

[0097] Exemplarily, the first indicator may be a skin hardness index, a skin color index after the third roasting, or a whole chicken weight loss index after the third roasting.

[0098] After obtaining the second baking inspection results and the third baking inspection results, the second baking adjustment parameters can be determined according to the above method, and the second baking adjustment parameters can adjust the parameters of the second baking process.

[0099] The beneficial effect brought about by the above-mentioned implementation method is that it is possible to judge the sampling results and actively determine whether it is necessary to conduct a sampling inspection on the previous baking process, thereby improving the flexibility in adjusting the baking parameters.

[0100] In some implementations, the above method also includes: when the second baking inspection result meets the preset second inspection condition, determining the first inspection quantity according to the second baking inspection result, and performing the first inspection quantity on the first baking products, and obtaining the first baking inspection result after the inspection.

[0101] Similarly, the second baking inspection result can be judged according to the preset second inspection condition, and then it can be judged whether it is necessary to inspect the previous baking process, which improves the flexibility of adjusting the baking parameters.

[0102] In some implementations, the above method further includes S310 to S320, and S310 to S320 are described in detail below.

[0103] S310, obtaining the increase in production volume in the next production cycle.

[0104] When scheduling the quality inspection process, the production process of the five-fingered ginseng chicken can also be scheduled in advance according to the change in production volume to improve the quality inspection effect of the five-fingered ginseng chicken in the next cycle.

[0105] Exemplarily, the time interval between the next production cycle and the current production cycle may be less than 12 hours or 24 hours, so as to ensure the reliability of the sampling inspection results when the production conditions vary slightly.

[0106] S320. When the increase in production volume is greater than the preset increase in production volume, adjust the target production volume in the current production cycle according to the increase in production volume, determine the sampling process and the sampling quantity corresponding to the sampling process for the target batch of five-fingered ginseng chicken according to the adjusted target production volume, and obtain the sampling results corresponding to the sampling process after the sampling inspection.

[0107] After obtaining the increase in production volume, when the increase in production volume is greater than the preset increase in production volume, it means that the production volume in the next cycle will increase by a larger amount. At this time, the target production volume in the current production cycle can be adjusted according to the increase in production volume, and then the sampling process corresponding to the target batch of five-fingered peach chicken and the number of samplings corresponding to the sampling process are determined according to the adjusted target production volume, so as to adjust the sampling plan, and obtain the sampling results corresponding to the sampling process after the sampling, so as to adjust the production process of the five-fingered peach chicken in the next production cycle during the production process of the current target batch of five-fingered peach chicken.

[0108] Exemplarily, the preset production volume increase may be 20% to 30%.

[0109] Exemplarily, when adjusting the target production volume in the current production cycle according to the production volume increase range, the production volume increase range and the target production volume in the current production cycle may be multiplied to obtain the adjusted target production volume.

[0110] The beneficial effect brought about by the above-mentioned implementation method is that when the production volume in the next cycle will increase significantly, the target production volume in the current production cycle is adjusted according to the increase in production volume, and then the sampling plan is adjusted, thereby realizing the adjustment of the sampling plan for the five-fingered ginseng chicken and improving the stability of the production quality of the five-fingered ginseng chicken.

[0111] In some implementations, the above method further includes S410 to S420, and S410 to S420 are described in detail below.

[0112] S410. When the third baking inspection result meets the preset third inspection condition, the second baking inspection result meets the preset second inspection condition, and the increase in production volume is greater than the preset increase in production volume, the second inspection quantity is determined according to the third baking inspection result, and the first inspection quantity is determined according to the second baking inspection result, and the second inspection quantity and the first inspection quantity are adjusted according to the increase in production volume to obtain the second adjusted inspection quantity and the first adjusted inspection quantity.

[0113] When formulating the sampling plan, when the results of the third baking sampling meet the preset third sampling conditions and the results of the second baking sampling meet the preset second sampling conditions, the second sampling quantity is determined according to the results of the third baking sampling. After the first sampling quantity is determined according to the results of the second baking sampling, when the increase in production volume is greater than the preset increase in production volume, the second sampling quantity and the first sampling quantity can be further adjusted in combination with the increase in production volume, so as to realize early adjustment of the second sampling quantity and the first sampling quantity to adapt to changes in production volume.

[0114] When formulating the sampling plan, the second sampling quantity and the first sampling quantity can be adjusted according to the increase in production volume to obtain the second adjusted sampling quantity and the first adjusted sampling quantity.

[0115] S420, performing a second sampling inspection on the products baked for the second time, and obtaining the second sampling inspection result after the sampling inspection; performing a first sampling inspection on the products baked for the first time, and obtaining the first sampling inspection result after the sampling inspection.

[0116] During random inspection, a second random inspection quantity can be inspected for the products baked for the second time, and the second baking random inspection results can be obtained after random inspection. A first random inspection quantity can be inspected for the products baked for the first time, and the first baking random inspection results can be obtained after random inspection. The baking process parameters can be adjusted based on the second baking random inspection results and the first baking random inspection results.

[0117] The beneficial effect brought about by the above-mentioned implementation method is that when the baking sampling inspection results meet the preset sampling inspection conditions, when the previous process is sampled, the sampling quantity can be adjusted in combination with the production volume in the next production cycle to ensure the stability of production quality and the scientific nature of the sampling inspection plan.

[0118] An embodiment of the present application also provides a factory production scheduling system for five-fingered ginseng chicken, and the factory production scheduling system for five-fingered ginseng chicken includes a unit for executing any of the methods described above.

[0119] Figure 6 A logical structure diagram of a factory production scheduling system for five-fingered ginseng chicken provided in one embodiment of the present application is shown in FIG. Figure 6 As shown, the system 1 of this embodiment includes a processing unit 11, a storage unit 12 and a transceiver unit 13. The processing unit 11 is used to process data, the storage unit 12 is used to store data, and the transceiver unit 13 is used to send and receive data. The processing unit 11, the storage unit 12 and the transceiver unit 13 cooperate with each other to implement the above method. The beneficial effects brought by the embodiment of the present application have been described in the above method and will not be repeated here.

[0120] An embodiment of the present application also provides a factory production scheduling system for five-fingered ginseng chicken, including a memory, a processor, and a computer program stored in the memory and executable on the processor, and the processor implements the method described above when executing the computer program.

[0121] Figure 7 A schematic diagram of the physical structure of a factory production scheduling system for five-fingered ginseng chicken provided in one embodiment of the present application is shown in FIG. Figure 7 As shown, the system 2 of this embodiment includes: at least one processor 20 ( Figure 7 Only one processor 20 is shown in the figure), a memory 21, and a computer program 22 stored in the memory 21 and executable on the at least one processor 20. When the processor 20 executes the computer program 22, the steps in any of the above-mentioned method embodiments are implemented. The beneficial effects brought about by the embodiments of the present application have been described in the above-mentioned methods and will not be repeated here.

[0122] It should be noted that the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.

[0123] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.

[0124] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the above-mentioned method embodiments can be implemented.

[0125] An embodiment of the present application provides a computer program product. When the computer program product runs on a mobile terminal, the mobile terminal can implement the steps in the above-mentioned method embodiments when executing the computer program product.

[0126] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium can at least include: any entity or device that can carry the computer program code to the camera / terminal device, recording medium, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, RandomAccess Memory), electric carrier signal, telecommunication signal and software distribution medium. For example, a USB flash drive, a mobile hard disk, a magnetic disk or an optical disk. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electric carrier signals and telecommunication signals.

[0127] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0128] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0129] In the embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0130] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0131] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A factory production scheduling method for five-fingered ginseng chicken, characterized in that: The method comprises: Obtaining the target production volume of a target batch of five-fingered ginseng chicken; According to the target production volume, the sampling process and the sampling quantity corresponding to the sampling process of the target batch of five-fingered ginseng chicken are determined, and the sampling results corresponding to the sampling process are obtained after the sampling; Through the production process adjustment model, the production process parameters corresponding to the sampling process are adjusted according to the sampling results corresponding to the sampling process.

2. The method according to claim 1, characterized in that The production process of five-fingered peach chicken includes: The fresh chicken is first soaked in the concentrated soup for a first soaking time, then roasted for a first roasting time and cooled; Perform a second soaking in the concentrated soup for a second soaking time, and then perform a second roasting for a second roasting time and cool; Perform a third soaking in the concentrated soup for the third soaking time, and then perform a third roasting for the third roasting time and cool; According to the target production volume, determine the sampling process and sampling quantity corresponding to the sampling process of the target batch of five-fingered hairy peach chicken, and obtain the sampling results corresponding to the sampling process after sampling, including: When the target production volume is less than the first production volume, the third sampling quantity is determined according to the first production volume, and the third sampling quantity is sampled on the third baked product, and the third baking sampling result is obtained after the sampling; wherein the third baking sampling result includes the skin hardness index, the third baking skin color index and the third baking whole chicken weight loss index; When the target production volume is greater than the first production volume and less than or equal to the second production volume, the second sampling quantity is determined according to the second production volume, and the third sampling quantity is sampled for the products baked for the third time, and the second sampling quantity is sampled for the products baked for the second time, and the sampling results of the third baking and the sampling results of the second baking are obtained after the sampling; wherein the sampling results of the second baking include the second baking skin color index and the second baking whole chicken weight loss index; When the target production volume is greater than the second production volume and less than or equal to the third production volume, the third sampling quantity is determined according to the third production volume, the third sampling quantity is sampled on the products baked for the third time, the second sampling quantity is sampled on the products baked for the second time, and the first sampling quantity is sampled on the products baked for the first time, and after the sampling, the sampling results of the third baking, the second baking and the first baking are obtained; among which, the sampling result of the first baking includes the doneness index of the whole chicken.

3. The method according to claim 2, characterized in that Through the production process adjustment model, according to the sampling results corresponding to the sampling process, the production process parameters corresponding to the sampling process are adjusted, including: Through the production process adjustment model, according to the third baking sampling results, determine the third baking adjustment parameters; or, By adjusting the production process model, according to the sampling results of the third baking and the sampling results of the second baking, the adjustment parameters of the second baking are determined, and according to the adjustment parameters of the second baking and the sampling results of the third baking, the adjustment parameters of the third baking are determined; or, Through the production process adjustment model, the first baking adjustment parameters are determined according to the third baking inspection results, the second baking inspection results and the first baking inspection results, and the second baking adjustment parameters are determined according to the first baking adjustment parameters and the second baking inspection results; the third baking adjustment parameters are determined according to the first baking adjustment parameters, the second baking adjustment parameters and the third baking inspection results; among which, the first baking adjustment parameters, the second baking adjustment parameters and the third baking adjustment parameters include baking time and baking temperature respectively.

4. The method according to claim 3, characterized in that Through the production process adjustment model, according to the third baking sampling inspection results, the second baking sampling inspection results and the first baking sampling inspection results, the first baking adjustment parameters are determined, including: Through the production process adjustment model, the adjustment parameters for the first baking and the adjusted weight of the whole chicken are determined according to the third baking inspection results, the second baking inspection results and the first baking inspection results.

5. The method according to claim 4, characterized in that The method further comprises: When the third baking inspection result meets the preset third inspection condition, the second inspection quantity is determined according to the third baking inspection result, and the second inspection quantity is inspected on the second baking products, and the second baking inspection result is obtained after the inspection.

6. The method according to claim 5, characterized in that The method further comprises: When the second baking inspection result meets the preset second inspection condition, the first inspection quantity is determined according to the second baking inspection result, and the first inspection quantity is inspected on the first baking products, and the first baking inspection result is obtained after the inspection.

7. A factory production scheduling system for five-fingered ginseng chicken, characterized in that: Comprising means for performing the method according to any one of claims 1 to 6.

8. A factory production scheduling system for five-fingered ginseng chicken, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method according to any one of claims 1 to 6 is implemented.

9. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 6 is implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.

Citation Information

Patent Citations

  • Production quality management and control method and system for intelligent electricity utilization acquisition terminal

    CN115685946A

  • Method and system for optimizing production process of plastic product

    CN115965166A