Black start method and device of power generation system and black start controller
By putting the load into the first target voltage after the energy storage converter of the offshore wind power generation system reaches the first target voltage, and boosting it to the second target voltage after the load is put into operation, the impact current problem caused by excessive load power peak during black start is solved. Increased the success rate of black startup.
Patent Information
- Application Number
- CN202411461815.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-18
- Publication Date
- 2024-12-06
AI Technical Summary
When the offshore wind power generation system is started in black, due to the large load power peak, the energy storage converter generates a large impact current, which cannot be successfully invested, resulting in the failure of the black startup.
After the energy storage converter reaches the first target voltage, an input load command is generated, and after the load is put into operation, the command to boost the second target voltage is sent to the energy storage converter to make the AC side of all energy storage converters The voltages are all boosted to the second target voltage, avoiding the total apparent power exceeding the total apparent power of the energy storage converter.
This increases the probability of black start-up, avoids the impact current of the energy storage converter at the moment of starting, and ensures successful load input.
Smart Images

Figure CN119093481A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of offshore wind power grid connection, and in particular to a black start method, device and black start controller for a power generation system. Background Art
[0002] With the rapid development of renewable energy, offshore wind power generation has gradually become an important source of electricity. However, offshore wind power generation systems face many challenges during black start (i.e., restoring power after a large-scale power outage).
[0003] In the related technology, the debugging level of each wind turbine in the wind farm can be obtained by responding to the wind turbine debugging command, the corresponding debugging strategy can be determined, and then the startup strategy of the black start system can be obtained, and the wind turbine can be debugged according to the startup strategy; it is also possible to obtain the generator speed set value according to the relationship between the speed of the resonant generator and the target speed during the generator speed increase process to meet the safe start-up of the propellers on the basis of the black start control requirements.
[0004] However, in the related art, when the black start system is started, some of the loads have a large peak power, which exceeds the total power of all energy storage inverters. As a result, the energy storage inverter will have a large impact current at the moment of startup, making it impossible to successfully put the load into operation, thus causing the black start failure, which urgently needs to be improved. Summary of the invention
[0005] The present application provides a black start method, device and black start controller for a power generation system to solve the problem in the related art that when a black start system is started, due to the large power peak of some loads, the energy storage inverter will generate a large impact current at the moment of starting, making it impossible to successfully put the load into operation, thereby causing the black start failure.
[0006] A first aspect of the present application provides a black start method for a power generation system, wherein the power generation system may include but is not limited to multiple energy storage inverters and a black start controller, wherein the method is applied to the black start controller, and includes the following steps: sending an instruction to boost the voltage to a first target voltage to some or all of the multiple energy storage inverters; detecting whether the some or all of the energy storage inverters respond to the instruction to boost the voltage to the first target voltage, so that the AC side voltage of the some or all of the energy storage inverters reaches the first target voltage; generating a load input instruction when it is detected that the instruction to boost the voltage to the first target voltage has been responded to, and after the power generation system responds to the load input instruction, sending an instruction to boost the voltage to a second target voltage to all of the multiple energy storage inverters, so that the AC side voltages of all the energy storage inverters are boosted to the second target voltage, wherein the second target voltage is greater than the first target voltage.
[0007] Optionally, in one embodiment of the present application, before detecting whether some or all of the energy storage inverters respond to the instruction to boost the voltage to the first target voltage, it also includes: receiving a first black start signal from all the energy storage inverters; in response to the first black start signal, sending a second black start signal to all the energy storage inverters to receive a feedback signal generated by all the energy storage inverters based on the second black start signal.
[0008] Optionally, in one embodiment of the present application, before generating the load input instruction, it also includes: judging whether the AC side voltage of some or all of the energy storage inverters reaches the first target voltage; if the first target voltage is reached, receiving the fourth black start signal sent by all the energy storage inverters to send the load input instruction.
[0009] Optionally, in one embodiment of the present application, the instruction to boost the voltage to the second target voltage is sent to all the multiple energy storage inverters, including: detecting whether the total apparent power of all the energy storage inverters is greater than a first preset power; when it is detected that the total apparent power is greater than the preset power, waiting to detect that the total apparent power is less than a second preset power to send the instruction to boost the voltage to the second target voltage, wherein the first preset power is greater than the second preset power.
[0010] The second aspect of the present application provides a black start device for a power generation system, including: a sending module, used to send an instruction to boost the voltage to a first target voltage to some or all of a plurality of energy storage converters; a detection module, used to detect whether the some or all of the energy storage converters respond to the instruction to boost the voltage to the first target voltage, so that the AC side voltage of the some or all of the energy storage converters reaches the first target voltage; a starting module, used to generate a load input instruction when it detects that the instruction to boost the voltage to the first target voltage has been responded to, and after the power generation system responds to the load input instruction, the module sends an instruction to boost the voltage to a second target voltage to all of the energy storage converters among the plurality of energy storage converters, so that the AC side voltages of all the energy storage converters are boosted to the second target voltage, wherein the second target voltage is greater than the first target voltage.
[0011] Optionally, in one embodiment of the present application, it also includes: a first receiving module, used to receive a first black start signal of all the energy storage inverters before detecting whether some or all of the energy storage inverters respond to the instruction to boost to the first target voltage; a second receiving module, used to send a second black start signal to all the energy storage inverters in response to the first black start signal, so as to receive a feedback signal generated by all the energy storage inverters based on the second black start signal.
[0012] Optionally, in one embodiment of the present application, it also includes: a judgment module, used to judge whether the AC side voltage of some or all of the energy storage inverters reaches the first target voltage before generating the load input instruction; a sending module, used to receive the fourth black start signal sent by all the energy storage inverters when the first target voltage is reached, so as to send the load input instruction.
[0013] Optionally, in one embodiment of the present application, the starting module includes: a detection unit, used to detect whether the total apparent power of all the energy storage inverters is greater than a first preset power; a sending unit, used to wait for detection that the total apparent power is less than a second preset power when it is detected that the total apparent power is greater than the preset power, so as to send the instruction to boost the voltage to the second target voltage, wherein the first preset power is greater than the second preset power.
[0014] A third aspect of the present application provides a black start controller, which includes the black start device of the power generation system described in the above embodiment.
[0015] A fourth aspect of the present application provides a power generation system, which includes the multiple energy storage converters and the black start controller described in the above embodiments.
[0016] The fifth aspect of the present application provides an electronic device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the black start method of the power generation system as described in the above embodiment.
[0017] A sixth aspect of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, which, when executed by a processor, implements the black start method of the power generation system as described above.
[0018] The seventh aspect of the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the black start method of the power generation system as described above.
[0019] The embodiment of the present application can generate a load-input instruction when the energy storage converter participating in the black start reaches the first target voltage, and after the load is put into operation, send an instruction to the energy storage converter to boost the voltage to the second target voltage, so that the AC side voltage of all energy storage converters is boosted to the second target voltage. Since the embodiment of the present application can avoid the situation where the total apparent power of the power generation system exceeds the total apparent power of all energy storage converters when the energy storage converter reaches the first target voltage and puts into operation, even if there is a large impact current on the load, the probability of a successful black start is increased. Thus, the problem in the related art that when the black start system is started, due to the large peak power of some loads, the energy storage converter generates a large impact current at the moment of starting, making it impossible to successfully put the load into operation, thereby causing the black start to fail.
[0020] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:
[0022] Figure 1 A schematic diagram of the structure of a power generation system provided according to an embodiment of the present application;
[0023] Figure 2 A flowchart of a black start method for a power generation system provided according to an embodiment of the present application;
[0024] Figure 3 A block diagram of voltage changes of a step-down energy storage converter of a power generation system provided according to an embodiment of the present application;
[0025] Figure 4 A flowchart of the working principle of a black start method for a power generation system provided according to an embodiment of the present application;
[0026] Figure 5 A block diagram of a black start device of a power generation system provided according to an embodiment of the present application;
[0027] Figure 6 It is a schematic diagram of the structure of an electronic device provided according to an embodiment of the present application. DETAILED DESCRIPTION
[0028] Embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.
[0029] The following describes the black start method, device and black start controller of the power generation system of the embodiment of the present application with reference to the accompanying drawings. In view of the problem that when the black start system mentioned in the above background technology is started, due to the large peak power of some loads, the energy storage converter will generate a large impact current at the moment of starting, so that the load cannot be successfully put into use, thereby causing the black start failure, the present application provides a black start method for a power generation system, in which a load input instruction can be generated when the energy storage converter participating in the black start reaches the first target voltage, and after the load is put into use, an instruction to boost the voltage to the second target voltage is sent to the energy storage converter, so that the AC side voltage of all energy storage converters is boosted to the second target voltage. Since the embodiment of the present application is when the energy storage converter reaches the first target voltage and puts into the load, even if there is a large impact current in the load, the total apparent power of the power generation system can be avoided to exceed the total apparent power of all energy storage converters, thereby increasing the probability of a successful black start. Therefore, the problem that when the black start system is started, due to the large peak power of some loads, the energy storage converter will generate a large impact current at the moment of starting, so that the load cannot be successfully put into use, thereby causing the black start failure, etc., is solved in the related art.
[0030] Before explaining the black start method of the power generation system provided in the embodiment of the present application, an example of the power generation system involved in the embodiment of the present application is first described.
[0031] Specifically, Figure 1 The figure is a schematic diagram of the structure of a power generation system provided according to one embodiment of the present application.
[0032] Among them, 100 is a system controller, 200 is a black start controller, 301 is a first energy storage converter, 302 is a second energy storage converter, 30n is an nth energy storage converter, and 400 is a load.
[0033] Specifically, the power generation system provided in the embodiment of the present application may include, but is not limited to: a system controller 100 , a black start controller 200 , a first energy storage converter 301 , a second energy storage converter 302 , an nth energy storage converter 30n , and a load 400 .
[0034] Among them, the power generation system can be understood as a new energy system, which can include but is not limited to a photovoltaic system, an energy storage system or a wind power system, etc., which can be specifically set by those skilled in the art according to actual conditions, and this application does not impose specific restrictions. In addition, the energy management system of the power generation system will set an off-grid mode for black start, that is, the energy management system is in an off-grid mode during black start in the embodiment of the present application, that is, it is started without electricity. In addition, the inverter voltage and frequency value of the energy storage inverter are set to the system controller 100.
[0035] The system controller 100 can synchronously send instructions to each energy storage converter. The system controller 100 can also set the minimum number of energy storage converters for black start, that is, some energy storage converters in the power generation system can perform black start, while others do not, or all energy storage converters can perform black start, which is not specifically limited in this application.
[0036] The black start controller 200 can control each energy storage converter, such as the first energy storage converter 301 , the second energy storage converter and / or the nth energy storage converter 30n .
[0037] Furthermore, when the embodiment of the present application includes both a system controller 100 and a black start controller 200, the system controller 100 can issue various instructions to each energy storage inverter, and the black start controller 200 can also issue instructions to each energy storage inverter. The specific settings can be made by technicians in this field according to actual conditions, and this application does not impose any specific restrictions.
[0038] For ease of understanding, the embodiment of the present application will be described by taking the black start controller 200 issuing various instructions to each energy storage converter as an example.
[0039] The AC sides of all energy storage converters, such as the first energy storage converter 301 , the second energy storage converter and the nth energy storage converter 30 n , are connected in parallel to connect the load 400 .
[0040] It should be understood that, with respect to the energy storage converter, any device powered by the energy storage converter can be regarded as the load 400 .
[0041] In the related art, each energy storage converter can output according to the second target voltage. When the load 400 is turned on, there will be a large impact current, causing the total power to exceed the rated current of each energy storage converter, thereby causing a black start failure.
[0042] In the embodiment of the present application, during a black start, the black start controller 200 can control each energy storage converter to first climb to the first target voltage, and then put the load 400 into operation. After the load 400 is put into operation, each energy storage converter is boosted from the first target voltage to the second target voltage. Therefore, when there is a large current in the load 400 of the embodiment of the present application, the total apparent power will not exceed the total apparent power of all energy storage converters, so it will not generate a large impact current on the energy storage converter, thereby promoting a successful black start. Among them, the first target voltage and the second target voltage can be set by a technician in this field according to actual conditions. Generally speaking, the second target voltage can be set to the rated voltage of the energy storage converter, and this application does not make specific restrictions. In addition, it is worth noting that the first target voltage of the embodiment of the present application is less than the second target voltage.
[0043] In addition, during black start, the embodiment of the present application can be divided into a host energy storage converter and a slave energy storage converter. Only when the host energy storage converter and the slave energy storage converter both rise to the first target voltage, the embodiment of the present application will control the load 400 to be put into operation.
[0044] Specifically, Figure 2 The present invention is a flowchart of a black start method for a power generation system provided according to an embodiment of the present application.
[0045] like Figure 2 As shown, the black start method of the power generation system, the power generation system may include but is not limited to multiple energy storage converters and a black start controller, wherein the method is applied to the black start controller, and the method includes the following steps:
[0046] In step S201 , an instruction to boost the voltage to a first target voltage is sent to some or all of the multiple energy storage converters.
[0047] It can be understood that the instructions may include but are not limited to: instructions to increase to the first target voltage, instructions to increase to the second target voltage, instructions to decrease to the first target voltage, instructions to add load, which can be specifically set by technicians in this field according to actual conditions, and this application does not impose specific limitations.
[0048] In addition, the first target voltage and the second target voltage can be set by those skilled in the art according to actual conditions, and this application does not impose any specific restrictions. In general, the first target voltage is smaller than the second target voltage.
[0049] From the above analysis, it can be seen that in the embodiment of the present application, the AC sides of all energy storage converters are connected in parallel to connect the load and during a black start, a black start controller can be used to control some energy storage converters to perform a black start while others do not perform a black start. Alternatively, all energy storage converters can perform a black start, and this application does not impose any specific restrictions.
[0050] In some embodiments, some energy storage converters participate in a black start. In the embodiments of the present application, a black start controller may send instructions to some energy storage converters to boost the voltage to a first target voltage.
[0051] In some embodiments, all energy storage converters participate in the black start. In the embodiments of the present application, a black start controller may send an instruction to boost the voltage to the first target voltage to all energy storage converters.
[0052] In step S202, it is detected whether some or all of the energy storage converters respond to the instruction to boost the voltage to the first target voltage, so that the AC side voltage of some or all of the energy storage converters reaches the first target voltage.
[0053] In some embodiments, when the embodiments of the present application detect that some energy storage converters have responded to an instruction to boost the voltage to the first target voltage, the responding part of the energy storage AC converters may be boosted so that their AC voltage reaches the first target voltage.
[0054] In some embodiments, when it is detected that all energy storage converters have responded to the instruction to boost the voltage to the first target voltage, the embodiments of the present application can boost the voltage of all energy storage converters so that their AC measured voltage reaches the first target voltage.
[0055] Optionally, in one embodiment of the present application, before detecting whether some or all energy storage inverters respond to the instruction to boost to the first target voltage, it also includes: receiving a first black start signal from all energy storage inverters; in response to the first black start signal, sending a second black start signal to all energy storage inverters to receive feedback signals generated by all energy storage inverters based on the second black start signal.
[0056] It can be understood that the black start signal is to achieve synchronization between energy storage converters, that is, a synchronous beat signal, and its specific form can be set by technicians in this field according to actual conditions, and this application does not impose specific restrictions.
[0057] In addition, during a black start, the embodiment of the present application can divide the energy storage converter into a master energy storage converter and a slave energy storage converter, and includes one master energy storage converter and at least one slave energy storage converter.
[0058] As a possible implementation method, the embodiment of the present application can receive both the first black start signal fed back by the host energy storage converter and the first black start signal fed back by the slave energy storage converter, and then respond to the received black start signal.
[0059] Furthermore, the embodiment of the present application sends a second black start signal to all slave energy storage converters. When the black start controller receives the second black start signal fed back by all slave energy storage converters, it sends the second black start signal to the host energy storage converter, and waits for receiving the second black start signal fed back by the host energy storage converter. The next step can only be executed after the black start controller of the embodiment of the present application receives the second black start signal fed back by all energy storage converters, otherwise it keeps waiting. That is to say, the embodiment of the present application can first send the second black start signal to the slave energy storage converter, and then send the second black start signal to the host energy storage converter.
[0060] In step S203, when it is detected that an instruction to boost the voltage to the first target voltage has been responded to, a load input instruction is generated, and after the power generation system responds to the load input instruction, an instruction to boost the voltage to the second target voltage is sent to all energy storage inverters among the multiple energy storage inverters, so that the AC side voltages of all energy storage inverters are boosted to the second target voltage, wherein the second target voltage is greater than the first target voltage.
[0061] As a possible implementation method, when the embodiment of the present application detects that the AC side voltage of the energy storage inverter reaches the first target voltage, it sends a load-adding instruction, and after the load is added, it sends a boost instruction to all energy storage inverters to boost the voltage of all energy storage inverters from the first target voltage to the second target voltage.
[0062] For example, the voltage change diagram of the step-down energy storage converter of the power generation system of the embodiment of the present application can be as follows: Figure 3 As shown, Figure 3 The horizontal axis represents time; the vertical axis represents the voltage of each energy storage converter; the line segment AB represents that the voltage of the energy storage converter gradually rises, that is, it rises from 0 to the first target voltage V1; the line segment BC represents the voltage plateau period, that is, the first target voltage V1 is kept unchanged, and the load is put into the BC segment. After the load is put into, the voltage of the energy storage converter continues to rise, that is, the line segment CD represents that the voltage of the energy storage converter rises, and when it reaches point D, the voltage of the energy storage converter rises to the second target voltage U0.
[0063] In the related art, during black start, the voltage of the energy storage converter is not put into load until it rises to the second target voltage U0, which causes excessive power, exceeding the maximum tolerance range of the energy storage converter, and thus causes black start failure.
[0064] In the embodiment of the present application, during black start, the energy storage converter can be controlled to boost to a first target voltage lower than the second target voltage, and the energy storage converter maintains the first target voltage and does not change, and then loads are put into operation. After the loads are put into operation, the energy storage converter is controlled to boost from the first target voltage to the second target voltage. Since the first target voltage is lower than the second target voltage, when the load is put into operation at the first target voltage stage of the energy storage converter, even if there is a large impact current in the load, the total apparent power of the power generation system will not be very large and will not exceed the total apparent power of all energy storage converters. Therefore, a large impact current will not be generated on the energy storage converter, and the black start can be successful.
[0065] In addition, in order to prevent the energy storage inverter from being subjected to a large impact current, the embodiment of the present application controls the energy storage inverter to boost from the first target voltage to the second target voltage only when the total apparent power of the power generation system is less than the second certain power. When the total apparent power of all energy storage inverters is greater than the first certain power, the total apparent power is waited for to decrease. Since the impact current generated when the load is put into operation will gradually decrease, the total apparent power will gradually decrease accordingly.
[0066] Furthermore, the embodiment of the present application sends an instruction to boost the voltage to the second target voltage to all energy storage converters in the multiple energy storage converters, which can be specifically understood as:
[0067] When the embodiment of the present application detects that the total apparent power of all energy storage converters is greater than the first certain power, the black start controller will be controlled to wait for the total apparent power of all energy storage converters to be detected to be less than the second certain power, and a boost instruction will be sent to all energy storage converters. Further, in order to ensure the success of the black start and to protect the energy storage converter from the impact of a large current, the embodiment of the present application does not immediately control the energy storage converter to boost to the second target voltage after the load is put into operation, but detects the total apparent power in the power generation system. For example, when the load is just put into operation, the total apparent power of all energy storage converters may be relatively large. For example, the total apparent power of all energy storage converters may be greater than 75% of the rated apparent power, and then a delay is performed until the total apparent power of all energy storage converters is less than the second certain power, and a boost instruction is sent to all energy storage converters. The energy storage converter is then boosted from the first target voltage to the second target voltage. Among them, for example, the second certain power can be set to 25% Pn, which can be set by a technician in this field according to actual conditions, and this application does not make specific restrictions.
[0068] Optionally, in one embodiment of the present application, before generating a load-initiating instruction, it also includes: determining whether the AC side voltage of some or all energy storage inverters reaches a first target voltage; if the first target voltage is reached, receiving a fourth black start signal sent by all energy storage inverters to send a load-initiating instruction.
[0069] In some embodiments, the embodiments of the present application will send a load-adding instruction only when the AC measured voltage of some energy storage converters reaches a first target voltage.
[0070] For example, the black start controller of the embodiment of the present application will receive the fourth black start signal sent by all partial energy storage converters only when the AC measured voltage of the partial energy storage converter reaches the first target voltage and the partial energy storage converter maintains the first target voltage unchanged, and then send a load-initiating instruction to the system controller. The black start controller waits for the system controller to put in load, and the system controller detects that the state of the black start controller is the waiting state for putting in load, and the system controller puts in load.
[0071] In some embodiments, the embodiment of the present application will send a load-initiating instruction only when the AC measured voltage of all energy storage AC devices reaches a first target voltage.
[0072] For example, the black start controller of the embodiment of the present application will receive the fourth black start signal sent by all energy storage converters only when the AC measured voltage of all energy storage converters reaches the first target voltage and all energy storage converters maintain the first target voltage unchanged, and then send a load-initiating instruction to the system controller. The black start controller waits for the system controller to initiate the load, and the system controller detects that the state of the black start controller is the waiting state for the load to be initiated, and the system controller initiates the load.
[0073] Optionally, in one embodiment of the present application, an instruction to boost the voltage to a second target voltage is sent to all energy storage converters among a plurality of energy storage converters, including: detecting whether the total apparent power of all energy storage converters is greater than a first preset power; when it is detected that the total apparent power is greater than the preset power, waiting to detect that the total apparent power is less than a second preset power to send an instruction to boost the voltage to the second target voltage, wherein the first preset power is greater than the second preset power.
[0074] As a possible implementation method, in the embodiment of the present application, when it is detected that the total apparent power of all energy storage inverters is greater than a first certain power, the black start controller waits to detect that the total apparent power of all energy storage inverters is less than a second certain power, and then sends a boost instruction to all energy storage inverters: that is, the voltage of all energy storage inverters is boosted from the first target voltage to the second target voltage.
[0075] The first certain power and the second certain power can be set by those skilled in the art according to actual conditions, and this application does not impose any specific restrictions. In addition, in this embodiment of the application, the first certain power is greater than the second certain power.
[0076] Furthermore, after sending a boost instruction to all energy storage converters participating in the black start, the embodiment of the present application will receive a second black start signal fed back by all energy storage converters participating in the black start, thereby indicating that the black start is successfully completed.
[0077] It should be noted that, in the embodiment of the present application, when each energy storage converter is boosted to the first target voltage, since there will be a large impact current after the load is put into operation, the embodiment of the present application can complete the start-up of the impact load after the impact load decreases and stabilizes. Specifically, the embodiment of the present application detects that the peak value of the load current ends through the black start controller. For example, in one possible implementation method, the embodiment of the present application can send a boost instruction to all energy storage converters after detecting that the total apparent power of all energy storage converters is less than the second certain power, and then control the voltage to continue to increase to the second target voltage of the energy storage converter after the energy storage converter receives the boost signal.
[0078] The working principle of the black start method of the power generation system proposed in the embodiment of the present application is described in detail below with reference to a specific embodiment.
[0079] in, Figure 4 The present invention is a flow chart of the working principle of a black start method for a power generation system provided according to one embodiment of the present application.
[0080] Step S401: Sending an instruction to boost the voltage to a first target voltage to the energy storage converter participating in the black start.
[0081] Step S402: in response to the first black start signal, sending a second black start signal to the energy storage converter, and waiting for receiving the second black start signal fed back by all black start energy storage converters.
[0082] It can be understood that the black start controller of the embodiment of the present application can receive both the first black start signal fed back by the host energy storage converter and the first black start signal fed back by the slave energy storage converter, and send the second black start signal to all slave energy storage converters. When the black start controller receives the second black start signal fed back by all slave energy storage converters, it sends the second black start signal to the host energy storage converter, and waits for the second black start signal fed back by the host energy storage converter. The next step can only be executed after the black start controller of the embodiment of the present application receives the second black start signal fed back by all energy storage converters, otherwise it keeps waiting. That is to say, the embodiment of the present application can first send the second black start signal to the slave energy storage converter, and then send the second black start signal to the host energy storage converter.
[0083] Step S403: When it is detected that the voltage has been responded to the instruction to boost the voltage to the first target voltage, a load-initiating instruction is generated.
[0084] That is to say, when the voltage of all energy storage converters reaches the first target voltage and all energy storage converters maintain the first target voltage unchanged, the embodiment of the present application receives the fourth black start signal sent by all energy storage converters and sends a load-initiating instruction. At this time, the black start controller of the embodiment of the present application waits for the system controller to initiate a load-initiating instruction, and the state of the black start controller is a waiting-for-load-initiating state, and the system controller initiates the load.
[0085] Step S404: when it is detected that the total apparent power is greater than the first certain power, wait for detection that the total apparent power is less than the second certain power, so as to send an instruction to boost the voltage to the second target voltage.
[0086] It can be understood that in the embodiment of the present application, after the load is put into operation, when the black start controller detects that the total apparent power of all energy storage inverters is greater than a first certain power, the black start controller waits to detect that the total apparent power of all energy storage inverters is less than a second certain power, and sends a boost instruction to all energy storage inverters: that is, the voltage of all energy storage inverters is increased from the first target voltage to the second target voltage.
[0087] Furthermore, after sending a boost instruction to all energy storage converters participating in the black start, the black start controller of the embodiment of the present application will receive a second black start signal fed back by all energy storage converters participating in the black start, thereby indicating that the black start is successfully completed.
[0088] According to the black start method of the power generation system proposed in the embodiment of the present application, when the energy storage converter participating in the black start reaches the first target voltage, a load input instruction can be generated, and after the load is input, an instruction to boost the voltage to the second target voltage is sent to the energy storage converter, so that the AC side voltage of all energy storage converters is boosted to the second target voltage. Since the embodiment of the present application can avoid the situation where the total apparent power of the power generation system exceeds the total apparent power of all energy storage converters when the energy storage converter reaches the first target voltage and puts the load in, even if there is a large impact current in the load, the probability of a successful black start is increased. Therefore, the problem in the related art that when the black start system is started, due to the large peak power of some loads, the energy storage converter will generate a large impact current at the moment of starting, making it impossible to successfully put the load in, thereby causing the black start to fail is solved.
[0089] Next, a black start device for a power generation system according to an embodiment of the present application will be described with reference to the accompanying drawings.
[0090] Figure 5 A block diagram of a black start device for a power generation system provided according to an embodiment of the present application.
[0091] like Figure 5As shown, the black start device 50 of the power generation system includes: a sending module 500 , a detection module 600 and a starting module 700 .
[0092] The sending module 500 is used to send an instruction to boost the voltage to the first target voltage to some or all of the multiple energy storage converters.
[0093] The detection module 600 is used to detect whether some or all of the energy storage converters respond to the instruction to boost the voltage to the first target voltage, so that the AC side voltage of some or all of the energy storage converters reaches the first target voltage.
[0094] The startup module 700 is used to generate a load-initiating instruction when it detects that an instruction to boost the voltage to the first target voltage has been responded to, and after the power generation system responds to the load-initiating instruction, send an instruction to boost the voltage to the second target voltage to all energy storage inverters among the multiple energy storage inverters, so that the AC side voltages of all energy storage inverters are boosted to the second target voltage, wherein the second target voltage is greater than the first target voltage.
[0095] Optionally, in one embodiment of the present application, it further includes: a first receiving module and a second receiving module.
[0096] The first receiving module is used to receive the first black start signal of all energy storage converters before detecting whether some or all energy storage converters respond to the instruction of boosting to the first target voltage.
[0097] The second receiving module is used to send a second black start signal to all energy storage converters in response to the first black start signal, so as to receive feedback signals generated by all energy storage converters based on the second black start signal.
[0098] Optionally, in an embodiment of the present application, it also includes: a judgment module and a sending module.
[0099] The judgment module is used to judge whether the AC side voltage of some or all energy storage converters reaches the first target voltage before generating a load input instruction.
[0100] The sending module is used to receive the fourth black start signal sent by all energy storage converters when the first target voltage transformation is achieved, so as to send a load input instruction.
[0101] Optionally, in one embodiment of the present application, the starting module 700 includes: a detection unit and a sending unit.
[0102] Wherein, the detection unit is used to detect whether the total apparent power of all energy storage converters is greater than the first preset power.
[0103] The sending unit is used to wait for the total apparent power to be detected to be less than a second preset power when the total apparent power is detected to be greater than a preset power, so as to send an instruction to boost the voltage to a second target voltage, wherein the first preset power is greater than the second preset power.
[0104] It should be noted that the above explanation of the embodiment of the black start method of the power generation system is also applicable to the black start device of the power generation system of this embodiment, which will not be repeated here.
[0105] According to the black start device of the power generation system proposed in the embodiment of the present application, when the energy storage converter participating in the black start reaches the first target voltage, a load input instruction can be generated, and after the load is input, an instruction to boost the voltage to the second target voltage is sent to the energy storage converter, so that the AC side voltage of all energy storage converters is boosted to the second target voltage. Since the embodiment of the present application can avoid the situation where the total apparent power of the power generation system exceeds the total apparent power of all energy storage converters when the energy storage converter reaches the first target voltage and puts the load in, even if there is a large impact current in the load, the probability of a successful black start is increased. Therefore, the problem in the related art that when the black start system is started, due to the large peak power of some loads, the energy storage converter will generate a large impact current at the moment of starting, making it impossible to successfully put the load in, thereby causing the black start to fail is solved.
[0106] An embodiment of the present application further provides a black start controller, which includes the black start device of the power generation system of the above embodiment.
[0107] An embodiment of the present application also provides a power generation system, which includes multiple energy storage converters and a black start controller according to the above embodiment.
[0108] Figure 6 This is a schematic diagram of the structure of an electronic device provided according to an embodiment of the present application. The electronic device may include:
[0109] A memory 601 , a processor 602 , and a computer program stored in the memory 601 and executable on the processor 602 .
[0110] When the processor 602 executes the program, the black start method of the power generation system provided in the above embodiment is implemented.
[0111] Furthermore, the electronic device further comprises:
[0112] The communication interface 603 is used for communication between the memory 601 and the processor 602 .
[0113] The memory 601 is used to store computer programs that can be executed on the processor 602 .
[0114] The memory 601 may include a high-speed RAM memory, and may also include a non-volatile memory (non-volatile memory), such as at least one disk memory.
[0115] If the memory 601, the processor 602 and the communication interface 603 are implemented independently, the communication interface 603, the memory 601 and the processor 602 can be connected to each other through a bus and communicate with each other. The bus can be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus. The bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 6 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0116] Optionally, in a specific implementation, if the memory 601, the processor 602 and the communication interface 603 are integrated on a chip, the memory 601, the processor 602 and the communication interface 603 can communicate with each other through an internal interface.
[0117] The processor 602 may be a central processing unit (CPU), or an application specific integrated circuit (ASIC), or one or more integrated circuits configured to implement the embodiments of the present application.
[0118] An embodiment of the present application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the black start method of the power generation system as described above.
[0119] An embodiment of the present application also provides a computer program product, including a computer program, which, when executed by a processor, implements the above black start method for a power generation system.
[0120] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or N embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0121] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, "N" means at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0122] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, fragment or portion of code comprising one or N executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.
[0123] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or N wirings (electronic devices), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways as necessary and then storing it in a computer memory.
[0124] It should be understood that the various parts of the present application can be implemented by hardware, software, firmware or a combination thereof. In the above embodiment, the N steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. If implemented by hardware, as in another embodiment, it can be implemented by any one or a combination of multiple of the following technologies known in the art: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0125] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.
[0126] In addition, each functional unit in each embodiment of the present application may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.
[0127] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present application. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present application.
Claims
1. A black start method for a power generation system, characterized in that: The power generation system includes a plurality of energy storage converters and a black start controller, wherein the method is applied to the black start controller and includes the following steps: Sending an instruction to boost the voltage to a first target voltage to some or all of the multiple energy storage converters; Detecting whether some or all of the energy storage converters respond to the instruction to boost the voltage to the first target voltage, so that the AC side voltage of some or all of the energy storage converters reaches the first target voltage; In the case where it is detected that the instruction to boost the voltage to the first target voltage has been responded to, a load input instruction is generated, and after the power generation system responds to the load input instruction, an instruction to boost the voltage to the second target voltage is sent to all the energy storage inverters among the multiple energy storage inverters, so that the AC side voltages of all the energy storage inverters are boosted to the second target voltage, wherein the second target voltage is greater than the first target voltage.
2. The black start method of the power generation system according to claim 1, characterized in that: Before detecting whether some or all of the energy storage converters respond to the instruction to boost the voltage to the first target voltage, the method further includes: Receiving a first black start signal of all the energy storage converters; In response to the first black start signal, a second black start signal is sent to all the energy storage converters to receive feedback signals generated by all the energy storage converters based on the second black start signal.
3. The black start method of the power generation system according to claim 1, characterized in that: Before generating the load instruction, the method further includes: Determining whether the AC side voltage of some or all of the energy storage converters reaches the first target voltage; If the first target voltage transformation is achieved, a fourth black start signal sent by all the energy storage converters is received to send the load input instruction.
4. The black start method of the power generation system according to claim 1, characterized in that: The step of sending an instruction to boost the voltage of all the energy storage converters in the plurality of energy storage converters to a second target voltage comprises: Detecting whether the total apparent power of all the energy storage converters is greater than a first preset power; When it is detected that the total apparent power is greater than the preset power, wait to detect that the total apparent power is less than a second preset power to send the instruction to boost the voltage to the second target voltage, wherein the first preset power is greater than the second preset power.
5. A black start device for a power generation system, characterized in that: include: A sending module, used for sending an instruction to boost the voltage to a first target voltage to some or all of the multiple energy storage converters; A detection module, used to detect whether some or all of the energy storage converters respond to the instruction to boost the voltage to the first target voltage, so that the AC side voltage of some or all of the energy storage converters reaches the first target voltage; A startup module is used to generate a load input instruction when it is detected that the instruction to boost the voltage to the first target voltage has been responded to, and after the power generation system responds to the load input instruction, send an instruction to boost the voltage to a second target voltage to all the energy storage inverters among the multiple energy storage inverters, so that the AC side voltages of all the energy storage inverters are boosted to the second target voltage, wherein the second target voltage is greater than the first target voltage.
6. A black start controller, characterized in that: include: A black start device for a power generation system as claimed in claim 5.
7. A power generation system, characterized in that: include: Multiple energy storage converters; A black start controller as claimed in claim 6.
8. An electronic device, characterized in that: include: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the black start method for a power generation system according to any one of claims 1 to 4.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: The program is executed by a processor to implement the black start method of the power generation system as described in any one of claims 1 to 4.
10. A computer program product, comprising a computer program, characterized in that The program is executed by a processor to implement the black start method of the power generation system as described in any one of claims 1 to 4.
Citation Information
Cited By
A starting control method of a multi-machine parallel energy storage system, an energy storage converter and an energy storage system
CN122763415A