PCTC head side thruster installation device and method

By designing the transportation device and fixing seat, the head side pushing is tilted and installed inclined by using the track and entering the pipe tunnel, the installation problem of the hull structure is solved, and the safe and stable installation of the PCTC head side pushing device is achieved, avoiding the problem of air suction.

CN119142476AInactive Publication Date: 2024-12-17SHANGHAI WAIGAOQIAO SHIP BUILDING CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411563603.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-05
Publication Date
2024-12-17
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When installing PCTC head-side pushing device on a ship, how to install the thruster without destroying the hull structure, especially the installation of the pipe tunnel structure is difficult, and it is necessary to avoid air caused by wind and waves and hull movement Inhalation problem.

Method used

A small car and a fixed seat including a transport device are designed. The head side pushing is tilted on the transport device through the track, and the fixed angle is determined according to the size of the pipe tunnel and the propeller. The transport device drives the head side pushing into the pipe tunnel to ensure output. After the shaft is aligned with the opening of the mounting flange, remove and fix it and perform vertical installation.

Benefits of technology

It realizes the safe and stable installation of the head-side push device without destroying the hull structure, avoids air inhalation caused by wind and waves and hull movement, and simplifies the installation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119142476A_ABST
    Figure CN119142476A_ABST
Patent Text Reader

Abstract

The invention provides a PCTC head side thruster installation device and method.The PCTC head side thruster installation device comprises a transportation device, a first side thruster installation device, a second side thruster installation device, a first side thruster installation device, a first side thruster installation device and a second side thruster installation device, and the head side pusher is obliquely installed on the transportation device, and the transportation device drives the head side pusher to be pushed into the pipe tunnel used for installing the head side pusher. According to the PCTC head side thruster mounting device, head side thruster mounting is achieved on the premise that the hull structure is not damaged, and the hull structure around the head side thruster does not need to be damaged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of front and side thrust installation, and in particular relates to a PCTC front and side thrust installation device and method. Background Art

[0002] Bow thruster is an auxiliary seakeeping device for modern ships, mainly used to help ships quickly adjust their direction in emergency situations to avoid collisions. It is usually installed on bulk carriers with larger tonnage, and consists of a propeller and a power unit installed at the bow. It can provide additional thrust in emergency situations to help ships quickly adjust their direction.

[0003] The bow thruster is mainly composed of a propeller and a power unit. The thrust generated by the propeller is perpendicular to the hull, so that the bow of the ship can quickly respond to direction adjustments. The bow thruster has a compact structure, but requires a dedicated hydraulic oil supply and operating system. The electric device usually requires a pair of bevel gear reductions, and the motor must be installed above the waterline.

[0004] To ensure safety and performance, the bow thruster is usually installed behind the bow collision bulkhead, and avoid being installed too close to the bow and stern. The distance between the guide cylinder axis and the keel and load waterline should be kept at one cylinder diameter to prevent air from being sucked in due to wind and waves and hull movement.

[0005] The PCTC bow lateral thruster is of tube-tunnel type, which is relatively difficult to install after the hull structure is complete. How to install the thruster without damaging the hull structure is a technical problem that needs to be solved urgently. Summary of the invention

[0006] The present invention provides a PCTC front side thrust installation device, comprising:

[0007] A transport device capable of entering a pipe tunnel for installing a bow thruster;

[0008] A bow thruster is obliquely installed on the transport device, and the transport device drives the bow thruster into the tunnel for installing the bow thruster.

[0009] Further: the transport device includes a trolley and a fixed seat, and the fixed seat is arranged on the trolley.

[0010] Furthermore: the transport device also includes a track, and the trolley can move back and forth along the track.

[0011] Furthermore: the track extends from the outside to the inside of the tunnel.

[0012] Further: the track includes two guide rails, and the two guide rails are arranged in parallel.

[0013] Further: the front side thruster is installed on the fixing seat.

[0014] Further: the fixing seat is arranged tilted, and the front thruster is installed tilted on the fixing seat.

[0015] Further: the bow thruster is a propeller.

[0016] In addition to the PCTC bow and side pusher installation device provided above, the present invention also provides a PCTC bow and side pusher installation method based on any of the PCTC bow and side pusher installation devices described above, comprising: determining the size of the transport device and the fixing angle of the bow and side pusher on the transport device according to the tunnel and the pusher size, fixing the bow and side pusher on the transport device after tilting at a certain angle, and the transport device driving the bow and side pusher into the tunnel.

[0017] Further: after the transport device drives the bow pusher into the tunnel, when the output shaft of the bow pusher reaches below the opening of the mounting flange, the transport device stops moving, the fixing of the bow pusher is removed, the bow pusher is hoisted vertically and mounted on the mounting flange.

[0018] The beneficial effects brought by the present invention are as follows:

[0019] It can be seen from the above scheme that the present invention provides a PCTC bow thruster installation device, which can realize the installation of the bow thruster without destroying the hull structure, and the hull structure around the bow thruster does not need to be destroyed. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A schematic diagram of a PCTC front thrust installation process provided by the present invention is shown.

[0021] In the figure, 1 is a fixed seat; 2 is a trolley; 3 is a track; 4 is a tunnel; 5 is a mounting flange; and 6 is a bow thruster. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0023] like Figure 1 As shown, the present invention provides a PCTC bow side thrust installation device, the PCTC bow side thrust installation device comprises:

[0024] A transport device, which can enter the pipe tunnel 4 for installing the bow thruster 6;

[0025] The bow thruster 6 is obliquely installed on a transport device, and the transport device drives the bow thruster 6 to enter the pipe tunnel 4 for installing the bow thruster 6.

[0026] It can be seen from the above scheme that the present invention provides a PCTC bow thruster installation device, which can realize the installation of the bow thruster 6 without destroying the hull structure, and the hull structure around the bow thruster 6 does not need to be destroyed.

[0027] Furthermore: the transport device includes a trolley 2 and a fixed seat 1, and the fixed seat 1 is arranged on the trolley 2.

[0028] Furthermore: the transport device also includes a track 3, and the trolley 2 can move back and forth along the track 3.

[0029] Furthermore: the track 3 extends from the outside of the tunnel 4 to the inside.

[0030] Furthermore: the track 3 comprises two guide rails, and the two guide rails are arranged in parallel.

[0031] Further: the front thruster 6 is installed on the fixing seat 1.

[0032] Further: the fixing seat 1 is arranged at an angle, and the front side thruster 6 is installed at an angle on the fixing seat 1 .

[0033] Further: the bow thruster 6 is a propeller.

[0034] In addition to the PCTC bow and side thrust installation device provided above, the present invention also provides a PCTC bow and side thrust installation method based on any of the PCTC bow and side thrust installation devices described above, including: determining the size of the transportation device and the fixing angle of the bow and side thrusters 6 on the transportation device according to the pipe tunnel 4 and the propulsion size, and fixing the bow and side thrusters 6 on the transportation device after the bow and side thrusters 6 are tilted at a certain angle, and the transportation device drives the bow and side thrusters 6 to enter the pipe tunnel 4.

[0035] Furthermore: after the transport device drives the bow and side thrusters 6 into the tunnel 4, when the output shaft of the bow and side thrusters 6 reaches below the opening of the mounting flange 5, the transport device stops moving, the fixing of the bow and side thrusters 6 is removed, and the bow and side thrusters 6 are hung vertically and mounted on the mounting flange 5.

[0036] like Figure 1As shown, a specific embodiment is used for explanation below: According to the pipe tunnel 4 and the propulsion size, the size of the transport device and the fixing angle of the bow and side thrusters 6 on the transport device are determined, the bow and side thrusters 6 are installed obliquely on the fixing seat 1, the fixing seat 1 is set obliquely, and the bow and side thrusters 6 are installed obliquely on the fixing seat 1. After the bow and side thrusters 6 are tilted at a certain angle, the specific angle is determined according to the on-site environment and installation requirements, the bow and side thrusters 6 are fixed on the transport device, and the transport device drives the bow and side thrusters 6 into the pipe tunnel 4. Two guide rails are arranged in parallel. : The track 3 extends from the outside of the pipe tunnel 4 to the inside. It can ensure smooth operation. After the transport device drives the bow and side thrusters 6 into the pipe tunnel 4, when the output shaft of the bow and side thrusters 6 is below the opening of the mounting flange 5, the transport device stops moving, the fixing of the bow and side thrusters 6 is removed, and the bow and side thrusters 6 are suspended vertically and mounted with the mounting flange 5.

[0037] It can be seen from the above scheme that the present invention provides a PCTC bow thruster installation device, which can realize the installation of the bow thruster 6 without destroying the hull structure, and the hull structure around the bow thruster 6 does not need to be destroyed.

[0038] The above are preferred embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as within the scope of protection of the present invention.

Claims

1. A PCTC front thrust installation device, characterized in that: include: A transport device capable of entering a pipe tunnel for installing a bow thruster; A bow thruster is obliquely installed on the transport device, and the transport device drives the bow thruster into the tunnel for installing the bow thruster.

2. The PCTC front side push installation device according to claim 1, characterized in that: The transport device comprises a trolley and a fixing seat, and the fixing seat is arranged on the trolley.

3. The PCTC front side push installation device according to claim 2, characterized in that: The transport device further comprises a track, and the trolley can reciprocate along the track.

4. The PCTC front side push installation device according to claim 3 is characterized in that: The track extends from the outside to the inside of the tunnel.

5. The PCTC front side push installation device according to claim 4 is characterized in that: The track comprises two guide rails, and the two guide rails are arranged in parallel.

6. The PCTC front side push installation device according to claim 5, characterized in that: The front thruster is mounted on the fixing seat.

7. The PCTC front side push installation device according to claim 6, characterized in that: The fixing seat is arranged tilted, and the front thruster is installed tilted on the fixing seat.

8. The PCTC front side push installation device according to claim 7, characterized in that: The bow thruster is a propeller.

9. A PCTC front side push installation method based on the PCTC front side push installation device according to any one of claims 1 to 8, characterized in that: include: According to the size of the tunnel and the propeller, the size of the transport device and the fixing angle of the bow thruster on the transport device are determined. After the bow thruster is tilted at a certain angle, it is fixed on the transport device, and the transport device drives the bow thruster into the tunnel.

10. The PCTC front side push installation method according to claim 9, characterized in that: After the transport device drives the bow pusher into the tunnel, when the output shaft of the bow pusher reaches below the opening of the mounting flange, the transport device stops moving, the fixing of the bow pusher is removed, the bow pusher is hoisted vertically and mounted on the mounting flange.

Citation Information

Patent Citations

  • Auxiliary tool for mounting side thruster and mounting method of side thruster

    CN106218808A

  • Ship manufacturing method

    CN107380343A

  • A bow lateral propeller mounting vehicle and a mounting method of the propeller

    CN109204689A

  • River-sea direct ship lateral propeller four-channel type combined pipe tunnel structure

    CN116280134A

  • Bow and stern thruster and related methods

    US20170120998A1