Coal mine advance roadway rock burst disaster treatment method based on yielding roadway

By building parallel pressure tunnels on the side of the coal mine’s advance tunnel to release the advance stress and lateral stress, the problem of complex and resource-consuming coal mine impact ground pressure control in the existing technology is solved, and the safety of coal mine production and tunnel safety is achieved. Target.

CN119288478AActive Publication Date: 2025-01-10CCTEG COAL MINING RES INST
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411535601.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-30
Publication Date
2025-01-10
Estimated Expiration
2044-10-30

AI Technical Summary

Technical Problem

The existing coal mine impact ground pressure disaster control methods are complex and consume a lot of manpower and material resources, making it difficult to effectively reduce the risk of damage in advance tunnels.

Method used

A parallel pressure passway is built on the side of the coal mine’s advance tunnel, which serves as a release channel for advance stress and lateral stress. The stress is released by allowing the pressure passway to avoid tunnel damage during mining in the advance working face.

Benefits of technology

It effectively reduces the risk of impact ground pressure on coal mines ahead of schedule, ensures safe production of coal mines, avoids damage to tunnels, and simplifies the governance process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119288478A_ABST
    Figure CN119288478A_ABST
Patent Text Reader

Abstract

The invention provides a coal mine advance roadway rock burst disaster treatment method based on a yielding roadway, and relates to the technical field of coal mine rock burst disaster prevention and control. The method comprises the steps that the yielding roadway is constructed in an advance working face on one side of a coal mine advance roadway, and the yielding roadway is parallel to the direction of the coal mine advance roadway; when the advanced working face is stoped, the yielding roadway serves as a releasing channel for the advanced stress of the coal mine advanced roadway and the lateral stress of the working face goaf corresponding to the advanced working face so as to release the advanced stress and the lateral stress, and it is ensured that the coal mine advanced roadway is prevented from being damaged. Therefore, the yielding roadway can release the advance stress and the lateral stress of the goaf of the corresponding adjacent working face corresponding to the advance working face through the yielding roadway, so that the coal mine advance roadway for pedestrians and vehicles is not damaged, the rock burst risk of the coal mine advance roadway is reduced, the rock burst risk of the coal mine advance roadway is avoided, and the service life of the coal mine advance roadway is prolonged. And the coal mine safety production is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of coal mine safety technology, and in particular to a method, device, electronic equipment and storage medium for managing rock burst disasters in a coal mine advance tunnel based on a yield tunnel. Background Art

[0002] Coal mine rock burst disaster is a dynamic phenomenon characterized by sudden, rapid and violent destruction caused by the release of deformation energy of coal mine shafts and coal rock masses around the mining area. In the advanced tunnel facing the empty space of the mining face, due to the combined influence of the lateral support pressure of the goaf of the adjacent mining face and the advance support pressure of the working face, the advanced tunnel is often the hardest hit area for rock burst.

[0003] In the relevant technologies, the methods for managing coal mine rock burst disasters all focus on the self-decompression of the advance tunnel, such as coal seam blasting decompression, coal seam large-aperture decompression, coal seam water injection decompression and roof pre-cracking, which are widely used on-site in coal mines. The operations are complicated, prone to errors, and require a lot of manpower and material costs. Summary of the invention

[0004] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.

[0005] To this end, the first purpose of the present invention is to propose a method for controlling rock burst disasters in coal mine advance tunnels based on a yield tunnel, wherein the yield tunnel can release the advance stress and the lateral stress of the goaf of the adjacent working face corresponding to the advance working face through the yield tunnel, thereby ensuring that the coal mine advance tunnel where pedestrians and vehicles pass is not damaged, reducing the danger of rock burst in the coal mine advance tunnel, avoiding the danger of rock burst in the coal mine advance tunnel, and ensuring safe production in coal mines.

[0006] The second purpose of the present invention is to propose a device for controlling rock burst disasters in coal mine advance tunnels based on yield tunnels.

[0007] A third objective of the present invention is to provide an electronic device.

[0008] A fourth object of the present invention is to provide a non-transitory computer-readable storage medium storing computer instructions.

[0009] To achieve the above-mentioned purpose, the first embodiment of the present invention proposes a method for managing rock burst disasters in a coal mine advance tunnel based on a yield tunnel, the method comprising:

[0010] Constructing a pressure relief tunnel in the advanced working face on one side of the advanced tunnel of the coal mine, wherein the pressure relief tunnel is parallel to the direction of the advanced tunnel of the coal mine;

[0011] When the advance working face is mined, the pressure relief tunnel is used as a release channel for the advance stress of the coal mine advance tunnel and the lateral stress of the goaf of the adjacent working face corresponding to the advance working face, so as to release the advance stress and lateral stress and ensure that the coal mine advance tunnel is protected from damage.

[0012] To achieve the above-mentioned purpose, the second embodiment of the present invention proposes a device for managing rock burst disasters in a coal mine advance tunnel based on a yield tunnel, the device comprising:

[0013] A construction module is used to construct a pressure relief tunnel in the advanced working face on one side of the advanced tunnel of the coal mine, wherein the pressure relief tunnel is parallel to the direction of the advanced tunnel of the coal mine;

[0014] The release module is used to use the pressure relief tunnel as a release channel for the advance stress of the coal mine advance tunnel and the lateral stress of the goaf of the adjacent working face corresponding to the advance working face when the advance working face is mined, so as to release the advance stress and lateral stress and ensure that the coal mine advance tunnel is protected from damage.

[0015] To achieve the above-mentioned purpose, the third aspect of the present invention proposes an electronic device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the method described in the first aspect.

[0016] In order to achieve the above-mentioned purpose, the fourth aspect of the present invention proposes a non-transitory computer-readable storage medium storing computer instructions, where the computer instructions are used to enable the computer to execute the method described in the first aspect.

[0017] The method, device, electronic device and storage medium for managing rock burst disasters in coal mine advance tunnels based on a yield tunnel in the embodiment of the present invention construct a yield tunnel in the advance working face on one side of the coal mine advance tunnel, and the yield tunnel is parallel to the direction of the coal mine advance tunnel; when the advance working face is mined, the yield tunnel is used as a release channel for the advance stress of the coal mine advance tunnel and the lateral stress of the goaf of the adjacent working face corresponding to the advance working face, so as to release the advance stress and lateral stress and ensure that the coal mine advance tunnel is protected from damage. Thus, the yield tunnel can release the advance stress and the lateral stress of the goaf of the adjacent working face corresponding to the advance working face through the yield tunnel, thereby ensuring that the coal mine advance tunnel where pedestrians and vehicles are traveling is not damaged, reducing the danger of rock burst in the coal mine advance tunnel, avoiding the danger of rock burst in the coal mine advance tunnel, and ensuring safe production in coal mines.

[0018] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0020] Figure 1 A schematic flow chart of a method for managing rock burst disasters in a coal mine advance tunnel based on a yield tunnel provided by an embodiment of the present invention;

[0021] Figure 2 A schematic plan view of a pressure relief tunnel provided by an embodiment of the present invention;

[0022] Figure 3 A schematic diagram of a yield tunnel inclination cross section provided by an embodiment of the present invention;

[0023] Figure 4 A schematic structural diagram of a device for controlling rock burst disasters in a coal mine advance tunnel based on a yield tunnel is provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0024] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0025] It should be noted that the acquisition, storage, use, and processing of data in the technical solution of this application comply with the relevant provisions of relevant laws and regulations.

[0026] The following describes, with reference to the accompanying drawings, a method and device for managing rock burst disasters in a coal mine advance tunnel based on a yield tunnel according to an embodiment of the present invention.

[0027] Figure 1 A schematic flow chart of a method for managing rock burst disasters in a coal mine advance tunnel based on a yield tunnel provided in an embodiment of the present invention.

[0028] like Figure 1 As shown, the method comprises the following steps:

[0029] Step 101, construct a pressure-yielding tunnel in the advance working face on one side of the coal mine advance tunnel, and the pressure-yielding tunnel is parallel to the direction of the coal mine advance tunnel.

[0030] In some embodiments, the yield tunnel is parallel to the coal mine advance tunnel, and the horizontal distance from the coal mine advance tunnel is twice the length of the plastic zone of the tunnel in the inclination direction of the advance working face.

[0031] Furthermore, the construction parameters of the yield tunnel are consistent with those of the coal mine advance tunnel, and no support and reinforcement measures are taken, only to ensure that the tunnel does not collapse and close before the advance working face is mined. The yield tunnel cannot be used for pedestrians, transportation and storage.

[0032] The construction parameters may include but are not limited to the height and width of the yield tunnel.

[0033] In addition, when excavating the yield tunnel, the yield tunnel is excavated in sections, and the excavation distance of each section is the influence length of the advance support pressure corresponding to the coal mine advance tunnel. Among them, when the advance working face is mined to the remaining length threshold of the yield tunnel, the next section of the yield tunnel is excavated.

[0034] The remaining length threshold of the yield tunnel may be 10 m, but is not limited thereto, and this embodiment does not make any specific limitation thereto.

[0035] Step 102, when the advance working face is mined, the yield tunnel is used as a release channel for the advance stress of the coal mine advance tunnel and the lateral stress of the goaf of the adjacent working face corresponding to the advance working face, so as to release the advance stress and lateral stress and ensure that the coal mine advance tunnel is protected from damage.

[0036] In some embodiments, according to the damage parameters of the coal mine advance tunnel when it is damaged, the strength, stiffness and support parameters of the coal mine advance tunnel are set to ensure that the coal mine advance tunnel is not damaged. Therefore, the coal mine advance tunnel should adopt high-strength, high-rigidity and high-reliability support to ensure that the coal mine advance tunnel is not damaged.

[0037] Among them, the pressure-relieving tunnel cannot be fully excavated at one time, otherwise it will collapse prematurely and fail to achieve the pressure-relieving effect.

[0038] In summary, the present invention proposes a plan view of a yield tunnel, such as Figure 2 As shown, specifically, after determining the goaf of the advance working face, the goaf of the adjacent working face and the coal pillars of the working face, a pressure-yielding tunnel is constructed in the advance working face on one side of the advance tunnel of the coal mine. The pressure-yielding tunnel is parallel to the direction of the advance tunnel of the coal mine (advanced tunnel), so that the advance stress and lateral stress can be released through the pressure-yielding tunnel, thereby ensuring that the coal mine advance tunnel where pedestrians and vehicles pass is not damaged.

[0039] Optionally, for a better understanding of the present invention, in the case of a yield roadway plan schematic diagram, the present invention also proposes a yield roadway inclination profile (A-A') schematic diagram, the yield roadway inclination profile sequentially includes the yield roadway, the working face coal pillar, the advance roadway, the working face coal pillar, and the adjacent working face goaf, such as Figure 3 shown.

[0040] Among them, Figure 2 Hehe Figure 3 In the figure, the black filling is the solid coal pillar of the working face, and the oblique line filling is the goaf.

[0041] The method for managing rock burst disasters in coal mine advance tunnels based on a yield tunnel in an embodiment of the present invention is to construct a yield tunnel in the advance working face on one side of the coal mine advance tunnel, and the yield tunnel is parallel to the direction of the coal mine advance tunnel; when the advance working face is mined, the yield tunnel is used as a release channel for the advance stress of the coal mine advance tunnel and the lateral stress of the goaf of the adjacent working face corresponding to the advance working face, so as to release the advance stress and lateral stress and ensure that the coal mine advance tunnel is protected from damage. Thus, the yield tunnel can release the advance stress and the lateral stress of the goaf of the adjacent working face corresponding to the advance working face through the yield tunnel, thereby ensuring that the coal mine advance tunnel where pedestrians and vehicles are traveling is not damaged, reducing the danger of rock burst in the coal mine advance tunnel, avoiding the danger of rock burst in the coal mine advance tunnel, and ensuring safe production in coal mines.

[0042] In addition, it should be noted that the present invention can also be extended to other tunnels with rock burst hazards, not just coal mine advance tunnels. The present invention uses the coal mine advance tunnels with advanced working face mining as the description object, simply because at the coal mine site, the coal mine advance tunnels are the most serious and representative areas of rock burst hazards.

[0043] In order to realize the above-mentioned embodiment, the present invention also proposes a device for controlling rock burst disasters in a coal mine advance tunnel based on a yield tunnel.

[0044] Figure 4 A schematic structural diagram of a device for controlling rock burst disasters in a coal mine advance tunnel based on a yield tunnel is provided in an embodiment of the present invention.

[0045] like Figure 4 As shown, the coal mine advance tunnel impact ground pressure disaster control device 40 based on the pressure-yielding tunnel includes a construction module 41 and a release module 42.

[0046] A construction module is used to construct a pressure relief tunnel in the advanced working face on one side of the advanced tunnel of the coal mine, wherein the pressure relief tunnel is parallel to the direction of the advanced tunnel of the coal mine;

[0047] The release module is used to use the pressure relief tunnel as a release channel for the advance stress of the coal mine advance tunnel and the lateral stress of the goaf of the adjacent working face corresponding to the advance working face when the advance working face is mined, so as to release the advance stress and lateral stress and ensure that the coal mine advance tunnel is protected from damage.

[0048] Furthermore, in a possible implementation of an embodiment of the present invention, the yield tunnel is parallel to the coal mine advance tunnel, and the horizontal distance from the coal mine advance tunnel is twice the length of the plastic zone of the tunnel in the inclination direction of the advance working face.

[0049] Furthermore, in a possible implementation of an embodiment of the present invention, the construction parameters of the yield tunnel are consistent with those of the coal mine advance tunnel, and no support and reinforcement measures are taken, only ensuring that the tunnel does not collapse and close before the advance working face is mined.

[0050] Furthermore, in a possible implementation of an embodiment of the present invention, the excavation module is used for excavating a pressure-yielding tunnel in sections, and each section excavation distance is the influence length of the advance support pressure corresponding to the coal mine advance tunnel, wherein when the advance working face is mined to the remaining length threshold of the pressure-yielding tunnel, the next section of the pressure-yielding tunnel is excavated.

[0051] Furthermore, in a possible implementation of an embodiment of the present invention, the strength, stiffness and support parameters of the coal mine advance tunnel are set according to the destruction parameters when the coal mine advance tunnel is destroyed to ensure that the coal mine advance tunnel is not destroyed.

[0052] The coal mine advance tunnel rock burst disaster control device based on the yield tunnel of the embodiment of the present invention constructs a yield tunnel in the advance working face on one side of the coal mine advance tunnel, and the yield tunnel is parallel to the direction of the coal mine advance tunnel; when the advance working face is mined, the yield tunnel is used as a release channel for the advance stress of the coal mine advance tunnel and the lateral stress of the goaf of the adjacent working face corresponding to the advance working face, so as to release the advance stress and lateral stress and ensure that the coal mine advance tunnel is protected from damage. Thus, the yield tunnel can release the advance stress and the lateral stress of the goaf of the adjacent working face corresponding to the advance working face through the yield tunnel, thereby ensuring that the coal mine advance tunnel where pedestrians and vehicles are driving is not damaged, reducing the danger of rock burst in the coal mine advance tunnel, avoiding the danger of rock burst in the coal mine advance tunnel, and ensuring safe production in coal mines.

[0053] In order to implement the above embodiment, the present invention further provides an electronic device, including:

[0054] at least one processor; and

[0055] a memory communicatively connected to the at least one processor; wherein,

[0056] The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can perform the aforementioned method.

[0057] In order to implement the above embodiment, the present invention further proposes a non-transitory computer-readable storage medium storing computer instructions, where the computer instructions are used to enable the computer to execute the above method.

[0058] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0059] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0060] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present invention includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present invention belong.

[0061] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute the instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.

[0062] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0063] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.

[0064] In addition, each functional unit in each embodiment of the present invention may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.

[0065] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present invention. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A method for controlling rock burst disasters in coal mine advance tunnels based on yield tunnels, characterized in that: The method comprises: Constructing a pressure relief tunnel in the advanced working face on one side of the advanced tunnel of the coal mine, wherein the pressure relief tunnel is parallel to the direction of the advanced tunnel of the coal mine; When the advance working face is mined, the pressure relief tunnel is used as a release channel for the advance stress of the coal mine advance tunnel and the lateral stress of the goaf of the adjacent working face corresponding to the advance working face, so as to release the advance stress and lateral stress and ensure that the coal mine advance tunnel is protected from damage.

2. The method according to claim 1, characterized in that The yield roadway is parallel to the coal mine advance roadway, and the horizontal distance from the coal mine advance roadway is twice the length of the plastic zone of the roadway in the inclination direction of the advance working face.

3. The method according to claim 1, characterized in that The construction parameters of the yield tunnel are consistent with those of the coal mine advance tunnel. No support and reinforcement measures are taken, only to ensure that the tunnel does not collapse and close before the advance working face is mined.

4. The method according to claim 1, characterized in that: The method further comprises: When excavating the yield tunnel, the yield tunnel is excavated in sections, and the excavation distance of each section is the influence length of the advance support pressure corresponding to the coal mine advance tunnel. When the advance working face is mined to the remaining length threshold of the yield tunnel, the next section of the yield tunnel is excavated.

5. The method according to claim 1, characterized in that The strength, rigidity and support parameters of the coal mine advance tunnel are set according to the destruction parameters when the coal mine advance tunnel is destroyed, so as to ensure that the coal mine advance tunnel is not destroyed.

6. A device for controlling rock burst disasters in coal mine advance tunnels based on yield tunnels, characterized in that: The device comprises: A construction module is used to construct a pressure relief tunnel in the advanced working face on one side of the advanced tunnel of the coal mine, wherein the pressure relief tunnel is parallel to the direction of the advanced tunnel of the coal mine; The release module is used to use the pressure relief tunnel as a release channel for the advance stress of the coal mine advance tunnel and the lateral stress of the goaf of the adjacent working face corresponding to the advance working face when the advance working face is mined, so as to release the advance stress and lateral stress and ensure that the coal mine advance tunnel is protected from damage.

7. The device according to claim 6, characterized in that The yield roadway is parallel to the coal mine advance roadway, and the horizontal distance from the coal mine advance roadway is twice the length of the plastic zone of the roadway in the inclination direction of the advance working face.

8. The device according to claim 6, characterized in that The device also includes: The excavation module is used for excavating the yield tunnel. The yield tunnel is excavated in sections, and the excavation distance of each section is the influence length of the advance support pressure corresponding to the advance tunnel of the coal mine. When the advance working face is mined to the remaining length threshold of the yield tunnel, the next section of the yield tunnel is excavated.

9. An electronic device, characterized in that: include: at least one processor; as well as a memory communicatively connected to the at least one processor; wherein, The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to perform the method according to any one of claims 1 to 5.

10. A non-transitory computer-readable storage medium storing computer instructions, characterized in that: The computer instructions are used to cause the computer to execute the method according to any one of claims 1-5.

Citation Information

Patent Citations

  • Structure for protecting stability of surrounding rock of development roadway and construction method

    CN107956475A

  • Surrounding rock stability control method suitable for mining main roadway of coal mine

    CN110145326A

  • Coal mine impact ground pressure governance method

    CN111411962A

  • Control method and control device for influence of mining on working face

    CN114183139A

  • Advanced large-diameter drilling pre-pressure-relief method for small coal pillar tunneling roadway

    CN115059469A