Barrier gate monitoring method and device

By analyzing the historical data of parking lot gates, predicting service life and pushing maintenance time, the problem of unattended parking lot gates is solved, and the effect of early maintenance and reducing operating costs is achieved.

CN119169727APending Publication Date: 2024-12-20XIAMEN KETUO COMM TECH HLDG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310732439.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-06-20
Publication Date
2024-12-20

AI Technical Summary

Technical Problem

The prior art cannot predict the service life of parking lots in advance, especially in unattended parking lots, which may cause the gate to malfunction, resulting in vehicles being unable to leave the site, resulting in vehicle congestion and operational losses.

Method used

By obtaining historical data of parking lots or highway gates, including the time and number of times each time the pole is lifted, predicting future gate opening data, estimating the service life of gates, and calculating maintenance time, and pushing them to gate management system. Ensure advance maintenance.

Benefits of technology

It realizes the service life of parking lot gates in advance, reduces gate failures and operating costs, and reduces damage and vehicle congestion caused by hardware problems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119169727A_ABST
    Figure CN119169727A_ABST
Patent Text Reader

Abstract

The invention discloses a barrier gate monitoring method and device, and relates to the technical field of parking lots. A specific embodiment of the method comprises the steps of obtaining historical data of a barrier gate of a parking lot or an expressway; predicting gate opening data of a second preset time period according to the historical data; estimating the service life of the barrier gate according to the gate opening data of the second preset time period; calculating the maintenance time of the barrier gate based on the service life; and pushing the maintenance time of the barrier gate to a barrier gate management system. According to the embodiment, the service life of the parking lot barrier gate is predicted in advance, and the parking lot barrier gate is maintained and replaced in advance, so that the probability that the problems of barrier gate rod damage, vehicle smashing and the like possibly caused by high hardware equipment cost and hardware problems of an existing parking lot barrier gate is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of parking lots, and in particular to a method and device for monitoring a barrier gate. Background Art

[0002] At present, most parking lot barriers on the market can monitor the operating status of the parking lot barriers at the hardware level and determine whether the parking lot barriers have aging problems. The on-site parking lot operators only need to purchase the corresponding hardware modules to monitor the status of the parking lot barriers, and then further determine whether the parking lot barriers need maintenance based on the equipment status of the parking lot barriers.

[0003] In the process of implementing the present invention, the inventors found that there are at least the following problems in the prior art:

[0004] At present, parking lots in the existing technology cannot predict the service life of parking lot gates in advance, especially in unmanned parking lots. It is very likely that the parking lot gate will malfunction when the vehicle leaves the lot, resulting in the vehicle being unable to leave the lot, causing traffic congestion and bringing losses to the parking lot operation. Summary of the invention

[0005] In view of this, an embodiment of the present invention provides a method for monitoring a gate, including:

[0006] Acquire historical data of a gate of a parking lot or a highway; wherein the historical data includes at least one of the following: a first time spent on each lifting of the gate, and a first number of times the gate is lifted within a first preset time period;

[0007] Predicting gate opening data for a second preset time period based on the historical data; wherein the gate opening data for the second preset time period includes at least one of the following: a second time spent on each lifting of the gate, and a second number of times the gate is lifted within the second preset time period;

[0008] estimating the service life of the barrier gate according to the gate opening data in the second preset time period;

[0009] Based on the service life, calculating the maintenance time of the gate;

[0010] The maintenance time of the gate is pushed to the gate management system.

[0011] Optionally, the maintenance time includes at least one of the following:

[0012] Preferred maintenance time period, preferred maintenance time node, and latest maintenance time node.

[0013] Optionally, predicting gate opening data in a second preset time period based on the historical data includes:

[0014] A coordinate system with time nodes as axes is established according to the historical data to simulate a first gateway data function;

[0015] Predicting the gate opening data in a second preset time period according to the trend of the first gate data function;

[0016] When the barrier data reaches preset barrier maintenance data, the barrier needs maintenance.

[0017] Optionally, estimating the service life of the barrier gate according to the gate opening data in the second preset time period includes:

[0018] According to the first gate data function, the historical data and the second preset time period, a coordinate system is established with the time node as the X-axis and the historical data and the gate opening data of the second preset time period as the Y-axis;

[0019] The function established by the data in the coordinate system is a second barrier function; wherein the second barrier function changes with the data in the coordinate system;

[0020] Calculating the service life of the barrier gate according to the derivative of the second barrier gate function;

[0021] The derivative of the second barrier gate function is used to identify how fast the barrier gate data changes.

[0022] Optionally, before estimating the service life of the barrier gate according to the gate opening data in the second preset time period, the method further includes:

[0023] Obtaining weather information of the area where the gate is located;

[0024] The time periods are divided according to the meteorological information, and the gate opening data of the second preset time period is weighted, and then the gate opening data of the second preset time period is updated.

[0025] Optionally, before estimating the service life of the barrier gate according to the gate opening data in the second preset time period, the method further includes:

[0026] According to the historical data of holidays and non-holidays, calculate the ratio of historical data of holidays to non-holidays;

[0027] The gate opening data of the second preset time period is weighted according to the ratio, and then the gate opening data of the preset time period is updated.

[0028] Optionally, it also includes:

[0029] Disassemble the components included in the barrier gate;

[0030] Analyze the components to be maintained according to the historical data of the barrier and the maintenance time;

[0031] The name of the component to be maintained is pushed to the gate management system.

[0032] According to another aspect of an embodiment of the present invention, a device for monitoring a gate is provided, comprising:

[0033] A historical data acquisition module, used to acquire historical data of a parking lot or a highway barrier; wherein the historical data includes at least one of the following: a first time spent on each lifting of the barrier, and a first number of times the barrier is lifted within a preset time period;

[0034] A gate opening data prediction module, used for predicting the gate opening data of a second preset time period according to the historical data; wherein the gate opening data of the preset time period includes at least one of the following: a second time spent on each lifting of the gate, and a second number of times the gate is lifted within the preset time period;

[0035] A service life estimation module, used to estimate the service life of the gate according to the gate opening data in the preset time period;

[0036] A maintenance time calculation module, used for calculating the maintenance time of the gate based on the service life;

[0037] The push module is used to push the maintenance time of the gate to the gate management system.

[0038] According to another aspect of an embodiment of the present invention, there is provided an electronic device for monitoring a barrier gate, comprising:

[0039] one or more processors;

[0040] a storage device for storing one or more programs,

[0041] When the one or more programs are executed by the one or more processors, the one or more processors implement the barrier gate monitoring method provided by the present invention.

[0042] According to another aspect of an embodiment of the present invention, a computer-readable medium is provided, on which a computer program is stored, and when the program is executed by a processor, the method for monitoring a barrier gate provided by the present invention is implemented.

[0043] One embodiment of the above invention has the following advantages or beneficial effects:

[0044] The present invention achieves the technical effect of predicting the service life of parking lot barriers in advance and maintaining and replacing parking lot barriers in advance by adopting a technical means of estimating the barrier operation and maintenance time according to historical barrier data, so as to reduce the high cost of existing parking lot barrier hardware equipment and the probability of problems such as barrier pole damage and car damage caused by hardware problems.

[0045] The further effects of the above-mentioned non-conventional optional manner will be described below in conjunction with the specific implementation manner. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] The accompanying drawings are used to better understand the present invention and do not constitute an improper limitation of the present invention.

[0047] Figure 1 is a schematic diagram of the main process of a method for monitoring a gate according to an embodiment of the present invention;

[0048] Figure 2 is a schematic diagram of a main process of estimating the service life of a barrier gate according to an embodiment of the present invention;

[0049] Figure 3 is another schematic diagram of the main process of estimating the service life of a barrier gate according to an embodiment of the present invention;

[0050] Figure 4 is another schematic diagram of the main process before estimating the service life of the barrier gate according to an embodiment of the present invention;

[0051] Figure 5 is a schematic diagram of the main process before estimating the service life of the gate according to an embodiment of the present invention;

[0052] Figure 6 is a schematic diagram of a main process of pushing a component name to be maintained to the user terminal according to an embodiment of the present invention;

[0053] Figure 7 is a schematic diagram of main modules of a gate monitoring device according to an embodiment of the present invention;

[0054] Figure 8 is an exemplary system architecture diagram to which embodiments of the present invention may be applied;

[0055] Fig. 9 It is a schematic diagram of the structure of a computer system of a terminal device or a server suitable for implementing an embodiment of the present invention. DETAILED DESCRIPTION

[0056] The following is a description of exemplary embodiments of the present invention in conjunction with the accompanying drawings, including various details of the embodiments of the present invention to facilitate understanding, which should be considered as merely exemplary. Therefore, it should be recognized by those of ordinary skill in the art that various changes and modifications may be made to the embodiments described herein without departing from the scope and spirit of the present invention. Similarly, for clarity and conciseness, the description of well-known functions and structures is omitted in the following description. Specific embodiment 1

[0058] Figure 1 is a schematic diagram of the main process of a method for monitoring a gate according to an embodiment of the present invention, such as Figure 1 As shown, including:

[0059] Step S101, obtaining historical data of a barrier gate of a parking lot or a highway; wherein the historical data includes at least one of the following: a first time spent each time lifting the barrier, and a first number of times the barrier is lifted within a first preset time period.

[0060] Optionally, the step of obtaining historical data may include collecting the opening and closing time of each entrance and exit gate of the parking lot through the parking lot server, and may also include estimating the historical information of the gate opening according to the time when the vehicle enters the parking lot after the server sends the vehicle gate opening information. In an optional embodiment, the acquired historical information can be stored, analyzed, and integrated on the cloud server to estimate the maintenance time of the gate.

[0061] Step S102, predicting the gate opening data of the second preset time period based on the historical data. The gate opening data of the second preset time period includes but is not limited to at least one of the following: the second time spent on lifting the bar each time, and the number of times the bar is lifted within the second preset time period. In actual applications, the time to lift the bar is 2-2.5s, and the time to lift the bar may be longer or shorter as the equipment ages. As the number of times the bar is lifted reaches the preset number / frequency, the gate equipment needs maintenance, such as applying lubricating oil, even if the time to lift the bar has not changed significantly. The above-mentioned gate opening data is not limited to the above-mentioned ones, and the type of gate opening data can be adaptively adjusted according to actual conditions.

[0062] Step S103: Estimate the service life of the barrier gate according to the gate opening data of the second preset time period. For example, if the number of times the barrier gate is opened in the preset time period is 2000 times, and the preset threshold opening number that requires maintenance is 3000 times, then the time point when the barrier gate is opened 3000 times, i.e., the service life, can be estimated according to the frequency of the gate opening.

[0063] Step S104: Based on the service life, calculate the maintenance time of the barrier; wherein the maintenance time includes but is not limited to one of the following: a preferred maintenance time period, a preferred maintenance time node, and a latest maintenance time node.

[0064] Step S105: Push the maintenance time of the gate to the gate management system; wherein the user terminal refers to the terminal used by the parking lot or the highway gate. In an optional embodiment, after the operation and maintenance time is calculated in the cloud server / local server, the maintenance time of the parking lot can be pushed to the user terminal so that the parking lot maintenance personnel can maintain the gate at the preset time period / time point. Specific embodiment 2

[0066] Figure 2 FIG. 4 is a schematic diagram of the main process of estimating the service life of the barrier gate according to an embodiment of the present invention. Figure 2 As shown, the estimating the service life of the gate according to the gate opening data in the preset time period includes:

[0067] Step S201: Establish a coordinate system with time nodes as axes according to the historical data to simulate the first gate data function. In other words, the change of the gate opening data will basically change along the function trend as time changes.

[0068] For example, as the number of gate openings increases, the time for each gate opening may become longer over time. Under normal circumstances, when the gate is new, the time for each gate opening is generally 2 seconds. As time goes by, the gate opening time will gradually increase. Assuming that the gate opening time is 3 seconds each time, maintenance is required. It is necessary to first estimate the time point / time period when the gate opening time is about 3 seconds. When this time point / time period is reached, it is determined as the maintenance time of the gate. That is, through step S202, according to the trend of the first gate data function, the gate opening data of the second preset time period is predicted to determine the maintenance time.

[0069] When the barrier data reaches preset barrier maintenance data, the barrier needs maintenance. Specific embodiment three

[0071] Figure 3 FIG. 2 is another schematic diagram of the main process of estimating the service life of the barrier gate according to an embodiment of the present invention. Figure 3 As shown, the estimating the service life of the gate according to the gate opening data in the preset time period includes:

[0072] Step S301: According to the first barrier gate data function, the historical data and the second preset time period, a coordinate system is established with the time node as the X-axis and the historical data and the gate opening data of the second preset time period as the Y-axis. The function established by the data in the coordinate system is the second barrier gate function; wherein the second barrier gate function changes with the data in the coordinate system.

[0073] Step S302: Calculate the service life of the barrier according to the derivative of the second barrier function;

[0074] Among them, the derivative of the barrier function is used to identify the speed of change of the barrier data.

[0075] The derivatives here include first-order derivatives and / or second-order derivatives. That is to say, when the value of the gate function changes rapidly / or the acceleration of the gate function changes rapidly, it can be reflected that the gate may have a fault and the operation and maintenance personnel need to be prompted to maintain the gate.

[0076] In practical applications, the second embodiment can be used in combination with the third embodiment, or can be used independently. When the second embodiment is used in combination with the third embodiment, the preset gate maintenance data and the derivative of the gate function need to be used as two parallel judgment conditions to prompt the operation and maintenance personnel to maintain the gate. Specific embodiment 4

[0078] Figure 4 FIG. 2 is another schematic diagram of the main process before estimating the service life of the gate according to an embodiment of the present invention. Figure 4 As shown, the estimating the service life of the gate according to the gate opening data in the preset time period also includes:

[0079] Step S401, obtaining weather information of the area where the gate is located;

[0080] Step S402: Divide the time periods according to the meteorological information, weight the gate opening data of the second preset time period, and then update the gate opening data of the second preset time period.

[0081] For example, when the weather information on a certain day indicates heavy rain, it means that the number of vehicles entering the parking lot / highway on that day is less than that in other weather conditions. By determining the weather information, the number of times the gate is opened can be estimated more accurately in advance. In addition, the gate maintenance personnel can be advised to maintain and service the gate when the gate is used less frequently, so as to reduce the loss of income caused by maintenance. Specific embodiment five

[0083] Figure 5is a schematic diagram of the main process before estimating the service life of the gate according to an embodiment of the present invention. Figure 5 As shown, before estimating the service life of the barrier gate according to the gate opening data in the preset time period, the method further includes:

[0084] Step S501, calculating the ratio of holiday historical data to non-holiday historical data based on historical data of holidays and non-holidays;

[0085] Step S502: after weighting the gate opening data of the second preset time period according to the ratio, update the gate opening data of the second preset time period.

[0086] Generally speaking, the vehicle traffic volume on holidays is significantly higher than that on non-holidays. In order to more accurately calculate the number of vehicle gate openings, the gate opening data for the next holiday can be predicted based on the historical gate opening data. In addition, the gate maintenance can be completed before the holidays to avoid technical problems such as high maintenance costs and delays for vehicle owners during peak hours. Specific embodiment six

[0088] Figure 6 FIG. 1 is a schematic diagram of the main process of pushing the component name to be maintained to the user terminal according to an embodiment of the present invention. Figure 6 As shown, the optional embodiment of the present invention also includes:

[0089] Step S601, decomposing the components included in the barrier;

[0090] Step S602: Analyze components to be maintained according to the historical data of the barrier and the maintenance time;

[0091] Step S603: Push the name of the component to be maintained to the gate management system.

[0092] For example, there are hinges, bearings, signal transceivers, etc. in the gate. The aging of different components may affect the opening time of the gate. However, since different components have different effects on the gate opening action, it is possible to analyze which component caused the gate failure from the gate opening action, time and other gate data. The algorithms for analyzing components are not listed here. Generally, artificial intelligence algorithms are used to analyze them. Specific embodiment seven

[0094] Figure 7 Schematic diagram of the main modules of a gate monitoring device according to an embodiment of the present invention. Figure 7 As shown, according to another aspect of an embodiment of the present invention, a device 700 for monitoring a gate is provided, comprising:

[0095] The historical data acquisition module 701 is used to acquire the historical data of the gate of the parking lot or the highway; wherein the historical data includes at least one of the following: the first time spent on each lifting of the gate, and the first number of times the gate is lifted within a preset time period;

[0096] The gate opening data prediction module 702 is used to predict the gate opening data of a second preset time period according to the historical data; wherein the gate opening data of the preset time period includes at least one of the following: a second time spent on each lifting of the gate, and a second number of times the gate is lifted within the preset time period;

[0097] A service life estimation module 703, used to estimate the service life of the gate according to the gate opening data in the preset time period;

[0098] A maintenance time calculation module 704, used to calculate the maintenance time of the gate based on the service life;

[0099] The push module 705 is used to push the maintenance time of the gate to the gate management system.

[0100] The specific embodiments of the present invention can be combined with each other, and the manner of combining the various embodiments will not be described in detail again.

[0101] Figure 8 An exemplary system architecture 800 to which the barrier gate monitoring method or barrier gate monitoring device according to the embodiment of the present invention can be applied is shown.

[0102] like Figure 8 As shown, system architecture 800 may include terminal devices 801, 802, 803, a network 804, and a server 805. Network 804 is used to provide a medium for communication links between terminal devices 801, 802, 803 and server 805. Network 804 may include various connection types, such as wired, wireless communication links, or optical fiber cables, etc.

[0103] Users can use terminal devices 801, 802, and 803 to interact with server 805 through network 804 to receive or send messages, etc. Various communication client applications can be installed on terminal devices 801, 802, and 803, such as shopping applications, web browser applications, search applications, instant messaging tools, email clients, social platform software, etc. (only examples).

[0104] The terminal devices 801 , 802 , and 803 may be various electronic devices having a display screen and supporting web browsing, including but not limited to smart phones, tablet computers, laptop computers, desktop computers, and the like.

[0105] The server 805 may be a server that provides various services, such as a backend management server (only an example) that provides support for shopping websites browsed by users using the terminal devices 801, 802, and 803. The backend management server may analyze and process the received data such as product information query requests, and feed back the processing results (such as target push information, product information - only an example) to the terminal device.

[0106] It should be noted that the barrier gate monitoring method provided in the embodiment of the present invention is generally executed by the server 805 , and accordingly, the barrier gate monitoring device is generally arranged in the server 805 .

[0107] It should be understood that Figure 8 The number of terminal devices, networks and servers in the embodiment is only for illustration. Any number of terminal devices, networks and servers may be provided according to implementation requirements.

[0108] Reference below Fig. 9 It shows a schematic diagram of the structure of a computer system 900 of a terminal device suitable for implementing an embodiment of the present invention. Fig. 9 The terminal device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.

[0109] like Fig. 9 As shown, the computer system 900 includes a central processing unit (CPU) 901, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 902 or a program loaded from a storage part 908 into a random access memory (RAM) 903. In the RAM 903, various programs and data required for the operation of the system 900 are also stored. The CPU 901, the ROM 902, and the RAM 903 are connected to each other via a bus 904. An input / output (I / O) interface 905 is also connected to the bus 904.

[0110] The following components are connected to the I / O interface 905: an input section 906 including a keyboard, a mouse, etc.; an output section 907 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker, etc.; a storage section 908 including a hard disk, etc.; and a communication section 909 including a network interface card such as a LAN card, a modem, etc. The communication section 909 performs communication processing via a network such as the Internet. A drive 910 is also connected to the I / O interface 905 as needed. A removable medium 911, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 910 as needed, so that a computer program read therefrom is installed into the storage section 908 as needed.

[0111] In particular, according to the embodiments disclosed in the present invention, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present invention include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from the network through the communication part 909, and / or installed from the removable medium 911. When the computer program is executed by the central processing unit (CPU) 901, the above-mentioned functions defined in the system of the present invention are executed.

[0112] It should be noted that the computer-readable medium shown in the present invention may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present invention, a computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, device or device. In the present invention, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, which carries a computer-readable program code. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than computer-readable storage media, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer-readable medium may be transmitted using any appropriate medium, including but not limited to: wireless, wire, optical cable, RF, etc., or any suitable combination of the above.

[0113] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present invention. In this regard, each box in the flow chart or block diagram can represent a module, a program segment, or a part of a code, and the above-mentioned module, program segment, or a part of a code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram or flow chart, and the combination of the boxes in the block diagram or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0114] The modules involved in the embodiments of the present invention may be implemented by software or hardware. The modules described may also be set in a processor. For example, they may be described as: a processor includes a sending module, an acquisition module, a determination module, and a first processing module. The names of these modules do not, in some cases, constitute limitations on the modules themselves. For example, the sending module may also be described as a "module for sending a picture acquisition request to the connected server."

[0115] As another aspect, the present invention further provides a computer-readable medium, which may be included in the device described in the above embodiment; or may exist independently without being assembled into the device. The above computer-readable medium carries one or more programs, and when the above one or more programs are executed by a device, the device

[0116] include:

[0117] Obtain historical data of a parking lot or a highway barrier; wherein the historical data includes at least one of the following: a first time spent on each lift, and a first preset time

[0118] The first number of lifts during the interval;

[0119] According to the historical data, predict the gate opening data of the second preset time period; wherein the gate opening data of the second preset time period includes at least one of the following: the time taken to lift the lever each time;

[0120] a second time, a second number of times the bar is lifted within a second preset time period;

[0121] estimating the service life of the barrier gate according to the gate opening data in the second preset time period;

[0122] Based on the service life, calculating the maintenance time of the gate;

[0123] The maintenance time of the gate is pushed to the gate management system.

[0124] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions may occur depending on design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for monitoring a gate, characterized in that: include: Acquire historical data of a gate of a parking lot or a highway; wherein the historical data includes at least one of the following: a first time spent on each lifting of the gate, and a first number of times the gate is lifted within a first preset time period; Predicting gate opening data for a second preset time period based on the historical data; wherein the gate opening data for the second preset time period includes at least one of the following: a second time spent on each lifting of the gate, and a second number of times the gate is lifted within the second preset time period; estimating the service life of the barrier gate according to the gate opening data in the second preset time period; Based on the service life, calculating the maintenance time of the gate; The maintenance time of the gate is pushed to the gate management system.

2. The method according to claim 1, characterized in that The maintenance time includes at least one of the following: Preferred maintenance time period, preferred maintenance time node, and latest maintenance time node.

3. The method according to claim 1, characterized in that: The predicting gate opening data in a second preset time period according to the historical data includes: A coordinate system with time nodes as axes is established according to the historical data to simulate a first gateway data function; Predicting the gate opening data in a second preset time period according to the trend of the first gate data function; When the barrier data reaches preset barrier maintenance data, the barrier needs maintenance.

4. The method according to any one of claims 1 to 3, characterized in that: The estimating the service life of the barrier gate according to the gate opening data in the second preset time period includes: According to the first gate data function, the historical data and the second preset time period, a coordinate system is established with the time node as the X-axis and the historical data and the gate opening data of the second preset time period as the Y-axis; The function established by the data in the coordinate system is a second barrier function; wherein the second barrier function changes with the data in the coordinate system; Calculating the service life of the barrier gate according to the derivative of the second barrier gate function; The derivative of the second barrier gate function is used to identify how fast the barrier gate data changes.

5. The method according to claim 4, characterized in that Before estimating the service life of the barrier gate according to the gate opening data in the second preset time period, the method further includes: Obtaining weather information of the area where the gate is located; The time periods are divided according to the meteorological information, and the gate opening data of the second preset time period is weighted, and then the gate opening data of the second preset time period is updated.

6. The method according to claim 4, characterized in that Before estimating the service life of the barrier gate according to the gate opening data in the second preset time period, the method further includes: According to the historical data of holidays and non-holidays, calculate the ratio of historical data of holidays to non-holidays; The gate opening data of the second preset time period is weighted according to the ratio, and then the gate opening data of the preset time period is updated.

7. The method according to claim 1, characterized in that Also includes: Disassemble the components included in the barrier gate; Analyzing components to be maintained according to the historical data of the barrier and the maintenance time; The name of the component to be maintained is pushed to the gate management system.

8. A device for monitoring a gate, characterized in that: include: A historical data acquisition module, used to acquire historical data of a parking lot or a highway barrier; wherein the historical data includes at least one of the following: a first time spent on each lifting of the barrier, and a first number of times the barrier is lifted within a preset time period; A gate opening data prediction module, used for predicting the gate opening data of a second preset time period according to the historical data; wherein the gate opening data of the preset time period includes at least one of the following: a second time spent on each lifting of the gate, and a second number of times the gate is lifted within the preset time period; A service life estimation module, used to estimate the service life of the gate according to the gate opening data in the preset time period; A maintenance time calculation module, used for calculating the maintenance time of the gate based on the service life; The push module is used to push the maintenance time of the gate to the gate management system.

9. An electronic device for gate monitoring, characterized in that: include: one or more processors; a storage device for storing one or more programs, When the one or more programs are executed by the one or more processors, the one or more processors implement the method according to any one of claims 1 to 8.

10. A computer readable medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 8 is implemented.