Leaking stoppage method for SMW construction method pile waterproof curtain
By using steel sealing plates, drainage pipes and water filter layers in the SMW working pile water stop curtain, combined with thin quilts and fast-setting materials, the problem of groundwater inflow during deep foundation pit excavation is solved, ensuring the stability of soil and foundation pits are safe to avoid soil deformation and collapse.
Patent Information
- Application Number
- CN202411538252.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2024-12-24
AI Technical Summary
During the excavation of deep foundation pits, due to groundwater geological differences, the water-stop curtain of SMW construction piles has weak points, resulting in a large amount of groundwater flowing in, resulting in major safety and quality accidents such as soil deformation and collapse.
The steel sealing plate is used to weld the SMW pile steel, a drainage pipe and a water filter layer are installed, thin quilts and fast-setting materials are used to strengthen the water filtering effect, and a transfer water well is set up at the water leakage point to ensure the stability of the soil.
Effectively prevent soil loss after curtain support, maintain soil stability, prevent particles unearthed from water belts, avoid soil from disengagement from support, and ensure that the foundation pit maintenance conforms to the design status.
Smart Images

Figure CN119177674A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of deep construction of building engineering, in particular to a SMW method pile water-stopping curtain plugging method. Background Art
[0002] When the deep foundation pit of a construction project does not have a natural slope, in order to protect the surrounding roads, buildings, pipelines and other facilities from damage caused by settlement and deformation due to local excavation unloading and groundwater drainage during the deep foundation pit excavation process, and to reduce the workload of excavation and backfilling and speed up the construction period, support technology has developed rapidly. Among them, SMW construction method piles are used in large quantities. Because the underground soil and water level cannot be intuitively understood, and the underground hydrogeological differences lead to differences in the quality of SMW construction method piles, there are weaknesses in the water-stop curtain. If not handled in time, a large amount of water will flow into the outside of the curtain within 2h-12h, and the mud and sand brought out can cause the soil behind the empty piles to deform or even collapse the foundation pit, resulting in major safety and quality accidents. Summary of the invention
[0003] The present invention aims to solve the above-mentioned problem, thereby providing a SMW method pile water-stopping curtain plugging method.
[0004] The present invention solves the above-mentioned problem by adopting the following technical solution: A SMW method pile water-stop curtain plugging method is carried out according to the following steps: Step 1: Dig a sump and use a water pump to drain water; ensure that there is no water accumulation on the working surface and ensure the safety of spot welding operations; Step 2: Use plates to block the 500mm area around the water gushing point. Use steel blocking plates to weld with the SMW pile steel on both sides; Step 3: Set up a drainage pipe on the plugging plate; its location should be around the leaking point, at any convenient location, and should be above the top elevation of the foundation; the main consideration is to facilitate the construction of the drainage pipe and the back filter layer; Step 4: After cleaning the back of the plugging board, add a water filter layer; a thin quilt is stuffed into the back of the plugging board as a water filter layer, and the thin quilt is compacted with a scaffolding pipe; compacting the quilt can replenish the lost soil and strengthen the support, and at the same time can enhance the water filtering effect; Step 5: Construction of the back plugging layer of the plugging plate; Since the water head height inside and outside the water-stop curtain is quite different, quick-setting materials are added during the process of inserting the quilt. After the quilt is squeezed and compacted, the upper end of the plate is plugged with quick-setting materials; Step 6: Set up a transfer water well; water from the drainage pipe must be drained away in time. Bury a section of well pipe at the edge of the sump excavated in step 1, introduce river water, and set up a pump to discharge it.
[0005] Furthermore, in step 2, the on-site sealing plate should be made of local materials, and the water-stop steel plate at the construction site can be used.
[0006] Compared with the prior art, the present invention adopting the above technical solution has the following outstanding features: According to the water management characteristic that blocking is not as good as draining, the present invention transforms the water flow at the leakage point into a regional pressure relief point, takes soil conservation as the goal, ensures the stability of the soil body, and ensures that the foundation pit and maintenance meet the design status. It can effectively prevent the loss of soil body after curtain support, prevent water from bringing out soil particles to form caves, and separate the soil body from the support, resulting in the occurrence of uncontrolled soil stability. BRIEF DESCRIPTION OF THE DRAWINGS
[0007] Figure 1 It is a schematic diagram of the main structure of an embodiment of the present invention; Figure 2 For the embodiment of the present invention Figure 1 Schematic diagram of the cross-sectional structure of AA; Marked in the figure: SMW method pile steel 1, plugging layer 2, plugging plate 3, water filtering layer 4, drainage pipe 5, water transfer well 6. DETAILED DESCRIPTION
[0008] The present invention will be further described below in conjunction with embodiments, the purpose of which is only to provide a better understanding of the content of the present invention. Therefore, the examples given do not limit the protection scope of the present invention.
[0009] See also Figure 1-Figure 2 , a SMW method pile water-stop curtain plugging method, according to the following steps: Step 1: Dig a sump and use a water pump to drain water; ensure that there is no water accumulation on the working surface and ensure the safety of spot welding operations; Step 2: Use plates to block the 500mm area around the water gushing point. Use steel blocking plates to weld with the SMW pile steel on both sides; Step 3: Set up a drainage pipe on the plugging plate; its location should be around the leaking point, at any convenient location, and should be above the top elevation of the foundation; the main consideration is to facilitate the construction of the drainage pipe and the back filter layer; Step 4: After cleaning the back of the plugging board, add a water filter layer; a thin quilt is stuffed into the back of the plugging board as a water filter layer, and the thin quilt is compacted with a scaffolding pipe; compacting the quilt can replenish the lost soil and strengthen the support, and at the same time can enhance the water filtering effect; excavators, sledgehammers and other machines can also be used on site to assist in compacting the quilt. In practice, 7-10 quilts are stuffed into a leaking point to ensure that the water flowing out of the drainage pipe does not contain sand or soil particles, otherwise the water filter layer needs to be filled; Step 5: Construction of the back plugging layer of the plugging plate; Since the water head height inside and outside the water-stop curtain is quite different, quick-setting materials are added during the process of inserting the quilt. After the quilt is squeezed and compacted, the upper end of the plate is plugged with quick-setting materials; Step 6: Set up a transfer water well; water from the drainage pipe must be drained away in time. Bury a section of well pipe at the edge of the sump excavated in step 1, introduce river water, and set up a pump to discharge it.
[0010] Furthermore, in step 2, the on-site sealing plate should be made of local materials, and the water-stop steel plate at the construction site can be used.
[0011] According to the water management characteristic that blocking is not as good as draining, the present invention transforms the water flow at the leakage point into a regional pressure relief point, takes soil conservation as the goal, ensures the stability of the soil body, and ensures that the foundation pit and maintenance meet the design status. It can effectively prevent the loss of soil body after curtain support, prevent water from bringing out soil particles to form caves, and separate the soil body from the support, resulting in the occurrence of uncontrolled soil stability.
[0012] The above description is only a preferred feasible embodiment of the present invention, and does not limit the scope of rights of the present invention. All equivalent changes made using the contents of the present specification and its drawings are included in the scope of rights of the present invention.
Claims
1. A SMW pile water-stop curtain plugging method, characterized in that: Follow these steps: Step 1: Dig a sump and use a water pump to drain water; ensure that there is no water accumulation on the working surface and ensure the safety of spot welding operations; Step 2: Use plates to block the 500mm area around the water gushing point. Use steel blocking plates to weld with the SMW pile steel on both sides; Step 3: Set up a drainage pipe on the plugging plate; its location should be around the leaking point, at any convenient location, and should be above the top elevation of the foundation; the main consideration is to facilitate the construction of the drainage pipe and the back filter layer; Step 4: After cleaning the back of the plugging board, add a water filter layer; a thin quilt is stuffed into the back of the plugging board as a water filter layer, and the thin quilt is compacted with a scaffolding pipe; compacting the quilt can replenish the lost soil and strengthen the support, and at the same time can enhance the water filtering effect; Step 5: Construction of the back plugging layer of the plugging plate; Since the water head height inside and outside the water-stop curtain is quite different, quick-setting materials are added during the process of inserting the quilt. After the quilt is squeezed and compacted, the upper end of the plate is plugged with quick-setting materials; Step 6: Set up a transfer water well; water from the drainage pipe must be drained away in time. Bury a section of well pipe at the edge of the sump excavated in step 1, introduce river water, and set up a pump to discharge it.
2. A SMW construction pile water-stop curtain plugging method according to claim 1, characterized in that: In step 2, the on-site sealing plate should be made of local materials, and the water-stop steel plate at the construction site can be used.