Multi-berth large-water-head wharf ship sewage receiving and conveying system

By setting up multi-layer trunk receiving pipes and ship sewage receiving barges on the dock berthing platform, sewage layering, berthing reception and transportation under different water levels and berths is realized, and the water level changes and berth changes in the existing technology are solved. The difficulty in transporting sewage improves operation ease and economic benefits.

CN119177704AActive Publication Date: 2024-12-24CCCC SECOND HARBOR CONSULTANTS CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202411529680.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-30
Publication Date
2024-12-24
Estimated Expiration
2044-10-30

AI Technical Summary

Technical Problem

The existing dock structure cannot be suitable for the requirements of stratification, berthing and transporting ship sewage. Especially in reservoir areas with large water level changes, the low head of the ship pump and the limited suction range of the self-priming pump lead to the inability to suction. Or inconvenient delivery.

Method used

A ship sewage receiving and conveying system for large water level difference terminals was designed. The first trunk receiving pipe and the second trunk receiving pipe are arranged in the multi-layer structure arranged between the berthing platforms, and the ship sewage receiving pipe is equipped with a ship sewage receiving barge. , including temporary storage cabinets, water inlet pipes, lift pumps and outlet pipes, realize the layering, berthing and receiving and transport of sewage, and use the ship pump head and lift pump to lift sewage.

Benefits of technology

The sewage reception and transportation at different water levels and berths are achieved, the problems of water level difference and berth changes are solved, operation and maintenance are simplified, investment costs are reduced, and economic and environmental benefits are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119177704A_ABST
    Figure CN119177704A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-berth large-water-head wharf ship sewage receiving and conveying system which comprises a plurality of berthing platforms and a ship sewage receiving wharf boat, the multiple layers of berthing platforms are arranged at intervals, each berthing platform comprises a plurality of ship berths, and each ship berth is provided with a first connecting pipe and a second connecting pipe; the ship sewage receiving wharf boat comprises a first temporary storage cabinet, a second temporary storage cabinet and two built-in lifting pumps, the first temporary storage cabinet is communicated with the first water inlet pipe, the second temporary storage cabinet is communicated with the second water inlet pipe, and the two built-in lifting pumps are respectively communicated with the first temporary storage cabinet and the second temporary storage cabinet. According to the embodiment of the invention, the ship can be parked on the berthing platforms with different heights according to the water level change, so that the requirements of layered and berth-separated receiving and conveying of ship oily water and ship domestic sewage are met; the lift of the ship pump is fully utilized, and the problem of insufficient lift or suction lift is solved; operation of wharf workers is simplified, and multiple berths share one sewage lifting pump; the method is simple to operate and has good economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of water transport engineering, and in particular to a ship sewage receiving and conveying system at a multi-berth large water level difference terminal. Background Art

[0002] Since 2000, my country has successively issued a number of laws and regulations on the prevention and control of pollution from ships to promote the prevention and control of pollution from inland ships. In 2021, the Yangtze River Protection Law was implemented, providing legal guidance for the prevention and control of pollution from ships on the Yangtze River. In 2020, the Chongqing Maritime Safety Administration proposed the concept of "zero emission", that is, storage on board and disposal on shore to achieve the goal of not bringing pollutants ashore. In the same year, Chongqing revised the "Regulations on the Prevention and Control of Water Pollution" to include centralized disposal of sewage on shore. In 2022, the Yangtze River Maritime Safety Administration promoted "zero emission" in Anhui and above. The "Guidelines for the Design of Onshore Reception Facilities for Inland Ports of Ship Water Pollutants" stipulates that the design of reception facilities should match the conditions of the terminal. Ship sewage storage cabinets are usually equipped, but the ship pump has a low head and can only be transported to the dock surface. At docks where the water level does not change much, ship pumps or self-priming pumps can be used to transport sewage to the dock storage device, and then pumped to the designated location. These measures and technical regulations provide a specific implementation path for the prevention and control of ship pollution.

[0003] The water level in the reservoir area varies greatly each year, and the flooding range can reach more than 30 meters. In order to adapt to the water level changes in the reservoir area, the dock structure usually adopts a multi-layer platform pile foundation structure, so that ships can berth at the corresponding berths of the platform at the corresponding elevation at different water levels. The head of ship pumps for transporting ship sewage is relatively low; self-priming pumps are limited by the suction range and have high requirements for the vacuum level of the suction pipe. When the suction pipe is long, the self-priming operation is inconvenient, and improper operation may result in the situation where sewage cannot be sucked up. When the flooding water level in the reservoir area is low, the use of ship pumps or self-priming pumps alone cannot achieve the requirements of receiving and transporting ship sewage in layers and berths. At the same time, since the lower dock surface will be flooded, it is not suitable to set up power connection equipment.

[0004] In summary, the existing wharf structure cannot meet the requirements of receiving and transporting ship sewage in layers and berths. Summary of the invention

[0005] The purpose of this application is to overcome the above-mentioned technical deficiencies and propose a ship sewage receiving and conveying system for a multi-berth large water level difference terminal, which has a simple structure, high safety, can adapt to changes in water level differences and the berthing requirements of multi-berth terminals, is easy to operate and maintain, has a low investment cost, and has good economic, environmental and social benefits.

[0006] In order to achieve the above technical objectives, this application adopts the following technical solutions: The present application provides a ship sewage receiving and conveying system for a multi-berth large water level difference wharf, including multiple berthing platforms and a ship sewage receiving pontoon: The berthing platforms are arranged in multiple layers at intervals, each layer of the berthing platforms includes multiple ship berths, and each of the berthing platforms is provided with a first connecting pipe and a second connecting pipe; and A ship sewage receiving pontoon, the ship sewage receiving pontoon includes a first temporary storage cabinet, a second temporary storage cabinet, a first water inlet pipe, a second water inlet pipe and a built-in lifting pump, the first temporary storage cabinet is connected to the first water inlet pipe, the second temporary storage cabinet is connected to the second water inlet pipe, and the two built-in lifting pumps are respectively connected to the first temporary storage cabinet and the second temporary storage cabinet.

[0007] In some embodiments of the present application, each of the berthing platforms also includes a first main receiving pipe and a second main receiving pipe, and multiple first connecting pipes arranged on the same layer are connected to the first main receiving pipe, and multiple second connecting pipes arranged on the same layer are connected to the second main receiving pipe.

[0008] In some embodiments of the present application, the first water inlet pipe is respectively connected to one end of the first trunk receiving pipe and the first temporary storage cabinet, and the second water inlet pipe is respectively connected to one end of the second trunk receiving pipe and the second temporary storage cabinet.

[0009] In some embodiments of the present application, the first connecting pipe, the second connecting pipe, the first water inlet pipe and the second water inlet pipe include flexible pipes, and the first trunk receiving pipe and the second trunk receiving pipe include hard pipes.

[0010] In some embodiments of the present application, the first trunk receiving pipe and the second trunk receiving pipe extend along the length direction of the docking platform.

[0011] In some embodiments of the present application, two lifting main pipes and two transfer main pipes are further included, and the two lifting main pipes are respectively connected to the first temporary storage cabinet and the second temporary storage cabinet, each of the lifting main pipes includes a plurality of water inlets, and the plurality of water inlets are arranged layer by layer, and the transfer main pipe is connected to the lifting main pipe.

[0012] In some embodiments of the present application, the water inlets in two adjacent lifting mains are arranged layer by layer and correspond one to one, and the corresponding two water inlets are arranged on the same layer and are respectively connected to the first temporary storage cabinet and the second temporary storage cabinet.

[0013] In some embodiments of the present application, the ship sewage receiving pontoon also includes a first outlet pipe and a second outlet pipe, and the two water inlets arranged on the same floor are respectively connected to the first temporary storage cabinet through the first outlet pipe and connected to the second temporary storage cabinet through the second outlet pipe.

[0014] In some embodiments of the present application, the first water outlet pipe and the second water outlet pipe include hoses.

[0015] In some embodiments of the present application, the lifting main pipe extends along the elevation direction of the berthing platform, and the transfer main pipe extends along the width direction of the berthing platform.

[0016] Compared with the prior art, the technical solution provided by this application has the following beneficial technical effects: The embodiment of the present application sets the first trunk receiving pipe and the second trunk receiving pipe on the berthing platform layer by layer, so that the ship can adapt to the change of water level to connect the first trunk receiving pipe and the second trunk receiving pipe, and sets a ship sewage receiving pontoon that can adapt to the change of water level, so that the multi-berth large water level difference wharf can receive and transfer ship sewage through the corresponding berth pipe of the wharf berthing platform at different water levels and different berths, and meet the requirements of receiving and transporting oily sewage and domestic sewage of ships in layers and berths in special wharf forms; fully utilizes the head of the ship pump, solves the problem of insufficient head of the ship pump or the suction head of the self-priming pump under the condition of large water level difference, and also solves the problem of limited selection of ship sewage lifting pump, the suction head of the self-priming pump is no longer a limiting factor, and the operation is convenient; simplifies the operation of the wharf staff, and when the wharf staff does not move the ship sewage receiving facilities or the sewage lifting pump, the requirement of sharing a set of sewage lifting pumps for sewage from multiple berths is achieved; the operation is simple, the daily maintenance requirements are low, the investment cost is low, and the operating cost of ship water transit transportation required when the flooding water level is low is reduced, which has good economic benefits, environmental benefits and social benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solution in this application, the following is a brief introduction to the drawings required for use in the embodiments: Figure 1 This is a pipeline schematic diagram of a ship sewage receiving and conveying system for a multi-berth large water level difference terminal provided in an embodiment of the present application; Figure 2 It is a schematic diagram of the plan position of a ship sewage receiving and conveying system at a multi-berth large water level difference terminal provided in an embodiment of the present application.

[0018] Reference numerals: 1-berthing platform, 2-ship berth, 3-ship sewage receiving pontoon, 4-lifting main pipe, 5-transfer main pipe; 21-first connecting pipe, 22-second connecting pipe, 23-first trunk receiving pipe, 24-second trunk receiving pipe; 31 - first water inlet pipe, 32 - second water inlet pipe, 33 - first temporary storage cabinet, 34 - second temporary storage cabinet, 35 - first water outlet pipe, 36 - second water outlet pipe, 41 - water inlet. DETAILED DESCRIPTION

[0019] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0020] Those skilled in the art will appreciate that in this specification, the wording "including" is an open-ended expression, which means that the described features exist but does not exclude other features. The directional words "up", "down", "left", "right", etc. are exemplary directions based on the drawings. Features defined as "first" and "second" implicitly include one or more of the features. Singular expressions can also be used in the plural. "Multiple" means two or more. The terms "installed", "connected", and "connected" can be fixed connections, detachable connections, or integrated connections; they can be directly connected, or indirectly connected through an intermediate medium, or they can be internal connections between two elements. In addition, "connected" can include wireless connections.

[0021] The purpose of this application is to overcome the above-mentioned technical deficiencies and propose a ship sewage receiving and conveying system for a multi-berth large water level difference terminal, which has a simple structure, high safety, can adapt to changes in water level differences and the berthing requirements of multi-berth terminals, is easy to operate and maintain, has a low investment cost, and has good economic, environmental and social benefits.

[0022] In order to achieve the above technical objectives, this application adopts the following technical solutions: The present application provides a system for receiving and conveying sewage from ships at a multi-berth large water level difference terminal, such as Figure 1 and Figure 2 As shown, Figure 1 This is a pipeline schematic diagram of a ship sewage receiving and conveying system for a multi-berth large water level difference terminal provided in an embodiment of the present application; Figure 2 It is a schematic diagram of the plan position of a ship sewage receiving and conveying system at a multi-berth large water level difference terminal provided in an embodiment of the present application.

[0023] A ship sewage receiving and conveying system for a multi-berth large water level difference wharf comprises a plurality of berthing platforms 1 and a ship sewage receiving pontoon 3: A multi-layer berthing platform 1, wherein the multi-layer berthing platforms 1 are arranged at intervals, each layer of the berthing platform 1 comprises a plurality of ship berths 2, and each of the ship berths 2 is provided with a first connecting pipe 21 and a second connecting pipe 22; and The ship sewage receiving pontoon 3 includes a first temporary storage cabinet 33, a second temporary storage cabinet 34 and two built-in lifting pumps. The first temporary storage cabinet 33 is connected to the first water inlet pipe 31, the second temporary storage cabinet 34 is connected to the second water inlet pipe 32, and the two built-in lifting pumps are respectively connected to the first temporary storage cabinet 33 and the second temporary storage cabinet 34.

[0024] The embodiment of the present application sets the first trunk receiving pipe 23 and the second trunk receiving pipe 24 on the berthing platform 1 layer by layer, so that the ship can adapt to the change of water level and connect the first trunk receiving pipe 23 and the second trunk receiving pipe 24. At the same time, a ship sewage receiving pontoon 3 that can adapt to the change of water level is set, so that the multi-berth large water level difference wharf can receive and transfer ship sewage through the corresponding berth pipeline of the wharf berthing platform 1 at different water levels and different berths, and meet the requirements of receiving and transporting oily sewage and domestic sewage of ships in layers and berths in special wharf forms; make full use of the ship pump head, solve the problem It solves the problem of insufficient ship pump head or self-priming pump suction under large water level difference, and also solves the problem of limited selection of dock sewage lifting pumps. The suction head of the self-priming pump is no longer a limiting factor, and the operation is easy; it simplifies the operation of dock staff, and the requirement of sharing a set of sewage lifting pumps for ships at multiple berths is achieved without the dock staff moving the ship sewage receiving facilities or sewage lifting pumps; it is simple to operate, with low daily maintenance requirements and low investment costs, and reduces the operating costs of ship water transit transportation when the flooding water level is low, with good economic, environmental and social benefits.

[0025] In some embodiments of the present application, each of the berthing platforms 1 also includes a first main receiving pipe 23 and a second main receiving pipe 24, and multiple first connecting pipes 21 arranged on the same layer are all connected to the first main receiving pipe 23, and multiple second connecting pipes 22 arranged on the same layer are all connected to the second main receiving pipe 24.

[0026] In this embodiment, a networked sewage receiving system is formed. When a ship is docked at a berth, the sewage of the ship is introduced into the corresponding first trunk receiving pipe 23 or second trunk receiving pipe 24 through the first connecting pipe 21 or the second connecting pipe 22. The trunk receiving pipe centrally transports the sewage collected from multiple berths on the same floor to the first temporary storage cabinet 33 or the second temporary storage cabinet 34 on the ship sewage receiving pontoon 3. The temporary storage cabinet temporarily stores sewage, and the built-in lifting pump extracts the sewage from the temporary storage cabinet and lifts it to the sewage treatment facility on the dock or transports it to the designated treatment site by other means.

[0027] Through the main receiving pipe, centralized management and transportation of sewage is achieved, which improves the efficiency and reliability of the system. The direct connection between each berth and the sewage receiving pontoon is reduced, which simplifies the complexity of the system and facilitates operation and maintenance. The system design can adapt to the changes of large water level differences and ensure effective operation under different water level conditions.

[0028] In some embodiments of the present application, the ship sewage receiving pontoon 3 also includes a first water inlet pipe 31 and a second water inlet pipe 32, the first water inlet pipe 31 is respectively connected to one end of the first main receiving pipe 23 and the first temporary storage cabinet 33, and the second water inlet pipe 32 is respectively connected to one end of the second main receiving pipe 24 and the second temporary storage cabinet 34.

[0029] In this embodiment, the water inlet pipe is directly connected to the main receiving pipe and the temporary storage cabinet, which simplifies the sewage flow path and improves the transportation efficiency. The water inlet pipe adopts a hose design with good compatibility, which can adapt to the sewage discharge requirements of different water levels and different types of ships, ensuring the stable operation of the system.

[0030] In some embodiments of the present application, the first connecting pipe 21, the second connecting pipe 22, the first water inlet pipe 31 and the second water inlet pipe 32 include hoses, and the first trunk receiving pipe 23 and the second trunk receiving pipe 24 include hard pipes.

[0031] In this embodiment, after the ship docks at the berth, the main receiving pipe (hard pipe) centrally transports sewage from multiple berths to the ship sewage receiving pontoon 3. The main receiving pipe adopts a hard pipe, which provides a stable transportation channel, reduces pressure loss, and improves transportation efficiency. The hard pipe has a high structural strength, can withstand large pressure and flow, and is suitable for long-term use.

[0032] The hoses (the first connecting pipe 21 and the second connecting pipe 22) are used to connect the sewage outlet of the ship and the main receiving pipe of the berthing platform 1. The sewage is transported to the main receiving pipe through the hoses, which have good flexibility and bendability, and are convenient for docking with the sewage outlet of the ship.

[0033] In some embodiments of the present application, the first trunk receiving pipe 23 and the second trunk receiving pipe 24 extend horizontally along the longitudinal direction of the wharf.

[0034] In this embodiment, the first trunk receiving pipe 23 and the second trunk receiving pipe 24 are arranged along the longitudinal horizontal direction of the berthing platform 1, that is, the length direction of the berthing platform 1 is parallel to the shoreline. The multiple first connecting pipes 21 and the second connecting pipes 22 on each berthing platform 1 are respectively connected with the horizontally extending first trunk receiving pipe 23 and the second trunk receiving pipe 24, so that the sewage of the ships on each berth is collected into the trunk receiving pipe. The sewage flows from each berth into the trunk receiving pipe through the first connecting pipe 21 and the second connecting pipe 22 and is collected in the horizontal direction.

[0035] In some embodiments of the present application, two lifting main pipes 4 and two transfer main pipes 5 are further included. The two lifting main pipes 4 are respectively connected to the first temporary storage cabinet 33 and the second temporary storage cabinet 34. Each of the lifting main pipes 4 includes a plurality of water inlets 41. The plurality of water inlets 41 are arranged layer by layer. The transfer main pipe 5 is connected to the lifting main pipe 4.

[0036] In this embodiment, the first temporary storage tank 33 and the second temporary storage tank 34 in the ship sewage receiving pontoon 3 collect sewage, and the built-in lifting pump extracts the sewage from the temporary storage tank and lifts it to the lifting main pipe 4. After the sewage is lifted to a corresponding height through the lifting main pipe 4, it is transported to the sewage treatment facility or other treatment location at a designated location on the shore through the transfer main pipe 5.

[0037] The design of the lifting main pipe 4 and the transfer main pipe 5 provides an efficient sewage transportation channel, ensuring that the sewage can be transported to the shore quickly and stably.

[0038] The design of the system helps to reduce pollution to the aquatic environment and meets environmental protection requirements.

[0039] In some embodiments of the present application, the water inlets 41 in two adjacent lifting mains 4 are arranged layer by layer and correspond one to one, and the corresponding two water inlets 41 are arranged on the same layer and are respectively connected to the first temporary storage cabinet 33 and the second temporary storage cabinet 34.

[0040] In this embodiment, the water inlets 41 of two adjacent lifting main pipes 4 are arranged at the same level, forming a pair of corresponding relationships, so as to avoid the domestic sewage and the oily sewage from crossing each other during the transfer process.

[0041] In some embodiments of the present application, the ship sewage receiving pontoon 3 also includes a first outlet pipe 35 and a second outlet pipe 36, and the two water inlets 41 arranged on the same floor are respectively connected to the first temporary storage cabinet 33 through the first outlet pipe 35 and connected to the second temporary storage cabinet 34 through the second outlet pipe 36.

[0042] In this embodiment, the water inlets 41 arranged layer by layer can realize the stratified collection of sewage from different berths and adapt to the discharge of ship sewage under different water level conditions.

[0043] Specifically, the height of the ship sewage receiving pontoon 3 is different according to different water levels, and the pontoon is connected to two water inlets 41 on the same level as the pontoon through a first outlet pipe 35 and a second outlet pipe 36 .

[0044] In some embodiments of the present application, the first water outlet pipe 35 and the second water outlet pipe 36 include hoses.

[0045] In this embodiment, these hoses have good flexibility and bendability, and are convenient for docking with the sewage outlet of the pontoon and the water inlet 41 of the lifting main pipe 4 .

[0046] In some embodiments of the present application, the lifting main pipe 4 extends vertically along the wharf pile foundation, that is, extends along the elevation direction of the berthing platform. The transfer main pipe 5 extends horizontally along the wharf approach bridge direction and extends along the width direction of the berthing platform.

[0047] In this embodiment, the oily wastewater and domestic sewage in the first temporary storage tank 33 and the second temporary storage tank 34 are pumped into two lifting mains 4 respectively by built-in lifting pumps, and the sewage rises in the lifting mains 4 and is output to a designated location on the shore through the transfer mains 5 at the top of the lifting mains 4 or near the top.

[0048] Optionally, the transfer trunk pipe 5 first extends horizontally along a first direction, parallel to the dock plane, to facilitate the connection between the ship sewage receiving pontoon 3 and the sewage treatment facilities or other treatment locations on shore.

[0049] After extending horizontally for a certain distance, the transfer main pipe 5 extends vertically along a second direction, which is perpendicular to the first direction and parallel to the wharf plane. The transfer main pipe 5 repeats the above horizontal extension and vertical extension process to form a spiral path at the same elevation.

[0050] Through the design of this circulation path, the transfer main pipe 5 forms a compact layout in space, reducing the floor space and making the system more compact and efficient.

[0051] The circulation path design of the transfer main pipe 5 can greatly reduce the occupied area, which is particularly important in a dock environment with limited space.

[0052] The compact layout improves space utilization efficiency, allowing the system to efficiently complete sewage collection and transportation tasks within a limited space.

[0053] Compared with the prior art, the technical solution provided by this application has the following beneficial technical effects: The embodiment of the present application sets the first trunk receiving pipe 23 and the second trunk receiving pipe 24 on the berthing platform 1 layer by layer, so that the ship can adapt to the change of water level and connect the first trunk receiving pipe 23 and the second trunk receiving pipe 24. At the same time, a ship sewage receiving pontoon 3 that can adapt to the change of water level is set, so that the multi-berth large water level difference wharf can receive and transfer ship sewage through the corresponding berth pipeline of the wharf berthing platform 1 at different water levels and different berths, and meet the requirements of receiving and transporting oily sewage and domestic sewage of ships in layers and berths in special wharf forms; make full use of the ship pump head, solve the problem It solves the problem of insufficient ship pump head or self-priming pump suction under large water level difference, and also solves the problem of limited selection of dock sewage lifting pumps. The suction head of the self-priming pump is no longer a limiting factor, and the operation is easy; it simplifies the operation of dock staff, and the requirement of sharing a set of sewage lifting pumps for ships at multiple berths is achieved without the dock staff moving the ship sewage receiving facilities or sewage lifting pumps; it is simple to operate, with low daily maintenance requirements and low investment costs, and reduces the operating costs of ship water transit transportation when the flooding water level is low, with good economic, environmental and social benefits.

[0054] Those skilled in the art will appreciate that the various operations, methods, steps, measures, and schemes in the processes discussed in this application may be alternated, modified, rearranged, decomposed, combined, or deleted.

[0055] The specific implementation methods of the present application described above do not constitute a limitation on the protection scope of the present application. Any other corresponding changes and modifications made according to the technical concept of the present application should be included in the protection scope of the claims of the present application.

Claims

1. A system for receiving and conveying sewage from ships at a multi-berth large water level difference wharf, characterized in that: include: A multi-layer berthing platform, wherein the multi-layer berthing platforms are arranged at intervals, each layer of the berthing platform comprises a plurality of ship berths, and each of the ship berths is provided with a first connecting pipe and a second connecting pipe; as well as A ship sewage receiving pontoon, the ship sewage receiving pontoon includes a first temporary storage cabinet, a second temporary storage cabinet, a first water inlet pipe, a second water inlet pipe and two built-in lifting pumps, the first temporary storage cabinet is connected to the first water inlet pipe, the second temporary storage cabinet is connected to the second water inlet pipe, and the two built-in lifting pumps are respectively connected to the first temporary storage cabinet and the second temporary storage cabinet.

2. The system for receiving and conveying sewage from ships at a multi-berth large water level difference terminal according to claim 1, characterized in that: Each of the berthing platforms further includes a first trunk receiving pipe and a second trunk receiving pipe. The plurality of the first connecting pipes arranged on the same layer are all connected to the first trunk receiving pipe, and the plurality of the second connecting pipes arranged on the same layer are all connected to the second trunk receiving pipe.

3. The system for receiving and conveying sewage from ships at a multi-berth large water level difference wharf according to claim 2 is characterized in that: The first water inlet pipe is respectively connected to one end of the first trunk receiving pipe and the first temporary storage cabinet, and the second water inlet pipe is respectively connected to one end of the second trunk receiving pipe and the second temporary storage cabinet.

4. A sewage receiving and conveying system for ships at a multi-berth large water level difference terminal according to claim 3, characterized in that: The first connecting pipe, the second connecting pipe, the first water inlet pipe and the second water inlet pipe include flexible pipes, and the first trunk receiving pipe and the second trunk receiving pipe include hard pipes.

5. The system for receiving and conveying sewage from ships at a multi-berth large water level difference wharf according to claim 3 is characterized in that: The first trunk receiving pipe and the second trunk receiving pipe extend along the length direction of the docking platform.

6. The system for receiving and conveying sewage from ships at a multi-berth large water level difference wharf according to claim 1, characterized in that: It also includes two lifting main pipes and two transfer main pipes. The two lifting main pipes are connected to the first temporary storage cabinet and the second temporary storage cabinet respectively. Each of the lifting main pipes includes multiple water inlets, and the multiple water inlets are arranged layer by layer. The transfer main pipe is connected to the lifting main pipe.

7. The system for receiving and conveying sewage from ships at a multi-berth large water level difference wharf according to claim 6, characterized in that: The water inlets in two adjacent lifting main pipes are arranged layer by layer and correspond one to one, and the corresponding two water inlets are arranged on the same layer and are respectively connected to the first temporary storage cabinet and the second temporary storage cabinet.

8. The system for receiving and conveying sewage from ships at a multi-berth large water level difference wharf according to claim 7, characterized in that: The ship sewage receiving pontoon also includes a first outlet pipe and a second outlet pipe. The two water inlets arranged on the same floor are respectively connected to the first temporary storage cabinet through the first outlet pipe and connected to the second temporary storage cabinet through the second outlet pipe.

9. A system for receiving and conveying sewage from ships at a multi-berth large water level difference wharf according to claim 8, characterized in that: The first water outlet pipe and the second water outlet pipe include hoses.

10. The system for receiving and conveying sewage from ships at a multi-berth large water level difference wharf according to claim 6, characterized in that: The lifting main pipe extends along the elevation direction of the berthing platform, and the transfer main pipe extends along the width direction of the berthing platform.

Citation Information

Patent Citations

  • Facility for taking water in rapids river bed and overall installation and construction method thereof

    CN110295648A

  • Mobile ship sewage receiving device and receiving method

    CN117905152A

  • Large-water-head wharf ship sewage treatment integrated intelligent system and method

    CN118724362A

  • Novel comb type slope passenger terminal

    CN211171807U

  • Multi-pipe ship-shore connection system for water system communication

    CN211232000U