Tunnel blast hole drilling and blast pipe fixing integrated device
By designing an integrated tunnel blasting hole drilling device, the precise placement of graded drilling and blasting pipes is achieved using hydraulic rods and conveying components, solving the problem that existing devices cannot fix and place blasting pipes, and improving blasting effect and safety and adapt to different geological conditions.
Patent Information
- Application Number
- CN202411343212.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-25
- Publication Date
- 2024-12-24
AI Technical Summary
The existing tunnel blasting hole drilling device cannot transport the blasting tube fixing device to the appropriate position after drilling and further drilling to place the blasting tube. It does not have the function of hierarchical drilling, and the blasting tube fixing structure is directly blasted after the fixing is completed. It will affect the blasting effect.
A integrated device for fixing of tunnel blasting holes and blasting tubes is designed, including a trolley, support plate, hydraulic rod, drive assembly, drilling barrel, spiral blade, connecting block and conveying assembly, and the drill barrel and spiral are driven by hydraulic rods. The blade rotates to achieve drilling, and the connecting barrel and drill bit are transported to the appropriate position through the conveying assembly, which realizes graded drilling and precise placement of the burst tube. At the same time, the split connecting barrel and rubber block are used to fix and support the burst tube to ensure blasting Effect.
The hierarchical drilling function is realized to ensure the precise placement of the blasting tube, enhance the use effect of the device, avoid affecting the blasting effect after the blasting tube is fixed, and to adapt to the hardness of different rock layers by adjusting the drill bit angle, improving crushing efficiency and safety.
Smart Images

Figure CN119177859A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an integrated device for drilling a tunnel blasting hole and fixing a blasting tube, and belongs to the field of tunnel blasting. Background Art
[0002] The drilling and blasting method is a commonly used method for the design and construction of tunnels and underground projects. It can achieve rapid construction, especially in overcoming complex geology, complex sections, super-large sections and complex surrounding environmental conditions. It has great advantages. During tunnel construction, a tunnel blasting hole drilling device is required. The existing tunnel blasting hole drilling device still has some shortcomings.
[0003] For example, the invention patent with publication number CN117684867B discloses a blasting hole drilling device for tunnel construction, including a support tube, an inner tube, a drive shaft, a drill bit, a discharge cylinder, a spiral blade and a gear pair; the two ends of the inner tube are fixedly connected to the inside of the support tube; the drive shaft is inside the inner tube, and the two ends of the drive shaft pass through the two ends of the support tube; the discharge cylinder is sleeved on the outside of the support tube; the spiral blade is fixedly connected to the outside of the discharge cylinder; one end of the drive shaft is clamped with the drill bit; the drill bit is sleeved on the outside of the end of the support tube away from the gear pair, and is rotatably connected to the end of the support tube; the outside of the other end of the drive shaft is meshed with the inside of the end of the discharge cylinder It is connected with a gear pair, which can shorten the drilling and cleaning of blastholes into one process, and can automatically clean the debris in the blasthole while drilling the blasthole, effectively improving the overall working efficiency of drilling and blasting, while reducing the labor intensity of the staff and avoiding the splashing of debris. Although the above device can prevent the splashing of debris, when in use, the device does not have the function of fixing the blasting tube, and the blasting tube fixing device cannot be transported to a suitable position after the tunnel is drilled and further holes cannot be drilled to place the blasting tube. It does not have the function of graded drilling, and the drill bit of the existing drilling device is usually fixed as a whole. Direct blasting of the blasting tube fixing structure after fixing will affect the blasting effect.
[0004] Therefore, we have made improvements to this and proposed an integrated device for tunnel blasting hole drilling and blasting tube fixing. Summary of the invention
[0005] (I) The technical problem to be solved by the present invention is that the existing tunnel blasting hole drilling device cannot transport the blasting tube fixing device to a suitable position after the tunnel is drilled and further drill holes to place the blasting tube, and does not have a graded drilling function. Direct blasting of the blasting tube fixing structure after the fixing is completed will affect the blasting effect.
[0006] (II) Technical solution
[0007] In order to achieve the above-mentioned invention object, the present invention provides an integrated device for drilling a tunnel blasting hole and fixing a blasting tube, comprising a trolley, a support plate is fixedly arranged on the top of the trolley, a connecting plate is installed on the top of the support plate, a first hydraulic rod is installed on the connecting plate, a first driving assembly is installed on the front side of the first hydraulic rod, a support rod is installed on the first driving assembly, a drill barrel is fixedly connected to the support rod, a spiral blade is arranged on the outer side of the drill barrel, a connecting block is installed on the spiral blade, a first drill bit is fixedly arranged on the connecting block, a first connecting tube and a second connecting tube are slidably installed in the drill barrel, and a first connecting tube is fixedly connected to the first connecting tube. There is a first convex plate, and the second connecting tube is fixedly connected with a second convex plate. The bottoms of the first convex plate and the second convex plate are fixedly connected with a supporting shaft, and a second drill bit is fixedly connected below the supporting shaft. A conveying assembly is installed in the drill tube, and a second driving assembly is installed in the second convex plate. A keyway is provided on the spiral blade, and a spline block is installed in the keyway. The spline block and the connecting block are fixedly connected, a first through hole is provided in the middle of the spline block, and a fixed shaft is fitted in the first through hole. The fixed shaft and the spiral blade are fixedly connected, and a second through hole is provided on the fixed shaft and the spiral blade, and an adjustment assembly is installed in the fixed shaft and the connecting block.
[0008] Among them, the first driving assembly includes a first supporting cylinder fixedly connected to the front side of the first hydraulic rod, a supporting block is fixedly installed on the first supporting cylinder, a first motor is installed on the supporting block, a gear is connected to the output shaft of the first motor, a gear ring is meshedly connected below the gear, a rotating cylinder is fixedly arranged inside the gear ring, the rotating cylinder and the supporting rod are fixedly connected, and the rotating cylinder and the first supporting cylinder are rotatably connected.
[0009] Among them, a movable groove, a first connecting groove, a second connecting groove and a third connecting groove are opened in the drill barrel, and the movable groove, the first connecting groove, the second connecting groove and the third connecting groove are connected to each other. The drill barrel is a truncated cone structure.
[0010] Wherein, rubber plates are connected to the inner walls of the first connecting tube and the second connecting tube. The rubber plates are evenly spaced inside the first connecting tube and the second connecting tube, and the rubber plates are in an arc shape.
[0011] The second connecting tube is provided with a groove, a rubber block is fitted in the groove, the rubber block is a spherical structure, the center of the rubber block is located inside the groove, and the rubber block is fixedly connected to the first connecting tube.
[0012] Among them, the second drill bit is a semi-cylindrical structure, and two adjacent second drill bits fit together. The outer walls of the first connecting tube, the second connecting tube, the first convex plate and the second convex plate all fit together with the inner wall of the movable groove.
[0013] Among them, the conveying assembly includes a slider slidably installed in the drill barrel, a slide groove for the slider to move is opened in the drill barrel, a first spring is fixedly connected between the slider and the drill barrel, a second motor is fixedly arranged on the slider, a rotating wheel is connected to the output shaft of the second motor, and transverse convex patterns are arranged on the outer side of the rotating wheel and the rear sides of the first connecting tube and the second connecting tube.
[0014] The second driving assembly includes a third motor fixedly connected to the second convex plate, the output shaft of the third motor is fixedly connected to a connecting shaft, the connecting shaft is fixedly connected to a rubber rotating disk, and the rubber rotating disk is protruding on the second convex plate.
[0015] Among them, the adjustment component includes a fixed block fixedly connected to the inner wall of the second through hole, a guide ring is fixedly connected to the fixed block, an inner groove is provided inside the fixed shaft, a clamping block is fitted in the inner groove, a second spring is fixedly connected between the clamping block and the fixed shaft, a traction steel rope is fixedly connected to the clamping block, the traction steel rope is connected to the connecting block through the guide ring, and an installation groove for docking with the fixed shaft and a docking groove for docking with the clamping block are provided in the connecting block.
[0016] Wherein, a second hydraulic rod is installed on the rear side of the connecting plate, and the trolley, the supporting plate and the connecting plate are fixedly connected to form an integral structure.
[0017] (III) Beneficial effects
[0018] The invention provides a tunnel blasting hole drilling and blasting tube fixing integrated device, which has the following beneficial effects:
[0019] 1. By setting up a first driving component, a drill barrel, a spiral blade, a first drill bit and a conveying component, the first driving component actively rotates the spiral blade of the drill barrel and the first drill bit. Since the first drill bit is evenly distributed along the spiral line of the spiral blade, the first drill bit can continuously perform crushing work during the drilling process of the device. When in use, the device can also continuously convey the first connecting tube and the second connecting tube for fixing the blasting tube outward through the conveying component. During the conveying process, the second drill bit can realize graded drilling work to ensure that the blasting tube can be accurately placed, thereby enhancing the use effect of the device and solving the problem that the existing blasting drilling device cannot convey the blasting tube fixing device to a suitable position after drilling a tunnel and further drill a hole to place the blasting tube. The device can not only realize the graded drilling function, but also can accurately place the blasting tube after drilling to a suitable position.
[0020] 2. By setting up the second drive assembly and the rubber plate, the rubber plate can support the blasting tube without the inner walls of the first connecting tube and the second connecting tube contacting the blasting tube, and can continuously transport the blasting tube outward through the rubber turntable on the second drive assembly. In order to ensure that the blasting tube can be placed at an angle during secondary drilling, the device can tilt the drill tube through the second hydraulic rod so that the second drill bit can drill obliquely downward, thereby ensuring the safety of the device when in use.
[0021] 3. By providing a detachable first connecting tube and a second connecting tube, the blasting tube, the first connecting tube and the second connecting tube can be separated from the device as a whole. The first connecting tube and the second connecting tube can not only be butted against each other through the rubber block of the spherical structure, but can also be separated when the inner walls of the first connecting tube and the second connecting tube are subjected to an outward supporting force. The first connecting tube and the second connecting tube not only have the function of fixing the blasting tube, but also can be used normally without affecting the blasting tube after separation. Compared with the conventional blasting tube fixing structure, the fixing structure can be automatically separated when subjected to impact force, thereby ensuring the blasting effect of the device, and solving the problem that the blasting tube fixing structure of the existing drilling device will affect the blasting effect if it is directly blasted after the fixing is completed.
[0022] 4. The device is provided with an adjustment component spline block and keyway. When the device is in use, the connection block can be pulled, and the connection block will pull the clamping block through the traction steel rope. After the clamping block is stored in the inner groove, the docking angle between the spline block and the keyway can be changed, so that the orientation of the first drill bit on the connection block is no longer tangent to the spiral line of the spiral blade, allowing adjustment according to the hardness and properties of different rock formations. By changing the angle of the first drill bit, the contact mode between the drill bit and the rock can be optimized, thereby improving the crushing effect and crushing efficiency. The angle adjustment of the first drill bit enables the device to adapt to different geological conditions and achieve more efficient rock crushing work. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0025] Figure 2 This is a schematic diagram of the internal structure of the drill tube of the present invention;
[0026] Figure 3 This is a schematic diagram of the connection structure between the first connecting tube and the second connecting tube of the present invention;
[0027] Figure 4 for Figure 3 A magnified schematic diagram of the structure at center A;
[0028] Figure 5 for Figure 3 A magnified schematic diagram of the structure at B in the middle;
[0029] Figure 6 This is a schematic diagram of the split structure of the connecting block and the spline block of the present invention;
[0030] Figure 7 This is a schematic diagram of the split structure of the connecting block and the fixed shaft of the present invention;
[0031] Figure 8 for Figure 7 A magnified schematic diagram of the structure at C in the middle;
[0032] Fig. 9 This is a schematic diagram of the separation structure of the first connecting tube and the second connecting tube of the present invention;
[0033] Fig.10 for Fig. 9 A magnified schematic diagram of the structure at D in the middle;
[0034] Fig.11 This is a schematic diagram of the connection structure between the support shaft and the second drill bit of the present invention;
[0035] Fig.12 It is a schematic diagram of the connection structure between the drill tube and the spiral blade of the present invention.
[0036] Figure numerals: 1, cart; 2, support plate; 3, first hydraulic rod; 4, first drive assembly; 401, first support cylinder; 402, support block; 403, first motor; 404, gear; 405, gear ring; 406, rotating cylinder; 5, support rod; 6, drill cylinder; 7, spiral blade; 8, connecting block; 9, first drill bit; 10, moving groove; 11, first connecting groove; 12, second connecting groove; 13, third connecting groove; 14, first connecting cylinder; 15, second connecting cylinder; 16, first convex plate; 17, second convex plate; 18, rubber plate; 19, support shaft; 20, second drill bit; 21, conveying assembly; 2101, slider; 2102, second motor; 2103, slide groove; 2104, first spring; 2105, rotating wheel; 2106, transverse convex pattern; 22, groove; 23, rubber block; 24, second driving assembly; 2401, third motor; 2402, connecting shaft; 2403, rubber turntable; 25, keyway; 26, spline block; 27, first through hole; 28, fixed shaft; 29, second through hole; 30, adjusting assembly; 3001, fixed block; 3002, second spring; 3003, clamping block; 3004, traction rope; 3005, guide ring; 3006, connecting block; 3007, mounting groove; 3008, docking groove; 3009, inner groove; 31, connecting plate; 32, second hydraulic rod. DETAILED DESCRIPTION
[0037] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples of the specification. The following examples are only used to illustrate the present invention, but cannot be used to limit the scope of the present invention.
[0038] Embodiment 1:
[0039] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8 , Fig. 9 , Fig.10 , Fig.11 and Fig.12As shown, the present embodiment proposes an integrated device for tunnel blasting hole drilling and blasting tube fixing, including a trolley 1, a support plate 2 is fixedly arranged above the trolley 1, a connecting plate 31 is installed above the support plate 2, a first hydraulic rod 3 is installed on the connecting plate 31, a first driving assembly 4 is installed on the front side of the first hydraulic rod 3, the support plate 2 and the trolley 1 are used to support the device as a whole, the first hydraulic rod 3 enables the device to continue to drill forward, thereby realizing the blasting hole drilling function, a support rod 5 is installed on the first driving assembly 4, a drill barrel 6 is fixedly connected to the support rod 5, a spiral blade 7 is arranged on the outer side of the drill barrel 6, a connecting block 8 is installed on the spiral blade 7, a first drill bit 9 is fixedly arranged on the connecting block 8, and the connecting block 8 on the spiral blade 7 cooperates with the first drill bit 9 to be able to Multi-point crushing is performed simultaneously, thereby improving the drilling efficiency. Multiple first drill bits 9 equidistantly distributed along the spiral line can ensure that the inside of the tunnel can be evenly crushed during drilling, thereby reducing equipment wear. A first connecting tube 14 and a second connecting tube 15 are slidably installed in the drill barrel 6. The first connecting tube 14 and the second connecting tube 15 are used to fix the blasting tube. A first convex plate 16 is fixedly connected to the first connecting tube 14, and a second convex plate 17 is fixedly connected to the second connecting tube 15. The bottoms of the first convex plate 16 and the second convex plate 17 are fixedly connected to a support shaft 19, and a second drill bit 20 is fixedly connected to the lower part of the support shaft 19. A conveying assembly 21 is installed in the drill barrel 6. The conveying assembly 21 enables the drill barrel 6 on the device to drive the first connecting tube 14 and the second connecting tube during continuous rotation. The second drill bit 20 on 15 rotates to realize the secondary drilling function. The conveying assembly 21 can make the second drill bit 20 continuously contact the rock formation in the tunnel, so as to ensure the drilling effect. The second driving assembly 24 is installed in the second convex plate 17. After the secondary drilling is completed, the blasting tube in the first connecting tube 14 and the second connecting tube 15 can be conveyed to the outside of the device through the second driving assembly 24. When the second drill bit 20 is stuck, the first connecting tube 14 and the second connecting tube 15 and the blasting tube inside can be conveyed to the outside of the device through the conveying assembly 21. The impact force during blasting can separate the first connecting tube 14 and the second connecting tube 15. The second drill bits 20 of the two semi-cylindrical structures can also be separated. The first connecting tube 14 and the second connecting tube 15 of the separated structure It can not only fix the blasting tube, but also ensure the blasting effect. A keyway 25 is provided on the spiral blade 7, and a spline block 26 is installed in the keyway 25. The spline block 26 and the connecting block 8 are fixedly connected. A first through hole 27 is provided in the middle of the spline block 26, and a fixed shaft 28 is fitted in the first through hole 27. The fixed shaft 28 and the spiral blade 7 are fixedly connected. A second through hole 29 is provided on the fixed shaft 28 and the spiral blade 7. An adjusting component 30 is installed in the fixed shaft 28 and the connecting block 8. The adjusting component 30 can change the engagement state between the fixed shaft 28 and the connecting block 8. The angle of the second drill bit 20 on the device can be changed by changing the angle of the spline block 26 in the keyway 25. When the device is used in different rock formations and geological conditions,The difficulty of rock crushing and the optimal crushing angle will vary. The adjustable crushing head angle makes the device more flexible to use and can be adjusted according to actual conditions to cope with complex geological environments.
[0040] Embodiment 2:
[0041] The solution in Example 1 is further introduced below in combination with a specific working method, as described below:
[0042] like Figure 1 As shown, as a preferred embodiment, on the basis of the above method, further, the first drive assembly 4 includes a first support cylinder 401 fixedly connected to the front side of the first hydraulic rod 3, a support block 402 is fixedly installed on the first support cylinder 401, a first motor 403 is installed on the support block 402, a gear 404 is connected to the output shaft of the first motor 403, a gear ring 405 is meshingly connected below the gear 404, a rotating cylinder 406 is fixedly arranged inside the gear ring 405, the rotating cylinder 406 and the support rod 5 are fixedly connected, the rotating cylinder 406 and the first support cylinder 401 are rotatably connected, the first support cylinder 401 is used to support the support block 402, the gear 404 is driven to rotate by the first motor 403 on the support block 402, the gear 404 drives the gear ring 405 and the rotating cylinder 406 with larger diameters to rotate, thereby increasing the torque during drilling.
[0043] like Figure 1 , Figure 2 and Figure 3 As shown, as a preferred embodiment, on the basis of the above-mentioned method, further, a movable groove 10, a first connecting groove 11, a second connecting groove 12 and a third connecting groove 13 are opened in the drill barrel 6, and the first connecting groove 11, the second connecting groove 12 and the third connecting groove 13 are convenient for the subsequent replenishment of the blasting tube, and the movable groove 10 can move the blasting tube out of the device, and the movable groove 10, the first connecting groove 11, the second connecting groove 12 and the third connecting groove 13 are connected to each other, and the drill barrel 6 is a truncated cone structure. When the drill barrel 6 with a truncated cone structure rotates, the device can achieve a multi-point contact effect when drilling, thereby improving the drilling efficiency of the device.
[0044] like Figure 3 As shown, as a preferred embodiment, on the basis of the above-mentioned manner, further, rubber plates 18 are connected to the inner walls of the first connecting tube 14 and the second connecting tube 15, and the rubber plates 18 are evenly spaced inside the first connecting tube 14 and the second connecting tube 15, and the rubber plates 18 are arc-shaped. The rubber plates 18 in the first connecting tube 14 and the second connecting tube 15 can ensure that the bursting tube is stably supported, so that the first connecting tube 14 and the second connecting tube 15 and the bursting tube can be pushed out as a whole later, or the bursting tube can be pushed out separately, so as to ensure the stability of the device when it is used.
[0045] like Fig.10 As shown, as a preferred embodiment, on the basis of the above-mentioned manner, further, a groove 22 is provided on the second connecting tube 15, and a rubber block 23 is fitted in the groove 22. The rubber block 23 is a spherical structure, and the center of the rubber block 23 is located inside the groove 22. The rubber block 23 and the first connecting tube 14 are fixedly connected. The rubber block 23 with a spherical structure can maintain a flexible engagement state after the first connecting tube 14 and the second connecting tube 15 are installed. When the inner walls of the first connecting tube 14 and the second connecting tube 15 are pushed outward, the rubber block 23 can be separated from the groove 22. The first connecting tube 14 and the second connecting tube 15 can not only support and fix the blasting tube, but also ensure that the blasting effect is not affected after the first connecting tube 14 and the second connecting tube 15 and the blasting tube are removed as a whole.
[0046] like Figure 3 As shown, as a preferred embodiment, on the basis of the above method, further, the second drill bit 20 is a semi-cylindrical structure, the two adjacent second drill bits 20 fit together, the outer walls of the first connecting tube 14, the second connecting tube 15, the first convex plate 16 and the second convex plate 17 are all fitted with the inner wall of the movable groove 10, and the inner wall of the movable groove 10 can abut the outer walls of the first connecting tube 14, the second connecting tube 15, the first convex plate 16 and the second convex plate 17, so that the first connecting tube 14, the second connecting tube 15, the first convex plate 16 and the second convex plate 17 rotate synchronously as a whole, so as to realize the secondary drilling function later.
[0047] like Figure 3 and Figure 4 As shown, as a preferred embodiment, on the basis of the above-mentioned manner, further, the conveying assembly 21 includes a slider 2101 slidably installed in the drill barrel 6, a slide groove 2103 for the slider 2101 to move is provided in the drill barrel 6, a first spring 2104 is fixedly connected between the slider 2101 and the drill barrel 6, a second motor 2102 is fixedly provided on the slider 2101, a rotating wheel 2105 is connected to the output shaft of the second motor 2102, and transverse convex grooves 2106 are provided on the outer side of the rotating wheel 2105 and the rear sides of the first connecting tube 14 and the second connecting tube 15. The slider 2101 can be under the pulling force of the first spring 2104, so that the rotating wheel 2105 on the second motor 2102 is always in contact with the first connecting tube 14 and the second connecting tube 15, so that the blasting tube and the first connecting tube 14 and the second connecting tube 15 can be subsequently conveyed outward.
[0048] like Figure 3 and Figure 5As shown, as a preferred embodiment, on the basis of the above-mentioned method, further, the second driving assembly 24 includes a third motor 2401 fixedly connected to the second convex plate 17, and a connecting shaft 2402 is fixedly connected to the output shaft of the third motor 2401, and a rubber turntable 2403 is fixedly connected to the connecting shaft 2402. The rubber turntable 2403 is protruding on the second convex plate 17, and the protruding rubber turntable 2403 can abut against the blasting tube. The connecting shaft 2402 and the rubber turntable 2403 are driven to rotate by the third motor 2401, so that the blasting tube is transported outward, thereby improving the convenience of the device when used.
[0049] like Figure 6 , Figure 7 and Figure 8 As shown, as a preferred embodiment, on the basis of the above-mentioned method, the further adjustment component 30 includes a fixed block 3001 fixedly connected to the inner wall of the second through hole 29, a guide ring 3005 is fixedly connected to the fixed block 3001, an inner groove 3009 is provided inside the fixed shaft 28, a clamping block 3003 is fitted in the inner groove 3009, a second spring 3002 is fixedly connected between the clamping block 3003 and the fixed shaft 28, a traction steel rope 3004 is fixedly connected to the clamping block 3003, the traction steel rope 3004 is guided by the guide ring 3005 and connected to the connecting block 3006, and a connection block 8 is provided in the connecting block 8 for docking with the fixed shaft 28 The installation groove 3007 and the docking groove 3008 for docking with the clamping block 3003, the device can change the angle of the connecting block 8, by pulling the connecting block 3006, the connecting block 3006 pulls the clamping block 3003 inside the inner groove 3009 through the traction steel rope 3004, the second spring 3002 is compressed until the clamping block 3003 is completely received inside the fixed shaft 28, at this time the connecting block 8 can be removed, after changing the angle of the connecting block 8, the clamping block 3003 is aligned with the docking groove 3008 at different positions in the installation groove 3007, and the engagement work of the fixed shaft 28 and the connecting block 8 is completed again, so that the angle of the connecting block 8 on the device can be adjusted.
[0050] like Figure 1 As shown, as a preferred embodiment, on the basis of the above-mentioned method, further, a second hydraulic rod 32 is installed on the rear side of the connecting plate 31, and the trolley 1, the support plate 2 and the connecting plate 31 are fixedly connected as an integral structure to ensure the overall stability of the device. When the device is drilling a hole for the second time, the extension of the second hydraulic rod 32 can make the drilling direction point obliquely downward in the ground direction, thereby ensuring that the blasting tube can be stably placed.
[0051] Embodiment 3:
[0052] The schemes in Example 1 and Example 2 are further introduced below in combination with specific working methods, as described below for details:
[0053] Specifically, when the tunnel blast hole drilling and blasting tube fixing integrated device is used: Figure 1 and Figure 2 As shown, when the device is in use, the second hydraulic rod 32 on the connecting plate 31 is first extended to make the cart 1 tilt forward, and the blasting tube is installed into the first connecting tube 14 and the second connecting tube 15 in the movable groove 10 through the first connecting groove 11, the second connecting groove 12 and the third connecting groove 13. The rubber plate 18 in the first connecting tube 14 and the second connecting tube 15 is used to support both sides of the blasting tube. The rubber plate 18 with an arc-shaped supporting structure allows the blasting tube to be buffered during the drilling process, thereby playing a safety protection function. When the device is drilling, the first motor 403 on the support block 402 drives the gear 404 to rotate, the gear 404 drives the gear ring 405 with a larger diameter to rotate, and the rotating cylinder 406 rotates on the first support cylinder 401, driving the support rod 5, the drill cylinder 6, the spiral blade 7, the connecting block 8 and the first drill bit 9 to rotate. Since the first drill bits 9 arranged equidistantly along the spiral line of the spiral blade 7 are tangent to the spiral line, the device can keep the first drill bit 9 in multi-point contact with the inside of the tunnel when the first hydraulic rod 3 is extended for drilling, thereby improving the drilling efficiency of the device.
[0054] like Figure 3 , Figure 4 , Figure 5 , Fig. 9 and Fig.10 As shown, after completing the first drilling, the second drilling can be performed. It should be noted that Fig. 9 The back side of the first connecting tube 14 and the second connecting tube 15 is shown in FIG. Fig. 9 The positions of the first connecting tube 14 and the second connecting tube 15 are Fig.11 The positions of the first connecting tube 14 and the second connecting tube 15 are opposite. Figure 3 and Figure 4As shown, the slider 2101 on the conveying assembly 21 can slide inside the slide groove 2103 under the pulling force of the first spring 2104, so that the transverse convex groove 2106 on the rotating wheel 2105 on the second motor 2102 is always in contact with the transverse convex groove 2106 on the first connecting tube 14 and the second connecting tube 15, so that when the rotating wheel 2105 rotates, it drives the first connecting tube 14 and the second connecting tube 15 and the outer side of the blasting tube device inside thereof to move, so as to subsequently convey the blasting tube and the first connecting tube 14 and the second connecting tube 15 outward. After conveying to a suitable position, the drill tube 6 continues to rotate, driving the first connecting tube 14 and the second connecting tube 15 as well as the support shaft 19 and the second drill bit 20 to rotate continuously. During the rotation of the second drill bit 20, it can be in contact with the inside of the tunnel, thereby realizing the secondary drilling function. During the secondary drilling, the second hydraulic rod 32 can be extended, and the cart 1 can be tilted forward as a whole, so that the drilling direction can point to the obliquely downward ground direction, thereby ensuring that the blasting tube can be stably placed in the hole inclined to the ground, ensuring that the blasting tube can be stably placed. When placing the blasting tube, the third motor 2401 drives the connecting shaft 2402 and the rubber turntable 2403 to rotate, and the rubber turntable 2403 can abut against the blasting tube. When the rubber turntable 2403 rotates, the blasting tube is transported outward to the hole of the secondary drilling. The first connecting tube 14 and the second connecting tube 15 on the device can not only play the function of fixing the blasting tube, but also after the inner walls of the first connecting tube 14 and the second connecting tube 15 are pushed outward, the rubber block 23 on the first connecting tube 14 will be separated from the groove 22 in the second connecting tube 15 under the action of tension. After the first connecting tube 14 and the second connecting tube 15 and the blasting tube are transported as a whole into the blasting hole, there is no need to remove the first connecting tube 14 and the second connecting tube 15, which are the fixing structures outside the blasting tube, and the blasting effect of the device can still be guaranteed.
[0055] like Figure 1 , Figure 6 , Figure 7 , Figure 8 and Fig.10As shown, the device can change the angle of the connecting block 8 on the spiral blade 7, thereby changing the angle of the first drill bit 9 to adapt to different geological conditions. When adjusting the angle of the first drill bit 9, first pull the connecting block 3006, the connecting block 3006 pulls the traction rope 3004, and the guide ring 3005 on the fixed block 3001 is used to change the direction of the pulling force transmission of the traction rope 3004, so that the traction rope 3004 pulls the block 3003 inside the inner groove 3009, and the block 3003 is affected by When the pulling force is reached, the second spring 3002 will be compressed. After the clamping block 3003 is completely received inside the fixed shaft 28, the fixed shaft 28 will be out of the engagement state with the connecting block 8. At this time, the connecting block 8 can be removed. After changing the angle of the connecting block 8, the spline block 26 and the keyway 25 are realigned and installed. Then, the clamping block 3003 is aligned with the docking grooves 3008 at different positions in the installation groove 3007, so that the fixed shaft 28 and the connecting block 8 are docked again, so that the angle of the first drill bit 9 on the device can be adjusted.
[0056] The above embodiments are only used to illustrate the present invention, but not to limit the present invention. Although the present invention is described in detail with reference to the embodiments, it should be understood by those skilled in the art that various combinations, modifications or equivalent substitutions of the technical solutions of the present invention do not depart from the spirit and scope of the technical solutions of the present invention, and should be included in the scope of the claims of the present invention.
Claims
1. A tunnel blast hole drilling and blasting tube fixing integrated device, comprising a trolley (1), characterized in that: A support plate (2) is fixedly arranged above the cart (1), a connecting plate (31) is installed above the support plate (2), a first hydraulic rod (3) is installed on the connecting plate (31), a first driving assembly (4) is installed on the front side of the first hydraulic rod (3), a support rod (5) is installed on the first driving assembly (4), a drill tube (6) is fixedly connected to the support rod (5), a spiral blade (7) is arranged on the outer side of the drill tube (6), a connecting block (8) is installed on the spiral blade (7), a first drill bit (9) is fixedly arranged on the connecting block (8), a first connecting tube (14) and a second connecting tube (15) are slidably installed in the drill tube (6), a first convex plate (16) is fixedly connected to the first connecting tube (14), a second convex plate (17) is fixedly connected to the second connecting tube (15), the first convex plate ( The bottom of the first convex plate (16) and the second convex plate (17) are fixedly connected to a support shaft (19), a second drill bit (20) is fixedly connected below the support shaft (19), a conveying assembly (21) is installed in the drill tube (6), a second driving assembly (24) is installed in the second convex plate (17), a keyway (25) is provided on the spiral blade (7), a spline block (26) is installed in the keyway (25), the spline block (26) and the connecting block (8) are fixedly connected, a first through hole (27) is provided in the middle of the spline block (26), a fixed shaft (28) is fitted in the first through hole (27), the fixed shaft (28) and the spiral blade (7) are fixedly connected, a second through hole (29) is provided on the fixed shaft (28) and the spiral blade (7), and an adjustment assembly (30) is installed in the fixed shaft (28) and the connecting block (8).
2. The integrated device for tunnel blasting hole drilling and blasting tube fixing according to claim 1, characterized in that: The first driving assembly (4) comprises a first supporting cylinder (401) fixedly connected to the front side of the first hydraulic rod (3), a supporting block (402) fixedly mounted on the first supporting cylinder (401), a first motor (403) mounted on the supporting block (402), a gear (404) connected to the output shaft of the first motor (403), a gear ring (405) meshingly connected below the gear (404), a rotating cylinder (406) fixedly arranged inside the gear ring (405), the rotating cylinder (406) and the supporting rod (5) are fixedly connected, and the rotating cylinder (406) and the first supporting cylinder (401) are rotatably connected.
3. The integrated device for tunnel blasting hole drilling and blasting tube fixing according to claim 1, characterized in that: The drill tube (6) is provided with a movable groove (10), a first connecting groove (11), a second connecting groove (12) and a third connecting groove (13); the movable groove (10), the first connecting groove (11), the second connecting groove (12) and the third connecting groove (13) are interconnected; and the drill tube (6) is a truncated cone structure.
4. The integrated device for tunnel blasting hole drilling and blasting tube fixing according to claim 1, characterized in that: Rubber plates (18) are connected to the inner walls of the first connecting tube (14) and the second connecting tube (15). The rubber plates (18) are evenly spaced inside the first connecting tube (14) and the second connecting tube (15), and the rubber plates (18) are in an arc shape.
5. The integrated device for tunnel blasting hole drilling and blasting tube fixing according to claim 3, characterized in that: The second connecting tube (15) is provided with a groove (22), and a rubber block (23) is fitted in the groove (22). The rubber block (23) is a spherical structure, and the center of the rubber block (23) is located inside the groove (22). The rubber block (23) is fixedly connected to the first connecting tube (14).
6. The integrated device for tunnel blasting hole drilling and blasting tube fixing according to claim 1, characterized in that: The second drill bit (20) is a semi-cylindrical structure, and two adjacent second drill bits (20) fit together. The outer walls of the first connecting tube (14), the second connecting tube (15), the first convex plate (16) and the second convex plate (17) all fit together with the inner wall of the movable groove (10).
7. The integrated device for tunnel blasting hole drilling and blasting tube fixing according to claim 1, characterized in that: The conveying assembly (21) comprises a slider (2101) slidably mounted in a drill tube (6); a slide groove (2103) for the slider (2101) to move is provided in the drill tube (6); a first spring (2104) is fixedly connected between the slider (2101) and the drill tube (6); a second motor (2102) is fixedly arranged on the slider (2101); a rotating wheel (2105) is connected to the output shaft of the second motor (2102); and transverse convex patterns (2106) are provided on the outer side of the rotating wheel (2105) and the rear sides of the first connecting tube (14) and the second connecting tube (15).
8. The integrated device for tunnel blasting hole drilling and blasting tube fixing according to claim 1, characterized in that: The second driving assembly (24) comprises a third motor (2401) fixedly connected to the second convex plate (17); a connecting shaft (2402) is fixedly connected to the output shaft of the third motor (2401); a rubber rotating disk (2403) is fixedly connected to the connecting shaft (2402); and the rubber rotating disk (2403) is protruding on the second convex plate (17).
9. The integrated device for tunnel blasting hole drilling and blasting tube fixing according to claim 1, characterized in that: The adjustment assembly (30) comprises a fixed block (3001) fixedly connected to the inner wall of the second through hole (29), a guide ring (3005) fixedly connected to the fixed block (3001), an inner groove (3009) provided inside the fixed shaft (28), a clamping block (3003) provided in close contact with the inner groove (3009), a second spring (3002) fixedly connected between the clamping block (3003) and the fixed shaft (28), a traction steel rope (3004) fixedly connected to the clamping block (3003), the traction steel rope (3004) being connected to the connecting block (3006) through the guide ring (3005), and a mounting groove (3007) for docking with the fixed shaft (28) and a docking groove (3008) for docking with the clamping block (3003) provided inside the connecting block (8).
10. The integrated device for tunnel blasting hole drilling and blasting tube fixing according to claim 1, characterized in that: A second hydraulic rod (32) is installed on the rear side of the connecting plate (31), and the trolley (1), the supporting plate (2) and the connecting plate (31) are fixedly connected to form an integral structure.
