Production process management method and device, electronic device and storage medium

By collecting production information of target processes in real time and applying pre-maintained production scheduling strategies, the production scheduling plan is automatically generated, which solves the high cost and subjectivity problems caused by manual dependence in the pre-sheet metal process of the home appliance industry, and achieves efficient and accurate production management .

CN119204579APending Publication Date: 2024-12-27QINGDAO HAIER TECH +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411447704.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-16
Publication Date
2024-12-27

AI Technical Summary

Technical Problem

In the prior art, the production schedule of pre-sheet metal process in the home appliance industry mainly relies on manual processing, resulting in high work costs and great human subjectivity, lack of automation and accuracy.

Method used

By collecting the production information of the target process of the products to be produced in real time, and based on the pre-maintained production scheduling strategy, including the correspondence between different production scheduling priorities and process production information, the production scheduling plan is automatically generated to ensure the accuracy and efficiency of the production process. .

Benefits of technology

It realizes automatic and accurate production schedules for products to be produced, reduces work costs, improves the accuracy of production schedules, and optimizes inventory management and production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119204579A_ABST
    Figure CN119204579A_ABST
Patent Text Reader

Abstract

The invention provides a production process management method and device, an electronic device and a storage medium, and relates to the technical field of smart home / smart home, the method comprises the steps that target process production information of a to-be-produced product is acquired in real time, and the target process production information is used for representing production information required for producing the to-be-produced product; and performing production scheduling on the to-be-produced product based on the target process production information and a pre-maintained production scheduling strategy to obtain a production scheduling plan of the to-be-produced product. The scheduling plan of the to-be-produced product can be automatically and accurately generated, the working cost is reduced, and the accuracy of generating the scheduling plan is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of process management, and in particular to a production process management method, device, electronic device and storage medium. Background Art

[0002] It is known from relevant technologies that for production process management, for example, the pre-process of sheet metal in the MES of the home appliance industry mainly relies on manual processing in production scheduling and control. This will lead to increased work costs and a large degree of human subjectivity.

[0003] Therefore, finding a production process management method that can automatically and accurately generate a production schedule for products to be produced has become a research hotspot. Summary of the invention

[0004] The present application provides a production process management method, device, electronic device and storage medium, which can automatically and accurately generate a production schedule for products to be produced, reduce work costs, and improve the accuracy of generating a production schedule.

[0005] The present application provides a production process management method, which includes: acquiring target process production information of a product to be produced in real time, wherein the target process production information is used to characterize the production information required for producing the product to be produced; scheduling the product to be produced based on the target process production information and a pre-maintained production scheduling strategy to obtain a production scheduling plan for the product to be produced.

[0006] According to a production process management method provided by the present application, the production scheduling strategy includes the correspondence between different production scheduling priorities and different process production information; the production scheduling strategy based on the target process production information and the pre-maintained production scheduling strategy is used to schedule the products to be produced to obtain a production scheduling plan for the products to be produced, specifically including: based on the target process production information and the correspondence between different production scheduling priorities and different process production information in the production scheduling strategy, a target production scheduling priority corresponding to the target process production information is determined; according to the target production scheduling priority, the products to be produced are scheduled to obtain a production scheduling plan for the products to be produced.

[0007] According to a production process management method provided by the present application, the process production information includes process route information, inventory information and delivery date information; the production scheduling priority includes at least a first production scheduling priority, a second production scheduling priority and a third production scheduling priority, wherein the first production scheduling priority is prior to the second production scheduling priority, and the second production scheduling priority is prior to the third production scheduling priority; when the delivery date information is shorter than a preset date, the inventory information is less than a preset inventory amount, and the process route information is process route information that does not require a process route change, it is determined that the process production information corresponds to the first production scheduling priority; when any one or two of the following conditions are met: the delivery date information is shorter than a preset date, the inventory information is less than a preset inventory amount, and the process route information is process route information that does not require a process route change, it is determined that the process production information corresponds to the second production scheduling priority; and other process production information except the process production information corresponding to the first production scheduling priority and the process production information corresponding to the second production scheduling priority is determined as the process production information corresponding to the third production scheduling priority.

[0008] According to a production process management method provided by the present application, after scheduling the production of the products to be produced and obtaining the production scheduling plan of the products to be produced, the method also includes: performing production processing on the products to be produced according to the production scheduling plan; collecting production status information of the products to be produced at preset intervals; determining the current inventory information of the products to be produced based on the original inventory information of the products to be produced and the production status information of the products to be produced, and displaying the current inventory information.

[0009] According to a production process management method provided by the present application, after determining the current inventory information of the product to be produced, the method further includes: comparing the current inventory information of the product to be produced with the preset inventory to obtain a comparison result; when the comparison result is that the current inventory information of the product to be produced is higher than the first preset inventory, issuing a first alarm reminder, wherein the first alarm reminder is used to remind the user that the inventory has exceeded the standard; when the comparison result is that the current inventory information of the product to be produced is lower than the second preset inventory, issuing a second alarm reminder, wherein the second alarm reminder is used to remind the user that the inventory is insufficient and the first preset inventory is greater than the second preset inventory.

[0010] According to a production process management method provided by the present application, after obtaining the comparison result, the method also includes: when the comparison result is that the current inventory information of the product to be produced is higher than the first preset inventory, determining the inventory difference between the current inventory information of the product to be produced and the first preset inventory information, and obtaining the formation time corresponding to the inventory difference; determining the target unit time inventory difference based on the inventory difference and the formation time corresponding to the formation of the inventory difference; calling a pre-maintained inventory reason table, wherein the inventory reason table includes the correspondence between different inventory backlog reasons and different unit time inventory differences; determining the inventory backlog reason of the current inventory information based on the target unit time inventory difference and the correspondence between different inventory backlog reasons and different unit time inventory differences.

[0011] According to a production process management method provided by the present application, after collecting the production status information of the product to be produced at the preset time interval, the method also includes: obtaining target production parameter information in the process of producing the product to be produced, wherein the target production parameter information is used to characterize the production quality of the product to be produced; obtaining standard production parameter information of the product to be produced, and when the difference between the standard production parameter information of the product to be produced and the target production parameter information is greater than a difference threshold, determining that an abnormality has occurred in the production process of the product to be produced, and performing alarm processing; when the difference between the standard production parameter information of the product to be produced and the target production parameter information is less than or equal to the difference threshold, determining that no abnormality has occurred in the production process of the product to be produced.

[0012] The present application also provides a production process management device, which includes: a collection module, which is used to collect in real time the target process production information of the product to be produced, wherein the target process production information is used to characterize the production information required for producing the product to be produced; a processing module, which is used to schedule the product to be produced based on the target process production information and a pre-maintained production scheduling strategy to obtain a production scheduling plan for the product to be produced.

[0013] The present application also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the production process management method described in any one of the above is implemented.

[0014] The present application also provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the production process management method as described in any one of the above is implemented.

[0015] The present application also provides a computer program product, including a computer program, wherein when the computer program is executed by a processor, the production process management method as described in any one of the above is implemented.

[0016] The production process management method, device, electronic device and storage medium provided by the present application obtain the target process production information of the product to be produced through real-time acquisition; and schedule the product to be produced based on the target process production information and the pre-maintained production scheduling strategy to obtain the production scheduling plan of the product to be produced. The production scheduling plan of the product to be produced can be automatically and accurately generated, which reduces the work cost and improves the accuracy of the generated production scheduling plan. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the present application or the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0018] Figure 1 It is a hardware environment diagram of a production process management method according to an embodiment of the present application.

[0019] Figure 2 It is one of the flow charts of the production process management method provided by this application.

[0020] Figure 3 This application provides a production scheduling strategy based on target process production information and pre-maintenance, which schedules the products to be produced and obtains a flow chart of the production scheduling plan for the products to be produced.

[0021] Figure 4 This is the second flow chart of the production process management method provided by this application.

[0022] Figure 5 This is the third flow chart of the production process management method provided by this application.

[0023] Figure 6 This is the fourth flow chart of the production process management method provided by this application.

[0024] Figure 7 It is a structural schematic diagram of the production process management device provided in this application.

[0025] Figure 8 It is a structural schematic diagram of the electronic device provided by this application. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in this application. Obviously, the described embodiments are part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0027] According to one aspect of an embodiment of the present application, a production process management method is provided. The production process management method is widely used in smart home, smart home, smart home equipment ecology, smart residential ecology and other whole-house intelligent digital control application scenarios. Optionally, in this embodiment, the above production process management method can be applied to Figure 1 In the hardware environment composed of the terminal device 102 and the server 104 shown in FIG. Figure 1 As shown, the server 104 is connected to the terminal device 102 via a network, and can be used to provide services (such as application services, etc.) for the terminal or a client installed on the terminal. A database can be set on the server or independently of the server to provide data storage services for the server 104. Cloud computing and / or edge computing services can be configured on the server or independently of the server to provide data computing services for the server 104.

[0028] The network may include but is not limited to at least one of the following: wired network, wireless network. The wired network may include but is not limited to at least one of the following: wide area network, metropolitan area network, local area network, and the wireless network may include but is not limited to at least one of the following: WIFI (Wireless Fidelity), Bluetooth. The terminal device 102 may be but is not limited to a PC, a mobile phone, a tablet computer, a smart air conditioner, a smart range hood, a smart refrigerator, a smart oven, a smart stove, a smart washing machine, a smart water heater, a smart washing equipment, a smart dishwasher, a smart projection equipment, a smart TV, a smart clothes drying rack, a smart curtain, a smart audio and video, a smart socket, a smart speaker, a smart speaker, a smart fresh air equipment, a smart kitchen and bathroom equipment, a smart bathroom equipment, a smart sweeping robot, a smart window cleaning robot, a smart mopping robot, a smart air purification equipment, a smart steamer, a smart microwave oven, a smart kitchen treasure, a smart purifier, a smart water dispenser, a smart door lock, etc.

[0029] In another embodiment, the production process management method provided by the present application can be applied to smart home appliances. Among them, smart home appliances refer to home appliances formed by introducing microprocessors, sensor technology, and network communication technology into home appliances, which have the function of automatically sensing the state of residential space, the state of the home appliances themselves, and the state of home appliance services, and can automatically control and receive control instructions from residential users in the home or remotely. It can be understood that smart home appliances are a component of smart homes.

[0030] The production process management method provided in this application can realize data transparency, production capacity improvement and inventory management optimization in the production process management process, thereby improving the production efficiency and quality of the entire production process, such as the previous process. In one example, the production process involved in this application can be a production process for producing household appliances.

[0031] In another embodiment, the production process management method provided in the present application can be implemented or executed through a pre-built management platform.

[0032] Figure 2 It is one of the flow charts of the production process management method provided by this application.

[0033] The following will be combined Figure 2 The process of the production process management method provided in this application is explained.

[0034] In an exemplary embodiment of the present application, Figure 2 It can be seen that the production process management method may include step 210 and step 220, and each step will be introduced below.

[0035] In step 210, target process production information of the product to be produced is collected in real time.

[0036] In one embodiment, the target process production information of the product to be produced can be collected in real time. The target process production information is used to represent the production information required to produce the product to be produced. In one example, the target process production information can be information about the working condition of the production equipment of the product to be produced, process route information, inventory information, and delivery date information.

[0037] In another example, the product to be produced may be a household appliance to be produced, such as a refrigerator, a washing machine, an air conditioner, etc.

[0038] In another embodiment, in the process of collecting the production information of the target process of the product to be produced, various data such as production plan, execution progress, work report data, inventory information, etc. in the previous process can be collected in real time through sensors, code scanning equipment, manual input, etc., and the ability to connect with equipment, assembly, materials, personnel, processes, and waste.

[0039] In step 220, the products to be produced are scheduled based on the target process production information and the pre-maintained production scheduling strategy to obtain a production scheduling plan for the products to be produced.

[0040] In another embodiment, the product to be produced can be scheduled according to the target process production information and the pre-maintained production scheduling strategy, so as to obtain the production scheduling plan of the product to be produced. The production scheduling strategy may include the correspondence between different production scheduling priorities and different process production information, and then the production scheduling plan of the product to be produced can be automatically and accurately obtained according to the correspondence between different production scheduling priorities and different process production information, as well as the target process production information of the product to be produced.

[0041] It should be noted that there can be multiple products to be produced. During the application process, the production schedule for each product to be produced can be automatically and accurately obtained based on the correspondence between different production scheduling priorities and different process production information, as well as the respective target process production information of different products to be produced.

[0042] The production process management method provided by the present application obtains the target process production information of the product to be produced through real-time acquisition; and schedules the product to be produced based on the target process production information and the pre-maintained production scheduling strategy to obtain the production scheduling plan of the product to be produced. The production scheduling plan of the product to be produced can be automatically and accurately generated, which reduces the work cost and improves the accuracy of the generated production scheduling plan.

[0043] Figure 3 This application provides a production scheduling strategy based on target process production information and pre-maintenance, which schedules the products to be produced and obtains a flow chart of the production scheduling plan for the products to be produced.

[0044] The following will be combined Figure 3 The process of scheduling the products to be produced based on the target process production information and the pre-maintained scheduling strategy to obtain the scheduling plan for the products to be produced is explained.

[0045] In an exemplary embodiment of the present application, the production scheduling strategy includes a correspondence between different production scheduling priorities and different process production information. In one example, the production scheduling strategy can be obtained based on historical process production information and corresponding production scheduling priorities, thereby ensuring the accuracy of the maintained production scheduling strategy.

[0046] Combination Figure 3 It can be seen that scheduling the products to be produced based on the target process production information and the pre-maintained scheduling strategy, and obtaining the scheduling plan for the products to be produced may include steps 310 and 320, and each step will be introduced below.

[0047] In step 310, based on the target process production information and the correspondence between different production scheduling priorities and different process production information in the production scheduling strategy, the target production scheduling priority corresponding to the target process production information is determined.

[0048] In step 320, the products to be produced are scheduled according to the target production scheduling priority to obtain a production scheduling plan for the products to be produced.

[0049] In one embodiment, the target production scheduling priority corresponding to the target process production information can be determined based on the correspondence between different production scheduling priorities and different process production information included in the pre-maintained production scheduling strategy, combined with the target process production information. The production scheduling priority can refer to the order in which the products to be produced are scheduled for production. Furthermore, the products to be produced can be scheduled according to the target production scheduling priority, so that the production scheduling plan for the products to be produced can be automatically obtained.

[0050] In another embodiment, the production scheduling strategy may also be updated regularly. For example, the obtained target process production information of the product to be produced and the corresponding target production scheduling priority may be used as a set of corresponding relationships to update the production scheduling strategy.

[0051] In another exemplary embodiment of the present application, the process production information may include process route information, inventory information, and delivery date information; wherein the production scheduling priority may include at least a first production scheduling priority, a second production scheduling priority, and a third production scheduling priority, wherein the first production scheduling priority is prior to the second production scheduling priority, and the second production scheduling priority is prior to the third production scheduling priority; When the delivery date information is shorter than the preset date, the inventory information is less than the preset inventory quantity, and the process route information is the process route information that does not need to be changed, it is determined that the process production information corresponds to the first production scheduling priority; In the case where any one or two of the following conditions are met: the delivery date information is shorter than the preset date, the inventory information is less than the preset inventory quantity, and the process route information is process route information that does not require process route replacement, it is determined that the process production information corresponds to the second production scheduling priority; The other process production information except the process production information corresponding to the first production scheduling priority and the process production information corresponding to the second production scheduling priority is determined as the process production information corresponding to the third production scheduling priority.

[0052] In one embodiment, when the delivery date information of the product to be produced is shorter than the preset date, the inventory information is less than the preset inventory quantity, and the process route information is process route information that does not require changing the process route, it can be determined that the product to be produced is a product that needs to be scheduled as a priority and will not incur cost waste on the process route. Therefore, the product to be produced can be determined as a product to be produced corresponding to the first scheduling priority.

[0053] In another embodiment, in any one or two of the following situations, for example, when the product to be produced meets the delivery date information that is shorter than the preset date, when the inventory information is less than the preset inventory, and when the process route information is process route information that does not require a process route change, or when any two of the aforementioned situations are combined, it can be determined that the product to be produced can be scheduled for the second priority, that is, the product to be produced is determined as the product to be produced corresponding to the second scheduling priority. In one example, when the information on the operability of the production equipment of the product to be produced is that it is not operable, the process route can be changed, that is, in the aforementioned situation, the corresponding process route information is process route information that requires a process route change.

[0054] In another embodiment, the process production information excluding the process production information corresponding to the first production scheduling priority and the process production information excluding the process production information corresponding to the second production scheduling priority can be determined as the process production information corresponding to the third production scheduling priority. Through this embodiment, the production scheduling priority can be matched according to the process production information of the product to be produced, so that the production scheduling of the product to be produced can be completed based on the production scheduling priority, and the corresponding production scheduling plan can be automatically and accurately obtained.

[0055] Figure 4 This is the second flow chart of the production process management method provided by this application.

[0056] The following will be combined Figure 4 The process of another production process management method provided by this application is explained.

[0057] In an exemplary embodiment of the present application, Figure 4 It can be seen that after scheduling the production of the products to be produced and obtaining the production scheduling plan for the products to be produced, the production process management method can also include steps 410 to 430, and each step will be introduced below.

[0058] In step 410, the product to be produced is produced according to the production schedule.

[0059] In step 420, production status information of the product to be produced is collected at preset time intervals.

[0060] In step 430, the current inventory information of the product to be produced is determined based on the original inventory information of the product to be produced and the production status information of the product to be produced, and the current inventory information is displayed.

[0061] In one embodiment, the production process of the product to be produced can be carried out according to the automatically generated production schedule. Furthermore, the production information of the product to be produced in the production process is collected at preset intervals, and the current inventory information of the product to be produced is determined based on the original inventory information of the product to be produced and the production information of the product to be produced, and the current inventory information is displayed. In this embodiment, the plan execution status, inventory status, work progress and other information of the previous process can be displayed in real time through a visual interface, which is convenient for managers to conduct real-time monitoring and decision-making to ensure the smooth progress of the production process.

[0062] In an exemplary embodiment of the present application, the above-mentioned embodiment is continued to be used as an example for explanation. After determining the current inventory information of the product to be produced, the production process management method may further include the following steps: Compare the current inventory information of the product to be produced with the preset inventory to obtain a comparison result; When the comparison result shows that the current inventory information of the product to be produced is higher than the first preset inventory, a first alarm reminder is issued, wherein the first alarm reminder is used to remind the user that the inventory has exceeded the limit; When the comparison result shows that the current inventory information of the product to be produced is lower than the second preset inventory, a second alarm reminder is issued, wherein the second alarm reminder is used to remind the user that the inventory is insufficient and the first preset inventory is greater than the second preset inventory.

[0063] In one embodiment, the current inventory information of the product to be produced can be compared with the first preset inventory to obtain a comparison result. Further, when the comparison result is monitored to be that the current inventory information of the product to be produced is higher than the preset inventory, it means that the inventory is high and a first alarm reminder needs to be issued to remind the user to pay attention to the inventory information.

[0064] In another embodiment, when the monitoring comparison result shows that the current inventory information of the product to be produced is lower than the second preset inventory, it means that the inventory is low and a second alarm reminder needs to be issued to remind the user to replenish the inventory in time to avoid production interruption.

[0065] Figure 5 This is the third flow chart of the production process management method provided by this application.

[0066] The following will be combined Figure 5An alternative production process management method is described below.

[0067] In an exemplary embodiment of the present application, Figure 5 It can be seen that after obtaining the comparison results, the production process management method can further include steps 510 to 540, and each step will be introduced below.

[0068] In step 510, when the comparison result is that the current inventory information of the product to be produced is higher than the first preset inventory, the inventory difference between the current inventory information of the product to be produced and the first preset inventory information is determined, and the formation time corresponding to the formation of the inventory difference is obtained.

[0069] In step 520, a target unit time inventory difference is determined based on the inventory difference and the formation time corresponding to the formation of the inventory difference.

[0070] In one embodiment, when the comparison result shows that the current inventory information of the product to be produced is higher than the first preset inventory, the inventory difference between the current inventory information of the product to be produced and the first preset inventory information can be determined, and the formation time corresponding to the formation of the inventory difference can be obtained. The formation time can be understood as the time taken from the last formed inventory information to the current formed current inventory information.

[0071] Further, the target unit time inventory difference can be determined based on the inventory difference and the formation time corresponding to the formation of the inventory difference. In one example, the target unit time inventory difference can be the quotient of the inventory difference and the formation time. The target unit time inventory difference can represent the rate of forming inventory.

[0072] In step 530, the pre-maintained inventory reason table is called.

[0073] In step 540, based on the target unit time inventory difference and the corresponding relationship between different inventory overstock reasons and different unit time inventory differences, the inventory overstock reason of the current inventory information is determined.

[0074] In another embodiment, a pre-maintained inventory reason table may be called. The inventory reason table includes the correspondence between different inventory backlog reasons and different unit time inventory differences. Further, based on the target unit time inventory difference and the correspondence between different inventory backlog reasons and different unit time inventory differences, the inventory backlog reason of the current inventory information is determined. Through this embodiment, the reasons for inventory backlog or waste can be found, and targeted optimization measures can be formulated to reduce inventory costs.

[0075] Figure 6 This is the fourth flow chart of the production process management method provided by this application.

[0076] The following will be combined Figure 6 An alternative production process management method is described below.

[0077] In another exemplary embodiment of the present application, in combination Figure 6 It can be seen that after collecting the production status information of the product to be produced at preset time intervals, the production process management method can also include the following steps 610 to 630, and each step will be introduced below.

[0078] In step 610, target production parameter information in the process of producing the product to be produced is obtained.

[0079] In step 620, standard production parameter information of the product to be produced is obtained, and when the difference between the standard production parameter information of the product to be produced and the target production parameter information is greater than a difference threshold, it is determined that an abnormality occurs in the production process of the product to be produced, and an alarm is processed.

[0080] In step 630, when the difference between the standard production parameter information and the target production parameter information of the product to be produced is less than or equal to the difference threshold, it is determined that no abnormality occurs in the production process of the product to be produced.

[0081] In one embodiment, target production parameter information can be obtained during the production process of the product to be produced, wherein the target production parameter information is used to characterize the production quality of the product to be produced, and the target production parameter information can include process parameters of the product to be produced, such as speed, temperature, pressure, etc.

[0082] Furthermore, standard production parameter information of the product to be produced can be obtained, and when the difference between the standard production parameter information of the product to be produced and the target production parameter information is greater than a difference threshold, it can be determined that an abnormality has occurred in the production process of the product to be produced and an alarm can be processed.

[0083] In yet another embodiment, when the difference between the standard production parameter information and the target production parameter information of the product to be produced is less than or equal to a difference threshold, it can be determined that no abnormality occurs in the production process of the product to be produced.

[0084] Through this embodiment, abnormal situations in the production process can be monitored, and an early warning mechanism can be automatically triggered to remind management personnel to handle them in time to avoid production interruptions or quality problems.

[0085] The production process management method provided by the present invention can also share and connect data with the final assembly to ensure real-time transmission and consistency of information, and can also realize the pulling and handover of materials between the previous process and the final assembly to ensure the timeliness and accuracy of material supply.

[0086] The production process management method provided in this application realizes the precise management and efficient coordination of the front process, such as the front process of sheet metal in the home appliance industry, improves production efficiency, reduces inventory costs, improves product quality, and creates greater economic benefits for the enterprise.

[0087] The production process management device provided in the present application is described below. The production process management device described below and the production process management method described above can be referenced to each other.

[0088] Figure 7 It is a structural schematic diagram of the production process management device provided in this application.

[0089] In an exemplary embodiment of the present application, Figure 7 It can be seen that the production process management device can include a collection module 710 and a processing module 720, and each module will be introduced below.

[0090] The acquisition module 710 may be configured to acquire target process production information of the product to be produced in real time, wherein the target process production information is used to represent the production information required to produce the product to be produced; The processing module 720 may be configured to schedule the product to be produced based on the target process production information and the pre-maintained production scheduling strategy to obtain a production scheduling plan for the product to be produced.

[0091] In an exemplary embodiment of the present application, the production scheduling strategy includes a correspondence between different production scheduling priorities and different process production information; the processing module 720 can use the following method to schedule the product to be produced based on the target process production information and the pre-maintained production scheduling strategy to obtain a production scheduling plan for the product to be produced: Based on the target process production information and the corresponding relationship between different production scheduling priorities and different process production information in the production scheduling strategy, determine the target production scheduling priority corresponding to the target process production information; The products to be produced are scheduled according to the target production scheduling priority to obtain a production scheduling plan for the products to be produced.

[0092] In an exemplary embodiment of the present application, the process production information includes process route information, inventory information and delivery date information; the production scheduling priority includes at least a first production scheduling priority, a second production scheduling priority and a third production scheduling priority, wherein the first production scheduling priority is prior to the second production scheduling priority, and the second production scheduling priority is prior to the third production scheduling priority; When the delivery date information is shorter than a preset date, the inventory information is less than a preset inventory amount, and the process route information is process route information that does not require a process route change, determining that the process production information corresponds to the first production scheduling priority; Determining that the process production information corresponds to the second production scheduling priority when any one or two of the following conditions are met: the delivery date information is shorter than a preset date, the inventory information is less than a preset inventory amount, and the process route information is process route information that does not require a process route change; The other process production information except the process production information corresponding to the first production scheduling priority and the process production information corresponding to the second production scheduling priority is determined as the process production information corresponding to the third production scheduling priority.

[0093] In an exemplary embodiment of the present application, the processing module 720 may also be configured to: Performing production processing on the product to be produced according to the production scheduling plan; Collecting the production status information of the product to be produced at preset time intervals; According to the original inventory information of the product to be produced and the production status information of the product to be produced, the current inventory information of the product to be produced is determined, and the current inventory information is displayed.

[0094] In an exemplary embodiment of the present application, the processing module 720 may also be configured to: Comparing the current inventory information of the product to be produced with the preset inventory to obtain a comparison result; When the comparison result shows that the current inventory information of the product to be produced is higher than the first preset inventory, a first alarm reminder is issued, wherein the first alarm reminder is used to remind the user that the inventory has exceeded the limit; When the comparison result is that the current inventory information of the product to be produced is lower than the second preset inventory, a second alarm reminder is issued, wherein the second alarm reminder is used to remind the user that the inventory is insufficient and the first preset inventory is greater than the second preset inventory.

[0095] In an exemplary embodiment of the present application, the processing module 720 may also be configured to: When the comparison result is that the current inventory information of the product to be produced is higher than the first preset inventory, determining the inventory difference between the current inventory information of the product to be produced and the first preset inventory information, and obtaining the formation time corresponding to the formation of the inventory difference; Determine a target unit time inventory difference based on the inventory difference and the formation time corresponding to the formation of the inventory difference; Calling a pre-maintained inventory reason table, wherein the inventory reason table includes a correspondence between different inventory backlog reasons and different unit time inventory differences; Based on the target unit time inventory difference and the corresponding relationship between different inventory backlog reasons and different unit time inventory differences, the inventory backlog reason of the current inventory information is determined.

[0096] In an exemplary embodiment of the present application, the processing module 720 may also be configured to: Acquiring target production parameter information in the process of producing the product to be produced, wherein the target production parameter information is used to characterize the production quality of the product to be produced; Acquire standard production parameter information of the product to be produced, and when the difference between the standard production parameter information of the product to be produced and the target production parameter information is greater than a difference threshold, determine that an abnormality occurs in the production process of the product to be produced, and perform alarm processing; When the difference between the standard production parameter information of the product to be produced and the target production parameter information is less than or equal to the difference threshold, it is determined that no abnormality occurs in the production process of the product to be produced.

[0097] Figure 8 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 8 As shown, the electronic device may include: a processor 810, a communication interface 820, a memory 830 and a communication bus 840, wherein the processor 810, the communication interface 820 and the memory 830 communicate with each other through the communication bus 840. The processor 810 may call the logic instructions in the memory 830 to execute the production process management method, which includes: acquiring the target process production information of the product to be produced in real time, wherein the target process production information is used to characterize the production information required for producing the product to be produced; scheduling the product to be produced based on the target process production information and the pre-maintained production scheduling strategy to obtain the production scheduling plan of the product to be produced.

[0098] In addition, the logic instructions in the above-mentioned memory 830 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0099] On the other hand, the present application also provides a computer program product, which includes a computer program. The computer program can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the production process management method provided by the above-mentioned methods, which method includes: real-time acquisition of target process production information of the product to be produced, wherein the target process production information is used to characterize the production information required for producing the product to be produced; scheduling the product to be produced based on the target process production information and a pre-maintained scheduling strategy to obtain a production scheduling plan for the product to be produced.

[0100] On the other hand, the present application also provides a non-transitory computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, it is implemented to execute the production process management method provided by the above-mentioned methods. The method includes: real-time acquisition of target process production information of the product to be produced, wherein the target process production information is used to characterize the production information required for producing the product to be produced; scheduling the product to be produced based on the target process production information and a pre-maintained scheduling strategy to obtain a production scheduling plan for the product to be produced.

[0101] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0102] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0103] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. A production process management method, characterized in that: The method comprises: Acquire target process production information of the product to be produced in real time, wherein the target process production information is used to represent the production information required to produce the product to be produced; Based on the target process production information and the pre-maintained production scheduling strategy, the product to be produced is scheduled to obtain a production scheduling plan for the product to be produced.

2. The production process management method according to claim 1, characterized in that: The production scheduling strategy includes the corresponding relationship between different production scheduling priorities and different process production information; The step of scheduling the product to be produced based on the target process production information and the pre-maintained scheduling strategy to obtain a scheduling plan for the product to be produced specifically includes: Based on the target process production information and the corresponding relationship between different production scheduling priorities and different process production information in the production scheduling strategy, determine the target production scheduling priority corresponding to the target process production information; The products to be produced are scheduled according to the target production scheduling priority to obtain a production scheduling plan for the products to be produced.

3. The production process management method according to claim 2, characterized in that: The process production information includes process route information, inventory information and delivery date information; the production scheduling priority includes at least a first production scheduling priority, a second production scheduling priority and a third production scheduling priority, wherein the first production scheduling priority is prior to the second production scheduling priority, and the second production scheduling priority is prior to the third production scheduling priority; When the delivery date information is shorter than a preset date, the inventory information is less than a preset inventory amount, and the process route information is process route information that does not require a process route change, determining that the process production information corresponds to the first production scheduling priority; Determining that the process production information corresponds to the second production scheduling priority when any one or two of the following conditions are met: the delivery date information is shorter than a preset date, the inventory information is less than a preset inventory amount, and the process route information is process route information that does not require a process route change; The other process production information except the process production information corresponding to the first production scheduling priority and the process production information corresponding to the second production scheduling priority is determined as the process production information corresponding to the third production scheduling priority.

4. The production process management method according to claim 1, characterized in that: After scheduling the product to be produced and obtaining a production scheduling plan for the product to be produced, the method further includes: Performing production processing on the product to be produced according to the production scheduling plan; Collecting the production status information of the product to be produced at preset time intervals; According to the original inventory information of the product to be produced and the production status information of the product to be produced, the current inventory information of the product to be produced is determined, and the current inventory information is displayed.

5. The production process management method according to claim 4, characterized in that: After determining the current inventory information of the product to be produced, the method further includes: Comparing the current inventory information of the product to be produced with the preset inventory to obtain a comparison result; When the comparison result shows that the current inventory information of the product to be produced is higher than the first preset inventory, a first alarm reminder is issued, wherein the first alarm reminder is used to remind the user that the inventory has exceeded the limit; When the comparison result is that the current inventory information of the product to be produced is lower than the second preset inventory, a second alarm reminder is issued, wherein the second alarm reminder is used to remind the user that the inventory is insufficient and the first preset inventory is greater than the second preset inventory.

6. The production process management method according to claim 5, characterized in that: After obtaining the comparison result, the method further includes: When the comparison result is that the current inventory information of the product to be produced is higher than the first preset inventory, determining the inventory difference between the current inventory information of the product to be produced and the first preset inventory information, and obtaining the formation time corresponding to the formation of the inventory difference; Determine a target unit time inventory difference based on the inventory difference and the formation time corresponding to the formation of the inventory difference; Calling a pre-maintained inventory reason table, wherein the inventory reason table includes a correspondence between different inventory backlog reasons and different unit time inventory differences; Based on the target unit time inventory difference and the corresponding relationship between different inventory backlog reasons and different unit time inventory differences, the inventory backlog reason of the current inventory information is determined.

7. The production process management method according to claim 4, characterized in that: After collecting the production information of the product to be produced at the preset time interval, the method further includes: Acquiring target production parameter information in the process of producing the product to be produced, wherein the target production parameter information is used to characterize the production quality of the product to be produced; Acquire standard production parameter information of the product to be produced, and when the difference between the standard production parameter information of the product to be produced and the target production parameter information is greater than a difference threshold, determine that an abnormality occurs in the production process of the product to be produced, and perform alarm processing; When the difference between the standard production parameter information of the product to be produced and the target production parameter information is less than or equal to the difference threshold, it is determined that no abnormality occurs in the production process of the product to be produced.

8. A production process management device, characterized in that: The device comprises: A collection module, used for collecting and obtaining target process production information of the product to be produced in real time, wherein the target process production information is used to represent the production information required for producing the product to be produced; The processing module is used to schedule the production of the product to be produced based on the target process production information and the pre-maintained production scheduling strategy to obtain a production scheduling plan for the product to be produced.

9. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the production process management method according to any one of claims 1 to 7 is implemented.

10. An electronic device comprising a memory and a processor, characterized in that: The memory stores a computer program, and the processor is configured to execute the production process management method according to any one of claims 1 to 7 through the computer program.