Partition hole presplitting blasting energy gathering pipe mounting equipment and blasting method

By introducing elastic and limiting mechanisms into the partition pre-cracking blasting energy-concentrating pipe installation equipment, the stress concentration on the edge of the rotary hole is reduced, the crack problem in existing equipment is solved and the blasting effect is improved.

CN119223113APending Publication Date: 2024-12-31CHINA NON-METALLIC MATERIALS NANJING MINE ENG CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411400940.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2024-12-31

AI Technical Summary

Technical Problem

The existing pre-cracking and blasting energy-concentrating pipe installation equipment is prone to cracks when turning the hole, causing the explosion energy to propagate along the cracks, and the rupture surface is facing an undesirable direction, resulting in poor blasting effect.

Method used

A partition pre-cracking and energy-concentrating pipe installation device including an elastic mechanism and a limiting mechanism is designed to reduce local stress concentration and reduce crack generation by providing pressure before the rotor contacts the ground and losing pressure after the rotor leaves. possibility.

Benefits of technology

It effectively reduces the generation of cracks at the edge of the rotary hole, improves the blasting effect, enables the explosion energy to be released as planned, and improves the control of the rupture surface.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119223113A_ABST
    Figure CN119223113A_ABST
Patent Text Reader

Abstract

The invention discloses separated-hole pre-splitting blasting energy-gathered pipe mounting equipment and a blasting method, belongs to the field of blasting, and aims to solve the problems that when the conventional separated-hole pre-splitting blasting energy-gathered pipe mounting equipment is used for drilling, cracks are easily generated at the edge of a drilling hole, so that energy generated by blasting is propagated along the cracks instead of being propagated according to a preset blasting plan, and the blasting efficiency is low. In order to solve the problem that the blasting effect is poor due to the facts that unexpected energy release causes a fracture surface to face an unexpected direction, the hole separation presplitting blasting energy gathering pipe mounting equipment comprises a vehicle body, a hydraulic cylinder fixedly connected to one side of the vehicle body, a hydraulic rod fixedly connected to the output end of the hydraulic cylinder and a first connecting plate fixedly connected to the lower end of the hydraulic rod. By arranging the elastic mechanism and the limiting mechanism, the elastic mechanism is pushed to move downwards, then pressure can be provided for the ground before the rotating head makes contact with the ground, the pressure on the ground is lost after the rotating head leaves the ground, and therefore the purpose that the blasting effect is better is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of blasting, and in particular to an installation device for a hole-separated pre-splitting blasting energy-gathering tube and a blasting method. Background Art

[0002] The installation equipment of energy-gathering tube for pre-splitting blasting is a kind of equipment for rotating and installing energy-gathering tube. Its main purpose is to make suitable holes inside the rock so that the energy-gathering tube can be installed to release better blasting force.

[0003] The publication number is CN217950258U, which discloses a blasting drilling device for high-gas tunnel construction, including a fixed seat, a first slide groove is opened on the front of the fixed seat, a limit rod is fixedly connected to the inner side wall of the first slide groove, and a first hydraulic cylinder is fixedly connected to the inner side wall of the first slide groove. When the existing hole pre-splitting blasting energy-gathering tube installation equipment is rotating the hole, cracks are easily generated on the edge of the rotating hole, causing the energy generated by the explosion to propagate along the cracks instead of according to the predetermined blasting plan. This unexpected energy release causes the rupture surface to face an undesirable direction, resulting in a poor blasting effect.

[0004] To solve the above problems, a hole-separated pre-splitting blasting energy-gathering tube installation device and a blasting method are proposed. Summary of the invention

[0005] The purpose of the present invention is to provide a device for installing energy-gathering tubes for pre-splitting blasting with separated holes and a blasting method, which solves the problem that cracks are easily generated on the edges of the holes when the existing device for installing energy-gathering tubes for pre-splitting blasting with separated holes is rotating, causing the energy generated by the explosion to propagate along the cracks instead of according to the predetermined blasting plan. This unexpected energy release causes the rupture surface to face in an undesirable direction, resulting in a poor blasting effect.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a device for installing a hole pre-splitting blasting energy-gathering tube, comprising a vehicle body, a hydraulic cylinder fixedly connected to one side of the vehicle body, a hydraulic rod fixedly connected to the output end of the hydraulic cylinder, a first connecting plate fixedly connected to the lower end of the hydraulic rod, a motor fixedly connected to the lower end of the first connecting plate, a rotating head fixedly connected to the output end of the motor, an elastic mechanism is arranged on the inner side of the hydraulic rod, and a limiting mechanism is arranged on one side of the elastic mechanism;

[0007] The limiting mechanism includes a guide component and a sliding component, and the sliding component is arranged on one side of the guide component;

[0008] A first groove is provided on the inner side of the hydraulic rod, and the elastic mechanism includes a sliding block provided on the inner side of the first groove, a first hole is connected to the interior of one side below the first groove, a fixed pressure rod is provided on the inner side of the first hole, and the fixed pressure rod is connected to the sliding block in a fixed connection manner, and the lower end of the fixed pressure rod is fixedly connected to a pressure cylinder, a first guide groove is connected to the upper inner wall of the first groove, a first guide rod is provided on the inner side of the first guide groove, a second groove is provided on the inner side of the sliding block, a pull rod is provided on the inner side of the second groove, a baffle is fixedly connected to the upper end of the pull rod, and a spring is fixedly connected to the upper end of the baffle, the spring and the hydraulic rod are connected in a rotating manner, and the first guide rod and the baffle are connected in a fixed manner, and the position height of the pressure cylinder in the natural state of the spring is lower than the position height of the lower end of the rotating head.

[0009] Preferably, the inner side surface of the first hole fits with the outer side surface of the fixed pressure rod, and the upper and lower lengths of the first hole are greater than the upper and lower lengths of the fixed pressure rod at one end close to the sliding block.

[0010] Preferably, the appearance structure of the first guide groove is spiral, and the first guide groove and the first guide rod are matched in a clearance fit.

[0011] Preferably, the baffle has a cylindrical appearance, and the outer side surface of the baffle is in contact with the inner side surface of the first groove.

[0012] Preferably, the guide assembly includes a support plate arranged on one side of the hydraulic cylinder, the support plate is connected to the vehicle body in a fixed connection, a second guide groove is arranged on the inner side of the support plate, the lower end of the second guide groove is connected to the third guide groove, a point a is arranged on the outer side of the upper end of the second guide groove, a point b is arranged on the inner side of the upper end of the second guide groove, a point c is arranged on the inner side of the lower end of the second guide groove, a second guide rod is arranged on the inner side of the second guide groove, a first slide groove is arranged on the inner side of the first connecting plate, a first slider is arranged on the inner side of the first slide groove, and the second guide rod and the first slider are connected in a fixed connection.

[0013] Preferably, the width of the first slide groove at one end close to the center of the first connecting plate is greater than the width of the first slide groove at one end away from the center of the first connecting plate, and the outer side surface of the first sliding block fits with the inner side surface of the first slide groove.

[0014] Preferably, point a of the second guide groove is farther away from the vehicle body than point b of the second guide groove, and point c of the second guide groove is closer to the vehicle body than the central axis of the third guide groove.

[0015] Preferably, the appearance structure of the third guide groove is a vertical straight line, and the third guide groove and the second guide rod are matched in a clearance fit.

[0016] Preferably, the sliding assembly includes a first push plate fixedly connected to the outer side of the second guide rod, a second push plate is slidably connected to the side of the support plate close to the hydraulic cylinder, a second slide groove is provided on the inner side of the second push plate, a second sliding block is provided on the inner side of the second slide groove, the second sliding block is connected to the first push plate in a fixed manner, a second hole is internally connected to the other side below the first groove, a fixing rod is provided on the inner side of the second hole, the fixing rod and the sliding block are connected in a fixed manner, the other end of the fixing rod is fixedly connected to the fixing plate, a limiting hole is provided on the inner side of the fixing plate, one end of the second push plate is fixedly connected to the limiting rod, the limiting holes are equidistantly distributed on the inner side of the fixing plate, and the limiting rod and the limiting hole are matched in a clearance match.

[0017] A blasting method for a hole-separated pre-splitting blasting energy-gathering tube comprises the following steps: aligning a rotating head with a location where a hole needs to be drilled, starting a hydraulic cylinder to drive a motor, a rotating head and a pressure cylinder to move downward to contact the ground, starting the motor to drive the rotating head to drill a hole, and after the rotating head has completed drilling a hole, starting the hydraulic cylinder to move in the opposite direction, so that the motor and the rotating head leave the ground first, and then the pressure cylinder leaves the ground later, and then the blasting energy-gathering tube is placed inside the drilled hole, explosives are loaded in the blasting energy-gathering tube, and the tube is connected to a detonating device, and finally personnel are evacuated to perform detonation.

[0018] Compared with the prior art, the present invention has the following beneficial effects:

[0019] 1. The present invention provides a hole-separated pre-splitting blasting energy-gathering tube installation device and a blasting method. By providing an elastic mechanism and a limiting mechanism, the elastic mechanism is pushed downward, so that pressure can be applied to the ground before the rotor contacts the ground, and the ground loses pressure after the rotor leaves the ground. Compared with the prior art, the local stress concentration phenomenon can be reduced, and the generation of cracks can be reduced, thereby achieving the purpose of achieving a better blasting effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the present invention;

[0021] Figure 2 It is a left side cross-sectional structural schematic diagram of the hydraulic rod of the present invention;

[0022] Figure 3 It is a front view structural schematic diagram of the second guide groove of the present invention;

[0023] Figure 4 It is a schematic diagram of the front cross-sectional structure of the pressing cylinder of the present invention;

[0024] Figure 5 For the present invention Figure 2 Schematic diagram of the structure at A in the middle;

[0025] Figure 6 For the present invention Figure 2 Schematic diagram of the structure at point B in the middle.

[0026] In the figure: 1, vehicle body; 2, hydraulic cylinder; 3, hydraulic rod; 4, first connecting plate; 5, motor; 6, rotating head; 7, elastic mechanism; 8, limiting mechanism; 81, guide assembly; 82, sliding assembly; 9, first groove; 701, sliding block; 702, first hole; 703, fixed pressure rod; 704, pressure cylinder; 705, first guide groove; 706, first guide rod; 707, second groove; 708, pull rod; 709, baffle; 71 0. Spring; 8101. Support plate; 8102. Second guide groove; 8103. Third guide groove; 8104. Second guide rod; 8105. First slide groove; 8106. First slider; 8201. First push plate; 8202. Second push plate; 8203. Second slide groove; 8208. Second slider; 8204. Second hole; 8205. Fixed rod; 8206. Fixed plate; 8207. Limit hole; 8209. Limit rod. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0028] See also Figure 1-Figure 6 The present invention provides a technical solution: a hole pre-splitting blasting energy-gathering tube installation device, comprising a vehicle body 1, a hydraulic cylinder 2 fixedly connected to one side of the vehicle body 1, a hydraulic rod 3 fixedly connected to the output end of the hydraulic cylinder 2, a first connecting plate 4 fixedly connected to the lower end of the hydraulic rod 3, a motor 5 fixedly connected to the lower end of the first connecting plate 4, a rotating head 6 fixedly connected to the output end of the motor 5, an elastic mechanism 7 is arranged on the inner side of the hydraulic rod 3, and a limiting mechanism 8 is arranged on one side of the elastic mechanism 7;

[0029] The limiting mechanism 8 includes a guide component 81 and a sliding component 82, and the sliding component 82 is arranged on one side of the guide component 81;

[0030] The inner side of the hydraulic rod 3 is provided with a first groove 9, and the elastic mechanism 7 includes a sliding block 701 arranged on the inner side of the first groove 9. A first hole 702 is connected to the inside of the lower side of the first groove 9. The inner side surface of the first hole 702 is in contact with the outer side surface of the fixed pressure rod 703, and the upper and lower lengths of the first hole 702 are greater than the upper and lower lengths of the fixed pressure rod 703 close to the sliding block 701, so that the fixed pressure rod 703 will not rotate when it moves up and down on the inner side of the first hole 702. A fixed pressure rod 703 is provided on the inner side of the first hole 702. The connection between the fixed pressure rod 703 and the sliding block 701 is a fixed connection. The lower end of the fixed pressure rod 703 is fixedly connected to a pressure cylinder 704. A first guide groove 705 is connected to the upper inner wall of the first groove 9. The appearance structure of the first guide groove 705 is spiral, and the first guide groove 705 and the first guide rod 706 are matched in a clearance fit, so that the first guide rod 706 is in the first guide groove 7 When the inner side of 05 moves, it will rotate along its trajectory. A first guide rod 706 is provided on the inner side of the first guide groove 705, a second groove 707 is provided on the inner side of the sliding block 701, and a pull rod 708 is provided on the inner side of the second groove 707. A baffle 709 is fixedly connected to the upper end of the pull rod 708, and a spring 710 is fixedly connected to the upper end of the baffle 709. The connection mode of the spring 710 and the hydraulic rod 3 is a rotational connection, and the connection mode of the first guide rod 706 and the baffle 709 is a fixed connection. The appearance structure of the first guide groove 705 is spiral, and the matching mode of the first guide groove 705 and the first guide rod 706 is a clearance match. The appearance structure of the baffle 709 is cylindrical, and the outer side surface of the baffle 709 fits with the inner side surface of the first groove 9, so that the baffle 709 can move on the inner side of the first groove 9 without shaking, and the position height of the pressing cylinder 704 in the natural state of the spring 710 is lower than the position height of the lower end of the rotating head 6.

[0031] The guide assembly 81 includes a support plate 8101 disposed on one side of the hydraulic cylinder 2. The support plate 8101 is connected to the vehicle body 1 in a fixed manner. A second guide groove 8102 is disposed on the inner side of the support plate 8101. The lower end of the second guide groove 8102 is connected to a third guide groove 8103. A point a is disposed on the outer side of the upper end of the second guide groove 8102. A point b is disposed on the inner side of the upper end of the second guide groove 8102. A point c is disposed on the inner side of the lower end of the second guide groove 8102. A second guide rod 8104 is provided on the inner side of 8102, and a first slide groove 8105 is provided on the inner side of the first connecting plate 4. The width of the first slide groove 8105 close to the center of the first connecting plate 4 is greater than the width of the first slide groove 8105 away from the center of the first connecting plate 4, and the outer side surface of the first slider 8106 is in contact with the inner side surface of the first slide groove 8105, so that when the first slider 8106 moves on the inner side of the first slide groove 8105, it will not shake or move to the first slide groove 8105. The control range of the slide groove 8105, a first slider 8106 is arranged on the inner side of the first slide groove 8105, the connection mode of the second guide rod 8104 and the first slider 8106 is a fixed connection, point a of the second guide groove 8102 is farther away from the vehicle body 1 than point b of the second guide groove 8102, and point c of the second guide groove 8102 is closer to the vehicle body 1 than the central axis of the third guide groove 8103, so that when the second guide rod 8104 moves to the point a position and moves downward, it will move to the side of the second guide groove 8102 close to the vehicle body 1, and when the second guide rod 8104 moves out from the inner side of the third guide groove 8103, the second guide rod 8104 can move to the side of the second guide groove 8102 away from the vehicle body 1, the appearance structure of the third guide groove 8103 is a vertical straight line, and the cooperation mode of the third guide groove 8103 and the second guide rod 8104 is a clearance cooperation, so that the second guide rod 8104 will not shake when moving on the inner side of the third guide groove 8103.

[0032] The sliding assembly 82 includes a first push plate 8201 fixedly connected to the outside of the second guide rod 8104, a second push plate 8202 is slidably connected to the side of the support plate 8101 close to the hydraulic cylinder 2, a second slide groove 8203 is provided on the inner side of the second push plate 8202, a second slider 8208 is provided on the inner side of the second slide groove 8203, the second slider 8208 is connected to the first push plate 8201 in a fixed manner, a second hole 8204 is connected to the inside of the other side below the first groove 9, and a fixing rod 82 is provided on the inner side of the second hole 8204. 05. The connection between the fixed rod 8205 and the sliding block 701 is a fixed connection. The other end of the fixed rod 8205 is fixedly connected to the fixed plate 8206. A limiting hole 8207 is arranged on the inner side of the fixed plate 8206. One end of the second push plate 8202 is fixedly connected to the limiting rod 8209. The limiting holes 8207 are equidistantly distributed on the inner side of the fixed plate 8206. The matching mode between the limiting rod 8209 and the limiting holes 8207 is a clearance match, so that the limiting rod 8209 can move to the inner side of the limiting hole 8207 to limit the fixed plate 8206.

[0033] A blasting method for a hole-separated pre-splitting blasting energy-gathering tube is disclosed. The swivel head 6 is aligned with a place where a hole needs to be drilled, and the hydraulic cylinder 2 is started to drive the motor 5, the swivel head 6 and the pressure cylinder 704 to move downward to contact the ground. The motor 5 is started to drive the swivel head 6 to drill a hole. After the swivel head 6 completes drilling, the hydraulic cylinder 2 is started to move in the opposite direction, so that the motor 5 and the swivel head 6 leave the ground first, and the pressure cylinder 704 leaves the ground later. Then, the blasting energy-gathering tube is placed inside the drilled hole, and explosives are loaded in the blasting energy-gathering tube, which is connected to a detonating device. Finally, personnel are evacuated to perform detonation.

[0034] When drilling holes, it is necessary to reduce the cracks around the drilling holes. The specific operations are as follows:

[0035] When it is necessary to drill a hole, start the hydraulic cylinder 2 to drive the hydraulic rod 3 to move downward, drive the first connecting plate 4 to drive the motor 5 and the rotating head 6 to move downward. Because the position height of the pressure cylinder 704 in the natural state of the spring 710 is lower than the position height of the lower end of the rotating head 6, the sliding block 701, the fixed pressure rod 703 and the spring 710 move downward, so that the pressure cylinder 704 will contact the ground before the rotating head 6. The spring 710 is compressed to exert a reaction force on the baffle 709, the sliding block 701 and the fixed pressure rod 703, so that the pressure cylinder 704 provides a uniform pressure on the ground. After the pressure cylinder 704 contacts the ground, continue to start the hydraulic cylinder 2 to move downward, so that the rotating head 6 contacts the ground, start the motor 5 to drive the rotating head 6 to rotate to drill a hole, thereby reducing local stress concentration. Stress concentration is the main cause of cracks. Uniform pressure can reduce the stress difference of the surrounding rock mass and reduce the possibility of cracks.

[0036] As the hole is deepened, spring 710 is continuously compressed, and the reaction force it provides becomes larger and larger. As the hole depth increases, the formation pressure on the hole wall also increases, which is caused by the weight of the upper rock and soil layer. As the depth increases, the required uniform stress also needs to increase to resist this increased formation pressure and reduce the possibility of cracks.

[0037] After the hole rotation is completed, the hydraulic cylinder 2 is started to drive the hydraulic rod 3 to move upward, so that the first connecting plate 4 and the first slide groove 8105 move upward, so that the first slider 8106 and the first push plate 8201 fixedly connected thereto move upward. Because point a of the second guide groove 8102 is farther away from the vehicle body 1 than point b of the second guide groove 8102, and point c of the second guide groove 8102 is closer to the vehicle body 1 than the central axis of the third guide groove 8103, when the second guide rod 8104 moves out from the inner side of the third guide groove 8103, the second guide rod 8104 moves out from the inner side of the third guide groove 8103. 4 can move to the side of the second guide groove 8102 away from the vehicle body 1, pull the second slider 8208, the second push plate 8202 and the limiting rod 8209 to move to the right side to the inside of the limiting hole 8207, limit the fixed plate 8206, the fixed rod 8205 and the sliding block 701, and then limit the sliding block 701, the fixed pressure rod 703 and the pressure cylinder 704, so that the pressure cylinder 704 still maintains a uniform stress on the ground. At this time, the hydraulic rod 3 continues to drive the first connecting plate 4, the motor 5 and the rotating head 6 to move upward, so that the rotating head 6 leaves the inside of the rotating hole and moves in the second When the guide rod 8104 moves to the point a, the second guide rod 8104 pushes the second push plate 8202 and the first push plate 8201 to move back, driving the limit rod 8209 to leave the inner side of the limit hole 8207, so that the sliding block 701, the pull rod 708 and the baffle 709 move back. Because the appearance structure of the first guide groove 705 is spiral, and the first guide groove 705 and the first guide rod 706 are matched in a clearance fit, the first guide rod 706 has a longer rising distance and takes a longer time, which can avoid the pressure applied. The pressure disappears quickly, thus causing cracks to form. When the rotary head 6 contacts the underground rock and soil, if the pressure cylinder 704 and the rotary head 6 are removed at the same time, it will cause a sudden stress release and form a stress concentration area. This sudden change will cause cracks in the hole wall. If the pressure cylinder 704 is released first, the drill bit is still in the rock and soil, leaving a cavity, which will cause the surrounding rock and soil to collapse or crack without sufficient support. The present device first removes the rotary head 6 and then removes the pressure cylinder 704, avoiding stress concentration in the surrounding rock and soil due to instantaneous stress release, thereby effectively reducing the generation of cracks.

[0038] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0039] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A device for installing a hole pre-splitting blasting energy-gathering tube, comprising a vehicle body (1), a hydraulic cylinder (2) fixedly connected to one side of the vehicle body (1), a hydraulic rod (3) fixedly connected to the output end of the hydraulic cylinder (2), a first connecting plate (4) fixedly connected to the lower end of the hydraulic rod (3), a motor (5) fixedly connected to the lower end of the first connecting plate (4), and a rotating head (6) fixedly connected to the output end of the motor (5), characterized in that: An elastic mechanism (7) is arranged on the inner side of the hydraulic rod (3), and a limiting mechanism (8) is arranged on one side of the elastic mechanism (7); The limiting mechanism (8) comprises a guide component (81) and a sliding component (82), wherein the sliding component (82) is arranged on one side of the guide component (81); A first groove (9) is arranged on the inner side of the hydraulic rod (3); the elastic mechanism (7) comprises a sliding block (701) arranged on the inner side of the first groove (9); a first hole (702) is connected to the interior of the lower side of the first groove (9); a fixed pressure rod (703) is arranged on the inner side of the first hole (702); the fixed pressure rod (703) is connected to the sliding block (701) in a fixed manner; a pressure cylinder (704) is fixedly connected to the lower end of the fixed pressure rod (703); a first guide groove (705) is connected to the upper inner wall of the first groove (9); a first guide groove (705) is arranged on the inner side of the first guide groove (705); A first guide rod (706) is provided, a second groove (707) is provided on the inner side of the sliding block (701), a pull rod (708) is provided on the inner side of the second groove (707), the upper end of the pull rod (708) is fixedly connected to a baffle (709), the upper end of the baffle (709) is fixedly connected to a spring (710), the spring (710) and the hydraulic rod (3) are connected in a rotating manner, the first guide rod (706) and the baffle (709) are connected in a fixed manner, and the position height of the pressure cylinder (704) in the natural state of the spring (710) is lower than the position height of the lower end of the rotating head (6).

2. The installation equipment for the hole pre-splitting blasting energy-gathering tube according to claim 1 is characterized by: The inner side surface of the first hole (702) fits the outer side surface of the fixed pressure rod (703), and the upper and lower lengths of the first hole (702) are greater than the upper and lower lengths of one end of the fixed pressure rod (703) close to the sliding block (701).

3. The installation equipment and blasting method of the hole pre-splitting blasting energy-gathering tube according to claim 1 are characterized by: The appearance structure of the first guide groove (705) is spiral, and the first guide groove (705) and the first guide rod (706) are matched in a clearance fit.

4. The installation equipment for the hole-separated pre-splitting blasting energy-gathering tube according to claim 1 is characterized by: The baffle plate (709) has a cylindrical appearance, and the outer side surface of the baffle plate (709) fits with the inner side surface of the first groove (9).

5. The installation equipment for the hole-separated pre-splitting blasting energy-gathering tube according to claim 1 is characterized by: The guide assembly (81) comprises a support plate (8101) arranged on one side of the hydraulic cylinder (2); the support plate (8101) is connected to the vehicle body (1) in a fixed manner; a second guide groove (8102) is arranged on the inner side of the support plate (8101); the lower end of the second guide groove (8102) is connected to the third guide groove (8103); a point a is arranged on the outer side of the upper end of the second guide groove (8102); a point b is arranged on the inner side of the upper end of the second guide groove (8102); a point c is arranged on the inner side of the lower end of the second guide groove (8102); a second guide rod (8104) is arranged on the inner side of the second guide groove (8102); a first slide groove (8105) is arranged on the inner side of the first connecting plate (4); a first slider (8106) is arranged on the inner side of the first slide groove (8105); and the second guide rod (8104) and the first slider (8106) are connected in a fixed manner.

6. The installation equipment for the hole-separated pre-splitting blasting energy-gathering tube according to claim 5 is characterized by: The width of the first slide groove (8105) at one end close to the center of the first connecting plate (4) is greater than the width of the first slide groove (8105) at one end away from the center of the first connecting plate (4), and the outer side surface of the first sliding block (8106) fits with the inner side surface of the first slide groove (8105).

7. The installation equipment for the hole-separated pre-splitting blasting energy-gathering tube according to claim 5 is characterized by: Point a of the second guide groove (8102) is further away from the vehicle body (1) than point b of the second guide groove (8102), and point c of the second guide groove (8102) is closer to the vehicle body (1) than the central axis of the third guide groove (8103).

8. The installation equipment for the hole-separated pre-splitting blasting energy-gathering tube according to claim 5 is characterized by: The appearance structure of the third guide groove (8103) is a vertical straight line, and the third guide groove (8103) and the second guide rod (8104) are matched in a clearance fit.

9. The installation equipment for the hole-separated pre-splitting blasting energy-gathering tube according to claim 1, characterized in that: The sliding assembly (82) includes a first push plate (8201) fixedly connected to the outside of the second guide rod (8104); a second push plate (8202) is slidably connected to the side of the support plate (8101) close to the hydraulic cylinder (2); a second slide groove (8203) is provided on the inner side of the second push plate (8202); a second slider (8208) is provided on the inner side of the second slide groove (8203); the second slider (8208) is connected to the first push plate (8201) in a fixed manner; a second hole (8204) is connected to the inside of the other side below the first groove (9); A fixing rod (8205) is arranged on the inner side of the second hole (8204), and the fixing rod (8205) is connected to the sliding block (701) in a fixed connection manner. The other end of the fixing rod (8205) is fixedly connected to a fixing plate (8206), and a limiting hole (8207) is arranged on the inner side of the fixing plate (8206). One end of the second push plate (8202) is fixedly connected to a limiting rod (8209), and the limiting holes (8207) are equidistantly distributed on the inner side of the fixing plate (8206), and the matching manner of the limiting rod (8209) and the limiting hole (8207) is a clearance match.

10. A blasting method for a blasting tube with hole pre-splitting blasting according to any one of claims 1 to 9, characterized in that: The rotating head (6) is aligned with the place where the hole needs to be drilled, and the hydraulic cylinder (2) is started to drive the motor (5), the rotating head (6) and the pressure cylinder (704) to move downward and contact the ground. The motor (5) is started to drive the rotating head (6) to drill the hole. After the rotating head (6) has completed drilling the hole, the hydraulic cylinder 2 is started to move in the opposite direction, so that the motor (5) and the rotating head (6) leave the ground first, and the pressure cylinder (704) leaves the ground later. Then, the blasting energy-gathering tube is placed inside the drilled hole, and explosives are loaded in the blasting energy-gathering tube, which is connected to the detonating device. Finally, the personnel are evacuated to perform detonation.