Energy storage and new energy optimization method and device considering dynamic section limit
By dynamically adjusting the section limit power, the problem of conservative section limit selection in the existing technology is solved, the new energy consumption and operation safety of the power system is improved, and more efficient new energy utilization is achieved.
Patent Information
- Application Number
- CN202411343271.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-25
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2044-09-25
AI Technical Summary
The selection of section limits in existing methods tends to be conservative, and the fixed limit values set based on historical data and experience cannot reflect dynamic changes in time, resulting in insufficient or excessive conservative operation of the power system, limiting the consumption of new energy and the power in the line. delivery.
Provide an energy storage and new energy optimization method that considers the limit of dynamic sections. By obtaining power data of energy storage and new energy in real time, using energy storage optimization operation model and new energy optimization operation model, constructing a collaborative optimization objective function, and dynamically adjusting the section The limit power is adjusted in real time according to the operating status of the power system and the load changes.
It improves the operational safety of the power system and the output of new energy, promotes the consumption of new energy, reduces the amount of wind and light abandonment, and improves system flexibility and new energy utilization efficiency.
Smart Images

Figure CN119231647A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of power system optimization and dispatching, and in particular to a method and device for optimizing energy storage and new energy by taking dynamic section limits into consideration. Background Art
[0002] In recent years, new energy represented by distributed power sources has developed rapidly around the world. These new energy sources have the advantages of being renewable, clean and pollution-free. However, new energy generation is characterized by volatility, randomness and intermittency, and the uncertainty in its output process has a significant impact on the safe and stable operation of the power grid.
[0003] In order to cope with the uncertainty of renewable energy generation, energy storage technology has received extensive attention and application. Energy storage power stations can store electricity when renewable energy generation is in excess and release electricity when renewable energy generation is insufficient, thereby smoothing the fluctuation of renewable energy output to a certain extent and improving the reliability and stability of the power grid.
[0004] Therefore, in the context of large-scale access to new energy, it is particularly important to achieve coordinated optimization of new energy sites and energy storage power stations. The coordinated optimization of new energy and energy storage is the key to achieving safe, economical and efficient operation of the power system.
[0005] In the process of coordinated optimization of new energy and energy storage, section time limit is an important consideration. The selection of section limits in existing methods tends to be conservative. The limit section is usually a fixed limit value set based on historical data and experience, which cannot reflect the dynamic changes in actual operation in a timely manner. Although setting the limit section constant value ensures the safety of the power system, it cannot guarantee the absorption rate. Summary of the invention
[0006] The purpose of this application is to provide a method and device for optimizing energy storage and new energy taking into account dynamic section limits, which can dynamically adjust the time-varying power of section limits, thereby improving the power output of new energy while ensuring the safety of the power system, effectively improving the flexibility of the system, and improving the efficiency of new energy utilization.
[0007] To achieve the above objectives, this application provides the following solutions:
[0008] In a first aspect, the present application provides an energy storage and new energy optimization method considering dynamic section limits, including:
[0009] Obtain real-time energy storage discharge power, real-time energy storage charging power, real-time wind power generation power, real-time photovoltaic power generation power and real-time wind and solar power abandonment;
[0010] The real-time energy storage discharge power and the real-time energy storage charging power are input into the energy storage optimization operation model to obtain the energy storage optimization amount, wherein the energy storage optimization operation model includes an energy storage optimization objective function and an energy storage constraint set, the energy storage optimization objective function is a function constructed with the goal of maximizing the first difference, the first difference is a value obtained by performing difference calculation on the balance optimization amount of the power system by the energy storage end, the energy storage end operation and maintenance coefficient, and the energy storage end life loss coefficient, and the energy storage constraint set includes energy storage charging and discharging state constraints, energy storage charging and discharging power constraints, and energy storage charge constraints;
[0011] The real-time wind power generation power, the real-time photovoltaic power generation power and the real-time wind and solar power abandonment power are input into the new energy optimization operation model to obtain the new energy optimization amount, wherein the new energy optimization objective function and the new energy constraint set, the new energy optimization objective function is a function constructed with the goal of maximizing the second difference, the second difference is a value obtained by performing difference calculation based on the new energy consumption amount and the wind and solar power abandonment penalty amount, and the new energy constraint set includes photovoltaic fluctuation penalty constraints and wind power fluctuation penalty constraints;
[0012] The energy storage optimization amount and the new energy optimization amount are input into the energy storage and new energy day-ahead collaborative optimization model to obtain the scheduling results of energy storage and new energy, wherein the energy storage and new energy day-ahead collaborative optimization model includes a collaborative optimization objective function and a power system operation constraint set, wherein the collaborative optimization objective function is a function calculated based on the energy storage optimization amount and the new energy optimization amount, and the power system operation constraint set includes the interconnection line transmission power constraint, phase angle constraint and section limit power time-varying constraint between each node in the power system, wherein the section limit power time-varying constraint The section limit power is the value obtained by substituting the real-time node active power into the section limit time-varying linear relationship, and the section limit time-varying linear relationship is the relationship obtained by fitting the historical node active power and the historical section limit power, and the historical node active power and the historical section limit power are the values obtained by processing the injected power and load of the target node on the typical day of the historical year using the continuous power flow method, and the typical day of the historical year refers to the historical date when the section limit power in the power system exceeds the section constant threshold, and the target node refers to the node corresponding to the transmission line at the section.
[0013] In a second aspect, the present application provides a computer device comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the above-mentioned method for optimizing energy storage and new energy taking into account dynamic section limits in the first aspect.
[0014] In a third aspect, the present application provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the above-mentioned energy storage and new energy optimization method considering dynamic cross-sectional limits in the first aspect.
[0015] In a fourth aspect, the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the above-mentioned energy storage and new energy optimization method considering dynamic cross-sectional limits in the first aspect.
[0016] According to the specific embodiments provided in this application, this application discloses the following technical effects:
[0017] The present application provides a method and device for optimizing energy storage and new energy taking into account dynamic section limits, by inputting real-time energy storage discharge power, real-time energy storage charging power, real-time wind power generation power, real-time photovoltaic power generation power and real-time wind and solar power abandonment into separately constructed energy storage optimization operation models and new energy optimization operation models, to obtain energy storage optimization amount and new energy optimization amount; constructing a collaborative optimization objective function based on the energy storage optimization amount and the new energy optimization amount, and determining the optimal scheduling results of energy storage and new energy based on a power system operation constraint set, wherein the traditional fixed-value limit section constraint in the power system operation constraint set is improved into a section limit time-varying constraint, and by adjusting the section limit power in the section limit time-varying constraint in real time according to the operation state and load changes of the power system, the section limit power can be more flexibly adapted to the actual operation conditions, thereby improving the operation safety and wind and solar power output of the power system, promoting the new energy consumption of the power system, increasing the new energy output, and reducing the wind and solar power abandonment. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 This is an application environment diagram of an energy storage and new energy optimization method considering dynamic cross-section limits in Example 1 of the present application;
[0020] Figure 2 A schematic flow chart of an energy storage and new energy optimization method considering dynamic cross-section limits provided in Example 1 of the present application;
[0021] Figure 3 A schematic diagram of the structure of a computer device provided in Example 2 of the present application. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0023] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, the present application is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0024] Example 1
[0025] The energy storage and new energy optimization method considering dynamic section limit provided in the embodiment of the present application can be applied to Figure 1In the application environment shown, the terminal 102 communicates with the server 104 through a network. The data storage system can store data that the server 104 needs to process. The data storage system can be set up separately, integrated on the server 104, or placed on the cloud or other servers. The terminal 102 can send the real-time energy storage discharge power, the real-time energy storage charging power, the real-time wind power generation power, the real-time photovoltaic power generation power and the real-time wind and solar power abandonment to the server 104. The server 104 obtains the scheduling results of energy storage and new energy by using the energy storage optimization operation model, the new energy optimization operation model and the energy storage and new energy day-ahead collaborative optimization model according to the received real-time energy storage discharge power, the real-time energy storage charging power, the real-time wind power generation power, the real-time photovoltaic power generation power and the real-time wind and solar power abandonment. The energy storage and new energy day-ahead collaborative optimization model includes a collaborative optimization objective function and a power system operation constraint set. The section limit power time-varying constraint in the power system operation constraint set is a section limit power time-varying constraint, and the section limit power is a value obtained by substituting the real-time node active power into the section limit time-varying linear relationship. The section limit time-varying linear relationship is a relationship obtained by fitting the historical node active power and the historical section limit power. The historical node active power and the historical section limit power are values obtained by processing the injection power and load of the target node on a typical day of a historical year using the continuous power flow method. The server 104 can feed back the obtained scheduling results of energy storage and new energy to the terminal 102. In addition, in some embodiments, an energy storage and new energy optimization method considering dynamic section limits can also be implemented by the server 104 or the terminal 102 alone, such as the terminal 102 can directly process the real-time energy storage discharge power, real-time energy storage charging power, real-time wind power generation power, real-time photovoltaic power generation power and real-time wind and solar power abandonment by using the energy storage and new energy optimization method considering dynamic section limits, or the server 104 can obtain the real-time energy storage discharge power, real-time energy storage charging power, real-time wind power generation power, real-time photovoltaic power generation power and real-time wind and solar power abandonment from the data storage system, and process them by using the energy storage and new energy optimization method considering dynamic section limits.
[0026] The terminal 102 may be, but is not limited to, various desktop computers, laptop computers, smart phones, tablet computers, IoT devices, and portable wearable devices. The IoT devices may be smart speakers, smart TVs, smart air conditioners, smart vehicle-mounted devices, etc. The portable wearable devices may be smart watches, smart bracelets, head-mounted devices, etc. The server 104 may be implemented as an independent server or a server cluster consisting of multiple servers, or may be a cloud server.
[0027] In an exemplary embodiment, a method for optimizing energy storage and new energy considering dynamic section limits is provided. The method is executed by a computer device, and can be executed by a computer device such as a terminal or a server alone, or by a terminal and a server together. In the embodiment of the present application, the method is applied to Figure 1 The server 104 in the example is used as an example to illustrate the method, which includes the following steps 201 to 208. Among them:
[0028] Step 201, obtaining real-time energy storage discharge power, real-time energy storage charging power, real-time wind power generation power, real-time photovoltaic power generation power and real-time wind and solar power abandonment power.
[0029] Step 202: input the real-time energy storage discharge power and the real-time energy storage charging power into the energy storage optimization operation model to obtain the energy storage optimization amount, wherein the energy storage optimization operation model includes an energy storage optimization objective function and an energy storage constraint set, the energy storage optimization objective function is a function constructed with the goal of maximizing a first difference, the first difference is a value obtained by performing a difference calculation based on the energy storage end's balanced optimization amount for the power system, the energy storage end operation and maintenance coefficient, and the energy storage end life loss coefficient, and the energy storage constraint set includes energy storage charging and discharging state constraints, energy storage charging and discharging power constraints, and energy storage charge constraints.
[0030] Step 203, input the real-time wind power generation power, the real-time photovoltaic power generation power and the real-time wind and solar power abandonment power into the new energy optimization operation model to obtain the new energy optimization amount, wherein the new energy optimization objective function and the new energy constraint set, the new energy optimization objective function is a function constructed with the goal of maximizing the second difference, the second difference is a value obtained by performing difference calculation based on the new energy absorption amount and the wind and solar power abandonment penalty amount, and the new energy constraint set includes photovoltaic fluctuation penalty constraints and wind power fluctuation penalty constraints.
[0031] Step 204, input the energy storage optimization amount and the new energy optimization amount into the energy storage and new energy day-ahead collaborative optimization model to obtain the scheduling results of the energy storage and new energy, wherein the energy storage and new energy day-ahead collaborative optimization model includes a collaborative optimization objective function and a power system operation constraint set, the collaborative optimization objective function is a function calculated based on the energy storage optimization amount and the new energy optimization amount, the power system operation constraint set includes the tie line transmission power constraint, phase angle constraint and section limit power time-varying constraint between each node in the power system, the section limit power time-varying constraint The section limit power in the beam is a value obtained by substituting the real-time node active power into the section limit time-varying linear relationship, and the section limit time-varying linear relationship is a relationship obtained by fitting the historical node active power and the historical section limit power. The historical node active power and the historical section limit power are values obtained by processing the injected power and load of the target node on the typical day of the historical year using the continuous power flow method. The typical day of the historical year refers to the historical date when the section limit power in the power system exceeds the section constant threshold, and the target node refers to the node corresponding to the transmission line at the section.
[0032] This embodiment adopts the above steps 201-204 to improve the fixed-value limit section constraint in the prior art into a section limit time-varying constraint. By adjusting the section limit (i.e., the section limit power) in real time according to the operating state and load changes of the power system (i.e., the injected power and load of the node in the power system), the section limit can be more flexibly adapted to the actual operating conditions, thereby improving the operating safety and wind and solar power transmission of the power system, and promoting the new energy consumption of the power system. At the same time, the section limit time-varying constraint of this embodiment can increase the new energy transmission and reduce the amount of wind and solar power abandonment, overcoming the defect that "the fixed-value limit section constraint is usually a fixed limit set based on historical data and experience, which cannot reflect the dynamic changes in actual operation in time. This static limit constraint may lead to insufficient safety margin or excessive conservatism in system operation in actual applications, thereby having an adverse effect on the new energy consumption of the power system, and especially limiting the power transmission within the line". The dynamic section limit constraint adopted in this embodiment can adjust the limit in real time according to the actual operating conditions, making the power system operation more flexible and efficient, and can dynamically increase the new energy transmission.
[0033] At the same time, in the coordinated optimization process of energy storage and new energy, this embodiment models the energy storage end and the new energy end respectively, comprehensively considers the life loss coefficient of the energy storage end and the operation and maintenance coefficient of the energy storage end, and uses the energy storage end equipment to promote the consumption of new energy, thereby improving the consumption capacity of new energy, thereby improving the new energy transmission efficiency of the power system, and overcoming the defect that "the joint modeling of energy storage and new energy in the existing methods is usually simplified, ignoring the life loss cost and operation and maintenance cost of the energy storage equipment. This simplified model may lead to low operating efficiency and shortened life of the energy storage equipment in actual application, affecting the economy and stability of the overall system". The modeling method of this embodiment can more accurately describe the operating characteristics of energy storage and new energy, consider the energy storage life loss and energy storage operation and maintenance coefficient, thereby optimizing the operation strategy of the power system, and improving the economic benefits and stability of the power system.
[0034] In this embodiment, it is considered that the existing multi-objective optimization problem solving methods usually adopt weighted summation method, Pareto optimal solution method, target programming method, etc. In practical applications, these methods are often difficult to determine the reasonable weights of each target, resulting in the solution results being biased towards a certain target and failing to fully balance the interests between the targets. The existing target weight allocation methods generally use expert scoring method, entropy weight method and other methods to determine the weights of each target. Most of these methods rely on subjective experience or statistical data, which are difficult to adjust dynamically, and in complex and changeable power systems, the rationality and accuracy of weight allocation cannot be guaranteed.
[0035] In order to overcome this technical defect, as an optional implementation method, this embodiment adopts a target hierarchy weight method to determine the energy storage optimization amount weight and the new energy optimization amount weight in the collaborative optimization objective function.
[0036] This embodiment uses the target hierarchy weight method to reasonably allocate the importance of each target in the system, and realizes the solution of the day-ahead collaborative optimization scheduling problem of the power system that fits the reality. By reasonably dynamically allocating the weight values of the two models (i.e., the energy storage optimization amount weight corresponding to the energy storage optimization operation model and the new energy optimization amount weight corresponding to the new energy optimization operation model), the weight of each target is dynamically adjusted according to the actual situation, avoiding the bias of a single target, ensuring that the optimization result is more in line with the actual needs, and maximizing the benefits of each subject, including distributed energy operators, energy storage system operators and power grid operators, while ensuring the safe and stable operation of the power system.
[0037] In this embodiment, the above steps 201 to 204 involve the calculation process of the cross-section limit power in the cross-section limit time-varying constraint, the establishment and solution process of the energy storage operation model, the new energy operation model, and the energy storage and new energy day-ahead collaborative optimization model. In order to make the implementation steps of these specific processes more clear to those skilled in the art, the following combined Figure 2 Provide further explanation.
[0038] (1) Convert the fixed limit section constraint into the time-varying section limit constraint.
[0039] At present, there is abundant renewable energy in northern Hebei, and the installed capacity of renewable energy is large, but there are few industries in the region and the load is small. The consumption of renewable energy in northern Hebei is a serious problem at present. In particular, the terrain in northern Hebei is complex, and it is inconvenient to set up transmission lines, so there are multiple restrictions on the transmission of renewable energy power. Among them, the most serious part of the transmission restriction is the section, and the maximum power that can be recited at the section is the section limit transmission value. In order to improve the consumption rate of renewable energy and realize the efficient use of clean energy, the increase in the transmission of section limit power is a key issue. The current choice of section limit tends to be conservative, and the fixed value of the transmission volume at the worst time is usually selected as the transmission limit value at all times. Although safety is guaranteed, the consumption rate cannot be guaranteed.
[0040] This embodiment changes the fixed section limit power into a dynamic section limit time-varying power (section limit power), thereby improving the power output of renewable energy while ensuring safety, effectively improving system flexibility, and improving the utilization efficiency of renewable energy.
[0041] The fixed limit section constraint is converted into a section limit time-varying constraint. The specific process includes:
[0042] Step 1: Screen based on the section constant limit, select the date that exceeds the section limit value threshold, calculate the corresponding section limit under different dates according to the continuous power flow method, and then build a section limit database.
[0043] In the collaborative optimization of energy storage and new energy in the present embodiment, the calculation of the section limit value of the power flow is transformed into a section limit time-varying calculation method that dynamically changes according to the node injection power. This greatly improves the regional new energy transmission power while satisfying the power flow limit constraint, providing an effective solution for the transmission of new energy in large new energy development areas.
[0044] As the injected power of distributed energy connected to the distribution network changes, the system flow will also change accordingly, and the fixed section limit will lead to a series of problems such as reduced system transmission capacity and over-limit of line carrying capacity. By building a section limit database, a basic guarantee can be provided for the establishment of the time-varying linear relationship of the section limit.
[0045] Step 1-1: Obtain the injected power and load of each node's new energy on a typical day in the history. The typical day in the history refers to the historical date when the section limit power in the power system exceeds the section fixed value threshold. The injected power includes active power P and reactive power Q, and the load includes active load P. L and reactive load Q L, assuming that the line set at the section is c, the total number of new energy nodes connected to the power system is m, and any transmission line (i.e. branch) between node a and node b is l ab , all l ab The line set c at the section is formed.
[0046] The section limit power objective function is constructed with the maximum section power output as the goal. The expression of the constraint function of the section limit power objective function is:
[0047]
[0048] In the above formula, U a and U b represents the voltage between node a and node b, G ab represents the line conductance between node a and node b, δ ab represents the phase angle between node a and node b, B ab Represents the susceptance between node a and node b.
[0049] Step 1-2: The above section limit power objective function is subject to the following constraints (i.e., section limit power objective function constraint function):
[0050] P l -H ab P ab ≤P l,max ;
[0051]
[0052] P a,min ≤P a ≤P a,max ;
[0053] Q a,min ≤Q a ≤Q a,max ;
[0054] V a,min ≤V a ≤V a,max ;
[0055] Among them, H ab is the branch disconnection distribution factor between node a and node b; P ab is the branch power flow between node a and node b; P l,max is the maximum limit active power of line l; P a is the active power of the new energy output of node a; P a,min , P a,max are the minimum active power and maximum active power of the new energy output of node a respectively; Q aQ is the reactive power of the renewable energy output of node a; a,min , Q a,max are the minimum reactive power and maximum reactive power of the renewable energy output of node a respectively; V a is the voltage amplitude of node a; V a,min 、V a,max are the minimum voltage amplitude and maximum voltage amplitude of node a respectively.
[0056] Step 1-3: Introduce the continuous variable α, adjust the active power output of the new energy output, and calculate the cross-section transmission power. The iterative formula is as follows:
[0057]
[0058] in, is the initial value of active power of node a; is the first iteration value of the active power of node a; and so on, is the nth iteration value of the active power of node a.
[0059] Based on the above formula, the overall injected power change value of node a can be obtained by incorporating the load change of node a. The calculation formulas for the active power change ΔP and the reactive power change ΔQ are as follows:
[0060]
[0061] in, and are the active load and reactive load values of node a respectively; listed here is the nth iteration formula.
[0062] Step 1-4: Iterate according to the continuous power flow method and combine it with the Newton-Raphson method to obtain the accurate power flow solution of the new state point. The iterative model of the continuous power flow method is as follows:
[0063]
[0064] Among them, J Pδ , J PU , J Qδ With J PU It is a known quantity of Jacobian submatrix in the conventional power flow calculation process and can be directly substituted for use;
[0065] The dδ obtained from the above formula (n+1) ,dU (n+1) with da (n+1) Substitute the continuous power flow method state point prediction model formula to obtain the result after a new round of iteration. The continuous power flow method state point prediction model formula is as follows:
[0066]
[0067] Among them, h represents the prediction step size, which can be set manually.
[0068] Step 1-5: After each iteration, substitute the iterative results U, P, Q and δ into the section limit power objective function and the section limit power objective function constraint function for solution. When the objective function meets the constraint conditions and converges (i.e., the section output power reaches a stable state), and when the set step size meets the given accuracy requirements, the output section limit power P cs , and based on this, the active power P of the new energy output of all other nodes in the power system is calculated, and the section limit power corresponding to each scheduling time interval and the active power of all nodes (i.e., the m different nodes mentioned above) are stored in the section limit database.
[0069] The above process is repeated according to the data obtained on different typical days to form the final section limit database.
[0070] Step 2: Based on the formed section limit database, typical samples are screened, and the active power of each node is fitted with the section limit using multivariate linear regression to form a time-varying linear relationship of the section limit.
[0071] The data input in step 1 is preprocessed, including supplementing missing values, removing outliers, etc., to ensure the quality and identity of the data.
[0072] Multiple linear regression models are often used to describe the relationship between multiple independent variables and a dependent variable, and to fit the data through a linear regression equation. The dependent variable y here is P cs , is the section limit power at two node sections of the power system, and the independent variable x is the active power P of the new energy output at m different nodes.
[0073] Step 2-1: You can establish a multiple linear regression equation as shown in the following formula:
[0074] y=l0+l1x1+l2x2+...+l m x m ;
[0075] Among them, λ0, λ1 to λ m is the regression coefficient, which indicates the influence of each independent variable on the dependent variable.
[0076] Step 2-2: Assume that there are a total of c groups of data in the cross-section limit database for training, which can be further expressed in the form of a matrix as follows:
[0077]
[0078] The above formula can also be written as:
[0079] y = xλ;
[0080] Multiply both sides of the above equation by x T , and then put λ alone on the side of the equal sign for transformation, the trained regression coefficient can be expressed as follows:
[0081]
[0082] Finally, the regression equation can be calculated as:
[0083]
[0084] For the data after training with the linear regression equation, the above formula can also be written as:
[0085]
[0086] Step 2-3: Use the existing data for testing. The original data is expressed as P cs Indicates that by screening the residual square R 2 The optimal regression coefficient and residual square R can be obtained. 2 The following formula is used for calculation:
[0087]
[0088] After manually screening out samples with larger residual squares and retraining the multivariate linear regression equation, the final cross-section limit time-varying formula can be obtained:
[0089]
[0090] in, to is the regression coefficient after retraining, P1 to P m is the active power corresponding to the 1st node to the mth node.
[0091] (2) Evaluation of the peak load support capability of energy storage and modeling of energy storage operation, evaluation of the system dispatch support capability of distributed energy (i.e. new energy) and modeling of new energy operation.
[0092] In the power system, energy storage is an important component of new energy power stations. In order to increase the transmission power of new energy, it is necessary to accurately model the energy storage.
[0093] In existing methods, energy storage and new energy are usually modeled jointly, which is usually simplified and ignores the life loss cost and operation and maintenance cost of energy storage equipment. This simplified model may lead to low operating efficiency and shortened life of energy storage equipment in practical applications, affecting the economy and stability of the overall system.
[0094] In order to overcome such technical defects, this embodiment models the energy storage operation model and the new energy operation model respectively, which can more accurately describe the operation characteristics of the energy storage end and the new energy end, consider the energy storage life loss and operation and maintenance coefficient, use energy storage equipment to promote the consumption of new energy, optimize the operation strategy of the power system, thereby improving the efficiency of new energy transmission of the power system, and improving economic benefits and system stability.
[0095] The energy storage side entity plays an important role in smoothing out the fluctuation of new energy sources during the operation of the power system and in peak shaving and valley filling. The energy storage optimization operation model includes an energy storage optimization objective function and an energy storage constraint set, wherein the energy storage optimization objective function is a function constructed with the goal of maximizing the first difference, which is the value obtained by calculating the difference between the energy storage end's balance optimization amount for the power system, the energy storage end operation and maintenance coefficient, and the energy storage end life loss coefficient. The energy storage optimization objective function comprehensively considers energy storage charging and discharging, operation and maintenance, and life loss, and the expression is:
[0096]
[0097] Wherein, f1 is the first difference; t is the tth scheduling time interval, there are 24 hours in a day, every 15 minutes is the minimum scheduling interval, and a day is divided into 96 points, that is, 96 scheduling time intervals; is the energy storage discharge power (i.e., energy storage discharge amount) at the tth scheduling time interval; is the energy storage charging power (i.e., energy storage charging amount) at the tth scheduling time interval; μ t is the energy storage charging and discharging coefficient at the tth scheduling time interval; Δt e k is the energy storage time; t h is the unit coefficient of energy storage operation and maintenance; dis h is the life loss coefficient of energy storage end discharge; ch The life loss coefficient of charging the energy storage end; γ t It is the unit coefficient of life loss of charging and discharging at the energy storage end.
[0098] The expression of the energy storage constraint set is:
[0099]
[0100] in, and They represent the energy storage discharge state and energy storage charge state respectively, both are 0-1 variables; E ch,max The maximum power of energy storage charging (i.e. the maximum energy storage charging capacity); E dis,max is the maximum power of energy storage discharge (i.e. the maximum energy storage discharge); is the energy storage charge at the tth scheduling time interval on the dth day; S oc,max is the maximum charge of energy storage; S oc,min is the minimum charge of energy storage; is the energy storage charge at the (t+1)th scheduling time interval on the dth day; is the energy storage charge at the 96th dispatching time interval on the dth day (i.e., the energy storage charge at the end of the dth day); is the energy storage charge at the 0th scheduling time interval on the (d+1)th day (i.e., the energy storage charge at the initial moment of the (d+1)th day).
[0101] The access of distributed energy to the power system will bring power support and performance improvement to the power system. While bringing new energy output, it also brings fluctuations in wind and solar power. Therefore, while it comes to the support of distributed energy for the dispatching capacity of the power system, the risks brought by distributed energy fluctuations to the system must also be considered.
[0102] The new energy optimization operation model includes a new energy optimization objective function and a new energy constraint set. The new energy optimization objective function is a function constructed with the goal of maximizing the second difference. The second difference is a value obtained by performing difference calculation based on the new energy consumption amount and the wind and solar power abandonment penalty amount. The new energy constraint set includes photovoltaic fluctuation penalty constraints and wind power fluctuation penalty constraints. The expression of the new energy optimization objective function is:
[0103]
[0104] Wherein, f2 is the second difference; t is the tth scheduling time interval; is the wind power generation power (i.e. wind power generation) in the tth scheduling time interval; is the photovoltaic power generation power (i.e. photovoltaic power generation) at the tth scheduling time interval; is the abandoned wind and solar power (i.e. abandoned wind and solar power amount) in the tth scheduling time interval; is the renewable energy transmission power (i.e., renewable energy transmission volume) at the tth scheduling time interval; z t is the power system performance improvement factor of the tth dispatching time interval; is the wind power fluctuation penalty fluctuation amount in the tth scheduling time interval; is the PV fluctuation penalty fluctuation at the tth scheduling time interval; f is the new energy penalty fluctuation coefficient.
[0105] After energy storage compensation, if the difference between the wind power transmission power (i.e. wind and solar power output) in the current scheduling time interval and the wind and solar power output in the previous scheduling time interval is still greater than 25% of the rated wind and solar power output, it will affect the stability of the power system. Therefore, it will be subject to wind and solar power output fluctuation penalty, which will be reflected in the objective function with a certain coefficient.
[0106] The expression of the new energy constraint set is:
[0107]
[0108]
[0109] in, is the wind power transmission power in the tth scheduling time interval; is the discharge power of energy storage acting on wind power in the tth scheduling time interval; is the charging power of energy storage on wind power in the tth scheduling time interval; is the photovoltaic power delivered at the tth scheduling time interval; is the discharge power of energy storage on photovoltaic power generation in the tth scheduling time interval; is the charging power of energy storage on photovoltaic power generation in the tth scheduling time interval; Δt wind is the wind power fluctuation time; is the minimum limit of wind power fluctuation; N wind,N is the rated power of wind power output; Δt pv is the photovoltaic fluctuation time; is the minimum limit of photovoltaic fluctuation; N pv,N is the rated power of photovoltaic output; is the wind power transmission power at the (t-1)th scheduling time interval; is the photovoltaic power transmission at the (t-1)th scheduling time interval.
[0110] (3) Construct a day-ahead collaborative optimization model for energy storage and new energy, and use the target hierarchy weight method to reasonably allocate the importance of each target in the system, so as to solve the day-ahead collaborative optimization scheduling problem of the system in a realistic way.
[0111] Step 3-1: Construct a collaborative optimization model for energy storage and new energy.
[0112] The day-ahead collaborative optimization model of energy storage and new energy includes a collaborative optimization objective function and a set of power system operation constraints. The collaborative optimization objective function is a function calculated based on the energy storage optimization amount and the new energy optimization amount. The power system operation constraint set includes the interconnection line transmission power constraints between nodes in the power system, phase angle constraints, and section limit power time-varying constraints between nodes at the section.
[0113] The expression of the collaborative optimization objective function is:
[0114] f=w1·f1+w2·f2;
[0115] Among them, f is the scheduling result of energy storage and new energy; w1 is the weight vector corresponding to f1; f1 is the energy storage optimization amount; f2 is the new energy optimization amount; w2 is the weight vector corresponding to f2;
[0116] The section limit power obtained in step (1) is incorporated into the system network operation constraint set, and the expression of the power system operation constraint set is:
[0117]
[0118] Among them, G t,i is the power plant output of the ith node in the tth scheduling time interval; is the wind power generation of the ith node in the tth scheduling time interval; is the photovoltaic power generation of the i-th node in the t-th scheduling time interval; is the energy storage discharge of the i-th node in the t-th scheduling time interval; is the energy storage charge of the i-th node at the t-th scheduling time interval; is the amount of renewable energy abandoned at the i-th node in the t-th scheduling time interval; L load,i is the load size of the i-th node at the t-th scheduling time interval; is the transmission power of the tie line between the ith node and the jth node at the tth scheduling time interval; is the phase angle of the i-th node in the t-th scheduling time interval; x i,j is the reactance value between the i-th node and the j-th node; B is the number of nodes in the power system; q min is the minimum phase angle allowed by the power system; q max is the maximum phase angle allowed by the power system; C min is the minimum transmission value of the tie line allowed by the power system; C max The maximum transmission value of the tie line allowed by the power system; is the transmission value of the tie line between the ith node and the jth node at the section; is the section limit power of the i-th node and the j-th node at the section, (Right now ) is to substitute the output of m nodes in this example into The formula is obtained.
[0119] Step 3-2: Determine the weight coefficients of each part in the day-ahead coordinated optimization model of energy storage and new energy based on the target hierarchy weight method, analyze and solve the day-ahead distributed energy planning and optimized coordinated scheduling of energy storage configuration, and determine the day-ahead optimal scheduling result of the power system.
[0120] In the power system, models usually need to consider multiple factors. Especially after the "dual carbon" goal was proposed, the safe operation of the system and the efficient access and consumption of new energy are both important influencing factors.
[0121] Existing technologies usually use weighted summation method, Pareto optimal solution method, target planning method, etc. when considering the optimal operation of new energy consumption and energy storage. In practical applications, these methods are often difficult to determine the reasonable weights of each target, resulting in the solution results being biased towards a certain target and failing to fully balance the interests of each target. Existing target weight allocation methods generally use expert scoring method, entropy weight method and other methods to determine the weights of each target. Most of these methods rely on subjective experience or statistical data and are difficult to adjust dynamically. In complex and changeable power systems, they cannot guarantee the rationality and accuracy of the weight allocation of new energy consumption, energy storage operation and system safety.
[0122] This embodiment dynamically distributes and solves the weight values of f1 and f2 in a reasonable manner, and dynamically adjusts the weight of each target according to the actual situation, thereby avoiding the bias towards a single target and ensuring that the optimization result is more in line with actual needs, thereby maximizing the new energy transmission volume and consumption rate while ensuring the safe and stable operation of the system.
[0123] The specific process of the multi-objective optimization method for energy storage and new energy based on the target hierarchical weighting method proposed in this embodiment includes:
[0124] Step3-2-1: Determine the hierarchy.
[0125] First, determine the hierarchical structure of the comprehensive optimization problem. The optimization structure can be divided into the following three parts:
[0126] Objective layer: overall goal (maximization of comprehensive benefits); criterion layer: f1, f2; solution layer: final optimization solution.
[0127] Step3-2-2: Use the analytic hierarchy process (AHP) to determine the weight of each objective.
[0128] First, based on existing experience or expert opinions, a pairwise comparison matrix of the two targets f1 and f2 is constructed to determine the relative importance of the three targets. Then, the pairwise comparison matrix is normalized to obtain a normalized matrix, and the average value of each row is calculated to obtain a weight vector. Finally, the consistency of the comparison matrix is tested by the consistency ratio (CR). If the CR is less than 0.1, the consistency of the comparison matrix is considered acceptable. Otherwise, the pairwise comparison matrix needs to be readjusted to determine w1 and w2.
[0129] The collaborative optimization objective function is solved using a single-objective optimization algorithm, and the multi-objective optimization scheduling results of energy storage and new energy are obtained considering the time-varying section limits.
[0130] The present application also provides an application scenario, which applies the above-mentioned energy storage and new energy optimization method considering dynamic section limits. Specifically: the energy storage and new energy optimization method considering dynamic section limits provided in this embodiment can be applied in the energy management and scheduling scenario of the smart grid. The energy management and scheduling scenario of the smart grid includes energy production scheduling, energy storage system management, and load forecasting. The energy storage and new energy optimization method considering dynamic section limits provided in this embodiment belongs to the comprehensive optimization link in energy production scheduling. The energy storage and new energy optimization method considering dynamic section limits provided in this embodiment provides an advanced solution for the efficient operation of the smart grid by comprehensively optimizing energy storage and new energy, and supports the development and utilization of sustainable energy.
[0131] Example 2
[0132] This embodiment provides a computer device, which may be a server or a terminal. Its internal structure diagram may be as follows: Figure 3 As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. Wherein, the processor, the memory and the input / output interface are connected via a system bus, and the communication interface is connected to the system bus via the input / output interface. Wherein, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store any data involved in the energy storage and new energy optimization method considering dynamic section limits. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, the energy storage and new energy optimization method considering dynamic section limits in Example 1 is implemented.
[0133] Those skilled in the art will understand that Figure 3 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0134] Example 3
[0135] This embodiment provides a computer device, including a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the computer program, the energy storage and new energy optimization method considering dynamic section limits in Embodiment 1 is implemented.
[0136] Example 4
[0137] This embodiment provides a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the energy storage and new energy optimization method considering dynamic section limits in Embodiment 1.
[0138] Example 5
[0139] This embodiment provides a computer program product, including a computer program, which, when executed by a processor, implements the energy storage and new energy optimization method considering dynamic section limits in Embodiment 1.
[0140] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.
[0141] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM may be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM).
[0142] The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. The non-relational database may include a distributed database based on blockchain, etc., but is not limited thereto. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but is not limited thereto.
[0143] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0144] This article uses specific examples to illustrate the principles and implementation methods of this application. The description of the above embodiments is only used to help understand the method and core ideas of this application. At the same time, for those skilled in the art, according to the ideas of this application, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting this application.
Claims
1. A method for optimizing energy storage and new energy considering dynamic cross-section limits, characterized in that: The energy storage and new energy optimization method considering dynamic section limits includes: Obtain real-time energy storage discharge power, real-time energy storage charging power, real-time wind power generation power, real-time photovoltaic power generation power and real-time wind and solar power abandonment; The real-time energy storage discharge power and the real-time energy storage charging power are input into the energy storage optimization operation model to obtain the energy storage optimization amount, wherein the energy storage optimization operation model includes an energy storage optimization objective function and an energy storage constraint set, the energy storage optimization objective function is a function constructed with the goal of maximizing the first difference, the first difference is a value obtained by performing difference calculation on the balance optimization amount of the power system by the energy storage end, the energy storage end operation and maintenance coefficient, and the energy storage end life loss coefficient, and the energy storage constraint set includes energy storage charging and discharging state constraints, energy storage charging and discharging power constraints, and energy storage charge constraints; The real-time wind power generation power, the real-time photovoltaic power generation power and the real-time wind and solar power abandonment power are input into the new energy optimization operation model to obtain the new energy optimization amount, wherein the new energy optimization objective function and the new energy constraint set, the new energy optimization objective function is a function constructed with the goal of maximizing the second difference, the second difference is a value obtained by performing difference calculation based on the new energy consumption amount and the wind and solar power abandonment penalty amount, and the new energy constraint set includes photovoltaic fluctuation penalty constraints and wind power fluctuation penalty constraints; The energy storage optimization amount and the new energy optimization amount are input into the energy storage and new energy day-ahead collaborative optimization model to obtain the scheduling results of energy storage and new energy, wherein the energy storage and new energy day-ahead collaborative optimization model includes a collaborative optimization objective function and a power system operation constraint set, wherein the collaborative optimization objective function is a function calculated based on the energy storage optimization amount and the new energy optimization amount, and the power system operation constraint set includes the interconnection line transmission power constraint, phase angle constraint and section limit power time-varying constraint between each node in the power system, wherein the section limit power time-varying constraint The section limit power is the value obtained by substituting the real-time node active power into the section limit time-varying linear relationship, and the section limit time-varying linear relationship is the relationship obtained by fitting the historical node active power and the historical section limit power, and the historical node active power and the historical section limit power are the values obtained by processing the injected power and load of the target node on the typical day of the historical year using the continuous power flow method, and the typical day of the historical year refers to the historical date when the section limit power in the power system exceeds the section constant threshold, and the target node refers to the node corresponding to the transmission line at the section.
2. The energy storage and new energy optimization method considering dynamic section limits according to claim 1, characterized in that: The target hierarchy weight method is adopted to determine the energy storage optimization amount weight and the new energy optimization amount weight in the collaborative optimization objective function.
3. The energy storage and new energy optimization method considering dynamic section limits according to claim 1, characterized in that: The continuous power flow method is used to process the injected power and load of the target node on typical days in historical years, including: Determining an initial value of injected power, an initial value of load, and an initial value of voltage of the target node; Calculate the injected power, load and voltage of the target node after the next iteration using the continuous power flow method according to the injected power initial value, the load initial value and the voltage initial value; Input the injected power, load and voltage of the target node after the next iteration into the section limit power objective function and the section limit power objective function constraint function to obtain the next section delivery power, wherein the section limit power objective function is a function constructed with the section delivery power as the maximum target, and the section limit power objective function constraint function includes the active power constraint of the transmission line at the section, the new energy active power constraint of the target node, the new energy reactive power constraint of the target node and the voltage constraint of the target node; Determine whether the next section power delivery reaches a stable state, and determine whether the prediction step length in the continuous power flow method is greater than a step length threshold, to obtain a first determination result; When the first judgment result is yes, the next section delivery power is used as the section limit power, and the active power of all nodes in the power system is calculated according to the section limit power; When the first judgment result is no, the injected power, load and voltage of the target node after the next iteration are used as new injected power initial value, load initial value and voltage initial value, and the process returns to the step of "calculating the injected power, load and voltage of the target node after the next iteration using the continuous power flow method according to the injected power initial value, the load initial value and the voltage initial value".
4. The energy storage and new energy optimization method considering dynamic section limits according to claim 1, characterized in that: The expression of the energy storage optimization operation model includes: The expression of the energy storage optimization objective function is: Wherein, f1 is the first difference; t is the tth scheduling time interval; is the energy storage discharge power at the tth scheduling time interval; is the energy storage charging power at the tth scheduling time interval; μ t is the energy storage charging and discharging coefficient at the tth scheduling time interval; Δt e k is the energy storage time; t h is the unit coefficient of energy storage operation and maintenance; dis h is the life loss coefficient of energy storage end discharge; ch The life loss coefficient of charging the energy storage end; γ t is the unit coefficient of life loss of energy storage end charging and discharging; The expression of the energy storage constraint set is: in, and Respectively represent the energy storage discharge state and energy storage charging state; E ch,max Maximum power for charging energy storage; E dis,max is the maximum power of energy storage discharge; is the energy storage charge at the tth scheduling time interval on the dth day; S oc,max is the maximum charge of energy storage; S oc,min is the minimum charge of energy storage; is the energy storage charge at the (t+1)th scheduling time interval on the dth day; is the energy storage charge at the 96th dispatching time interval on the dth day; is the energy storage charge at the 0th scheduling time interval on the (d+1)th day.
5. The energy storage and new energy optimization method considering dynamic section limits according to claim 1, characterized in that: The expression of the new energy optimization operation model includes: The expression of the new energy optimization objective function is: Wherein, f2 is the second difference; t is the tth scheduling time interval; is the wind power generation power in the tth scheduling time interval; is the photovoltaic power generation power in the tth scheduling time interval; is the abandoned wind and solar power in the tth scheduling time interval; is the renewable energy transmission power in the tth scheduling time interval; t is the power system performance improvement factor of the tth dispatching time interval; is the wind power fluctuation penalty fluctuation amount in the tth scheduling time interval; is the PV fluctuation penalty fluctuation amount at the t-th scheduling time interval; f is the new energy penalty fluctuation coefficient; The expression of the new energy constraint set is: in, is the wind power transmission power in the tth scheduling time interval; is the discharge power of energy storage acting on wind power in the tth scheduling time interval; is the charging power of energy storage on wind power in the tth scheduling time interval; is the photovoltaic power delivered at the tth scheduling time interval; is the discharge power of energy storage on photovoltaic power generation in the tth scheduling time interval; is the charging power of energy storage on photovoltaic power generation in the tth scheduling time interval; Δt wind is the wind power fluctuation time; is the minimum limit of wind power fluctuation; N wind,N is the rated power of wind power output; Δt pv is the photovoltaic fluctuation time; is the minimum limit of photovoltaic fluctuation; N pv,N is the rated power of photovoltaic output; is the wind power transmission power at the (t-1)th scheduling time interval; is the photovoltaic power transmission at the (t-1)th scheduling time interval.
6. The energy storage and new energy optimization method considering dynamic section limits according to claim 1, characterized in that: The time-varying linear relationship of the cross-section limit is: in, is the section limit power; to are the regression coefficients after training; P1 is the active power of the first node in history; P m is the active power of the mth node in the history.
7. The energy storage and new energy optimization method considering dynamic section limits according to claim 1, characterized in that: The expression of the energy storage and new energy day-ahead coordinated optimization model includes: The expression of the collaborative optimization objective function is: f=w1·f1+w2·f2; Among them, f is the scheduling result of energy storage and new energy; w1 is the weight vector corresponding to f1; f1 is the energy storage optimization amount; f2 is the new energy optimization amount; w2 is the weight vector corresponding to f2; The expression of the power system operation constraint set is: Among them, G t,i is the power plant output of the ith node in the tth scheduling time interval; is the wind power generation of the ith node in the tth scheduling time interval; is the photovoltaic power generation of the i-th node in the t-th scheduling time interval; is the energy storage discharge of the i-th node in the t-th scheduling time interval; is the energy storage charge of the i-th node at the t-th scheduling time interval; is the amount of renewable energy abandoned at the i-th node in the t-th scheduling time interval; L load,i is the load size of the i-th node at the t-th scheduling time interval; is the transmission power of the tie line between the ith node and the jth node at the tth scheduling time interval; is the phase angle of the i-th node in the t-th scheduling time interval; x i,j is the reactance value between the i-th node and the j-th node; B is the number of nodes in the power system; q min is the minimum phase angle allowed by the power system; q max is the maximum phase angle allowed by the power system; C min is the minimum transmission value of the tie line allowed by the power system; C max The maximum transmission value of the tie line allowed by the power system; is the transmission value of the tie line between the ith node and the jth node at the section; is the section limit power of the i-th node and the j-th node at the section.
8. A computer device comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the energy storage and new energy optimization method considering dynamic section limits as described in any one of claims 1-7.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the energy storage and new energy optimization method considering dynamic section limits described in any one of claims 1 to 7 is implemented.
10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the energy storage and new energy optimization method considering dynamic section limits described in any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
Power grid section self-adaptive dynamic monitoring method
CN116317118A
Data-driven section grading condition limit rule generation and control method
CN117541069A