Highway pavement construction quality detection method
Through the combined water injection movement and sampling detection mechanism, the problem of the existing technology being unable to detect water seepage inside the highway is solved, and the comprehensiveness and accuracy of water seepage inside the highway is achieved, ensuring the accuracy of the detection data and the practicality of the equipment.
Patent Information
- Application Number
- CN202411463071.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-20
- Publication Date
- 2025-01-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing highway pavement construction quality inspection device cannot effectively detect the water seepage inside the highway, resulting in incomplete inspection and inability to detect and prevent internal damage caused by rainwater seepage in a timely manner.
Using a combined water injection moving mechanism and sampling and testing mechanism, through drilling sampling, hole cleaning and penetration inspection, it ensures comprehensive water seepage detection inside the highway, improves detection accuracy, and realizes automatic disassembly and sealing of samples through structural linkage. Ensure the accuracy of the detection data.
It realizes comprehensive inspection of water seepage conditions inside the highway, improves the detection accuracy and practical functionality of the equipment, and ensures the accuracy and operational stability of the detection data.
Smart Images

Figure CN119246371A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of highway quality detection, and in particular to a highway pavement construction quality detection method. Background Art
[0002] Roads are infrastructure for various trackless vehicles and pedestrians to pass through. After the road construction is completed, it is generally necessary to inspect the construction quality of the road. The items usually inspected include the paving thickness of the road, the permeability of the asphalt road, the flatness and compaction of the road, etc. However, there are still certain problems in the use of the current highway pavement construction quality inspection device, and patent documents have been used to improve this.
[0003] For example, Chinese patent CN116067863B discloses a road pavement construction quality inspection device, including a vehicle body, a roller mounted on the lower end of the vehicle body, a push rod fixedly connected to the upper right end of the vehicle body, a water tank mounted on the upper middle end of the vehicle body, support columns fixed on both sides of the right end of the vehicle body, and a support frame connected to the left side of the support column, a movable plate passing through the upper end of the support column, a mounting plate bolted to the left side of the movable plate, a dual-axis motor fixed to the upper end of the mounting plate, and a second threaded screw rod passing through the upper end of the support frame. The road pavement construction quality inspection device, by setting a wastewater recovery mechanism, can recycle wastewater generated by cooling and dust reduction during drilling and coring, without causing pollution to the road surface and moisture generated by cleaning, without manual cleaning, reducing the workload of operators, and the cooling liquid delivered by the cooling mechanism can directly reach the bottom of the drill bit, with better cooling effect, less use of cooling liquid, and reduced waste of water resources.
[0004] Although the equipment in the above document can detect water seepage on the road surface and drill holes to take samples, it still has defects that need to be improved in actual use, such as: When a highway is being built, the top surface is usually repaired more thoroughly, which improves its waterproofness. Therefore, when the equipment is testing the highway surface, it usually does not show serious water seepage data. However, the interior of the highway cannot be effectively tested by the equipment, which makes the test incomplete. Once the surface of the highway is damaged, rainwater will directly penetrate into the interior of the entire highway and cause damage to it. Therefore, a highway pavement construction quality inspection method that can improve inspection accuracy is now designed to solve such defects. Summary of the invention
[0005] In view of the deficiencies of the prior art, the present invention provides a method for detecting the quality of highway pavement construction, which solves the problems of the prior art equipment.
[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: A method for detecting the quality of highway pavement construction, specifically comprising the following steps: S1. Equipment movement: Before use, use the tires on both sides to push the water injection mobile mechanism as a whole to the designated location on the highway for preparation; S2, road surface sampling: start the cylinder to push the cutting cylinder in the sampling and detection mechanism down to drill holes in the road surface for sampling; S3, hole cleaning: move the second rectangular seat and lower the water spray rack into the hole to clean the inner wall of the hole; S4, penetration test: move the sealing tube, and make the airbag ring and the sealing tube drop down to dock with the hole, and then inject water for testing; S5. Sample disassembly: While testing, the round gear column is driven to dock with the sample, and the sample is disassembled and taken out.
[0007] Preferably, the water injection moving mechanism includes an equipment box, a moving port is provided on the surface of the equipment box, a calibration groove is provided on the upper part of the surface of the equipment box, and three calibration grooves are equidistantly arranged, a sampling and detection mechanism is installed inside the equipment box, and the sampling and detection mechanism includes two load-bearing sliding frames, and the two load-bearing sliding frames are respectively installed on both sides of the inner cavity of the equipment box, a horizontal sliding table is slidably installed on the inner side of the load-bearing sliding frame, a U-shaped groove is provided on the surface of the horizontal sliding table, and three U-shaped grooves are provided, and the three U-shaped grooves are respectively provided with a first rectangular seat, a second rectangular seat and a third rectangular seat.
[0008] Preferably, the bottom of the first rectangular seat is fixedly connected to a sealing cylinder via a fixing block, an air guide tube is slidably installed on the top of the first rectangular seat via an opening, and the bottom end of the air guide tube passes through the sealing cylinder and extends to the bottom of the sealing cylinder, a third spring is fixedly installed on the surface of the air guide tube and located on the inner side of the sealing cylinder via a fixing block, a sealing ring is fixedly connected to the lower part of the surface of the sealing cylinder, a hollow disk is fixedly installed on the bottom end of the air guide tube, and an airbag ring is fixedly connected to the surface of the hollow disk via an opening, a compression plug is fixedly connected to one side of the top of the first rectangular seat via a bracket, a horizontal insertion rod is fixedly connected to the rear of the sealing cylinder via a bracket, and an extension tube is fixedly connected to the right side of the sealing cylinder via an opening.
[0009] Preferably, the top of the second rectangular seat is fixedly connected to a docking pipe through an opening, and the bottom end of the docking pipe is fixedly connected to a water spray rack, and the surfaces of the first rectangular seat, the second rectangular seat and the third rectangular seat are all fixedly connected to a concave frame.
[0010] Preferably, the top of the third rectangular seat is fixedly connected to a motor via a bracket, the output shaft of the motor is fixedly connected to a tapping rod via a coupling, and the bottom end of the tapping rod passes through the third rectangular seat and extends to the bottom of the third rectangular seat, there is no connection between the tapping rod and the third rectangular seat, and a cutting cylinder is fixedly connected to the surface of the tapping rod and located below the third rectangular seat.
[0011] Preferably, support rods are fixedly connected to both sides of the surface of the horizontal sliding table, and the front ends of the support rods pass through the movable opening and extend to the front of the equipment box, and a push-pull plate is fixedly connected between the front ends of the two support rods, and a U-shaped plug rod used in conjunction with the calibration groove is slidably installed on the surface of the push-pull plate through an opening, and a fourth spring is fixedly installed on the surface of the U-shaped plug rod through a fixed block.
[0012] Preferably, the rear side of the top of the equipment box is fixedly connected to a cylinder via an opening, the bottom end of the cylinder is fixedly connected to a docking plate used in conjunction with the concave frame, a positioning groove is provided on the front side of the top of the docking plate, a rectangular rod is slidably installed on the top of the docking plate through the opening, the bottom end of the rectangular rod is fixedly connected to a positioning vertical plate used in conjunction with the positioning groove and the concave frame via a fixing plate, a spring is sleeved on the surface of the rectangular rod, and an upper push rod used in conjunction with the rectangular rod is fixedly connected to the top of the inner cavity of the equipment box.
[0013] Preferably, the front and rear parts of the left side of the inner cavity of the equipment box are fixedly connected with guide slide columns, and the surfaces of the two guide slide columns are respectively slidably mounted with a first gear frame and a second gear frame, and the left side of the equipment box is rotatably connected with a gear cylinder meshing with the first gear frame and the second gear frame through a bearing member, and the bottom end of the first gear frame is fixedly connected with a guide rod frame, and a lifting plate is slidably mounted on the surface of the guide rod frame, and a first spring is sleeved on the surface of the guide rod frame and located below the lifting plate, and a round gear column used in conjunction with a sealing cylinder is fixedly mounted on the top of the lifting plate.
[0014] Preferably, the rear of the equipment box is fixedly connected to a vertical guide column via a bracket, a U-shaped plate is slidably installed on the surface of the vertical guide column, and the left end of the U-shaped plate is fixedly connected to the rear of the second gear frame, and the right end of the U-shaped plate is fixedly connected to a rectangular sleeve used in conjunction with the horizontal insertion rod.
[0015] Preferably, a water tank is fixedly installed on the left side of the equipment box, a water pump is fixedly installed on the top of the equipment box, the water inlet of the water pump is connected to a water pumping pipe, and the water pumping pipe passes through the water tank and extends to the interior of the water tank, the water outlet of the water pump is connected to two water pipes, one end of the two water pipes are respectively connected to the docking pipe and the extension pipe, and solenoid valves are installed on the surfaces of the two water pipes. Beneficial Effects
[0016] The present invention provides a method for detecting the quality of highway pavement construction. Compared with the existing technology, it has the following beneficial effects: (1) The highway pavement construction quality inspection method combines the water injection moving mechanism and the sampling inspection mechanism. The two mechanisms can be used to drill holes in the highway and take samples in turn, clean the holes, and finally use the holes to conduct a more comprehensive water seepage inspection on the inside of the highway to ensure the accuracy of the data. At the same time, the linkage between the structures can be used to allow the round gear column to cooperate with the motor to disassemble and remove the sample, effectively improving the overall practical functionality of the equipment.
[0017] (2) This highway pavement construction quality inspection method uses a cross slide table to install a third rectangular seat inside the load-bearing slide frame, and installs a motor on the top of the third rectangular seat, and is used in conjunction with a tapping rod and a cutting cylinder. The arrangement of these structures enables the tapping rod to drill and tap on the top of the sample when the cutting cylinder cuts and samples, so that the tapping rod and the sample are engaged, so that the sample can be directly pulled out of the hole after the third rectangular seat is pulled up, and the staff need to use tools to clamp the sample later, which is convenient for use.
[0018] (3) The highway pavement construction quality inspection method comprises a sealing cylinder disposed below the first rectangular seat, and an air guide tube, a hollow disk and an air bag ring disposed inside the sealing cylinder, which are used in conjunction with a compression plug. After the hollow disk enters the hole, the compression plug can compress the air inside the air guide tube to expand the air bag ring and block the hole, thereby improving the sealing of the hole and facilitating the subsequent water injection into the hole to inspect the water permeability inside the highway, thereby ensuring the accuracy of the inspection data and the stability during operation.
[0019] (4) This highway pavement construction quality inspection method uses a first tooth frame to install a lifting plate and a round tooth column on the left side of the inner cavity of the equipment box, and uses it in conjunction with a rectangular sleeve and a horizontal insertion rod. The arrangement of these structures can use the round tooth column to limit the bottom of the sample when the sealing cylinder is performing penetration testing, so that the tapping rod can rotate in the opposite direction and disengage from the sample, and push the sample down and disengage from the cutting cylinder, making it convenient for the staff to take out the sample. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the process of the present invention; Figure 2 It is a structural schematic diagram of the present invention; Figure 3 It is a cross-sectional view of the equipment box structure of the present invention; Figure 4 A bottom view of the structure of the present invention; Figure 5 A side view of the internal structure of the equipment box of the present invention Figure 6 For the present invention Figure 5 A partial enlarged view of the middle A; Figure 7 It is a schematic diagram of the U-shaped plate, the second spring and the rectangular sleeve structure of the present invention; Figure 8 It is a schematic diagram of the round tooth column, vertical guide column and U-shaped plate structure of the present invention; Fig. 9 It is a schematic diagram of the sampling and detection mechanism structure of the present invention; Fig.10 It is a schematic diagram of the push-pull plate, the U-shaped plug rod and the fourth spring structure of the present invention; Fig.11 It is a cross-sectional view of the sealing cylinder structure of the present invention; Fig.12 It is a schematic diagram of the butt-joint pipe, water spray rack and concave frame structure of the present invention; Fig.13 It is a cross-sectional view of the cutting tube structure of the present invention.
[0021] In the figure: 1, water injection moving mechanism; 2, sampling and testing mechanism; 101, equipment box; 102, cylinder; 103, docking plate; 104, rectangular rod; 105, positioning groove; 106, positioning vertical plate; 107, spring; 108, guide slide column; 109, first gear frame; 110, second gear frame; 111, gear cylinder; 112, guide rod frame; 113, lifting plate; 114, first spring; 115, round tooth column; 116, vertical guide column; 117, U-shaped plate; 118, second spring; 119, rectangular sleeve; 120, water storage tank; 121, water pump; 122, water guide pipe; 123, water pump; 124, solenoid valve; 125, moving port; 1 26. Calibration groove; 127. Upper push rod; 201. Load-bearing sliding frame; 202. Horizontal sliding table; 203. U-shaped groove; 204. First rectangular seat; 205. Second rectangular seat; 206. Third rectangular seat; 207. Sealing tube; 208. Air guide tube; 209. Third spring; 210. Sealing ring; 211. Hollow disk; 212. Air bag ring; 213. Compression plug; 214. Horizontal insertion rod; 215. Extension tube; 216. Motor; 217. Tapping rod; 218. Cutting tube; 219. Butt joint tube; 220. Spraying rack; 221. Concave frame; 222. Support rod; 223. Push-pull plate; 224. U-shaped insertion rod; 225. Fourth spring. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] See also Figure 1-13 The present invention provides a technical solution: a method for detecting the quality of highway pavement construction, which specifically comprises the following steps: S1. Equipment movement: Before use, the water injection mobile mechanism 1 is pushed as a whole to a designated position on the highway using tires on both sides for preparation; S2, road surface sampling: start the cylinder 102 to push the cutting cylinder 218 in the sampling and detection mechanism 2 down to drill holes in the road surface for sampling; S3, hole cleaning: move the second rectangular seat 205, and lower the water spray rack 220 into the hole to clean the inner wall of the hole; S4, penetration test: move the sealing cylinder 207, and make the airbag ring 212 and the sealing cylinder 207 descend to dock with the hole, and then inject water for testing; S5. Sample disassembly: While testing, the round tooth column 115 is driven to dock with the sample, and the sample is disassembled and taken out.
[0024] The above-mentioned method for detecting the quality of highway pavement construction comprises the following more specific steps: S1. Equipment movement: Before use, first use the tires on both sides to push the water injection mobile mechanism 1 as a whole to the designated position on the road, and align the cutting barrel 218 with the sampling point, and the preparation process is completed at this time; S2, road surface sampling: start cylinder 102 to push cutting cylinder 218 in sampling detection mechanism 2 to descend. As docking plate 103 and concave frame 221 are docked, third rectangular seat 206 and U-shaped groove 203 will be separated. At the same time, upper push rod 127 no longer presses rectangular rod 104, so that positioning vertical plate 106 rises under the elastic force of spring 107 and inserts into concave frame 221 and inner side of positioning groove 105 to lock docking plate 103 and concave frame 221. During the descent, motor 216 starts to drive tapping rod 217 and cutting cylinder 218 to rotate synchronously. When descending to the road surface, cutting cylinder 218 performs cylindrical cutting on the road surface. After the distance, the tapping rod 217 will open a hole on the top of the sample and perform tapping to engage the tapping rod 217 with the sample until the cutting cylinder 218 completely cuts the sample and separates it from the road, then the motor 216 is turned off, and then the cylinder 102 drives the third rectangular seat 206 to rise. Since the tapping rod 217 engages with the inner side of the sample, the cutting cylinder 218 also drives the sample up. When the third rectangular seat 206 rises to the inner side of the U-shaped groove 203 again, the upper push rod 127 will also press the rectangular rod 104 to allow the positioning vertical plate 106 to withdraw from the positioning groove 105 and the inner side of the concave frame 221, and unlock the concave frame 221 and the docking plate 103; S3, hole cleaning: after the sealing cylinder 207 is raised, pull the U-shaped rod 224 out from the inner side of the calibration groove 126 by hand, then pull the support rod 222 to drive the horizontal slide 202 to move left on the inner side of the load-bearing slide frame 201 until the U-shaped rod 224 is inserted into the calibration groove 126 in the middle and stops. At this time, the concave frame 221 at the rear of the second rectangular seat 205 is accurately docked with the docking plate 103, and then the cylinder 102 is started again to push the second rectangular seat 205 down to make the water spray rack 220 enter the hole. At this time, the water pump 121 is started, and the solenoid valve 124 opens the water pipe 122 connected to the docking pipe 219. The water pump 121 draws water from the water tank 120 and sprays it through the water spray rack 220 to wash away the dust on the inner wall of the hole. After the washing is completed, the cylinder 102 pulls the second rectangular seat 205 up again and resets it to the U-shaped groove 203; S4, penetration test: after the third rectangular seat 206 rises, move the horizontal slide 202 to make the concave frame 221 at the rear of the first rectangular seat 204 dock with the docking plate 103, and at the same time, the horizontal insertion rod 214 is also inserted into the inner side of the rectangular sleeve 119, and then the cylinder 102 pushes the first rectangular seat 204 to descend, and the hollow disk 211 first enters the hole, and after the hollow disk 211 touches the bottom, the first rectangular seat 204 will push the sealing tube 207 to slide on the surface of the air guide tube 208 and continue to descend to compress the third spring 209. At this time, the compression plug 213 follows the first rectangular seat 204 to descend and insert into the air guide tube 208 to squeeze and compress, so that the air inside the air guide tube 208 is compressed into the inside of the hollow disk 211 and the air bag ring 212 is bulged to fully fill the inner wall of the hole. Fill and fit, at this time the hole is sealed, and when the sealing ring 210 fits with the road surface to surround the hole, the cylinder 102 stops descending, and at this time the solenoid valve 124 opens the water pipe 122 connected to the extension pipe 215, so that water is injected into the sealing cylinder 207 through the extension pipe 215 and fills the hole, and then it is left to stand to observe whether the water level inside the sealing cylinder 207 drops, so as to observe the water permeability of the road, and after the detection is completed, the cylinder 102 is started to pull the first rectangular seat 204 up, and when the first rectangular seat 204 drives the sealing cylinder 207 to rise and separate from the road surface, the compressed third spring 209 pushes the air pipe 208 and the hollow disk 211 to descend, so that the air pipe 208 is separated from the compression plug 213 and reset to release the air inside the air pipe 208; S5. Sample removal: During the process of step S4, the first rectangular seat 204 will drive the U-shaped plate 117 and the second tooth frame 110 to descend while descending. The descent of the second tooth frame 110 will cause the first tooth frame 109 to drive the guide rod frame 112 and the lifting plate 113 to rise through the rotation of the gear cylinder 111, so that the round tooth column 115 enters the interior of the cutting cylinder 218 and uses the elastic force of the first spring 114 to press only the bottom of the sample. At the same time, the motor 216 starts to drive the tapping rod 217 to rotate in the opposite direction. When the tapping rod 217 rotates in the opposite direction, it will push the sample down and separate the tapping rod 217 from it. After the sample is pushed down by the tapping rod 217, it will also press the lifting plate 113 to sink under the guidance of the guide rod frame 112, so that the sample is completely separated from the interior of the cutting cylinder 218, and then the sample is taken out.
[0025] The above-mentioned highway pavement construction quality detection method is implemented by the following steps: Please refer to Fig. 9 , Fig.10 , Fig.11 , Fig.12 and Fig.13, showing the overall structure of the sampling and detection mechanism 2, the water injection moving mechanism 1 includes an equipment box 101, a moving port 125 is provided on the surface of the equipment box 101, a calibration slot 126 is provided on the upper part of the surface of the equipment box 101, and three calibration slots 126 are arranged at equal intervals, a sampling and detection mechanism 2 is installed inside the equipment box 101, the sampling and detection mechanism 2 includes two load-bearing slide frames 201, the two load-bearing slide frames 201 are respectively installed on both sides of the inner cavity of the equipment box 101, a horizontal sliding table 202 is slidably installed on the inner side of the load-bearing slide frame 201, a U-shaped groove 203 is provided on the surface of the horizontal sliding table 202, and three U-shaped grooves 203 are arranged, the three U-shaped grooves 203 are respectively provided with a first rectangular seat 204, a second rectangular seat 205 and a third rectangular seat 206, The bottom of a rectangular seat 204 is fixedly connected to a sealing cylinder 207 through a fixing block, an air guide tube 208 is slidably installed on the top of the first rectangular seat 204 through an opening, and the bottom end of the air guide tube 208 passes through the sealing cylinder 207 and extends to the bottom of the sealing cylinder 207, a third spring 209 is fixedly installed on the surface of the air guide tube 208 and located on the inner side of the sealing cylinder 207 through a fixing block, a sealing ring 210 is fixedly connected to the lower part of the surface of the sealing cylinder 207, and the sealing ring 210 is made of rubber material, a hollow disk 211 is fixedly installed on the bottom end of the air guide tube 208, and an air bag ring 212 is fixedly connected to the surface of the hollow disk 211 through an opening, and the air bag ring 212 is made of rubber material, and a compression plug is fixedly connected to one side of the top of the first rectangular seat 204 through a bracket 213, the rear part of the sealing cylinder 207 is fixedly connected to the horizontal rod 214 through a bracket, the right side of the sealing cylinder 207 is fixedly connected to the extension tube 215 through an opening, the top of the second rectangular seat 205 is fixedly connected to the butt pipe 219 through an opening, and the bottom end of the butt pipe 219 is fixedly connected to the water spray rack 220, the surfaces of the first rectangular seat 204, the second rectangular seat 205 and the third rectangular seat 206 are all fixedly connected to the concave frame 221, and the concave frame 221 will seamlessly dock with the docking plate 103 when the first rectangular seat 204, the second rectangular seat 205 and the third rectangular seat 206 are moved, and the concave frame 221 will not be separated from the docking plate 103, and the top of the third rectangular seat 206 is fixedly connected to the motor 216 through a bracket, and the motor 21 6 is a servo motor, the output shaft of the motor 216 is fixedly connected to a tapping rod 217 through a coupling, and the bottom end of the tapping rod 217 passes through the third rectangular seat 206 and extends to the bottom of the third rectangular seat 206, the tapping rod 217 and the third rectangular seat 206 are not connected, the surface of the tapping rod 217 and the cutting cylinder 218 is fixedly connected below the third rectangular seat 206, both sides of the surface of the horizontal slide table 202 are fixedly connected to support rods 222, and the front ends of the support rods 222 pass through the moving opening 125 and extend to the front of the equipment box 101, and a push-pull plate 223 is fixedly connected between the front ends of the two support rods 222, and a U-shaped plug rod 224 used in conjunction with the calibration groove 126 is slidably installed on the surface of the push-pull plate 223 through an opening,A fourth spring 225 is fixedly mounted on the surface of the U-shaped plug rod 224 via a fixing block.
[0026] Please refer to Figure 4 , Figure 5 , Figure 6 , Figure 7 and Figure 8 , showing the overall structure of the water injection moving mechanism 1, the rear side of the top of the equipment box 101 is fixedly connected with the cylinder 102 through an opening, the bottom end of the cylinder 102 is fixedly connected with a docking plate 103 used in conjunction with the concave frame 221, a positioning groove 105 is opened on the front side of the top of the docking plate 103, a rectangular rod 104 is slidably installed on the top of the docking plate 103 through the opening, and the bottom end of the rectangular rod 104 is fixedly connected with a positioning vertical plate 106 used in conjunction with the positioning groove 105 and the concave frame 221 through a fixing plate, and the rectangular rod 10 4 is sleeved with a spring 107, the top of the inner cavity of the equipment box 101 is fixedly connected with an upper push rod 127 used in conjunction with the rectangular rod 104, the front and rear of the left side of the inner cavity of the equipment box 101 are fixedly connected with guide slides 108, the surfaces of the two guide slides 108 are respectively slidably mounted with a first gear frame 109 and a second gear frame 110, the left side of the equipment box 101 is rotatably connected with a gear cylinder 111 meshing with the first gear frame 109 and the second gear frame 110 through a bearing, and the bottom end of the first gear frame 109 is fixedly connected with a guide rod frame 11 2. A lifting plate 113 is slidably mounted on the surface of the guide rod frame 112. A first spring 114 is sleeved on the surface of the guide rod frame 112 and below the lifting plate 113. A round tooth column 115 used in conjunction with the sealing cylinder 207 is fixedly mounted on the top of the lifting plate 113. A vertical guide column 116 is fixedly connected to the rear of the equipment box 101 through a bracket. A U-shaped plate 117 is slidably mounted on the surface of the vertical guide column 116. The left end of the U-shaped plate 117 is fixedly connected to the rear of the second tooth frame 110. The right end of the U-shaped plate 117 is fixedly connected to the horizontal insertion rod. A rectangular sleeve 119 is used in conjunction with 214, a water tank 120 is fixedly installed on the left side of the equipment box 101, a water pump 121 is fixedly installed on the top of the equipment box 101, the water inlet of the water pump 121 is connected to a water suction pipe 123, and the water suction pipe 123 passes through the water tank 120 and extends to the inside of the water tank 120, the water outlet of the water pump 121 is connected to two water pipes 122, one end of the two water pipes 122 are respectively connected to the docking pipe 219 and the extension pipe 215, and the surfaces of the two water pipes 122 are installed with solenoid valves 124.
[0027] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
Claims
1. A method for detecting the quality of highway pavement construction, characterized in that: The specific steps include: S1. Equipment movement: Before use, the water injection mobile mechanism (1) is pushed as a whole to a designated location on the road using tires on both sides for preparation; S2, road surface sampling: starting the cylinder (102) to push the cutting cylinder (218) in the sampling and detection mechanism (2) down to drill holes in the road surface for sampling; S3, hole cleaning: moving the second rectangular seat (205) and lowering the water spray rack (220) into the hole to clean the inner wall of the hole; S4, penetration test: move the sealing cylinder (207), and make the airbag ring (212) and the sealing cylinder (207) descend to dock with the hole, and then inject water for testing; S5, sample disassembly: while testing, the round tooth column (115) is driven to dock with the sample, and the sample is disassembled and taken out.
2. A method for detecting the quality of highway pavement construction according to claim 1, characterized in that: The water injection movement mechanism (1) comprises an equipment box (101), a movement opening (125) is provided on the surface of the equipment box (101), a calibration groove (126) is provided on the upper part of the surface of the equipment box (101), and three calibration grooves (126) are arranged at equal intervals. A sampling detection mechanism (2) is installed inside the equipment box (101), and the sampling detection mechanism (2) comprises two load-bearing sliding frames (201), and the two load-bearing sliding frames (201) are respectively installed on both sides of the inner cavity of the equipment box (101), and a horizontal sliding table (202) is slidably installed on the inner side of the load-bearing sliding frame (201), and a U-shaped groove (203) is provided on the surface of the horizontal sliding table (202), and three U-shaped grooves (203) are arranged, and the three U-shaped grooves (203) are respectively provided with a first rectangular seat (204), a second rectangular seat (205) and a third rectangular seat (206).
3. A highway pavement construction quality detection method according to claim 2, characterized in that: The bottom of the first rectangular seat (204) is fixedly connected to a sealing cylinder (207) via a fixing block, and an air guide tube (208) is slidably mounted on the top of the first rectangular seat (204) via an opening, and the bottom end of the air guide tube (208) penetrates the sealing cylinder (207) and extends to the bottom of the sealing cylinder (207), and a third spring (209) is fixedly mounted on the surface of the air guide tube (208) and located on the inner side of the sealing cylinder (207) via a fixing block, and the lower part of the surface of the sealing cylinder (207) is fixedly mounted. A sealing ring (210) is connected, a hollow disk (211) is fixedly mounted on the bottom end of the air guide tube (208), an air bag ring (212) is fixedly connected to the surface of the hollow disk (211) via an opening, a compression plug (213) is fixedly connected to one side of the top of the first rectangular seat (204) via a bracket, a transverse insertion rod (214) is fixedly connected to the rear of the sealing cylinder (207) via a bracket, and an extension tube (215) is fixedly connected to the right side of the sealing cylinder (207) via an opening.
4. A highway pavement construction quality detection method according to claim 2, characterized in that: The top of the second rectangular seat (205) is fixedly connected to a butt-joint pipe (219) via an opening, and the bottom of the butt-joint pipe (219) is fixedly connected to a water spray frame (220), and the surfaces of the first rectangular seat (204), the second rectangular seat (205) and the third rectangular seat (206) are all fixedly connected to a concave frame (221).
5. A highway pavement construction quality detection method according to claim 4, characterized in that: The top of the third rectangular seat (206) is fixedly connected to a motor (216) via a bracket, the output shaft of the motor (216) is fixedly connected to a tapping rod (217) via a coupling, and the bottom end of the tapping rod (217) passes through the third rectangular seat (206) and extends to the bottom of the third rectangular seat (206), the tapping rod (217) and the third rectangular seat (206) are not connected, and a cutting cylinder (218) is fixedly connected to the surface of the tapping rod (217) and located below the third rectangular seat (206).
6. A highway pavement construction quality detection method according to claim 2, characterized in that: Support rods (222) are fixedly connected to both sides of the surface of the horizontal sliding table (202), and the front ends of the support rods (222) pass through the movable opening (125) and extend to the front of the equipment box (101), and a push-pull plate (223) is fixedly connected between the front ends of the two support rods (222), and a U-shaped plug rod (224) used in conjunction with the calibration groove (126) is slidably installed on the surface of the push-pull plate (223) through an opening, and a fourth spring (225) is fixedly installed on the surface of the U-shaped plug rod (224) through a fixing block.
7. A highway pavement construction quality detection method according to claim 4, characterized in that: The rear side of the top of the equipment box (101) is fixedly connected to a cylinder (102) via an opening, the bottom end of the cylinder (102) is fixedly connected to a docking plate (103) used in conjunction with a concave frame (221), a positioning groove (105) is provided on the front side of the top of the docking plate (103), a rectangular rod (104) is slidably mounted on the top of the docking plate (103) via the opening, the bottom end of the rectangular rod (104) is fixedly connected to a positioning vertical plate (106) used in conjunction with the positioning groove (105) and the concave frame (221) via a fixing plate, a spring (107) is sleeved on the surface of the rectangular rod (104), and an upper push rod (127) used in conjunction with the rectangular rod (104) is fixedly connected to the top of the inner cavity of the equipment box (101).
8. A highway pavement construction quality detection method according to claim 7, characterized in that: The front and rear parts of the left side of the inner cavity of the equipment box (101) are fixedly connected with guide slide columns (108), and the surfaces of the two guide slide columns (108) are slidably mounted with a first gear frame (109) and a second gear frame (110), respectively. The left side of the equipment box (101) is rotatably connected with a gear cylinder (111) meshing with the first gear frame (109) and the second gear frame (110) through a bearing member, and the bottom end of the first gear frame (109) is fixedly connected with a guide rod frame (112), and a lifting plate (113) is slidably mounted on the surface of the guide rod frame (112). A first spring (114) is sleeved on the surface of the guide rod frame (112) and located below the lifting plate (113), and a round tooth column (115) used in conjunction with a sealing cylinder (207) is fixedly mounted on the top of the lifting plate (113).
9. A highway pavement construction quality detection method according to claim 8, characterized in that: The rear of the equipment box (101) is fixedly connected to a vertical guide column (116) via a bracket, a U-shaped plate (117) is slidably mounted on the surface of the vertical guide column (116), and the left end of the U-shaped plate (117) is fixedly connected to the rear of the second gear frame (110), and the right end of the U-shaped plate (117) is fixedly connected to a rectangular sleeve (119) used in conjunction with the horizontal insertion rod (214).
10. A highway pavement construction quality detection method according to claim 5, characterized in that: A water tank (120) is fixedly installed on the left side of the equipment box (101), and a water pump (121) is fixedly installed on the top of the equipment box (101); a water inlet of the water pump (121) is connected to a water pumping pipe (123), and the water pumping pipe (123) passes through the water tank (120) and extends to the inside of the water tank (120); a water outlet of the water pump (121) is connected to two water guide pipes (122), one end of the two water guide pipes (122) is respectively connected to a butt joint pipe (219) and an extension pipe (215), and a solenoid valve (124) is installed on the surface of the two water guide pipes (122).