A pile foundation self-elevating construction platform

By designing a pile foundation self-lifting construction platform, using the combination of drive components and rubber pipes, the problem of underwater pile foundation inspection is solved in an unstable environment, a flexible and safe detection environment is achieved, and the safety and reliability of inspection is improved.

CN119266190BActive Publication Date: 2025-05-09LINYI DONGCHEN ROAD & BRIDGE ENG CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411777853.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-05
Publication Date
2025-05-09
Estimated Expiration
2044-12-05

AI Technical Summary

Technical Problem

Existing underwater pile foundation inspections are difficult to operate under stable and safe conditions, and are affected by factors such as water level, flow rate, and bottom environment.

Method used

A pile-based self-lifting construction platform is designed, including a third ring, rubber tube and a circular cover. The second ring is driven to rotate by the driving assembly, and the connecting rope tightens the rubber tube, so that the cover can move on the pile foundation, and a power assembly is provided at the bottom of the inner cavity of the cover to move along the length of the pile foundation.

Benefits of technology

It provides a flexible and safe working environment, reduces the impact of water level, flow rate, and bottom environment on operators, and improves the safety and reliability of pile foundation inspection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119266190B_ABST
    Figure CN119266190B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of pile foundation lifting platforms, and specifically discloses a pile foundation self-lifting construction platform, comprising a third ring, a rubber tube and a circular cover shell, wherein a first ring is fixed on the top of the cover shell, a rotatable second ring is installed on the first ring, the rubber tube passes through the first ring and the second ring, the top of the rubber tube is connected to the side of the third ring, the bottom of the rubber tube is connected to the side of the cover shell, a plurality of connecting ropes are arranged on the outer side of the rubber tube, the two ends of the connecting ropes are respectively fixedly connected to the first ring and the second ring, a driving component for driving the second ring to rotate is installed on the cover shell, the bottom of the inner cavity of the cover shell is connected to one end of the second tube body, and no less than three power components are installed on the inner wall of the cover shell. The pile foundation self-lifting construction platform has strong adaptability to different water depths and underwater environments, and provides a flexible and safe working environment for pile foundation detection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pile foundation lifting platforms, in particular to a pile foundation self-lifting construction platform. Background Art

[0002] The pile foundation is the key load-bearing part of the bridge. The safety of the pile foundation plays a vital role in the stability of the entire bridge, especially the underwater pile foundation. As the bridge ages and is affected by water erosion, pile foundation erosion, concrete shedding, steel corrosion and other problems are very likely to occur. It is particularly important to regularly inspect and evaluate the underwater pile foundation.

[0003] Existing underwater pile foundation inspections mostly require operators to wear diving suits and dive into the water. The operators observe the surface of the pile foundation and inspect the pile foundation through inspection equipment. However, due to factors such as water level, flow rate, and underwater environment, it is difficult for operators to dive in a stable and safe condition while wearing diving suits, which affects the underwater pile foundation inspection. Summary of the invention

[0004] The technical problem to be solved by the present invention is to overcome the existing defects and provide a pile foundation self-elevating construction platform which has strong adaptability to different water depths and underwater environments and provides a flexible and safe working environment for pile foundation detection.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a pile foundation self-lifting construction platform, comprising a third ring, a rubber tube and a circular cover shell, a first ring is fixed to the top of the cover shell, a rotating second ring is installed on the first ring, the rubber tube passes through the first ring and the second ring, the top of the rubber tube is connected to the side of the third ring, the bottom of the rubber tube is connected to the side of the cover shell, a plurality of connecting ropes are provided on the outer side of the rubber tube, the two ends of the connecting ropes are respectively fixedly connected to the first ring and the second ring, a driving assembly for driving the second ring to rotate is installed on the cover shell, the bottom of the inner cavity of the cover shell is connected to one end of the second tube body, and no less than three power assemblies are installed on the inner wall of the cover shell.

[0006] The cover shell includes two arc plates buckled toward each other, the first ring includes two first arc rods, the second ring includes two second arc rods, the third ring includes two third arc rods, and the rubber tube is made by bending and connecting the two ends of a rubber sheet.

[0007] Wherein, a first arc-shaped rod is fixed on each arc-shaped plate.

[0008] The cover is sleeved on the external pile foundation, the driving assembly drives the second ring to rotate, the second ring tightens the rubber tube through the connecting rope, and the rubber tube fits on the pile foundation, and the power assembly moves the cover along the length direction of the pile foundation.

[0009] As a preferred technical solution of the present invention, it also includes a first tube body, the interior of the third ring is hollow, the third ring is provided with a plurality of vents connected to the inner cavity of the third ring, and the inner cavity of the third ring and the bottom of the inner cavity of the cover shell are connected through the first tube body.

[0010] As a preferred technical solution of the present invention, the power component includes a pushing component, one end of which is connected to the inner wall of the cover shell, and the other end of the pushing component is rotatably mounted with a mounting frame, and both ends of the mounting frame are equipped with rotating guide wheels.

[0011] Wherein, the two guide wheels of the power assembly are both against the pile foundation.

[0012] Among them, at least one guide wheel is a hub motor equipped with a tire, and the other guide wheels are elastic wheels.

[0013] As a preferred technical solution of the present invention, the pushing assembly and the inner wall of the cover shell are connected via a bearing, a fixing frame is fixed on the pushing assembly, and a positioning bolt is installed on the fixing frame.

[0014] As a preferred technical solution of the present invention, a valve is installed on the first tube body.

[0015] As a preferred technical solution of the present invention, a manhole is provided on one of the arc-shaped plates, and an opening and closing door panel is installed on the manhole.

[0016] As a preferred technical solution of the present invention, the outer side surface of the rubber tube and the second ring are detachably connected, and the cover shell, the first ring, the second ring, and the rubber tube form a closed chamber.

[0017] As a preferred technical solution of the present invention, a support frame is fixed to the bottom of the inner cavity of the cover shell.

[0018] As a preferred technical solution of the present invention, the connecting rope is an elastic rubber rope or an elastic nylon rope.

[0019] As a preferred technical solution of the present invention, the driving component is an electric telescopic rod or a hydraulic jack.

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] 1. The self-elevating pile foundation construction platform of the present invention can adapt to different water depths and underwater environments, and provides a flexible and safe working environment for pile foundation detection.

[0022] 2. In the pile foundation self-elevating construction platform of the present invention, the driving assembly drives the second ring to rotate, the second ring is clamped with a rubber tube by a connecting rope, and the rubber tube is attached to the pile foundation, and the cover enters the water: on the one hand, the rubber tube clamped by the connecting rope prevents water from entering from the top of the cover, and the rubber tube does not affect the movement of the cover along the pile foundation. The operator detects the pile foundation in the cover, which ensures the safety of the operator and reduces the influence of the water level, flow rate and underwater environment on the operator's detection of the pile foundation; on the other hand, the cover, the first ring, the second ring and the rubber tube A closed chamber is formed. When a breach occurs due to friction between the rubber tube and the pile foundation, the air in the cover enters the closed chamber through the breach. The air entering the closed chamber stays in the closed chamber, reducing the loss of air in the closed chamber and improving the safety of the pile foundation self-elevating construction platform. On the other hand, the air ejected from the third circular air hole forms an annular bubble wall around the pile foundation. The bubble wall weakens the water flow toward the pile foundation. The bubble wall reduces the settlement of mud and sand on the rubber tube, reduces the resistance of the cover during the rising process along the pile foundation, and improves the reliability of the pile foundation self-elevating construction platform.

[0023] 3. The pile foundation self-elevating construction platform of the present invention has at least four contact points between the connecting rope and the rubber tube on any plane passing through the axis of the housing, so as to avoid air loss in the housing due to a single rupture on the rubber tube.

[0024] 4. In the example of the pile foundation self-lifting construction platform of the present invention, the operator adjusts the squeezing pressure of the guide wheel on the pile foundation by pushing the assembly. The operator controls the forward and reverse rotation and speed of the hub motor, so that the two guide wheels of the power assembly move along the surface of the pile foundation. The two guide wheels of the power assembly adapt to the uneven surface of the pile foundation to ensure the positioning effect of the power assembly on the cover. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a structural schematic diagram of one viewing angle of the present invention;

[0026] Figure 2 for Figure 1 Schematic diagram of the structure of removing the rubber tube;

[0027] Figure 3 It is another perspective structural schematic diagram of the present invention;

[0028] Figure 4 It is a partial cross-sectional structural schematic diagram of the present invention;

[0029] Figure 5 It is a schematic diagram of the structure of the power assembly of the present invention.

[0030] In the figure: 1 cover, 2 first ring, 3 drive assembly, 4 second ring, 5 third ring, 6 rubber tube, 7 valve, 8 first tube body, 9 power assembly, 91 guide wheel, 92 mounting frame, 93 pushing assembly, 94 fixing frame, 95 bearing, 10 connecting rope, 11 second tube body, 12 supporting frame. DETAILED DESCRIPTION

[0031] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0032] Embodiment 1:

[0033] See also Figure 1-5 The present embodiment discloses a pile foundation self-elevating construction platform, comprising a third circular ring 5, a rubber tube 6 and a circular cover shell 1, a first circular ring 2 is fixed to the top of the cover shell 1, a rotatable second circular ring 4 is mounted on the first circular ring 2, the rubber tube 6 passes through the first circular ring 2 and the second circular ring 4, the top of the rubber tube 6 and the side of the third circular ring 5 are detachably connected, the bottom of the rubber tube 6 and the side of the cover shell 1 are detachably connected, a plurality of connecting ropes 10 are provided on the outer side of the rubber tube 6, the two ends of the connecting rope 10 are respectively fixedly connected to the first circular ring 2 and the second circular ring 4, a driving component 3 for driving the second circular ring 4 to rotate is mounted on the cover shell 1, the bottom of the inner cavity of the cover shell 1 is connected to one end of the second tube body 11, the other end of the second tube body 11 is connected to the air outlet of the external air pump, and no less than three power components 9 are mounted on the inner wall of the cover shell 1.

[0034] The cover shell 1 includes two arc-shaped plates buckled toward each other, and the two arc-shaped plates are fixed together by bolts or buckles. The first circular ring 2 includes two first arc-shaped rods, the second circular ring 4 includes two second arc-shaped rods, and the third circular ring 5 includes two third arc-shaped rods, and the two third arc-shaped rods are buckled and fixed toward each other. The rubber tube 6 is made by bending and connecting the two ends of a rubber sheet, and the two ends of the rubber sheet are connected by glue or a waterproof zipper, and a first arc-shaped rod is fixed on each arc-shaped plate.

[0035] Furthermore, the driving assembly 3 is an electric telescopic rod or a hydraulic jack commonly used in the prior art.

[0036] The working process and principle of this embodiment are:

[0037] Initially, the two arc-shaped plates are separated and the two ends of the rubber sheet are not fixed together.

[0038] The operator makes the two arc plates buckle on the pile foundation, and the operator connects the two arc plates by bolts or buckles. The pile foundation is located between the power components 9, and the rubber sheet is bent and covered on the pile foundation. The operator connects the two horizontal ends of the rubber sheet by glue bonding or waterproof zippers, and the top end of the rubber tube 6 and the side of the third ring 5 are fixed and sealed by bolts or buckles. The bottom end of the rubber tube 6 and the side of the cover shell 1 are fixed and sealed by bolts or buckles. The operator makes the driving component 3 push the second ring 4 to rotate, and the second ring 4 tightens the rubber tube 6 by the connecting rope 10, and the rubber tube 6 is attached to the pile foundation. The power component 9 enables the cover shell 1 to move along the length direction of the pile foundation.

[0039] The operator enters the cover 1, and then the external air pump injects air into the cover 1 through the second tube 11. The operator moves the cover 1 downward along the pile foundation through the power assembly 9, and the cover 1 enters the water. The rubber tube 6 tightened by the connecting rope 10 prevents water from entering from the top of the cover 1, and the rubber tube 6 does not affect the movement of the cover 1 along the pile foundation. The operator detects the pile foundation in the cover 1 to ensure the safety of the operator and reduce the impact of flowing water on the operator's detection of the pile foundation.

[0040] Furthermore, the connecting ropes 10 are elastic rubber ropes or elastic nylon ropes, so that the tightening degree of each connecting rope 10 on the rubber tube 6 is similar.

[0041] Furthermore, on any plane passing through the axis of the housing 1 , there are at least four contact points between the connecting rope 10 and the rubber tube 6 , so as to prevent a single break in the rubber tube 6 from causing air loss in the housing 1 .

[0042] Furthermore, a slot is provided on the second arc rod, and a block adapted to the slot is provided on the first arc rod. When the second ring 4 clamps the rubber tube 6 through the connecting rope 10, the slot of the second arc rod is engaged with the blocks of the two first arc rods, thereby improving the stability of the buckling of the two cover shells 1.

[0043] Embodiment 2:

[0044] like Figure 1-3 As shown, this embodiment discloses a pile foundation self-lifting construction platform, and its structure is roughly the same as that of the first embodiment, except that this embodiment also includes a first tube body 8, the interior of the third ring 5 is hollow, and a plurality of vents connected to the inner cavity of the third ring 5 are opened at equal angles on the third ring 5, and the inner cavity of the third ring 5 and the bottom of the inner cavity of the cover shell 1 are connected through the first tube body 8.

[0045] The working process and principle of this embodiment are:

[0046] After the cover shell 1 enters the water, the air in the cover shell 1 is ejected through the first tube body 8, the inner cavity of the third ring 5, and the air holes on the third ring 5. The air ejected from the air holes of the third ring 5 forms an annular bubble wall around the pile foundation. The bubble wall weakens the water flow toward the pile foundation. The bubble wall reduces the settlement of silt on the rubber tube 6, reduces the resistance of the cover shell 1 during the rising process along the pile foundation, and improves the reliability of the pile foundation self-elevating construction platform.

[0047] Embodiment three:

[0048] like Figure 5 As shown, this embodiment discloses a pile foundation self-lifting construction platform, and its structure is roughly the same as that of the second embodiment, except that the power assembly 9 of this embodiment includes a pushing assembly 93, one end of the pushing assembly 93 is connected to the inner wall of the cover 1, and the other end of the pushing assembly 93 is rotatably mounted with a mounting frame 92, and both ends of the mounting frame 92 are mounted with rotating guide wheels 91.

[0049] The two guide wheels 91 of the power assembly 9 are both against the pile foundation.

[0050] At least one guide wheel 91 is a hub motor with a tire installed, and the other guide wheels 91 are elastic wheels. The hub motor is electrically connected to an external power source.

[0051] Preferably, the pushing assembly 93 is an electric telescopic rod or a hydraulic jack.

[0052] The working process and principle of this embodiment are:

[0053] The operator adjusts the squeezing pressure of the guide wheel 91 on the pile foundation by pushing the component 93. The operator controls the forward and reverse rotation and speed of the hub motor, so that the two guide wheels 91 of the power component 9 move along the surface of the pile foundation. The two guide wheels 91 of the power component 9 adapt to the uneven surface of the pile foundation, ensuring the positioning effect of the power component 9 on the cover 1.

[0054] Furthermore, the housing 1 can be kept at a predetermined depth underwater by the friction between the rubber tube 6 and the pile foundation, and the friction between the guide wheel 91 and the pile foundation.

[0055] Embodiment 4:

[0056] like Figure 3 , 5 As shown, this embodiment discloses a pile foundation self-lifting construction platform, and its structure is substantially the same as that of the third embodiment, except that, in this embodiment, the pushing component 93 and the inner wall of the cover shell 1 are connected via a bearing 95, and a fixing frame 94 is fixed on the pushing component 93, and a threaded hole is provided on the fixing frame 94, and a positioning bolt is installed on the threaded hole.

[0057] The working process and principle of this embodiment are:

[0058] When the operator needs to stay at a predetermined depth underwater for a long time, the operator shortens the length of the propulsion assembly 93, and then the operator rotates the propulsion assembly 93 so that the line connecting the two guide wheels 91 in the power assembly 9 is perpendicular to the pile foundation, and then the operator lengthens the propulsion assembly 93. The two guide wheels 91 of the power assembly 9 rest against the pile foundation to improve the stability of the cover 1 underwater.

[0059] The operator rotates the positioning bolt so that the positioning bolt abuts against the bearing 95 or the cover 1 to prevent the push assembly 93 from rotating and ensure that the guide wheel 91 squeezes the pile foundation.

[0060] Embodiment five:

[0061] like Figure 1 , 2 As shown, this embodiment discloses a pile foundation self-elevating construction platform, and its structure is substantially the same as that of the second embodiment, except that a valve 7 is installed on the first pipe body 8 of this embodiment.

[0062] The working process and principle of this embodiment are:

[0063] The greater the underwater depth of the housing 1, the greater the opening of the valve 7, so that the density of the bubbles in the bubble wall is maintained within a set range.

[0064] The operator adjusts the density of the bubbles in the bubble wall by adjusting the opening of the valve 7, thereby adjusting the energy consumption of the pile foundation self-elevating construction platform.

[0065] Embodiment six:

[0066] like Figure 1 , 4 As shown, this embodiment discloses a pile foundation self-elevating construction platform, and its structure is roughly the same as that of the first embodiment, except that in this embodiment, a manhole is opened on one of the arc plates, and an opening and closing door panel is installed on the manhole to facilitate the operator to enter and exit the cover 1.

[0067] When water leaks from the housing 1 , the operator opens the door panel to facilitate the operator to escape from the housing 1 underwater.

[0068] Embodiment seven:

[0069] like Figure 2 As shown, this embodiment discloses a pile foundation self-lifting construction platform, and its structure is substantially the same as that of the first embodiment, except that the outer side surface of the rubber tube 6 and the second ring 4 of this embodiment are detachably sealed and connected, and the cover 1, the first ring 2, the second ring 4, and the rubber tube 6 form a closed chamber.

[0070] The working process and principle of this embodiment are:

[0071] When the rubber tube 6 and the pile foundation rub against each other and a crack occurs, the air in the cover shell 1 enters the closed chamber through the crack, and the air entering the closed chamber stays in the closed chamber, reducing the loss of air in the closed chamber and improving the safety of the pile foundation self-elevating construction platform.

[0072] Embodiment eight:

[0073] like Figure 3 , 4 As shown, this embodiment discloses a pile foundation self-elevating construction platform, and its structure is substantially the same as that of the first embodiment, except that a support frame 12 is fixed to the bottom of the inner cavity of the cover shell 1 in this embodiment, and the support frame 12 provides a support point for the operator to stand on the cover shell 1.

[0074] While the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that many changes, modifications, substitutions and variations can be made to the embodiments without departing from the principles and spirit of the invention.

Claims

1. A pile foundation self-elevating construction platform, characterized in that: The invention comprises a third circular ring (5), a rubber tube (6) and a circular cover (1), wherein a first circular ring (2) is fixed on the top of the cover (1), a second circular ring (4) is mounted on the first circular ring (2), the rubber tube (6) passes through the first circular ring (2) and the second circular ring (4), the top of the rubber tube (6) is connected to the side of the third circular ring (5), the bottom of the rubber tube (6) is connected to the side of the cover (1), a plurality of connecting ropes (10) are arranged on the outer side of the rubber tube (6), the two ends of the connecting rope (10) are respectively fixedly connected to the first circular ring (2) and the second circular ring (4), a driving component (3) for driving the second circular ring (4) to rotate is mounted on the cover (1), the bottom of the inner cavity of the cover (1) is connected to one end of the second tube body (11), and no less than three power components (9) are mounted on the inner wall of the cover (1); The housing (1) comprises two arc-shaped plates that are buckled toward each other, the first circular ring (2) comprises two first arc-shaped rods, the second circular ring (4) comprises two second arc-shaped rods, the third circular ring (5) comprises two third arc-shaped rods, and the rubber tube (6) is made by bending two ends of a rubber sheet and connecting them; It also comprises a first tube body (8), the interior of the third circular ring (5) is hollow, the third circular ring (5) is provided with a plurality of vent holes connected to the inner cavity of the third circular ring (5), and the inner cavity of the third circular ring (5) and the bottom of the inner cavity of the housing (1) are connected via the first tube body (8); The connecting rope (10) is an elastic rubber rope or an elastic nylon rope; Wherein, a first arc-shaped rod is fixed on each arc-shaped plate; The cover (1) is sleeved on an external pile foundation, the driving assembly (3) drives the second ring (4) to rotate, the second ring (4) clamps the rubber tube (6) via a connecting rope (10), and the rubber tube (6) is attached to the pile foundation, and the power assembly (9) causes the cover (1) to move along the length direction of the pile foundation.

2. The pile foundation self-elevating construction platform according to claim 1, characterized in that: The power assembly (9) comprises a pushing assembly (93), one end of the pushing assembly (93) is connected to the inner wall of the housing (1), the other end of the pushing assembly (93) is rotatably mounted with a mounting frame (92), and both ends of the mounting frame (92) are mounted with rotatable guide wheels (91); Wherein, the two guide wheels (91) of the power assembly (9) are both against the pile foundation; Wherein, at least one guide wheel (91) is a hub motor with a tire mounted thereon, and the other guide wheels (91) are elastic wheels.

3. The pile foundation self-elevating construction platform according to claim 2, characterized in that: The pushing component (93) and the inner wall of the housing (1) are connected via a bearing (95); a fixing frame (94) is fixed on the pushing component (93); and positioning bolts are installed on the fixing frame (94).

4. The pile foundation self-elevating construction platform according to claim 1, characterized in that: A valve (7) is installed on the first tube body (8).

5. The pile foundation self-elevating construction platform according to claim 1, characterized in that: A manhole is provided on one of the arc-shaped plates, and an opening and closing door panel is installed on the manhole.

6. The pile foundation self-elevating construction platform according to claim 1, characterized in that: The outer side surface of the rubber tube (6) and the second circular ring (4) are detachably connected, and the cover shell (1), the first circular ring (2), the second circular ring (4) and the rubber tube (6) form a closed chamber.

7. The pile foundation self-elevating construction platform according to claim 1, characterized in that: A support frame (12) is fixed at the bottom of the inner cavity of the cover shell (1).

8. The pile foundation self-elevating construction platform according to claim 1, characterized in that: The driving component (3) is an electric telescopic rod or a hydraulic jack.

Citation Information