Integrated wet spraying machine device and operation method thereof
By integrating the wet sprayer and air press on the same walking mechanism, the problem of space and electricity risks of traditional wet sprayer equipment is solved, the construction efficiency and injection quality are improved, and the stability of the equipment and energy consumption are saved is achieved. .
Patent Information
- Application Number
- CN202411410049.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2025-01-07
AI Technical Summary
The air compressor equipment of traditional wet sprayers occupies a large amount of space, resulting in messy construction sites, increasing the risk of electricity consumption, and when moving in the foundation pit, the wind compressor's operating resistance is large due to the long wires, which affects the construction efficiency.
Integrate the wet sprayer and air press on the same walking mechanism, equipped with a gas storage tank to reduce space occupation, set up a power supply module in a centralized manner, adopt a rotary connected walking wheel and a connecting structure, improve movement and transportation convenience and ensure air pressure stability , and improve the injection quality through the grille and protective layer.
It reduces space occupation and electricity risks, improves construction efficiency, reduces energy consumption (saving more than 30%), and ensures the quality of sprayed concrete and the stability of equipment.
Smart Images

Figure CN119266866A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of integrated wet spraying machine devices, relates to an integrated wet spraying machine device, and also relates to an operating method of the integrated wet spraying machine device. Background Art
[0002] Wet spraying machine is a kind of concrete spraying equipment, which is mainly used for spraying concrete construction of underground projects such as tunnels, culverts, subways, foundation pit support, etc. The wet spraying machine uses hydraulic pumping to transport the concrete mixture to the nozzle through a pipeline. At the nozzle, the concrete mixture is fully mixed with high-pressure water mist and sprayed onto the working surface at a certain speed. The hydraulic pumping pressure of the traditional wet spraying machine is provided by an air compressor. A separate place must be provided on site to place the air compressor. The gas tank equipped with a set of air compressors and the air compressor itself occupy a lot of space, and it is also necessary to connect the wires separately. Once there are too many lines, it is easy to cause chaos on site, and multiple lines increase the risk of electricity use. When the wet spraying machine moves and sprays in the foundation pit, if it exceeds the length of the wire, the air compressor equipment must be moved, resulting in low construction efficiency. At the same time, when the air compressor pipeline is too long, it is easy for the pipeline to bend, resulting in excessive resistance when the air compressor is running, causing pipe bursting. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide an integrated wet spraying machine device and an operation method thereof, which can reduce space occupation, do not require wiring, improve construction efficiency, and facilitate transportation.
[0004] The technical solution adopted by the present invention is: an integrated wet spraying machine device, including a traveling mechanism, a wet spraying machine and an air compressor, the wet spraying machine and the air compressor are respectively installed on the right and left ends of the traveling mechanism, the left end of the traveling mechanism is installed with a hanging structure for hanging a traveling vehicle, and also includes a winding reel and a power box installed on the traveling mechanism, and also includes an air tank, the air outlet of the air compressor is connected to the air tank, and the air tank is connected to the wet spraying machine.
[0005] Furthermore, the above-mentioned walking mechanism includes a mounting plate and walking wheels, two rows of walking wheels are installed on the left and right sides of the mounting plate, and the left wheel frame of the left row of walking wheels is rotatably connected to the bottom of the mounting plate through a rotating mechanism.
[0006] Furthermore, the above-mentioned hanging structure is hung on the left wheel frame.
[0007] Furthermore, the above-mentioned hanging structure includes a hanging joint and an isosceles tripod, the hanging joint is installed at one corner of the tripod, and the other two corners of the tripod are respectively hinged on two hinged ears, and the two hinged ears are fixedly connected to the left side of the left wheel frame. The tripod includes a left top triangular plate frame and a hinged ear, and two pairs of side steel bars are welded to the two right corners of the left top triangular plate frame, respectively. Each pair of side steel bars is arranged up and down on each corner of the left top triangular plate frame, and a hinged ear is welded to the right end of each pair of side steel bars. A plurality of transverse steel bars are welded between the two pairs of side steel bars to form an isosceles trapezoidal structure, and both ends of each transverse steel bar are located between each pair of side steel bars and are fixedly connected to them at the same time, and a plurality of vertical bars are welded on the outside between each pair of side steel bars.
[0008] Furthermore, the above-mentioned hanging joint includes a hanging tube and a lifting ear screw, the hanging tube is welded to the top of the connecting rod, the lifting ear screw is spirally connected to the connecting ear at the bottom of the connecting rod and locked with a nut, and the connecting rod is fixedly connected to the left top corner of the left top triangle frame.
[0009] Furthermore, a grille is provided in the hopper of the wet spraying machine, and the grille is connected to a step provided in the hopper through springs at four corners. A gate frame is provided on the grille, and a pneumatic vibration pump is fixedly connected to the gate frame and the height ensures that the pneumatic vibration pump is higher than the top surface of the hopper. The cross-section of the mesh side wall of the grille is an isosceles triangle, and each grille hole formed by the mesh side wall has a trapezoidal cross-section in the vertical and horizontal directions.
[0010] Furthermore, the above-mentioned pneumatic vibration pump is provided with a protective layer on the outside. The protective layer is a barrel-shaped structure. After covering the pneumatic vibration pump, the bottom is fixedly connected to the door frame. The protective layer includes a waterproof layer, a sponge layer and a thermal insulation layer arranged from the outside to the inside. Two through holes for installing the air inlet pipe and the air outlet pipe of the pneumatic vibration pump are provided on the top of the protective layer. The two through holes are embedded with a waterproof sleeve. The waterproof sleeve is provided with an annular groove. The annular groove is sealed and connected to the protective layer. A plurality of sealing rings are provided in the inner hole of the annular groove.
[0011] Furthermore, a shielding rubber is fixed on the outside of the hopper side wall, and the shielding rubber covers the air pressure distribution valve fixedly installed on the outside of the hopper side wall.
[0012] Furthermore, a transport fixing structure is installed on the above-mentioned walking mechanism, and the transport fixing structure includes a U-shaped card and a round tube. The U-shaped card is inverted and fixedly connected to the bottom of the mounting plate, and the round tube is rotatably connected to the U-shaped card. One end of the round tube is extended out of the U-shaped card and then locked by an anti-rotation device. Multiple pairs of U-shaped card and round tube are used, which are respectively arranged on the front and back sides of the bottom of the mounting plate. It also includes a binding rope and a hanging hole on the transport pallet truck. The hanging holes are arranged in two rows, and two binding ropes are used. They are staggered up and down on one side to pass through the space between the round tube and the U-shaped card and the hanging hole to lock the walking mechanism on the transport pallet truck. Triangular card are provided on both sides of the bottom of the walking wheel.
[0013] An operating method of an integrated wet spraying machine device, the method comprising the following steps: (1) Start up: Start the wet spraying machine and conduct a self-check of the equipment; (2) Material supply: Check the supply of concrete and confirm that the concrete mix ratio and supply quantity meet the requirements; (3) Air supply: Open the air valve of the wet spraying machine to ensure that the air path is unobstructed, which is conducive to the adhesion of the sprayed concrete; (4) Spraying: According to the needs, adjust the spraying parameters of the wet spraying machine, which include spraying distance, spraying angle and spraying pressure, and then start the spraying operation. During the spraying process, always observe the spraying situation and adjust the parameters in time to ensure that the spraying effect meets the requirements; the machine is equipped with an intelligent operating system, which can be adjusted according to the actual needs of the site. The equipped pressure gauge can display the pressure in real time, which is convenient for adjustment and control; (5) Stopping the material: When the concrete supply is finished or no longer needs to be sprayed, turn off the concrete supply system and keep the air valve open to allow the wet spraying machine to continue to operate for the set time so that the concrete in the pipeline can be completely sprayed out; (6) Shutdown: Shut down the wet spraying machine, clean and maintain the equipment. Before shutting down, stop the spraying operation and ensure that the concrete in the pipe is completely sprayed out. After shutting down the wet spraying machine, check whether all parts of the equipment are normal and perform maintenance in time to ensure the normal use and life of the equipment.
[0014] Beneficial effects of the present invention: Compared with the prior art, the effects of the present invention are as follows: (1) The present invention integrates the wet spraying machine and the air compressor on the same walking mechanism, which reduces the occupied space, is convenient for on-site movement and transportation, and is convenient for centralized power supply module to provide power, avoiding the site clutter caused by too many lines, reducing the risk of electricity consumption, and centralized placement, which also avoids the problem of pipe burst caused by excessive resistance during the operation of the air compressor due to the long pipeline. Moreover, after the installation of the gas storage tank, the stability of the air pressure can be ensured, thereby improving the quality of the shotcrete. More importantly, it can save energy consumption and save more than 30% of electricity. (2) The walking mechanism adopts two rows of walking wheels, which is stable and reliable. In addition, the elastic buffering effect of the tires can also reduce noise and vibration during use. The left wheel frame adopts a rotating mechanism to connect the mounting plate, which is convenient for loading and transitioning during the movement of the trailer, improves the walking stability, and protects the tires to avoid excessive turns that lead to accelerated tire wear. (3) The mounting structure is mounted on the left wheel frame to facilitate walking and turning; (4) The hanging structure adopts a hanging joint and an isosceles tripod, a frame structure, light weight, convenient hanging, high rigidity and strength, good hanging reliability, an isosceles trapezoidal structure transition connection frame composed of side steel bars, transverse steel bars and longitudinal steel bars, and can be welded using on-site waste steel bars, which is convenient to weld and low in cost. In addition, the frame structure is light weight, convenient to hang, high rigidity and strength, good stability, and a left top tripod frame and a hinged ear; (5) A hooking tube is used, and a connecting rod is set on the rear side of the flatbed truck. After the connecting rod is inserted into the hooking tube, a latch is used to pass through the hooking tube and the connecting rod and then locked. The connection is convenient and easy to assemble and disassemble. The hooking lug screw is used for hanging, which is convenient for hanging; (6) A grid mesh is used on the hopper to break up the concrete fed into the mixing tank and evenly feed it into the mixing and feeding mechanism at the bottom, thereby improving the quality of concrete spraying and facilitating the filtering of oversized particles to avoid them entering the spraying mechanism and damaging the equipment. A door frame is set in the hopper to suspend the pneumatic vibration pump above the hopper to avoid the moisture in the concrete in the hopper affecting the pneumatic vibration pump. A pneumatic vibration pump is used to avoid the electromagnetic vibration pump being easily damaged in a humid environment. The conventional grid mesh adopts a square hole structure composed of round rod steel bars. Due to long-term use, concrete is easily left on the grid mesh, which is difficult to clean and not easy to fall off under vibration. The present application adopts a mesh side wall with a blade structure, and in combination with vibration, it is very easy to achieve that the added concrete falls from the grid mesh to the mixing and feeding mechanism below, thereby avoiding the concrete from adhering to the grid mesh after long-term use and affecting the concrete from falling off and being difficult to clean. Cleaning is more time-saving and labor-saving. (7) The pneumatic vibration pump is covered with a protective layer, which can effectively protect it from damage. The three-layer structure of waterproof, sponge and heat preservation can provide waterproof, elastic protection and isolation from excessive external temperature. The setting of the waterproof cover facilitates the sealing insertion of the air inlet and outlet pipes. (8) Setting a shielding rubber can prevent concrete from splashing onto the air pressure distribution valve, causing the pressure distribution valve to be damaged by condensed cement mortar for a long time; (9) A transport fixing structure consisting of a U-shaped card, a round tube, a binding rope, a hanging hole and a triangular card is provided to conveniently and stably connect the walking mechanism to the transport flatbed truck to avoid shaking during transportation. A rotatable round tube is used, which can act as a pulley during the binding process, making it easier for the binding rope to slide through and make the binding tighter. After binding, an anti-rotation mechanism is used to lock it, which can further improve the stability of the binding; (10) The sequential operation process and specific spraying parameter control of shotcrete can effectively ensure the quality of shotcrete and ensure that the damper of the wet shotcrete machine is not closed after the spraying is completed, so that the concrete in the pipe can be completely sprayed out. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1It is a front structural schematic diagram of an integrated wet spraying machine device; Figure 2 It is a schematic diagram of the cross-sectional structure of the hopper; Figure 3 This is a schematic diagram of the protective cover perforation installation structure; Figure 4 It is a schematic diagram of the hopper structure; Figure 5 This is a schematic diagram of the mounting structure (with dimensions); Figure 6 It is a schematic diagram of the connection structure between the U-shaped card and the round tube; Figure 7 for Figure 4 A schematic diagram of the enlarged structure of the middle part A; Figure 8 This is a schematic diagram of the structure of the jet walking trolley; Fig. 9 It is a schematic diagram of the side structure of the anti-rotation device. DETAILED DESCRIPTION
[0016] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments.
[0017] Example 1: Figure 1-9 As shown, an integrated wet spraying machine device includes a traveling mechanism 1, a wet spraying machine 2 and an air compressor 3, wherein the wet spraying machine 2 and the air compressor 3 are respectively mounted on the right and left ends of the traveling mechanism 1, and a hanging structure 4 for hanging a traveling vehicle is mounted on the left end of the traveling mechanism 1. The device also includes a cable reel 5 and a power supply box 6 mounted on the traveling mechanism, wherein the cable reel 5 is located in front of an air storage tank 7, and the power supply box 6 is located on the right side of the cable reel 5. The cable reel 5 is mounted on the traveling mechanism 1 through a winding frame, and the winding frame is connected to the cable reel 5 through a rotating shaft, and a motor is connected to the rotating shaft, and the motor is mounted on the rear side of the winding frame. The power supply box 6 connects the power supply cable on the cable reel to its power inlet port, and the power supply cable is connected to the power output port of the diesel generator, and also includes an air storage tank fixedly connected to the traveling mechanism through two supporting frames. 7. The air outlet of the air compressor 3 is connected to the air storage tank 7, and the air storage tank 7 is connected to the air inlet end of the wet spraying machine 2. The mortar pushed out by the wet spraying machine is pneumatically sprayed through the air inlet end, and then the mortar is sprayed to the wall for bonding. The wet spraying machine and the air compressor are integrated on the same walking mechanism, which reduces the occupied space, can be conveniently moved on site and transported, and is also convenient for centralized power supply modules to supply power, avoiding too many lines causing clutter on site, reducing the risk of electricity use, and centralized placement, and also avoiding the problem of pipe bursting caused by excessive resistance during the operation of the air duct machine due to the long laying of the pipeline. Moreover, after the air storage tank is installed, the stability of the air pressure can be ensured, thereby improving the quality of the shotcrete. More importantly, it can save energy consumption and save more than 30% of electricity.
[0018] The wet spraying machine, air compressor, and gas storage tank are integrated and installed in one piece. By reasonably allocating space, the overall unit is optimized to the most reasonable space. A cable reel is set to centrally wind the unit wires. The wires are wound to the appropriate position according to the movement of the machine, so as not to cause the wires on site to be messy. Its working principle is to use the thrust generated by the air compressor to send the concrete from the conveying pipeline to the mixing pipe, and then form a thin flow through the pipeline to the nozzle through the compressed air. At the nozzle, a certain proportion of accelerator will be added (the accelerator is placed in a storage bucket, placed on the walking mechanism or on the ground on one side, and the storage bucket is connected to the accelerator inlet of the wet spraying machine through a pipeline). The addition of accelerator is continuously adjustable and can be infinitely adjusted according to the amount of spraying, and then directly sprayed onto the sprayed surface. The mechanical equipment is a three-in-one machine, electricity, and hydraulic, with simple operation and high construction efficiency.
[0019] According to the needs of the on-site foundation pit, the length of the conveying pipeline can be adjusted, and the machine does not need to be hoisted into the foundation pit, occupying a small working surface of the foundation pit, effectively reducing interference with other processes. In addition, the excavation of earthwork in the foundation pit generally leads to an uneven site, and the wet spraying machine is difficult to move, and sometimes a steel plate is required to move it. Since the equipment is above the foundation pit and uses four-wheel solid tires, it is easy to move, simple to operate and maintain, and can quickly move to the position of the designated spraying surface, which has significant advantages for secondary spraying and large-area initial spraying.
[0020] This equipment improvement aims to achieve the safety and operability of the unit and improve on-site construction efficiency.
[0021] The air compressor is installed in a box with removable doors on the front and back sides. A sound insulation sponge is installed in the box. The box is connected to the traveling mechanism through a shock absorbing mechanism. The shock absorbing mechanism cooperates with the rubber traveling wheels to better play a shock absorbing role and prevent the electrical components in the power box and the control box from being damaged by long-term vibration. The power box and the control box are also connected to the traveling mechanism with a shock absorbing mechanism to further achieve a vibration reduction and buffering protection effect.
[0022] The walking mechanism 1 comprises a mounting plate 101 and a walking wheel 102. The mounting plate 101 comprises a frame-shaped mounting frame and an iron plate fixedly connected to the mounting frame by welding, and the support is stable and reliable. Two rows of walking wheels 102 are installed on the left and right sides of the mounting plate 101. The left row of walking wheels 102 is rotatably connected to the left rotating shaft. The left rotating shaft is fixedly connected to the stacked strip shock-absorbing spring plates by U-bolts. The two ends of the stacked strip shock-absorbing spring plates are connected to the two lower convex connecting ears of the left wheel frame 103. The left wheel frame 103 is rotatably connected to the bottom of the mounting plate 101 by a rotating mechanism. The walking mechanism adopts two rows of walking wheels, and the walking is stable and reliable. In addition, due to the elastic buffering effect of the tire during use, it can also play a role in noise reduction and vibration reduction; the left wheel frame adopts a rotating mechanism to connect the mounting plate, which is convenient for loading and transitioning during the movement of the trailer, improves the walking stability, and plays a role in protecting the tire, avoiding excessive turning and causing the tire to wear faster; the hanging structure 4 is hung on the left wheel frame 103, and the hanging structure is hung on the left wheel frame, which is convenient for walking and turning.
[0023] Wherein, the hanging structure 4 includes a hanging joint 401 and an isosceles tripod 402, the hanging joint 401 is installed at one corner of the tripod 402, and the other two corners of the tripod 402 are respectively hinged on two hinged ears 403 through a connecting single ear 413 perpendicular to the right side of the tripod (i.e. horizontally to the right), the hinged ear is wider, and the right side is also connected to one end of the stacked strip shock-absorbing spring, which can simplify the left wheel frame structure, and the two hinged ears 403 are fixedly connected to the left side of the left wheel frame 103. The tripod 402 includes a left top triangular plate frame 404 and a hinged ear 405. Two pairs of side steel bars 406 are respectively welded at the two right corners of the left top triangular plate frame 404, and each pair of side steel bars 406 is arranged up and down at each corner of the left top triangular plate frame 404. A hinged ear 405 is welded on the right end, and multiple transverse steel bars 407 are welded between two pairs of side steel bars 406 to form an isosceles trapezoidal structure. Both ends of each transverse steel bar 407 are located between each pair of side steel bars 406 and are fixedly connected to each other. Multiple vertical bars 408 are welded on the outside between each pair of side steel bars 406. The hanging structure of the hanging joint and the isosceles tripod is adopted. The frame structure is light in weight, convenient for hanging, high in rigidity and strength, and good in hanging reliability. The isosceles trapezoidal structure transition connection frame composed of side steel bars, transverse steel bars and longitudinal steel bars can be welded with waste steel bars on site, which is convenient for welding and low in cost. In addition, the frame structure is light in weight, convenient for hanging, high in rigidity and strength, and good in stability. The left top triangular plate frame and the hinged ear.
[0024] In order to facilitate hanging on the trailer, the hanging joint 401 includes a hanging tube 409 and a lifting eye screw 410. The hanging tube 409 is welded to the top of the connecting rod 411. The lifting eye screw 410 is spirally connected to the connecting ear 411 at the bottom of the connecting rod 405 and is locked with a nut 412. The connecting rod 405 is fixedly connected to the left top corner of the left top triangular plate frame 404. A hanging tube is used to set a connecting rod on the rear side of the cart. After the connecting rod is inserted into the hanging tube, a pin is used to pass through the hanging tube and the connecting rod and then locked. The connection is convenient and easy to assemble and disassemble. The lifting eye screw is used for hanging, which is convenient to hang.
[0025] Among them, a grid net 202 is arranged in the hopper 201 of the wet spraying machine 2, and the grid net 202 is connected to the step 204 arranged in the hopper 201 through the springs 203 at the four corners. A gate frame 205 is arranged on the grid net 202, and a pneumatic vibration pump 206 is fixedly connected to the gate frame 205 and the height ensures that the pneumatic vibration pump 206 is higher than the top surface of the hopper 201. The mesh side wall section of the grid net 202 is an isosceles triangle, and each grid hole formed by the mesh side wall has a trapezoidal cross-section in the vertical and horizontal directions; the grid net is used on the hopper, so that the concrete fed into the mixing tank can be broken up and evenly fed into the mixing and feeding mechanism on the lower side, thereby improving the spraying quality of the concrete, and also facilitating the filtering of oversized particles to avoid entering the spraying mechanism and damaging the equipment. A gate frame is arranged in the hopper to suspend the pneumatic vibration pump above the hopper to avoid the concrete moisture in the hopper affecting the pneumatic vibration pump. A pneumatic vibration pump is used to prevent the electromagnetic vibration pump from being easily damaged in a humid environment. The conventional grille mesh adopts a square hole structure composed of round rod steel bars. Due to long-term use, concrete is easily generated on the grille mesh, which is not easy to clean and is not easy to fall off under vibration. The present application adopts a mesh side wall with a blade structure, and in combination with vibration, it is very easy to achieve that the added concrete falls from the grille mesh to the mixing and feeding mechanism below, avoiding adhesion to the grille mesh after long-term operation and affecting the falling of concrete and difficulty in cleaning. Cleaning is more time-saving and labor-saving. Two handles are provided on the grille mesh to facilitate the disassembly of the grille mesh. A downward-inclined high-pressure jet port is provided around the spring 203, which can timely blow off the mortar generated on the spring to avoid affecting the vibration reduction performance of the spring. Under the condition of blowing and vibration, the mortar is less likely to adhere to the spring and is easier to clean.
[0026] In order to protect the pneumatic vibration pump, a protective layer 207 is provided on the outside of the pneumatic vibration pump 206. The protective layer 207 is a barrel-shaped structure. After covering the pneumatic vibration pump 206, the bottom is fixedly connected to the door frame 205. The protective layer 207 includes a waterproof layer 208, a sponge layer 209 and a thermal insulation layer 210 arranged from the outside to the inside. Two through holes 211 for installing the air inlet pipe and the air outlet pipe of the pneumatic vibration pump 206 are provided on the top of the protective layer 207. The two through holes 211 are embedded with a waterproof sleeve 212. The waterproof sleeve 212 is provided with an annular groove 213. The annular groove 213 is sealed and connected to the protective layer 207. The inner hole of the annular groove 213 is provided with a plurality of sealing rings 214. Covering the pneumatic vibration pump with a protective layer can play an effective protective role and prevent the pneumatic vibration pump from being damaged. The three-layer structure of waterproof, sponge and thermal insulation can play the role of waterproof, elastic protection and isolation of excessive external temperature. The provision of the waterproof sleeve facilitates the sealing insertion of the air inlet pipe and the air outlet pipe.
[0027] In order to protect the air pressure distribution valve 216, a shielding rubber 215 is fixed on the outside of the side wall of the hopper 201, and the shielding rubber 215 covers the air pressure distribution valve 216 fixedly installed on the outside of the side wall of the hopper 201; the shielding rubber is provided to prevent concrete from splashing and falling onto the air pressure distribution valve, which may cause the pressure distribution valve to be damaged due to the solidification of cement mortar for a long time. Pedals are provided on the outer bottom of the front and rear sides of the hopper 201. Standing on the pedals is convenient for feeding operations. A shielding rubber 215 is also provided on the bottom of the hopper facing the mixing tank, and the shielding rubber covers the bottom of the hopper 201. The output pipe plays a protective role to prevent excessive mortar from falling on the output pipe and making it inconvenient to clean. The shielding rubber 215 is fixed to the hopper with a clamping mechanism. The clamping mechanism includes a T-shaped slide rail 217 and a T-shaped slot tube 218 used in conjunction with the T-shaped slide rail 217. The upper end of the shielding rubber 215 is elastically squeezed in the gap between the T-shaped slide rail 217 and the T-shaped slot tube 218. When in use, the shielding rubber is placed on the T-shaped slide rail, and the T-shaped slot tube is pushed in from one end of the T-shaped slide rail to lock the shielding rubber. It is easy to assemble and disassemble, and quick and easy to clean.
[0028] In order to facilitate the stable transportation of the entire equipment, a transportation fixing structure is installed on the walking mechanism 1, and the transportation fixing structure includes a U-shaped card 801 and a round tube 802. The U-shaped card 801 is inverted and fixedly connected to the bottom of the mounting plate 101, and the round tube 802 is rotatably connected to the U-shaped card 801. One end of the round tube 802 extends out of the U-shaped card 801 and is locked by an anti-rotation device. The U-shaped card 801 and the round tube 802 are used in multiple pairs, respectively arranged at the front and rear sides of the bottom of the mounting plate 101, and also include a binding rope 803 and a hanging hole 804 on the transport flatbed truck. The hanging hole 804 is arranged in two rows, and the binding rope 803 is used. 03 Two rods are used, staggered up and down on one side to pass through the space between the round tube 802 and the U-shaped card 801 and the hanging hole 804 to lock the walking mechanism on the transport cart. Triangular cards 805 are set on both sides of the bottom of the walking wheel 102. The transportation fixing structure composed of the U-shaped card, round tube, binding rope, hanging hole and triangular card is set to conveniently and firmly connect the walking mechanism to the transport cart to avoid shaking during transportation. The rotatable round tube can act as a pulley during the bundling process, which is convenient for the bundling rope to slide through and make the bundling tighter. After bundling, the anti-rotation mechanism is used to lock it, which can further improve the bundling stability. The anti-rotation device includes a ratchet 806 and a pawl 807. The ratchet 806 is fixedly connected to the left end of the circular tube 802. The pawl 807 used in conjunction with the ratchet 806 is rotatably connected to the U-shaped card 801 and the pawl 807 can overlap the ratchet teeth of the ratchet 806. It is loosened when used for bundling. Limit plates 808 are arranged on both sides of a section of the circular tube 802 located inside the U-shaped card 801 to facilitate limiting and preventing slippage. The limit plates 808 are fixedly connected to the circular tube 802 by welding. A pair of through holes 809 are radially arranged on the right end of the circular tube 802 to facilitate insertion of a steel pipe for rotation, and also to facilitate winding the binding rope around the circular tube and then inserting it into the through holes for fixing. The circular tube is rotated to play the role of a winding drum, and cooperates with the anti-rotation device to realize the fixation of a binding rope between the corresponding hanging holes of the single-sided circular tube.
[0029] Embodiment 2: An operating method of an integrated wet spraying machine device, the method comprising the following steps: (1) Start up: Start the wet spraying machine and conduct a self-check of the equipment; (2) Material supply: Check the supply of concrete and confirm that the concrete mix ratio and supply quantity meet the requirements; (3) Air supply: Open the air valve of the wet spraying machine to ensure that the air path is unobstructed, which is conducive to the adhesion of the sprayed concrete; (4) Spraying: According to the needs, adjust the spraying parameters of the wet spraying machine, which include spraying distance, spraying angle and spraying pressure, and then start the spraying operation. During the spraying process, always observe the spraying situation and adjust the parameters in time to ensure that the spraying effect meets the requirements; the machine is equipped with an intelligent operating system, which can be adjusted according to the actual needs of the site. The equipped pressure gauge can display the pressure in real time, which is convenient for adjustment and control; During the spraying process, a spraying walking trolley is used for spraying, such as Figure 8 As shown, the jet travel trolley includes a jet head 901 and an electric travel mechanism trolley 902. The jet head 901 is mounted on an electric pitch head 903. The electric pitch head 903 is connected to the electric travel mechanism trolley 902 through a support frame 904. A three-dimensional laser scanner 905 is mounted on the electric travel mechanism trolley 902. The three-dimensional laser scanner 905 is used to scan the wall surface and construct a three-dimensional model of the wall surface. Two infrared distance sensors 906 that follow the pitch are arranged on both sides of the jet head 901. The two infrared distance sensors 906 respectively measure the wall surface conditions before and after the jetting. The jet head 901 is connected to the electric pitch head 903 through a support frame 904. A three-dimensional laser scanner 905 is installed on the electric travel mechanism trolley 902. The three-dimensional laser scanner 905 is used to scan the wall surface and construct a three-dimensional model of the wall surface. Two infrared distance sensors 906 that follow the pitch are arranged on both sides of the jet head 901. The two infrared distance sensors 906 respectively measure the wall surface conditions before and after the jetting. The soft rubber hose 907 is connected to the output pipe of the wet spraying machine 2, the three-dimensional laser scanner 905 is connected to the controller of the wet spraying machine, the controller is connected to the electric walking mechanism trolley, the infrared distance sensor and the electric pitch head, and the three-dimensional laser scanner is used to build a model according to the scanning results after cruise control, and spraying is carried out according to the model, and pitch control is performed. During the walking process, pitch spraying molding is realized on the wall surface, and the infrared distance sensor is used to detect the spraying thickness in real time, so as to make timely remedial measures, improve the uniformity of the surface spraying thickness, and avoid unevenness when the spraying parameter control cannot achieve accurate spraying.
[0030] (5) Stopping the material: When the concrete supply is finished or no longer needs to be sprayed, turn off the concrete supply system and keep the air valve open to allow the wet spraying machine to continue to operate for the set time so that the concrete in the pipeline can be completely sprayed out; (6) Shutdown: Shut down the wet spraying machine, clean and maintain the equipment. Before shutting down, stop the spraying operation and ensure that the concrete in the pipe is completely sprayed out. After shutting down the wet spraying machine, check whether all parts of the equipment are normal and perform maintenance in time to ensure the normal use and life of the equipment.
[0031] The sequential operation process and specific spraying parameter control of shotcrete can effectively ensure the quality of shotcrete, and ensure that the wet shotcrete machine continues to operate without closing the air valve after the spraying is completed, so as to completely spray out the concrete in the pipe.
[0032] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. An integrated wet spraying machine device, characterized in that: The invention comprises a traveling mechanism (1), a wet spraying machine (2) and an air press (3), wherein the wet spraying machine (2) and the air press (3) are respectively mounted on the right and left ends of the traveling mechanism (1), and a hanging structure (4) for hanging a traveling vehicle is mounted on the left end of the traveling mechanism (1). The invention also comprises a cable reel (5) and a power supply box (6) mounted on the traveling mechanism, and an air storage tank (7), wherein an air outlet of the air press (3) is connected to the air storage tank (7), and the air storage tank (7) is connected to the wet spraying machine (2).
2. The integrated wet spraying machine device according to claim 1, characterized in that: The walking mechanism (1) comprises a mounting plate (101) and walking wheels (102); two rows of walking wheels (102) are mounted on the left and right sides of the mounting plate (101); and a left wheel frame (103) of the left row of walking wheels (102) is rotatably connected to the bottom of the mounting plate (101) via a rotating mechanism.
3. The integrated wet spraying machine device according to claim 2, characterized in that: The hanging structure (4) is hung on the left wheel frame (103).
4. The integrated wet spraying machine device according to claim 3, characterized in that: The hanging structure (4) comprises a hanging joint (401) and an isosceles tripod (402), wherein the hanging joint (401) is installed at one corner of the tripod (402), and the other two corners of the tripod (402) are respectively hinged on two hinged ears (403), and the two hinged ears (403) are fixedly connected to the left side of the left wheel frame (103), and the tripod (402) comprises a left top triangular plate frame (404) and a hinged ear (405), and the two right corners of the left top triangular plate frame (404) are respectively welded with two pairs of side steel Each pair of side reinforcement bars (406) is arranged up and down at each corner of the left top triangular plate frame (404); a hinged ear (405) is welded to the right end of each pair of side reinforcement bars (406); a plurality of transverse reinforcement bars (407) are welded between the two pairs of side reinforcement bars (406) to form an isosceles trapezoidal structure; both ends of each transverse reinforcement bar (407) are located between each pair of side reinforcement bars (406) and are fixedly connected to each other; a plurality of vertical reinforcement bars (408) are welded outside each pair of side reinforcement bars (406).
5. The integrated wet spraying machine device according to claim 4, characterized in that: The hanging joint (401) comprises a hanging tube (409) and a hanging ear screw (410), wherein the hanging tube (409) is welded to the top of the connecting rod (405), the hanging ear screw (410) is spirally connected to a connecting ear (411) at the bottom of the connecting rod (405) and is locked with a nut (412), and the connecting rod (405) is fixedly connected to the left top corner of the left top triangular plate frame (404).
6. The integrated wet spraying machine device according to claim 1, characterized in that: A grille net (202) is arranged in a hopper (201) of a wet spraying machine (2). The grille net (202) is connected to a step (204) arranged in the hopper (201) via springs (203) at four corners. A gate frame (205) is arranged on the grille net (202). A pneumatic vibration pump (206) is fixedly connected to the gate frame (205) and the height of the pneumatic vibration pump (206) is ensured to be higher than the top surface of the hopper (201). The mesh side wall section of the grille net (202) is an isosceles triangle, and each grille hole formed by the mesh side wall has a trapezoidal cross section in both the longitudinal and transverse directions.
7. The integrated wet spraying machine device according to claim 5, characterized in that: A protective layer (207) is arranged outside the pneumatic vibration pump (206). The protective layer (207) is a barrel-shaped structure. After covering the pneumatic vibration pump (206), the bottom is fixedly connected to the door frame (205). The protective layer (207) includes a waterproof layer (208), a sponge layer (209) and a thermal insulation layer (210) arranged from the outside to the inside. Two through holes (211) for installing an air inlet pipe and an air outlet pipe of the pneumatic vibration pump (206) are arranged on the top of the protective layer (207). The two through holes (211) are embedded with a waterproof sleeve (212). The waterproof sleeve (212) is provided with an annular groove (213). The annular groove (213) is sealed and connected to the protective layer (207). The inner hole of the annular groove (213) is provided with a plurality of sealing rings (214).
8. The integrated wet spraying machine device according to claim 6, characterized in that: A shielding rubber (215) is fixed outside the side wall of the hopper (201), and the shielding rubber (215) covers the air pressure distribution valve (216) fixedly installed outside the side wall of the hopper (201).
9. The integrated wet spraying machine device and the operating method thereof according to claim 2, characterized in that: The walking mechanism (1) is provided with a transport fixing structure, which comprises a U-shaped card (801) and a round tube (802). The U-shaped card (801) is fixedly connected to the bottom of the mounting plate (101) in an inverted manner, and the round tube (802) is rotatably connected to the U-shaped card (801). One end of the round tube (802) is locked by an anti-rotation device after extending out of the U-shaped card (801). The U-shaped card (801) and the round tube (802) are provided in multiple pairs and are arranged at the front and rear sides of the bottom of the mounting plate (101) respectively. The U-shaped card (801) and the round tube (802) also comprise a binding rope (803) and a hanging hole (804) on a transport pallet truck. The hanging holes (804) are arranged in two rows. Two binding ropes (803) are provided and are staggered up and down on one side to pass through the space between the round tube (802) and the U-shaped card (801) and the hanging hole (804) to lock the walking mechanism on the transport pallet truck. Triangular cards (805) are provided on both sides of the bottom of the walking wheel (102).
10. The method for operating an integrated wet spraying machine according to claim 1, characterized in that: The method comprises the following steps: (1) Start up: Start the wet spraying machine and conduct a self-check of the equipment; (2) Material supply: Check the supply of concrete and confirm that the concrete mix ratio and supply quantity meet the requirements; (3) Air supply: Open the air valve of the wet spraying machine to ensure that the air path is unobstructed; (4) Spraying: According to the needs, adjust the spraying parameters of the wet spraying machine, which include spraying distance, spraying angle and spraying pressure, and then start the spraying operation. During the spraying process, always observe the spraying situation and adjust the parameters in time to ensure that the spraying effect meets the requirements; the machine is equipped with an intelligent operating system, which can be adjusted according to the actual needs of the site, and the equipped pressure gauge can display the pressure in real time; (5) Stopping the material: When the concrete supply is finished or spraying is no longer needed, turn off the concrete supply system and keep the air valve open to allow the wet spraying machine to continue running for the set time; (6) Shutdown: Shut down the wet spraying machine and clean and maintain the equipment. Before shutting down, stop the spraying operation and ensure that the concrete in the pipe is completely sprayed out. After shutting down the wet spraying machine, check whether all parts of the equipment are normal and perform maintenance in time.