Energy taking device of cable on-line monitoring equipment and energy taking management method of energy taking device
By adopting a combination of multiple energy acquisition modules and energy distribution modules in the cable online monitoring equipment, the problems of power withdrawal difficulty and low load offline are solved, and the impact of power withdrawal equipment is alleviated under high load conditions, realizing the equipment's Stable power supply and high reliability.
Patent Information
- Application Number
- CN202411531493.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-30
- Publication Date
- 2025-01-17
AI Technical Summary
The existing technology cannot effectively solve the problems of power extraction of existing cable online monitoring equipment, low load offline, and power extraction equipment impact under high load conditions.
Design an energy acquisition device for online cable monitoring equipment, adopts power control conversion circuit and multiple energy acquisition modules (including solar energy, cable coupling, mains and DC power supply modules), and selects the appropriate energy acquisition method according to the installation environment. And energy management is carried out through the energy distribution module to ensure stable power supply of the equipment under different load conditions.
It improves the reliability and online rate of power withdrawal, avoids the equipment sleeping off-line at low loads, and impact problems at high loads, ensuring the reliable operation of the cable online monitoring equipment.
Smart Images

Figure CN119324439A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the technical field of cable energy extraction, and in particular to an energy extraction device for cable online monitoring equipment and an energy extraction management method thereof. Background Art
[0002] Cables above 35kV mainly use single-core cables with metal sheaths. Because the metal sheath of the single-core cable is hinged with the magnetic lines of force generated by the AC current in the core wire, a high induced voltage appears at both ends, so appropriate grounding measures must be taken to keep the induced voltage within the safe voltage range. At the same time, when the cable sheath insulation is damaged, the metal sheath grounding current will be abnormal, affecting the current carrying capacity of the cable, and in severe cases, even causing the cable to heat up severely and burn.
[0003] In order to better monitor the working condition of cables, a large number of online monitoring devices for cable sheath circulating current are currently installed on cable transmission lines to monitor the grounding current of cable sheaths. However, due to the limitations of the cable monitoring environment and the design problems of early devices, most of the existing online monitoring devices for cable sheath circulating current only support current transformer (CT) coupling power extraction, which has a single power extraction method and cannot be compatible with or expand the access of other energy extraction methods; when the cable line is in a low-load condition, the monitoring equipment will be dormant and offline due to the inability to obtain sufficient energy through coupling power extraction. Other cable-type online monitoring devices also face the problems of difficulty in obtaining power and low-load offline. For example, traditional solar power extraction has the problem of being unable to obtain energy at night; when the mains power extraction or external DC current power supply is designed and installed during the construction, it may not be in use, and it is also impossible to obtain sufficient energy. In addition, the existing technology has not been able to solve the impact problem of the power extraction equipment under high cable load conditions, resulting in noise and vibration in the power extraction equipment. Summary of the invention
[0004] The purpose of the embodiments of the present disclosure is to provide an energy acquisition device for cable online monitoring equipment and an energy acquisition management method thereof, so as to at least solve the technical problems existing in the prior art that cable online monitoring equipment has difficulty in obtaining power and is offline at low load, as well as the impact on the power acquisition equipment under high cable load conditions.
[0005] In order to solve the above technical problems, the embodiments of the present disclosure adopt the following technical solutions:
[0006] In a first aspect, an embodiment of the present disclosure provides an energy acquisition device for a cable online monitoring device, comprising a power supply control conversion circuit and a plurality of energy acquisition modules, wherein the power supply control conversion circuit is respectively connected to the plurality of energy acquisition modules, and the power supply control conversion circuit can select at least one energy acquisition module from the plurality of energy acquisition modules according to the installation environment of the cable online monitoring device to supply power to the cable online monitoring device.
[0007] In some embodiments, the energy acquisition module includes a solar energy acquisition module, a cable-coupled energy acquisition module, and a mains power energy acquisition module.
[0008] In some embodiments, the energy acquisition module also includes a DC power supply energy acquisition module.
[0009] In some embodiments, the energy acquisition device further includes a plurality of energy distribution modules, and the plurality of energy distribution modules are respectively connected to the power control conversion circuit, and the power control conversion circuit distributes the energy acquired by the energy acquisition module to the corresponding energy distribution module.
[0010] In some embodiments, the energy distribution module includes a 12V output unit, a 24V output unit, and an energy storage unit.
[0011] In some embodiments, the energy storage unit includes a charging mode and a discharging mode, and the charging mode and the discharging mode are switched according to the energy acquired by the energy acquisition module;
[0012] Among them, if the energy obtained by the energy acquisition module is less than the first preset energy threshold, the charging mode is turned off; if the energy obtained by the energy acquisition module is greater than the second preset energy threshold, the charging mode is turned on; if the energy obtained by the energy acquisition module is zero, the energy release mode is turned on.
[0013] In some embodiments, the power control conversion circuit includes a charging circuit, and the charging circuit is respectively connected to the solar energy acquisition module, the cable coupling energy acquisition module, and the mains energy acquisition module to charge the energy acquisition device.
[0014] In some embodiments, a protection circuit is provided in the connection circuit between the power control conversion circuit and the cable-coupled energy extraction module.
[0015] In some embodiments, the DC power supply and energy acquisition module is a USB DC power supply and energy acquisition module.
[0016] In a second aspect, an embodiment of the present disclosure provides an energy acquisition device applied to a cable online monitoring device, the energy acquisition device comprising a power control conversion circuit and a plurality of energy acquisition modules, and the method comprising:
[0017] The power control conversion circuit selects at least one energy acquisition module from the plurality of energy acquisition modules according to the installation environment of the cable online monitoring device to supply power to the cable online monitoring device.
[0018] In a third aspect, an embodiment of the present disclosure provides an electronic device, comprising at least a memory and a processor, wherein the memory stores a computer program, and the processor implements the energy acquisition management method of the energy acquisition device of the above-mentioned cable online monitoring equipment when executing the computer program on the memory.
[0019] In a fourth aspect, an embodiment of the present disclosure provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the energy acquisition management method of the energy acquisition device of the above-mentioned cable online monitoring equipment is implemented.
[0020] An energy acquisition device for an online cable monitoring device and an energy acquisition management method thereof are provided in an embodiment of the present disclosure. A plurality of energy acquisition modules are arranged, and the plurality of energy acquisition modules are respectively connected to a power control conversion circuit of the energy acquisition device. The power control conversion circuit selects at least one energy acquisition module from the plurality of energy acquisition modules according to the installation environment of the online cable monitoring device to supply power to the online cable monitoring device, which makes up for the problem of insufficient energy supply due to a single power acquisition method to a certain extent, improves the power acquisition reliability of the power acquisition device, and improves the online rate of the online cable monitoring device. Different energy acquisition modules are respectively independent of the power control conversion circuit and do not interfere with each other. When any one or more of the lines connected between the energy acquisition modules and the power control conversion circuit fail, it does not affect the power supply of other normal power acquisition paths, thereby further ensuring the power acquisition reliability of the power acquisition device and the online rate of the online cable monitoring device. In addition, the above-mentioned power-drawing device can be used to transform the power-drawing method of existing equipment with a single power-drawing method, thereby improving the online rate of existing equipment. The transformation method is flexible and convenient. The above-mentioned power-drawing device can ensure the reliable operation of the cable online monitoring equipment, monitor the cable through the monitoring equipment, and promptly discover the situation where the cable load exceeds the standard, and take corresponding measures to make adjustments, thereby solving the impact problem on the power-drawing equipment under high cable load conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the embodiments of the present disclosure or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0022] Figure 1 A schematic diagram of the structure of an energy extraction device of an online cable monitoring device according to an embodiment of the present disclosure;
[0023] Figure 2 Another structural schematic diagram of the energy harvesting device of the cable online monitoring equipment according to the embodiment of the present disclosure. DETAILED DESCRIPTION
[0024] Various aspects and features of the present disclosure are described herein with reference to the drawings.
[0025] It should be understood that various modifications may be made to the embodiments of the present application. Therefore, the above description should not be considered as limiting, but only as an example of an embodiment. Other modifications within the scope and spirit of the present disclosure will occur to those skilled in the art.
[0026] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the present disclosure and, together with the general description of the present disclosure given above and the detailed description of the embodiments given below, serve to explain the principles of the present disclosure.
[0027] These and other characteristics of the present disclosure will become apparent from the following description of a preferred form of embodiment given as a non-limiting example, with reference to the attached drawings.
[0028] It should also be understood that, although the present disclosure has been described with reference to some specific examples, those skilled in the art will be able to realize many other equivalent forms of the present disclosure that have the features described in the claims and are therefore within the scope of protection defined thereby.
[0029] The above and other aspects, features and advantages of the present disclosure will become more apparent from the following detailed description when taken in conjunction with the accompanying drawings.
[0030] Specific embodiments of the present disclosure are described hereinafter with reference to the accompanying drawings; however, it should be understood that the embodiments claimed are merely examples of the present disclosure, which may be implemented in a variety of ways. Well-known and / or repeated functions and structures are not described in detail to avoid obscuring the present disclosure with unnecessary or redundant details. Therefore, the specific structural and functional details claimed herein are not intended to be limiting, but merely serve as a basis and representative basis for the claims to teach those skilled in the art to use the present disclosure in a variety of ways with substantially any suitable detailed structure.
[0031] This specification may use the phrases "in one embodiment," "in another embodiment," "in a further embodiment," or "in other embodiments," all of which may refer to one or more of the same or different embodiments according to the present disclosure.
[0032] Embodiment 1
[0033] Figure 1 and Figure 2 The schematic diagram of the structure of the energy taking device of the cable online monitoring device according to the embodiment of the present disclosure is shown as follows: Figure 1 and Figure 2As shown, an energy acquisition device for a cable online monitoring device provided by an embodiment of the present disclosure includes a power supply control conversion circuit 1 and a plurality of energy acquisition modules 2, wherein the power supply control conversion circuit 1 is respectively connected to the plurality of energy acquisition modules 2, and the power supply control conversion circuit 1 can select at least one energy acquisition module 2 from the plurality of energy acquisition modules 2 according to the installation environment of the cable online monitoring device to power the cable online monitoring device.
[0034] Among them, each energy acquisition module 2 represents an energy acquisition method. The cable online monitoring device can select two or more energy acquisition methods to work simultaneously according to the installation environment around it, which makes up for the problem of insufficient energy supply in a single power acquisition method to a certain extent, improves the power acquisition reliability of the power acquisition device, and improves the online rate of the cable online monitoring device. In this embodiment, different energy acquisition modules 2 are independent of the power control conversion circuit 1 and do not interfere with each other; in the line connected between each energy acquisition module 2 and the power control conversion circuit 1, when any one or more of the lines fail, it does not affect the power supply of other normal power acquisition paths, further ensuring the power acquisition reliability of the power acquisition device and the online rate of the cable online monitoring device.
[0035] In addition, the above-mentioned power extraction device can be used to transform the power extraction method of existing equipment with a single power extraction method, thereby improving the online rate of existing equipment. The transformation method is flexible and convenient. For example, the existing current transformer coupled power extraction equipment can be transformed to obtain a power extraction device including multiple energy extraction modules 2. The power extraction device provided in this embodiment can ensure the reliable operation of the cable online monitoring equipment, monitor the cable through the monitoring equipment, and promptly detect the situation where the cable load exceeds the standard, and take corresponding measures to adjust it, thereby solving the impact problem of the power extraction equipment under high cable load conditions.
[0036] In some embodiments, the energy acquisition module 2 includes a solar energy acquisition module 21 , a cable coupling energy acquisition module 22 and a mains power energy acquisition module 23 .
[0037] In this embodiment, the commonly used power supply methods such as current transformer (CT) coupling power supply, mains power supply, and solar power supply are taken into consideration, and the corresponding energy supply module 2 can be flexibly selected according to the installation environment of the online monitoring equipment. For example, in order to meet the monitoring requirements of the cable sheath circulating current online monitoring device, current transformer coupling power supply can be preferentially selected. At the same time, the load condition of the cable line is monitored in real time through the online monitoring device. When the cable line is in a low-load condition, if the installation environment of the cable online monitoring equipment is during the day, while the current transformer coupling power supply is being performed, the solar energy supply module 21 is selected for power supply to avoid the cable online monitoring equipment being offline due to low load; if the installation environment of the cable online monitoring equipment is at night, while the current transformer coupling power supply is being performed, the mains power supply is selected to avoid the cable online monitoring equipment being offline due to low load. The mains power supply module 23 is, for example, AC 220V (50Hz).
[0038] When electricity is obtained through the solar energy acquisition module 21, the solar energy acquisition module 21 can use a solar illumination simulator to test and obtain the VI curve of the solar panel (for example, the model designed for use) at different output voltages, which is recorded as the matrix UI. The operating matrix P (power) of the solar panel is calculated based on the UI matrix, and the weighted sum of the powers under different illumination conditions at the same output voltage is calculated based on the matrix P (the weighting coefficient is selected as 1) to obtain the approximate matrix PM. PM is used to approximately simulate and express the sunshine power output ratio of the solar panel under different control output voltages. Then, the maximum output power ratio in the PM matrix is selected, and the voltage value of the power ratio is taken as the optimal output voltage point of the solar panel.
[0039] When power is taken through the cable-coupled energy-taking module 22, the cable-coupled energy-taking module 22 uses a relay protection instrument to simulate the test to obtain the VI curve of the power-taking type current transformer (designed model) at different output voltages, which is recorded as the matrix UI. And the working condition matrix P (power) of the power-taking type current transformer is calculated based on the UI matrix. By monitoring the output current I after rectification of the current transformer, the switching duty cycle of the rectification process at the front end is adjusted to limit its power input range. During design, the UI matrix is used as the reference curve and 50A is used as the reference point. The initial duty cycle is calculated based on the power consumption requirements of the device being used (cable online monitoring device). When the device is working, when the current continues to rise, the duty cycle output continues to decrease to provide a larger input power; when the current decreases due to the increase in input voltage, the duty cycle output continues to increase, stabilizing the input power.
[0040] In some embodiments, the energy acquisition module further includes a DC power supply energy acquisition module 24 .
[0041] In this embodiment, the energy collection device can also directly draw power from an external DC power supply, further improving the diversity of power collection methods and improving the reliability of power collection. The DC power supply energy collection module 24 draws energy as an emergency backup input, and the energy collection device mainly draws power through the above-mentioned solar energy collection module 21, cable coupling energy collection module 22 and AC power collection module 23. The DC power supply energy collection module 24 is preferably a USB DC power supply energy collection module, which is easy to connect and has strong versatility. When the power collection device has no other input, the power collection device has emergency work, and common USB charging sources such as mobile phone power banks can be used as input.
[0042] In some embodiments, the energy acquisition device also includes multiple energy distribution modules 3, and the multiple energy distribution modules 3 are respectively connected to the power control conversion circuit 1, and the power control conversion circuit 1 distributes the energy acquired by the energy acquisition module 2 to the corresponding energy distribution module 3.
[0043] In this embodiment, through multiple energy distribution modules 3 connected to the power control conversion circuit 1, reasonable path distribution management can be performed on the energy obtained by the energy acquisition device to avoid repeated restarts of the energy acquisition device under low load, thereby improving energy utilization efficiency.
[0044] In some embodiments, the energy distribution module 3 includes a 12V output unit 31 , a 24V output unit 32 and an energy storage unit 33 .
[0045] Energy usage distribution includes energy output path (12V output unit 31, 24V output unit 32) and energy storage path (energy storage unit 33). The output ends of multiple energy extraction modules 2 are respectively connected to the energy storage unit 33 to store the energy obtained through different energy extraction methods in the energy storage unit 33, and reasonably distribute it according to the actual power supply needs, output a part of the energy through the 12V output unit 31 and the 24V output unit 32 to the cable online monitoring equipment, and store the other part of the energy in the energy storage unit 33, so as to effectively deal with the insufficient power extraction of the energy extraction device. For example, when the above-mentioned multiple power extraction modules 2 are insufficient in power extraction, the energy stored in the energy storage unit 33 can be used to power the power extraction device itself or the cable online monitoring equipment.
[0046] The energy storage unit 33 is preferably a storage battery, which is built into the energy extraction device. The storage battery is preferably a high-performance lithium-ion battery, which can cope with the power shortage valley period of more than 96 hours of the power extraction device, and effectively ensure the power extraction reliability of the power extraction device.
[0047] In some embodiments, Figure 2 As shown, the power control conversion circuit 1 includes a charging circuit, which is respectively connected to the solar energy acquisition module 21, the cable coupling energy acquisition module 22, and the mains energy acquisition module 23 to charge the energy acquisition device.
[0048] The solar energy acquisition module 21 is connected to the energy storage unit 33 through a first charging circuit (solar energy charging circuit with MPPT), the cable-coupled energy acquisition module 22 is connected to the energy storage unit 33 through a second charging circuit, and the AC power acquisition module 23 is connected to the energy storage unit 33 through a third charging circuit.
[0049] The circuit connecting the cable-coupled energy extraction module 22 and the power control conversion circuit 1 also includes a wide-range voltage input DC / DC converter to cope with certain specific occasions such as the input voltage exceeding the normal variation range and fluctuating within a wider range, while also being able to increase the power level.
[0050] In some embodiments, a protection circuit is provided in the connection circuit between the power control conversion circuit 1 and the cable-coupled energy extraction module 22 .
[0051] The circuit in which the AC power acquisition module 23 is connected to the power control conversion circuit 1 also includes an AC / DC power supply module to effectively convert the acquired AC power into the required energy.
[0052] The power control conversion circuit 1 connected to the DC power supply and energy acquisition module 24 includes a DC output conversion circuit (DC / DC), which is connected between the DC power supply and energy acquisition module 24 and the energy storage unit 33, and can realize efficient conversion of DC power supply to meet the voltage and current requirements of different devices.
[0053] Furthermore, the energy storage unit 33 includes a charging mode and a discharging mode, and the charging mode and the discharging mode are switched according to the energy acquired by the energy acquisition module 2;
[0054] Among them, if the energy obtained by the energy acquisition module 2 is less than the first preset energy threshold, the charging mode is turned off; if the energy obtained by the energy acquisition module 2 is greater than the second preset energy threshold, the charging mode is turned on; if the energy obtained by the energy acquisition module 2 is zero, the energy release mode is turned on.
[0055] In this embodiment, an independent backup energy storage unit (different from the above-mentioned battery) can be set up, which is specifically used for charging and discharging the energy storage unit 33 (battery) to prevent dangerous behaviors such as overcharging and over-discharging of the energy storage unit 33. When the energy storage unit 33 can fluctuate in the comprehensive energy extraction peak and valley through each energy extraction module 2, in order to avoid severe load fluctuations, the charging and discharging of the energy storage unit 33 is controlled by the backup energy storage unit to stabilize the external output power of the energy extraction device.
[0056] The energy distribution management strategy of the backup energy storage unit is that when the energy storage unit 33 obtains less energy through the above-mentioned different energy acquisition modules 2, the charging mode of the backup energy storage unit is turned off, thereby turning off the charging of the energy storage unit 33, ensuring the external function of the energy acquisition device (powering the cable online monitoring equipment), avoiding repeated restarts of external devices such as the cable online monitoring equipment due to insufficient energy acquisition, and ensuring the operation of external devices. When the energy storage unit 33 obtains more energy than the external output demand through the above-mentioned different energy acquisition modules 2, the charging mode of the backup energy storage unit is turned on, and the charging of the energy storage unit 33 is turned on, and the excess energy is stored in the energy storage unit 33 for subsequent use, and energy waste is avoided, and energy utilization and efficiency are improved. When the energy storage unit 33 obtains zero energy through the above-mentioned different energy acquisition modules 2, the backup energy storage unit turns on the energy release mode to maintain the energy supply to the external equipment until the energy storage unit 33 turns on the low voltage protection.
[0057] It is understandable that the above-mentioned backup energy storage unit can also be an integrated structure with the battery that obtains energy through each energy extraction module 2, that is, the energy storage unit 33 does not need to be provided with an independent backup energy storage unit, and the energy storage unit 33 is charged and discharged according to its own comprehensive energy extraction situation.
[0058] From the above, it can be seen that the cable online monitoring equipment provided by the embodiment of the present disclosure can not only flexibly select the energy acquisition method according to the installation environment of the online monitoring equipment, thereby improving the power acquisition reliability and the online rate of the online monitoring equipment; it can also reasonably use and allocate the acquired energy, thereby avoiding repeated restarts of the cable online monitoring equipment under low load, and improving energy utilization and efficiency.
[0059] Embodiment 2
[0060] The present disclosure provides an energy acquisition management method, which is applied to the energy acquisition device of the cable online monitoring device of the above embodiment, wherein the energy acquisition device includes a power control conversion circuit 1 and a plurality of energy acquisition modules 2. The method includes:
[0061] S101: The power control conversion circuit 1 selects at least one energy acquisition module 2 from a plurality of energy acquisition modules 2 according to the installation environment of the cable online monitoring device to supply power to the cable online monitoring device.
[0062] In some embodiments, the energy acquisition module includes a solar energy acquisition module, a cable-coupled energy acquisition module, and a mains power energy acquisition module.
[0063] In some embodiments, the energy acquisition module also includes a DC power supply energy acquisition module.
[0064] In some embodiments, the energy acquisition device further includes a plurality of energy distribution modules, and the method further includes:
[0065] S201: The power control conversion circuit distributes the energy obtained by the energy acquisition module to the corresponding energy distribution module.
[0066] In some embodiments, the energy distribution module includes a 12V output unit, a 24V output unit, and an energy storage unit.
[0067] In some embodiments, the energy storage unit includes a charging mode and a discharging mode, and the method further includes:
[0068] If the energy acquired by the energy acquisition module is less than a first preset energy threshold, the power supply control conversion circuit 1 turns off the charging mode;
[0069] If the energy acquired by the energy acquisition module is greater than a second preset energy threshold, the power supply control conversion circuit 1 turns on the charging mode;
[0070] If the energy obtained by the energy acquisition module is zero, the power control conversion circuit 1 turns on the energy release mode.
[0071] In some embodiments, the power control conversion circuit includes a charging circuit, and the charging circuit is connected to the solar energy acquisition module, the cable coupling energy acquisition module, and the mains power acquisition module respectively. Step S101 specifically includes:
[0072] The energy of the corresponding energy acquisition module is obtained through the charging circuits respectively connected to the solar energy acquisition module, the cable coupling energy acquisition module and the mains power energy acquisition module.
[0073] In some embodiments, a protection circuit is provided in the connection circuit between the power control conversion circuit and the cable-coupled energy extraction module, and the method further includes:
[0074] The cable-coupled energy extraction module is protected by the protection circuit.
[0075] In some embodiments, the DC power supply and energy acquisition module is a USB DC power supply and energy acquisition module.
[0076] The energy collection management method for cable online monitoring equipment provided in the embodiment of the present disclosure corresponds to the energy collection device of the cable online monitoring equipment in the above-mentioned embodiment. Any optional items in the embodiment of the energy collection device of the cable online monitoring equipment are also applicable to the embodiment of the energy collection management method for the energy collection device of the cable online monitoring equipment, which will not be repeated here.
[0077] Embodiment 3
[0078] An embodiment of the present disclosure also provides an electronic device, comprising at least a memory and a processor, wherein the memory stores a computer program, and the processor implements the energy acquisition management method of the energy acquisition device of the above-mentioned cable online monitoring equipment when executing the computer program on the memory.
[0079] In some embodiments, the processor executing the computer program may be a processing device including one or more general-purpose processing devices, such as a microprocessor, a central processing unit (CPU), a graphics processing unit (GPU), etc. More specifically, the processor may be a complex instruction set computing (CISC) microprocessor, a reduced instruction set computing (RISC) microprocessor, a very long instruction word (VLIW) microprocessor, a processor running other instruction sets, or a processor running a combination of instruction sets. The processor may also be one or more special-purpose processing devices, such as an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA), a digital signal processor (DSP), a system on a chip (SoC), etc.
[0080] The memory may be a read-only memory (ROM), a random access memory (RAM), a phase-change random access memory (PRAM), a static random access memory (SRAM), a dynamic random access memory (DRAM), an electrically erasable programmable read-only memory (EEPROM), other types of random access memory (RAM), a flash disk or other form of flash memory, a cache, a register, a static memory, a compact disk read-only memory (CD-ROM), a digital versatile disk (DVD) or other optical storage, a cassette or other magnetic storage device, or any other possible non-temporary medium used to store information or instructions that can be accessed by a computer device.
[0081] The electronic devices of the embodiments of the present disclosure may include but are not limited to fixed terminal devices such as servers, desktop computers, digital TVs, etc., and mobile terminal devices such as vehicle-mounted devices (such as head-up display devices), handheld devices (such as mobile phones, tablet computers, etc.), wearable devices (such as smart watches, smart bracelets, etc.), etc.
[0082] Embodiment 4
[0083] The embodiment of the present disclosure further provides a computer-readable storage medium, wherein the computer-readable medium stores a computer program, and when the computer program is executed by a processor, the energy acquisition management method of the energy acquisition device of the above-mentioned cable online monitoring equipment is implemented.
[0084] The computer-readable storage medium of the disclosed embodiment may be a computer-readable signal medium or a computer-readable storage medium or any combination of the two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to, an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.
[0085] In the embodiments of the present disclosure, a computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, device or device. In the present disclosure, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, which carries a computer-readable program code. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. A computer-readable signal medium may also be any storage medium other than a computer-readable storage medium, which may send, propagate, or transmit a program for use by or in combination with an instruction execution system, device or device. The program code contained on the storage medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.
[0086] The computer programs of the embodiments of the present disclosure may be organized into one or more computer executable components or modules. Any number and combination of such components or modules may be used to implement the various aspects of the present disclosure. For example, the various aspects of the present disclosure are not limited to the specific computer executable instructions or specific components or modules shown in the drawings and described herein. Other embodiments may include different computer executable instructions or components with more or less functions than those shown and described herein.
[0087] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0088] Those of ordinary skill in the art will appreciate that the modules and algorithm steps of each example of the energy acquisition device described in the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this disclosure.
[0089] In addition, each functional unit in each embodiment of the present disclosure may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0090] In addition, the features of the embodiments shown in the drawings of the present disclosure or the various embodiments mentioned in this specification are not necessarily understood as independent embodiments from each other. Instead, each feature described in one example of an embodiment can be combined with one or more other desired features from other embodiments to produce other embodiments not described in words or with reference to the drawings.
[0091] The above description is only a preferred embodiment of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of disclosure involved in the present disclosure is not limited to the technical solutions formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in the present disclosure (but not limited to) by each other to form a technical solution.
Claims
1. An energy extraction device for a cable online monitoring device, characterized in that: It includes a power control conversion circuit and multiple energy extraction modules. The power control conversion circuit is respectively connected to the multiple energy extraction modules. The power control conversion circuit can select at least one energy extraction module from the multiple energy extraction modules according to the installation environment of the cable online monitoring equipment to power the cable online monitoring equipment.
2. The energy extraction device of the cable online monitoring equipment according to claim 1 is characterized in that: The energy acquisition modules include a solar energy acquisition module, a cable coupling energy acquisition module and a mains power energy acquisition module.
3. The energy extraction device of the cable online monitoring equipment according to claim 2 is characterized in that: The energy acquisition module also includes a DC power supply energy acquisition module.
4. The energy extraction device of the cable online monitoring equipment according to claim 1 is characterized in that: The energy acquisition device also includes a plurality of energy distribution modules, and the plurality of energy distribution modules are respectively connected to the power control conversion circuit, and the power control conversion circuit distributes the energy acquired by the energy acquisition modules to the corresponding energy distribution modules.
5. The energy extraction device of the cable online monitoring equipment according to claim 4 is characterized in that: The energy distribution module includes a 12V output unit, a 24V output unit and an energy storage unit.
6. The energy extraction device of the cable online monitoring equipment according to claim 5, characterized in that: The energy storage unit includes a charging mode and a discharging mode, and the charging mode and the discharging mode are switched according to the energy acquired by the energy acquisition module; Among them, if the energy obtained by the energy acquisition module is less than the first preset energy threshold, the charging mode is turned off; if the energy obtained by the energy acquisition module is greater than the second preset energy threshold, the charging mode is turned on; if the energy obtained by the energy acquisition module is zero, the energy release mode is turned on.
7. The energy extraction device of the cable online monitoring equipment according to claim 2, characterized in that: The power control conversion circuit includes a charging circuit, which is respectively connected to the solar energy acquisition module, the cable coupling energy acquisition module, and the mains energy acquisition module to charge the energy acquisition device.
8. The energy extraction device of the cable online monitoring equipment according to claim 2, characterized in that: A protection circuit is provided in the connection circuit between the power control conversion circuit and the cable-coupled energy extraction module.
9. The energy extraction device of the cable online monitoring equipment according to claim 3, characterized in that: The DC power supply and energy acquisition module is a USB DC power supply and energy acquisition module.
10. A method for energy management, characterized in that: An energy acquisition device applied to a cable online monitoring device, the energy acquisition device comprising a power control conversion circuit and a plurality of energy acquisition modules, the method comprising: The power control conversion circuit selects at least one energy acquisition module from the plurality of energy acquisition modules according to the installation environment of the cable online monitoring device to supply power to the cable online monitoring device.
Citation Information
Cited By
Direct-current power transmission line differential pressure energy taking system and direct-current power transmission system
CN119995117A