Construction quality monitoring system and method for bubble light soil
By introducing a construction quality monitoring system into the bubble lightweight soil construction to monitor and adjust the mixing and pouring processes in real time, the problem of difficult monitoring and analysis of construction quality in the existing technology is solved, and efficient and dynamic construction quality management is achieved.
Patent Information
- Application Number
- CN202411289047.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2025-01-21
AI Technical Summary
During the construction of existing bubble light soil, it is difficult for construction personnel to monitor and analyze the construction quality in real time, especially during the mixing and pouring process, and it is impossible to effectively discover and adjust problems.
A construction quality monitoring system is provided, including a mixing quality monitoring module, a pouring quality monitoring module and a pouring adjustment module. By real-time monitoring of the bubble density, slurry moisture content and mixing uniformity during the mixing process, as well as the curing performance and environmental impact value during the pouring process, the mixing and pouring conditions can be dynamically adjusted to ensure construction quality.
Dynamic quality monitoring of bubble light soil construction process can quickly discover and analyze construction quality problems, timely adjust construction conditions, and improve construction efficiency and quality.
Smart Images

Figure CN119328899A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction quality monitoring, and more specifically, to a system and method for monitoring the construction quality of bubble lightweight soil. Background Art
[0002] The construction of bubble lightweight soil mainly includes three steps. The first step is the preparation of bubble lightweight soil, that is, adding various raw materials and bubbles into the mixing equipment, and making bubble lightweight soil by mixing. The second step is the pouring of bubble lightweight soil, that is, pouring the bubble lightweight soil into the roadbed. The third step is the maintenance stage of bubble lightweight soil, that is, moisturizing and maintaining the poured bubble lightweight soil. Among them, the first and second steps are the two most important steps in the construction of bubble lightweight soil. In the second step, the bubble lightweight soil needs to be poured in layers. At present, a large number of construction personnel are required to supervise the construction quality during the construction of bubble lightweight soil. At the same time, the construction personnel can only find the problems on the surface during the construction of bubble lightweight soil, and cannot conduct targeted analysis of the problems and make targeted adjustments. Summary of the invention
[0003] In view of the deficiencies in the prior art, the present invention aims to provide a construction quality monitoring system and method for bubble lightweight soil.
[0004] To achieve the above object, the present invention provides the following technical solutions:
[0005] The construction quality monitoring system of bubble lightweight soil includes mixing quality monitoring module, pouring quality monitoring module and pouring adjustment module;
[0006] The mixing quality monitoring module monitors the mixing effect of the bubble lightweight soil during the mixing process, and determines whether to adjust the mixing conditions based on the comparison result between the mixing quality monitoring value and its threshold value;
[0007] The pouring quality monitoring module monitors the solidification of each layer of the bubble lightweight soil during the pouring process, and determines whether to mark the bubble lightweight soil as solidified foreign soil based on the comparison result of the solidification quality monitoring value and its threshold value;
[0008] The pouring adjustment module is used to obtain the mean value of the environmental impact of solidified foreign soil and take corresponding measures based on the comparison result of the mean value of the environmental impact and its threshold value.
[0009] Furthermore, the stirring effect of the bubble lightweight soil during the stirring process is monitored, and whether to adjust the stirring conditions is determined based on the comparison result of the stirring quality monitoring value and its threshold. Specifically, during the stirring process of the raw materials of the bubble lightweight soil, the bubble density, slurry moisture content and mixing uniformity of the stirring material are obtained every hour, and then a stirring log of the stirring material is generated, and the stirring quality monitoring value of the stirring material is obtained according to the stirring log, and the stirring quality monitoring threshold is set. When the stirring quality monitoring value of the stirring material is less than the stirring quality monitoring threshold, the stirring conditions are adjusted, and the bubble lightweight soil is obtained after the stirring is completed.
[0010] Furthermore, the mixing log includes bubble density, slurry moisture content, mixing uniformity, and total mixing time;
[0011] The stirring quality monitoring value of the stirring material is obtained in the following way: the bubble density, slurry moisture content and mixing uniformity of the stirring log are subjected to data fusion processing to obtain stirring fusion data, and the stirring fusion data and the total stirring time are used as input data of the stirring quality monitoring model to obtain the stirring quality monitoring value.
[0012] Furthermore, the stirring quality monitoring model is obtained in the following manner: multiple stirring data groups are set, each stirring data group includes stirring fusion data and total stirring time, the stirring data group is used as input data of the neural network model, a stirring quality monitoring value is assigned to the stirring data group, the multiple stirring data groups are divided into a training set and a validation set, the training set and the validation set are iteratively trained with a neural network to obtain a stirring quality monitoring model, the stirring quality monitoring value is greater than 0, and the larger the value of the stirring quality monitoring value, the better the stirring effect of the stirring material corresponding to the current total stirring time.
[0013] Furthermore, during the pouring process, the solidification of each layer of the bubble lightweight soil is monitored, and based on the comparison result of the solidification quality monitoring value and its threshold, it is determined whether the bubble lightweight soil is marked as solidified foreign soil. Specifically, based on the preset cycle, a new layer of bubble lightweight soil is poured on the roadbed at each cycle node. After the pouring of the new layer of bubble lightweight soil is completed, the roadbed is inspected every t time to generate a roadbed quality monitoring record. The roadbed quality monitoring record includes a solidification performance value, an environmental impact value, and a quality monitoring time. Then, the solidification quality monitoring value of the layer of bubble lightweight soil is obtained, and a solidification quality monitoring threshold is set. When the solidification quality monitoring value of the layer of bubble lightweight soil is greater than or equal to the solidification quality monitoring threshold, the layer of bubble lightweight soil is marked as solidified foreign soil, and the pouring cycle of the next layer of bubble lightweight soil under the solidified foreign soil is extended.
[0014] Furthermore, the solidification performance value recorded by the roadbed monitoring record is obtained by the following method: the wet density and compressive strength of the bubble lightweight soil in the roadbed are collected every t, and marked as SMD and KYD respectively, using the formula The curing performance value is obtained, wherein b1 is the wet density coefficient and b2 is the compressive strength coefficient.
[0015] Furthermore, the environmental impact value of the roadbed monitoring record is obtained in the following way: within a time period of t, the environmental vibration amplitude around the roadbed is detected in real time, and a preset vibration amplitude is set. When the environmental vibration amplitude is greater than or equal to the preset vibration amplitude, a vibration mark record is generated. The vibration mark record includes the vibration amplitude and the vibration mark time. The vibration amplitudes of all vibration mark records are summed and averaged to obtain the average vibration amplitude, which is marked as RWZ. All vibration mark records are sorted in the order of the vibration mark time. The time difference between the vibration mark times of two adjacent vibration mark records after sorting is calculated to obtain the vibration interval. All vibration intervals are summed and averaged to obtain the average vibration interval, which is marked as EYB. The average temperature, average humidity and average light intensity of the environment around the roadbed within a time period of t are obtained and marked as the environmental data set [A1, A2, A3]. The environmental data set is used as the input data of the environmental analysis model to obtain the basic environmental value, which is marked as CSK. The formula is used The environmental impact value SBH is obtained, where a1 is the average vibration amplitude coefficient, a2 is the average vibration interval coefficient, and a3 is the basic environmental value coefficient.
[0016] Furthermore, the solidification quality monitoring value of the bubble lightweight soil is obtained in the following manner: all roadbed material monitoring records of the layer of bubble lightweight soil are obtained, the total number of roadbed material monitoring records of the layer of bubble lightweight soil is marked as TEA, all roadbed material monitoring records are sorted in the order of quality monitoring time, the next adjacent roadbed material monitoring record after sorting is marked as the previous quality monitoring record, and the previous adjacent roadbed material monitoring record after sorting is marked as the post-quality monitoring record, the solidification performance value of the post-quality monitoring record is calculated by difference with the solidification performance value of the previous quality monitoring record to obtain the solidification performance value-added, and the solidification performance threshold value-added is set. When the solidification performance value-added is less than the solidification performance threshold value-added, the number of solidification low increases is increased once, and the number of solidification low increases of the layer of bubble lightweight soil is summed to obtain the total number of solidification low increases, and marked as RZB, and the formula is used. The solidification quality monitoring value ZBT of bubble lightweight soil, where c1 is the total number coefficient of roadbed material monitoring records, and c2 is the total number of solidification low-increase coefficients.
[0017] Furthermore, the mean environmental impact of the solidified foreign soil is obtained, and corresponding measures are taken based on the comparison result of the mean environmental impact and its threshold value, specifically: the mean environmental impact of the solidified foreign soil is obtained, and the mean environmental impact threshold is set; when the mean environmental impact is greater than or equal to the mean environmental impact threshold, the solidified foreign soil is marked as soil that affects environmental quality, and corresponding environmental protection measures are taken for the soil that affects environmental quality; when the mean environmental impact is less than the mean environmental impact threshold, the solidified foreign soil is marked as soil that affects casting method, and the casting method of the soil that affects casting method is adjusted;
[0018] The mean environmental impact of solidified foreign soil is obtained by the following method: all roadbed material monitoring records of solidified foreign soil are obtained, the environmental impact values of all roadbed material monitoring records are summed up and averaged to obtain the mean environmental impact.
[0019] Furthermore, the construction quality monitoring method of the bubble lightweight soil comprises the following steps:
[0020] Step 1: Monitor the mixing effect of the bubble lightweight soil during the mixing process, and determine whether to adjust the mixing conditions based on the comparison result between the mixing quality monitoring value and its threshold value;
[0021] Step 2: After the mixing of the bubble lightweight soil is completed, the solidification monitoring of each layer of the bubble lightweight soil during the pouring process is carried out, and based on the comparison result of the solidification quality monitoring value and its threshold value, it is determined whether the bubble lightweight soil is marked as solidified foreign soil;
[0022] Step 3: Obtain the mean environmental impact of solidified foreign soil and take corresponding measures based on the comparison between the mean environmental impact and its threshold.
[0023] Compared with the prior art, the present invention has the following beneficial effects:
[0024] 1. The method of the present invention can dynamically monitor the quality of the two important construction stages of the bubble lightweight soil, refine the monitoring standards for the construction quality of the bubble lightweight soil, and quickly handle and analyze the causes of problems in the construction quality of the bubble lightweight soil on the basis of ensuring the construction quality of the bubble lightweight soil;
[0025] 2. A mixing quality monitoring module is set up to dynamically monitor the bubble lightweight soil during the mixing process, and the mixing conditions of the bubble lightweight soil are dynamically adjusted according to the monitoring situation. On the basis of ensuring the mixing quality of the bubble lightweight soil, the mixing efficiency of the bubble lightweight soil can be effectively controlled. A pouring quality monitoring module and a pouring adjustment module are set up to monitor the quality of the bubble lightweight soil during the pouring process, dynamically analyze the solidification state of the bubble lightweight soil, and conduct targeted analysis on the bubble lightweight soil with solidification quality problems, quickly analyze the causes of the solidification quality problems, and make targeted adjustments. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a flow chart of the construction quality monitoring method of bubble lightweight soil;
[0027] Figure 2 A flowchart for taking appropriate measures to solidify foreign soil. DETAILED DESCRIPTION
[0028] Example 1
[0029] Reference Figure 1The construction quality monitoring method of bubble lightweight soil includes the following steps:
[0030] Step 1: Monitor the mixing effect of the bubble lightweight soil during the mixing process, and determine whether to adjust the mixing conditions based on the comparison result between the mixing quality monitoring value and its threshold value;
[0031] Step 2: monitor the solidification of each layer of bubble lightweight soil during the pouring process, and determine whether to mark the bubble lightweight soil as solidified foreign soil based on the comparison result of the solidification quality monitoring value and its threshold value;
[0032] Step 3: Obtain the mean environmental impact of solidified foreign soil and take corresponding measures based on the comparison between the mean environmental impact and its threshold.
[0033] Through the above method, the quality of the two important construction stages of bubble lightweight soil can be dynamically monitored, the monitoring standards for the construction quality of bubble lightweight soil can be refined, and on the basis of ensuring the construction quality of bubble lightweight soil, the causes of problems in the construction quality of bubble lightweight soil can be quickly processed and analyzed.
[0034] Example 2
[0035] Reference Figure 2 The construction quality monitoring system of bubble lightweight soil includes mixing quality monitoring module, pouring quality monitoring module and pouring adjustment module.
[0036] Mixing quality monitoring module: During the mixing process of the raw materials of bubble lightweight soil, the bubble density, slurry moisture content and mixing uniformity of the mixture are obtained every hour, and then a mixing log of the mixture is generated. The mixing log includes bubble density, slurry moisture content, mixing uniformity, and total mixing time (the total time from the start of mixing to the generation of the mixing quality monitoring value). The mixing quality monitoring value of the mixture is obtained according to the mixing log, and the mixing quality monitoring threshold is set. The mixing quality monitoring threshold is a system-set threshold and can be adjusted according to actual needs. When the mixing quality monitoring value of the mixture is greater than or equal to the mixing quality monitoring threshold, no corresponding processing is performed. When the mixing quality monitoring value of the mixture is less than the mixing quality monitoring threshold, the mixing conditions are adjusted (such as adjusting the mixing speed, adjusting the mixing temperature, and adjusting the water ratio). After mixing, bubble lightweight soil is obtained.
[0037] The stirring quality monitoring value of the stirring material is obtained by the following method: the bubble density, slurry moisture content and mixing uniformity of the stirring log are subjected to data fusion processing (the data fusion processing method can be a weighted fusion method) to obtain stirring fusion data, and the stirring fusion data and the total stirring time are used as input data of the stirring quality monitoring model to obtain the stirring quality monitoring value.
[0038] The stirring quality monitoring model is obtained in the following manner: multiple stirring data groups are set, each stirring data group includes stirring fusion data and total stirring time, the stirring fusion data and total stirring time in the stirring data group can be actual data or preset data, the stirring data group is used as the input data of the neural network model, the stirring data group is assigned a stirring quality monitoring value, the multiple stirring data groups are divided into a training set and a validation set, the training set and the validation set are iteratively trained by the neural network, and the stirring quality monitoring model is obtained. The value of the stirring quality monitoring value is greater than 0. The larger the value of the stirring quality monitoring value, the better the stirring effect of the stirring material corresponding to the current total stirring time.
[0039] The mixing quality monitoring module is set up to dynamically monitor the bubble lightweight soil during the mixing process, dynamically adjust the mixing conditions of the bubble lightweight soil according to the monitoring situation, and effectively control the mixing efficiency of the bubble lightweight soil on the basis of ensuring the mixing quality of the bubble lightweight soil.
[0040] Pouring quality monitoring module: Based on the preset cycle (the preset cycle refers to the conventional pouring interval of bubble lightweight soil, usually not less than 6h), a new layer of bubble lightweight soil is poured on the roadbed at each cycle node. After the pouring of a new layer of bubble lightweight soil is completed, the roadbed is inspected every t time to generate a roadbed quality monitoring record. The roadbed quality monitoring record includes the solidification performance value, the environmental impact value, and the quality monitoring time (the corresponding time for generating the roadbed quality monitoring record). Then, the solidification quality monitoring value of the layer of bubble lightweight soil is obtained, and the solidification quality monitoring threshold is set. The solidification quality monitoring threshold is the threshold set by the system and can be modified according to actual needs. When the solidification quality monitoring value of the layer of bubble lightweight soil is greater than or equal to the solidification quality monitoring threshold, the layer of bubble lightweight soil is marked as solidified foreign soil, and the pouring cycle of the bubble lightweight soil under the solidified foreign soil is extended.
[0041] Casting adjustment module: obtain the mean environmental impact value of solidified foreign soil, set the mean environmental impact threshold value, when the mean environmental impact value is greater than or equal to the mean environmental impact threshold value, mark the solidified foreign soil as soil that affects environmental quality, and take corresponding environmental protection measures (such as shielding measures, etc.) for the soil that affects environmental quality; when the mean environmental impact value is less than the mean environmental impact threshold value, mark the solidified foreign soil as soil that affects casting method, and adjust the casting method of the soil that affects casting method (such as adjusting the casting thickness, casting direction, height of the casting pipe, moving speed of the casting pipe, etc.).
[0042] The mean environmental impact of solidified foreign soil is obtained by the following method: all roadbed material monitoring records of solidified foreign soil are obtained, the environmental impact values of all roadbed material monitoring records are summed up and averaged to obtain the mean environmental impact.
[0043] The solidification performance value recorded by the roadbed monitoring record is obtained by the following method: the wet density and compressive strength of the bubble lightweight soil in the roadbed are collected every t, and marked as SMD and KYD respectively, and the formula is used to obtain the solidification performance value of the roadbed. The curing performance value is obtained, where b1 is the wet density coefficient, b2 is the compressive strength coefficient, the value of b1 is 0.63, and the value of b2 is 0.51.
[0044] The environmental impact value is obtained in the following way: within the duration of t, the environmental vibration amplitude around the roadbed is detected in real time, and a preset vibration amplitude is set. The preset vibration amplitude is a system preset value and can be adjusted according to actual needs. When the environmental vibration amplitude is greater than or equal to the preset vibration amplitude, a vibration mark record is generated. The vibration mark record includes the vibration amplitude and the vibration mark time (that is, the corresponding time of generating the vibration mark record). When the environmental vibration amplitude is less than the preset vibration amplitude, no corresponding processing is performed. The vibration amplitudes of all vibration mark records are summed and averaged to obtain the average vibration amplitude, which is marked as RWZ. All vibration mark records are sorted in the order of vibration mark time. The time difference between the vibration mark times of the two adjacent vibration mark records after sorting is calculated to obtain the vibration interval. All vibration intervals are summed and averaged to obtain the average vibration interval, which is marked as EYB. The average temperature, average humidity and average light intensity of the environment around the roadbed within the duration of t are obtained and marked as the environmental data set [A1, A2, A3]. The environmental data set is used as the input data of the environmental analysis model to obtain the basic environmental value and marked as CSK. The formula is used The environmental impact value SBH is obtained, where a1 is the average vibration amplitude coefficient, a2 is the average vibration interval coefficient, and a3 is the basic environmental value coefficient. The value of a1 is 0.82, the value of a2 is 0.76, and the value of a3 is 0.98.
[0045] The environmental analysis model is obtained in the following way: obtain multiple sets of environmental data sets, use the environmental data sets as input data of the neural network model, assign basic environmental values to the environmental data sets, divide the multiple sets of environmental data sets into training sets and validation sets, perform neural network iterative training on the training sets and validation sets, and obtain the environmental analysis model. The value range of the basic environmental value is (0-10]. The larger the value of the basic environmental value, the more conducive the environment around the roadbed is to the solidification of the bubble lightweight soil.
[0046] The solidification quality monitoring value of the bubble lightweight soil is obtained in the following way: obtain all the roadbed material monitoring records of the layer of bubble lightweight soil, mark the total number of roadbed material monitoring records of the layer of bubble lightweight soil as TEA, sort all the roadbed material monitoring records in the order of quality monitoring time, mark the next roadbed material monitoring record after sorting as the previous quality monitoring record, mark the next roadbed material monitoring record after sorting as the post-quality monitoring record, calculate the difference between the solidification performance value of the post-quality monitoring record and the solidification performance value of the previous quality monitoring record to obtain the solidification performance value-added, set the solidification performance threshold value-added, the solidification performance threshold value-added is the system setting threshold, which can be modified according to actual needs, when the solidification performance value-added is greater than or equal to the solidification performance threshold value-added, no corresponding processing is performed, when the solidification performance value-added is less than the solidification performance threshold value-added, the number of solidification low increases is increased once, the number of solidification low increases of the layer of bubble lightweight soil is summed up to obtain the total number of solidification low increases, and marked as RZB, using the formula The solidification quality monitoring value ZBT of bubble lightweight soil, where c1 is the total number coefficient of roadbed material monitoring records, c2 is the total number coefficient of solidification low increase, the value of c1 is 0.78, and the value of c2 is 0.72.
[0047] The pouring quality monitoring module and the pouring adjustment module are set up to monitor the quality of the bubble lightweight soil during the pouring process, dynamically analyze the solidification state of the bubble lightweight soil, and conduct targeted analysis on the bubble lightweight soil with solidification quality problems, quickly analyze the causes of the solidification quality problems, and make targeted adjustments.
[0048] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.
[0049] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center by wired or wireless (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.
[0050] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0051] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0052] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0053] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0054] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in the various embodiments of the present application. The aforementioned storage media include: various media that can store program codes, such as USB flash drives, mobile hard disks, read-only memories (ROM), random access memories (RAM), magnetic disks or optical disks.
[0055] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. The construction quality monitoring system of bubble lightweight soil is characterized by: Including mixing quality monitoring module, pouring quality monitoring module, pouring adjustment module; The mixing quality monitoring module monitors the mixing effect of the bubble lightweight soil during the mixing process, and determines whether to adjust the mixing conditions based on the comparison result between the mixing quality monitoring value and its threshold value; The pouring quality monitoring module monitors the solidification of each layer of the bubble lightweight soil during the pouring process, and determines whether to mark the bubble lightweight soil as solidified foreign soil based on the comparison result of the solidification quality monitoring value and its threshold value; The pouring adjustment module is used to obtain the mean value of the environmental impact of solidified foreign soil and take corresponding measures based on the comparison result of the mean value of the environmental impact and its threshold value.
2. The construction quality monitoring system of bubble lightweight soil according to claim 1 is characterized in that: The stirring effect of the bubble lightweight soil during the stirring process is monitored, and whether to adjust the stirring conditions is determined based on the comparison result of the stirring quality monitoring value and its threshold. Specifically, during the stirring process of the bubble lightweight soil raw materials, the bubble density, slurry moisture content and mixing uniformity of the stirring material are obtained every hour, and then a stirring log of the stirring material is generated. The stirring quality monitoring value of the stirring material is obtained according to the stirring log, and the stirring quality monitoring threshold is set. When the stirring quality monitoring value of the stirring material is less than the stirring quality monitoring threshold, the stirring conditions are adjusted, and the bubble lightweight soil is obtained after the stirring is completed.
3. The construction quality monitoring system of bubble lightweight soil according to claim 2 is characterized in that: The mixing log includes bubble density, slurry moisture content, mixing uniformity, and total mixing time; The stirring quality monitoring value of the stirring material is obtained in the following way: the bubble density, slurry moisture content and mixing uniformity of the stirring log are subjected to data fusion processing to obtain stirring fusion data, and the stirring fusion data and the total stirring time are used as input data of the stirring quality monitoring model to obtain the stirring quality monitoring value.
4. The construction quality monitoring system of bubble lightweight soil according to claim 3 is characterized in that: The stirring quality monitoring model is obtained in the following way: multiple stirring data groups are set, each stirring data group includes stirring fusion data and total stirring time, the stirring data group is used as input data of the neural network model, a stirring quality monitoring value is assigned to the stirring data group, multiple stirring data groups are divided into a training set and a validation set, the training set and the validation set are iteratively trained with a neural network to obtain a stirring quality monitoring model, the stirring quality monitoring value is greater than 0, and the larger the value of the stirring quality monitoring value, the better the stirring effect of the stirring material corresponding to the current total stirring time.
5. The construction quality monitoring system of bubble lightweight soil according to claim 1 is characterized in that: The solidification of each layer of bubble lightweight soil during the pouring process is monitored, and whether to mark the bubble lightweight soil as solidified foreign soil is determined based on the comparison result between the solidification quality monitoring value and its threshold. Specifically, based on the preset cycle, a new layer of bubble lightweight soil is poured on the roadbed at each cycle node. After the pouring of the new layer of bubble lightweight soil is completed, the roadbed is inspected every t time to generate a roadbed quality monitoring record. The roadbed quality monitoring record includes the solidification performance value, the environmental impact value, and the quality monitoring time, and then the solidification quality monitoring value of the layer of bubble lightweight soil is obtained, and the solidification quality monitoring threshold is set. When the solidification quality monitoring value of the layer of bubble lightweight soil is greater than or equal to the solidification quality monitoring threshold, the layer of bubble lightweight soil is marked as solidified foreign soil, and the pouring cycle of the next layer of bubble lightweight soil under the solidified foreign soil is extended.
6. The construction quality monitoring system of bubble lightweight soil according to claim 5 is characterized in that: The solidification performance value recorded by the roadbed monitoring record is obtained by the following method: the wet density and compressive strength of the bubble lightweight soil in the roadbed are collected every t, and marked as SMD and KYD respectively, and the formula is used to obtain the solidification performance value of the roadbed. The curing performance value is obtained, wherein b1 is the wet density coefficient and b2 is the compressive strength coefficient.
7. The construction quality monitoring system of bubble lightweight soil according to claim 5 is characterized in that: The environmental impact value of the roadbed monitoring record is obtained in the following way: within the time period t, the environmental vibration amplitude around the roadbed is detected in real time, and a preset vibration amplitude is set. When the environmental vibration amplitude is greater than or equal to the preset vibration amplitude, a vibration mark record is generated. The vibration mark record includes the vibration amplitude and the vibration mark time. The vibration amplitudes of all vibration mark records are summed and averaged to obtain the average vibration amplitude, which is marked as RWZ. All vibration mark records are sorted in the order of the vibration mark time. The time difference between the vibration mark times of the two adjacent vibration mark records after sorting is calculated to obtain the vibration interval. All vibration intervals are summed and averaged to obtain the average vibration interval, which is marked as EYB. The average temperature, average humidity and average light intensity of the environment around the roadbed within the time period t are obtained and marked as the environmental data set [A1, A2, A3]. The environmental data set is used as the input data of the environmental analysis model to obtain the basic environmental value and marked as CSK. The formula is used The environmental impact value SBH is obtained, where a1 is the average vibration amplitude coefficient, a2 is the average vibration interval coefficient, and a3 is the basic environmental value coefficient.
8. The construction quality monitoring system of bubble lightweight soil according to claim 5 is characterized in that: The solidification quality monitoring value of the bubble lightweight soil is obtained in the following way: all the roadbed quality monitoring records of the layer of bubble lightweight soil are obtained, the total number of roadbed quality monitoring records of the layer of bubble lightweight soil is marked as TEA, all the roadbed quality monitoring records are sorted in the order of quality monitoring time, the next adjacent roadbed quality monitoring record after sorting is marked as the previous quality monitoring record, and the previous adjacent roadbed quality monitoring record after sorting is marked as the post-quality monitoring record. The difference between the solidification performance value of the post-quality monitoring record and the solidification performance value of the pre-quality monitoring record is calculated to obtain the solidification performance value-added, and the solidification performance threshold value-added is set. When the solidification performance value-added is less than the solidification performance threshold value-added, the number of solidification low increases is increased once, and the number of solidification low increases of the layer of bubble lightweight soil is summed to obtain the total number of solidification low increases, and marked as RZB. The formula is used. The solidification quality monitoring value ZBT of bubble lightweight soil, where c1 is the total number coefficient of roadbed material monitoring records, and c2 is the total number of solidification low-increase coefficients.
9. The construction quality monitoring system of bubble lightweight soil according to claim 8 is characterized in that: Obtain the mean value of the environmental impact of the solidified foreign soil, and take corresponding measures based on the comparison result of the mean value of the environmental impact and its threshold value, specifically: obtain the mean value of the environmental impact of the solidified foreign soil, set the mean value of the environmental impact threshold, when the mean value of the environmental impact is greater than or equal to the mean value of the environmental impact threshold, mark the solidified foreign soil as soil that affects environmental quality, and take corresponding environmental protection measures for the soil that affects environmental quality; when the mean value of the environmental impact is less than the mean value of the environmental impact threshold, mark the solidified foreign soil as soil that affects the casting method, and adjust the casting method of the soil that affects the casting method; The mean value of the environmental impact of solidified foreign soil is obtained by the following method: all roadbed material monitoring records of solidified foreign soil are obtained, the environmental impact values of all roadbed material monitoring records are summed up and averaged to obtain the mean value of the environmental impact.
10. A method for monitoring the construction quality of bubble light soil, applied to the system for monitoring the construction quality of bubble light soil according to claim 1, characterized in that: The steps include: Step 1: Monitor the mixing effect of the bubble lightweight soil during the mixing process, and determine whether to adjust the mixing conditions based on the comparison result between the mixing quality monitoring value and its threshold value; Step 2: After the bubble lightweight soil is mixed, the solidification monitoring of each layer of bubble lightweight soil during the pouring process is carried out, and based on the comparison result of the solidification quality monitoring value and its threshold value, it is determined whether to mark the bubble lightweight soil as solidified foreign soil; Step 3: Obtain the mean environmental impact of solidified foreign soil and take corresponding measures based on the comparison between the mean environmental impact and its threshold.