A method for treating settlement defects in existing high-speed railway ballastless track

By deploying segmented expandable bladders under the track sleepers, the expansion force of these bladders is used to precisely lift the subgrade bed, solving the problem of uneven settlement of existing high-speed railway ballastless tracks. This achieves efficient and low-cost settlement treatment, improving operational safety and comfort.

CN119332544BActive Publication Date: 2026-11-17TIANJIN UNIV
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411780684.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-05
Publication Date
2026-11-17
Estimated Expiration
2044-12-05

AI Technical Summary

Technical Problem

Existing technologies are insufficient to achieve precise treatment of uneven settlement defects in ballastless tracks while ensuring the normal operation of existing high-speed railways. Furthermore, common methods suffer from problems such as complex construction, high costs, and damage to the track structure.

Method used

Segmented expandable bladders are deployed under the track sleeper structure. By controlling the amount of grout injected at different locations, the expansion force of the bladders is used to precisely lift the subgrade and ballastless track, and the deformation is monitored in real time, thus achieving the treatment of settlement defects over a long distance.

Benefits of technology

It achieves refined management of uneven settlement of ballastless track, is simple to construct and low in cost, avoids damage to track structure and slurry pollution, and improves operational safety and comfort.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119332544B_ABST
    Figure CN119332544B_ABST
Patent Text Reader

Abstract

This invention provides a method for treating settlement defects in existing high-speed railway ballastless tracks, comprising the following steps: first, determining the ballastless track lifting amount and the placement location of segmented expandable bladders; then, fabricating the segmented expandable bladders; starting from the side of the embankment, performing curved drilling operations within the subgrade; binding the segmented expandable bladders to their minimum diameter and placing them in the drilled holes; and finally, grouting and lifting the segmented expandable bladders. During the grouting process, the deformation of the subgrade and ballastless track is monitored in real time. Grouting is stopped once the concrete track slab reaches the preset lifting height, while monitoring and re-inspection of the ballastless track deformation continue, ultimately completing the settlement defect treatment. This invention has the advantages of simple construction, flexible layout, high lifting efficiency, and low treatment cost, achieving refined treatment and lifting of uneven settlement defects in ballastless tracks without damaging the track structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the technical field of railway settlement control methods, specifically relating to a method for controlling settlement defects in existing high-speed railway ballastless tracks. Background Technology

[0002] Existing high-speed railway tracks are mostly ballastless tracks. Under the influence of long-term traffic loads, deteriorating geological conditions, and other factors, they are prone to problems such as reduced subgrade bearing capacity and uneven track settlement. Current railway line design specifications have very strict requirements for the settlement deformation of ballastless track subgrades, especially uneven settlement. During operation, the allowable adjustment of subgrade settlement is only 15mm, and the allowable uneven settlement at the connection between different structures is only 5mm. Currently, some high-speed railway lines in operation in my country have already experienced uneven settlement exceeding the requirements of high-speed railway design specifications, seriously affecting the safety, comfort, and transportation efficiency of high-speed railway operations. Therefore, how to address the uneven settlement problems of ballastless tracks while ensuring the normal operation of existing high-speed railways is one of the key issues that urgently needs to be solved in the high-speed rail field.

[0003] The common methods for dealing with uneven settlement defects in ballastless tracks can be roughly divided into the following categories:

[0004] 1) The smoothness and settlement of the track can be adjusted by adjusting the fastening system. However, the adjustment range of the fastening system is limited. When the settlement of a local section exceeds the allowable adjustment range of the fastening system, the only option is to limit the train speed. Moreover, this adjustment method is difficult to guarantee its long-term effectiveness under the influence of train operation load.

[0005] 2) Settlement problems are addressed by lifting the ballastless track using polymer foam materials. This is achieved by injecting polymer foam materials into the graded crushed stone beneath the track slab support layer through drilled holes, utilizing the expansion generated by the foam materials to lift the track slab.

[0006] A search revealed that patent application number 201710013063.4 discloses a method for grouting and lifting / correcting ballastless track. This method utilizes a combination of polymer bags and jacks to lift and correct the track. While the polymer bags limit the spread of the injected grout in the support layer, this method requires cutting and drilling into the sealing layer and track slab, causing significant damage to the roadbed and track structures. Furthermore, ensuring a proper lifting effect during the drilling and grouting process is challenging.

[0007] A search revealed that patent application number 202111106080.5 discloses a method for repairing settlement in ballastless track of high-speed railways using a grouting chamber. This method calculates the relationship between lifting force and polyurethane expansion force, injecting expandable polyurethane into the grouting chamber to raise the track slab to a predetermined elevation. While this method ensures the integrity of the track structure, the grouting chamber is tightly attached to the track structure, making it difficult to precisely control the lifting amount during the grouting process. Furthermore, it can only lift a single point on the track, failing to address long-distance settlement issues in ballastless track. The overall treatment cost is high, and the construction is complex.

[0008] This method has limitations in practical engineering applications due to the rapid reaction speed of polymer foam materials, their high requirements for the surrounding environment, and the low controllability of expansion pressure, expansion degree, and impact range. It also makes it difficult to achieve precise lifting of ballastless tracks. Furthermore, the reaction and expansion process can easily pollute the embankment and its pipeline components. Additionally, drilling holes in the top of the track slab to open grouting channels can easily damage the track structure.

[0009] (3) Using mechanical equipment to lift the ballastless track: After the ballastless track settles, mechanical equipment is used to lift the track slab structure, including the concrete track bed slab and base slab, to a predetermined elevation. Flexible grouting material is injected between the base slab and the surface of the subgrade. After the material solidifies, the track slab is lowered to control the settlement of the ballastless track. This method has poor durability and high cost of flexible grouting material, and it is prone to foaming when exposed to water, making it unsuitable for wet environments. Furthermore, due to the low longitudinal bending strength of the track slab structure, it is easy to cause tensile cracking damage to the track slab structure during the mechanical lifting and lowering process, making the technology difficult to implement.

[0010] Based on this, a method for treating settlement defects in existing high-speed railway ballastless tracks is proposed. Summary of the Invention

[0011] The technical problem to be solved by the present invention is to provide a method for treating settlement defects of existing high-speed railway ballastless track, in order to address the shortcomings of the prior art mentioned above.

[0012] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is: a method for treating settlement defects in existing high-speed railway ballastless tracks, comprising the following steps:

[0013] S1. Determine the lifting amount of the ballastless track and the layout position of the segmented inflatable bladder;

[0014] A high-precision level instrument was used to inspect the ballastless track. Based on the measurement results, the lifting amount of the ballastless track was determined, and the placement position of the segmented inflatable bladder was determined.

[0015] S2. Fabricate segmented expandable capsules;

[0016] Fabricate and inspect the integrity and compactness of the segmented expandable bladders, and determine the number, length, burial location and burial depth parameters of the segmented expandable bladders based on the ballastless track lifting amount determined in S1.

[0017] S3. Drilling operation;

[0018] Curved drilling operations are carried out from the side of the embankment within the subgrade bed, with the drilling depth consistent with the preset burial depth of the segmented expandable bladder.

[0019] S4. Bind the expandable bladder;

[0020] The segmented expandable bladder is bundled to its minimum diameter to ensure that the bundling material can maintain the shape of the expandable bladder before grouting and does not affect the expansion of the bladder during grouting.

[0021] S5. Segmented expandable bladder grouting and lifting;

[0022] The grouting connection end and the sealing end are respectively installed and connected to the segmented expandable bladder. Then, the installed segmented expandable bladder is placed in the roadbed borehole. The segmented expandable bladder is equipped with segmented grouting pipes. The segmented grouting pipes are connected to the grouting equipment through the main grouting pipe. Grout is injected into the segmented expandable bladder using the grouting equipment. The deformation of the concrete track slab, concrete base slab and roadbed is monitored in real time during the grouting process. Grouting is stopped when the concrete track slab reaches the preset lifting height.

[0023] S6. Grouting pipe removal;

[0024] After the concrete track slab is raised to the preset height, the grouting pipes are removed, the grouting connection ends are sealed, and the deformation of the concrete track slab continues to be monitored. The track geometry is also re-inspected to complete the treatment of settlement defects.

[0025] As a further explanation of the present invention, the surface material of the segmented expandable bladder is made of a high-strength elastic material with embedded tensile reinforcement mesh, and the compressive strength of the segmented expandable bladder is greater than 2MPa.

[0026] As a further explanation of the present invention, the segmented inflatable bladder is also provided with a scratch-resistant felt.

[0027] As a further explanation of the present invention, the two ends of the segmented expandable bladder are connecting ends, and the connecting ends of the segmented expandable bladder are provided with spiral connecting heads, and the spiral connecting heads are provided with grouting holes.

[0028] As a further explanation of the present invention, the drilling direction of the curved drilling path in S3 is parallel to the track travel direction.

[0029] As a further explanation of the present invention, the segmented expandable bladder in S4 can be bundled to a minimum diameter of 6-10cm, and the maximum diameter of the segmented expandable bladder after grouting and expansion is in the range of 20-40cm.

[0030] As a further explanation of the present invention, the adjacent segmented expandable bladders and the grouting connection end and the sealing end are fixed to each other with hose clamps, and epoxy resin is used to seal and waterproof the gaps between the segmented expandable bladders and the grouting connection end and the sealing end.

[0031] As a further explanation of the present invention, the slurry is a retarded cement slurry.

[0032] As a further explanation of the present invention, the grouting pressure of the grouting equipment is between 0.2 and 0.4 MPa.

[0033] As a further explanation of the present invention, the segmented expandable bladder in S1 is arranged in the subgrade bed below the sleepers on both sides.

[0034] Compared with the prior art, the present invention has the following advantages:

[0035] 1. This invention employs segmented expandable bladder grouting active control technology. Segmented expandable bladders are flexibly deployed below the track sleeper structure. By controlling the grouting volume of the segmented expandable bladders at different locations, precise treatment of settlement defects is achieved. The expansion force generated by the grouting bladders compresses and lifts the surrounding soil, compensating for and lifting uneven settlement of the subgrade and ballastless track. During the lifting process, the deformation of the treatment location is monitored in real time. Grouting is stopped after the concrete track slab is lifted to the preset position to ensure displacement control accuracy. This invention can treat uneven settlement defects of the subgrade and ballastless track over long distances.

[0036] 2. This invention has the advantages of simple construction, flexible layout, high lifting efficiency and low treatment cost, and avoids the pollution of the surrounding soil by the grout. It achieves refined treatment and lifting of uneven settlement of ballastless track without damaging the ballastless track. Attached Figure Description

[0037] Figure 1 This is a cross-sectional view of the segmented expandable bladder layout of the present invention;

[0038] Figure 2 This is a side view of the segmented expandable bladder arrangement structure of the present invention;

[0039] Figure 3This is a schematic diagram of the segmented expandable bladder connection structure of the present invention.

[0040] Explanation of reference numerals in the attached figures:

[0041] 1-Sleeper; 2-Concrete track slab; 3-Concrete base slab; 4-Subgrade; 5-Segmented expandable bladder; 6-Drill hole; 7-Grouting connection end; 8-Spiral connection end; 9-Sealing end; 10-Segmented grouting pipe; 11-Main grouting pipe; 12-Grouting equipment. Detailed Implementation

[0042] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0043] like Figure 1-3 As shown, the present invention provides a technical solution: a method for treating settlement defects in existing high-speed railway ballastless tracks, characterized by comprising the following steps:

[0044] S1. Determine the lifting amount of the ballastless track and the layout position of the segmented inflatable bladder 5.

[0045] A high-precision level instrument was used to inspect the ballastless track. Based on the measurement results and actual conditions, the lifting amount of the ballastless track was determined, and the placement position of the segmented inflatable bladder 5 was determined.

[0046] To ensure the lifting effect and reduce the impact on the subgrade, the segmented expandable bladder 5 is placed in the subgrade between the two side sleepers 1.

[0047] S2. Fabricate segmented expandable capsules 5;

[0048] The integrity and density of the segmented expandable bladder 5 were manufactured and tested. The surface material of the segmented expandable bladder 5 was made of a high-strength elastic material with embedded tensile reinforcement mesh. The compressive strength of the segmented expandable bladder 5 was greater than 2 MPa.

[0049] To improve the puncture resistance of the segmented expandable bladder 5, a scratch-resistant felt is also provided on the outside of the segmented expandable bladder 5.

[0050] The two ends of the segmented expandable bladder 5 are connecting ends. The connecting ends of the segmented expandable bladder 5 are provided with spiral connecting ends 8. The spiral connecting ends 8 are provided with grouting holes. Segmented grouting pipes 10 are installed in each segmented expandable bladder 5 to facilitate the control of the grouting operation of each segmented expandable bladder 5.

[0051] Based on the ballastless track lifting amount determined in S1, the number of burial chambers is determined to be 2, each consisting of 3 segmented chambers, each segment being 6m long and buried at a depth of 1.5m.

[0052] S3. Drilling operation;

[0053] Curved drilling operations are carried out within the subgrade bed starting from the side of the embankment. The drilling depth of borehole 6 is consistent with the preset burial depth of the segmented expandable bladder 5, and the drilling direction of borehole 6 is parallel to the track travel direction.

[0054] S4. Bind the expandable bladder;

[0055] The segmented expandable bladder 5 is bound to its minimum diameter to ensure that the binding material can maintain the shape of the expandable bladder before grouting and does not affect the expansion of the bladder during grouting. The segmented expandable bladder 5 can be bound to a minimum diameter of 6-10cm, and the maximum diameter of the segmented expandable bladder 5 after grouting expansion is 20-40cm.

[0056] S5, segmented expandable bladder 5 grouting and lifting;

[0057] The segmented expandable bladder 5 is fixed to the grouting connection end 7 and the sealing end 9 using hose clamps. Epoxy resin is used to seal and waterproof the gaps between the segmented expandable bladder 5 and the grouting connection end 7 and the sealing end 9. The grouting connection end 7 and the sealing end 9 are then installed and connected to the front and rear ends of the segmented expandable bladder 5, respectively. Finally, the segmented expandable bladder 5 with the grouting connection end 7 and the sealing end 9 installed is placed... The segmented expandable bladder 5 is placed in the borehole of the subgrade bed. The segmented grouting pipe 10 is built into the grouting equipment 12. The segmented grouting pipe 10 is then connected to the grouting equipment 12 through the grouting main pipe 11. Grout is injected into the segmented expandable bladder 5 by the grouting equipment 12. The grouting pressure is between 0.2 and 0.4 MPa. The grout is a slow-setting cement grout. The lifting amount can be controlled by different injection times and different injection speeds to achieve supplementary correction of uneven settlement of ballastless track.

[0058] During the grouting process, the deformation of the concrete track slab 2, concrete base slab 3 and roadbed 4 is monitored in real time, and grouting is stopped after the preset lifting height is reached.

[0059] S6. Grouting pipe removal;

[0060] After the concrete track slab 2 is raised to the preset height, the grouting pipe is removed, the grouting connection end 7 is sealed, and the deformation of the concrete track slab 2 is monitored. The track geometry is also re-inspected to complete the treatment of settlement defects.

[0061] This invention is simple to construct, flexible in layout, highly efficient in lifting, and low in treatment cost. It also avoids the pollution of the surrounding soil by the grout, and achieves refined treatment and lifting of uneven settlement of ballastless track without damaging the track.

[0062] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.

[0063] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A method for treating settlement defects in existing high-speed railway ballastless track, characterized in that: Includes the following steps: S1. Determine the lifting amount of the ballastless track and the layout position of the segmented inflatable bladder (5); The uneven settlement of the ballastless track was detected by a high-precision level instrument. The lifting amount of the ballastless track was determined based on the measurement results. The placement position of the segmented expandable bladder (5) was determined. The surface material of the segmented expandable bladder (5) was made of high-strength elastic material with embedded tensile reinforcement mesh. The compressive strength of the segmented expandable bladder (5) was greater than 2MPa. The segmented expandable bladder (5) was also provided with anti-scratch felt. The segmented expandable bladder (5) was placed in the subgrade bed between the sleepers (1) on both sides. S2. Fabricate segmented expandable capsules (5); The integrity and compactness of the segmented expandable bladder (5) are manufactured and tested. The number, length, burial location and burial depth parameters of the segmented expandable bladder (5) are determined according to the ballastless track lifting amount determined in S1. S3. Drilling operation; Starting from the side of the embankment, curved drilling operations are carried out in the subgrade bed. The drilling depth of the formed borehole (6) is consistent with the preset burial depth of the segmented expandable bladder (5). The drilling direction of the curved borehole (6) path is parallel to the track travel direction. S4. Bind the expandable bladder; The segmented expandable bladder (5) is bundled to the minimum diameter to ensure that the bundling material can maintain the shape of the expandable bladder before grouting and does not affect the expansion of the bladder during grouting. The segmented expandable bladder (5) can be bundled to a minimum diameter of 6-10cm. The maximum diameter of the segmented expandable bladder (5) after grouting expansion is 20-40cm. The two ends of the segmented expandable bladder (5) are connecting ends. The connecting ends of the segmented expandable bladder (5) are provided with spiral connecting ends (8). The spiral connecting ends (8) are provided with grouting holes. The adjacent segmented expandable bladders (5), grouting connecting ends (7), and sealing ends (9) are fixed to each other with hose clamps. Epoxy resin is used to seal and waterproof the gaps between the segmented expandable bladders (5), grouting connecting ends (7), and sealing ends (9). S5, segmented expandable bladder (5) grouting and lifting; The grouting connection end (7) and the sealing end (9) are respectively installed and connected to the segmented expandable bladder (5). Then, the installed segmented expandable bladder (5) is placed in the roadbed borehole (6). The segmented expandable bladder (5) is pre-installed with a segmented grouting pipe (10). The segmented grouting pipe (10) is connected to the grouting equipment (12) through the grouting main pipe (11). Grout is injected into the segmented expandable bladder (5) using the grouting equipment (12). The grouting pressure of the grouting equipment (12) is between 0.2 and 0.4 MPa. The grout is a slow-setting cement grout. During the grouting process, the deformation of the concrete track slab (2), the concrete base slab (3) and the roadbed (4) is monitored in real time. Grouting is stopped after the concrete track slab (2) reaches the preset lifting height. S6. Grouting pipe removal; After the concrete track slab (2) is raised to the preset height, the grouting pipe is removed, the grouting connection end (7) is sealed, and the deformation of the concrete track slab (2) is monitored. Finally, the track geometry is re-inspected to complete the treatment of settlement defects.

Citation Information

Patent Citations

  • A method for grouting and lifting of ballastless track and for correcting deviation during lifting.

    CN106758591B

  • A method for grouting and lifting repair of ballastless track settlement in high-speed railways

    CN113802424B

  • Rapid repairing method for sunken ballastless track through grouting lifting

    CN104153259A

  • Method for controlling vertical deformation of high-speed railway subgrade in shield underneath passing high-speed railway construction

    CN115559157A