Multi-modal design achievement iteration derivation method based on virtual construction
Through the iterative development method of multi-modal design results based on virtual construction, the iteration and optimization problems from two-dimensional design drawings to six-dimensional information models are solved, the design efficiency and user experience are improved, and the efficient connection between design and construction is achieved.
Patent Information
- Application Number
- CN202411561399.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2024-06-18
- Filing Date
- 2024-11-04
- Publication Date
- 2025-01-21
- Estimated Expiration
- 2044-11-04
AI Technical Summary
The existing technology is difficult to effectively solve the iteration and optimization problems from two-dimensional design drawings to six-dimensional information models in the design and creative industries, resulting in low design efficiency and poor user experience.
Adopting the iterative evolution method of multi-modal design results based on virtual construction, through standardized and modular design, establishment of virtual construction environment, iteration of detailed design results, generation of construction drawings and real-time monitoring of the construction process, the integration of design and construction is realized Efficient connection and optimization.
It improves the efficiency of design work, provides a more intuitive and immersive experience, enhances the participation of owners and other stakeholders, and ensures efficient connection and optimization of design and construction.
Smart Images

Figure CN119337623A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of virtual construction application, and in particular to a multi-modal design achievement iterative derivation method based on virtual construction. Background Art
[0002] The development of virtual construction technology is constantly promoting the progress of the design and creative industries. It not only improves the efficiency of design work, but also provides users with a more intuitive and immersive experience. By combining two-dimensional and three-dimensional design results and using virtual reality and other means, virtual construction technology provides better support for the multimodal display of design results. Virtual construction technology, usually combined with building information modeling (BIM) technology, is a revolutionary advancement in the design and creative industries. It provides a new way of design, analysis and communication by creating and simulating three-dimensional digital models of buildings or engineering projects. Traditional design mainly relies on two-dimensional drawings, which have limitations in expressing complex structures and spatial relationships, and are difficult for non-professionals to understand.
[0003] The information disclosed in this background technology section is only intended to deepen the understanding of the overall background technology of the present invention, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art already known to those skilled in the art. Summary of the invention
[0004] In view of the problems existing in the prior art, the purpose of the present invention is to provide an iterative derivation method for multimodal design results based on virtual construction, so as to realize the gradual iteration and optimization from two-dimensional design drawings to six-dimensional information models.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions: A multi-modal design result iterative derivation method based on virtual construction, comprising the following steps: Step 1: Standardize and modularize the design results; the design results include drawings and BIM models involved in the design planning stage, preliminary design stage, detailed design stage and in-depth design stage; the standardization refers to the scale, line type and line width, symbols and legends, material annotations, annotations and instructions of the two-dimensional and three-dimensional design results following unified regulations; the modularization refers to the two-dimensional and three-dimensional design results, which establish one-to-one corresponding modules through slicing, realize the addition of two-dimensional to six-dimensional information through modules, and establish the iterative evolution relationship between six-dimensional and three-dimensional design results through modules; Step 2: Establish a virtual construction environment, and establish corresponding virtual scenes according to the modularized design results; the virtual construction environment is an integrated space including all virtual module scenes; Step 3: Import the two-dimensional and three-dimensional preliminary design results into the virtual construction environment; the two-dimensional preliminary design results are design drawings; the three-dimensional preliminary design results are BIM models corresponding to the design drawings; the two-dimensional and three-dimensional design results are imported into the corresponding virtual scenes according to the modules, and the scheme simulation is carried out; Step 4: Iteratively derive preliminary design results based on simulation results to form detailed design results; the detailed design results add time dimension information, import the corresponding four-dimensional virtual scenes according to modules, and perform construction progress simulation; Step 5: Iterate the detailed design results according to the simulation results to form in-depth design results; the in-depth design results add cost dimension information, import the corresponding five-dimensional virtual scenes according to the modules, and perform material and construction process simulation; Step 6: Iteratively derive in-depth design results based on simulation results; the in-depth design results add environmental and safety dimension information, import the corresponding six-dimensional virtual scenes according to modules, and simulate the planning of temporary facilities on the construction site; the six-dimensional virtual scenes integrate GIS model data; Step 7: Integrate all modular virtual scenes established in step 6 to simulate the overall design plan, construction progress, materials and construction process, and temporary facilities planning at the construction site; the simulation is a multi-modal design result cycle simulation; the design result is a two-dimensional or three-dimensional design result that is iterated cyclically based on the simulation results.
[0006] Further: The standardization and modularization of the design results in step 1 are specifically achieved through the following steps: Step 1.1: Establish a unified coding standard: Ensure that 2D drawings and 3D models use the same coding and naming rules for easy identification and association; Step 1.2: Establish a unified data dictionary: ensure that the data expressions in the two-dimensional drawings, three-dimensional models, construction processes, and construction scheme design results have the same meaning, so as to facilitate the association and iteration of two-dimensional to six-dimensional scene modules; Step 1.3: Use the modular function of BIM software to create reusable modular units based on 2D drawings, and reversely associate and generate corresponding 2D drawings; Step 1.4: Parameterize and informatize the module unit components to realize the linkage update of all views and drawings when modifying a single component; Step 1.5: 2D and 3D module linkage. Synchronous management of 2D plane module information and 3D space module information is performed in the virtual construction system. Through the 2D and 3D linkage method, the 2D and 3D module linkage visualization display is realized. For example, clicking on the 2D drawing module can locate the module corresponding to the 3D model and highlight it, and vice versa.
[0007] Further: Step 2 is specifically implemented through the following steps: Step 2.1: Use the virtual construction platform to establish a collaborative management project; Step 2.2: In the virtual project, build a virtual module scene, each module scene corresponds to the standardized module divided in step 1; Step 2.3: Integrate 2D and 3D models, schedule, cost, environment and safety dimension information to build an integrated space including all virtual module scenes; Step 2.4: Virtual scene linkage. Through the cross-scene association of two-dimensional and three-dimensional modules in virtual scenes, the linkage of two-dimensional and three-dimensional modules in each virtual scene is realized. For example, when the three-dimensional model in sub-scene one changes, the corresponding modules involving the three-dimensional model in other scenes change synchronously.
[0008] Further: Steps 3, 4, 5, and 6 are specifically implemented by the following steps: Step 3.1: Import the 2D and 3D design results of each stage by module; Step 3.2: Each module imports the virtual scene linkage; Step 3.3: Simulation of each module scenario; Step 3.4: Improve the 3D design results based on the simulation results; Step 3.5: Generate, export, improve and divide the two-dimensional design results into modules; Step 3.6: Repeat steps 3.1-3.5 until the next stage of two-dimensional and three-dimensional design results are formed.
[0009] Further: Step 7 is specifically implemented by the following steps: Step 7.1: Import the final 2D and 3D design results formed in step 6; Step 7.2: In the integrated virtual construction scene, the overall plan of the design results, construction progress, material and construction process simulation, and temporary facilities planning simulation at the construction site are carried out in sequence; Step 7.3: Make local adjustments based on the simulation results, locate the corresponding scene module, and repeat steps 3.3 and 3.4; Step 7.4: Improve and export the 3D design results; Step 7.5: Repeat steps 7.1-7.4 until the plan, construction progress, material and construction process simulation, and construction site temporary facilities planning simulation results are passed.
[0010] By adopting the above technical solution, the present invention has the following beneficial effects: The multimodal design results iterative derivation method based on virtual construction of the present invention not only improves the efficiency of design work, but also enhances the participation of owners and other stakeholders by providing a more intuitive and immersive experience, thereby playing an important role in the design and creative industries. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0012] Figure 1 This is a technical architecture diagram of the multi-modal design results iterative derivation method based on virtual construction described in the present invention. DETAILED DESCRIPTION
[0013] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0014] The specific implementation of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the present invention, and is not used to limit the present invention.
[0015] Combination Figure 1 As shown, the present invention provides an iterative derivation method of multi-modal design results based on virtual construction, which establishes a virtual construction environment by standardizing and modularizing the design results, gradually importing and iterating the design results, thereby achieving efficient connection and optimization between design and construction. Specifically, it includes the following steps: Step 1: Standardization and modularization of design results: Step 1.1: Standardization: Unify the scale, line type, line width, symbols and legends, material markings, annotations and instructions of two-dimensional and three-dimensional designs to ensure the consistency and readability of design results in all dimensions.
[0016] Step 1.2: Scale: Unify the scale of 2D drawings and 3D models to ensure the accuracy and consistency of the models.
[0017] Step 1.3: Line type and line width: Establish unified line type and line width standards to facilitate consistency between design results of different dimensions and stages.
[0018] Step 1.4: Symbols and Legends: Create a unified symbol and legend library to ensure consistent symbol and legend representation in different drawings and models.
[0019] Step 1.5: Material marking: Standardize the method and content of material marking to ensure the consistency and accuracy of material information in the design results.
[0020] Step 1.6: Notes and instructions: Unify the format and content of notes and instructions to facilitate consistency in design results at different stages.
[0021] Step 1.7: Modularization: Establish two-dimensional to six-dimensional information modules through slicing to maintain the correspondence between design results in each dimension.
[0022] Step 1.8: Slicing method: Slice the design results according to functional blocks, component types, etc. to form standardized and modular design units.
[0023] Step 1.9: Modular components: Use BIM software to create reusable modular units that can be reverse engineered into 2D drawings to facilitate consistency between design outcomes at different stages.
[0024] Step 1.10: Parameterization and informatization: Parameterize and informatize the module unit components to achieve linkage updates when the components are modified, ensuring the timeliness and accuracy of the design results.
[0025] Step 1.11: 2D and 3D linkage: Synchronously manage 2D and 3D module information in the virtual construction system to achieve visual display and linkage, and facilitate data transmission and sharing between different dimensions.
[0026] Step 2: Create a virtual construction environment: Step 2.1: Virtual scene construction: Create the corresponding virtual scene based on the modular design results.
[0027] Step 2.2: Virtual module scene: Create a virtual scene for each module unit to maintain the consistency of modular design results in the virtual environment.
[0028] Step 2.3: Scene construction method: Use the virtual construction platform and BIM software to import the modular design results into the virtual scene and establish the corresponding virtual model.
[0029] Step 2.4: Scene linkage: Realize the linkage and synchronous changes of modules in each virtual scene to ensure the consistency and visual display of design results at different stages in the virtual environment.
[0030] Step 2.5: Integrated space: Integrate all virtual module scenes to form a comprehensive virtual construction environment.
[0031] Step 2.6: Integrated space construction: Integrate each virtual module scene into a unified virtual construction environment to facilitate overall solution simulation and verification.
[0032] Step 2.7: Virtual construction platform: Use the virtual construction platform for project management, data integration, and information sharing to achieve seamless integration of design results in all dimensions.
[0033] Step 2.8: Data integration: Integrate 2D drawings, 3D models, schedules, cost information, environmental and safety data into the virtual construction environment to form a comprehensive design results information library.
[0034] Step 3: Import and simulate preliminary design results: Step 3.1: Import design results: Import 2D design drawings and 3D BIM models into the virtual scene by module.
[0035] Step 3.2: Design results import method: According to the standards of modular design results, import the two-dimensional drawings and three-dimensional models into the virtual scene one by one to ensure the consistency and visual display of the design results in the virtual environment.
[0036] Step 3.3: Data format conversion: Convert the data format of the imported design results to ensure accurate display and operation in the virtual scene.
[0037] Step 3.4: Scheme simulation: Conduct scheme simulation of the preliminary design results in a virtual environment.
[0038] Step 3.5: Simulation content: Simulate the functional layout, structural form, spatial relationship and other aspects of the preliminary design results to verify the feasibility and rationality of the design solution.
[0039] Step 3.6: Simulation tools: Use the simulation tools of the virtual construction platform to dynamically simulate the design scheme, observe and analyze the performance of the design scheme in the virtual environment.
[0040] Step 3.7: Analysis of simulation results: Analyze the design solution based on the simulation results, identify problems and deficiencies, and make suggestions for improvement.
[0041] Step 4: Detailed design results iteration: Step 4.1: Adding the time dimension: Add the time dimension in the detailed design and import the four-dimensional virtual scene by module to simulate the construction progress.
[0042] Step 4.2: How to add the time dimension: Import the construction schedule into the virtual scene step by step according to the standards of modular design results to form a four-dimensional virtual model.
[0043] Step 4.3: Four-dimensional model construction: Based on the three-dimensional model, add time dimension information to form a four-dimensional virtual model that can be dynamically displayed.
[0044] Step 4.4: Progress simulation: Use the four-dimensional virtual model to simulate the construction progress, observe and analyze the time arrangement and resource allocation during the construction process.
[0045] Step 4.5: Iterate based on simulation results: Iterate and update the design results based on the simulation results.
[0046] Step 4.6: Iterative update method: According to the simulation results of the four-dimensional virtual model, adjust and optimize the design results to ensure the feasibility and rationality of the design scheme during the construction stage.
[0047] Step 4.7: Data feedback: Feed the simulation results back to the design stage for iterative updates to form new design results.
[0048] Step 4.8: Iterations: Perform multiple iterations as needed until the design meets the expected requirements.
[0049] Step 5: Deepen the design results iteration: Step 5.1: Add cost dimension: Add cost dimension in the in-depth design, and import the five-dimensional virtual scene by module to simulate materials and construction processes.
[0050] Step 5.2: How to add the cost dimension: Import the cost information into the virtual scene step by step according to the standards of modular design results to form a five-dimensional virtual model.
[0051] Step 5.3: Five-dimensional model construction: Based on the four-dimensional model, add cost dimension information to form a five-dimensional virtual model that can be dynamically displayed.
[0052] Step 5.4: Cost simulation: Use the five-dimensional virtual model to simulate the material cost and construction process, and observe and analyze the rationality of the project cost and construction process.
[0053] Step 5.5: Iterate based on simulation results: Iterate and update the design results based on the simulation results.
[0054] Step 5.6: Iterative update method: According to the simulation results of the five-dimensional virtual model, adjust and optimize the design results to ensure the feasibility and rationality of the design scheme in terms of cost and construction technology.
[0055] Step 5.7: Data feedback: Feed the simulation results back to the design stage for iterative updates to form new design results.
[0056] Step 5.8: Iterations: Perform multiple iterations as needed until the design meets the expected requirements.
[0057] Step 6: Final design iteration: Step 6.1: Add environmental and safety dimensions: Add environmental and safety dimensions in the in-depth design, import the six-dimensional virtual scene by module, and simulate the planning of temporary facilities on the construction site.
[0058] Step 6.2: Method of adding environment and safety dimensions: gradually import the environment and safety information into the virtual scene according to the standards of modular design results to form a six-dimensional virtual model.
[0059] Step 6.3: Construction of six-dimensional model: Based on the five-dimensional model, add environmental and safety dimension information to form a six-dimensional virtual model that can be dynamically displayed.
[0060] Step 6.4: Environmental and safety simulation: Use the six-dimensional virtual model to simulate the planning of temporary facilities on the construction site, and observe and analyze the environmental and safety conditions of the construction site.
[0061] Step 6.5: GIS data integration: The six-dimensional virtual scene integrates GIS data to improve environmental and safety information.
[0062] Step 6.6: GIS data integration method: gradually import GIS data into the virtual scene according to the standards of modular design results to form a comprehensive environment and safety information database.
[0063] Step 6.7: GIS data application: Use GIS data to analyze and evaluate the environmental and safety conditions of the construction site to ensure the rationality and feasibility of the design plan in terms of environment and safety.
[0064] Step 6.8: Data feedback: Feed the analysis results of GIS data back to the design stage for iterative updates to form new design results.
[0065] Step 6.9: Iterations: Perform multiple iterations as needed until the design meets the expected requirements in terms of environment and safety.
[0066] Step 7: Design and construction connection: Step 7.1: Generation of construction drawings: Generate standardized construction drawings based on the final design results.
[0067] Step 7.2: Construction drawing generation method: Use BIM tools and virtual construction platforms to generate standardized construction drawings based on the six-dimensional virtual model to ensure the consistency between the construction drawings and the final design results.
[0068] Step 7.3: Drawing content: Construction drawings should include detailed information on structure, materials, construction technology, schedule, cost budget, and environmental and safety measures to ensure accurate execution of the construction phase.
[0069] Step 7.4: Real-time monitoring of the construction process: Use the virtual construction platform to monitor and provide feedback on the construction process in real time.
[0070] Step 7.5: Monitoring method: Deploy sensors and monitoring equipment at the construction site to transmit real-time data to the virtual construction platform for real-time monitoring and feedback.
[0071] Step 7.6: Data analysis: Analyze real-time data through the virtual construction platform to identify and solve problems that arise during the construction process to ensure the smooth progress of the construction process.
[0072] Step 7.7: Information feedback: Feedback the actual situation and data during the construction process to the design stage, make necessary adjustments and optimizations, and ensure the feasibility of the design plan and the smooth progress of the construction.
[0073] Step 8: Project summary and optimization: Step 8.1: Project Summary: Summarize the project and analyze the experiences and lessons learned during the design and construction process.
[0074] Step 8.2: Summary content: including the coordination between design and construction, the feasibility of the design plan, problems and solutions during the construction process, cost control, time management, environment and safety, etc.
[0075] Step 8.3: Summary report: Prepare a project summary report to provide reference for subsequent projects.
[0076] Step 8.4: Optimization suggestions: Make optimization suggestions based on the project summary to improve the design and construction process.
[0077] Step 8.5: Optimization direction: including improvement of design standardization and modularization, optimization of virtual construction platform, management and monitoring of construction process, optimization of cost control and time management, improvement of environmental and safety measures, etc.
[0078] Step 8.6: Implementation Plan: Develop an optimized implementation plan to guide the design and construction of subsequent projects and improve the overall project management level and efficiency.
[0079] In summary, the present invention realizes the gradual iteration and optimization from two-dimensional design drawings to six-dimensional information models through the iterative derivation method of multimodal design results based on virtual construction. Through standardized and modular design, the establishment of a virtual construction environment, the iteration of detailed design results, the generation of construction drawings and the real-time monitoring of the construction process, the efficient connection and optimization of design and construction are ensured, and the overall management level and efficiency of construction projects are improved.
[0080] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A multi-modal design results iterative derivation method based on virtual construction, characterized in that: The following steps are involved: Step 1: Standardize and modularize the design results; the design results include drawings and BIM models involved in the design planning stage, preliminary design stage, detailed design stage and in-depth design stage; the standardization refers to the scale, line type and line width, symbols and legends, material annotations, annotations and instructions of the two-dimensional and three-dimensional design results following unified regulations; the modularization refers to the two-dimensional and three-dimensional design results, which establish one-to-one corresponding modules through slicing, realize the addition of two-dimensional to six-dimensional information through modules, and establish the iterative evolution relationship between six-dimensional and three-dimensional design results through modules; Step 2: Establish a virtual construction environment, and establish corresponding virtual scenes according to the modularized design results; the virtual construction environment is an integrated space including all virtual module scenes; Step 3: Import the 2D and 3D preliminary design results into the virtual construction environment; the 2D preliminary design results are design drawings; the 3D preliminary design results are the BIM models corresponding to the design drawings; The two-dimensional and three-dimensional design results are imported into corresponding virtual scenes according to modules, and scheme simulation is performed; Step 4: Iteratively derive preliminary design results based on simulation results to form detailed design results; the detailed design results add time dimension information, import the corresponding four-dimensional virtual scenes according to modules, and perform construction progress simulation; Step 5: Iterate the detailed design results according to the simulation results to form in-depth design results; the in-depth design results add cost dimension information, import the corresponding five-dimensional virtual scenes according to the modules, and perform material and construction process simulation; Step 6: Iteratively derive in-depth design results based on simulation results; the in-depth design results add environmental and safety dimension information, import the corresponding six-dimensional virtual scenes according to modules, and simulate the planning of temporary facilities on the construction site; the six-dimensional virtual scenes integrate GIS model data; Step 7: Integrate all modular virtual scenes established in step 6 to simulate the overall design plan, construction progress, materials and construction process, and temporary facilities planning at the construction site; the simulation is a multi-modal design result cycle simulation; the design result is a two-dimensional or three-dimensional design result that is iterated cyclically based on the simulation results.
2. The multi-modal design result iterative derivation method based on virtual construction according to claim 1, characterized in that: The standardization and modularization of design results in step 1 are implemented through the following steps: Step 1.1: Establish a unified coding standard: Ensure that 2D drawings and 3D models use the same coding and naming rules for easy identification and association; Step 1.2: Establish a unified data dictionary: ensure that the data expressions in the two-dimensional drawings, three-dimensional models, construction processes, and construction scheme design results have the same meaning, so as to facilitate the association and iteration of two-dimensional to six-dimensional scene modules; Step 1.3: Use the modular function of BIM software to create reusable modular units based on 2D drawings, and reversely associate and generate corresponding 2D drawings; Step 1.4: Parameterize and informatize the module unit components to realize the linkage update of all views and drawings when modifying a single component; Step 1.5: 2D and 3D module linkage: synchronous management of 2D plane module information and 3D space module information in the virtual construction system, and visualization of 2D and 3D module linkage through 2D and 3D linkage method.
3. The multi-modal design achievement iterative derivation method based on virtual construction according to claim 1, characterized in that: Step 2 is implemented through the following steps: Step 2.1: Use the virtual construction platform to establish a collaborative management project; Step 2.2: In the virtual project, build a virtual module scene, each module scene corresponds to the standardized module divided in step 1; Step 2.3: Integrate 2D and 3D models, schedule, cost, environment and safety dimension information to build an integrated space including all virtual module scenes; Step 2.4: Virtual scene linkage, through the cross-scene association of two-dimensional and three-dimensional modules in the virtual scene, the linkage of two-dimensional and three-dimensional modules in each virtual scene is realized.
4. The multi-modal design achievement iterative derivation method based on virtual construction according to claim 1, characterized in that: Steps 3, 4, 5, and 6 are specifically implemented through the following steps: Step 3.1: Import the 2D and 3D design results of each stage by module; Step 3.2: Each module imports the virtual scene linkage; Step 3.3: Simulation of each module scenario; Step 3.4: Improve the 3D design results based on the simulation results; Step 3.5: Generate, export, improve and divide the two-dimensional design results into modules; Step 3.6: Repeat steps 3.1-3.5 until the next stage of two-dimensional and three-dimensional design results are formed.
5. The multi-modal design achievement iterative derivation method based on virtual construction according to claim 1, characterized in that: Step 7 is implemented by the following steps: Step 7.1: Import the final 2D and 3D design results formed in step 6; Step 7.2: In the integrated virtual construction scene, the overall plan of the design results, construction progress, material and construction process simulation, and temporary facilities planning simulation at the construction site are carried out in sequence; Step 7.3: Make local adjustments based on the simulation results, locate the corresponding scene module, and repeat steps 3.3 and 3.4; Step 7.4: Improve and export the 3D design results; Step 7.5: Repeat steps 7.1-7.4 until the plan, construction progress, material and construction process simulation, and construction site temporary facilities planning simulation results are passed.
Citation Information
Patent Citations
BIMbased metro construction method
CN106202723A
High-speed railway space-time big data analysis service engine system and method
CN113779353A
Long tunnel digital twin system and method based on BIM + GIS technology
CN114201798A
Building construction method based on BIM
CN115329416A
Building construction management device
JP2021021983A